Supreme Court of the Cited States
October Term, 1987

CONSOLIDATED ALUMINUM CORPORATION,
Petitioner,

Ws

C. F. BEAN CORPORATION, BEAN DREDGING
CORPORATION, AMERICAN EMPLOYERS
INSURANCE COMPANY, OCEAN MARINE

INDEMNITY COMPANY, LTD., ST. PAUL FIRE

AND MARINE INSURANCE COMPANY,
HIGHLAND INSURANCE COMPANY and
ARKWRIGHT-BOSTON MANUFACTURERS
MUTUAL INSURANCE COMPANY,

Respondents.

PETITION FOR WRIT OF CERTIORARI TO THE UNITED STATES
COURT OF APPEALS FOR THE FIFTH CIRCUIT

DONALD C. WINSON
(Counsel of Record) -

HowarD D. SCHWARTZ
Rosert L. BYER
JENNIFER WILSON HEWITT

ECKERT SEAMANS CHERIN & MELLOTT
42nd Floor, 600 Grant Street
Pittsburgh, Pennsylvania 15219
(412) 566-6000

Of Counsel

James E. HUGHES
CONSOLIDATED ALUMINUM
CORPORATION

I
QUESTION PRESENTED

In admiralty, is a negligent tortfeasor liable for harm
which its conduct was a substantial factor in causing where
the risk of general harm to a class of which plaintiff was a
member was foreseeable but the tortfeasor could not have
foreseen the extent of the harm or the manner of its
occurrence?

li
STATEMENT UNDER RULE 28.1
Petitioner Consolidated Aluminum Corporation is a
wholly-owned subsidiary of Alusuisse of America, Inc.

Alusuisse of America is wholly-owned by Swiss Alumin-
ium, Ltd. and Lonza, Ltd.

ill

TABLE OF CONTENTS

Page
SE ne 5 Ze l
Ey a l
Lec UR te eneseseeesecees l
Reasons for Granting the Writ .................... 4

I. The Fifth Circuit’s Decision Conflicts With
Decisions In Other Circuits And Is Contrary
To Modern Concepts Of Tort Law, As Set
Forth In The Restatement (Second) Of Torts . 4

A. The Fifth Circuit’s Decision Conflicts
With Admiralty Decisions In The Sec-
Om Ame Tee COCeiee.. oa ccc ccsces. 5

B. Analytical Confusion Regarding Duty,
Foreseeability And Legal Or Proximate
Re iar rr a eee eo i al wh i 9

C. Modern Concept Of Legal Cause, As Set
Forth In The Restatement (Second) Of
ee Na. Saeed wen 6-8-8 12

II. This Court Has Never Addressed The Proper
Standard For Legal Cause In A Maritime
et Sah ee wad ek aad me wos 15

en cha ee ee eae eke 17

ee eens os we pda eee mew ned A-]

iV
TABLE OF AUTHORITIES

CASES
Page
Avery v. United States, 829 F.2d 817 (9th Cir. 1987). ..11
Barber Lines A/S v. M/V Donau Maru,

op wb fi” ee ees oe 15
Consolidated Aluminum Corp. v. C. F. Bean Corp.,

reese pepe. — os A... Reena 15
Cruickshank & Co., Ltd. v. Sorros, 765 F.2d 20

EE os eer edn wnd da ween sows bees 11
East River Steamship Corp. v. Transamerica _

Delaval Inc., 476 U.S. 858 (1986) .............. 15
Fitzgerald v. United States Lines Co.,

Sr es so 5 as oa hea ee hs 15
Kermarec v. Compagnie Generale Transatlantique,

pe te er rere 1, 10
Lindsay v. McDonnell Douglas Aircraft Corp.,

GD Fe re Gs Fe aa cn ccc kaeaeeasccn 11
The Lottawanna, 88 U.S. (21 Wall.) 558 (1874) ....... 5

Louisiana ex rel. Guste v. M/V Testbank,
752 F.2d 1019 (Sth Cir. 1985), cert. denied, —

U.S. a ss ok bc Gees ce we 15
Moragne vy. States Marine Lines, Inc.,

Be BEE as cap us case en deaa wes 5, 10, 15
Palsgraf v. Long Island Railroad Co.,

B08 TA... Fas BE PE. Fe Fe ov once we ccccns 9

Pan-Alaska Fisheries, Inc. v. Marine Construction
& Design Co., 565 F.2d 1129 (9th Cir. 1977)..... 11

Pastore v. Taiyo Gyogyo, K.K., 571 F.2d 777
Cee EE x vo dS bse ons mee ae » ee

Patentas v. United States, 687 F.2d 707
COE Da ka & vn ae ys eankk acces 11

Petition of Kinsman Transit Co., 338 F.2d
708 (2d Cir. 1964), cert. denied, 380
OLE FR Ch 96.3 on dc eee eee 5, 8, 9, 10

Protectus Alpha Navigation Co., Ltd. v. North
Pacific Grain Growers, Inc., 767 F.2d 1379

Coe Oe, Sa a vs bk vsvscse tees 11
Robins Dry Dock & Repair Co. v. Flint,

STS UI Bee CET v0 640s seta tinea 15
Spinks v. Chevron Oil Co., 507 F.2d 216

(FO Ee. CPi isn vos ectesxdae eee 11, 12
Workman v. New York City, 179 U.S. 552 (1900)...... 5

AUTHORITIES

RESTATEMENT (SECOND) OF TorTS § 9 (1965) .......... 12
RESTATEMENT (SECOND) OF TorTS § 281 (1965)......... 15
RESTATEMENT (SECOND) OF TorTs § 431 (1965) ..10, 12, 13
RESTATEMENT (SECOND) OF TorTs § 433 (1965)......... 12

RESTATEMENT (SECOND) OF Torts § 435 (1965) ..10, 13, 14
RESTATEMENT (SECOND) OF Torts § 435,

mapertirs TaN Tene én nah hake kdsesceree 10
TREATISES
J. Dooley, 1 MODERN Tort Law (1982) .............. 8
F. Harper, F. James, Jr. & O. Gray,
3 THE Law oF Torts (2d ed. 1986) ...... prin 8, 10
C. Morris & C. Morris, Jr., MORRIS ON TORTS
(2 OB, Se soko s Koa aS 10

W. Prosser & W. Keeton, Torts § 43 (Sth ed. 1984) ..10

vi

Page

Law Review ARTICLES
Currie, Federalism and the Admiralty: The Devil's Own

Mess, 1960 Sup. Cr. Rev. 158 (1960)... .......... 5
Green, Proximate Cause in Texas Negligence
FY ) SF &. FPP Tree 10

Harper, The Foreseeability Factor in the Law
of Torts, 7 Notre Dame Law. 468 (1932) ......... s

OPINIONS BELOW

The opinion of the Court of Appeals for the Fifth
Circuit is reported at 833 F.2d 65 and is reprinted in the
appendix (“App.”) at App. A. The opinion of the United
States District Court for the Western District of Louisiana
is reported at 639 F. Supp. 1173 and is reprinted at App. B.
A prior opinion of the court of appeals reversing summary
judgment against Petitioner is reported at 772 F.2d 1217
and is reprinted at App. C. The opinion of the district
court granting summary judgment is unreported and 1s
reprinted at App. D.

JURISDICTION

The court of appeals entered judgment on December
3, 1987 (App. E) and denied a timely petition for rehearing
on January 5, 1988. (App. F) Petitioner invokes this
Court's jurisdiction under 28 U.S.C. § 1254(1).

STATEMENT OF THE CASE

In this admiralty action,' petitioner Consolidated Alu-
minum Corporation (“Consolidated”) sought damages
from respondents C.F. Bean Corporation and Bean Dredg-
ing Corporation (collectively “Bean™) caused by Bean's
negligent rupturing of a high-pressure natural gas pipeline
while performing maintenance dredging of a navigable _
river.’

‘Petitioner invoked the district court's jurisdiction under 28 U.S.C.
§ 1333 and 46 U.S.C. § 740. Petitioner also invoked the district court's
diversity jurisdiction under 28 U.S.C. § 1332, but principles of admi-
ralty law control even where jurisdiction of a maritime tort case 1s based
upon diversity. Kermarec v. Compagnie Generale Transatlantique, 358
U.S. 625 (1959).

"The remaining respondents are Bean's imsurance carners, who
were joined as parties pursuant to Loursiana’s direct action statute.

2

Consolidated owned an aluminum reduction plant
near Lake Charles, Louisiana. The plant’s sole source of
energy was natural gas, which it obtained from a pipeline
running under the Calcasieu River. (772 F.2d at 1219,
App. C 3-5)

On April 5, 1980, Bean was dredging the river pursu-
ant to a contract with the Army Corps of Engineers. The
contract had alerted Bean to the presence and location of
14 gas pipelines within the scope of its dredging contract,
including the pipeline which Bean negligently ruptured.
This pipeline also was marked with two warning signs in
the river. (639 F. Supp. at 1176-78, App. B 4-5, 9; PX-2 at
1-7) Bean struck and ruptured the pipeline while dredging.
Within minutes, the rupture deprived Consolidated’s
plant, located six miles from the rupture site, of the gas
volume and pressure required to prevent a “freeze-up” of
molten aluminum, causing extensive physical damage to
Consolidated’s plant. (772 F.2d at 1219, App. C 5; 639
F. Supp at 1178-79, App. B 10-11; Tal Transcript (“Tr.”)
735-48, 1098-99)

Bean conceded that its conduct was negligent. (Tr.
524) At the time of its negligence, Bean did not have spe-
cific knowledge of the existence of Consolidated’s plant or
that Consolidated’s plant was connected to the pipeline.
(639 F. Supp. at 1182, App. B 20) However, at the time of
its negligence, Bean knew that many industrial plants were
located in the Lake Charles vicinity and that the pipeline
might service one or more of these plants, many of which
were clearly visible from the rupture site. (PX-47 at 5-6,
111-12; Tr. 605-07; PX-20, PX-22, PX-23)

‘In fact, at least 16 major industrial facilities, including Consoli-
dated’s aluminum manufacturing plant, were located within a seven-
(Continued on next page)

3

After a bench trial in the Western District of Louisi-
ana, the district court held that because Bean did not know
of Consolidated’s connection to the pipeline, Consoli-
dated’s damage was an unforseeable consequence of Bean’s
negligence. Therefore, the district court entered judgment
in favor of Bean on Consolidated’s claim. (639 F. Supp. at
1183, App. B 21)

The Fifth Circuit affirmed. The court reasoned that
Bean should not be held liable to Consolidated, because a
reasonably thoughtful person would not have foreseen that
Consolidated would have suffered the precise harm in
question as a result of Bean’s negligent conduct, even

(Continued)

mile radius of the Calcasieu River at the point of the rupture. (Tr. 599-
604, PX-48) By 1980, the Lake Charles area had a reputation for 20 or
more years as an industrial area and it was know” as one of the fore-
most petrochemical and refining centers in the Gulf Coast area. (Tr.
263, 604-05) It was also widely known in 1980 that natural gas was
being used as a primary source of fuel not only in all the plants in and
around the Lake Charles area but throughout the whole Gulf Coast area.
(Tr. 607-09) The natural gas was supplied to the plants in the Lake
Charles area by a network of pipelines that ran throughout the area,
including the 14 gas pipelines identified in Bean's contract as crossing
under the Calcasieu River. (Tr. 609-10)

‘The district court initially entered summary judgment in favor of
Bean and against Consolidated, holding that under Robins Dry Dock &
Repair Co. v. Flint, 275 U.S. 303 (1927), Consolidated could not recover
for what the district court characterized as Bean's negligent inierference
with Consolidated’s gas supply contract. (App. D 6) The Fifth Circuit
reversed, holding that the district court had mischaracterized Consoli-
dated’s cause of action and that because Consolidated had sustained
physical harm to its plant as the result of Bean's negligence, the “bright
line” rule of Robins Dry Dock did not preclude recovery. (772 F.2d at
1218: App. C 2) The Court of Appeals remanded the case to the district
court with a direction that the trial court decide Consolidated’s claim
under traditional tort principles, including foreseeability and duty, as
applied in admiralty. (/d. at 1224; App. C 16)

|

4

though it was foreseeable that Bean’s negligence would
result in harm to the pipeline. (833 F.2d at 68, App. A 7)

REASONS FOR GRANTING THE WRIT

I. The Fifth Circuit’s Decision Conflicts With Decisions
In Other Circuits And Is Contrary To Modern Con-
cepts Of Tort Law, As Set Forth In The Restatement
(Second) Of Torts.

The decision of the Fifth Circuit creates a conflict
among the circuits and injects substantial analytical confu-
sion into the law of admiralty regarding the scope of a
tortfeasor’s duty and the closely related question of liabil-
ity for unforeseeable consequences.

As acknowledged by the Fifth Circuit, the existence of
a duty depends upon whether “harm of a general sort to
persons of a general class might have been anticipated by a
reasonably thoughtful person... .” (833 F.2d at 68; App.
A7) However, according to the Fifth Circuit, the inability
of this “reasonably thoughtful person” to have anticipated
the precise sequence of events flowing from the negligent
act places that sequence of events and the resulting harm
“beyond the pale of general harm” and therefore makes
them unforeseeable and outside the scope of the actor’s
duty. (/d.)

In so holding, the Fifth Circuit confuses the concept of
“foreseeability,” as it relates to a reasonably thoughtful
person’s anticipation of the risk of some general harm
required in order to impose a duty, with the related but
different question of whether the particular method, man-
ner and extent of harm is so highly extraordinary that a
negligent actor should be relieved of liability even though
the actor’s conduct was a substantial factor in causing the

5

harm. The Fifth Circuit’s handling of these historically and
intellectually nettlkesome questions creates a conflict
among the circuits, is contrary to admiralty’s policy of
uniformity and its remedial nature, Moragne vy. States
Marine Lines, Inc., 398 U.S. 375, 387 (1970), and conflicts
with the modern concept of legal cause, as set forth in the
Restatement (Second) of Torts.

