# Amicus Curiae Brief — Fed. Energy Regulatory Comm'n v. Elec. Power Supply Ass'n, 135 S. Ct. 2049 (2015) (No. 14-840)

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40385016_0317%3A30

## Record

- **Collection:** Supreme Court brief
- **Document type:** Amicus Curiae Brief
- **Published:** January 1, 2015

## Text

Supreme Court, U.S.
FILED

JUL 16 2015
No 14-840 OFFICE OF THE CLERK
In the Suprenve Court of the Eirited States
FEDERAL ENERGY REGULATORY COMMISSION,
PETITIONER

Vv.
ELECTRIC POWER SUPPLY ASSOCIATION, ET. AL.

ON WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF APPEALS
FOR THE DISTRICT OF COLUMBIA CIRCUIT

BRIEF OF GRID ENGINEERS AND EXPERTS AS AMICI
CURIAE IN SUPPORT OF NEITHER PARTY

JUSTIN FLORENCE DOUGLAS HALLWARD-DRIEMEIER

Ropes & Gray LLP Counsel of Record

Prudential Tower Ropes & Gray LLP

800 Boylston Street One Metro Center

Boston, MA 02199 700 12th Street, NW, Suite 900
Washington, DC 20006

BRIAN ROODER (202) 508-4600

MEREDITH S. PARKINSON Douglas. Hallward-Driemeier

Ropes & Gray LLP @ropesgray.com

1211 Avenue of the Americas

New York, NY 10036

TABLE OF CONTENTS

Page

I 65 Ge GD eccrine 1

Introduction and SUMMATY .............csecescereeeeersensenserereees 5

Argument:

I. Engineers plan and operate the grid to balance
generation and load and ensure reliable and
cost-effective electricity ...............cccecescssererseceneeees 8

II. Demand response resources are in many ways
fungible with generation resources ................+++. 13

III. Demand response resources enhance the
reliability of the id ...............cccesecsosessscsseeeeceeeeees 18

IV. The availability of demand response resources
lowers rates for wholesale electricity.................. 22

i iicinsicictennincnsomnncenonentinniinieamammmnnatie 27

(1)

II

TABLE OF AUTHORITIES
Page(s)
Cases:
Electric Power Supply Ass'n v. FERC, 753
PBB BID CAG. Ga. BBO cccccccencestessnsccsesesenscccsnssees 7
New York v. FERC, 535 U.S. 1 (2002) ............ 8,9, 11
Statutes, regulations and orders:
Federal Power Act § 201(b),
ta te aerate arinrentateal 9, 23
18 C.F.R.:
Teena ee 13, 14
a irecinenricinanitiniel 14
Section 35.28(2)(1)(V)(A).......csecsccesercessernerseeeees 2A
ee 21, 25
ea passim
SERIE Cnet eer 21
Miscellaneous:
Jean-Yves Blanc et al., The Benefits of
Demand Response for Utilities (2014)............... 10

Steven Braithwait & Ahmad Faruqui, The
Choice Not to Buy: Energy Savings and
Policy Alternatives for Demand
Response (March 15, 2001) ..............cceccceesseeeseees 26

Ill

tiscellaneous—Continued: Page(s)

Matthew H. Brown & Richard P. Sedano,
National Council on Electricity Policy,
Electricity Transmission: A Primer

Paul Centolella, Next Generation Demand

Response: Responsive Demand through
Automation and Variable Pricing (March

Department of Energy, Benefits of Demand
Response in Electricity Markets and
Recommendations for Achieving Them
(February 2006) ...............c-.cccccecesseseeseeseees 14, 20, 26

Joel B. Eisen, Who Regulates the Smart
Grid? FERC’s Authority Over Demand
Response Compensation in Wholesale
Electricity Markets, 4 San Diego J. Cli-
mate & Energy L. 69 (2013).................... 15, 16, 20
Electric Energy Market Competition Task
Force, Report to Congress on
Competition in Wholesale and Retail
Markets for Electric Energy,
http://www.ferc.gov/legal/fed-sta/ene-pol-
act/epact-final-rpt.pdf. ...................sceeseseeeeseeseseees 25
FERC, Energy Primer, a Handbook of
Energy Market Basics (July 2012),
http//www-.ferc.gov/market-oversight/
guide/energy-primer.pdf .........-...ccsecssceereeeeesereees 12

IV

Miscellaneous—Continued: Page

FERC, Security Constrained Economic

Dispatch: Definition, Practices, Issues

and Recommendations (2006),

http://www ferc.gov/industries/electric/in

dusact/joint-boards/final-cong-rpt.pdf...21, 23, 24
Eric Hirst, Real-Time Balancing Operations

and Markets: Key to Competitive

Wholesale Electricity Markets (Apr.

Eric Hirst & Brendan Kirby, Retail-Load
Participation in Competitive Electricity
Pp EE 12

William W. Hogan, Competitive Electricity
Market Design: A Wholesale Primer

SO: ie UE citeininnetanicnasnensetcnmnierriennsenmnicscamemnsccens 10
Doug Hurley et al., Demand Response as a

Power System Resource (May 2013)...............-+- 15
ISO/RTO Council, The Value of Independent

Regional Grid Operators (Nov. 2005),

http://www.nyiso.com/public/webdocs/me
dia_room/press_releases/2005/isortowhite
paper_final11112005.pdf .................scsccsceceeeeeeeees 10
Paul L. Joskow, Creating a Smarter U.S.
Electricity Grid, 26 J. Econ. Perspectives
iitssinannentninensnnanaitninsnineemenee 10, 25
Brendan J. Kirby, Demand Response for
Power System Reliability: FAQ (2006),
https://esdr.lbl.gov/sites/all/ files/dr-
eee 12, 17, 20, 21

V

Miscellaneous—Continued: Page

Harvey Michaels & Kat Donnelly, Energy
Innovation, Architecting the Consumer
Side of the Grid for Energy Efficient
IIIT isintiihinseiensisinieanbanpangigntenmintesceminasetecen 16, 25

Michael Milligan & Brendan Kirby, Utilizing
Load Response for Wind and Solar
Integration and Power System
Reliability (Jume 2010)............cccc-cceceeseeseseerees 18, 19

MIT, The Future of the Electric Grid: An
Interdisciplinary MIT Study (2011),
http://mitei.mit.edu/system/files/Electric
_Grid_Full_Report. pdf ............c.cccsseseeeeees 8, 17, 18

Sam Newell & Frank Felder, Quantifying
Demand Response Benefits in PJM (Jan.

