# Joint Appendix Vol I — Kelo v. New London

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40385016_0031%3A08

## Record

- **Collection:** Supreme Court brief
- **Document type:** Joint Appendix Vol I
- **Published:** January 1, 2005
- **Citation:** 545 U.S. 469

## Text

In The

vv

SUSETTE KELO, THELMA BRELESKY, PASQUALE
CRISTOFARO, WILHELMINA AND CHARLES DERY, JAMES
AND LAURA GURETSKY, PATAYA CONSTRUCTION
LIMITED PARTNERSHIP, and WILLIAM VON WINKLE,

Petitioners,
v.

CITY OF NEW LONDON, and NEW |
LONDON DEVELOPMENT CORPORATION,

Respondents.
On Writ Of Certiorari To The
Supreme Court Of Connecticut
JOINT APPENDIX
Volume I, Pages 1 to 212

Horton, SHIELDS & Knox, P-C. INSTITUTE FOR JUSTICE
WeEsLeY W. Horton* WILLIAM H. MELLOR
DANIEL J. KRISCH ' Scott G. BULLOcK*
90 Gillett Street DaNa BERLINER
Hartford, CT 06105 1717 Pennsylvania Ave., NW
(860) 522-8338 Suite 200
(860) 728-0401 (fax) Washington, DC 20006

(202) 955-1300
WALLER, SMITH & PALMER, PC.
Bowen B. Conan, (202) 955-1329 (fax)
52 Eugene O'Neill Drive SAWYER Law Firm, LLC
New London, CT 06320 Scott W. SAWYER
(860) 442-0367 The Jill S. Sawyer Building
(860) 447-9915 (fax) 251 Williams Street
Conway & LONDREGAN New London, CT 06320

(860) 442-8131
THOMAS J. LONDREGAN (860) 442-4131 (fax)
JEFFREY T LONDREGAN
38 Huntington Street Counsel for Petitioners
New London, CT 06320
(860) 447-3171
(860) 444-6103 (fax)
Counsel for Respondents
*Counsel of Record

Petition For Certiorari Filed July 19, 2004
Certiorari Granted September 28, 2004

COCKLE LAW BRIEF PRINTING CO (800) 225-6904
OR CALL COLLECT (402) 342-2831

JOINT APPENDIX TABLE OF CONTENTS

Volume I
Relevant Docket Entries from the Courts below................. 1

EXHIBITS FROM TRIAL HELD IN THE
SUPERIOR COURT, JUDICIAL DISTRICT OF
NEW LONDON IN JULY AND AUGUST, 2001

MAPS

Plaintiffs’ Exhibit TT — Fort Trumbull MDP Area —
TD AAT 3

Plaintiffs’ Exhibit VV — Fort Trumbull MDP Com-
posite Lanid Use Plan Map 3..................::ccccsseseeeseseeeeeenes 4

Plaintiffs’ Exhibit YY — Fort Trumbull Develop-
ment Site Plan dated October 10, 2000 ..................:.00000. 5

OTHER EXHIBITS
Plaintiffs’ Exhibit B —- Representative Statement of

Plaintiffs’ Exhibit I - New London Development
Corporation (NLDC) Board’s Record of Vote and

Resolution dated October 16, 2000 .............225 ence, cee co]
Plaintiffs’ Exhibit II — Letter to George Milne frein

Claire Gaudiani dated December 15, 1997................... 18
Plaintiffs’ Exhibit PP1 - Email to George Milne

from James Serbia dated October 21, 1998.................. 21

Plaintiffs’ Exhibit PP2 - Letter to Dr. Claire
Gaudiani from George Milne, Jr. dated March 8,

il

JOINT APPENDIX
TABLE OF CONTENTS - Continued

Defendant NLDC’s Exhibit 12 - New London City
Counsel Resolution of January 18, 2000, author-
izing the use of eminent domain .................:cccc0cccceeeeeeee 26

Plaintiffs’ Exhibit HHH - Memorandum from
Developer Marty Jones of Corcoran Jennison to
Joseph E. Corcoran, Gary Jennison, Scott
Dumont, Harry Nash and Eliza Edelsberg dated
SammaTY 1B, BOOB .cccrccsccocssessesteemmmseniiiiaaaan 30

Excerpts from Defendant NLDC’s Exhibit 38 - Fort
Trumbull Municipal Development Plan (MDP) Revised
Administrative Draft, August 1999

* Section 1: Introduction (pgs. 1-1 through 1-11

GHEY) -coceccscscoecsnsessnsannsiennnmpmtaasaae 83
* Section 3: Existing Site Conditions (pgs. 3-19