A. The Fifth Circuit’s Decision Conflicts With Admiralty
Decisions In The Second And Third Circuits.

This Court has long recognized the important policy
of uniformity in the law of admiralty. Moragne, 398 U.S.
at 402 (1970); Workman v. New York City, 179 U.S. 552,
558 (1900); The Lottawanna, 88 U.S. (21 Wall.) 558, 575
(1874). See generally Currie, Federalism and the Admi-
ralty: The Devil’s Own Mess, 1960 Sup. Ct. Rev. 158
(1960). The Fifth Circuit’s decision in this case evidences a
retreat from that policy in a critical area of maritime law
already beset by confusion.

The cornerstone of the Fifth Circuit’s opinion is the
inability of a reasonably thoughtful person to have fore-
seen the precise sequence of events and harm to Consoli-
dated caused by Bean’s negligence. (833 F.2d at 68, App.
A 7) Therefore, under the holding of the Fifth Circuit, the
foreseeability of the precise manner and extent of harm
sustained by a plaintiff determines the tortfeasor’s duty
and its parameters.

Such a holding is in direct conflict with the Second
Circuit’s landmark admiralty decision in Petition of Kins-
man Transit Co., 338 F.2d 708 (2d Cir. 1964), cert. denied,
380 U.S. 944 (1965), and the admiralty decision of the
Third Circuit in Pastore v. Taiyo Gyogyo, K.K., 571 F.2d
777 (3d Cir. 1978). The Second Circuit held in Kinsman

6

that liability exists for unforeseeable consequences directly
resulting from a tortfeasor’s negligence so long as the harm
resulting therefrom, “although other and greater than
expectable, is of the same general sort that was risked.” 338
F.2d at 724. Likewise, the Third Circuit in Pastore,
approaching the issue from the perspective of proximate
cause, also concluded that liability exists even when the
precise manner of the occurrence of the harm was not
foreseeable as long as it can be said that the conditions
encountered were not “so unusual” as to require a finding
of “no proximate cause as a matter of law.” 571 F.2d at
782.

In Kinsman, a negligently moored ship had parted
from its moorings and set in motion a remarkably complex
chain of events eventually resulting in a damming of the
Buffalo River and the collapse of both towers of a draw-
bridge.* The Second Circuit imposed liability for, among
other things, the resulting flood damage, even after
acknowledging that the precise consequences of the vari-
ous parties’ negligence could not have been fairly foreseen.
338 F.2d at 726.

‘About three miles upstream from the drawbridge, the Shiras,
owned by Kinsman, was negligently moored at a dock when her stern
lines parted and she drifted into the current. Traveling down the S-
shaped river, she struck the bow of the Tewksbury causing the latter's
mooring lines to part and the Tewksbury followed the Shiras stern first
down the river. A call was placed to the drawbridge crew and, although
just a little more than two minutes was needed to elevate the bridge, it
was just being raised some 30 minutes later when the Tewksbury
crashed into its center, causing the south tower of the bridge to fall. The
Shiras then became wedged against the Tewksbury, substantially dam-
ming the flow and causing water and ice to back up and flood installa-
uons on the bank with consequent damage as far as nearly three miles
upstream. Subsequently, the north tower of the bridge collapsed, dam-
aging adjacent property. Kinsman, 338 F.2d at 712-13.

j

[W]e would find it difficult to understand why one
who had failed to use the care required to protect
others in light of the expectable forces should be exon-
erated when the very risks that rendered his conduct
negligent produced other and more serious conse-
quences to such persons than were fairly foreseeable
when he fell short of what the law demanded.

Foreseeability of danger is necessary to render conduct
negligent; where as here the damage was caused by
just those forces whose existence required the exercise
of greater care than was taken... the incurring of con-
sequences other and greater than foreseen does not
make the conduct less culpable or provide a reasoned
basis for insulation.

Id. at 723-724. (citations omitted) (footnote omitted).

Athough employing a different analytical framework,
the conclusion of the Third Circuit in Pastore—that
unforeseeability of the precise manner of the harm’s occur-
rence will not prevent liability from attaching—is consis-
tent with the holding in Kinsman, but contrary to the Fifth
Circuit’s position in this case. In Pastore, a longshoreman,
who had been unloading cargo from a ship, discarded a
cigarette butt in the ship’s hold, resulting in a fire. A city
fireman fell off a ladder that had been lowered into the
hold and injured himself. The stevedore, who had
employed the longshoreman, successfully argued in the
district court that the fire was not the proximate cause of
the injury since the vessel’s crew had negligently failed to
warn the fireman that the ladder was resting not on what
appeared to be the deck, but rather on an unstable pile of
frozen meat. In the district court’s view those were “unu-
sual and unforeseen circumstances” relieving the stevedore
from liability. 571 F.2d at 782.

8

In reversing, the Third Circuit agreed that “[t]he pre-
cise way in which the plaintiff fell was, perhaps, not clearly
foreseeable.” Jd. Nonetheless, the court concluded the cir-
cumstances were not “so unusual” as to find “no proxi-
mate causation as a matter of law.” Jd.

The resulting harm was a more remote consequence of
the negligent conduct in Kinsman and Pastore than it was
in this case. Certainly, a reasonable dredger could foresee
the risk of some general harm to those serviced by the high
pressure natural gas pipelines in the area from a disruption
of the supply of natural gas resulting from the rupture of
one of those pipelines even though a reasonably thoughtful
person might not foresee the precise customer which
would suffer the harm or the precise nature of that harm or
the manner by which it would occur. Nevertheless, the
Fifth Circuit refused to impose liability for precisely the
same rationale which the Second Circuit had rejected in
Kinsman as “difficult to understand.” Kinsman, 338 F.2d
at 723.

Therefore, the decision of the Fifth Circuit is in con-
flict with both the Second Circuit and the Third Circuit on
the issue of what must be foreseeable—a risk of some
general harm versus the specific consequences—in order to
impose liability in admiralty.®

‘The Fifth Circuit’s decision in this case also is contrary to tradi-
tional concepts of tort law, pursuant to which a risk of some general
harm is all that must be foreseeable and not the specific consequences
resulting from the negligent conduct. See J. Dooley, | MODERN Tort
Law, § 3.10 at 30 (1982); F. Harper, F. James, Jr. & O. Gray, 3 THE Law
OF Torts, § 18.2 at 669-670 (2d ed. 1986); Harper, The Foreseeability
Factor in the Law of Torts, 7 Notre Dame Law. 468, 470 (1932).

9

B. Analytical Confusion Regarding Duty, Foreseeability
And Legal Or Proximate Cause.

As the Second Circuit in Kinsman correctly
acknowledged:

[t]he weight of authority in this country rejects the
limitation of damages to consequences foreseeable at
the time of the negligent conduct when the conse-
quences are “direct,” and the damage, although other
and greater than expectable, is of the same general sort
that was risked.

338 F.2d at 724.

Nevertheless, Judge Friendly’s opinion for the court in
Kinsman observed:

[t]his does not mean that the careless actor will always
be held for all damages for which the forces that he
risked were a cause in fact. Somewhere a point will be
reached -when courts will agree that the link has
become too tenuous—that what is claimed to be con-
sequence is only fortuity.

Id. at 725.

In grappling with this policy issue the Second Circuit
conceded that, although ‘agreement in result” might be
achieved in a particular factual situation, such agreement
“might not be paralleled by similar unanimity in reason-
ing.” Id.

This “agreement in result” but lack of “unanimity in
reasoning,” emanating from the seminal case of Palsgraf v.
Long Island Railroad Co., 248 N.Y- 339, 162 N.E. 99
(1928), and its multi-faceted progeny, is discussed in depth

10

in Kinsman, 338 F.2d at 721-26,’ and is reflected in the
Kinsman and Pastore decisions. The existence of such con-
fusion is contrary to the strong admiralty traditions of
simplicity and practicality, Kermarec, 358 U.S. at 631, and
results in a breakdown of admiralty’s tradition of uniform-
ity. Moragne, 398 U.S. at 402 (citing The Lottawanna,
supra).

Recognizing the analytical confusion in the areas of
duty, foreseeability and causation, the American Law
Institute attempted to clarify the law and adopt modern
concepts to be used in analyzing these problems in its
influential Restatement (Second) of Torts. See, e@.g.,
RESTATEMENT (SECOND) OF TorTs § 435, Reporter’s Notes at
150-51 (1966). Under the Restatement (Second) of Torts
analysis, once the requirement of a risk of general harm to
the plaintiff or a class of which plaintiff is a member is
established (in other words, the establishment of a duty)
and the actor’s conduct is both negligent and a substantial
factor in bringing about that harm, the unforeseeability of
the extent of the harm or the manner in which it occurred
will not prevent liability from attaching. RESTATEMENT (SEC-
OND) OF Torts, § 435(1) (1965).

As is readily apparent, Section 435(1) of the Restate-
ment parallels the language of Kinsman. Compare RESTATE-
MENT (SECOND) OF Torts § 435(1) with Kinsman, 338 F.2d
at 724, 726. Kinsman recognized that “a point will be
reached when courts will agree that the link has become
too tenuous.” /d. at 725. The Restatement in Section
435(2) attempts to bring clarity to this issue by making the

7See generally F. Harper, F. James, Jr. & O. Gray, 3 THe Law oF
Torts, § 18.1 at 650, § 18.2 (2d ed. 1986); C. Morris & C. Morris, Jr.,
Morris ON TorTS at 161-67 (2d ed. 1980); W. Prosser & W. Keeton,
Torts § 43 at 284-90 (Sth ed. 1984); L. Green, Proximate Cause in
Texas Negligence Law, 28 Tex. L. Rev. 755 (1950).

11

question of responsibility for such unforeseeable conse-
quences an issue for the court under a determination of
legal cause. Under the Restatement, as discussed in the
next section, the court employs a hindsight test of foresee-
ability pursuant to which the events have to be “highly
extraordinary” in order for the actor’s conduct not to be
deemed the legal cause of the harm. RESTATEMENT (SECOND)
oF Torts, § 435(2) (1965).8

The legal cause analysis of the Restatement was
adopted into the law of admiralty in the Fifth Circuit in
Spinks v. Chevron Oil Co., 507 F.2d 216 (Sth Cir. 1975).°
In Spinks, the Fifth Circuit, speaking through Judge Wis-
dom, pertinently observed, “[t]he concept of proximate
cause often obscures the true analysis of a tort. A court
makes a policy judgment on the limits of liability when
causation in fact has been established.” 507 F.2d at 222. As
noted by Spinks, “[i]t would be anamalous to allow an
overly strict interpretation of proximate cause to defeat the
remedial purposes of admiralty tort law.” Jd. at 223. Typi-
fying the analytical confusion which exists in this area, the
Fifth Circuit in this case failed to employ the Restate-
ment’s legal cause analysis. Indeed, the court did not dis-
cuss or even cite Spinks or the Restatement.

‘In Pastore, the Third Circuit confirmed its holding of liability by
reference to the hindsight standard of legal cause reflected in the
Restatement (Second) of Torts, § 435(2). Pastore, 571 F.2d at 783.

*The federal courts frequently refer to the Restatement (Second) of
Torts in admiralty cases. See, e.g., Avery v. United States, 829 F.2d 817,
819 (9th Cir. 1987); Cruickshank & Co., Ltd. v. Sorros, 765 F.2d 20, 25
(2d Cir. 1985); Protectus Alpha Navigation Co., Ltd. v. North Pacific
Grain Growers, Inc., 767 F.2d 1379 (9th Cir. 1985); Patentas v. United
States, 687 F.2d 707, 713-17 (3d Cir. 1982); Pan-Alaska Fisheries, Inc. v.
Marine Construction & Design Co., 565 F.2d 1129, 1135 (9th Cir. 1977);
Spinks v. Chevron Oil Co., 507 F.2d 216 (Sth Cir. 1975); Lindsay vy.
McDonnell Douglas Aircraft Corp., 460 F.2d 631, 636-637 (8th Cir.
1972).

12

The lack of “unanimity of reasoning” reflected both
among and within the circuits as respects the maritime tort
concepts of duty, foreseeability and causation should not
exist in an area of such traditions and important concern
as admiralty. This Court, as discussed later in this Petition,
has not directly addressed these issues. Accordingly, this
case provides the appropriate vehicle for this Court to
clarify the proper analysis of the issues of duty, foreseeabil-
ity and legal cause in admiralty.

C. Modern Concept Of Legal Cause, As Set Forth In The
Restatement (Second) Of Torts.

As noted in Spinks, “[b]ecause of strong policy consid-
erations in admiralty, legal cause analysis [under the
Restatement (Second) of Torts] is particularly suited to
maritime tort law.” 507 F.2d at 223.

Under the analysis promulgated in the Restatement
(Second) of Torts, the concept of legal cause is used to
determine the circumstances under which a defendant who
has engaged in negligent conduct towards the plaintiff or a
class of which plaintiff is a member will be held liable for
the harm resulting from such conduct. See RESTATEMENT
(SECOND) OF Torts § 9 (1965). In order for such negligent
conduct to be a legal cause of the harm, the conduct must
be a substantial factor in causing the harm, /d. § 431(a),
and there must be “no rule of law relieving the actor from
liability because of the manner in which his negligence has
resulted in the harm.” Jd. § 431(b).

On this record, there can be no dispute that Bean’s
concededly negligent conduct was, under the standards of
the Restatement, id. § 433, a substantial factor in causing
the harm to Consolidated. (772 F.2d at 1222, App. C 12)

13

Rather, the issue in this case, which the Fifth Circuit con-
fused with other concepts,!° is whether Bean’s inability, at
the time of its negligence, to foresee the specific manner
and extent of the harm to Consolidated, a member of the
class served by the high pressure natural gas pipeline, gives
rise to a rule of law relieving it “from liability because of
the manner in which [its] negligence has resulted in the
harm.” Jd. § 431(b).

The Restatement (Second) of Torts provides the
answer to that question in § 435:

Foreseeability of Harm or Manner of Its Occurrence

(1) If the actor’s conduct is a substantial factor in
bringing about harm to another, the fact that the actor
neither foresaw nor should have foreseen the extent of
the harm or the manner in which it occurred does not
prevent him from being liable.

