# Joint Appendix Vol II — Kelo v. New London

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40385016_0031%3A09

## Record

- **Collection:** Supreme Court brief
- **Document type:** Joint Appendix Vol II
- **Published:** January 1, 2005
- **Citation:** 545 U.S. 469

## Text

te

' —
} Supreme Court ES
| rrieD

No. 04-108

oo 2004
In The

Supreme Court of the United States

SUSETTE KELO, THELMA BRELESKY, PASQUALE
CRISTOFARO, WILHELMINA AND CHARLES DERY, JAMES
AND LAURA GURETSKY, PATAYA CONSTRUCTION
LIMITED PARTNERSHIP, and WILLIAM VON WINKLE,

Vv

Petitioners,

CITY OF NEW LONDON, and NEW
LONDON DEVELOPMENT CORPORATION,

@®

Respondents.

-

On Writ Of Certiorari To The
Supreme Court Of Connecticut

,

JOINT APPENDIX
Volume II, Pages 213 to 487

Horton, SHIELDS & KNox, P-C.
WesLey W. Horton*

DANIEL J. KRISCH

90 Gillett Street

Hartford, CT 06105

(860) 522-8338

(860) 728-0401 (fax)

WALLER, SMITH & PALMER, PC.
EDWARD B. O'CONNELL

52 Eugene O'Neill Drive
New London, CT 06320
(860) 442-0367

(860) 447-9915 | ax)

Conway & LONDREGAN
THOMAS J. LONDREGAN
JEFFREY T. LONDREGAN
38 Huntington Street
New London, CT 06320
(860) 447-3171

(860) 444-6103 (fax)

Counsel for Respondents
*Counsel of Record

4

INSTITUTE FOR JUSTICE
WILLIAM H. MELLOR
Scott G. BULLOCK*

DANA BERLINER

1717 Pennsylvania Ave., NW
Suite 200

Washington, DC 20006
(202) 955-1300

(202) 955-1329 (fax)

SAWYER Law Firm, LLC
Scott W. SAWYER

The Jill S. Sawyer Building
251 Williams Street

New London, CT 06320
(860) 442-8131

(860) 442-4131 (fax)

Counsel for Petitioners

Petition For Certiorari Filed July 19, 2004
Certiorari Granted September 28, 2004

COCKLE LAW BRIEF PRINTING CO (800) 225-6964
OR CALL COLLECT (402) 342-2831

JOINT APPENDIX TABLE OF CONTENTS

Volume I

Relevant Docket Entries from the Courts below...........

EXHIBITS FROM TRIAL HELD IN THE

SUPERIOR COURT, JUDICIAL DISTRICT OF
NEW LONDON IN JULY AND AUGUST, 2001

MAPS
Plaintiffs’ Exhibit TT — Fort Trumbull MDP Area —

- New London, Connecticut .................c.ccccccceeeceeeeeeeeeees

Plaintiffs’ Exhibit VV — Fort Trumbull MDP Com-

posite Land Use Plan Map 3.................cccccccssseeeeeeeeeees

Plaintiffs’ Exhibit YY - Fort Trumbull Develop-

ment Site Plan dated October 10, 2000 .....................

OTHER EXHIBITS
Plaintiffs’ Exhibit B —- Representative Statement of

I ccscrcsneccenssstestesneennrnganmnnninaanne

Plaintiffs’ Exhibit I - New London Development
Corporation (NLDC) Board’s Record of Vote and

Resolution dated October 16, 2000 ..................ccccc0e00s

Plaintiffs’ Exhibit II — Letter to George Milne from

Claire Gaudiani dated December 15, 1997................

Plaintiffs’ Exhibit PP1 —- Email to George Milne

from James Serbia dated October 21, 1998................

Plaintiffs’ Exhibit PP2 -— Letter to Dr. Claire
Gaudiani from George Milne, Jr. dated March 8,

BIRD -ccceccecccosccneceesccsvvssssnnaneeseqnounenenssosssnsnnssonesssooonenente

ii

JOINT APPENDIX
TABLE OF CONTENTS - Continued

Page

Defendant NLDC’s Exhibit 12 - New London City
Counsel Resolution of January 18, 2000, author-
izing the use of eminent domain.........................00000008 26

Plaintiffs’ Exhibit HHH - Memorandum from
Developer Marty Jones of Corcoran Jennison to
Joseph E. Corcoran, Gary Jennison, Scott
Dumont, Harry Nash and Eliza Edelsberg dated
ne 30

Excerpts from Defendant NLDC’s Exhibit 38 — Fort
Trumbull Municipal Development Plan (MDP) Revised

Administrative Draft, August 1999
¢ Section 1: Introduction (pgs. 1-1 through 1-11
rt cesiesihiceienteininibebterentaciitigisidadbehiapaamiendenmemmanteteresseqseees 83
* Section 3: Existing Site Conditions (pgs. 3-19
iia cecrierimastasrcemmnnennnniemmtnccee 96
¢ Section 5: Proposed Improvements........................ 108
¢ Section 9: Administrative Plan Summary ............. 188

¢ Appendix A: Selection of and Rationale for the
Preferred Alternative — Fort Trumbull MDP
I sindacetnieiasiaestneatienehidaibienbiaiemimmenaadepesnecescnanesoteeuenes 190

¢ Proposed Land Uses Map 5.1................c:ccccseeeeeeees 212

Volumes II and III

Defendant NLDC’s Exhibit 34 - Draft Environ-
mental Impact Evaluation — dated November 10,
aaa eeuidesideethchannuieiaastnidgueidesstidpiasedntatemitmuentgnesendeousversnetes 213

iii

JOINT APPENDIX
TABLE OF CONTENTS - Continued

Page

The following documents have been omitted in the

printing of this Joint Appendix. They may be found in the

Appendix to the Petition for Writ of Certiorari at the
following pages:

Opinion of the Superior Court of Connecticut,
Judicial District of New London, At New London,

Decided March 13, 2002 ............ccccccccceeeceeeeeeeeeeees App. 191
Opinion of the Connecticut ago Court, De-
Cided March 9, 2004.........::::ccccccsesrsececssscsssrerssesesesers App. 1

Order of Connecticut Supreme Court Granting
Motion for Stay of Execution Pending Decision by
the United States Supreme Court, Decided April
i Wai ccessnsncescccsscsscesscssscsccsscscossscesssssnessecscoseseees App. 425

Order of the Connecticut Supreme Court Denying
Motion for Reconsideration, Decided April 20,

213

DEFENDANTS’ EXHIBIT 34
DRAFT ENVIRONMENTAL IMPACT EVALUATION

FORT TRUMBULL
MDP AREA
New London, Connecticut

November 10, 1998
(Map Omitted In Printing)

Sponsoring Agency:
State of Connecticut
Department of Economic and Community

Development

Implementing Agency:
New London Development Corporation
New London, Connecticut

Primary Author:
Milone & MacBroom, Inc.
716 South Main Street
Cheshire, Connecticut 06410
Contributors:
The Downes Group — Program Management
Marguerite Wilbur - Program Management
Wallace Roberts and Todd — Land Use Planning
RKG Associates, Inc. - Economic Analysis/
Building Inventory
Bartram and Cochran MBIA — Economic Analysis
Harrall-Michalowski Associates, Inc. -
HRP Associates, Inc. - Hazardous Waste and
Contamination Assessment
Diversified Technology Consultants, Inc. -

214

NOTE TO REVIEWERS
November 10, 1998

Notice is hereby given by the State of Connecticut De-
partment of Economic and Community Development that,
pursuant to Section 22a-1(d) of the Connecticut Environ-
mental Policy Act, a Copy of the Draft Environmental
Impact Evaluation (DEIE) document for the Fort Trumbull
Municipal Development Plan (MDP) Area, New London,
Connecticut is available for review at the office of the New
London Development Corporation, 165 State Street, Suite
313, New London, Connecticut. Copies of the DEIE are
also available at the following locations:

New London City Clerk's Office
New London Public Library
New London Office of Development & Planning
New London Senior Center
Connecticut Department of Economic
and Community Development
This project will involve preparation and implementation
of a Municipal Development Plan under Section 130, 132,
and/or 588(1) of the Connecticut General Statutes. The
project area is located along the west bank of the Thames
River to the north of Greens Harbor and includes the U'S.
Navy's closed Naval Undersea Warfare Center (NUWC),
the regional Water Pollution Control Facility, and the
adjacent Fort Trumbull area to the east of the Amtrak rail
line, and portions of Howard Street, Hamilton Street,
Shaw Street, and Harris Street to the west of the rail line.

The comment period for the DEIE will conclude on De-
cember 28, 1998. Written comments should be submitted
to:

215

Attention: Peter Simmons, PE.
Community Development Specialist
Connecticut Department of Economic
and Community Development
505 Hudson Street
Hartford, Connecticut 06106

The Draft EIE has been distributed to the following
agencies and organizations:
Federal Organizations/Individuals Number

of Copies
U.S. Navy 2
U.S. Coast Guard Academy ? 1
U.S. Army Corps of Engineers 1

State Organizations/Individuals == # Number

Department of Economic and Community

Council of Environmental Quality
Office of Policy and Management

Local Organizations/Individuals of Copies
New London City Clerk 1
New London Public Library 1
New London Senior Center 1
New London City Councilors 7
New London City Manager 1
New London Director Office of Development
and Planning 1
1

216

New London Fire Chief 1

New London Planning and Zoning Commission 10
New London Development Corporation 6°

NLDC Board of Directors |

Private Organizations/Individuals
Pfizer, Inc.
Downes Group
Wallace Roberts & Todd
Harrall-Michalowski & Associates
RKG Associates, Inc.
Diversified Technologies Consultants
HRP Associates, Inc.
Hirsch! & Silvestri
NLDC Corporate Council
EDAW Architects
Blu-Prints Unlimited
Copycats

eee eee te ee oO

TABLE OF CONTENTS
EXECUTIVE SUMMARY
1.0 PURPOSE AND NEED

Ba ee erccececersensencsnnscnntecsneceseeteniiemnness
1.1.1 Project Background ....................0.0006
RE
1.1.3 Project Chronology ...................ccccccc000
RI FR cennccanntercssnenesetseteemnn
1.2.1 Overview of Regulation. ...................0

1.2.2 Determination of Environmental

LS — Prehecnt Cee oo eaccccscesccccsesccssnvesesoscnsssorssvssvososensees

of Copies

1.4
1.5

2.0
2.1

2.3

2.4

217

PpeeeOE AAAS RD wccrccccccccccccecescscccvsvesccescnssesosensessese 1-13
Relationship to Other Projects and Planning
BPRS cccccascensescevecesevvssessesesevenscevssnscsussccccsseeee 1-14
AFFECTED ENVIRONMENT
EE) guumureempssessecssees 2-1
2.1.1 Statewide Land Use Conservation

and Development.................::0c0cceeeeeeeees 2-1
2.1.2 Regional Land Use ...............cccccccceeeeeeees 2-6
2.1.3 Land Uses in the Project Vicinity ........... 2-7
2.1.4 Land Uses Within the MDP Boundary ...... 2-7
2.1.5 History of Development.......................: 2-10
SE ee 2-11
2.1.7 Coastal Zone Management.................... 2-14
chee RNG .ccccccccscccssccccccccccccvcccccsscvscevecsnensesees 2-18
2.2.1 Demographics .................ccccccccceeeeereeees 2-18
BBB BRAT crcecccccccccccscccscrcccsecccssecccseecee 2-21
2.23 Existing Tax Revenues.....................0+ 2-24
Neighborhood/Housing ..................0:c0seeeeseeeeeeeees 2-25
2.3.1 Citywide Housing................ccccccsseeees 2-25
2.3.2 Residential Analysis...................:000000 2-28
2.3.3 Building Inventory of the MDP Area ....... 2-33
2.3.4 Relocation Plan and Process ................. 2-36
2.3.5 Residential Households, Businesses,

and Non-Profit Agencies....................+++ 2-37
2.3.6 Anticipated Relocation Expenses.......... 2-39
Community Facilities and Services..................... 2-41

A cei 2-41

2.5

2.6

2.7

2.8

218
ee — ircctctetesimnne 2-42
2.4.3. Public Safety and Emergency Services....... 2-43
2.4.4 Parks and Recreation. .....................000 2-44
Aesthetic/Visual Resources.....................ccccc00e0e 2-46
2.5.1 Regional Landscape......................:0008 2-46
2.5.2 MDP Area Landscape....................:.00 2-47
Public Utilities and Services ......................cc00008 2-48
SD PR cccnteceenteretecesnnenes 2-48
ee ccccnneescetesscnentsceninennsens 2-54
SE «—- cenecceeteiiins 2-57
2.6.4 THloctrio nergy ...........00ccccccscsccccccsscceseees 2-57
BI - iicntecintcensicsntdsnenncsiiensersenennnnivennicteniés 2-58
NN 2-58
i iecmnnenstesicrcennesencsnscctenienseinseiepaiiens 2-58
IE nicctrenicisttntcietemnnininns 2-59
2.7.1 Statewide Cultural Resources Policies ......2-59
2.7.2 Cultural Resources at the NUWC Site...... 2-59
2.7.3 Cultural Resources in the MDP Area........ 2-64
I so nincniseniimemssttscnniommaien 2-73
2.8.1 Roadway Network ...............ccccccccceeeee 2-73
2.8.2 Existing Traffic Conditions ................... 2-75
2.8.3 Public Transportation ....................... 2-75
2.8.4 Existing Parking...........................:0000+ 2-75
Se trrrnseecctnteninn 2-76
2.8.6 Amtrak Operations..................ccccccceee 2-77