Caveughs 3-06 anlliy) ..ccccccosssesssensneistieimusasaeee 96
* Section 5: Proposed Improvements.......................- 108
* Section 9: Administrative Plan Summary............. 188

* Appendix A: Selection of and Rationale for the
Preferred Alternative — Fort Trumbull MDP
fT 190

* Proposed Land Uses Map 5.1..............c.ecccceeceeeeeees 212

Volumes II and III

Defendant NLDC’s Exhibit 34 - Draft Environ-
mental Impact Evaluation — dated November 10,
BGGD .....ccscessenssosscennsnssessnneme 213

JOINT APPENDIX
TABLE OF CONTENTS - Continued

Page

The following documents have been omitted ii. the

printing of this Joint Appendix. They may be found in the

Appendix to the Petition for Writ of Certiorari at the
following pages:

Opinion of the Superior Court of Connecticut,
Judicial District of New London, At New London,

Decided March 13, 2002 ...............ccccccceceeeeeeeenenees App. 191
Opinion of the Connecticut Supreme Court, De-
chddad Bharal ©, BODE. .......0.<00reseeeccssesesccccessscceccssscscee App. 1

Order of Connecticut Supreme Court Granting
Motion for Stay of Execution Pending Decision by
the United States Supreme Court, Decided April
GG cecnecesessencncscennsssenscszecessesecsnsssssnsesssscasensvess App. 425

Order of the Connecticut Supreme Court Denying
Motion for Reconsideration, Decided April 20,

1

RELEVANT DOCKET ENTRIES

Connecticut Supreme Court
CASE NUMBER SC 16742

Docket Text

Complaint

Answer of Defendants City of New London
and New London Redevelopment Agency

Answer of New London Development
Corporation

Memorandum of Decision

Plaintiffs’ Appeal
Cross-Appeal of Defendant New London
Development Corporation
Cross-Appeal of Defendants City of New
London and New London Redevelopment
Agency

Transfer Letter

Brief of Plaintiffs
Statement of the Issues of Plaintiffs
Brief of City of New London

Statement of the Issues of City of New
London

Brief of New London Development Corpo-
ration

Statement of the Issues of New London
Development Corporation
Reply Brief of Plaintiffs

2

9/20/02 Reply Brief of New London Development
Corporation
9/23/02 Reply Brief of City of New London
* - -
3/11/04 Supreme Court Decision by the Court
3/11/04 Supreme Court Decision by the Court
* - *
3/29/04 Motion for Reconsideration
3/29/04 Motion for Stay of Execution Pending
Decision by United States Supreme Court
4/20/04 Order Denying Motion for Reconsideration
4/20/04 Order Granting Motion for Stay Pending

Decision by United States Supreme Court

Figure 2
As oe Bieler”

|

"sar
wT.

& pore

temereted

by les & be Brou,

chats Commutas DEP.

PEMA ont LS Nowy

su aa sc ky z,
Sey

Sass

eoangs édet

8
s
-

<=

SK
SEAN Ne

Fert Trumbull MDP Ares - New London, Connecticut

Shaws Cove 8 Columbia Cove

5 “5
p
Y

i

7

,
ween ee
<<< =

“a=

DRAFT i“ Water Dependent Use

Site Plan :
Fort Trumbull Development Plan

October 19, 2000 |
wean Companies | oe | ee PROPOSED HOTEL MEETING
‘Associates, Architects Sar" () prorosep nore. surronr PROPOSED HOTEL CIRCULATION
= ==
vil CC) prorossp nore. prass

6

PLAINTIFFS’ EXHIBIT B

NO. RED CV 00- SUPERIOR COURT
CITY OF NEW LONDON JUDICIAL DISTRICT OF
V. NEW LONDON AT
ROSE CIAVAGLIA, NEW LONDON
WILHEMINA J. DERY

aka WILHEMINA DERY

and CHARLES DERY NOVEMBER 6, 2000

STATEMENT OF COMPENSATION

The CITY OF NEW LONDON, acting by and through
the NEW LONDON DEVELOPMENT CORPORATION,
the Condemner, represents and states:

1. The Condemner is a municipal corporation located
in the County of New London and State of Connecticut.

2. The Condemner is acting herein by the NEW
LONDON DEVELOPMENT CORPORATION, its duly
designated development agency exercising the powers set
forth in Chapter 132 of the Connecticut General Statutes.

3. On October 16, 2000, the New London Develop-
ment Corporation duly voted to acquire the hereinafter
described property, and found that the convenience and
necessity of the Condemner requires the same, for the
purpose and effectuating the Condemner’s development
project plan.