U.S. Energy Information Administration,
Fewer Wind Curtailments And Negative
Power Prices Seen In Texas After Major
Grid Expansion (June 24, 2014),
http//www.eia.gov/today inener-
gy/detail.cfm?id=16831 ..................ssssssseeeees 10, 22

In the Supreme Court of the Hmited States

FEDERAL ENERGY REGULATORY COMMISSION,
PETITIONER

v.
ELECTRIC POWER SUPPLY ASSOCIATION, ET. AL.

ON WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF APPEALS
FOR THE DISTRICT OF COLUMBIA CIRCUIT

BRIEF OF GRID ENGINEERS AND EXPERTS
AS AMICI CURIAE IN SUPPORT OF
NEITHER PARTY

Amici curiae, in their individual capacities, respect-
fully submit this brief in support of neither party.’

INTEREST OF AMICI CURIAE
Amici are engineers who are nationally recognized
experts regarding the operation of the electric grid.
They collectively have nearly 200 years of experience
helping to manage and study the U.S. electric grid.
Amici also research, publish, and teach courses on the
grid.

' All parties have consented to the filing of this amicus curiae
brief. No counsel for any party authored this brief in whole or in
part, and no person or entity, other than amici curiae or their
counsel made a monetary contribution intended to fund the prepa-
ration or submission of this brief.

(1)

2

Amicus curiae David W. Hilt is the president and
owner of Grid Reliability Consulting, LLC. He has
nearly forty years of experience in electric power sys-
tem engineering, operation, and regulatory activities,
and has been a manager responsible for the design,
specification, and construction of electric substations
from distribution to EHV including protective relaying.
He has also managed transmission and resource plan-
ning activities for a major Midwestern electric and nat-
ural gas utility. Mr. Hilt has directed the development
and installation of state estimation and OASIS systems
for a Midwestern Reliability Coordination Center. As a
Vice President at NERC, he led the development of the
compliance monitoring and enforcement program for
the bulk-power system reliability standards in North
America, working closely with the industry, FERC,
and Canadian regulatory authorities. While at NERC,
he led the investigation of the August 2003 blackout in
the Northeastern United States and Canada, providing
technical input to the U.S.-Canada Power System Out-
age Task Force report. Mr. Hilt’s recent experience
includes assessment of risk from physical attack and
grid resiliency.

Amicus curiae Brendan Kirby is a private consult-
ant with numerous clients including the Hawaii PUC,
National Renewable Energy Laboratory, EPRI,
AWEA, Oak Ridge National Laboratory, and others.
He served on the NERC Standards Committee and is
currently on the NERC Essential Reliability Services
Task Force. He retired from the Oak Ridge National
Laboratory's Power Systems Research Program. He
has 40 years of electric utility experience and has pub-
lished over 180 papers, articles, book chapters, and re-

3

ports on ancillary services, wind integration, restruc-
turing, the use of demand response as a bulk system
reliability resource, and power system reliability. He
has a patent for responsive loads providing real-power
regulation and is the author of a NERC certified course
on Introduction to Bulk Power Systems: Physics / Eco-
nomics / Regulatory Policy. Mr. Kirby is a licensed Pro-
fessional Engineer with a M.S. degree in Electrical En-
gineering (Power Option) from Carnegie-Mellon Uni-
versity and a BS. in Electrical Engineering from
Lehigh University.

Amicus curiae Kenneth J. Lutz has had decades of
experience in energy, telecommunications, and public
policy. He has developed and is teaching a new course
on the smart grid at the University of Delaware, where
he is an adjunct professor. For the past two years he
served as the faculty-member-in-residence for the
Washington Internship for Students of Engineering
(WISE) in Washington, DC. In 2009 Dr. Lutz was an
IEEE/AAAS Congressional Fellow for United States
Senator Ron Wyden, where he was instrumental in
writing federal legislation for renewable energy and
energy efficiency. He then founded AMR Strategies,
LLC, to help utilities modernize their grids, with smart
grid technologies, renewable energy sources, energy
storage, and other technological improvements. Prior
to his fellowship, Dr. Lutz was a Distinguished Member
of the Technical Staff at Telcordia Technologies (for-
merly Bell Communications Research) and at Bell Tel-
ephone Laboratories. He has a Ph.D. in electrical engi-
neering from the Johns Hopkins University and a
B.E.E. from the University of Delaware.