2.9

2.10

2.11

2.12

ee I ccenccttncnnninnnemnensnmemaniteinenn 2-78
2.9.1 Surface Water Resources.................... 2-78
A ESE 2-79
Ce 2-79
Flood Hazard Potential ...................:cccccccceeeeeeeeees 2-82
SS Ee 2-82
2.10.2 Astronomical Tide Levels....................... 2-82
2.10.3 Tidal Flood Levels ..................cccccseeeeeees 2-83
2.10.4 FEMA Regulatory Program .................. 2-84
2.10.5 Conservation and Development Poli-

cies Plan for Connecticut...................... 2-86
2.10.6 State and Federal Regulations and

eee 2-87
Biological Environment ...................cccccsceeeeeeeeees 2-89
2.11.1 Coastal Management Policies ............... 2-89
ET 2-89
2.11.3 Living Marine Resources....................... 2-91
BR Te cecnntecmnesnnscecsscncsnsersotessnccsnnensees 2-93
B.20.G Tebemd Weekes .n....ccccicccccccccceccececsecccses 2-93
SF Bi Eran 2-94
Tei ctcenncteectinrernterennconennmncditsiléanins 2-94
2.11.8 Species of Special Concern .................... 2-96
Physical Environment ...................:.::cccssseeeesseeees 2-97
TR ccrnccccsnsnsssenescscenssesssnessnemessnes 2-97
RE i iceesrtenstinnteiineennen 2-97
2.12.3 Surficial Geology...................cccccsccceeeseeees 2-97
2.12.4 Bedrock Geology .................cccccccseeeeeees 2-101

2.13

2.14

3.0
3.1
3.2

220
Ba ccrvtcnseemnivnerrnnisitintateinnaniiinenes 2-102
2.13.1 Federal Air Quality Regulations and
I cosscccncteneniasaninsnnedeiiaanbiataisantanean 2-102
2.13.2 Statewide Air Quality Policies and
ee cccccssnsennscisnnnateninnianmnanassess 2-103
2.13.3 Site Specific Air Quality Analysis....... 2-107
BD ccscccsinesseanmnensienmeertitananiiagnmeieennnin 2-108
2.14.1 Local Noise Policies and Regulations ...... 2-108
2.14.2 Noise Measurements in the Project
CE cccicunensnnnnienvtsigitamesionasnmisseniamnede 2-109
Solid Waste and Hazardous Materials.............. 2-112
2 eee 2-112
2.15.2 Hazardous Materials........................... 2-113
2.15.3 Applicable Environmental Regulations.... 2-113
2.15.4 Potential Environmental Contami-
nation in the Project Area ................... 2-118
ALTERNATIVES CONSIDERED
ID cccresceremnsssittiscnnioticinnipemnestninnneass 3-1
Land Use Concept Alternatives..................cc000000+: 3-3
3:2.1 Overview of Alternatives and Fixed
Een 3-3
3.2.2 Programs Elements Common to Al-
ternatives 2 Through 6....................0000+ 3-12
3.2.3. Roadway Improvement Alternatives ....3-14
3.2.4 Alternative No. 1 — No Action................ 3-24
3.2.5 Alternative No. 2 — Recreation/
eR icsscecenterctectennemamnnneneenn 3-25

3.2.6 Alternative No. 3 — Residential/

4.0
4.1

42

~~ 4.3

221

3.2.7 Alternative No. 4 — Business Campus...... 3-29
3.2.8 Alternative No. 5 — Mixed Use 1.............. 3-30
3.2.9 Alternative No. 6 — Mixed Use 2.............. 3-31
IMPACT EVALUATION
CE er ID ccccnecscrssennccnnnticcnmnasenseanceenssses 4-1
Land Use and Zoning Impacts ..........................+. 4-10
42.1 Consistency With Relevant Policies
ee 4-10
4.2.2 Alternative No. 1 — No Action............... 4-13
4.23 Alternative No. 2 — Recreation/
I ccsnnsissccstusisintanasenceitiitaninintdalieatannent 4-14
4.2.4 Alternative No. 3 — Residential/
I icnainsescisiinapeicietianicciiimienainndel 4-14
4.2.5 Alternative No. 4— Business Campus...... 4-14
4.2.6 Alternative No. 5- Mixed Use 1............. 4-15
4.2.7 Alternative No. 6 —- Mixed Use 2............. 4-15
Socioeconomic Impacts ..................:cccccssssseseesseeees 4-16
GE a rercrrersettensteceen 4-16
4.3.2 Alternative No. 1 —- No Action............... 4-18
4.3.3 Alternative No. 2 -— Recreation/
i iscccccsetntcunicinivanintiemnietinnndbiiuasiies 4-19
4.3.4 Alternative No. 3 — Residential/
Eee 4-22
4.3.5 Alternative No. 4 — Business Campus...... 4-24
4.3.6 Alternative No. 5 — Mixed Use 1............. 4-26
4.3.7 Alternative No. 6 — Mixed Use 2 ............ 4-29
4.3.8 — GUREREEY ...-2220-00ecrcrescececerecenececrevesesocecees 4-32

4.4

4.5

4.6

222
Neighborhood/Housing Impacts ....................00++ 4-35
4.4.1 Atternative No. 1 — No Action............... 4-35
442 Alternative No. 2 — Recreation/
SD ccccccrnvntscnmnnsecevsenesictssaiiaaibcamnianti 4-35
443 Alternative No. 3 —- Residential/
SI cccccrcncscsccscunencitamapviansensinnes 4-36
4.4.4 Alternative No. 4 -— Business Campus...... 4-39
4.4.5 Alternative No. 5- Mixed Use 1............. 4-39
4.46 Alternative No. 6 - Mixed Use 2............. 4-41
Community Facilities and Services Impacts....... 4-43
4.5.1 Common Elements .................:::ccccccceee 4-43
4.5.2 Alternative No. 1 — No Action............... 4-44
45.3 Alternative No. 2 —- Recreation/
I ccnastigsenntiictormbesesnnennidebmudiones 4-44
4.5.4 Alternative No. 3 —- Residential/
Ee 4-44
4.5.5 Alternative No. 4 —- Business Campus...... 4-46
4.5.6 Alternative No. 5- Mixed Use 1............. 4-46
4.5.7 Alternative No. 6 —- Mixed Use 2............. 4-47
Aesthetic/Visual Resource Impacts..................... 4-48
4.6.1 Alternative No. 1 —No Action................ 4-48
46.2 Alternative No. 2 — Recreation/
I scscseneesenscsnasssersvinssssnsnnttinnnenmees 4-48
46.3 Alternative No. 3 — Residential/
I rccnenesrenssenenrsntananntsitiiiniae 4-49
4.6.4 Alternative No. 4 — Business Campus...... 4-49
4.6.5 Alternative No. 5-— Mixed Use 1............. 4-49

4.6.6 Alternative No. 6 — Mixed Use 2.............. 4-50

4.7

4.8

4.9

223

Public Utilities and Services Impacts................. 4-51
4.7.1 Common Elements ..................:c:ceceee 4-51
4.7.2 Alternative No. 1 — No Action............... 4-54
4.73 Alternative No. 2 — Recreation/
fy IE an cesssssssemeesennitisidmmiaminen 4-56
4.7.4 — Alternative No. 3 — Residential/
ee 4-58
4.7.5 Alternative No. 4 —- Business Campus...... 4-59
4.7.6 Alternative No. 5- Mixed Use 1............. 4-61
4.7.7 Alternative No.6 — Mixed Use 2.............. 4-62
Cultural Resources Impacts ..................000++ coves 4-64
4.8.1 Alternative No. 1 — No Action............... 4-64
4.8.2 Alternative No. 2 —- Recreation/
ED ccnvctncrnsvsnstnnnenceiieieiinsi 4-65
48.3 Alternative No. 3 — Residential/
I cccccnnesicannssiitemninmamnsins 4-65
4.8.4 Alternative No. 4 —- Business Campus...... 4-65
4.8.5 ~ Alternative No. 5-— Mixed Use 1............. 4-65
4.8.6 Altemative No. 6- Mixed Use 2 ............. 4-66
Traffic and Parking Impacts...................c00.c000000 4-67
49.1 Traffic Generation ..................ccccccceeeees 4-67
4.9.2 Intersection Capacity Analysis ............. 4-71
49.3 Evaluation Methodology........................ 4-72
Water Resource Impacts.................ccccccsseeeeeeeeeees 4-77
Flood Hazard Impacts ....................ccccceeeeeeeeeeeenes 4-78
4.11.1 Common Elements ...................cccccceeeeees 4-78
4.11.2 Alternative No. 1 — No Action............... 4-79

4.12

4.13
4.14

4.15

4.16

224
4.11.3 Alternative No. 2 — Recreation/
i ssticatid shesinaihicinmenneetenstanesastmene 4-79
4.11.4 Alternative No. 3 — Residential/
| ee 4-79
4.11.5 Alternative No. 4 — Business Campus...... 4-80
4.11.6 Alternative No. 5- Mixed Use 1............. 4-80
4.11.7 Alternative No. 6— Mixed Use 2............. 4-81
| MI i scscniiesicstuninitagsnesenenesesnecnennescece 4-81
Biological Environment Impacts.......................... 4-83
4.12.1 Alternative No. 1 - No Action............... 4-83
4.12.2 Alternative No. 2 — Recreation/
TTT isis siicniddsieininatnatneddpsdedunsecconsseennss 4-85
4.12.3 Alternative No. 3 — Residential/
RT i sinnnnicenteisnshcnnecieesnaniicsssenece 4-87
4.12.4 Alternative No. 4 — Business Campus...... 4-88
4.12.5 Alternative No. 5— Mixed Use 1............. 4-88
4.12.6 Alternative No. 6— Mixed Use 2............. 4-89
Physical Environment Impacts....................000+ 4-90
Air Quality Impacts...................:cssccsssseecessseeceeeee 4-91
4.14.1 Short-Term Air Quality Impacts........... 4-91
4.14.2 Long-Term Air Quality Impacts............. 4-92
EEE ee 4-93
4.15.1 Short-Term Impacts ..................00c00000000 4-93
4.15.2 Long-Term Impacts ................:0cccccceeeeee 4-93
Solid Waste and Hazardous Materials Impacts....... 4-95
4.16.1 Alternative No. 1 — No Action ............... 4-96

4.16.2 Alternative No. 2 — Recreation/
EE SN a 4-96

4.17
4.18
4.19

4.20

225

4.16.3

4.16.4
4.16.5 Alternative No. 5- Mixed Use 1...........
4.16.6 Alternative No. 6 —- Mixed Use 2...........
Crrmmullative Empact,s ...........000ccssecesccsssssscssssssseess
Unavoidable Adverse Environmental Impacts.......

Irreversible and Irretrievable Commitment
tee

Certificates, Permits, Approvals .......................
4.20.1 Pertinent Regulations and Statutes ......
4.20.2 Tidal Wetlands and Structures,

4.20.3

4.20.4
4.20.5
4.20.6

Army Corps of Engineers Permits ......
401 Water Quality Certificate.............

Flood Management Compliance Cer-
Ee

4.20.7
a
4.20.8

4.20.9
4.20.10 Local Inland Wetland Permits ............
4.20.11 Coastal Consistency Site Plan Re-

Alternative No. 4 — Business Campus....

5.0
5.1
5.2
5.3
5.4

5.5

5.6

5.7

5.8

5.9

5.10
5.11
5.12

5.13

5.14

—

226

MITIGATION OPPORTUNITIES

Land Use Mitigation Opportunities....................
Socioeconomic Mitigation Opportunities ............

Neighborhood/Housing Mitigation Opportu-

CED ccessccnetsatnatieninbiatetnientiannmasitetansetantmantiiiatbininn

a ID cccccenessrernsmeenseensinrsenenseneen

i rcrccniioncescescsnnenareasinimeciasns

Flood Hazard Mitigation Opportunities .............
Biological Environment Mitigation Opportu-
ED ccnszsenesnnsesnsevesnmemenesemsesetenemsnsniennemness
Physical Environment Mitigation Opportuni-
eR censsennsensersnensnenribesntennesemannanseninaenniasi
Air Quality Mitigation Opportunities .................

5.14.1 Short-Term Impact Mitigation
SE eee

5.14.2

227
5.15 Noise Mitigation Opportunities........................... 5-13
5.15.1 Short-Term Impact Mitigation
0 5-13
5.15.2 Long-Term Impact Mitigation Meas-
— 5-13
5.16 Solid Waste/Hazardous Materials Mitigation
Gupte D....0caccececscescscesscecesseesssnesenessssssssosanense 5-13
5.16.1 Investigation/Remediation Factors....... 5-13
5.16.2 Future Land Use Factors ...................... 5-14
6.0 CONSULTATION AND COORDINATION
Oe 6-1
6.2 Consultation and Coordination with Agen-
cies/Organizations .............. pobpuniannennnpsscsisammmmnmanel 6-1
| 6-2
OF ee 6-3
7.0 DOCUMENT PREPARERG..................:ccccccccsseeres 7-1
CG ccccnsceensenmemsiecsmemeen 8-1
TABLES
Table ES-1 Summary of Socioeconomic Impacts...... ES-6
Table 2.2-1 New London Historic Population
(1900-1990) ntinapepesindmesnnmnnenteammmeteitet 2-19
Table 2.2-2 1998 Estimated New London Popula-
tion — Claritas. Inc... semmmemppusnannevanteqemuenn 2-19
Table 2.2-3 Demographic and Socioeconomic
Characteristics; City of New London
and Fort Trumbull Study Aree ............... 2-21

Table 2.2-4

Table 2.2-5

Table 2.2-6

Table 2.3-1

Table 2.3-2

Table 2.3-3

Table 2.3-4

Table 2.3-5
Table 2.3-6

Table 2.3-7
Table 2.3-8

Table 2.3-9

Table 2.4-1

228

Employment Trends by Place of Work
for the City of New London (Resi-
dents and Non-Residents) (1990-

PD cencensnsnnmmnmnennes

Composition of the New London
Housing Stock (1980-1990) ................0...
Age of New London Housing Stock.........
Estimated Increase in Housing Units
for New London and Selected Sur-
rounding Towns — 1980 to 1989..............

Comparative Census Statistics - New
London and Adjacent Communities........

Housing Units by Structure Type...........
Housing Units Authorized (New
Construction) 1990 to 1997.00.00...

Residential Sales Data (1993 to 1997)...