(2) The actor’s conduct may be held not to be a legal
cause of harm to another where after the event and
looking back from the harm to the actor’s negligent
conduct, it appears to the court highly extraordinary
that it should have brought about the harm.

The Fifth Circuit’s opinion in this case is irreconcil-
able with the modern concept of legal cause under the

‘The Fifth Circuit’s opinion in this case also speaks of “the antici-
pation of harm of a general sort to persons of a general class,” and in so
doing appears on the verge of properly articulating the standard for
initially determining the existence of a duty on the part of the defen-
dant. (833 F.2d at 67-68: App. A 4-7) (citing F. Harper, The Foreseeabil-
ity Factor in the Law of Torts, 7 Notre Dame Law. 468, 482 (1932)
(emphasis in original)). See also note 6, above. However, the rest of the
Fifth Circuit opinion evidences general confusion over foreseeability as
it relates to the concepts of duty and legal cause. The way in which the
Fifth Circuit resolves these issues clearly is at odds with the Second
Circuit, the Third Circuit and the Restatement.

14

Restatement. First, the Fifth Circuit treated the issue of
whether a reasonably thoughtful person could have fore-
seen the extent of the harm or manner in which it occurred
as being relevant to the concept of duty, rather than to the
analysis of legal cause. Second, and more important, in
fashioning its requirement, unprecedented in admiralty, of
such specific foreseeability, the Fifth Circuit reached a
result in conflict with Kinsman and Pastore and inconsis-
tent with Restatement (Second) of Torts § 435(1), pursuant
to which the unforeseeability of specific consequences does
not preclude negligent conduct from being the legal cause
of the harm.

Finally, by determining whether the particular conse-
quences were foreseeable by a reasonably thoughtful per-
son at the time of Bean's negligence, the Fifth Circuit
adopted a prospective approach to the determination of
foreseeability rather than the approach of Section 435(2) of
the Restatement, under which a tortfeasor’s conduct is a
legal cause of the harm notwithstanding “the manner in
which [the] negligence has resulted in the harm,” id.
§ 431(b), except where, by Aindsight, “it appears to the
court highly extraordinary that it should have brought
about the harm.” /d. § 435(2). In adopting the hindsight
approach to legal cause under § 435(2), the Restatement
makes it clear that it is the court, as a matter of policy,
which determines whether there is anything so highly unu-
sual in the extent of the harm or the manner of its occur-
rence so as to release the tortfeasor from liability.

Because of the remedial policies of maritime tort law
and this Court’s important role in fostering these policies,
this Court should grant certiorari to resolve the conflict in
the circuits and to establish both an “agreement in result”

15

and “unanimity in reasoning” as respects the concepts of
duty, foreseeability and causation in admiralty.

Il. This Court Has Never Addressed The Proper Stan-
dard For Legal Cause In A Maritime Tort Action.

This Court has recognized the “substantial law-creat-
ing function” of the federal judiciary as a whole, and this
Court in particular, in the formulation of admiralty law.
Fitzgerald v. United States Lines Co., 374 U.S. 16, 20
(1963). This Court has also noted admiralty’s remedial and
uniform nature. Moragne v. States Marine Lines, 398 U.S.
375, 387 (1970). The Fifth Circuii opinion furthers neither
of these well-settled objectives of the law of admiralty.
Instead, with its overly-restrictive approach toward liabil-
ity, the Fifth Circuit opinion undermines and evidences a
retreat from the traditionally broad remedial purpose of
admiralty law, in a manner which creates conflict among
the circuits.'!

"The concern expressed by this Court in East River Steamship
Corp. v. Transamerica Delaval Inc., 476 U.S. 858 (1986), a product
liability case, that the concept of foreseeability might be “an inadequate
brake” on liability, 476 U.S. at 874, does not exist with respect to the
elements of a cause of action for negligence under the Restatement. See
Restatement (Seconp) of Torts § 281 (1965). Unlike a strict habuility
claim where a duty is owed to the public generally, a maritime tort
analyzed under the Restatement requires the establishment of a legally
protected interest. Restatement (Secon) oF Torts § 281(a) (1965). The
requirement of a legally protected interest serves as a pragmatic limita-
tion on a tortfeasor’s liability by excluding liability for unintentional
invasions which result solely in economic loss. See Robins Dry Dock &
Repair Co. v. Flint, 275 U.S. 303 (1927). Consolidated Aluminum Corp.
v. CF. Bean Corp., 772 F.2d 1217, 1222-24 (Sth Cir. 1985), Barber
Lines A/S v. M/V Donau Maru, 764 F.2d 50, 51-54 (ist Cir. 1985);
Louisiana ex rel Guste v. M/V Testhank, 752 F.2d 1019, 1021-25 (Sth
Cir. 1985), cert. denied, _.. U.S. —__., 106 S. Ct. 3271 (1986). “While
the number of plaintiffs suffering only economic harm from a aegligent

(Continued on next page)

16

This Court has never before expressly decided the
standards for legal cause in an admiralty tort action. Given
the importance of uniformity in the law of admiralty and
the important role of this Court in determining the princi-
ples to be applied in such cases, we respectfully suggest that
this case would be appropriate for review by this Court in
order to decide the proper role of foreseeability in the
determination of the concepts of duty and legal cause in
negligence actions cognizable in admiralty.

(Continued)

act 1s indeterminate and perhaps infinite, the number of potential plain-
tiffs suffering physical harm is generally neither as indeterminate nor as
possibly infinite.” Consolidated, 772 F.2d at 1223.

17
CONCLUSION

For the above reasons, Consolidated respectfully
requests this Court to grant this petition and issue a writ of
certiorari to the United States Court of Appeals for the

Fifth Circuit.

April 4, 1988

Respectfully submitted,

Donacp C. WINSON
(Counsel of Record)
Howarpd D. SCHWARTZ
Ropert L. Byer
JENNIFER WILSON Hewiit

ECKERT SEAMANS CHERIN & MELLOTI
42nd Floor, 600 Grant Street
Pittsburgh, Pennsylvania 15219
(412) 566-6000

Of Counsel

James E. HUGHES
CONSOLIDATED ALUMINUM
CORPORATION

A-l

APPENDIX A

CONSOLIDATED ALUMINUM CORP.,
Plaintiff-Appellant,
v.
C.F. BEAN CORP., et al.,
Defendants-Appellees.
No. 86-4657.

United States Court of Appeals,

FIFTH CIRCUIT.
Dec. 3, 1987.

Appeal from the United States District Court for the
Western District of Louisiana.

Before THORNBERRY, REAVLEY and POLITZ,
Circuit Judges.

POLITZ, Circuit Judge:

This case returns after remand, 772 F.2d 1217 (Sth
Cir. 1985), with Consolidated Aluminum Corporation
appealing a benchtrial judgment rejecting its claims against
C.F. Bean Corporation and Bean Dredging Corporation
(collectively Bean), 639 F. Supp. 1173 (W.D.La. 1986).
Consolidated seeks recovery for physical damage to its
aluminum manufacturing facilities and for attendant eco-
nomic loss caused by the interruption of its supply of natu-
ral gas. Its gas supply was suddenly terminated when a
Bean dredge negligently ruptured a Texaco pipeline, caus-
ing Texaco to close the nearest valves to stem the flow of
escaping gas. In the first appeal Consolidated sought and
secured reversal of a summary judgment in favor of Bean.

A-2

The district court initialiy concluded that the rule of Rob-
ins Dry Dock & Repair Co. v. Flint, 275 U.S. 303, 48 S.Ct.
134, 72 L.Ed. 290 (1927), as expanded by this court in
Louisiana ex rel. Guste v. M/V TESTBANK, 752 F.2d
1019 (Sth Cir. 1985) (en banc), cert. denied, sub nom.
White v. M/V TESTBANK, US. , 106 S.Ct. 3271,
91 L.Ed.2d 562 (1986), mandated a summary dismissal.
We concluded that the “bright line” rule of Robins Dry
Dock and TESTBANK “does not reach the instant case
and that a plaintiff's claim of negligence for physical dam-
ages to equipment in which the plaintiff has a proprietary
interest should be analyzed under tort principles applied
by this Court in admiralty.” 772 F.2d at 1218.

Background

The facts are set forth in detail in our prior decision
and in the opinion on remand. We note only the most
salient. On April 5, 1980, around 7:00 A.M., Bean was
dredging the Calcasieu River Ship Channel near Lake
Charles, Louisiana, pursuant to a contract with the United
States Corps of Engineers. The contract warned Bean of
the location of Texaco’s twelve-inch, high-pressure, natural
gas pipeline, which traversed the channel to service a
nearby PPG Industries, Inc. plant. Bean had submitted a
plan for dredging in the vicinity of structures and utilities
crossing or adjacent to the channel. The plan comported
with industry safety practices but the dredging crew failed
to follow its procedures. As a result of the crew's negligent
lapse, the dredge’s cutterhead struck and ruptured the Tex-
aco pipeline, allowing the escape of a large amount of gas.

The rupture caused an immediate drop in the pressure
in the pipeline. To stem the flow, Texaco closed the nearest
upline block valves. Unfortunately for Consolidated,

A-3

whose aluminum reduction plant was located approxi-
mately six miles from the rupture site, the closing of the
valves cut off its supply of natural gas. The sudden termi-
nation of natural gas flow, Consolidated’s only energy
source for its electrical generators, caused substantial phys-
ical damage to Consolidated’s plant and work-in-progress,
plus an estimated equal amount of economic loss.

Consolidated’s aluminum reduction plant is the small-
est in the United States. It has the unique distinction of
having only one energy source for the generation ~~ t*e
electricity used in its operation. The record reflects t >t
aluminum reduction plants follow the universal practi» of
having a readily-available, alternate energy source. his
practice avoids the risk of the very damages that Co oli-
dated sustained as a result of the unprogrammec 1
down. When the plant near Lake Charles, Louisian as
built, a calculated judgment was made—no a!-crnate
energy source, such as fuel oil, was provided, despite the
fact that the generators installed could operate on either
natural gas or fuel oil.

Consolidated filed suit against Bean and Texaco, and
their insurers, and the Corps of Engineers, alleging tort and
contract claims, and invoking admiralty and diversity
jurisdiction. Consolidated’s claims against Bean were first
dismissed, as noted, on the motion for summary judg-
ment. We remanded for reconsideration by the trial court
and application of traditional tort principles, including
“foreseeability and the related concept of legal duty.” 772
F.2d at 1224.

After trial, the district court awarded Texaco judg-
ment against Bean for damage to its pipeline and for the
value of the gas lost. Consolidated’s demands against Bean

A-4

were rejected on findings and conclusions that its damages
were unforeseeable and, consequently, were not within the
protected ambit of the duty imposed on Bean to dredge in
a non-negligent manner. Consolidated appeals. We affirm.

Analysis

The analysis of a maritime tort is guided by general
principles of negligence law. Casaceli v. Martech Int’l.,
Inc., 774 F.2d 1322 (Sth Cir. 1985); Daigle v. Point Land-
ing, Inc., 616 F.2d 825 (Sth Cir. 1980). Under those princi-
ples a tortfeasor is accountable only to those to whom a
duty 1s owed. Watz v. Zapata Offshore Co., 431 F.2d 100
(Sth Cir. 1970); 57 Am.Jur.2d Negligence § 33 (1971).

Determination of the tortfeasor’s duty, and its param-
eters, is a function of the court. Green, Proximate Cause in
Texas Negligence Law, 28 Tex.L.Rev. 775 (1950). That
determination involves a number of factors, including
most notably the foreseeability of the harm suffered by the
complaining party. Prosser and Keeton on Torts, Duty § 53
(Sth ed. 1984); Green, The Duty Problem in Negligence
Cases, 28 Col.L.Rev. 1014 (1928); 29 Col.L.Rev. 255
(1929). The foreseeability factor persuaded the trial court.
We also find that factor decisive. The critical inquiry is the
foreseeability of the injury to Consolidated resulting from
Bean’s negligent dredging operation. The answer to that
question largely defines the duty, if any, owned by Bean to
Consolidated.

“Duty... 1s measured by the scope of the risk that
negligent conduct foreseeably entails.” Harper & James,
The Law of Torts, Scope of Duty in Negligence Cases § 18.2
at 655 (2d ed. 1986). The duty “may be owed only with
respect to the interest that is foreseeably jeopardized by the
negligent conduct, and not to other interests even of the

A-5

same plaintiff which may in fact happen to be injured.” Id.
at 660 (interpreting dicta in Palsgraf v. Long Island Rail-
road Co., 248 N.Y. 339, 347, 162 N.E. 99, 101 (1928)).
For, as the eminent commentator and scholar Wex S.
Malone observed in his Ruminations on Cause-in-Fact,
collected in his Essays on Torts, p. 172 (1985), first pub-
lished 9 Stan.L.Rev. 60 (1956):

All rules of conduct, irrespective of whether they
are the product of a legislature or are a part of the
fabric of the court-made law of negligence, exist for
purposes. They are designed to protect some persons
under some circumstances against some risks. Seldom
does a rule protect every victim against every risk that
may befall him, merely because it is shown that the
violation of the rule played a part in producing the
injury. The task of defining the proper reach or thrust
of a rule in its policy aspects is one that must be
undertaken by the court in each case as it arises
(emphasis in original).

Foreseeability obviously marks the limits placed on a
defendant’s duty; the precise meaning of the concept is
vital. As negligence law developed in England the concept
became “whether any ordinarily prudent man would have
foreseen that damage would probably result from his act.”
F. James & R. Perry, Legal Cause, 60 Yale L.J. 761, 786
(1951) (quoting 8 W. Holdsworth, A History of English
Law 450 (2d ed. 1937)). Modern courts have given the
concept varying meanings.! One scholar assigned an

'For example, see, Words and Phrases, Foreseeability (1953) (“rea-
sonable anticipation that harm or injury is a likely result of acts or
omissions.” Emery v. Thompson, 148 S.W.2d 479, 480, 347 Mo. 494
(1941)); Words and Phrases, Foreseeability (1987) (“that which is objec-
tively reasonable to expect, not merely what might conceivably occur.”
Augenstine v. Dico Co., Inc., 481 N.E.2d 1225, 1228, 90 Ill.Dec. 314,

(Continued on next page)

A-6

almost generic definition, “the anticipation of harm of a
general sort to persons of a general class.” Harper, The
Foreseeability Factor in the Law of Torts, 7 N.D.Law. 468,
482 (1932) (emphasis in original).