4

Amicus curiae Harvey Michaels is a lecturer and
research scientist with ties to the MIT Sloan School of
Management and the interdisciplinary MIT Energy In-
itiative, related to energy efficiency and demand man-
agement with a focus on strategy innovation. He joined
MIT in 2008, following a career as a leading practitioner
in the field. As Director of the MIT Energy Efficiency
Strategy Project, he led business and policy studies of
utility, community, and smart-grid enabled efficiency
and deployment models, and was a member of the fac-
ulty team for the MIT Energy Initiative Future of the
Electric Grid Study in 2012, as well as the MIT Indus-
trial Performance Center’s Energy Innovation Study in
2011. He currently participates in the MIT Center for
Energy and Environmental Policy Research and the
Center for Collective Intelligence and consults in cities
including Boston and Cambridge, as well as for Massa-
chusetts utilities on community energy and climate ac-
tion. From 1997 to 2007, Mr. Michaels was chairman
and CEO of Nexus Energy Software (now Aclara
Software) which develops utility energy data analytic
solutions. Before founding Nexus, Harvey was Presi-
dent of XENERGY (now part of DNV/KEMA Consult-
ing and Con Edison Solutions), which specialized in effi-
ciency resource studies and systems.

Amicus curiae Brian Parsons worked as an engi-
neer and manager at the National Renewable Energy
Lab, and its predecessor, the Solar Energy Research
Institute, for over 30 years. His work included renew-
able power technology development, systems analysis,
and variable renewable electrical grid integration top-
ics. He led the Transmission and Grid Integration
Group at NREL from its formation in 2007 until early

5

2013. During that time, his team led grourd breaking,
high renewable penetration, grid operational analyses
including the Western Wind and Solar Integration
studies. Since retiring from NREL, Mr. Parsons has
been consulting to NREL and various organizations on
various aspects of grid integration of renewables, both
domestically and internationally. Mr. Parsons is also a
Director of the Western Grid Group. Mr. Parsons has
been a long-time participant and advisor to the Utility
Variable-Generation Integration Group (formerly the
Utility Wind Integration Group), and has served as a
technical reviewer for numerous utility-sponsored re-
newable grid studies. He has presented on wind and
grid integration issues to regulators, elected officials,
power engineers, and other stakeholders throughout
the U.S. and internationally.

Amici believe their experience with and knowledge
of the electric grid may assist the Court as it considers
the issues in this case. In particular, they believe the
opinion of the court below reflects some misunder-
standings of how the U.S. electric grid actually oper-
ates, as well as of the role that demand response re-
sources play in the grid. And they believe that proper
and effective regulation of the wholesale markets, in-
cluding of demand response resources participating in
those markets, will enable grid operators to fulfill their
responsibilities of providing reliable and cost-effective
electricity to the country.

INTRODUCTION AND SUMMARY

Amici, as experts in the operations of the electric
grid, have significant experience in the way that the
electric grid operates to provide reliable and cost-

6

effective electricity to the United States. Amici are not
lawyers or economists, and take no position on the spe-
cific questions at issue in this case related to FERC’s
jurisdiction and Order 745. Nonetheless, amici have
significant interests in the effective functioning of the
electricity grid and markets. Demand response re-
sources play an increasingly important role in ensuring
the reliable and cost-effective availability of electricity.
Demand response resources can be as helpful as gener-
ation of additional supply in maintaining the reliability
of the grid, and may, in fact, offer advantages over gen-
eration under certain circumstances. And they can be
drawn on at peak times to reduce the overall cost of
electricity. Ensuring that demand response resources
can be drawn on (or dispatched) in the wholesale ener-
gy markets and ancillary services markets (defined be-
low) thus allows grid engineers and operators to effec-
tively fulfill their responsibilities. In this brief, amici
make four points about the function of the electric grid
and the role of demand response resources.

First, the physical properties of electricity and the
geography of the U.S. electric grid require grid opera-
tors to instantaneously and continuously balance the
“generation” (i.e., supply) of electricity with “load” (i.e.,
demand)—in ways that are at once interconnected
across large regions, but also responsive to local needs.

Second, as grid operators balance generation and
load on the grid, demand response resources are in
many ways fungible vith generation resources: pur-
chasing demand response resources can, in many cir-
cumstances, fulfill the same purpose as purchasing ad-
ditional generation resources.

7

Third, demand response resources can in some cir-
cumstances provide advantages over generation re-
sources in facilitating grid operators’ mission of main-
taining a reliable flow of electricity. Not only do they
provide an additional flexible tool, but because they can
be quickly activated—including in specific locations
where needed—they can substantially help achieve
balance on the grid and thus avoid service disruptions.

Fourth, demand response resources directly affect
prices in the wholesale energy and ancillary services
markets. The algorithms that grid operators use to col-
lect bids on and dispatch electricity look for the lowest
price available (given reliability constraints). At times
the price of purchasing demand response will be lower
than the price of purchasing additional generation.
Moreover, the economics of the energy market cannot
be disconnected from the reliability factors involved in
balancing the grid and maintaining reliable operation of
the grid. The pricing system takes into account relia-
bility factors, so that grid operations and energy mar-
kets (including their reliance on demand response re-
sources) are inherently intertwined with each other.
Also, by reducing demand on the grid, demand re-
sponse resources can potentially lessen the need for
additional transmission system upgrades, providing
further cost efficiencies.

In all of these ways, demand response resources
are not at all like “steel, fuel, and labor.” Compare
Electric Power Supply Ass’n v. FERC, 753 F.3d 216,
221 (D.C. Cir. 2014). Grid operators cannot call on steel
or labor to balance the load overall, or to enhance the
reliability of a particular sector of the grid. The algo-
rithms that grid operators use to balance load and de-

8

termine the lowest available price cannot accept bids
for additional steel or additional labor. From the per-
spective of grid operators, it is quite helpful to regulate
the energy markets in a manner that accounts for the
availability and effect of dispatchable demand response
resources—something that cannot be said for those
other commodities.