Table 2.6-1
Table 2.6-2
Table 2.6-3
Table 2.6-4

Table 2.6-5
Table 2.6-6
Table 2.6-7

Table 2.8-1

Table 2.10-1
Table 2.10-2
Table 2.10-3
Table 2.13-1
Table 2.13-2

Table 2.14-1
Table 2.14-2

Margin of Safety for Current and
Projected Consumption Based on Ex-

isting Supply Sources.......................0000 2-49
Various Scenarios for Increasing Safe
cecilia eitiien aedaidiaeantitiinlichasil 2-50
Water Service Mains for the Fort
Trumbull MDP Area.................ccccccccceeees 2-52
Hydrant Lecatieas...........20000:csecccsseeseseseess 2-53
Hydrant Flow Testing .....................0006 2-53
Sanitary Sewer Mains for the Fort
Trumbull MDP Area ................cccccccceeeeeees 2-55
Comparison of Traffic Volumes (1984
SESE Sc RAR as a 2-76
Army Corps of Engineers Predicted
Tidal Water Elevations............................ 2-83
Still Water Flood Levels (NGVD)............ 2-83
Explanation of Flood Zone Designa-
Sar icscianl a ennccsastaitaliapnansiatasinnereaneaiemtantainasatis 2-84

Summary of National Ambient Air

Quality Standards ..................ccccccceeeeeee 2-103
Estimated Carbon Monoxide Levels
in the Project Area..................cccceceeeere 2-107
City of New London Noise Restrictions ...... 2-108
Measured Nose Levels in the Project
GRD ccmnnninmnnnnenigetin 2-111

Table 3.2-1

Table 4.1-1

Table 4.1-2

Table 4.1-3

Table 4.1-4

Table 4.1-5

Table 4.1-6

Table 4.1-7

Table 4.3-1

Table 4.3-2

Table 4.3-3

Table 4.3-4

Table 4.3-5

Table 4.3-6

230

Access to Fort Trumbull MDP Area
Comparison of Access Options ................

Advantages and Disadvantages of
Alternative No. 1 — No Action. .................

Advantages and Disadvantages of
Alternative No. 2 — Recreation/Tourism.....

Advantages and Disadvantages of
Alternative No. 3 —- Residential/

Advantages and Disadvantages of
Alternative No. 4 - Business Campus ....

Advantages and Disadvantages of
Alternative No. 5 — Mixed Use 1.............

Advantages and Disadvantages of
Alternative No. 6 — Mixed Use 2.............

Fort Trumbull MDP Area Alterna-
tives Impact Summary ...................00000006

Square Footage Per Employee by
I nccccscepenesescenenscesnrennenntesssenseonnnesets

IIT ccnnccssssssvecnnassnstessscssncsnenenmenernees
Development Program - Alternative
2 — Recreation/Tourism ..................0000008

Estimated Range of Direct Employment
~ Alternative 2 — Recreation/Tourism..........

Estimated Range of Indirect Em-
ployment - Alternative 2 — Recreation/
TEIIITI coscnssnssnecsdseancuniantseusesssecemnanmtapesses

Estimated Construction Costs -

Table 4.3-7

Table 4.3-8

Table 4.3-9

Table 4.3-10

Table 4.3-11

Table 4.3-12

Table 4.3-13

Table 4.3-14

Table 4.3-15

Table 4.3-16

Table 4.3-17

Table 4.3-18

Table 4.3-19

231

Development Program - Alternative

3 — Residential/Commercial .................... :

Estimated Range of Direct Employ-
ment - Alternative 3 — Residential/

Estimated Range of Indirect Employ-

Estimated Construction Costs - Alter-
native 3 — Residential/Commercial.........

Development Program - Alternative
4 — Business Campus ..............:::0:0000000000
Estimated Range of Direct Employ-
ment — Alternative 4 - Business

Estimated Range of Indirect Em-
ployment - Alternative 4 — Business
QRRTIIIUID coccccscccccccccsccecscccsscesessouseeonescsosoress

Estimated Constructién Costs -
Alternative 4 — Business Campus...........

Development Program - Alternative
0)
Estimated Range of Direct Employ-
ment — Alternative 5 — Mixed Use 1 .......
Estimated Range of Indirect Em-
ployment — Alternative 5 — Mixed
TEED Bb ccconscncncssnsnsennesenecsussceesnestesanssenessacneess

Estimated Construction Costs -

Table 4.3-20

Table 4.3-21

Table 4.3-22

Table 4.3-23

Table 4.3-24

Table 4.3-25

Table 4.3-26

Table 4.4-1

Table 4.4-2

Table 4.4-3

Table 4.4-4

Table 4.5-1

Table 4.7-1

Table 4.7-2

232

Estimated Range of Direct Employ-
ment— Alternative 6 — Mixed Use 2........
Estimated Range of Indirect Em-
ployment - Alternative 6 - Mixed
i i cccisinsincinenionsdeinninanneetetimmpstaisdatainiabantasitenes

Estimated Construction Costs -
Alternative 6 — Mixed Use 2 ...................

Range of Employment Estimates by
Land Use Alternative .....................cc0008

Range of Indirect Job Creation by
Land Use Alternative .......................:s:+++

Summary of Construction Impacts by
Land Use Alternative .......................000008

Summary of Tax Revenues Generated
by Land Use Alternative ........................

Estimate of Displacement - Alterna-
tive 2 — Recreation/Tourism ....................

Estimate of Displacement - Alterna-
tive 3 — Residential/Commercial .............

Estimate of Displacement - Alterna-
tive 4 — Business Campus .......................
Estimate of Displacement - Alterna-
tive § — Mimed Use 1 ...............ccscccccesssseees

Demographics Concerning New
London’s School-Aged Population. ...........

Estimated Domestic Water Usage -
Alternative 1 — No Actiwn.........................

Table 4.7-3

Table 4.7-4

Table 4.7-5

Table 4.7-6

Table 4.7-7

Table 4.9-1

Table 4.9-2

Table 4.9-3

Table 4.9-4

Table 4.9-5

Table 4.9-6
Table 4.9-7

233

Estimated Domestic Water Usage -—
Alternative 2 — Recreation/Tourism........ 4-56

Estimated Domestic Water Usage -
Alternative 3 — Residential/Commercial .... 4-58

Estimated Domestic Water Usage -

Alternative 4 —- Business Campus........... 4-60
Estimated Domestic Water Usage -
Alternative S — Mixed Use 1................... 4-62
Estimated Domestic Water Usage -
Alternative 6 — Mixed Use 2 ................... 4-63

Summary of Projected Traffic Counts..... 4-68
Anticipated Site-Generated Traffic -

Alternative 4 —- Business Campus........... 4-69
Anticipated Site-Generated Traffic -
Alternative 6 — Mixed Use 2 ................. 4-70
Levels of Service for Signalized
I cnncnscctinrastnicenenatevinatansinins 4-73
Levels of Service for Unsignalized
I ecicittctntninnnsinteimns 4-73
Anticipated Levels of Service.................. 4-74
Anticipated Critical Volume/Capacity
Beil ccromanunsinsenentnsineniremanmnamemannns 4-75

Figure 1.1-1
Figure 1.1-2

Figure 1.1-3
Figure 1.1-4
Figure 1.1-5

Figure 2.1-1

Figure 2.1-2
Figure 2.1-3

Figure 2.2-1

Figure 2.3-1

Figure 2.7-1

Figure 2.7-2
Figure 2.7-3
Figure 2.7-4

Figure 2.10-1

Figure 2.12-1
Figure 2.12-2 Soil Types

234

FIGURES

Location Map — City of New London...
Project Location Map.......................++

Conservation and Development

Policies Plan Locational Map..............

1990 Census Tracts — New London,

Block and Lot Designations.................

Proposed Historic District at NUWC

| eae
Archaeological Assessment - NUWC....
Prehistoric Archeological Sensitivity ....
Historic Archeological Sensitivity ......

235
Figure 2.14-1 Noise Monitoring Locations .......... — 2-110
Figure 2.15-1 Preliminary Environmental Risk
BI ictuasondnstcedestmnnsnnsenticcsescensiniinisinnds 2-120
Figure 3.2-1 Alternative No. 1 — No Action. ................. 3-6
Figure 3.2-2 Alternative No. 2 —- Recreation/
i cnticnteniinnniansenessinniciiniiiadadinnniineiia 3-7
Figure 3.2-3 Alternative No. 3 — Residential/
i icccnsevicnsersecsinaininitipitaintissienni 3-8
Figure 3.2-4 Alternative No. 4 — Business Cam-
iD icanicttninnseieninnepremannanietinenin 3-9
Figure 3.2-5 Alternative No. 5 —Mixed Use 1............ 3-10
Figure 3.2-6 Alternative No. 6 — Mixed Use 2 .......... 3-11
Figure 3.2-7 Roadway Improvement Option A -
Modify Existing Bridges........................ 3-21
Figure 3.2-8 Roadway Improvement Option B -
New Access Road Over Tracks .............. 3-22
Figure 3.2-9 Roadway Improvement Option C -
Construct New Railroad Under-
I icccscieciercteneienninnieamneneine 3-23
APPENDICES
AppendixA Environmental Assessment
Appendix B Housing Availability
Appendix C Listing of Properties within the MDP Area
Appendix D Traffic Volume Data/Graphics a eae
Appendix E Summary of Findings of Environmental
Property Reviews
Appendix F Relevant Correspondence

236

LIST OF ABBREVIATIONS
Army Corps of Engineers
Bartram and Cochran MBIA
Base Realignment and Closure
Connecticut Coastal Management Act
Camp Dresser & McKee, Inc.
Connecticut Environmental Policy Act

Comprehensive Environmental Response
Compensation and Liability Act

Connecticut General Statutes
Connecticut Historical Commission
Connecticut Housing Finance Authority
Connecticut Light & Power

Carbon Monoxide

Council of Governments

Connecticut Department of Environmental
Protection

A-Weighted Decibel

Department of Economic and Community
Development

Department of Environmental Protection

Department of Transportation

Department of Public Health

Department of Public Utility Control

Decent, Safe, and Sanitary

Diversified Technology Consultants

Environmental! Assessment

Environmental! Impact Evaluation

Environmental Protection Agency

Economics Research Associates

Federal Emergency Management Agency

FHWA _ Federal Highway Administration

gpd gallons per day

HMA Harrall-Michalewski Associates, Inc.

HUD Department of Housing and Urban Development

ISO Insurance Services Organization

kV kilovolt

KVA kilovolt ampere

L, Day/Night Sound Level

L. Equivalent Sound Level

LOS Level of Service

LRA Local Reuse Authority

MDP Municipal Development Plan

yg/m’* microgram per cubic meter

MG million gallons

MGD million gallons per day

MMI Milone & MacBroom, Inc.

NAAQS National Ambient Air Quality Standards

NDDB_Natural Diversity Data Base

NESHAP National Emission Standards for Hazardous
Air Pollutants

NGVD National Geodetic Vertical Datum

NLDC New London Development Corporation

NO, Nitrogen Dioxide

NPDES _ National Pollutant Discharge Elimination
System

NRCS Natural Resources Conservation Service

NUWC Naval Undersea Warfare Center

OLISP Office of Long Island Sound Programs

OPM Office of Policy and Management

Pb Lead

PM Particulate Matter

237

238

Project Oceanology

parts per billion

parts per million

Research and Development

Resource Conservation and Recovery Act

RKG Associates, Inc.

Remediation Standard Regulations

Record of Decision

Superfund Amendments and Reauthorization

Soil Conservation Service

South East Area Transit

Square Feet

State Historic Preservation Officer

Southern New England Telephone

Sulfur Dioxide

State Traffic Commission

TAMS Consultants, Inc.

Toxicity Characteristic Leaching Procedure

Urban Land Institute

Uniform Relocation Assistance Act

United States ,

United States Department of Agriculture

United States Department of Housing amd
Urban Development

Underground Storage Tank

Water Pollution Control Facility

Wallace Roberts and Todd

Wilbur Smith and Associates

Water and Water Pollution Control Autmority

x-ray fluorescent

239

EXECUTIVE SUMMARY
Introduction

Project Background

The New London Development Corporation (NLDC), in
association with the Connecticut Department of Economic
and Community Development (DECD), is undertaking a
planning project adjacent to the Thames River in New
London, Connecticut. Plans for the project area are being
prepared in accordance with a Municipal Development
Planning process under Section 130, 132, and/or 588(1) of
the Connecticut General Statutes. The planning process
may result in a recommendation to undertake redevelop-
ment of all or part of the planning area. Because state
funds are involved, this Environmental Impact Evaluation
(EIE) is being prepared under the Connecticut Environ-
mental Policy Act (CEPA) in conjunction with the Munici-
pal Development Plan (MDP). *

The population in New London has been declining since
1960 and has not been lower since the 1930's. The unem-
ployment rate in New London as of June 1998 was 7.6%,
as compared to the nearby urban mu.icipalities of Nor-
wich at 6.3% and Groton at 4.7%, and statewide unem-
ployment of 4.0%. The end of the “cold war” and reduction
in defense contracts has had a significant local economic
impact.

The project area is located in the southeast part of New
London, encompassing approximately 90 acres of primar-
ily residential and commercial areas. The project area

~~Yneludes the U.S. Navy's closed Naval Undersea Warfare

Center (NUWC) along the Thames River, the regional
Water Pollution Control Facility (WPCF), and the adjacent
Fort Trumbull area, including all or portions of Howard,

240

Hamilton, Shaw, Harris, Trumbull, Walbach, Nameaug,
Smith, Chelsea, Goshen, and East Streets, and Pequot
Avenue. For discussion purposes, the project area, which
is generally referred to as the Fort Trumbull area, has
been segmented into several smaller areas as shown on
Figure 1.1-4 and on the front cover of this document.
These are referenced as the Gateway Area, Fort Area,
NUWC, and Lower Pequot Avenue Area.

The Fort Trumbull area has been targeted for evaluation
under the municipal development planning process for
numerous reasons. The majority of structures in the area
are in relatively poor condition, exhibit a high amount of
functional obsolescence, and have limited market poten-
tial. Vacancy rates are notably high (82% vacancy of non-
residential buildings and 20% vacancy of residential
units). Tax revenues in the MDP area (+$325,000) are
quite low considering it comprises an area of approxi-
mately 90 acres.

An 800,000 square foot clinical research development
facility proposed by Pfizer, Inc. (to be located immediately
to the south and outside of the MDP area) dnd reuse of a
portion of the NUWC site for development of a state park
creates an opportunity for improvement of the Fort Trum-
bull area consistent with these planned projects. This also
presents opportunities to stimulate the local economy,
improve waterfront access along the Thames River, make

Planning Process
In June of 1998, the Connecticut Department of Economic
and Community Development issued an Environmental

241

Assessment (EA) for the Fort Trumbull] MDP area which
concluded that the project could potentially have a signifi-
cant effect on the environment. Several major areas of
concern were identified in the EA, including the possible
acquisition of residential properties and relocation of
residents; adequacy of the existing water supply; conges-
tion and traffic safety issues; historic importance and
archaeological significance of the project area; flooding;
and stormwater management. As a result of DECD’s
finding, the subject Environmental Impact Evaluation has
been undertaken.