4. The property to be taken pursuant to this State-
ment of Compensation is located in the City and County of
New London and State of Connecticut, consists of four
buildings or residences on one parcel of land known as 28
East Street, 79 Walbach Street, 81-83 Walbach Street and

7

87 Walbach Street and is more particularly bounded and
described in Schedule “A” attached hereto.

5. The names of all persons having a record interest
in the property are

ROSE CIAVAGLIA, WILHELMINA J. DERY
aka WILHELMINA DERY and CHARLES DERY
87 Walbach Street

New London, Connecticut

6. The Condemner has determined that the amount
of the compensation to be paid to the persons entitled
thereto for such property is $506,000.00, and this sum is
being deposited with the Clerk of the Superior Court for
the Judicial District of New London at New London in
accordance with the provisions of Section 8-130 of the
Connecticut General Statutes.

CITY OF NEW LONDON, acting by
the NEW LONDON DEVELOPMENT
CORPORATION

By /s/ Edward B. O’Connell
Edward B. O’Connell, of
Waller, Smith & Palmer, P.C.
Its Attorneys

SCHEDULE A

A certain piece or parcel of land, with the buildings
and improvements thereon, located in the City and County
of New London and State of Connecticut, more particu-
larly described as follows:

Beginning at the southwest corner of Walbach
and East Streets and running thence southerly

anc along the westerly side of East Street one
ay eS cincen (138 feet, more or less, to land

therl ide of Walbach Street; thence easterly
o> ant ans the southerly side of Walbach
Street one hundred eight and twenty-five hun-
dredths (108.25) feet to the point and place of be-

ginning.

PLAINTIFFS’ EXHIBIT I
New LONDON

DEVELOPMENT CORPORATION
RECORD OF VOTE

At its Board meeting on October 16, 2000, the NLDC
ae Le Cees cates, agke Ce as
attached:

Resolution 001016-1
Resolution 001016-2
Resolution 001016-3

The board voted in one new member, and will continue to

vote on new members at upcoming meetings. The new
member is Judge Antoinete Dupont.

Resolution 001016-1
WHEREAS, the New London City Council has designated
the New London Development Corporation, a nonprofit
development corporation, as its development agency
pursuant to the Connecticut General Statutes, and

WHEREAS, the New London Development Corporation
has prepared a project plan for The Fort Trumbull Mu-
nicipal Development Plan Area pursuant to Section 8-189
of the Connecticut General Statutes, and

WHEREAS, the project plan for The Fort Trumbull Mu-
nicipal Development Plan Area has been duly approved

and adopted pursuant to Section 8-191 of the Connecticut
Genera! Statutes, and

10

WHEREAS, it is necessary to acquire certain properties
located in the Fort Trumbull Municipal Development Plan
Area of New London in order to carry out and administer
said project plan, and

WHEREAS, pursuant to Section 8-193 of the Connecticut
General Statutes the New London Development Corpora-
tion has the approval of the New London City Council to
acquire by eminent domain properties within the Fort
Trumbull Municipal Development Plan Area.

NOW, THEREFORE, IT IS RESOLVED that the New
London Development Corporation, in the name of the City
of New London, acquire certain properties located in the
Fort Trumbull Municipal Development Plan Area of New
London through the exercise of the power of eminent
domain as granted to it under Chapter 132 of the Con-
particularly described as follows:

ADDRESS Map Bock Lot Owner

78 Smith Street 21 106 #£%1 Thelma Brelesky
72 Smith Street 21 106 2 CarolynA. Luzi

41 Goshen Street 21 106 8 Pataya Const. Ltd
Partship

49 Goshen Street 21 106 9 Pataya Const. Ltd
Partship

54 Goshen Street 22 107 24 Albert P. Anton
42 Goshen Street 22 107 28 Isabelle M. Rogovin
36 Walbach St. 22 107 30 Isabelle M. Rogovin
82 Trumbull Street 21 105 13 Foss & Bourke, Inc
8 East Street 21 105 11 Suzette T. Kelo

11

19-23 Smith Street 21 105 17 James R. & LauraA.
Guretsky

27 Smith Street 21 105 18 William von Winkle,
Trustee

31 Smith Street 21 105 19 William von Winkle,
Trustee

33-35 Smith Street 21 105 20 William von Winkle,
Trustee

216 Howard Street 22 107 32 William von Winkle,

189 Howard Street 22 101 20 Antoinette Farrell

195 Howard Street 22 101 21 Lillian M. Del-
Grosso, Trustee
53 Goshen Street 21 106 10 Pasquale & Mar-
gaerita Cristofaro

9 Walbach Street, 21 105 3 Rose Ciavaglia &

1-83 Walbach St., Wilhemina &
7 Walbach Street Charles Dery
28 East Street
11-13 Smith Street 21 105 14 Edward & Josephine
Johnson

IT IS FURTHER RESOLVED, that the New London
Development Corporation take such steps as are necessary
to effectuate such acquisition in the manner provided in
Sections 8-128 through 8-133 of the Connecticut General
Statutes.