ARGUMENT

I. ENGINEERS PLAN AND OPERATE THE GRID TO
BALANCE GENERATION AND LOAD AND
ENSURE RELIABLE AND COST-EFFECTIVE
ELECTRICITY

The electric power system in the U.S. is comprised
of three independently synchronized grids: the Eastern
Interconnection, the Western Interconnection, and the
Electric Reliability Council of Texas. New York v.
FERC, 535 U.S. 1, 31 n.4 (2002). Within each of those
grids, wholesale electricity markets operate, in which
electricity is produced by power-producing entities, or
generators, and sold to resellers—typically local distri-
bution companies. They, in turn, sell electricity to end-
use customers in the retail electricity market.

Organized wholesale electricity markets cover ap-
proximately two thirds of the U.S. electricity load.’ In
areas of the country with organized wholesale electrici-
ty markets, the grids are operated by Independent
System Operators (ISOs) and Regional Transmission

*See MIT, The Future of the Electric Grid: An Interdisciplinary
MIT Study 3 (2011), http://mitei.mit.edu/system/files/Electric
_Grid_Full_Report.pdf (MIT).

* See id. at 4.

9

Organizations (RTOs). ISOs and RTOs also administer
the region’s electricity market, and provide reliability
planning to ensure dependable service. In addition to
operating the grids, ISOs and RTOs also function as the
financial exchange for energy sales in wholesale energy
markets. See Federal Power Act § 201(b), 16 U.S.C.
82A4(b).

In most of the country, “any electricity that enters
the grid immediately becomes a part of a vast pool of
energy that is constantly moving in interstate com-
merce.” New York, 535 U.S. at 7. Because of the
unique nature of electricity, its production and con-
sumption must occur at virtually the same time.’ In-
deed, due to the physics of the flow of electricity and
the fact that it cannot be easily stored for later use, it
has been dubbed the “ultimate real-time product.”

The energy grid must therefore be kept constantly
in balance, such that the amount of electricity being
generated and dispatched equals the amount being
used by consumers at any given time.’ “On an electrici-
ty grid, supply and demand must be balanced continu-
ously to maintain a variety of physical network crite-
ria—like frequency, voltage, and capacity constraints—

* In the remaining areas of the country, the grids are operated
by local utilities and balancing authorities.

* See Matthew H. Brown & Richard P. Sedano, Electricity
Transmission: A Primer 67 (June 2004) (Brown & Sedano).

* See Eric Hirst, Real-Time Balancing Operations and Markets:
Key to Competitive Wholesale Electricity Markets 1 (Apr. 2001)
(Hirst).

" For this reason, grid operators can be fined for failure to bal-
ance load and generation within certain limits.

10

within narrow bounds.” If generation and load are not
balanced, the grid will fail. More demand than supply
leads to disrupted service and blackouts, as does more
supply than demand.’ Reliable, real-time balancing of
supply and demand is therefore critical to the operation
of the grid.”

Grid operators are responsible for achieving the
proper balance of supply and demand on the electric
grid—within narrow bounds—to ensure system integ-
rity. In particular, grid operators (with the aid of au-
tomatic equipment) must react instantaneously in re-
sponse to changes in consumers’ demands for electrici-
ty." Effectively the air traffic controllers of the power
grid, grid operators work to address reliability issues in
rea] time, reconfiguring the system when a major pow-
er line fails to ensure continued access to electricity,
ensuring that generators meet reliability standards and
transmission lines are not overloaded, and preparing
for equipment failures and extreme weather.”

* Paul L. Joskow, Creating a Smarter U.S. Electricity Grid, 26 J.
Econ. Perspectives 29, 33 (2012).

* See U.S. Energy Information Administration, Fewer Wind
Curtailments and Negative Power Prices Seen in Texas After Ma-
jor Grid Expansion (June 24, 2014), http//www.eia.gov/today
inenergy/detail.cfm?id=16831 (U.S. Energy Info. Admin.); Brown
& Sedano 67; Jean-Yves Blanc, et al., The Benefits of Demand Re-
sponse for Utilities 2, 4 (2014).

° See William W. Hogan, Competitive Electricity Market De-
sign: A Wholesale Primer 3 (Dec. 17, 1998).

See ISO/RTO Council, The Value of Independent Regional
Grid Operators 11 (Nov. 2006), http://www.nyiso.com/pu
blic/webdocs/media_room/press_releases/20065/isortowhitepaper_fi
nal11112006.pdf.

* See Brown & Sedano 33-34, 53.

1]

The electric grid shares characteristics with a “pool
of water,” but in some ways too it can act like « series
of “water pipes,” albeit not in a simplistic way. See
New York, 535 U.S. at 7 n.5. On the one hand, energy
disperses throughout the electric grid, so that adding
some in one place and taking it out in another leaves
the system in balance. “[AJny activity on the interstate
grid affects the rest of the grid.” Jbid. On the other
hand, the “pool” metaphor does not fully capture the
complexity of the grid. Ibid. The location and capacity
of transmission lines (and related equipment such as
transformers and transmission stations that convert
voltage from the high levels used for long-distance
transmission to the low levels used by consumers) can
limit how much energy can be moved from Point A to
Point B. As a result, grid operators must balance sup-
ply and demand not just on the grid as a whole, but in
each location on the grid, accounting for how much
transmission inflow and outflow is possible between lo-
cations. Grid operators must also maintain system reli-

ability parameters by ensuring that system voltage,
limits, and stability are maintained.

In order for grid operators to balance generation
and load, they must estimate the demand for electricity
and then dispatch resources to meet that demand while
maintaining system reliability parameters. Estimating
demand enables grid operators to ensure that there are
sufficient generation resources ready to produce the
needed power in the proper locations.