The EIE process began in late June 1998. Numerous
consultations were engaged to assist in specific phases of
the work. Preliminary findings were discussed at numer-
ous neighborhood meetings. Input and review comments
public on the Draft EIE. Input has also been solicited from
local, state and federal agencies.

Upon completion of a 45 day public comment period of the
DEIE (to be concluded on December 28, 1998), the Con-
necticut Department of Economic and Community Devel-
opment must forward the following information to the
Office of Policy and Management, for determination of the
adequacy of the evaluation:
(1) all public notice documentation;
(2) a brief summary of the public hearing, if one
is held;
(3) comments received from all interested par-
ties,

(4) the agency decision relative to proceeding

242

(5) a discussion of the intentions for initiation of

This constitutes the Record of Decision.

The CEPA process concludes with the review of the EIE
and Record of Decision by OPM and their determination of
whether or not regulatory requirements have been satis-
fied. The final EIE is the basis for the implementation of
the project. A municipal Development Plan is then created
consistent with the findings of the CEPA process. A
mandatory public hearing is held upon completion of the
MDP. Procedures for the adoption of the MDP are set forth
in Section 32-224(c) of the Connecticut General Statutes.
This process must include a finding by the OPM that the
plan is not inimical to the overall goals and objectives of
the state. Upon obtaining such a finding, the plan would
then be legally adopted by the city and approved by
DECD.

Project Goals
The project goals for the Fort Trumbull area have been
defined as follows:

1. To create a world-class development that ~——

will complement the undertakings of Pfizer,
Inc. and set a standard for development in
New London.

2. To create an economic asset for the City of
New London that will create jobs, generate
tax revenue, and result in spin-off economic
activity.

3. To maximize public access to the waterfront
and, in doing so, encourage uses which are

243

water dependent or which will be enhanced
by water access and views.

4. To develop a project which will help build
momentum for the revitalization of down-
town New London and the balance of the
city to the benefit of the city’s residents and
visitors.

—

Alternatives Evaluated

A variety of potential uses have been evaluated for the
Fort Trumbull area. However, a preferred alternative has
not yet been selected. It is anticipated that the ultimate
selected preferred plan may be a hybrid of several of the
alternatives evaluated herein. Major project components
are highlighted below:

¢ Approximately 16 acres of the land currently occupied
by the U.S. Naval Undersea Warfare Center will be
transferred to the Department of Environmental! Pro-
tection to establish the Fort Trumbull State Park,
providing open space for passive and active recreation
as well as preservation of this historic site as a cul-
tural resource. One small parcel of the NUWC site
will remain in the possession of the U.S. Coast Guard
and a second will remain in the possession of the U.S.
Navy for their continued use. The remainder of the
property is anticipated to be improved and developed,
either through public sale or through another form of
conveyance.

¢ Upgrades to the existing regional Water Pollution
Control Facility are planned to reduce odors, improve
aesthetics, and improve the quality of treated waste-
water.

244

¢ Stormwater quality will be improved via the installa-
tion of an updated stormwater collection and treat-
ment system.

¢ Roadway and traffic improvements are planned to
accommodate increased projected traffic in the area
and to overcome existing deficiencies.

¢ The following land use alternatives are under consid-
eration:

Alternative No. 1 — No Action

Alternative No. 2 - Recreation/Tourism
Alternative No. 3 —- Residential/Commercial
Alternative No. 4 - Business Campus
Alternative No. 5 —- Mixed Use 1
Alternative No. 6 —- Mixed Use 2

Various project elements are common to all of the alterna-
tives except the no action alternative. They include the
redevelopment of the NUWC site as a state historic park,
a continuous riverfront walkway, water dependent uses at
Columbia Cove, Shaw’s Cove, and along Bentley Creek,
and research and development land use west of Pequot

Avenue.
A brief description of the six alternatives follows.

Alternative 1 - No Action - One of the requirements of
CEPA is to evaluate a no action alternative. In this par-
ticular instance, no action is somewhat unusual in that
other activities and plans would likely proceed even if
there were no MDP action.

Under the no action scenario, it is assumed that the Navy
would proceed with disposition of the NUWC property as

245

planned prior to the introduction of the MDP process, in
accordance with the approved Local Reuse Authority’s
(LRA) preferred plan. The LRA’s preferred plan indicated
disposition of the NUWC property through conveyance of
the southern portion to the Department of Environmental
Protection for future development of a state park, public
benefit conveyance of a portion of the property near
Columbia Cove for maritime uses, and public sale of the

Alternative 2 - Recreation/Tourism - This alternative
complements the proposed Fort Trumbull State Park,
concentrating recreational, educational, and cultural uses
east of the railroad in the Fort Area and at NUWC. Office
and retail uses are proposed west of the railroad in the
Gateway Area.

Alternative 3 - Residential/Commercial - This alter-
native highlights a residential component throughout the
MDP area, intermixed with the state park and open space
recreational areas, and minor amounts of office and retail
uses proposed in the Gateway Area.

Alternative 4 - Business Campus - This alternative
focuses the majority of land use in the form of office
campus and a supporting hotel/conference center, with
small amounts of retail and residential uses in the Gate-
way Area.

Alternatives 5 & 6 - Mixed Use 1 & 2 - These two mixed
use alternatives incorporate recreational, residential,
commercial office, retail, and hotel/conference uses in
different proportions and arrangements.

246

Potential Impacts

The following presents brief summaries of potential
impacts that would be anticipated as a result of implemen-
tation of this project.

Land Use and Zoning Impacts - The majority of the
Fort Trumbull MDP area has been designated in the
Conservation and Development Policies Plan for Connecti-
cut as an Urban Area Regional Center. Regional Centers
encompass land areas containing traditional core commer-
cial, industrial, transportation, specialized institutional
services, and facilities of intertown significance. State
policy seeks to concentrate economic development to the
extent possible in major urban centers, promoting infill
development and intensification where appropriate. It is
also intended to promote stability of urban communities
and to support staged, orderly growth of urban develop-
ment. Regional and local policies and plans are reflective
of the regional center designation. This is also reflected in
local zoning ordinances of the Fort Trumbull area.

Land use and zoning impacts vary among the six land use
alternatives. Alternatives 2 (Recreation/Tourism) and 3
(Residential/Commercial) do not generally meet the goals
and objectives of local, regional, and statewide land use
policies, whereas Alternatives 1 (No Action), 4 (Business
Campus), 5 (Mixed Use 1), and 6 (Mixed Use 2) do.

Socioeconomic Impacts - All six of the land use alterna-
tives would have a positive impact on job creation and
generation of tax revenues. These are summarized in
Table ES-1

247

Neighborhood/Housing Impacts - Varying degrees of
neighborhood relocation would be required to implement
Alternatives 2, 4, 5, and 6. Extensive mitigative measures
have been proposed to offset these impacts. In the “no
action” alternative there would be no relocation, since all
of the land use changes would occur at the NUWC prop-
erty. In Alternatives 2 (Recreation/Tourism), 4 (Business
Campus), and 6 (Mixed Use 2), most or all of the existing
residents and businesses would be relocated. Alternatives
3 (Residential/Commercial) and 5 (Mixed Use 1), have the
potential to retain some, but not all, of the existing resi-
dents and businesses.

Aesthetic/Visual Resource Impacts - A\l of the Alterna-
tives would result in aesthetic and visual improvements.
Alternative 1 would only involve the NUWC property, and
therefore improvements would be less widespread. Imple-
mentation of Alternatives 2 through 6 would result in
aesthetic improvements to the Water Pollution Control
Facility, creation of a waterfront riverwalk, landscaping
improvements, and demolition of decrepit buildings.

248

TABLE ES-1
Summary of Socioeconomic Impacts
Land Alt. 1 Alt. 2 Alt. 3 Alt. 4 Alt. 5 Alt. 6
Use No Recreation/ Residential’ | Business Mixed Mixed
Category Action Tourism |(Commercial| Campus Use 1 Use 2
Direct Employment —Low 1,080 506 335 1,332 574 591
Direct Employment — High 1,779 1,019 710 2,289 1,099 1,124
Indirect Job Creation — Low 802 337 220 949 385 394
Indirect Job Creation — High 1,321 659 452 1,610 720 734
Construction Costs — Low $3,200,000} 28,231,500) 40,131,680| 56,752,040 | 43,713,320) 48,943,320
Construction Costs — High $12,000,000; 58,098,330} 64,249,500! 104,202,900 | 72,893,250} 79,402,750
Construction Wages — Low $1,440,000; 12,704,175| 18,059,256] 25,538,428 | 19,670,994| 22,024,494
Construction Wages — High $5,400,000! 26,144,249| 28,912,275! 46,891,305 | 32,801,963| 35,731,238
Construction Employment — 38 331 470 665 512 574
Low
Construction Employment — 141 681 753 1,222 854 931
High
Tax Revenues — Low $61,152 375,704 603,116 931,651 671,562 771,507
Tax Revenues — High $229,320 946,459 1,064,008 1,838,437| 1,229,190} 1,353,587

Source: Marshal! Valuation Service and RKG Associates, Inc.

249

Public Utilities and Services Impacts - Utility im-
provements would be necessary under all of the alterna-
tives. This work is anticipated to be conducted within
existing or future roadway right-of-ways and not impact
adjacent land uses. Under all land use alternatives, the
existing storm drainage system will need to be modified to
accommodate new roadway alignments and improvements
and to correct deficiencies in the existing system. The
storm drainage systems will incorporate stormwater
quality renovation elements and/or infiltration systems to
meet stormwater general permit requirements.

Energy Use and Conservation - There is no known data
readily available on historic energy use in the Fort Trum-
bull MDP area and guidelines have not been prepared for
future energy use. In general, it is anticipated that new
buildings will be more energy efficient than the older
existing buildings, and will need to conform to or exceed
current standards.

High electrical-demand uses are not proposed under any of
the identified land use alternatives. However, it is antici-
pated that individual users will take advantage of energy-
saving measures and available incentives. Additionally,
future development projects will be designed in accordance
with applicable state and local building codes with respect
to electrical components, lighting, and HVAC.

Cultural Resources Impacts - Potential impacts to
cultural resources would result under all of the land use
alternatives. However, extensive mitigation measures
have been proposed to offset these impacts. The Connecti-
cut Historic Commission has reviewed and agreed with the
proposed course of action.

250

Traffic and Parking Impacts - Al) of the land use
Alternatives will result in additional traffic in the Fort
Trumbull area. The “no action” alternative (Alternative 1)
results in the highest peak hour traffic. Under Alterna-
tives 2 through 6, mitigation measures have been proposed
to offset these impacts.

Water Resource Impacts - Minimal water resource
impacts are anticipated under any of the alternatives.
Improvement to stormwater management is expected in
any case.

Flood Hazard Impacts - Much of the Fort Trumbull
MDP area is located in the flood hazard zone. Redevelop-
ment of a portion or all of the area would present an
opportunity to floodproof buildings or construct new
buildings in accordance with FEMA and DEP standards.
An evacuation plan would be developed under Alternatives
2 through 6, as well as roadway modifications to improve
ingress and egress in the area.

Physical Environment Impacts - Minimal physical
impacts are anticipated under any of the alternatives.

Air Quality Impacts - As there will be additional traffic
generated as a result of implementation of any of the
identified alternatives (including the no action alterna-
tive), localized air quality impacts will also result. How-
ever, these are expected to be minimal and will not be
regionally significant. It should be noted that the “no
action” alternative (i.e. no MDP action) would result in the
highest peak hour traffic, with no associated roadway
improvement mitigation.

Noise Impacts - There will be increases in off-site traffic
levels, particularly along Howard Street and Bank Street

261

as a result of the planned ‘fizer facility as well as pro-
posed uses within the Fort Trumbull MDP area. It is
anticipated that increased traffic will create noise that will
be consistent with an urban transportation hub. However,
the geometric and lane improvements at intersections will
minimize changes in noise from motor vehicles. Electrifi-
cation of the Amtrak rail line is expected to lessen rail
operation related noise.

Solid Waste and Hazardous Materials Impacts - The
need for and extent of site remediation will be governed by
the relevant statutes and regulations affecting such
activities. Implementation of any of the alternatives would _
result in the clean-up of contaminated soil, waste contain-
ers, and aging material storage tanks.

Cumulative Impacts

Positive cumulative impacts are anticipated as a result of
implementation of this project with respect to economic
growth through job and tax revenue creation, parks and
recreational facilities, public access, wetland restoration,
aesthetics, site remediation, improved stormwater man-
agement, and additional flood protection. Negative im-
pacts are expected with respect to traffic, air quality,
noise, cultural resources, neighborhood relocation, and

possibly marine water resources.

Unavoidable Impacts

Unavoidable impacts caused by demolition and construc-
tion are anticipated with respect to air and noise quality,
as well as short-term increased equipment traffic and use.

252

Unavoidable long term impacts are expected in the areas
of traffic, air quality, noise, and cultural resources.

Lrreversible and Lrretrievable Commitment of Resources

The implementation of any of the six alternatives would
consume non-renewable resources during the construction
and implementation (i.e., construction supplies, fuel, etc).
Since these resources can not be reused, they are consid-
ered to be irreversibly and irretrievably committed.
Similarly, disposal of demolition material at a landfill
and/or solid waste disposal facility will take up capacity in
such facilities which is irreversible and irretrievable.

Mitigation Opportunities

Mitigation opportunities have been evaluated for each of
the identified resources. The areas that have been evalu-
ated in the greatest detail and for which the greatest
number measures have been proposed are those which
have the greatest potential to have impacts. These include
traffic and transportation, neighborhood relocation,
sensitive cultural resources, and flood hazard areas.

1.0 PURPOSE AND NEED
1.1 Introduction

1.1.1 Project Background

The New London Development Corporation (NLDC),
in association with the Connecticut Department of
Economic and Community Development (DECD), is

undertaking a planning project adjacent to the

1.1- 1 is a location plan of the City of New London and

253

New London County. Figure 1.1-2 shows the project
area in relation to downtown New London. The pro-
ject area includes the U.S. Navy’s closed Naval Un-
dersea Warfare Center (NUWC), the regional Water
Pollution Control Facility (WPCF), and the adjacent
Fort Trumbull area as shown in Figure 1.1-3. The pro-
ject area is also adjacent to the Shaw’s Cove Redevel-
opment Area.