CERTIFICATE

I, Garon Camassar, Secretary of the New London Devel-
opment Corporation, do hereby certify the above resolution
was adopted at a meeting of the Board of Directors of the

12

New London Development Corporation held on October 16,
2000 and that the said resolution is contained in the
minutes of said meeting on file in the New London Devel-
opment Corporation office, 165 State Street, Suite 313,

New London, Connecticut, and that it has not been modi-

fied nor rescinded whatsoever.

Attest:

/s/ Garon Camassar 10/16/00
Garon Camassar, Secretary Date

New London Development Corporation

New LONDON

DEVELOPMENT CORPORATION
NLDC BOARD RESOLUTION 001016-2

Whereas, the Fort Trumbull Municipal Development Plan
was approved on January 18, 2000 by the New London

Economic and Community Development, and
Whereas, the Corcoran Jennison Companies were se-
lected to develop a proposal for Municipal Development
Plan Parcels 1, 2, and 3 in accordance with the Municipal
Development Plan proposed land uses, and present their
proposed plans for the designated parcels, and

uses of the site was presented by Corcoran Jennison
Companies on October 10, 2000,

13

It is hereby resolved that the Board of Directors of the
New London Development Corporation approves and
concurs with the preliminary plan for the layout and uses
of Parcels 1, 2, and 3 of the Fort Trumbull Municipal

Development Plan as set forth in the Corcoran Jennison
Plan dated October 10, 200°.

CERTIFICATE

I, Garon Camassar, Secretary of the New London Devel-
opment Corporation, do hereby certify the above resolution
was adopted at a meeting of the Board of Directors of the
New London Development Corporation held on October 16,
2000 and that the said resolution is contained in the
minutes of said meeting on file in the New London Devel-
opment Corporation office, 165 State Street, Suite 313,
New London, Connecticut, and that it has not been modi-
fied nor rescinded whatsoever.

Attest:

Garon Camassar, Secretary Date
New London Development Corporation

NEw LONDON

DEVELOPMENT CORPORATION
NLDC BOARD RESOLUTION 00101€-3

Whereas, the Fort Trumbull Municipal Development Plan
Map 3.8 (Proposed Streets) details proposed streets in the
Fort Trumbull Municipal Development Plan Area, and

14

Whereas, the Fort Trumbull Municipal Development Plan
Map 5.1 (Proposed Land Uses) details the land uses
proposed for the Fort Trumbull Municipal Development
Plan area, including the land uses for Parcels 1, 2, and 3
in accordance with that plan, and

Whereas, a preliminary plan dated October 10, 2000 was
presented by Corcoran Jennison that details land uses
consistent with the Fort Trumbull Municipal Development
Plan in terms of use, intensity, and location; such plan
being received and approved by the Board of the New
London Development Corporation on October 16, 2000,
and

Whereas, the Fort Trumbull Municipal Development Plan
states that “More specific traffic and street plans will be
developed based upon ... further refinement of develop-
ment plans of the MDP area,” and

Whereas, said refinements are consistent with and not
substantial modifications of the Municipal Development
Plan,

Now therefore, It is hereby resolved that the Board of
Directors of the New London Development Corporation
approve the attached Map 5.1A and 5.1B as supplemental
documents to Map 5. 1 and Map 3.8 which more particu-
larly set forth descriptions of Parcels 1, 2, and 3 and
proposed streets.

It is further resolved, that the following text changes be

made to retain consistency with the plan as modified by

the supplemental maps:

Page 5-1;

- Proposed Land Uses for Parcel 1: add reference to
“health club and fitness facility” to description of
hotel/conference center complex.

15

Page 5-2;

Parcel 2; change parcel size to 6 acres. Add reference to
“This parcel will also accommodate approxi-
mately 25 extended stay hotel units.” Delete refer-
ence to Coast Guard Museum.

Parcel 3; change parcel size to 11 acres. Delete refer-
ence to health club complex.

Pages 5-24, 5-28, 5-29, 5-32, and 5-33;

Change references describing the principal pedestrian
spine, Village Green access, and division between resi-
dential and office parcels from “Smith Street” to “East
Street.”