Generation is matched with load at various time in-
tervals in the energy markets, including the day-ahead
and real-time (typically, five- to fifteen-minutes-ahead)

12

markets.” (In addition to the wholesale energy mar-
kets, there are also “capacity” and “ancillary services”
markets. Capacity markets cover time periods “such as
a month, season or year,” through auctions held “up to
three years prior to when the capacity is needed.” An-
cillary services markets provide for immediate operat-
ing reserves necessary to “provide the system operator
with control over the real-time generation/load bal-
ance.”"). In the day-ahead market, grid operators fore-
cast the next day’s load based on historical usage data,
weather forecasts, and current usage data from the re-
al-time market and commit generators to serve that
load on a least-cost basis. In the real-time energy mar-
ket, grid operators dispatch generators based on near-
term sophisticated load forecasts that use instantane-
ously-reported load (as measured and reported by a va-
riety of measuring devices) to provide the most accu-
rate forecast.

Forecasting demand—either in the real-time or
day-ahead market—permits grid operators to coordi-
nate generation and transmission and schedule genera-
tion to assure that sufficient power (and, to the extent
demand rises or generation is lost, back-up power) is
available and can be reliably delivered. However, not-
withstanding scheduling of generation in day-ahead
markets, imbalances “unavoidably occur in real time”

* See Eric Hirst & Brendan Kirby, Retail-Load Participation in
Competitive Electricity Markets 39 (January 2001).

“ FERC, Energy Primer, a Handbook of Energy Market Basics
67 (July 2012), http://www.ferc.gov/market-oversight/guide
/energy-primer.pdf; see Brendan J. Kirby, Demand Response for
Power System Reliability; FAQ 2-3 (2006), https://esdr.
Ibl.gov/sites/all/files/dr-for-psr-faq_0.pdf (Kirby).

13

because of factors such as unexpected generator outag-
es, generators not accurately following schedules, the
intermittent nature of certain types of generation, sud-
den changes in weather conditions, load forecast error,
and inevitable short-term load fluctuations.”

II. DEMAND RESPONSE RESOURCES ARE IN

MANY WAYS FUNGIBLE WITH GENERATION
RESOURCES

From the perspective of grid operators, who must
balance the grid to maintain a reliable flow of electrici-
ty, demand response resources and generation re-
sources serve many similar functions. The traditional
form of demand response can be defined as “a reduction
in the consumption of electric energy by customers
from their expected consumption in response to an in-
crease in the price of electric energy or to incentive
payments designed to induce lower consumption of
electric energy.” 18 C.F.R. 35.28(b)(4)."° A demand re-
sponse resource, in turn, is “a resource capable of
providing demand response.” 18 C.F.R. 35.28(b)(5).
Demand response programs can reduce demand by
providing payment or other incentives to reduce con-
sumption of electricity. See, e.g., 18 C.F.R. 35.28(b)(4).

In wholesale electricity markets and ancillary ser-
vices markets, providers of dispatchable demand re-
sponse often are large industrial or commercial custom-

* See Hirst 1.

With recent advances in technology, the term has evolved to
additionally encompass increases in demand called upon to offset
giuts in supply. Further, a grid operator may pay for a provider to
stand ready to reduce demand very rapidly in response to a sys-
tem emergency, even if, ultimately, no response is required.

14

ers, or companies that act as third party “aggregators”
of smaller commercial and residential customers.”
These demand response providers offer this resource
by contracting to curtail electricity use during periods
of peak demand or high prices by reducing or modifying
their operations during such periods (e.g., temporarily
cycling off factory equipment used for industrial pro-
cesses, marginally reducing commercial in-store light-
ing, or, in the case of residential demand response re-
sources, cycling off water heaters or air conditioners).
These entities may also provide second-to-second de-
mand response used by grid operators to fine-tune the
balance of the grid on a real-time basis (termed “regu-
lation” in industry parlance). This type of demand re-
sponse is not predicated on there being peak demand or
high prices, but rather is used as an ongoing mainte-
nance mechanism whereby an industrial or commercial
provider automatically adjusts its energy consumption
up or down based on commands from the grid operator
or in direct automated response to imbalances in the
grid.

Given the energy-intensive nature of their busi-
nesses, curtailment by these large energy consumers
can produce substantial reductions in demand. Thus, a
large industrial consumer may act in multiple capaci-
ties. In one respect, it is a consumer who purchases
electricity on the retail market. In another respect, it
is a demand response provider in the wholesale market
that has the right to bid into the day-ahead and real-

" See Department of Energy, Benefits of Demand Response in
Electricity Markets and Recommendations for Achieving Them
42, n.47 (Feb. 2006) (Department of Energy).

15

time energy markets when it makes economic sense to
do so. In a third respect, it may be a provider of relia-
bility services (7.e., “ancillary services”), either provid-
ing real-time response at the grid operators’ command
to rebalance the grid in the event of an emergency out-
age, or supplying regulation, meaning the second-to-
second balancing of net demand with net supply under
the grid operator’s automatic control.

For now, the provision of demand response into the
wholesale markets by smaller commercial and residen-
tial electricity consumers is less prevalent.” These con-
sumers generally are unable to participate directly in
wholesale markets because their individual demand re-
sponse capabilities are too small to satisfy applicable
minimum bidding requirements.” Smaller consumers

" See Doug Hurley et al., Demand Response as a Power System
Resource 11 (May 2013) (“The residential market remains largely
untapped for now. Few demand response providers have even ap-
proached the residential market to date due to the amount and
variety of load available from large customers. However, cost-
effective technology to provide small amounts of demand response
from a very large number of residential customers is not far away,
and may lead to widespread implementation by the end of the dec-
ade.”).

* See Joel B. Eisen, Who Regulates the Smart Grid? FERC’s
Authority Over Demand Response Compensation in Wholesale
Electricity Markets, 4 San Diego J. Climate & Energy L. 69, 81
n.67 (2013) (“As an example, the minimum individual or aggregat-
ed curtailment that may be bid into the PJM RTO’s markets is 100
kW, larger than the amount that could be provided by any single
residential customer.”); see also PJM Interconnection, L.L.C,
Amended and Restated Operating Agreement of PJM Intercon-
nection, L.L.C. { 1.54.10 (2015) (“Aggregation for Economic Load
Response Registrations”), http//www.pjm.com/~/media/doc
uments/agreements/oa_ashx.