NLDC is a nonprofit, private economic development
organization originally formed in 1978. The corpora-
tion was established with the authority to raise and
borrow funds, manage projects, acquire and sell prop-
erties, and engage in any activity related to the pro-
gress and general welfare of the community.

Plans for the project area will be prepared in accor-
dance with a Municipal Development Planning proc-
ess under Section 130, 132, and/or 588(1) of the
Connecticut General Statutes. The planning process
may result in a recommendation to undertake rede-
velopment of all or part of the planning area. This
Environmental Impact Evaluation (EIE) is being pre-
en SSeS Dee
Act (CEPA) in conjunction with the Municipal Devel-
opment Plan (MDP). An Environmental Impact
Statement is also being prepared for the disposition of
the NUWC property, but has not yet been issued by
the Department of the Navy.
The driving force behind this project is the City of
New London’s desire to revitalize its economy by fo-
cusing on the potential offered in the Thames River
corridor. The need to stimulate the local economy is
heightened by the closing of the NUWC facility in
1996. As many as 1,500 people (not including contrac-
NN at ee
in the late 1980's (personal communication, John
Templeton, September 30, 1998).

254

A key catalyst for development of this area is the pro-
posed Pfizer, Inc. global research facility to be located
immediately to the south of the MDP boundary. New
London Mills previously occupied the site on which
Pfizer has proposed its development. The project will
involve a private investment of approximately $150
million and is designed to accommodate approxi-
mately 2,000 employees.

+e

a

Fort Trumbull MDP Area - New London, Connecticut
Draft Environmental Impact Evaluation - November 1998

8 Miles

257

-" pbull MDP Area - New London, Connecticut

438

Figure 1.1-3
Project Area
/\/_ MDP Project Border

boviroumental impact Evaluation - November 1998

(New Landan, FEMA, and US Navy Irucnded for plarrang

not for design use.

258

In order to induce private investment into the Fort
Trumbull area, the State of Connecticut and the City
of New London have committed to invest over $64
million. Major categories of public investment include
$20 million for the creation of Fort Trumbull State
Park on a portion of the NUWC property; $7 million
for the upgrade of the regional sewage treatment fa-
cility which is located in the Fort Trumbull area; $9
million for environmental remediation of sites; and
$24 million for the preparation of a comprehensive
plan for the area, for property acquisition, infrastruc-
ture development, and other activities to support im-
plementation of the plan. An additional $10.5 million
will be available for relocation assistance. Of this
amount, $10 million will be in the form of Connecticut
Housing Finance Authority (CHFA) low rate financing
loan money. Two hundred and fifty thousand dollars
will be available in the form of down payment assis-
tance to residents, and an additional $250,000 will be
available through Small Business Assistance Program
relocation funding.

1.1.2 Project Location

The City of New London is located in southeastern
Connecticut. It is a waterfront community, along the
tidal estuary of the Thames River and Long Island
Sound. New London is only 5.79 square miles in size,
making it geometrically the second smallest munici-
pality in the State of Connecticut. The estimated 1998
population is 23,860 people based on data published
by Claritas, Inc. (State of Connecticut DECD popula-
tion estimates for 1995 are somewhat higher at
26,920 people.) The community supports several insti-
tutions, including Connecticut College, Mitchell Col-
lege, and the U.S. Coast Guard Academy. Nearly 54%
of the total lard area of New London is occupied by

259

nonprofit institutions which are exempt from local
property taxes.

The project area is approximately 90 acres in size and
includes a residential and commercial area of ap-
proximately 115 parcels. The NUWC site alone is 32
acres. For discussion purposes, the MDP area has
been segmented into several smaller areas as de-
scribed below. Figure 1.1-4 delineates the various pro-
ject planning areas. A brief description of each
follows:

Gateway Area — The Gateway Area-is envisioned to be
the primary entrance to the MDP area and encom-
passes the land area to the west of the Amtrak rail-
way. It includes properties on both sides of Howard
Street from its intersection with Hamilton Street to
the junction with Shaw Street and Trumbull Street.
The Gateway Area also includes properties on Hamil-
ton Street between Howard Street and the railroad
tracks, as well as properties along Harris Street to
the south. This area is currently occupied primarily
by commercial properties and parking, intermixed
with single- and multi-family residential dwellings,
and vacant properties. It occupies approximately 21
acres.

Thames River

09

261

Lower Pequot Avenue Area — The Lower Pequot Ave-
nue Area is a small portion of the MDP area, ap-
proximately 1.3 acres in size. It is limited to the four
parcels located just south of the junction of Shaw and
Trumbull Streets, between the railroad tracks to the
west, and Pequot Avenue to the east. This area in-
cludes two vacant residential properties, one vacant
lot, and one industrial use parcel.

Fort Area — The Fort Area includes all of the property
to the east of the Amtrak railroad within the MDP
area, exclusive of NUWC. This includes the Amtrak
property immediately adjacent to the railroad tracks,
as well as properties along Trumbull Street, Nameaug
Street, East Street, Walbach Street, Smith Street,
Goshen Street, and Chelsea Street. A prominent
physical feature of this area is the regional Water Pol-
lution Control Facility (WPCF), which occupies both
sides of Trumbull Street from Nameaug Street to

Naval Undersea Warfare Center (NUWC) -
1.1-5 shows the NUWC property and building desig-
nations. Building references by name and number are
listed in Appendix C. The NUWC property encom-

passes approximately 32 acres along the Thames

aff

The current plan for the property as adopted by the
local Reuse Authority (LRA) contemplates the dispo-
sition of 16 acres to the Connecticut Department of
Environmental Protection (DEP) for the establish-

262

for possible future development; and several smaller
parcels, including a 1.5-acre parcel and a 0.1l-acre
parcel, to be retained by the U.S. Coast Guard and
the Navy, respectively. The reuse plan for the prop-
erty is being reevaluated as part of the MDP process.
The recommendation of the MDP process will be pre-
sented to the LRA for its consideration.

Pfizer Site — The Pfizer site is located on the 24-acre
property which was historically occupied by New
London Mills, a manufacturer of linoleum. The New
London Mills complex was dismantled in the late
1980's and early 1990's. Although the Pfizer site is not
part of the Municipal Development Plan (MDP) and is
not subject to the CEPA process, this facility is a
neighboring property which, when developed, will
substantially contribute to the city’s economic devel-
opment objectives. It is being considered in the EIE,
primarily due to the cumulative nature of activities in
the area.

NUWC New London Site Plan

veal
Columbia Cove : i
| 3
>.
we

300 ie)
— Property Boundary ee “
— ; a eae Feet
*_y Buildings _ 00
Scare m Meters
Mapping provided by TAMS Consultants, Inc. FIGURE 1.1-5 U

442

£92

264

1.1.3 Project Chronology

The following is a chronology of major activities,
events, and milestones to date relating to the Fort
Trumbull MDP area:

1997 - New London Development Corporation
(NLDC) reforms to assist the City of New London
in its economic development process.

January 1998 — The State Bond Commission au-
thorizes $5.35 million in bonds to support plan-
ning activities and property acquisition to be
undertaken by NLDC in support of the project
and $10 million as the first installment toward
the investment in the creation of Fort Trumbull
State Park.

February 1998 — Pfizer Inc. announces its inten-
tion to develop a facility for clinical trials on the
former New London Mills site.

April 1998 —- NLDC hires an executive director,
its first employee. The New London City Council
gives initial designation to NLDC to prepare a
Municipal Development Plan for the Fort Trum-
bull area.

April 1998 —- NLDC holds the first in a series of
informal, neighborhood meetings to include and
incorporate public comment on the MDP process.
The City Council also creates a committee of six
people (two from the Local Reuse Authority
(LRA), two from the NLDC, and two from the
State of Connecticut) to evaluate the current
LRA plan for the disposition of the NUWC prop-
erty and to consider asking for a delay in the
public sale of a portion of this property.

May 1998 — The New London City Council gives
authority to NLDC to prepare plans for the Fort

265

Trumbull area under any of three state statutes
(Section 130, 132, and/or 588(1)) and establishes
the boundaries of the planning area. The State
Bond Commission approves the second install-
ment of $2.9 million to fund the preparation of a
Municipal Development Plan for the area and to
fund property acquisition activities. NLDC initi-
ates requests for qualifications from consultants
to prepare various aspects of the Municipal De-
velopment Plan and Environmental Impact
Evaluation under CEPA.

May 1998 — A consultant is hired by the Water
Pollution Control Authority to conduct a study of
the possible upgrades to the regional WPCF.

June 1998 — The City of New London authorizes
the conveyance of the former New London Mills
site to Pfizer, with the contingency that the State
of Connecticut commits to resolve or guarantee
resolution of all liens on the property. A total of
$6.1 million in additional state bonding authority
is approved to support the project.

June 1998 — The Local Reuse Authority formally
requests of the Navy that public sale of proper-
ties on the NUWC site be delayed until February
28, 1999 to allow time for the preparation of a
comprehensive plan for the Fort Trumbull area
through the Municipal Development Plan proc-
ess. This request is approved by the Navy.

June 1998 — The final Environmental Assess-
ment under the Connecticut Environmental Pro-
tection Act is issued by the Department of
Economic and Community Development, with
the recommendation to proceed with a full Envi-
ronmental Impact Evaluation.

266

¢ July 1998 —- Planning consulting team is hired for
the CEPA process and Municipal Development
Plan Preparation.

1.2 The CEPA Process

1.2.1 Overview of Regulation

The Connecticut Environmental Policy Act (CEPA),
established in Sections 22a-1 through 22a-1h of the
Connecticut General Statutes, recognizes the complex
relationship between the natural environment and
human actions, including population growth, high-
density urbanization, industrial expansion, natural
and cultural resources, and technological advances.
The Regulations of Connecticut State Agencies (Sec-
tions 22a-1 through 22a-la-12) outline a process
whereby, through coordination with other state, local,
regional and federal governments, as well as public
and private entities, a sponsoring state agency can
evaluate and minimize the projected impacts of a pro-
ject to the resources of the state.

State funds will be utilized in the Fort Trumbull MDP
area, thus triggering the CEPA process. The sponsor-
ing state agency is the Connecticut Department of
Economic and Community Development (DECD).
NLDC is the implementing agency.

1.2.2 Determination of Environmental Signifi-
cance

A major function of the CEPA process is the determi-
nation of whether a project will have a significant ef-
fect. Significant effect is defined as substantial
adverse impact on the environment. Agencies prepar-
ing such CEPA documents must consider the follow-
ing two factors: (1) direct and indirect effects and, (2)
cumulative impacts.

267

Environmental Assessment

The first phase of the CEPA process is development of
an Environmental Assessment (EA). In this work
task, existing data and information are evaluated in a
relatively fast track process to assess whether a pro-
ject may potentially cause a significant env'ronmental
impact. In some cases, a determination is made that
additional site specific and more intensive study is
necessary to make that determination. In other, less
complex cases, a Finding of No Significant Impact
(FONSI) is issued at the conclusion of the EA process.

In July 1998, the Connecticut Department of Eco-
nomic and Community Development issued an Envi-
ronmental Assessment for the Fort Trumbull MDP
area and determined that the project could potentially
have a significant effect on the environment. A copy of
this is included as Appendix A. Several major areas of
concern were identified in the EA, including the pos-
sible acquisition of residential properties and reloca-
tion of residents; adequacy of the existing water
supply; congestion and traffic safety issues; historic
importance and archaeological significance of the pro-
ject area; flooding; and stormwater management. As a
result of DECD’s finding, the subject Environmental
Impact Evaluation has been conducted.

Environmental Impact Evaluations

The Environmental Impact Evaluation (EIE) process
is intended to be an early planning process during
which options are discussed and the impact of each
alternative action is compared. Significant issues are
identified and analyzed in detail, allowing participa-
tion of interested and/or affected agencies and per-
sons.

Public input and participation is a major component
of the CEPA process. Early scoping and information
exchange is essential. Section 6.0 of this document
contains a detailed accounting of the scoping, consul-
tation, and coordination process thet has taken place
to date. The overall process for public participation is
summarized as follows:

¢ A period of no less than forty-five (45) days must
be provided for notice, distribution, and review of
the Draft Environmental Impact Evaluation by
any interested parties.

¢ Upon receiving comment, the sponsoring agency
must review comments, perform any additional
environmental study and analysis, or amend the
evaluation as appropriate. It is the sponsoring
agency's responsibility to respond to all substan-
tive comments received.

¢ A public hearing may be held, if requested in ac-
cordance with state statutes, regulations, and
Section 22a-la-11 of the regulations. A period of
no less than thirty (30) days following the date of
availability of the EIE must be provided before

tion of the adequacy of the evaluation: (1) all
public notice documentation; (2) a brief summary
of the public hearing, if one is held, (3) comments
received from all interested parties; (4) the
agency decision relative to proceeding with the
proposed action; and (5) a discussion of the inten-

(final EIE docuses and the measures for miti-
gation identified ‘ .erein).

¢ The CEPA process concludes with the review of
the EIE and Record of Decision by OPM and
their determination of whether or not regulatory
requirements have been satisfied. The final EIE
is the basis for the implementation of the project.

¢ A Municipal Development Plan is then created
consistent with the findings of the CEPA process.
A mandatory public hearing is held upon comple-
tion of the MDP. Procedures for the adoption of
the MDP are set forth in Section 32-224(c) of the
Connecticut General Statutes. This process must
include a finding by the OPM that the plan is not
inimical to the overall goals and objectives of the
state. Upon obtaining such a finding, the plan
would then be legally adopted by the city and
approved by DECD.

1.3 Project Goals

To date, input has been solicited from local, state and
federal agencies. At the local level, this has included
various departments and agencies within the City of
New London, educational institutions located within
the city, the business community, and the New Lon-

of Policy and Management, (OPM), and the Depart-
ment of Transportation (DOT) have been included. At
the federal level, the U.S. Navy and their interests at
the NUWC property, the U.S. Coast Guard, and the
State Historic Preservation Officer (SHPO) have been

14

270

represented. This process creates a vehicle for com-
munity input and involvement.