CERTIFICATE

I, Garon Camassar, Secretary of the New London Devel-
opment Corporation, do hereby certify the above resolution
was adopted at a meeting of the Board of Directors of the
New London Development Corporation held on October 16,
2000 and that the said resolution is contained in the
minutes of said meeting on file in the New London Devel-
opment Corporation office, 165 State Street, Suite 313,
New London, Connecticut, and that it has not been modi-
fied nor rescinded whatsoever.

Attest:

Garon Camassar, Secretary Date
New London Development Corporation

~{F>2B ‘ Y j MUNICIPAL DEVE Lope

-. s mi, P | A A BG Pe EG Yj ?
MAP SIA

=
oC
Ny

Gr
YY /llllbaiyy)
Py Or, PARCEL |
4 ‘ - Zee , J “Wy

. YM Hy rY@ELE QY | Hore | Con -€hence

SWAY

<
Bb
ro
it.
x
9
. *
4"

ROUTE
THLETIC CLusg.

wae RESIDENTIAL
wg a
_
-_, a :
-@ .— “
— x

>

>*

al
~

.

-

\*
ent, ge
ed

° > :

. e’ a . {

‘a / . .
e. . % af
“ A e” 4
s \ *

a % , * et}
a »% 4 A -

: ~~
ib “—_ fi
i 3 sf /
Se.” 4 i
~ . ” ‘c.
» .
> af j
. 4 ‘ e f
2° 2 I /
> tee? a o 28 fl
4 ¢ oes , @
{
e ‘i \ le 4
‘a 1 «
' > =
. _—
’ - ¢ . .
i s 4
" Pa
| , ars
- ‘
—

91

MAP SAB

Site Plan
Fort Trumbull Development Plan

October 10, 2000

o8080

LEGEND
on aD we eer CC wwompnore: war
Ono Te Lo Be re ree

LI

18

PLAINTIFFS’ EXHIBIT I
New London Development Corporation
181 Broad Street, New London, CT 06320
December 15, 1997

George M. Milne, Jr.
President

Pfizer Central Research
Groton, CT 06340

Dear George:

The directors of the New London Development Corpo-
ration are pleased to make the commitments outlined
below to enable you to decide to construct a Pfizer Central
Research facility in New London. This commitment 1s
presented in conjunction with the State of Connecticut and
the City of New London.

We have been working with the renowned firm of
Wallace, Roberts and Todd to design a land plan to ensure
that the new Pfizer facility will be the centerpiece of a
concentrated reuse of the area surrounding the former
New London Mills (see Appendix A). In addition to your
facility the project includes the development of the state's
fourth biotechnology incubator, the refurbishment of
historic Fort Trumbull, the reuse of the vacant Naval
Underwater Warfare Center and the development of
mixed retail and residential space that will be fully inte-
grated into the surrounding neighborhoods of the City of
New London. In order to achieve these goals, it will be
necessary to relocate the Calamari Bros. scrap dealer,
upgrade utilities and infrastructure, and acquire a number
of surrounding properties.

19 20

Based on the commitments from the state (see Appen- 5. Biotechnology Incubator - The proximity to the

dix B) and city (see Appendix C), the New London Devel- Pfizer research facility creates a tremendous op-
opment Corporation will: portunity to create another asset - a new bio-
technology incubator facility. The mission of this
1. Calamari Bros. - Acquire and perform environ- organization will be to support the early phase
mental testing on this site which will serve as development of biotechnology firms until they
the entry way to the research facility. The status are successful enough to move to permanent lo-
of negotiations are summarized in Appendix D. cations elsewhere in Connecticut. The location in
Environmental testing would be needed on the the project area will be a significant positive at-
current site and would require funding. The tribute in recruiting startup ventures to this fa-
cleanup costs of any contaminants found on the cility. Site acquisition costs and methods are
site prior to its transfer to Pfizer will be identi- outlined with other properties in Appendix E.
fied as part of the testing program and funds Additional funding will be needed for construc-
made available subsequent to the conclusion of tion or renovation of buildings and relocation of
testing current tenants

2. Surrounding Properties — Residential and com- 6. Former Naval Underwater Warfare Center — The
mercial properties in the area including aban- portion of this site, excluding Fort Trumbull
doned buildings and vacant lots will be acquired State Park and land occupied by the United
for integration into the overall design plan. States Coast Guard Station New London will be
Every effort will be made to ensure the highest acquired from the Department of Defense as de-

and best use of all properties. Consideration will scribed in Appendix I

Thank you very much for your consideration of this

and other roads. Appendix E describes estimated proposal. We will work with you to refine this proposal to
costs and the manner in which options will be meet Pfizer's requirements. We will also work closely with
acquired and the purchases executed. you at the appropriate time to plan an announcement that
3. Fort Trumbull State Park - Some of the sites is befitting the magnitude of this project.