Foreseeability guided our decision in Republic of
France v. United States, 290 F.2d 395 (Sth Cir.1961) in
which a fire in the ship’s cargo of fertilizer grade ammo-
nium nitrate was followed by an explosion. The explosion
was unprecedented; there was no general knowledge of the
explosive nature of nitrate when exposed to fire. Although
the vessel owners were negligent in handling the fire, we
exonerated them from liability for the injuries caused by
the explosion, concluding that because of the unknown
volatility of the cargo, the ship-owners reasonably could
not have foreseen that explosion. We held that to be found
liable a defendant must have “knowledge of a danger, not
merely possible but probably . . .”” 290 F.2d at 401 (quoting
Dalehite v. United States, 346 U.S. 15, 42, 73 S.Ct. 956,
971, 97 L.Ed. 1427 (1953) (citations omitted) ).

Other commentators muse that ‘“‘foreseeabil-
ity... includes whatever is likely enough in the setting of
modern life that a reasonably thoughtful person would

(Continued)

317, 135 ILApp.3d 273 (Ist Dist. 1985)); ““whether the injury or an
injury similar in general might reasonably have been anticipated as a
natural and probably result of negligent act or acts.” Geo. D. Barnard
Co. vy. Lane, 392 S.W.2d 769, 771 (Tex.Civ.App.1965): “consequence
which is probable according to ordinary and usual experience.” Wyatt v.
Motsenbocker, 360 S.W.2d 543, 546 (Tex.Civ.App.1962); “one which
prudent man would anticipate as likely to result from an act” Firestone
Tire & Rubber Co., Inc. v. Lippincott, 383 So.2d 1181, 1182 (Fla.
App.1980); “anticipation of a general category of harm which in ordi-
nary experience might be expected to flow from a particular type of
negligence.”’ Garrett v. United States, 501 F. Supp. 337, 339
(D.C.Ga.1980).

A-7

take account of it in guiding practical conduct.” Harper &
James, The Law of Torts, Scope of Duty in Negligence
Cases § 18.2 at 657-59 (2d ed. 1986).

We perceive a harm to be the foreseeable consequence
of an act or omission if harm of a general sort to persons of
a general class might have been anticipated by a reasonably
thoughtful person, as a probable result of the act or omis-
sion, considering the interplay of natural forces and likely
human intervention.

Applying this definition, we are not persuaded that
Bean could have anticipated that is failure to follow safe
dredging practices would likely result in physical damage
to the equipment and work-in-progress at Consolidated’s
aluminum reduction plant several miles away. The harm
was not of a general sort expected to follow from the fail-
ure to dredge carefully in proximity to a gas pipeline.
Injury to property and persons from the escaping gas, or
from a fire which might have ensued, would be examples
of consequences that would be foreseeable.2 The damages
sustained by Texaco obviously were foreseeable. But the
damage arising from the loss of natural gas supply, in turn
causing the shut down of electric turbines, in turn causing
a loss of electric power vital to the aluminum reduction
process, with the ultimate result being substantial damage
to equipment and product-in-process, goes beyond the pale
of general harm which reasonably might have been antici-
pated by negligent dredgers.

Of interest is the rejection of the claims of PPG Industries, Inc. for
its loss incurred in purchasing replacement gas at a higher cost during
the period of repair of the pipeline. The PPG plant was adjacent to the
channel and was the entity being served by the lateral pipeline. The
Louisiana Supreme Court concluded that this risk was outside of the
duty imposed on Bean. PPG Industries, Inc. v. Bean Dredging, 447
So.2d 1058 (La.1984).

A-8

We find no error in any factual finding or legal conclu-
sion inherent in the trial court’s ruling that the damages
suffered by Consolidated were not foreseeable and, as such,
not within the reach of the duty imposed on Bean to per-
form its dredging operations in a non-negligent manner.
The judgment of the district court is therefore
AFFIRMED.

B-1

APPENDIX B

CONSOLIDATED ALUMINUM
CORPORATION
v.
C.F. BEAN CORPORATION, et al.,
Civ. A. No. 81-0500.

United States District Court,
W.D. LOUuISANA,
LAKE CHARLES DIVISION.

July 16, 1986.

OPINION
VERON, District Judge.

Plaintiff, Consolidated Aluminum Corporation (here-
inafter referred to as Consolidated) filed suit seeking lost
profits and damages allegedly sustained by its aluminum
manufacturing plant located south of Lake Charles, Louisi-
ana. The alleged damages occurred when the natural gas
supply to the plant was shut off due to a dredging barge
breaking the pipeline which supplied the natural gas.
Named as defendants were: C.F. Bean Corporation and
Bean Dredging Corporation (hereinafter collectively
referred to as Bean), the owners/operators of the dredge;
Bean’s insurers; and Texaco, Inc. (hereinafter referred to as
Texaco), the owners of the pipeline. Texaco subsequently
filed a third-party claim against the United States through
the United States Army Corps of Engineers (hereinafter
referred to as Corps of Engineers), as the party with pri-
mary responsibility for the dredging operations, tendering

B-2

the Corps of Engineers to Consolidated as a direct defen-
dant. Additionally Texaco has asserted a cross-claim
against Bean for the cost of repairing its pipeline and the
value of the natural gas lost due to the rupture of the
pipeline by Bean. Texaco also seeks indernnification or
contribution from Bean for any amount it might be
required to pay to Consolidated. Texaco has filed a claim
against the United States through the Corps of Engineers
contending that the Corps of Engineers is liable for Bean's
actions because it failed to properly supervise and control
Bean's activities, and that the Corps of Engineers is inde-
pendently liable because it failed to select a competent
contractor to dredge the Calcasieu River Ship Channel.
Bean has filed a cross-claim against Texaco, seeking
indemnification or contribution in any amount for which
it may be cast.

This Court acting upon Bean’s motion for summary
judgment originally granted that summary judgment as to
Bean on the grounds that, under Robins Dry Dock &
Repair Co. v. Flint, 275 U.S. 303, 48 S.Ct. 134, 72 L.Ed.
290 (1927), no cause of action exists in tort for negligent
interference with contract.' The United States Fifth Circuit
Court of Appeals, 772 F.2d 1217, reversed the summary
judgment and remanded, finding that “the bright line” rule
of Robins Dry Dock did not apply in the instant case and
Stating that the plaintiff's claim of negligence should be
analyzed under tort principles applied by this Court in
admiralty.

‘Final judgment under Fed.R.Civ.P. 54 was entered and all further
proceedings in the case were stayed pending outcome of appeal to the
Fifth Circuit.

B-3

The issues of liability and quantum of damages have
been bifurcated with the latter being reserved for resolu-
tion at a future date.

On remand, after hearing the testimony, reviewing the
stipulations and pleadings, and weighing all of the evi-
dence presented at trial on the merits, the Court makes the
following:

FINDINGS OF FACT
1.

Consolidated is and was at all pertinent times a New
York corporation doing business within this District. Bean
(collectively) is and was at all pertinent times a Louisiana
corporation. Texaco is and was at all pertinent times a
Delaware corporation doing business within this District.
The United States is and was at all pertinent times a sover-
eign nation as to which venue properly lies within this
District.

2.

In 1963, Texaco laid a natural gas pipeline in order to
provide natural gas service to one customer, PPG Indus-
tries, Inc. This pipeline consisted of two segments: a six-
inch line known as the “Big Lake Line” or the “Hackberry
Line,” running from the Hackberry area south of Lake
Charles, Louisiana to a valve manifold known as “Point
C”™; and, a twelve-inch line known as the “PPG Lateral,”
running from Point C to the PPG plant located across the
Calcasieu River.

The Corps of Engineers issued a permit (no. LMNOD
(Calcasieu River) 287) to Texaco allowing Texaco to con-
struct the twelve-inch pipeline across the Calcasieu River

B-4

at Mile 31.9 Station No. 1683 + 90. The permit set forth
the guidelines to be followed in laying and maintaining the
pipeline crossing. The permit additionally provided in
Clause (g), as one of the conditions for issuance:

That the United States shall in no case be liable for
any damage or injury to the structure or work herein
authorized, which may be caused by or result from
future operations undertaken by the Government for
the conservation or improvement of navigation or for
other purposes and no claim or right to compensation
shall accrue from any such damage.

That pipeline was laid and maintained in accordance with
the requirements of the Corps of Engineers permit.

4.

In 1965, Texaco connected an unused sixteen-inch
production line, known as the “Evangeline Pipeline,” to
the PPG lateral. Natural gas was then transported through
the Evangeline Pipeline.

5.

By contract dated September 20, 1968, a Gas Sales
and Purchase Contract was executed between Texaco and
Consolidated’s predecessor in interest, Gulf Coast Alumi-
num Corporation. In accordance therewith, a pipeline was
laid from Point C southward to Consolidated’s plant,
located south of Lake Charles. The gas contract provided
that Consolidated would purchase its plant’s requirements,
up to a stated maximum, and in any case, not less than a
specific quantity of gas, from Texaco.

6.

On December 14, 1979, Bean, who at all times held
itself out to the public as an expert, independent dredging

B-5

contractor, entered into Construction Contract No.
DACW 29-80-C-0063 with the United States Army Engi-
neer District, New Orleans for maintenance dredging of
the Calcasieu River and Pass from Mile 15.5 to Mile 36,
along with other areas unimportant to this litigation. For
the area surrounding Texaco’s pipeline crossing, the con-
tract specifications called for dredging to a minus forty feet
MLG (mean low gulf) over a four hundred foot project
width of the bottom with one foot allowable over-dredging
and side slopes of one to three feet.

7.

General provision |2 of the contract provides in perti-
nent part:

The Contractor shall, without additional expense to
the Government, be responsible . . . for all damages to
persons or property that occur as a result of his fault
or negligence. He shall take the proper safety and
health precautions to protect the work, the workers,
the public and the property of others... .

And, the technical provisions of the contract provides:

1-10.1 The Contractor shall exercise caution when
working in the vicinity of structures and utilities cross-
ing or adjacent to the channel or disposal areas.
Repair of any damage resulting from excessive or
improper excavation in the bottom or side slopes of
the channel will be the responsibility of the Contrac-
tor. Where dredging to the theoretical section might
endanger any structure, the Contracting Officer may
reduce the required excavation in the vicinity of such

structure.

B-6

1-10.2 The Contractor shall provide at least project
dimensions over all utility crossings by whatever
approved method the Contractor elects to use. The
Contractor shall submit for approval by the Con-
tracting Officer a detailed plan of operation at each
pipeline or utility crossing where construction surveys
indicated project channel does not exist. The plan
shall contain emergency measures to be taken in the
event of an accident. The Contractor shall notify the
owners of pipelines or utilities at least 3 days prior to
operating within 150 feet of a pipeline or utility.

1-10.3 The following structures or utilities are
located within the limits of the work. The vertical
clearances listed below were furnished by the utility
owners at the time permits were issued and are not the
result of a survey made by the Government. It will be
the responsibility of the Contractor to verify these
locations and clearances.

9.

The correct location of Texaco’s pipeline was pro-
vided in the contract as well as Texaco’s address.

10.

On January 14, 1980, Bean provided the Corps of
Engineers with a general plan for safe dredging around and
over utility crossings like Texaco’s pipeline, which was
approved by the Corps of Engineers. Among other things
this plan provided that:

The owners of each pipeline and/or utility lines will be
contacted at least seven (7) days before by phone and
by letter to have a crew come out and mark and verify
the elevations of respective lines and give all informa-
tion to the Dredge Superintendent.... [Bean] will

B-7

request that a representative be on board the dredge to
witness the depths and swing of the dredge.

This plan further provided that the dredge was to advance
to within twenty-five feet of the pipeline and then tie off
the cutter. This plan reflected the typical and customary
practice in the dredging industry.

11.

Dredging began on January 14, 1980. On March 24,
1980, Bean added its Dredge No. 32 (the dredge involved
in this matter) to the project. The dredge was 202 feet long,
49 feet in width, and contained a 56 foot cutter ladder, to
which the cutter was attached. The dredge maintained a
crew of approximately 45 men.

12.

Mr. Elton McCabe, a project manager for Bean, was in
charge of and had overall supervision of Bean’s dredges
operating pursuant to the dredging contract, including
Dredge No. 32.

13.

Captain Adloph Pontiff was the Dredge Superinten-
dent of Dredge No. 32 during all pertinent times, and as
such, Pontiff supervised and controlled the operation of
Dredge No. 32, including all employees aboard the vessel.
On board the dredge, he had total authority and discretion
in running the dredging operations.

14.

Pontiff had only occupied the position of Dredge
Superintendent for approximately three months prior to
the accident. This was the second dredging project that

B-8

Pontiff worked on in the capacity of dredge superinten-
dent, and the first of those projects that involved dredging
in the vicinity of utility and pipeline crossings. However,
Pontiff had worked on dredges for many years in various
other capacities.

15.

Dredge No. 32 began work above the Texaco pipeline
crossing and worked its way down river. The method of
dredging employed by Dredge No. 32 was the “box” cut
method whereby the dredge dredges beyond the channel
limits, controlling the width of the cut by reading degrees
of the dredge’s swing, thus “feeling for the bank” of the
channel.

16.

Though this method of dredging may or may not be a
proper procedure in areas free of utility crossings, it is
contrary to sound and generally accepted dredging practice
in areas proximate to utility crossings such as the area
around the Texaco pipeline.

17.

The sound and generally accepted dredging practice to
be employed especially in areas where utility crossings are
located is to stake or mark the channel so that the dredge
will be able to maintain proper alignment on the centerline
of the channel. Buoys, stakes or markers are required in
order to mark the centerline and toes (edges) of the chan-
nel so that those persons operating the dredge will know
how much of a swing to make.

B-9

18.

Bean, through its Dredge No. 32, failed to follow the
standard dredging practice as described in Finding of Fact
No. 17.