The goals for the Fort Trumbull area have been iden-
tified by the committee of six as follows:

1. To create a world-class development that will

complement the undertakings of Pfizer, Inc. and
set a standard for development in New London.

2. To create an economic asset for the City of New
London that will create jobs, generate tax reve-
ue, and result in spin-off economic activity.

3. To maximize public access to the waterfront and,
in doing so, encourage uses which are water de-
pendent or which will bo enhanced ty water ao
cess and views.

4. To develop a project which will help build mo-
mentum for the revitalization of downtown New
London and the ba’ance of the city to the benefit
of the city’s resideats and visitors.

These goals have been carried through the planning
and evaluation of alternatives.

Proposed Action

A variety of potential uses have been evaluated for
the Fort Trumbull area. However, a preferred alterna-
tive has not yet been selected. It is anticipated that
the ultimate selected preferred plan may be a hybrid
of several of the alternatives evaluated herein. Major
project components are highlighted below:

¢ Approximately 16 acres of the land currently oc-
cupied by the Naval Undersea Warfare Center
will be transferred to the Department of Envi-
ronmental Protection to establish the Fort

271

Trumbull State Park, providing open space for
passive and active recreation as well as preserva-
tion of this historic site as a cultural resource.
One small parcel of the NUWC site will remain
in the possession of the U.S. Coast Guard and a
second will remain in the possession of the U.S.
Navy for their continued use. The remainder of
the property is anticipated to be improved and
developed, either through public sale or through
another form of conveyance.

for the remainder of the Fort Trumbull area. The
following-land use alternatives are under consid-
eration. These are described in detail in Section
3.0 of this document.
Alternative No. 1 — No Action
Alternative No. 2 — Recreation/Tourism
Alternative No. 3 — Residential/Commercial
Alternative No. 4 - Business Campus
Alternative No. 5 — Mixed Use 1
Alternative No. 6 —- Mixed Use 2

Upgrades to the existing regional Water Pollu-
tion Control Facility are planned to reduce odors,
improve aesthetics, and improve the quality of
treated wastewater.

Stormwater quality will be improved via the in-
stallation of an updated stormwater collection

272

15 Relationship to Other Projects and Planning
Documents

For the purposes of this EIE, numerous planning
documents have been evaluated in the context of the
Fort Trumbull area to ensure that this planning effort
is consistent with relevant state, regional, and local

State Planning Documents

Conservation and Development, Policies Plan for
Connecticut, 1998-2003, Office of Policy and
Management, Hartford, CT.

Connecticut Environmental Goals and Indica-
tors, Connecticut Institute of Water Resources,
University of Connecticut, September 30, 1996.

Regional Planning Documents

Southeastern Council of Governments, Land Use,
1990, February 1991.

Southeastern Council of Governments, Population
and Housing, 1990, March 1992.
Southeastern Council of Governments, Social In-
dicators, 1990, February 1995.

Southeastern Council of Governments, Proposed

273

Guide for Southeastern Connecticut (DRAFT),
July 1997.

Local Planning Documents

¢ Plan of Conservation and Development, City of
New London, CT. Prepared by: The Office of De-
velopment and Planning and the New London
Plan of Development Steering Committee, March
1, 1997 (Adopted April 3, 1997).

¢ Zoning Regulations, City of New London, CT,
Planning and Zoning Commission, as amended
through September 1, 1998.

Other Related Documents

A great deal of work has been conducted to date by

the Navy on the NUWC property. The NUWC prop-

erty lies within the MDP boundary and, therefore, the

EIE has considered following planning and site inves-

tigation documents:

¢ Feasibility Report, Naval Undersea Warfare
Center, Fort Trumbull State Park, June 18, 1997,
Amended: December 1997.

¢ Implementation Strategy, Naval Undersea War-
fare Center, New London, CT, Economics Re-
search Associates and Sasaki Associates, Inc.,
April 17, 1997.

¢ Redevelopment Strategy, Naval Undersea War-
fare Center, New London, CT, Economics Re-
search Associates and Sasaki Associates, Inc.,
April 17, 1997.

¢ Draft Cultural Resources Survey; Naval Under-

sea Warfare Center; New London, Connecticut;
TAMS Consultants, Inc.; April 1998.

274

Additionally, the EIE has considered the neighboring
Pfizer, Inc. development through ongoing coordination
with Pfizer representatives. Pfizer is planning an
800,000 square foot global research and development
facility. The site of the Pfizer complex is located im-
mediately to the south of the Fort Trumbull MDP
area, between Pequot Avenue and Trumbull Street, on
property which was previously occupied by New Lon-
don Mills.

2.0 AFFECTED ENVIRONMENT
2.1 Land Use

An understanding of land use plans and policies at the
local, regional and state levels is essential to the analysis
of potential alterations of land uses. The following discus-
sion sets the framework of land use policies which apply to
the Fort Trumbull MDP area. Consistency of identified
project alternatives (presented in Section 3.0) with these
plans, policies, statutes, and regulations is evaluated in
Section 4.0 of this document.

2.1.1 Statewide Land Use Conservation and

Development

The following discussion presents portions of the Con-
servation and Development Policies Plan for Connecti-
cut (1998-2003) as they relate to the Fort Trumbull
MDP project. Italicized sections are direct excerpts
from the Plan. Not all Plan policies are included in
this discussion, as they may not directly apply. For an
expanded review of the Plan, the reader is directed to
the full 141-page document.

Connecticut (1998-2003) is a statement of the state's
growth, resource management, and public investment

275

policies. The Plan provides a policy and planning
framework for the administrative and programmatic
actions and capital and operational investment deci-
sions of state government, which influence the future
growth and development of the state. The objective of
the Plan is to guide a balanced response to human,
environmental, and economic needs in a manner
which best suits the future of Connecticut. The Con-
necticut General Assembly, in accordance with Sec-
tions 16a-24 through 16a-33 of the Connecticut
General Statutes, established the Plan.

Public Act 91-395 requires state agencies to be consis-
tent with the Plan when undertaking certain actions,
including authorization of state grant money in ex-
cess of $100,000 for the acquisition, development, or
improvement of real property. The MDP project will
receive state funding as described in Section 1.0 of
this document. Therfore consistency with the state
Plan is evaluated herein.

The accompanying Conservation and Development
Plan Locational Guide Map apportions the state into
land categories according to each area’s characteristics
and suitability for different forms of development or
conservation activities. The categories of land use are
designated on the Locational Guide Map as follows:

Urban Areas

¢ Regional Centers

¢ Neighborhood Conservation Areas
¢ Growth Areas

Areas of Environmental Concern
¢ Existing Preserved Open Space

¢ Preservation Areas

¢ Conservation Areas

276

Rural Areas
¢ Rural Community Centers
¢ Rural Land

Figure 2.1-1 shows the statewide conservation and devel-
opment plan land designations for the project area. The
majority of the Fort Trumbull area is classified as a
Regional Center, with most of the balance of the project
area classified as Conservation Area. Small areas of
Preservation and Existing Preserved Open Space are also
designated on the Locational Guide Map. Descriptions of
land use designations in the project area are presented
below.

Regional Centers

Regional Centers encompass land areas containing
traditional core area commercial, industrial, trans-
portation, specialized institutional services, and fa-
cilities of intertown significance.

Section 4-66b of the General Statutes sets forth the
following urban goals to be used to assess consistency
of a proposed action with state policy:

¢ to revitalize the economic base of our urban areas
by rebuilding older commercial and industrial ar-
eas and encouraging new enterprises to locate in
the central cities in order to protect existing jobs
and create new job opportunities needed to provide
meaningful economic opportunity for inner city
residents;

¢ to revitalize urban neighborhoods to reduce the iso-
lation of various income, age, and minority groups
through the promotion of fair and balanced hous-
ing opportunities for low and moderate-income
residents;

Thames River

art Trumbull MDP Area - New London, Connecticut
[ Environmental Impact Evaluation - November 1998

LLG

278

¢ to revitalize the quality of life for the residents of
our urban areas by ensuring quality education,
comprehensive health care, access to balanced
transportation, adequate recreational facilities, re-
sponsive public safety, coordinated effective human
services programs, decent housing, and employment
opportunities; by preserving the scarce resources of
pure air and clean water; and by ensuring full and
equal rights and opportunities for all people to reap
the economic and social benefits of our society; and

© to coordinate the conservatio.: and growth of all ar-
eas of our state to ensure that each area preserves
its unique character and sense of community and
further ensure a balanced and prudent use of our
state’s scarce resources.

State policy seeks to concentrate economic develop-
ment to the extent possible in major urban centers,
promoting infill development and intensification
where appropriate. It is also intended to promote sta-
bility of urban communities and to support staged,
orderly growth of urban development.

The highest priority has been assigned to affirma-
tively supporting rehabilitation and revitalization of
the economic, social, and physical environment of Re-
gional Centers. State policy supports a range of public
facilities, services, and amenities that serve to en-
courage private investment in development forms
consistent with urban strategies. As a result, the fol-
lowing approach and guidelines are among those
identified in the Conservation and Development Poli-
cies Plan for Growth Areas (i.e. lands near Regional
Centers that provide the opportunity for staged urban
expansion generally in conformance with municipal or
regional development plans).

279

target economic development assistance emphasiz-
ing site cleanup, land assembly, structural reha-
bilitation; and the location of labor-intensive
businesses to revitalize the economic base of Re-
gional Centers, to encourage new enterprises and
create new opportunities for urban residents;

give priority to infrastructure proposals that pro-
vide needed growth capacity in Regional Centers;

support new product development and facilities for
start-up firms, especially those that provide some
entry level employment opportunities and which are
strategically suited to their communities (can com-
pete in local markets or complement a regional eco-
nomic cluster);

scrutinize regulatory processes and seek to simplify,
streamline, or eliminate those rules that unduly
hinder economic development in urban areas, while
ensuring continuing efficient protection of public
safety, health and the environment;

locate all appropriate state facilities within urban
areas with preference to sites in Regional Centers;

promote recreational uses of urban rivers and their
banks as part of a greenway system and the protec-
tion, interpretation, and public use of other urban
natural resources;

develop heritage parks where appropriate to foster
tourism and recreational opportunities and to dis-
play and interpret local history;

promote, to the extent possible, the concentration of
major facilities on public transportation routes at
employment densities of at least 50 employees per
acre.

280

Conservation Areas

Conservation Areas represent a significant portion of
the state and a myriad of land resources. Conserva-

tion areas include flood fringe areas that are, or may
be, defined under the National Flood Insurance Pro-
grams, Connecticut’s Channel Encroachment Line
Program, or the Coastal Area Management Program,
as areas subjected to 100-year flood and not included
in the floodway. Historic preservation areas are also
included in Conservation Areas.

To attain the widest range of beneficial public uses
and appropriate development, state actions in Con-
servation Areas should be designed to:

* promote research, education, resource management,
regulations, financial, and technical assistance or
public acquisition as necessary to achieve proper
use and protection of Conservation Areas;

¢ undertake or support only those uses that are com-
patible with the resource or hazard of concern, con-
sistent with evaluations of both direct and

secondary impacts;

¢ demonstrate the lack of alternative sites, overriding
social or economic concerns, and the lack of any
reasonable alternative public or private uses for
any proposal which is clearly and significantly in-
compatible with conservation; and

¢ include mitigation measures necessary to both pro-

tect against degradation and enhance environ-
mental quality.

Preservation and Existing Preserved Open Space
Areas

A narrow fringe of land along the waterfront edge
within the MDP area has been classified as

281

Preservation Area, due to its proximity to the water-
front and associated flood hazard characteristics.
State policies regarding preservation areas promote
preservation and management of these areas as open
space. Plans and proposals that are incompatible with
open space uses should demonstrate overriding public
benefits and the lack of viable alternative sites.

A small triangular parcel formed by Howard Street,
Harris Street, and Shaw Street has been classified as
Existing Preserved Open Space. It is unclear why this
designation has been assigned, since this land area is
currently developed. This area should be redesignated
by OPM during its next revision to the Plan.

2.1.2 Regional Land Use

The Southeastern Connecticut Region consists mostly
of the suburban municipalities of Colchester, East
Lyme, Griswold, Ledyard, Lisbon, Montville, Preston,
Sprague, Stonington, and Waterford surrounded by
the rural towns of Salem, Bozrah, Franklin, Volun-
town, and North Stonington. Norwich, Groton, and
New London are the urban centers, making up ap-
proximately 11.3% of the 559.2 square miles of the
Southeastern Connecticut Region.

Approximately 21% of the region is occupied by inten-
sive land uses, leaving a rather large portion (61%) of
undeveloped lands. Several factors limit the ability to
intensively develop areas in the southeastern Con-
necticut region, including poorly drained soils, shal-

low depth to bedrock, steep slopes, flood hazard areas,
availability of utilities, ownership, zoning, financing,

and regulatory jurisdictions of state and federal gov-

ernments.

The major development contributing to regional
growth has occurred at low densities, more in the

rural and suburban towns than the three urban mu-
nicipalities, although urban growth continues along
the Thames River corridor and the Long Island Sound
coast, and more recently along Interstate 95.

The region has had a historic dependence on defense
related industries. The end of the Cold War signifi-
cantly altered regional land use patterns, with the re-
duction of defense-related industries and manu-
facturing. It is further expected that dramatic
changes will continue to occur with the increase in
gional Conservation and Development Policy Guide
for Southeastern Connecticut, October 1997)

It is the goal of the Southeastern Connecticut Council
of Governments (SCCOG) that diversified and bal-
anced development be sought in the region and oppor-
tunities be created in an effort to minimize
dependence on a single industry for employment,
thereby reducing the strain of high unemployment
rates on the region’s economic health.

2.1.3 Land Uses in the Project Vicinity
Development in southeastern Connecticut is concen-
trated primarily along the coastline of Long Island
Sound and along the Thames River. Single-family and
multi-family residential areas, commercial establish-
ments, ~ ym pram ~ mama aceasta
the densely developed coastline

On the western bank of the Thames River, north of
the project area, are the Shaw's Cove area and down-
town New London which supports commercial uses
and major transportation uses, including ferry ser-
vices, passenger rail, and a major parking facility.
Further north are the State Pier, the Goldstar Memo-
rial bridge, Connecticut College and the U.S. Coast

283

Guard Academy. To the south along the western bank
of the Thames River are Greens Harbor, Mitchell Col-
lege, and Ocean Beach.