mentioned in paragraph “2” above will be utilized Cordially,

in the development of Fort Trumbull State Park. lal

Appendix F outlines the Connecticut Department SL Gontianl

of Environmental Protection's timetable and plan. Clair . udian

4. Utilities and Infrastructure Upgrades - Utilities CLG:deb
and infrastructure in the project area will re- 97-667-2
quire upgrades in order to guarantee utilities
consistent with the requirements of the new fa-
cilities. See Appendix G.

21

PLAINTIFFS’ EXHIBIT PP1
Serbia, James
From: Serbia, James
Sent: Wednesday, October 21, 1998 1:42 PM
To: Milne, George M
Subject: Ft. Trumbull MDP
Importance: High

Dr Milne (Questions shown in red and CAPS)

I have left for you 3 drawings depicting some the latest
concept plans that NLDC has put together. There seems to
be some confusion regarding the expectation that Pfizer
(you in particular) has regarding development of the
peninsula (Something I know you have heard before — bear
with me). This confusion has caused some friction between
NLDC and DECD/DEP.

NLDC indicates that an original conceptual

saguthur tay Wdieas Ghats 98 ED sete
key meetings — one involving you/state/city/NLDC and the
other being the CMC meeting (IS THIS YOUR RECOL-
LECTION?). NLDC indicates that this plan represents
“the commitment” to Pfizer. The State feels that “the
commitment” is more along the lines of what is outlined in
the letters from DECD to Pfizer.

I think what it boils down to is whether or not Pfizer is
flexible regarding the development plans — | believe the
answer is yes per all of our previous discussions on this —
as long as some key components are included:

- a residential component which would be attractive to
professionals
— a hotel/conference component

22

_ treatment plant upgrades/state park/ete and commercial
or retail development to make the area an attractive place
to visit/work.

DOES THIS SOUND ABOUT RIGHT?

The State, from a public policy perspective, has difficulty
in supporting residential areas located in a floodplain, and
in condemning/taking an existing residential area and
replacing it with a more upscale residential district. They
do indicate that they can accomodate an upscale residen-
tial component, but that they would have some difficulty if
this portion of the development became substantial.

Can you clarify the following:

1. WOULD APPROXIMATELY 70-80 HIGH END RESI-
DENTIAL UNITS FIT WITH YOUR EXPECTATION?

2. THE LARGEST HOTEL AREA THAT IS CUR-
RENTLY SHOWN ON ANY OF THE PLANS IS FOR 250
UNITS. THIS SEEMS LOW TO ME. HIGH, LOW, OR

OK?

3. YOU MENTIONED THAT I SHOULD KEEP AN EYE
OUT REGARDING PLANS FOR AN AMPHITHEATER.
THE ORIGINAL WRT PLAN SHOWED ONE, BUT IT
DOESNT APPEAR THAT THIS IS STILL IN THE
PLANS. IS IT SOMETHING YOU WOULD LIKE TO SEE
OR IS IT SOMETHING WE WOULD PKEFER NOT BE
INCLUDED IN THE DEVELOPMENT?

Thanks for your help and patience.
Jim

23

PLAINTIFFS’ EXHIBIT PP2
Central Research Division
Pfizer Inc
Eastern Point Road
Groton, CT 06340
Tel 860 441 4844 Fax 860 441 6204
(LOGO)

Central Research

George M. Milne, Jr., Ph.D.
President

March 8, 1999

Dr. Claire Gaudiani

President, New London Development Corporation
Connecticut College

270 Mohegan Avenve

New London, CT 06320

Dear Claire:

On behalf of Pfizer Inc., | am pleased to affirm my support
of the New London Development Corporation's application
for an Economic Development Conveyance for the Naval
Undersea Warfare Center (NUWC) property.

Pfizer Inc is a research-based global health care company
that discovers, develops, manufactures, and markets
innovative medicines for both humans and animals. This
will be the he- dquarters for Central Research, Pfizer's
R&D Division, based in Southeastern, Connecticut. We are
building a $270 million Global Development Facility
(GDF) in New London to open by October 1, 2000. This
facility will employ more than 2,000 Ph.D.s, M.D.s and
other scientists, researchers, and clinical specialists. Our
New London expansion requires the world class redevel-
opment planned for the adjacent 90 acres in the Fort

24

Trumbull Municipal Development plan including the 16
acres of the NUWC property.