19,

Dredge No. 32 struck and ruptured the Texaco pipe-
line at approximately 7:00 A.M. on April 5, 1980. The
point of rupture was located 34 feet east of the eastern toe
of the channel.

20.

On the evening before the dredge reached the pipeline
crossing, Pontiff left instructions with the leverman on
watch to call him when the dredge was 50 feet before the
pipeline. The leverman misunderstood Pontiff instruc-
tions. He thought that Pontiff was to be called when the
dredge spuds were within 50 feet of the line, at which point
the cutterhead would have already crossed the line.
Instructions were relayed by him to the other leverman to
proceed over the Texaco pipeline. Consequently, Pontiff
was not summoned before the cutterhead started across
the line.

21.

~ The exact location of the pipeline was well delineated
by fully visible and legible signs stating: WARNING/DO
NOT ANCHOR OR DREDGE. Bean was also put on
notice of the correct location of the pipeline by provisions
contained in the dredging contract.

pam

Bean failed to notify Texaco that the pipeline was
being dredged over by Dredge No. 32, as mandated by the

B-10

dredging contract and Bean’s general plan, in order that a
Texaco representative may be present during that proce-
dure, although the evidence reveals that Bean in fact
attempted to contact Texaco.

23.

Safe dredging practice requires that when a utilities
owner is not present and the exact location of the crossing
is unknown, dredging be suspended in the area of the
crossing and that the dredge pass over the crossing, resum-
ing dredging a safe distance beyond the crossing. Safe
dredging practice, as well as the provisions of the general
plan, also requires that a dredge tie Ou is cutterhead when
it approaches within twenty-five feet of utility crossing.

24.

It is evident that Dredge No. 32 failed to undertake

any of those safety practices recognized in Finding of Fact
No. 23.

25.

The rupture in the natural gas pipeline allowed a
mammoth amount of gas to be released from the line,
sending mud, silt and water spraying fifty feet into the air.

26.

The rupture of the pipeline caused pressure in the
pipeline to immediately drop. At 9:15 A.M. of the same
day, Texaco was forced to shut off the gas flow at a block
valve located on the Evangeline Line. The effect of closing
this valve was to completely cut off the flow of natural gas
to Consolidated’s plant.

B-i 1

27.

The break in the pipeline was repaired by Texaco and
a full gas supply was restored to Consolidated on April 15,
1980.

28.

Consolidated’s plant consisted inter alia of the follow-
ing facilities: (A) An electrically operated aluminum reduc-
tion pot line containing 71 operating smelting pots wherein
alumina and bath materials are heated and melted in an
electrolytic process by which molten aluminum is pro-
duced. Each pot utilizes 24 carbon anodes weighing in
excess of a thousand pounds each which are suspended
above the pots and project downward into the molten
bath. The bottom of each pot consists of cathode blocks on
which the aluminum is produced. (B) A gas fired coke
calciner approximately 180 feet in length which is lined
with refractory brick and refractory material. In this
calciner green coke is subject to temperatures, which in
portions of the calciner exceed 2,500 degrees Fahrenheit,
and the green coke is thereby refined into calcined coke.
(C) A power plant which utilizes natural gas to produce
electric energy for plant operations. The power plan con-
sists of three gas fired jet turbines, three steam boilers and
two steam turbines, as well as associated electric
generators.

29.

Because of the reduction in gas pressure and gas sup-
ply, Consolidated sustained physical damages to its equip-
ment and work in process at the plant and attendant eco-
nomic damages. These physical damages inc!ude:
(A) Freezing (solidifying) of the liquid bath materials and
liquid aluminum in the reduction pots; (B) Cracking and

B-12

air burning of anodes in the reduction pots; (C) Cracking
of cathode blocks in the reduction pots; (D) Air burning of
side wall blocks in the reduction pots; (E) Burning of
breaker bars in the reduction pots; (F) Loss of useful life of
the reduction pots; and (G) Loss and cracking of calciner
refractory materials.

30.

Consolidated’s Lake Charles plant had no back-up or
secondary source of power whatsoever. It was unique in
this respect. The testimony of Mr. John Fitzgerald, for-
merly of Kaiser Aluminum, and Mr. Dwight Keller, for-
merly with Reynolds Aluminum, made it clear that the
Consolidated Lake Charles Plant, with no secondary
source or back-up, was unique in the aluminum industry.
No other aluminum reduction plant is fed with power
from only one source. Consolidated’s situation was
unheard of in the aluminum industry. Energy is the critical
element in the aluminum industry. It is such 4 critical
factor that a constant and continuing source(s) of it must
exist. Consolidated’s arrangement for gas delivery from
Texaco only, with no secondary source or back-up, was
inadequate.

31.

Mr. William Boyer, Consolidated’s executive in
charge of the original planning and construction of the
plant, explained the reasons behind this peculiar situation.
Mr. Boyer, in order to get the plant built, had to obtain
power at a cost of no more than 4.0 mills per kilowatt-
hour. Mr. Boyer went to great lengths to explain the ulti-
mate cost to Consolidated of even a | mill increase in
power cost. But with the Texaco contract cost, including

B-13

the cost of the power plant to convert that gas into electric-
ity, Mr. Boyer was able to arrange a power cost right at the
4.0 mills per kilowatt-hour budget. Consolidated would
spend no more. Boyer did not even consider the cost of an
oil storage tank for a back-up to fuel his turbines. That
cost, estimated by Boyer to be $200,000, was prohibitive.
Consolidated’s gas turbines were designed to operate on
liquid fuel oil as well as on natural gas, but Consolidated
never made the necessary implementations. It was
explained that the Lake Charles plant was at a considerable
“disadvantage” because of its size. It was the smallest alu-
minum reduction plant in the United States. It did not
have the production to “spread the cost” of other and
suitable alternatives.

32.

Considering the actual delivery of Texaco’s gas, even
Mr. Boyer did not expect a “fail safe” system. Although he
believed that Texaco’s “vast distribution system” was a
reliable one, Boyer did not evaluate any of the risks to his
plant in the event of an interruption in Texaco’s “vast”
pipeline system.

33.

Mr. William Kinney was employed as a construction
inspector by the Corps of Engineers and was the primary
field representative of the Corps of Engineers on this par-
ticular project. One of Kinney’s responsibilities was to
monitor the work done by Bean to insure compliance with
the dredging contract. Kinney’s office was aboard one of
Bean’s dredges (not Dredge No. 32). Kinney visited each
dredge on the project two or three times a week.

34.

Kinney was not aboard the Dredge No. 32 at the time
of the allision with the pipeline. He noted on previous
occasion that the Dredge No. 32 was not using stakes,
buoys, or markers in dredging; however, the dredge at that
time was not operating in the vacinity of a utility crossing,
and Kinney had no reason at that time to believe that the
dredge would not follow the prescribed methods for dredge
over and around utility crossings.

35.

The Corps of Engineers’ permit issued prior to the
construction of the original pipeline from the Hackberry
Area to PPG required that where the PPG Lateral (Texaco
pipeline) passed beneath the proposed Calcasieu Ship
Channel, it should lay at a depth fifty feet below Mean Low
Gulf for that area where the pipeline would be beneath and
coextensive with the deepest portion of the Ship Channel
(four hundred feet). The measurements were based upon
the theoretical location of the Ship Channel inasmuch as it
had not yet been dredged with the PPG Lateral was laid.
Once the Ship Channel began to slope upward, it was the
requirement that the Texaco pipeline remain ten feet
beneath the side slopes of the channel, the ten feet being
measured along a line perpendicular to the side slopes.
Surveys performed following the accident established that
the Texaco pipeline was clearly marked and buried to its
required depth or greater, particularly in the area of the
break.

36.

Prior to April 5, 1980, there was no block valve in the
Texaco pipeline system between the east bank of the Calca-
sieu River and the point at which the Evangeline Line tied

B-15

into the Texaco pipeline so as to enable Texaco to isolate
the section of the pipeline which crossed the channel in the
event of a rupture of the pipeline.

37.

As a result, in the instant situation, Texaco was forced
to close a block valve on the Evangeline Line and a block
valve at Point C in order to isolate the rupture occurring in
the Calcasieu River. The result of this was that the natural
gas supply to Consolidated’s plant was cut off.

38.

There was conflicting expert testimony presented at
trial by the parties regarding whether or not sound engi-
neering practices dictated that Texaco should have had a
block valve located on the east bank of the channel cross-
ing so that it could have been closed instead of the valve
located on the Evangeline Line. Had such a block valve
existed, Consolidated would have continued to receive a
flow of natural gas.

3D.

Mr. Roger Craddock, testifying as Consolidated’s
expert witness, maintained that sound engineering practice
required the placement of such a block valve on the east
bank of the channel. However, Craddock admitted that no
government regulation or industry standards code require
such a placement of a valve.

40.

On the other extreme, Mr. Johnny Atwood, testifying
as Texaco’s expert witness, stated that all reasonable
design precautions were taken by Texaco and all applicable

B-16

industry standards, government codes and sound engineer-
ing practices had been conformed with in designing and
constructing the pipeline.

41.

Consolidated also points to the fact that Texaco, sub-
sequent to the accident, installed a block valve on the east
bank of the channel crossing and suggests that Texaco
should have installed the valve prior to the allision. How-
ever, Mr. Atwood testified that the valve was added after
the repairs to the pipeline were made as merely a precau-
tion against the possibility that the ends of the pipeline
might pull away from the clamps used to reconnect them.

42.

After careful reflection, this Court agrees with the
expert opinion of Atwood and accepts his conclusions as to
reasonableness of Texaco’s design and construction of the
pipeline system.

DISCUSSION OF LAW AND RULING

This Court has jurisdiction of this action as an admi-
ralty and maritime claim, as well as under diversity of
citizenship jurisdiction, and venue is proper in the West-
ern District of Louisiana.

The issues presented for resolution by this Court are:
whether the various parties owed any duties of care; to
whom those duties were owned if any existed; whether any
of these duties were breached; and what damage resulted as
a consequence of those breaches, if any, occurred.

B-17

CONSOLIDATED’S CLAIM AGAINST BEAN

The Fifth Circuit, in denying a rehearing on its rever-
sal of this Court’s summary judgment, aptly characterized
the situation presented to this Court on remand:

Our discussion of the Robins Dry Dock/
TESTBANK line of cases showed that the ‘pragmatic
limitation upon the tort doctrine of foreseeability,
State of Louisiana, ex rel. Guste vy. M/V TESTBANK,
752 F.2d 1019, at 1023 (Sth Cir. 1985), established by
these cases, is inapplicable to the instant case because
the plaintiff Consolidated unquestionably suffered
physical harm to its own property. We further con-
clude the mere existence of a contract between Texaco
(whose property suffered the most immediate harm
from the defendant's dredging) and Consolidated does
not create a legal bar to Consolidated’s claim against
Bean for negligent dredging. We in no way intimated
that Consolidated could recover for ‘negligent interfer-
ence with contract.’ Nor did we hold that summary
judgment for the defendant would necessarily be
improper on the facts of the instant case. Rather, we
remanded because the district court expressly omitted
to review the issue of foreseeability with regard to
negligent dredging. We expressly declined to reach the
question of ‘whether Consolidated’s claim of negli-
gence would withstand scrutiny under a foreseeability
test,” 772 F.2d at 1218 n. 2, and left the application of
traditional tort principles, including foreseeability and
the related concept of legal duty, for the trial court to
determine on remand at 1224.

Consolidated Aluminum Corp. v. C.F. Bean Corp., 772
F.2d 1217 at 1224 (5th Cir.1985).

This Court must now consider the legal duty owed by
Bean, the scope of that duty, to whom it was owed, and the

B-18

foreseeability of Consolidated’s harm. Foreseeability is
defined as “...the reasonable anticipation that harm or
injury is a likely result of acts or omissions.” Blacks Law
Dictionary, 5th ed. The issues of whether Bean owes a duty
to Consolidated, and whether the conduct of Bean in
regard to Consolidated was negligent, turn on whether
Bean could have reasonably anticipated the risk of physical
harm (as well as economic) to Consolidated.

[A] tort to the person or propety of one man does
not make the tortfeasor liable to another merely
because the injured person was under a contract with
that other, unknown to the doer of the wrong. [Robins
Dry Dock], 275 U.S. [303] at 309, 48 S.Ct. [134] at
135.

Cargill, Inc. v. oxford and Sunderland, Ltd., 782
F.2d 496 and 498 (Sth Cir.1986).

In PPG Industries, Inc. v. Bean Dredging, 447 So.2d
1058 (La. 1984), a case involving the same accident as that
in the instant case, the Louisiana Supreme Court, when
confronted with PPG's claim for indirect losses and addi-
tional fuel costs resulting from the rupture of Texaco’s
pipeline, held that the particular risk, that being the risk of
shutting down the PPG plant, was not encompassed by
Bean’s duty not to negligently damage Texaco’s pipeline.
Id. 1059-1060.

The Louisiana Supreme Court, as was suggested to
this Court by the Fifth Circuit in the instant matter,
applied duty-risk analysis. Finding that PPG’s losses were
indirect, that Court stated that:

[T}here is clearly an ease of association in the
present case between the rule of law which imposes a
duty not to negligently damage property belonging to

B-19

another and the risk of injury sustained by [PPG]
because of the damage to its property. As noted, how-
ever, a rule of law is seldom intended to protect every
person against every risk. It is much more difficult to
associate the same rule of law, in terms of the moral,
social and economic values involved, with the risk of
injury and the economic loss sustained by the person
whose only interest in the pipeline damaged by the
tortfeasor’s negligence arose from a contract to
purchse gas from the pipeline owner. It is highly
unlikely that the moral, social and economic consider-
ations underlying the imposition of a duty not to neg-
ligently injure property encompass the risk that a third
party who has contracted with the owner of the
injured property will thereby suffer an economic loss.
Id. at 1061.

This Court recognizes that the PPG case involved
what appeared to be only economic losses; however, this
Court is of the firm opinion that the rationale, espoused by
the Louisiana Supreme Court therein, applies as well to the
instant matter relating to the physical damage suffered by
Consolidated.