Major land uses on the eastern bank of the Thames
River, across from the project area, include General
Dynamic’s Electric Boat facility, Pfizer Pharmaceuti-
cal Company, and Fort Griswold.

Other noteworthy land uses in the surrounding re-
gional area include Crystal Mall in Waterford, Fox-
woods Casino in Ledyard, Mohegan Sun Casino in
Montville, and Mystic Seaport and Aquarium in Ston-
ington. Nearby open space areas include Harkness
Memorial State Park in Waterford, and Bluff Point
State Park and Fort Griswold in Groton.

_Land uses immediately surrounding the Fort Trum-
bull area consist of waterfront uses dominated by
harbors and marinas, commercial uses, and mixed
residential and office/commercial areas.

2.1.4 Land Uses Within the MDP Boundary

Figure 2.1-2 depicts existing land uses in the project
area. Land use within the MDP area includes the
NUWC facility, the regional Water Pollution Control
Facility, a mixed residential/commercial area, and
single- and multi-family neighborhoods. A description
of land uses in the four project planning areas follows.

284

|

t ry

:

Figure 2. 1-2
Land Uses in
the Project Area

rort Trumbull MDP Area - New London, Connecticut
t Environmental Impact Evaluation - November 1998

Qtty of New Landon, and US Navy. Innended for planning

inc. and HMA, Inc. Sources inchade Conmectiag DEP,
any - not for desagn purposes.

cae. GIS coverages developed by Milone & Mar Brmaxr

—
te]
"Fr

285

Gateway Area

The portion of the project area located to the west of
the railroad tracks consists of commercial and indus-
trial establishments intermixed with single- and
multi-family residences. The Miner & Alexander
Lumber Company is the major commercial establish-
ment located between Hamilton Street and Shaw’s
Cove. The largest building in this area is a 50,000
square foot office building located at 194 Howard
Street. This structure has been vacant but is being
renovated for office use. Businesses, office buildings,
and residences occur along Howard Street. Several
undeveloped parcels occur to the west of Howard
Street along the western edge of the project area.

Fort Area

A major physical feature in the Fort Area is the re-
gional Water Pollution Control Facility which is bor-
dered by Nameaug Street to the west, Walbach Street
to the north, Smith Street to the east, and Bentley
Creek to the south. The facility is marked by the mas-
sive treatment tanks and buildings associated with
the wastewater treatment process.

The remainder of the Fort Area consists primarily of
single-family and multi-family residences, with sev-
eral smal] businesses, restaurants, and commercial
establishments. New London Seafood Distributors is
located in the northern portion of the Fort Area near
Columbia Cove, and Fort Trumbull Marina is located
in the southern portion of the Fort Area along Bentley
Creek.

286

Lower Pequot Avenue Area

Land uses in the Lower Pequot Avenue Area are lim-
ited to two vacant residential dwellings, one vacant
lot, and one industrial property.

NUWC Area

The eastern portion of the project area, located to the
east of Smith and East Streets and bordering the
Thames River, is occupied by the Fort Trumbull U.S.
Navy Reserve Base, Naval Undersea Warfare Center
(NUWC). The base consists of a 19th century fort and
blockhouse as well as various laboratories, adminis-

trative offices, residences, and other buildings. Sev-

eral piers on the Thames River are also associated
with this facility. This facility has been closed since
1996 and most of the buildings are unoccupied. A staff
of approximately 15 people continue to secure and
maintain the facility.

2.1.5 History of Development

Aerial photographs of the project area dating back to
1965 were examined to qualitatively dd®ument
changes which have occurred over the last three dec-
ades. A discussion of this review follows.

1965 aerial photograph
In 1965, the project area was densely developed, with

a general appearance similar to present day condi-
tions. The following differences are noted:

* The NUWC property had more lawn and parking
areas and fewer buildings than it does today. A
small bay was present at the southeastern corner
of the property.

¢ The regional Water Pollution Control Facility on
Trumbull Street appears much the same as today;

287

however, the portion of the facility to the north of
Trumbull Street had not yet been constructed.
This area supported residential houses, a ware-
house, and undeveloped land.

¢ In the western portion of the project area, the un-
developed land between Howard Street and Shaw
Street appeared less overgrown than it does to-
day. An open stormwater drainage channel ex-
tended north to Hamilton Street. The large parcel
between Howard Street and the railroad tracks,
now the site of a large office building, supported
several factory or warehouse buildings.

1970 aerial photograph

Very little visible change took place within the project
area between 1965 and 1970. The open stormwater
drainage channel in the undeveloped land between
Howard Street and Shaw Street had been piped un-
derground at its northern end, and the remaining open
channel appeared much the same as it does today.

1975 aerial photograph

Significant changes occurred at the NUWC property
between 1970 and 1975. Several buildings were con-
structed, including Buildings 2, 80T, 96, 99, and 122T
(see Figure 1.1-5). The small bay at the southeastern
corner of NUWC had been filled in and a parking lot
w.s constructed on top of it.

The factory or warehouse buildings located on the
large parcel between Howard Street and the railroad
tracks were demolished, and the site was vacant.

1980 aerial photograph
The portion of the regional Water Pollution Control

Facility south of Trumbull Street was constructed
between 1975 and 1980. The buildings that had

288

occupied the site were demolished, with the exception
of a large building near the corner of Walbach Street
and Smith Street, which remains standing today.

The large parcel between Howard Street and the rail-
road tracks remained vacant.

1986 aerial photograph

A large office building had been constructed on the
vacant parcel between Howard Street and the rail-
road tracks. North of the study area, the realignment
of Howard Street and the construction of the Shaw’s
Cove office complex was completed.

1990 aerial photograph

Between 1986 and 1990, a parking lot was con-
structed at the regional Water Pollution Control Fa-
cility on the corner of Nameaug Street and Walbach
Street. Otherwise, very little visible change occurred
in the area during this period.

1996 aerial photograph

An additional sewage treatment tank was constructed
at the regional Water Pollution Control Facility on
the north side of Trumbull Street.

2.1.6 Zoning

Three municipal zones occur within the project area as
shown graphically in Figure 2.1-3. These are Waterfront
Commercial/Industrial (WC-I]), General Commercial
District (C-1), and the Waterfront Development District
(WD). In many locations within the MDP area, land
uses are inconsistent with the zoning designation.

A description of zoning in the project planning areas
follows.

Ro natn es ER
eS Cae ~
EK
.

+ Trumbull MDP Area - New London, Connecticut Figure 2.3-1
ar~* Environmental Impact Evaluation - November 1998 Block and Lot
GS coverages deveiaped by Mane & MacBroom. Designations

«
68 22 0 0 0
89 22 2 0 ri
101 22 i3 id 19
102 29 r 7 8
105 22 22 34 rv
106 22 7 12 id
io? | 21& 22 16 25 29
109 26 0 0 0
TOTAL:| 64 92 iis

Upon completion and approval of the Fort Trumbull
Municipal Development Plan by the governing body of
the City of New London and initiation of the project,
NLDC staff and/or its designees will meet with each
resident owner and tenant scheduled to be displaced
to conduct a survey. The purpose of the survey will be
to document the characteristics of each household or
business, (i.e., services or products sold, space occu-
pied) and ultimately determine specifications for a
new residence or business site. Based upon this in-
formation, alternative dwelling units and commercial
sites will be identified for these households, busi-

nesses, and non-profit agencies.

2.4

330

At this time, the real estate market, both its residen-
tial and commercial segments, appears to have a va-
cancy rate and turnover rate that will satisfy the
requirements of potential displacees from the project
area. Project relocation staff and/or its designees will
follow the Relocation Assistance Advisory Plan to be
adopted by NLDC and the City of New London to
carry out relocation responsibilities.

2.3.6 Anticiputed Relocation Expenses

The total expenses to relocate residential households,
businesses, and non-profit agencies from the project
area cannot be estimated at this time. Upon comple-
tion of the-Municipal Development Plan, a determina-
tion of the extent of acquisition, if any, will be made
and a budget will be established. The budget will in-
clude expenditures for eligible moving payments,
fixed payments, replacement housing payments, mov-
ing personal property and, when necessary, payments
for direct losses of personal property. A contingency
account will also be budgeted.

Funding for the relocation program is to coincide with
the phasing of the acquisition of properties.

Additional information regarding relocation expenses
is presented in Section 5.0 of this document.

Community Facilities and Services

The following information regarding education,
health care, public safety, emergency services, and
parks and recreation has been taken in part from the
City of New London Plan of Development. Personal
telephone interviews have been conducted to update

331

and verify this information, which will serve as the
basis for evaluation of potential impacts as presented
in Section 4.0 of this document.

2.4.1 Education

The City of New London provides a full range of edu-
cational services to its residents. The education sys-
tem is managed by a seven-member group of elected
officials known as the Board of Education. Five ele-
mentary schools located throughout the city provide
educational services for children in grades K-6. These
elementary schools include the Winthrop, Jennings,
Edgerton, Harbor, and Nathan Hale Schools. Also in-
cluded in the school system is the Little Red School-
house, providing special needs programs. Middle
school services are provided at the Bennie Dover
Jackson Middle School for grades 6-8. The New Lon-
don High School provides education for grades 9-12.

A number of private schools also exist in the City of
New London. Five private schools provide elementary
education, including Saint Mary’s School, Saint Jo-
seph’s School, Solomon Schecter Academy, the Word
Center Christian Academy, the Regional Multi-
Cultural Magnet School, and the Inter-district School
for Arts and Communication (ISAAC). The Williams
Memorial Institute provides private education at the
junior and senior high school levels.

Both daytime and evening adult education programs
are provided to the residents of New London. The city
leases a building in the Shaw’s Cove Business Park
which houses the Adult Education Center. Also lo-
cated within the city are several institutions of higher
learning, including the Sawyer School, Ridley Lowell
Business and Technical Institute, Mitchell College,

332

Connecticut College, and the United States Coast
Guard Academy.

The current school enrollment levels are expected to
remain relatively stable. As a result, it is not antici-
pated that any schools will be closed or new schools
constructed. At the present time, most of the schools
operate at enrollment levels below the rated capacity
of the buildings.

Table 2.4-1 lists the grades, current enrollment as of
1998, maximum capacity of each school, and the
streets in the Fort Trumbull area of New London in
each school district. The majority of the MDP area is
allocated to the Harbor School for elementary educa-
tion. All middle school and high school students in
this area would go to Bennie Dover Jackson Middle
School and New London High School, respectively.

333

TABLE 2.4-1
Current Enrollment and Maximum Capacities
of New London Public Schools
Name Grade /Current imum|Fort Trumbull
Enroll- |Capacity |Area Streets
ment Assigned
to School

Little Red ungraded Not |None
Schoolhouse Available!
(special needs
program)

Edgerton elementary; 327 408 (None
School

Harbor School \elementary 377 476 |Chelsea Street
East Street

[Goshen Street
Maple Avenue

Pequot Aven

Jennings elementary; 382 377 |None
School

Nathan Hale (elementary, 259 408 /jNone
School

Winthrop elementary 271 383 {Hamilton

School Howard Street
Bennie Dover | middle 683 728 «All

Jackson school

Middle School

New London high 726 800 |All
High School school

Source: City of New London. Board of Education, 1998.

334

2.4.2 Health Care

The major contributor to the region’s health care fa-
cilities is the Lawrence and Memorial Hospital lo-
cated on Montauk Avenue in New London. This
facility maintains 350 beds and serves approximately
14,000 hospitalized inpatients and over 100,000 out-
patients per year. The hospital is currently under an
expansion and modernization project which will bring
the facility up to par with some of the other leading
hospitals in the state. When the project is complete,
the new services will include a new advanced emer-
gency room, a maternity service wing, new operating
suites, and a community service center. The expan-
sion project has been divided into three separate
phases. Currently, Phase 2 is near completion.

The City of New London is also home to approxi-
mately 70 offices of local physicians, dentists, and
other health care professionals. The Community
Health Center relocated its facility to the Shaw’s Cove
Business Park in the fall of 1994.

The City of New London Health Department is also
active in protecting the health of the public. The
Health Department currently oversees a number of
programs, including lead abatement, code enforce-
ment, immunization, radon, Aids, teen pregnancy pro-
tection, and school dental and health.

2.4.3 Public Safely and Emergency Services

The City of New London provides a variety of police,
fire and emergency services in an effort to reduce the
loss of life and property and protect the public’s
safety.

335

Police Services

The New London Police Department headquarters
(staffed 24 hours per day) is located on Governor Win-
throp Boulevard. In addition to the headquarters,
there are two auxiliary police stations (staffed a por-
tion of the day) located on Bank Street and Truman
Street. A total of 90 sworn officers and 20 civilian per-
sonnel comprise the New London Police Department.
The Police Department also operates 14 marked pa-
trol cars and 10 unmarked cars as well as a marine
unit that includes a boat and three officers. (Personal
communication, Captain Edwards, July 1998)

Fire and Emergency Services

The New London Fire Department headquarters is lo-
cated on Bank Street. Two additional fire stations are
located on Broad Street and Lower Boulevard. In all,
the Fire Department employs 76 people, including the
fire chief, deputy fire chief, fire marshal, a fire inspec-
tor, and administrative staff. There are no volunteer
firefighters. The Fire Department headquarters lo-
cated on Bank Street also houses one ladder and one
tower engine. The Fire Department possesses two ad-
ditional fire engines held in reserve. (Personal com-
munication, Fire Department administrative staff,
July 1998)

In addition to its firefighting relaced responsibilities,
the New London Fire Department serves as the lead
resource necessary to abate hazardous materials inci-
dents, rescue operations, radiological incidents, and
other emergency incidents.

The City of New London operates an Ambulance Divi-
sion as part of the Fire Department. The Ambulance
Division operates out of the Fire Department head-
quarters located on Bank Street as well as at the
North Station. Two ambulances are operated full

336

time, with one additional ambulance in reserve. Each
ambulance is operated by a two-person crew, with a
total of four employees working per shift providing
emergency medical services to the community. (Per-
sonal communication, Fire Department administra-
tive staff, July 1998)

From the perspective of fire hazard rating of construc-
tion materials, 41% (427,200 square feet) of the build-
ing stock in the study area is wood framed construction
(Class D), and another 18% (185,000 square feet) is
wood and masonry framed construction (Class C).
There are 423,200 square feet (41%) of masonry/steel
construction (Class B or A), reflective of more modern
construction techniques. This group includes Build-
ings 2, 80 and 96 at NUWC, as well as the 194 How-
ard Street office building.