The Fort Trumbull area is integral to our corporate facility
and to the plan for the revitalization of New London to a
world class standard. The Amended Reuse Plan will
provide a waterfront hotel with about 200 rooms, a confer-
ence center and physical fitness area, extended-stay
residential units and 80 units of housing. We will use the
proposed hotel and conference facility as an extension of
our facility committing to 100 of those rooms on a daily
basis for visiting international staff and other profession-
als. In addition we require conference space and are
exploring a “virtual” Pfizer University to keep our re-
searchers up to date on the most recent breakthroughs in
biotechnology. The extended stay housing will provide for
researchers who often stay for periods of up to 3-6 months.
Year round quality housing is also crucial to recruiting top
scientists. The waterfront residential neighborhood envi-
sioned provides a one-of-a-kind housing option desired by
many of our employees. As a result, the NUWC property is
and has been key to our investment in the area.

We are prepared to enter into agreements with the NLDC
and developers to build the type of facilities we require,
but this is not just about Pfizer. The plan developed by the
NLDC is intended to transform New London and is des-
tined, we believe, to become a model for high impact, high
value public/private partnerships. We have also requested
the NLDC to expedite the development as quickly as
possible to meet our schedule and the OpSail 2000 target
for the unveiling of the new, New London. The transfer of
NUWC and the completion of the developments proposed
in the Amended Reuse Plan are fundamental to the

25

success of these effor's and of our Global Development
Facility in New London.

We greatly appreciate the assistance of the Department of
the Navy in making the Fort Trumbull and NUWC rede-

velopment a national example of which we may all be
proud.

Sincerely,
/s/ George M. Milne, Jr., Ph.D.

ce: Governor John G. Rowland, State of Connecticut
Timothy West, Mayor City of New London

26

DEFENDANTS’ EXHIBIT 12

MINUTES OF THE CITY
COUNCIL OF NEW LONDON

1/18/00 — 6

7.8 Fort Trumbull Municipal Development Plan

Upon motion of Councilor Burdick, seconded by
Councilor Curtin, it was voted 6-1: To approve resolution
number 011800-3 concerning the New London City Coun-
cil approving the Fort Trumbull Municipal Development
Plan and making certain findings. The Clerk reads the
resolution by title only, all Councilors having copies, and
the subject resolution is adopted by Roll Call Vote. Those
voting in favor: Burdick, Pero, West, Curtin, Nossek,
Hewett. Those voting against: Beachy.

RESOLUTION NUMBER 011800-3
Certified Resolution

By the NEW LONDON CITY COUNCIL approving the
Fort Trumbull Municipal Development Plan and making
certain findings.

WHEREAS, it is desirable and in the public interest that
the New London Development Corporation prepare a
Development Plan for a Municipal Development Project
for purposes of contributing to the economic welfare of the
municipality and the state pursuant to the provisions of
Chapter 130, Chapter 132 and Chapter 588(1) of the
Connecticut General Statutes as amended; and

WHEREAS, the New London Development Corpora-
tion prepared a Development plan for the project known

27

as bs Fort Trumbull Municipal Development Plan;
an

WHEREAS, the Fort Trumbull Municipal Development
plan was referred to the Planning and Zoning Commis-
sion of the City of New London and the regional
planning agency known as the Southeastern Connecti-

cut Council of Governments Regional Planning
Commission; and

WHEREAS, thereafter the New London Redevelop-
ment Agency held a public hearing on the Fort Trumbull
Municipal Development Plan on January 13, 2000, pursu-
ant to the provisions of local law, state statutes, Chapter
130 of the Connecticut General Statutes, as amended, and
thereafter approved said Plan; and the New London
Development Corporation held a public hearing on the
Fort Trumbull Municipal Development Plan on January
13, 2000, pursuant to the provisions of local law, state
statues, Chapter 132 and Chapter 588(1) of the Connecti-
cut General Statutes, as amended, and thereafter, ap-
proved said plan;

NOW THEREFORE, the New London City Council
hereby resolves:

(1) That the Fort Trumbull Municipal Development Plan
is hereby approved;

(2) That the land and buildings within the Fort Trumbull
Municipal Development Plan project area will be used
principally for industrial, business, housing and rec-
reational uses; that the land and buildings within the
boundaries of the Project Area will be used primarily
for economic base business purposes or business sup-
port services; and that the Plan is essential to the pur-
pose of redevelopment of the area;