Here, the duty owned by Bean is the same as that
found in the PPG case. Clearly, the evidence shows that
Bean owed a duty to conduct its dredging operations in a
reasonable manner so as to avoid causing physical damage
to owners of pipelines located in the area of the dredging
operations. Breach of that duty would create a recognizable
harm to a pipeline owner such as Texaco.

In Diamond State Tel. Co. v. Atlantic Refining Co.,
205 F.2d 402 (3rd Cir.1953), a case involving an allision
between a tanker and a telephone cable laying across a ship
channel, the Third Circuit found that:

B-20

Here we have the unforeseeable libellant, a mari-
time instance of the landlubber’s unforeseeable plain-
tiff. The scope of the Yeager’s duty is not to be deter-
mined by what we know now but by what those
aboard her knew or should have known as they
approached the flotilla. They knew that there were one
or more vessels ahead of them and that any
unseamanlike navigation on their part would subject
those vessels to an unreasonable risk of harm. Thus,
they had a duty to navigate so as not to create such
risk, and they did. They could not possibly have fore-
seen that poor navigation would have subjected libel-
lant’s cable to an unreasonable risk of harm because
they neither knew nor should have known that the
cable was there. Thus, as to the cable, there was no
duty and, consequently, could be no negligence. /d. at
407.

Though somewhat factually dissimilar to this case, the
rationale expressed by the Court is applicable here.

In the instant matter, though Bean had knowledge of
the pipeline crossing or at least should have had the knowl-
edge, Bean could not have possibly foreseen that its
improper dredging practices would have subjected Consol-
idated’s plant, so remotely located, to an unreasonable risk
of harm because Bean did not know, nor should it have
known of Consolidated’s connexity to the pipeline. Thus
as to Consolidated’s plant, there was no duty and therefore
no negligence on the part of Bean.

Consolidated, however, is not a pipeline owner.
Neither is Consolidated an owner of any property near the
site of the rupture of Texaco’s pipeline, unlike PPG whose
plant was located proximate to the pipeline. Consoli-
dated’s damage occurred only because Texaco was unable

B-21

to deliver the natural gas as was contracted for by Consoli-
dated and Texaco. Only after that natural gas supply was
interrupted did the physical damage to Consolidated’s
facilities occur. Consolidated’s plant was located more
than six miles away from the point of rupture, on a differ-
ent body of water, and “upstream” in Texaco’s gas distri-
bution system. It is clear that Bean had no knowledge of
Consolidated’s connexity to the Texaco pipelinne. There
was nothing to even suggest that Bean reasonably antici-
pated or should have reasonably anticipated that a rupture
of the Texaco pipeline would cause such physical damage
to such a remotely located plant. Consolidated was so far
outside the zone of any obvious danger from Bean’s dredg-
ing that no reasonable person would have anticipated that
Consolidated would suffer physical harm as a result of
Bean’s dredging. In comparison to the PPG case, the possi-
bility, of physical harm involved here was much more
remote and attenuated than the mere possibility of eco-
nomic loss.

For the foregoing reasons, this Court finds that the
physical damage sustained by Consolidated was an unfore-
seeable consequence of the rupture of Texaco’s pipeline by
Bean, and therefore, Bean is not liable.

However, we will also address the issue of whether
Consoidated is entitled to punitive damages from Bean in
the event the appellate court disagrees with our conclusion
that Bean was not negligent in its conduct toward Consoli-
dated and is not liable to Bean.

Under general maritime law, punitive damages may
be recovered when a wrongdoer has acted willfully and
with gross disregard for the plaintiffs rights. Complaint of
Merry Shipping, Inc. 650 F.2d 622 at 625 (Sth Cir. 1981). In

B-22

the instant matter, this Court is unable to conclude that the
conduct of Bean and/or its employees was willful and in
gross disregard for the rights of Consolidated. Pontiff gave
instructions that he was to be notified when the dredge
approached within fifty feet of the pipeline crossing. These
instructions may have been ambiguous and could have
been misunderstood by the crew. As a result, the cut-
terhead had already started across the pipeline when Pon-
tiff was notified. Though this conduct may have consti-
tuted negligence, it cannot be said that it was willful and in
gross disregard of Consolidated’s rights.

Additionally, the principle or master cannot be case
for punitive damages for the willful or reckless act of an
agent or employee unless the act was committed with the
approval and knowledge of the principle. McGuffie v.
Transworld Drilling Co., 625 F.Supp. 369, 371 (Sth
Cir.1985). Even assuming that Pontiff and/or the crew of
Dredge No. 32 acted willfully and with gross disregard for
Consolidated’s rights, Bean, as master or principal, would
not be liable for punitive damages arising as a result of that
conduct. Pontiff had total authority and discretion in run-
ning the dredging operations. Bean had provided a plan of
dredging which met all requirements of established safety
practice. It is readily apparent that Bean expected and
depended upon Pontiff to carry out that plan. There is
nothing in the record to indicate that Bean, as a routine
and continuing practice, allowed, approved or had knowl-
edge of dredging operations conducted in a contravention
of submitted dredging plant and accepted dredging
practices.

We now address the other various claims made tn this
case.

B-23

ALL CLAIMS AGAINST THE UNITED STATES?

The evidence presented at trial and herein previously
outlined in this Court’s findings of fact, clearly reveals that
Bean acted as an independent contractor of the United
States. Equally clear is the rule of law which provides that
a contractee is generally not liable for the torts of an inde-
pendent contractor. Kirk v. United States, 270 F.2d 110, at
116 (9th Cir.1959). Nor does the fact that the United States
retains the right to inspect work under construction to see
that the provisions of the contract are carried out, and also
the right to stop work if they are not, provide sufficient
basis to hold the United States liable for damage resulting
from negligence of the contractors in the peformance of the
contractor. Jd. at 116-117. Additionally the issuance of
regulations relating to safety does not render the United
States liable for an independent contractor’s negligence.
Market Insurance Company vy. United States, 415 F.2d 459,
at 463 (Sth Cir.1969).

Therefore, it is the conclusion of this Court that the
United States is not liable for damages occasioned by the
fault of Bean to any party to this suit.

It is to be additionally noted that Texaco cannot
recover its own damages from the United States on an

*Consolidated has cited for our consideration the case of City of
Vew Orleans. Etc. y. United States, 501 F.Supp. 164 (E.D.La. 1980) as
the only precedent for liability of the United States. However, this
decision was subsequenily reversed by the United States Fifth Circuit
Court of Appeals in 1981 on other grounds in an unpublished opinion
(665 F.2d 350) and the appeallate court did not address the issue of
whether the United States, through the Corps of Engineers, could in fact
be held liable for the torts of a dredging contractor. As such this Court
does not feel compelled to follow the ruling of the District Court in City
of New Orleans. but. instead chooseds to follow the established law of
the United States as analyzed in the text of this opinion.

B-24

independent basis of liability in light of Clause (g) of the
Corps of Engineers permit granting Texaco permission to
lay its pipeline across the Calcasieu River which provides:

That the United States shall in no case be liable for
any damage or injury to the structure or work herein
authorized, which may be caused by or result from
future operations undertaken by the Government for
the conservation or improvement of navigation or for
other purposes and no claim or fight to compensation
shall accrue from any such damage.

The courts of this nation have upheld the validity of
this clause which disclaims liability on the part of the
United Stetes for any damage or injury to a structure
authorized by a Corps of Engineers permit. See Boston
Edison Co. v. Great Lakes Dredge and Dock Co., 423 F.2d
891 (1st Cir.1970); Pacific Northwest Bell Tel. Co. v. United
States, 549 F.2d 1313 (9th Cir.1977), cert. denied 434 U.S.
820, 98 S.Ct. 62, 54 L.Ed.2d 76 (1977).

TEXACO’S CLAIM AGAINST BEAN

This Court now turns its attention to Texaco’s cross-
claim against Bean for the costs of repairing its pipeline
and the value of the natural gas lost due to the breaking of
the pipeline by Bean.

‘It is well established that there is a presumption
of fault against a moving vessel that strikes a statutory
object, such as a dock or navigational aid.’ Freeport
Sulphur Co. v. S/S HERMOSA, 368 F.Supp. 952, 953
(E.D.La.1973); Brown & Root Marine Operators, Inc.
v. Zapata Off-Shore Co., 377 F.2d 724 (Sth Cir.1967).
‘In admiralty, this presumption does more that merely
require the ship to go forward and produce some evi-
dence on the presumptive matter. The moving vessel

B-25

must show that it was without fault or that the colli-
sion was occasioned by fault of the stationary object or
was the result of inevitable accident.’ Patterson Termi-
nals, Inc. v. S/S JOHNANNES FRANS, 209 F.Supp.
705, 707 (E.D.Pa.1962), citing Carr v. Hermosa
Amusement Corp., Ltd., 137 F.2d 983, 985 (9th
Cir.1943). We have held that ‘[t]he burden is heavily
upon the vessel asserting [the inevitable accident]
defense.’ “Such vessels ‘must exhaust every reason-
able possibility which the circumstances admit and
show that in each they did all that reasonable care
required.’” Brown & Root Marine Operators, Inc.,
supra, 377 F.2d at 725. Bunge Corp. v. M/V FUR-
NESS BRIDGE, 558 F.2d 790 at 793-794 (Sth
Cir.1977), cert. denied 435 U.S. 924, 98 S.Ct. 1488, 55
L.Ed.2d 518 (1978) (footnote omitted).

The presumption applies to an instance where the
fixed object happens to be a submerged pipeline. Marathon
Pipeline Company v. Drilling Rig Rowan/Odessa, 527
F.Supp. 824 (E.D.La.1981), affd. on other grounds, 699
F.2d 240 (Sth Cir.1983), cert. denied sub nom. 464 U.S.
820, 104 S.Ct. 82, 78 L.Ed.2d 92 (1983), reversed on other
matters, 761 F.2d 229 (Sth Cir.1985). A pipeline owner is
not guilty of any fault or neglect which contributed to
damage sustained by the pipeline when it is struck by a
vessel, where the pipeline is properly laid in accordance
with required permits. /d. at 831.

In the instant case, it is undisputed that the Bean
dredge struck Texaco’s pipeline, and it is abundantly clear
that Bean knew or should have known where the pipeline
was located. The location of the pipeline was specifically
stated in the dredging contract and the actual traversal of
the channel by the pipeline was clearly marked by warning
signs situated directly across the pipeline. Bean certainly

B-26

owed a duty to Texaco to exercise caution in dredging
around the pipeline.

Bean attempted, at trial, to overcome the presumption
of fault by asserting that Texaco’s pipeline was not laid in
accordance of the requirements of the Army Corps of Engi-
neers permit, and that this was in fact the cause of the
allision between the Bean dredge and the pipeline. How-
ever, the evidence, as reflect-«’ in the Findings of Fact,
reveals that the pipeline was indeed laid according to per-
mit requirements, and that it was covered by the requisite
ten feet of cover at the point where the dredge struck it.
Even if this Court were to assume that the pipeline was
mislaid as Bean contends, the evidence clearly establishes
that Bean did not follow the requirements for dredging
over and around Texaco’s pipeline, and that Bean’s course
of conduct would have resulted in an allision with the
pipeline regardless of the pipeline’s exact location.

Bean has not met its burden of overcoming this pre-
sumption of its fault. This Court alsd notes, as previously
stated, that Bean was negligent and breached its duty to
Texaco. This Court therefore concludes that Bean is liable
to Texaco for the costs of repairing the pipeline and the
value of the natural gas lost due to the rupture.?

Though punitive damages are available under general
maritime law, they are not warranted in this instance.
Bean’s conduct was certainly eggregious; however, there is
no evidence to suggest that Bean acted willfully or wan-
tonly. See discussion of punitive damages under this
Court’s discussion of CONSOLIDATED’s CLAIM
AGAINST BEAN.

*The issue of quantum has been reserved for resolutation at a later
date. 639 F.Supp.—27

B-27
CONSOLIDATED’S CLAIM AGAINST TEXACO

Consolidated also makes a claim against Texaco alleg-
ing that Texaco did not act in a reasonable and prudent
manner in protecting Consolidated form the possibility of
a break in the pipeline because it failed to install a bypass
valve on the upstream bank of the river so that the valve
could be closed in the event, such as this, of a rupture of
the pipeline, thus allowing the continuing flow of natural
gas to Consolidated’s plant.

However, the evidence presented at trial shows that
Texaco was under no duty to place such a bypass valve on
the upstream bank of the river. Texaco’s expert witness,
Mr. Johnny Atwood, a well-qualified natural gas expert,
testified that all reasonable design precautions had been
taken by Texaco, and that the Texaco pipeline system was
designed and constructed in conformity with all applicable
industry standards, government orders and sound engi-
neering practices. And though Consolidated’s own expert,
Mr. Roger Craddock, testified that he was of the opinion
that the pipeline was not built in accordance with sound
engineering practices, he also admitted that no government
regulation or industry standards code required the place-
ment of any bypass valve different from the existing layout
of the pipeline. Mr. Atwood also testified that the purpose
of the subsequent addition of a valve during the repair of
the ruptured pipeline was merely a precaution taken in the
event the ends of the ruptured pipeline pulled away from
the clamps used to repair the rupture, and that such a
subsequent addition did not imply that a valve should
have been installed prior to the accident.

There is also no evidence to indicate that Texaco
breached any other duty owed to Consolidated. Indeed,

B-28

Texaco did not have a duty to guard Consolidated against
the unexpected negligence of a third party (Bean). This
Court finds that Texaco acted in a reasonable and prudent
manner in all respects, and is accordingly not liable to
Consolidated in any manner.

CONCLUSION

For the foregoing reasons, judgment is entered in
favor of Texaco and against Bean for the costs of repairing
its pipeline-and the amount of gas lost due to the rupture.

All other claims involved are here DISMISSED.

Bean is hereby ORDERED to prepare a judgment in
accordance with this opinion, subject to federal Rule of
Civil Procedure 54(b).

C-]

APPENDIX C

CONSOLIDATED ALUMINUM CORPORATION,
Plaintiff-Appellant,
Vv.
C.F. BEAN CORPORATION, et al.,
Defendants-Appellees.
No. 84-4195.

United States Court of Appeals,

FIFTH CIRCUIT.
Oct. 7, 1985.