16

may therefore consolidate demand response resources
through an aggregator, which will often provide the
technological capabilities necessary to harness such re-
sources through “smart” technologies (such as pro-
grammable thermostats or appliances that turn off at
night without the consumer even being aware) that al-
low consumers automatically to curtail energy con-
sumption in response to price signals.” As buildings
become “smarter” by incorporating new lights, appli-
ances and thermostats with web-communicating con-
trollers, building owners and residents can provide
general instructions via web-based applications to
regulate the building’s energy consuming devices and
appliances. “In addition, these [‘smart-grid’ communi-
cation and control] systems can allow utilities to direct-
ly control building loads.” These “smart” technologies
thus may also be capable of responding (i) directly to
grid operator commands and (ii) autonomously to
changes in the balance of the grid.* Over time, these
types of demand response resources may become easier
to bundle, facilitating their ability to participate

” See Eisen, 4 San Diego J. Climate & Energy L. at 82 (“Typical-
ly, the [aggregator} offers * * * a technological solution designed to
manage and control the response to price signals[—¢.g.,] a pro-
gram might allow a consumer to set a programmable thermostat to
reduce demand of specific devices at given price levels.”).

™ See Harvey Michaels and Kat Donnelly, Energy Innovation,
Architecting the Consumer Side of the Grid for Energy Efficient 5
(June 2011) (Michaels & Donnelly).

™ See Paul Centolella, Next Generation Demand Response: Re-
sponsive Demand through Automation and Variable Pricing, 4-5
(Mar. 2015) (Centolella) (noting that “smart devices can continu-
ously and autonomously optimize the timing of power use.”).

17

(through aggregators) in the wholesale energy mar-
kets.”

It is true that demand response resources and gen-
eration resources differ in some respects. For instance,
demand response resources alone cannot power the
electric grid, and generation resources will always be
required to input new megawatts into the system in or-
der to keep power flowing. See FERC Order 745 22.

Nonetheless, from a grid operator’s perspective,
demand response resources and generation resources
are comparable for purposes of balancing supply and
demand in wholesale electricity markets over all time
scales from cycles to hours. “This balance of supply and
demand can be done equally effectively by controlling
the load side of the equation. It is no surprise, then,
that “numerous commentators” on FERC’s Order 745
“address[ed] the physical or functional comparability of
demand response and generation, agreeing that an in-
crement of generation is comparable to a decrement of

* See Centolella 3, 4 (“We soon will reach the tipping point when
network connected devices in millions of homes and businesses
could (change the power system by] efficiently tim[ing] their use of
electricity to minimize costs[.] The integration of these devices
with power markets and system operations could greatly reduce
costs, make the power system more resilient, and facilitate the low
cost integration of wind and solar energy.”); see also MIT 144 (not-
ing that advanced metering technologies and “smart’ energy re-
sponse and management technologies—such as programmable
controllable thermostats and ‘smart charging’ of electric vehicles—
* * * can, in principle, involve even smaller commercial and resi-
dential customers in more active management of their electricity
consumption and facilitate their responses to price or other supply-
side signals.”).

* Kirby 3.

18

load for purposes of balancing supply and demand in
the day-ahead and real-time energy markets.” FERC
Order 745 { 20.

The essential fungible nature of generation re-
sources and demand response resources is particularly
relevant given the dynamics of how electricity moves
through the grid. Onerators of wholesale markets ben-
efit from visibility into all potential load-balancing re-
sources across the broad footprint of the grid. That
way, when appropriate, they can draw on the least-cost
resource, whether it is a generator that produced elec-
tricity or a demand response resource that will reduce
electricity consumption, to meet the load in each geo-
graphic area—regardless of whether this crosses state
lines or involves multiple retail distributors.

III. DEMAND RESPONSE RESOURCES ENHANCE
THE RELIABILITY OF THE GRID

As explained above, any imbalance between supply
and demand (“generation” and “load”) on the grid cre-
ates reliability issues—described as “security” concerns
in the parlance of grid operators. Grid operators his-
torically focused on the supply side of the market to
maintain this balance, adjusting supply by increasing or
decreasing the deployment of generation resources in
specific locations in order to meet demand and maintain
system reliability parameters.” Balancing the grid by
controlling only the generation facilities can be costly
and inefficient.” Adjusting the outputs of generators

* See, e.g., MIT 145.

™ See, ¢.g., Michael Milligan & Brendan Kirby, Utilizing Load
Response for Wind and Solar Integration and Power System Re-
liability 2 (June 2010) (“Historically, this control has concentrated

19

up and down uses excessive amounts of fuel, causes in-
creased wear and tear on generators, and creates addi-
tional levels of pollution compared to running genera-
tors at a steady rate. It can also take an extended peri-
od of time for generation resources to power up. And,
the location of generation resources in certain fixed
spots can make them less optimal for addressing peak
load requirements, transmission system limitations and
reliability parameters (such as voltage and system sta-
bility) in other places on the grid. (As explained above,
although the electric grid is interconnected, it also re-
quires meeting the load at each place along the topog-
raphy of the grid.)

The availability of demand response addresses
these deficiencies, providing additional flexibility that
generation alone cannot provide. “{Tjhe fungibility of
demand response and generation output creates great-
er operational flexibility that, in turn, offers RTOs and
ISOs multiple options to solve system issues both in
energy and ancillary service markets.” See FERC Or-
der 745 { 20 (citing Occidental May 13, 2010 Comments
at 11). “(WJhen load can be predicted and controlled in
response to price, system reliability and efficiency is
increased because the system operator can rely on ac-
tively managed load as a resource that can retain sys-
tem balance.” See FERC Order 745, Reply Comments
of Viridity Energy, Inc. at 9 (June 18, 2010).