2.4.4 Parks and Recreation
City-Wide Park and Recreation Facilities

According to information in the 1997 New London
Plan of Development, the city owns and operates
one regional park, three citywide parks, three
beaches, one senior center/auditorium, two historic
sites, 11 neighborhood playgrounds, seven neighbor-
hood parks, one pier, one marina, and two open
space parks. This park system totals 292 acres at 28
sites and ranges in size from 0.35 acres to 95 acres.

In addition to these public facilities, there are several
private and quasi-public facilities located within the
city that are available to community residents. These
include the Garde Arts Center, Mitchell Woods Park,
the U.S. Coast Guard Academy, Connecticut College,
the Connecticut College Arboretum, Mitchell College,
the BP Learned House, six marinas, a yacht club, a
state boat launch, and a number of privately owned

337

beaches. These facilities add over 220 acres of recrea-
tional area to the city. The combination of public and
private land held for open space totals 14% of the
land area of the city.

Planning for the city park system is currently based
upon the Urban Park and Recreation Recovery Action
Program. The city is in the process of revising this
plan which inventoried and assessed the provision of
the parks and recreation services to its residents and
established goals and recommendations for future
needs.

Greens Harbor Beach and Park is located in the pro-
ject vicinity. This is a 3.5-acre public recreational fa-
cility operated by the City of New London. Caulkins
Park is a 12.9-acre park located across the railroad
tracks from Greens Harbor Park. Under present day
conditions, there are no recreational facilities within
the confines of the Fort Trumbull MDP area.

Planned Facilities by the State Department of Envi-
ronmental Protection

The Connecticut Department of Environmental Pro-
tection is planning to take over a portion of the
NUWC site for use as a historic state park. Tentative
activities include removing numerous incompatible
buildings, opening the 19th century fort and block-
house for visitors, and providing waterfront access.
The specific planned components of the Fort Trumbull
State Park are described in greater detail in Section
3.0 of this document.

The following discussion is based on the Department
of Environmental Protection's application to the Fed-
eral Lands to Parks Program administered by the
United States Department of the Interior, National
Park Service, Northeast Region.

338

Planning is underway by the Department of Envi-
ronmental Protection with the City of New London
and the Town of Groton in the development of the
Thames Maritime Heritage Park in New London.
New London is one of six “Tier One” State Heritage
Parks projects intended to combine historic preserva-
tion, promote tourism and economic regeneration and
increase the region’s recreational opportunity. Each
park is based upon a local theme. The Thames Mari-
time Heritage Park’s theme will be local maritime
history with a focus on the Thames River Estuary.
Because this significant military history is shared by
both sides of the river, the Thames Maritime Heritage
Park will be unique in Connecticut in being a multi-
municipality facility.

The goal of the heritage park is to link the area's
many marine-related attractions, unitizing a visitor
center/museum as the focal point. Tour boat rides
around the harbor and docking at designated loca-
tions will allow visitors opportunities to tour key his-
toric attractions along the Thames River. Some of
these attractions will include: Fort Griswold State
Park, National Submarine Memorial, New London
Ledge Lighthouse, Project Oceanology, U.S.S. Nauti-
lus Memorial, U.S. Coast Guard Academy, Customs
House, Shaw Mansion, and Fort Trumbull State Park.
The addition of Fort Trumbull State Park is seen as a
key to the rebirth of the waterfront in New London
and as the cornerstone of the Thames Maritime Heri-
tage Park.

Aesthetic/Visual Resources

The following discussion provides background on the
aesthetic and visual condition of the project area.

339

2.5.1 Regional Landscape

The southeastern portion of Connecticut falls into two
geological areas, the eastern uplands and the coastal
slope. Bedrock, composed of mainly metamorphic
rocks like schist and gneiss, make up the eastern up-
lands. Hills rise out of the eastern side of the Central
Valley, running mostly north and south, reaching
1,000 feet at the northernmost reach, while the
southernmost part reaches only 500 to 700 feet in
height, creating a slope of 10 to 20 feet per mile. At
the coast, the slope steepens to 50 feet per mile.

The eastern uplands are composed of the Bolton
Range, Mohegan Range, and the Windham Hills. This
hilly area, aptly named the uplands, is covered with
rich soil that is generally quite good for farming
unlike much of New England. Yet another aspect of
the eastern uplands is the minerals and metals found
beneath the rich soil.

The coastal area of southeastern Connecticut is very
unique. Unlike the smooth shores of Rhode Island
and the southern side of Long Island, Connecticut's
shore is rocky and irregular. Made up of salt marshes,
freshwater meadows, and beaches, its many notches
are well suited for harbors and are largely responsible
for the important role maritime industries have
played in the past.

New London Harbor is an industrial port serving
southeastern Connecticut. The dry docks and other
shipbuilding facilities at Electric Boat and the manu-
facturing buildings at Pfizer are located on the east
side of the harbor in Groton. On the west, the NUWC
facility, State Pier, Cross Sound Ferry, and the rail-
road are predominant waterfront features. Urban
downtown New London completes the landscape of
the outer harbor.

340

Upstream along the Thames River, north of Interstate
95 and the Gold Star Memorial Bridge, the industrial
waterfront continues, but to a lesser extent. The Navy
submarine base occupies the east bank of the Thames
River, while the U.S. Coast Guard Academy overlooks
the river on the west.

Downstream of the project area, to the south, the
roadway along Pequot Avenue provides continuous
shoreline views. Moving further south, a transition to
residential neighborhoods occurs. Ocean Beach is lo-
cated further south.

2.5.2 MDP Area Landscape

The entire project area has been used extensively by
European settlers since the mid 17th century. Little
natural landscape remains. The most

area is the bedrock hill upon which Fort Trumbull
was built. It commands a fine view of the Thames
River and central New London. Even here, the land-
scape has been cut, filled, and regraded to meet
changing needs.

The lower lying areas north, west, and south of the
hill have also seen extensive disturbance, typical of
older urban areas. The landscape is dominated by
wood frame buildings, several industrial buildings, a
sewage treatment plant, and roads. Vegetation is lim-
ited to scattered hardwood trees in yards, lawns, and
hedges associated with the residential landscape. The
rock outcrops and the remnant tidal wetlands associ-
ated with Bentley Creek are the only remains of the
natural landscape features.

The visual quality of the landscape within the project
area is best described as being deteriorated. The
streets and sidewalks show a lack of maintenance.

2.6

341

Individual structures in the vicinity of NUWC exhibit
a similar lack of care, for the most part. The street-
scape character, which is likely to have existed in the
18th and 19th centuries, is no longer apparent.

Public Utilities and Services

Existing utilities are described below. This inventory
provides a baseline against which to measure impacts
of alternatives, as presented in Section 4.0 of this
document.

2.6.1 Water

Source of Supply

The City of New London has operated its own water
supply system since 1873 in accordance with an ena-
bling Act of the General Assembly dated June 5, 1871.
On March 28, 1997, the operation of the water supply
system was transferred to the Professional Service
Group, taking charge of all administrative power ex-
cept for capital projects. Professional Service Group
provides public water service within city boundaries,
as well as to portions of the Town of Waterford and
the Town of Montville.

New London utilizes surface water sources for its
supply system. Table 2.6-1 presents storage, water
surface area, and watershed data for the active water
supplies. These consist of four active reservoirs: Lake
Konomoc, Fairy Lake, Barnes Reservoir, and Bogue
Brook Reservoir. Lake Konomoc, the principal storage
reservoir of the supply system, is located along Lakes
Pond Brook, a tributary to the Niantic River, in
Montville and Waterford. Fairy Lake, located in Sa-
lem, is located along Latimer Brook, a tributary to the
Niantic River, and is upstream of Barnes Reservoir

342

which is located in Montville, also along Latimer
Brook. Bogue Brook Reservoir is located in Montville
as well, along Bogue Br »ok.

TABLE 2.6-1
Active Water Supplies
s ‘Storage Water Surface Watershed
(MG) (acres) (sq. mi.)

Lake Konomac 1,216 286.0 1.40
Barnes Reservoir 170 42.2 2.00

Brook Reservoir| 212 110.0 1.65
Fairy Lake 235 121.2 0.89
Beckwith Pond 2 3.7 2.24
Great Swamp a Pa 068
Totals 1,835 563.1 8.86 ,

Source: Comprehensive Water Supply Plan. City of New
London, Water and Water Pollution Control Authority,

rev. 1998.

Note: MG is million gallons

Additional supply sources include the Beckwith Pond
Reservoir, in Montville at the confluence of Latimer
and Bogue Brooks, and the Great Swamp Diversion,
northeast of Lake Konomac. An emergency source,
Brandagee Lake, owned by the Water and Water Pol-
lution Contro!] Authority (WWPCA), is located at the
northern border of New London. An additional emer-
gency source, although restricted and not used, .. the
smal] pond known as Bond Reservoir, located imme-
diately north of Fairy Lake.

Future projections provided in the city’s Water Supply
Plan forecast the population of the New London service
area to be relatively stable. However, the adjacent
Town of Waterford service population and consumption
is growing steadily and is projected to continue to in-
crease. The State Department of Public Heath (DPH)
has indicated that system improvements are needed to

343

increase New London’s available water supply in the
future. Although the safe yield of the water system
meets the current average demands, a water deficit is
projected for the 50-year planning period. This supply
deficit is projected for systems during a severe
drought when the margin of safety falls below 1.0.
The margin of safety for a system is defined as the
unitless ratio of the water available in the system
(safe yield) to the average daily demand. A margin of
safety of at least 15% (1.15) relative to a 99% safe
yield is recommended by the Department of Public
Utility Control (DPUC).

Table 2.6-2 presents safe yield, average daily demand,

~ and margin of safety data for existing conditions and

the 5-, 20-, and 50-year planning periods. New Lon-
don’s water supply is projected to fall below the de-
sired margin of safety by the year 2012 and it is
projected that the existing safe yield will be exceeded
by the year 2030. Even using more conservative popu-
lation projections, it is anticipated that the margin of
safety will be inadequate by the year 2040.

TABLE 2.6-2
Margin of Safety for Current and Projected

Consumption Based on Existing Supply Sources

Time Safe Yield) Average Daily of
Frame (MGD) |Demand (MGD)
FY 1993-1997 7.0 5.54 1.26
5-year (2002) 7.0 5.69 1.23
20-year (2010) 7.0 6.01 1.16
50-year (2040) 7.0 7.52 0.93

Source: Comprehensive Water Supply Plan. City of New
London, Water and Water Pollution Control Authority,
rev. 1998.

To address the forecasted deficiencies, the city has
submitted an application for a water diversion permit

344

to the Department of Environmental Protection to de-
velop the Hunts Brook diversion to increase water
supply safe yield. The replacement of the Great
Swamp pump station has also been identified as a
possible action to increase the available yield to the
water supply system. Any future development with
high water demands would need to be carefully coor-
dinated with the city to ensure that adequate water
supply is available to meet such needs.

Table 2.6-3 presents options for increasing the safe
yield through various scenarios. It should be noted
that a permitted diversion rate does not equate to
safe yield and, in fact, is often considerably greater

345

Existing Reservoir System with
7.4 MGD Diversion at Beckwith Pond
and
1.2 MGD Diversion at Great Swamp
10.0 MGD Diversion at Hunts Brook

9.5

Existing Reservoir System with
7.4 MGD Diversion at Beckwith Pond
and
1.2 MGD Diversion at Great Swamp
8.0 MGD Diversion at Hunts Brook
and
5.0 MGD Diversion at Miller Pond

11.0

Existing Reservoir System with
7.4 MGD Diversion at Beckwith Pond

than safe yield.
TABLE 2.6-3

Various Scenarios for Increasing Safe Yield

Description

Safe Yield (MGD)

and

1.2 MGD Diversion at Great Swamp
8.0 MGD Diversion at Hunts Brook
and

10.0 MGD Diversion at Miller Pond 11.0

Existing Reservoir System with
7.4 MGD Diversion at Beckwith Pond
and
0.25 MGD Diversion at Great Swamp

7.0

Existing Reservoir System with
7.4 MGD Diversion at Beckwith Pond
and
1.2 MGD Diversion at Great Swamp

7.2

Existing Reservoir System with
7.4 MGD Diversion at Beckwith Pond
and
1.2 MGD Diversion at Great Swamp
6.0 MGD Diversion at Hunts Brook

9.3

Existing Reservoir System with
7.4 MGD Diversion at Beckwith
Pond and

1.2 MGD Diversion at Great ry

8.0 MGD Diversion at Hunts Brook

9.4

Source: Comprehensive Water Supply Plan. City of New
London, Water and Water Pollution Control Authority,
rev. 1998.

Implementation of various combinations of these op-
tions would increase safe yield to acceptable levels,
with an adequate margin of safety. A regional water
supply planning program is currently underway by
the State of Connecticut Department of Public Health
which will further evaluate supply deficits and poten-
tial future supply sources in the southeastern Con-
necticut region.

Distribution System

The New London Plan of Development and the city’s
Water Supply Plan indicate that the distribution system
storage capacity is adequate for the existing and future
demands. The Plan of Development further indicates
that the Waterford distribution piping is relatively new

346

and in good condition. The New London distribution
system, particularly in the southern half of the city, was
constructed in the early 1900's and is in need of sub-
stantial repairs. The system has numerous areas of fire
flow deficiencies, reduced pipe capacities, undersized
mains and low pressure areas.

Fire flow deficiencies are gradually being addressed
through the city’s main replacement program. Minor
repairs and maintenance have been performed on the
Lake Konomac Dam, Barnes Reservoir Dam, and Bra-
negee Lake Dam in response to orders issued by the
Department of Environmental Protection. Plans also
include installation of the additional instrumentation
necessary to assure compliance with the 1997 Safe
Drinking Water Act Additionally, a comprehensive
metering program, intended to assist in the recovery
of lost revenues, is underway to replace all customer
meters within eight years.

Remaining deficiencies are addressed in the short-term
and long-term capital improvement plans. Two pro-
grams are outlined in the capital plan: one for p

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40385016_0031%3A09. Public record. Not legal advice.