Opinion on Rehearing and Rehearing En Banc
Dec. 6, 1985.

Appeal from the United States District Court for the
Western District of Louisiana.

Before JOHNSON, JOLLY, and HILL, Circuit
Judges.

JOHNSON, Circuit Judge:

Consolidated Aluminum Corporation (Consolidated)
sues C.F. Bean Corporation (Bean) for physical damages
and economic losses that occurred shortly after a dredge
owned and operated by Bean ruptured a Texaco natural
gas pipeline. The Texaco pipeline supplied Consolidated’s
aluminum processing plant with natural gas. The resulting
interruption in the supply of gas to Consolidated’s plant
caused extensive damage to the physical equipment at the
plant that Consolidated employed for processing
aluminum.

C-2

The district court granted Bean’s motion for summary
judgment on Consolidated’s claim of negligence for dam-
ages to the plant’s equipment.' The district court held that,
under Robins Dry Dock & Repair Co., v. Flint, 275 US.
303, 48 S.Ct. 134, 72 L.Ed. 290 (1927), no cause of action
exists in tort for negligent interference with contract, even
where a plaintiff has sustained physical damages arising
out of the interference with contract. This Court has inter-
preted Robins Dry Dock to hold that recovery is barred to a
plaintiff who asserts a claim for economic loss unaccompa-
nied by physical damage to property in which the plaintiff
has a proprietary interest. Louisiana ex rel. Guste v. M/V
TESTBANK, 752 F.2d 1019 (Sth Cir.) (en banc), petition
for cert. filed, 53 U.S.L.W. 3839 (May 28, 1985). After
careful consideration of the stipulated facts of this appeal
and this Court's interpretation of Robins Dry Dock in
TESTBANK, we hold that the “bright line” rule of Robins
and 7TESTBANK does not reach the instant case and that a
plaintiffs claim of negligence for physical damages to
equipment in which the plaintiff has a proprietary interest
should be analyzed under tort principles applied by this
Court in admiralty.? Accordingly, the summary judgment
in favor of Bean on Consolidated’s negligence claim is
reversed and the case is remanded.

'The district court entered a final judgment under Fed.R.Civ.P. 54
and stayed all further proceedings in the case pending appeal to this
Court. Record at 3.259-60.

>The limited nature of this appeal deserves special emphasis. As
noted in more detail later in this opinion, see infra at 1220-1221, the
district court explicitly declared that it was resting its opinion on a
theory of negligent interference with contract and that no findings were
made as to whether Consolidated’s claim of negligence would withstand
scrutiny under a foreseeability test. Accordingly, those questions are not
reached on this appeal.

C-3
I. Facts and Procedural Histery
A. Stipulated Facts on this Appeal

For the district court’s use in ruling upon Bean's
motion for summary judgment, Bean, its insurers,’ and
Consolidated entered into a stipulation of facts. These stip-
ulated facts will be summarized here.

Consolidated owned and operated an aluminum
reduction plant near Lake Charles, Louisiana. This plant
contained the following facilities:

a. An electrically operated aluminum reduction pot
line containing 7! operating smelting pots wherein
alumina and bath materials are heated and melted in
an electrolytic process by which molten aluminum is
produced. Each pot utilizes 24 carbon anodes weigh-
ing in excess of 1000 pounds each which are sus-
pended above the pots and project downward into the
molten bath. The bottom of each pot consists of cath-
ode blocks on which the aluminum ts produced.

b. A gas fired coke calciner approximately 180 feet in
length which is lined with refractory brick and refrac-
tory material. In this calciner green coke is subject to
temperatures, which in portions of the calciner exceed
2500 degrees Fahrenheit, and the green coke is thereby
refined into calcined coke.

c. A power plant which utilizes natural gas to produce
electric energy for plant operations. The power plant

‘Consolidated sued both C.F. Bean Corporation, Bean Dredging
Corporation, and their insurers. The stipulation of the parties recog-
nized that C.F. Bean Corporation and Bean Dredging Corporation
should be collectively referred to as “Bean™ for the purposes of consid-
ering the motion for summary judgment and the appeal from the dis-
trict court's ruling thereon. Record at 3.39. Following the parties’ stipu-
lation, we also refer to both companies and their insurers as “Bean.”

C-4

consists of three gas fired jet turbines, three steam
boilers and two steam turbines, as well as associated
electric generators.

Record at 3.39-40. To supply the power plant with gas
necessary for the power plant’s operation, Consolidated
had entered into a Gas Sale and Purchase Agreement with
Texaco. Other than Consolidated’s contractual interest,
Consolidated had no ownership interest in the Texaco
pipeline. Bean had no knowledge of this contract between
Consolidated and Texaco prior to the accident in question.

On April 5, 1980, Bean was conducting maintenance
dredging operations in the Calcasieu River Ship Channel
under a contract with the United States Army Corps of
Engineers. This contract between Bean and the Corps of
Engineers specifically warned Bean of the presence and
location of the Texaco pipeline:

1-10. WORKING IN THE VICINITY OF STRUC-
TURES AND UTILITY CROSSINGS

1-10.1 The Contractor [Bean] shall exercise caution
when working in the vicinity of structures and utilities
crossing or adjacent to the channel....

af ~ ~

1-10.3 The following structures or utilities are located
within the limits of the work..... It will be the
responsibility of the Contractor to verify these loca-
tions and clearances.

Utility or Address

Structure Owner Station Elevation of Owner

12° gas Texaco, 1683 -50.0 MLG P.O. Box 60252,
pipeline Inc. +90 N.O., La. 70160

Record at 3.232-33.4

During the performance of Bean’s work, the cut-
terhead of one of the dredges owned and operated by Bean
struck and ruptured the Texaco pipeline. Within minutes,
the rupture of the Texaco pipeline caused a reduction in
gas pressure and supply to Consolidated’s power plant,
located approximately six miles from the pipeline rupture
in the Calcasieu River.’ As a result of this loss of supply,
the amount of natural gas flowing to Consolidated’s plant
fell below the minimum required to operate Consoli-
dated’s plant powerhouse. Because of the reduction in gas
pressure and supply, Consolidated sustained heavy physi-
cal damages:

a. Freezing (solidifying) of the liquid bath materials
and liquid aluminum in the reduction pots;

b. Cracking and air burning of anodes in the reduction
pots;

c. Cracking of cathode blocks in the reduction pots;
d. Air burning of sidewall blocks in the reduction pots;
e. Burning of breaker bars in the reduction pots;

f. Loss of useful life of the reduction pots; and

g. Loss and cracking of calciner refractory materials.

4As noted above, however. Bean did not specifically know that the
Texaco pipeline served Consolidated’s plant.

‘The parties dispute in their briefs whether the harm to Consoli-
dated’s plant occurred immediately or whether the harm occurred only
after Texaco shut down a main gas line to repair the rupture. Given the
procedural posture of the instant case, this Court has not attempted to
resolve this factual dispute and has assumed, for purposes of this
appeal, that the rupture caused a reduction in gas supply “within
minutes.”

C-6

Record at 3.42-43. Indeed, the resulting physical damage
was so heavy that the parties stipulated the physical
damages to Consolidated’s plant at a value of $2.3 mil-
lion. Consolidated contends that it suffered total physical
and economic damages amounting to approximately $4.6
million. Full natural gas supply was not restored to Con-
solidated until ten days later on April 15, 1980.

B. Procedural History

Consolidated filed its complaint against C.F. Bean
Corporation, Bean Dredging Corporation, their insurers,
and Texaco to claim damages for physical and economic
losses resulting from the interruption of gas services at
Consolidated’s plant. Consolidated’s complaint alleged
three grounds of recovery: (1) an action against Bean and
Texaco on grounds of negligent or intentional acts or omis-
sions leading to the injury; (2) an action against Bean on
the grounds that Consolidated could recover as a third-
party beneficiary under the Bean-Army Corps of Engineers
contract; and (3) an action in contract against Texaco
based on the Texaco-Consolidated Gas Sale and Purchase
Agreement.® Texaco, in turn, impleaded the United States
through the Department of the Army and its Corps of
Engineers, claiming that the United States was also respon-
sible for the negligent dredging which caused the rupture of
the Texaco natural gas pipeline. Jurisdiction was based on
the Admiralty Extension Act, 46 U.S.C. § 740, and on
diversity, 28 U.S.C. § 1332.

*As noted above, see supra at 1218 n. 1, all further proceedings in
the district court were stayed pending appeal on the district court's
granting of summary judgment in favor of Bean on Consolidated’s tort
action against Bean. Any questions arising from Consolidated’s other
alleged causes of action are not presented to this Court on this appeal.

C-7

At the time set for trial, the United States raised the
issue of Robins Dry Dock concerning the claims by Consol-
idated, through Texaco, against the United States. After
consideration of the issue, the district court then permitted
Bean to reopen a prior summary judgment motion by
Bean based on the same grounds. As noted above, Consoli-
dated and Bean entered inio a stipulation of facts for the
district court’s use in considering Bean’s renewed motion
for summary judgment.’

In its opinion, the district court held that Consoli-
dated’s action for negligent dredging against Bean was
barred by Robins Dry Dock and its progeny in this Court.
The district court’s opinion, however, also contained state-
ments which could be construed as stating that the district
court also held that Consolidated was an unforeseeable
plaintiff when its cause of action was considered in light of
common law tort principles. See Record at 3.247 (““Consol-
idated’s extensive physical and economic damages were
too remote and not foreseeable as a result of Bean’s negli-
gence’). Concerned about a possible ambiguity in the dis-
trict court’s opinion, Consolidated filed a motion urging
the district court to clarify its holding so that the matter
would be more clearly presented to this Court on appeal.*
Consolidated’s motion noted, “Had the issue of foresee-
ability been before the [District] Court, Consolidated

The stipulation also noted that Texaco had invoked as a defense
the force majeure provision in Consolidated’s action in contract against
Texaco based on the Consolidated-Texaco Gas Sale and Purchase
Agreement.

*We commend the practice of the parties in stipulating the facts
clearly and in clearing up any possible ambiguity in the district court's
opinion. Although the district court's holding, when read as a whole, 1s
remarkably precise, the action by Consolidated relieved this Court of
any doubt in the matter. The parties are also commended for their
thorough presentation of the issue presented.

C-8

would have presented a substantial volume of evidence
showing that harm to customers served by the pipeline was
a foreseeable consequence of the pipeline rupture.” Record
at 3.251. The motion in subparagraphs 3(b)-(e) then
pointed out several issues of fact which bore on the ques-
tion of foreseeability and which had been referred to in the
district court’s opinion but which were not contained in
the stipulation of facts. In response to Consolidated’s
motion, the district court supplemented its original
opinion:

The Court has granted summary judgment in
favor of Bean and against Consolidated on Consoli-
dated’s cause of action for negligence against Bean, on
the basis of the Court's holding, as a matter of law,
that no cause of action exists for negligent interference
with contract, even where the plaintiff has sustained
physical damages arising out of the interference with
contract. The Court has made no findings of fact with
respect to the issue of foreseeability or the other issues
listed in paragraph 3(b)-(e) of Consolidated’s motion.

Record at 3.257-58.

Il. The Merits

The district court granted summary judgment in
Bean’s favor on Consolidated’s claim of Bean’s negligence
in its dredging operations. Summary judgment ts appropri-
ate only if the full record discloses “that there is no genu-
ine issue as to any material fact and that the moving party
is entitled to judgment as a matter of law.” Fed.R. Civ.P
56(c). In considering whether to grant a motion for sum-
mary judgment, the district court must view the evidence
in the light most favorable to the party resisting the

C-9

motion. The standard of review on appeal is the same.
Simon v. United States, 711 F.2d 740 (Sth Cir.1983).

Since Consolidated’s contractual right to receive natu-
ral gas from Texaco was interrupted by Bean’s negligent
remture of the Texaco pipeline, the district court character-
ized Consolidated’s action against Bean for negligence as
an action for negligent interference with contract. Record
at 3.240, 3.244. While Consolidated recognizes that purely
economic losses flowing from negligent interference with
contract are not recoverable as a matter of law, see, e.g.,
TESTBANK, Consolidated argues that the presence of
physical damages to property in which Consolidated has a
proprietary interest (i.e., physical damages to its own
plant) requires that this case be considered under tort prin-
ciples of foreseeability. Consolidated asserts that it will
present evidence on foreseeability if Consolidated is
allowed to proceed to trial. Record at 3.251. Bean, on the
other hand, argues that the distinction of physical damages
in the instant case is of no significance and that this case is
governed by cases in this Court holding that no cause of
action exists for economic damages resulting from negli-
gent interference with a contractual right.

In arguing that the district court’s summary judgment
should be sustained, Bean relies heavily on Robins. In
Robins, a ship had been delivered to the defendant for
repairs. Under the terms of a contract between the ship’s
owner and the time charterers, the time charterers were not
obliged to pay rent while the ship was being repaired. The
defendant, who had contracted with the owner of the ship
for the repair work, negligently damaged the ship’s propel-
ler. During the additional delay caused by repairs to the
propeller, the time charterers lost expected profits from the
use of the ship. The time charterers sued the defendant for

C-10

these economic losses. The Supreme Court rejected the
claim. The only item physically damaged was the propel-
ler, and “‘[t]he injury to the propelier was no wrong to the
[time charterers] but only to those to whom it belonged.”
Robins, 275 U.S. at 308, 48 S.Ct. at 135. The Court went
on to note that the time charterers had lost only the benefit
of their contract for hire and that “a tort to the person or
property of one man does not make the tort-feasor liable to
another merely beacuse the injured person was under a
contract with that other, unknown to the doer of the
wrong. The law does not spread its protection so far.” /d.
at 308-09, 48 S.Ct. at 135 (citations omitted).