Because of the additional flexibility they provide
operators, demand response resources lower the likeli-

on the generation side, but that is not necessary. Control of energy
consumption can be equally effective and often more economic
than control of energy supply.”).

20

hood of outages that “impose financial costs and incon-
venience on customers.” For this reason, demand re-
sponse has been described as a “safety valve that less-
ens system pressure[,]” helping to alleviate systemic
strain that could otherwise result in service disrup-
tions.”

Demand response resources enhance grid reliabil-
ity not just by providing an additional tool for engi-
neers and operators to draw on, but also because of
their unique characteristics. First, unlike some genera-
tion resources, some demand response resources can be
activated and dispatched relatively quickly (with notifi-
cation of anywhere from seconds to days), to reduce
load at critical times such as peak demand periods or
“when a generator or a transmission line unexpectedly
fails.” See FERC Order 719-A, Wholesale Competition
in Regions with Organized Electric Markets, 128
FERC f 61,059, 2009 WL 2115220, at *12 & n.76 (July
16, 2009); FERC Order 745-A, 137 FERC 4 61,215,
2011 WL 6523756, at *6 (“[Slystem reliability realizes a
benefit because demand response generally can be dis-
patched by the system operator with a minimal notice
period, helping to balance the electric system in the
event that an unexpected contingency occurs.”). Some
types of demand response are “technically superior to
generation” for purposes of providing quick-response
ancillary services, because they “can curtail consump-
tion faster than generation can increase production.”
Demand response can therefore reduce load expedi-

* Department of Energy vi.
™ See Eisen, 4 San Diego J. Climate & Energy L. at 78.
* Kirby 8.

21

tiously, helping to balance the grid and avoid the poten-
tial for brownouts or rolling blackouts when demand
exceeds forecasts and available supply.”

Second, the use of demand response resources can
avoid some operational difficulties that can arise from
attempting to achieve balance through generation
alone. “Factors that can affect grid capabilities include
generation and transmission facility outages, line capac-
ities as affected by loading levels and flow direction,
and the weather.” These types of security constraints
are less relevant for demand resources, because reduc-
ing load in the proper locations does not present the
same operational challenges (e.g., grid congestion) as
increasing generation. Demand response thus may be
dispatched as a means of alleviating operational issues
presented by generation resources.

Third, demand response can enhance the reliability
of the grid in another, counter-intuitive way as well.
Although demand response is most often thought of as
turning off requests to use electricity to avoid high us-
age peaks that strain generation resources and over-
load transmission lines, demand response can also in-
volve using additional electricity to bring the grid into
balance when there is excess generation. In West Tex-
as, for example, there is so much wind-generated elec-
tricity at night that the price of electricity often goes
negative. Demand response resources can help allevi-

* See id. at x, 8.

" FERC, Security Constrained Economic Dispatch: Definition,
Practices, Issues and Recommendations 6 (2006), nag

22

ate such situations by increasing demand as needed to
offset excess supply, which in turn will help integrate
low-cost renewable resources such as wind power into
the grid.” In fact, because renewable electric genera-
tion sources are often highly intermittent—such as so-
lar and wind—integrating these resources into the en-
ergy markets benefits from the use of quickly activated
demand response resources to balance load.

IV. THe AVAILABILITY OF DEMAND RESPONSE
RESOURCES LOWERS RATES FoR WHOLESALE
ELECTRICITY

As grid operators and engineers balance supply
and demand to achieve stability and a reliable flow of
electricity, they also operate markets to provide that
electricity in a cost-effective manner. To ensure that
end-use customers are supplied with power at the low-
est possible price, grid operators dispatch power (to re-
tailers) on a least-cost basis. Through the use of sophis-
ticated and proprietary algorithms and computer sys-
tems, ISOs and RTOs coordinate an open bidding pro-
cess in the wholesale electricity market.

Most simply, generators bid into the market, stat-
ing the price at which they are willing to sell electricity
during a specified time period. The bids are ranked
from lowest to highest, forming what is known as the
“bid stack.” The ISO or RTO then dispatches the gen-
erators, from the lowest to highest bid in the bid stack,
until all power demand is met, at which time the mar-

™ See U.S. Energy Info. Admin.

23

ket is said to “clear.” The hourly clearing prices also
establish the locational marginal prices, or LMPs, that
take into account congestion or other limitations on the
grid. Market prices must satisfy the Federal Power
Act’s requirement that rates be just and reasonable.
See Federal Power Act § 201(b), 16 U.S.C. 824(b).

The priority rule by which generators are dis-
patched on a least-cost basis can be departed from to
ensure the security and reliability of the grid, i.e., to
avoid congestion or other operational problems associ-
ated with dispatching the least-cost generator, as de-
scribed above. This modification—to account for relia-
bility concerns—is often referred to as security-
constrained unit commitment and economic dispatch.”
Hence, grid operators will dispatch lower-cost re-
sources before higher-cost resources unless operational
considerations require otherwise.

Grid operators dispatch demand response re-
sources in much the same way as generation resources.
Under security-constrained economic dispatch, grid op-

™ At the same tim«, the ISO or RTO also establishes reliability
reserves for regulation and contingencies (i.e¢., ancillary services),
and “co-optimizes” the provision of energy and ancillary services
as it clears both the energy markets and the ancillary service mar-
kets simultaneously.

“ See generally FERC 6 (endorsing the definition of security-
constrained economic dispatch set forth in “Section 1234 of the
EPAct 2005: ‘the operation of generation facilities to product en-
ergy at the lowest cost to reliably serve consumers, recognizing
any operational limits of generation and transmission facilities.””).
“Unit commitment” refers to the selection of which generators will
be on line each hour, and “economic dispatch” refers to the selec-
tion of the power level at which each on-line generator will oper-
ate.

24

erators meet increased load by dispatching the lowest-
cost reliable power supply or demand response that is
then available.” Pursuant to the least-cost basis princi-
ple and security-constrained economic dispatch meth-
odology, demand response resources are dispatched
when it is operationally expedient and economically ef-
ficient to do so. Stated differently, demand response
typically will be dispatched when it is “able to displace
a generation resource in a manner that serves the [grid
operator] in balancing supply and demand” and “is cost-
effective.” See FERC Order 745 ¥ 48; see also 18
C.F .R. 35.28(¢)(1)(v (A).

As a result, the availability of demand response re-
sources has a direct effect on the wholesale price of en-
ergy. See FERC Order 719-A, 2009 WL 2115220, at
*12 (“{(Llower demand means a lower wholesale
price.”). The availability of demand response further
directly impacts the wholesale price of energy by virtue
of its related effect on the price of ancillary services,
because the two are inextricably interdependent. More
specifically, adding ancillary service capability from
demand response reduces the price of both ancillary
services (by providing them in a cost-effective manner)
and the price of energy (by freeing up generation re-
sources from providing ancillary services and allowing
these resources to dedicate their full capacity to provid-
ing energy).

The availability of demand response resources can
exert a significant influence on price during periods of
peak demand, when the cost of generation is highest,

* See FERC 5.

25

and the supply curve steepest.” See FERC Order 745
{ 38. This is because supply bids are organized in as-
cending order—from lowest to highest—meaning that
the higher the demand, the higher the price that will
clear the market.” When demand is extremely high,
the wholesale price can increase exponentially. For in-
stance, in January 2001, wholesale prices in California,
which had averaged approximately $27 per megawatt
hour, spiked to $450 per megawatt hour.” Further, ac-
counting for dispatchable demand response in integrat-
ed resource planning for future supply and delivery
systems will prevent overbuilding and maintain the
lowest prices.”

™ This salutary influence on wholesale energy prices is not lim-
ited to periods of peak demand, however, as demand response can
also be used to provide contingency reserves at any demand level,
which reduces wholesale energy and ancillary services costs at the
same time. Tlius, demand response can be used both to “shave”
peak demand and to provide ancillary services, both of which con-
\ribute to lowering wholesale energy prices.

“ See Joskow, 26 J. Econ. Perspectives at 33 (“As demand in-
creases, ‘dispatchable’ generating capacity—first ‘base load,’ then
‘intermediate,’ then ‘peaking’ capacity—with higher and higher
marginal operating costs, is called to balance supply and de-
mand.”).

™ See The Electric Energy Market Competition Task Force, Re-
port to Congress on Competition in Wholesale and Retail Markets
for Electric Energy 28, http://www .ferc.gov/legai/fed-sta/ene-pol-
act/epact-final-rpt.pdf.

” See Michaels and Donnelly 3 (“Finding ways to enable build-
ing energy demands to be more responsive to utility system loads
may optimize our utilization of electric system capacity, supporting
future growth without as much need for expensive and hard-to-
site new facilities.”).

26

Dispatching demand response resources at these
peak times can alleviate the need to activate so-called
“peaker” generation resources, which are back-up re-
sources reserved for the highest periods of demand.
Peaker generators are typically among the most expen-
sive generation resources to operate. Avoiding resort
to such maximaliy expensive generation resources
brings wholesale prices down during peak hours.
“{Ljower wholesale market prices * * * result because
demand response averts the need to use the most cost-
ly-to-run power plants during periods of otherwise high
demand, driving production costs and prices down for
all wholesale electricity purchasers.” Indeed, the de-
ployment of “even modest amounts of demand response
can lead to significant reductions in wholesale prices at
times of capacity constraints.” For example, one
study found that in five Mid-Atlantic states, a three
percent load or demand reduction during the top 100
hours of peak demand would yield net annual economic
benefits of approximately $138-$281 million.*

The advantages that demand response resources
have for maintaining the reliability of the grid also help

“ Department of Energy vi.

" Steven Braithwait & Ahmad Faruqui, The Choice Not to Buy:
Energy Savings and Policy Alternatives for Demand Response 48
(Mar. 15, 2001).

* See Sam Newell & Frank Felder, Quantifying Demand Re-

sponse Benefits in PJM 4 (Jan. 29, 2007), http//www.brattle.com/
system/publications/pdfi/000/004/91Voriginal/Quantifying.
Demand_Response_Benefits_in_PJM_Jan_29fits_in PJM_Jan_29_
2007 pdf? 1379343092.

27

them achieve lower prices in the wholesale energy
markets. As explained pp. 23-24, supra, with respect to
generation resources, it is not infrequently necessary to
diverge from a pure least-cost basis approach in order
to protect the power system from operational prob-
lems. In these scenarios, the grid operator may be con-
strained to dispatch a more costly resource to ensure
that load can be met reliably. But that is not necessari-
ly the case for demand response resources, which, when
priced appropriately, can be drawn on to achieve a low-
er overall price while minimizing security constraints.

CONCLUSION

For the foregoing reasons, the availability of
demand response resources in the energy markets
plays a critical role in the provision of reliable and cost-
effective electricity.

Respectfully submitted.

DOUGLAS HALLWARD-DRIEMEIER
JUSTIN G. FLORENCE

BRIAN ROODER

MEREDITH S. PARKINSON

Ropes & GRAY LLP

JULY 2015

---