Taken by itself, Robins, however, is of somewhat lim-
ited applicability in that it holds “only that if a defendant’s
negligence injures party 4, and the plaintiff suffers loss of
expected income or profits because it had a contract with
A, then the plaintiff has no cause of action based on the
defendant’s negligence.” TESTBANK, 752 F.2d at 1040
(Wisdom, J., dissenting). In the instant case, the plaintiff
Consolidated sues not solely for any lost income or other
economic loss from the interruption of its supply of natural
gas (e.g., due to being forced to pay higher prices for an
alternative supply) but instead for physical losses, as well
as attendant economic damages, to its own property which
occurred as a result of the interruption of Consolidated’s
supply of gas “within minutes” of the pipeline’s rupture.
Thus, unlike the time charterers in Robins, Consolidated’s
Suit centers on the physical damages it sustained resulting
from the incident.

Thus, if a rule based on Robins which bars Consoli-
dated’s claim per se is to ve found, it must lie in the
interpretation that this Court and other jurists have given
to Robins. Recently, this Court, sitting en banc, conducted

C-11

an exhaustive study of Robins and its progeny. In
TESTBANK, this Court reviewed a summary judgment
entered against a host of plaintiffs who claimed purely
economic losses arising out of a spill of a toxic chemical in
the Mississippi River Gulf outlet. Reviewing this Court’s
interpretation of Robins? and the cases cited by Justice
Holmes in his opinion in Robins, the Court determined
that Robins is not based on whether a plaintiffs harm is
“foreseeable” or “remote” in a factual sense but instead on
“the character of the interest harmed” for which a plaintiff
seeks relief. TESTBANK, 752 F.2d at 1022-24 (quoting
Dick Meyers Towing Service, Inc. v. United States, 577
F.2d 1023, 1025 (Sth Cir.1978), cert. denied, 440 U.S. 908,
99 S.Ct. 1215, 59 L.Ed.2d 455 (1979)). The “character of
the interest harmed” for which the plaintiffs sought relief
in TESTBANK was solely economic. Jd. at 1021. Given
this character of the interest harmed, the Court reaffirmed
the holding of this Court that “physical damage to a pro-
prietary interest [is] a prerequisite to recovery for eco-
nomic loss in cases of unitentional maritime tort.” Jd. at
1020. The Court emphasized that to abandon the physical
injury requirement would impose a “limitless type of lia-
bility,” id. at 1025 (quoting General Foods Corp. v. United
States, 448 F.Supp. 11 (D.Md.1978)), and the result would
be “‘wave upon wave of successive economic conse-
quences.” /d. at 1028. The Court also noted the corre-
sponding difficulty to courts in managing such economic

*Perhaps most notably, the 7ESTBANK Court observed that in
Kaiser Aluminum & Chemical Corp. v. Marshland Dredging Co., 455
F.2d 957 (Sth Cir.1972)(per curiam), the plaintiff lost gas supplies when
the defendant dredging company broke a gas pipeline owned by Sugar
Bowl Gas Company. Kaiser sought only economic losses for shutdown
expenses and production losses. The Court held that because such eco-
nomic losses were only negligently inflicted, recovery was precluded as a
matter of law.

C-12

claims on a discrete basis under traditional tort principles.
Id. at 1028. Thus, where the character of the interest
harmed was solely economic, the Court held that no recov-
ery could be allowed under Robins as a “pragmatic limita-
tion upon the tort doctrine of foreseeability.” Jd. at 1023.

In the instant case, this “pragmatic limitation upon
the tort doctrine of foreseeability” does not apply. Rather,
Consolidated plainly suffered physical harm to property in
which it has a proprietary interest—i.e., its own equipment
for deriving aluminum. Thus, 7ESTBANK does not apply.
See Domar Ocean Transportation, Ltd. v. M/V ANDREW
MARTIN, 754 F2.d 616 (Sth Cir.1985)(“‘maritime tort
damages for economic loss can be awarded only when the
plaintiff has suffered physical damage to a proprietary
interest’). Further, Beans’s characterization of the physical
harm in this case as a “negligent interference with con-
tract’’ tends to obscure more than to illuminate. Unlike the
claimant in Robins, Consolidated does not seek recovery
solely for the loss of a contractual expentancy. While
Bean’s alleged negligence certainly interfered with Consoli-
dated’s contractual arrangement with Texaco, it cannot be
gainsaid that, under the stipulated facts on this appeal,
Bean’s negligence also led to Consolidated’s physical dam-
ages. While the presence of the Consolidated-Texaco con-
tract is relevant to the question of foreseeability, its pres-
ence in the causal chain does not bar recovery.!°

'°Indeed, the Court in TESTBANK noted that a contractual rela-
tionship can make the plaintiffs harm more foreseeable. In discussing
Byrd v. English, 117 Ga. 191, 192, 43 S.E. 419 (1903), a case involving a
printer’s recovery for lost profits resulting from the defendant’s negli-
gent interruption of the plaintiffs electrical power, the Court stated,

That the printing company had a contract with the power company
did not make more remote the relationship between its loss of
(Continued on next page)

C-13

The Court’s result in the instant case is consistent with
the opinions of other courts and commentators. In accord
with this Court’s rule in TESTBANK, the Restatment (Sec-
ond) of Torts, for example, notes that there has been no
general recognition of liability for a negligent interference
with contract absent physical injury to a plaintiff's proprie-
tary interest.'' The authors explain that courts generally
have been reluctant to allow claims for such economic
losses because of the difficulty in limiting a defendant’s
liability. Restatement (Second) of Torts § 766C, Comment
a. Where plaintiffs have suffered physical harm to their
own property, however, these authorities recognize that
the rationale for applying the rule foreclosing relief for

(Continued)
profits and the tortious acts. To the contrary, the contract reduced
this remoteness by defining an orbit of predictable injury smaller
than if there were no contract between the power company and the
printer. When the loss is economic rather than physical, that the
loss caused a breach of contract or denied an expectancy is of no
moment.

752 F.2d at 1023-24

"Section 766C states:

Negligent Interference with Contract or Prospective Contractual
Relation.

One is not liable to another for pecuniary harm not deriving from
physical harm to the other, if that harm results from the actor’s
negligently

(a) causing a third person not to perform a contract with the other,
or

(b) interfering with the other’s performance of his contract or mak-
ing the performance more expensive or burdensome, or

(c) interfering with the other’s acquiring a contractual relation with
a third person.

Restatement (Second) of Torts § 766C.

C-14

economic harm does not apply. While the number of
plaintiffs suffering oniy economic harm from a negligent
act is indeterminate and perhaps infinite, the number of
potential plaintiffs suffering physical harm is generally
neither as indeterminate nor as possibly infinite. See Com-
ment, Foreseeability of Third-Party Economic Injuries—A
Problem in Analysis, 20 U.Chi.L.Rev. 283, 298 (1953);
Pearlman, /nterference with Contract and Other Economic
Expectancies: A Clash of Tort and Contract Dectrine, 49
U.Chi.L.Rev. 61, 71-72 (1982). Thus, commentators have
stated that a plaintiff is not barred from recovery where the
plaintiff has suffered physical harm to his own person or
property. The Restatement authors explain:

b. Physical harm to the other. The rule stated in this
Section [766C] applies when the plaintiff suffers only
pecuniary loss, such as the loss of the financial benefits
of a contract or of prospective trade or financial loss
through being put to additional expense. If there is
physical harm to the person or land or chattels of the
plaintiff, the rule stated in this Section does not apply
and there may be recovery for negligence that results
in physical harm because of the nonperformance of a
contract with the plaintiff. This recovery is of course
subject to the usual rules governing liability for
negligence.

Restatement (Second) of Torts § 766C, Comment b (cita-
tions omitted).'? Likewise, Professors Prosser and Keeton

'2The distinction that this Court has drawn (as exhibited in
TESTBANK) between physical and economic damages has also been
drawn by other courts. See, e.g., Barber Lines A/S vy. M/V Donau Maru,
764 F.2d 50 (1st Cir.1985). Likewise, state courts have made a similar
distinction. In Stop & Shop Cos. v. Fisher, 387 Mass. 889, 444 N.E.2d
368 (1983), the plaintiff sought damages for loss of business revenues

(Continued on next page)

C-15

distinguish instances in which a plaintiff recovers for phys-
ical damages from the rule denying relief for economic
losses resulting from negligent interference with contract.
W. Prosser & W. Keeton, Prosser and Keeton on the Law of
Torts, § 129, at 1000 n. 27 (Lawyers’ ed. 1984).

(Continued)

allegedly caused by the defendant’s negligent collision with a draw-
bridge. Although the plaintiff had no proprietary interest in the draw-
bridge, the plaintiff alleged that it suffered economic losses due to the
loss of potential customers who could not cross the drawbridge and
reach the plaintiff's store. The court distinguished an earlier Massachu-
setts case, Newlin v. New England Telephone & Telegraph Co., 316
Mass. 234, 54 N.E.2d 929 (1944), on the basis that Newlin involved
physical harm to the plaintiff's own property caused by the interruption
of plaintiffs supply of electricity from the power company. On an
appeal from the trial court’s sustaining of a demurrer, the court in
Newlin allowed recovery for the loss of plaintiffs mushrooms which
resulted when the defendant’s telephone pole fell and severed an electri-
cal power line supplying plaintiff's electrical apparatus for controlling
temperature. Similarly, courts generally have recognized, albeit in dicta,
that a distinction exists between cases in which a plaintiff sustains
physical damages and those in which only economic damages are
claimed. See, e.g., Akron Corp. v. M/T CANTIGNY, 706 F.2d 151, 153
(Sth Cir.1983) (per curiam); Louisville & N. R.R. v. M/V VAYOU
LACOMBE, 597 F.2d 469, 473-74 (Sth Cir.1979); Nebraska Innkeepers,
Inc. v. Pittsburgh-Des Moines Corp., 345 N.W.2d 124, 126 (lawa 1984).

Moreover, to the extent that Louisiana law is relevant to the instant
case, it is consistent with this writing. In PPG Industries, Inc. v. Bean
Dredging Corp., 447 So.2d 1058 (La.1984), the court was confronted
with PPG’s claims for economic losses only arising out of the same
dredging accident as that which occurred in the instant case. The court
did not apply a rule of per se exclusion, as that contained in Robins, but
instead held that PPG’s claim for economic losses was not recoverable
under a duty risk analysis. The court emphasized that its holding turned
largely on the economic character of PPG’s loss. 447 So.2d at 1061.

III. Conclusion

We therefore conclude that the district court erred in
granting summary judgment in favor of Bean. The “prag-
matic limitation upon the tort doctrine of foreseeability,”
derived from Robins and TESTBANK, does not apply to
the instant case. While defendant Bean urges this Court to
determine “[uJnder a traditicnal tort analysis [that] Con-
solidated’s harm [is]... too remote,” Bean’s Brief at 12,
we leave the determination of the foreseeability of Consoli-
dated’s injury for the trial court to determine on remand.
Likewise, application of other tort law principles applied in
admiralty are left for the trial court on remand as ques-
tions calling for the determination of such principles are
not presented on this appeal.

REVERSED AND REMANDED

ON PETITION FOR REHEARING
WITH SUGGESTION FOR
REHEARING EN BANC
PER CURIAM:

The petition for panel rehearing is DENIED. In view
of the petition’s suggestion that the panel opinion inadver-
tently creates “a brand new theory of recovery for negligent
interference with a contract where physical damage occurs
solely from the loss of anticipated contract benefits,” we
take this opportunity to reemphasize the limited nature of
the appeal and the narrowness of our holding.

Our discussion of the Robins Dry Dock/TESTBANK
line of cases showed that the “pragmatic limitation upon
the tort doctrine of foreseeability,” State of Louisiana, ex
rel, Guste v, m/v TESTBANK, 752 F.2d 1019, at 1023 (Sth
Cir, 1985), established by these cases, is inapplicable to the

C-17

instant case because the plaintiff Consolidated unquestion-
ably suffered physical harm to its own property. We further
conclude that the mere existence of a contract between
Texaco (whose property suffered the most immediate harm
from the defendant's dredging) and Consolidated does not
create a legal bar to Consolidated’s claim against Bean for
negligent dredging. We in no way intimated that Consoli-
dated could recover for “negligent jinterference with con-
tract.” Nor did we hold that summary judgment for the
defendant would necessarily be improper on the facts of
the instant case. Rather, we remanded because the district
court expressly omitted to review the issue of foreseeability
with regard to negligent dredging. We expressly declined to
reach the question of “whether Consolidated’s claim of
negligence would withstand scrutiny under a foreseeability
tes.” 772 F.2d at 1218 n. 2, and left the application of
traditional tort principles, including foreseeability and the
related concept of legal duty, for the trial court to deter-
mine on remand, at 1224.

Thus, the petition for rehearing is DENIED, and no
member of this panel nor Judge in regular active service on
the Court having requested that the Court be polled on
rehearing en banc (Federal Rules of Appellate Procedure
and Local Rule 35), the suggestion for rehearing en banc ts
DENIED.

‘es

D-|

APPENDIX D

IN THE

United States District Court

For
THE WESTERN District OF LOUISIANA
LAKE CHARLES DIVISION

CONSOLIDATED
ALUMINUM CORP.

— CIVIL ACTION
NO. 81-0500
C. F. BEAN CORPORA-
TION, et al

February 8, 1984

EARL E. VERON
UNITED STATES DISTRICT JUDGE

RULING ON DEFENDANT, C. F. BEAN’S
MOTION FOR SUMMARY JUDGMENT

Plaintiff, Consolidated Aluminum Corporation (here-
inafter “Consolidated”’), the owner of an aluminum pro-
duction plant, had a contract with defendant/third-party
plaintiff Texaco, Inc., for the delivery of natural gas. On
April 5, 1980, the delivery of those services was allegedly
negligently interfered with when Texaco’s submerged pipe-
line was ruptured by the cutterhead of Dredge 32, owned
by Bean Dredging Corporation (hereinafter “Bean’’),
which was performing ship channel maintenance dredging
pursuant to a contract with the United States Army Corps
of Engineers, Consolidated filed a complaint against both

D-2

Bean and Texaco, and Texaco filed a third-party complaint
against the United States.

Consolidated seeks recovery for Bean’s alleged negli-
gent dredging which ruptured Texaco’s gas pipeline
thereby causing physical damage to Consolidated’s plant
with resulting economic losses. Bean brings the instant
motion arguing that, as a matter of law, Consol

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40385019_1588%3A1. Public record. Not legal advice.