28

(3) That the Fort Trumbull Municipal Development Plan
is in accordance with the City of New London Plan of
Conservation and Development, and that it is in ac-
cordance with the Plan of Development for the South-
eastern Connecticut Council of Governments Regional
Planning Commission;

(4) That the Fort Trumbull Municipal Development Plan
is not inimical to any statewide planning program ob-
jectives of the state or state agencies as coordinated by
the Secretary of the Office of Policy and Management,

(5) That the Fort Trumbull Municipal Development Plan
project will contribute to the economic welfare of the
City of New London and the State of Connecticut; and

(6) That to carry out and administer the project, public
action under Chapters 130, 132 and 588(1) of the Con-
necticut General Statutes as amended is required;
and, for the purposes of carrying out this project, that
the New London City Council approves and bestows
upon the New London Development Corporation all
rights and powers that are permitted to accrue to a
development agency or implementing agency under
Chapters 130, 132, and 588(1) of the Connecticut Gen-
eral Statutes as amended, including the power of emi-
nent domain with the project area in the name of the
City of New London per Chapter 130, Section 8-128,
and Chapter 132, Section 8-193.

(7) That all properties in the Fort Trumbull Municipal
Development Plan listed as “to be acquired” shall be
acquired prior to December 31, 2002, unless this date
is extended by the City Council.

(8) That the Chief Operating Officer of the New London
Development Corporation is hereby authorized to
submit the resolution of approval of the Fort Trumbull
Municipal Development Plan as approved by the New
London City Council to the Connecticut Department

29

of Economic and Community Devel
an y elopment for ap-

Upon motion of Councilor Pero, seconded by Councilor

Curtin, it was unanimously voted: To recess the meeting at
12 midnight.

Attest: /s/ Michael J. Tranchida
Michael Tranchida, Assistant City Clerk

30
PLAINTIFFS’ EXHIBIT HHH
MEMO
CORCORAN JENNISON
COMPANY, INC.

DATE: JANUARY 12, 2001
TO: JOSEPH E. CORCORAN

GARY JENNISON

SCOTT DUMONT

HARRY NASH

ELIZA EDELSBERG
FROM: MARTY JONES

COMMERCIAL OFFICE STUDY
ON NEW LONDON

&

Here is the commercial office study prepared by Jay
Hooper on New London. We need a document for NLDC to
show we are working on this. Please give me your com-
ments. We plan to seek brokers in February to keep the
community aware the deal is moving forward.

Harry is working on a detailed analysis of Building 2
systems which will be added to update the cost side of the
proforma.

CORCORAN JENNISON COMPANIES, INC.
MARKETING PLAN
FOR
COMMERCIAL DEVELOPMENT SPACE
Fort Trumbull Development
New London, CT
Corcoran Jennison Companies, Inc.

150 Mount Vernon Street, Suite 500
Boston, MA 02125

31

Table of Contents
1. Project Description
2. Market Study Summary
3. Commercial Development Program
4

Financial Feasibility Study of Commercial Develop-
ment

5. Conclusions of Financial and Market Study
6. Target Market for Commercial Space

7. Marketing Strategy

8. Marketing Execution Plan

9. Project and Marketing Schedule

10. Marketing Budget

11. Addenda

* Sample Draft of Broker Request for Proposals

* New London Office Absorption History
(Miner & Silverstein Appraisal Company)

* Comparable Office Lease Data

Project Description
Background

The New London Development Corporation (NLDC), in
association with the Connecticut Department of Economic
and Community Development (DECD), has undertaken a
municipal planning project targeting an area adjacent to
the Thames River in New London, Connecticut. Known as
the Fort Trumbull Municipal Development Plan (MDP),
the MDP area encompasses approximately 90 acres
immediately south of downtown New Lond: n and adjacent
to historic Fort Trumbull, which has been developed into a

32

state park. The principal catalyst for development in this
area is the construction of Pfizer Inc.'s 790,000-square-foot
Global Development Facility immediately south of the
MDP area. This facility is the headquarters for Pfizer's
worldwide research operations.

The NLDC selected Corcoran Jennison Companies as the
developer of a 30-acre waterfront parcel adjacent to Fort
Trumbull. The majority of the parcel consists of the U.S.
Navy's closed Naval Undersea Warfare Center (NUWC).
The balance is made up of an aging working class

Project Description

Corcoran Jennison Companies has proposed a mixed-use
development, to include a four-star hotel, housing, and
commercial space, for the 30-acre parcel. The attached site
plan, labeled the Fort Trumbull Development Plan, depicts
the latest proposed development plan for the Fort Trum-
bull site. New public roadways and infrastructure will be
built to support the development. Total development costs
are projected to be approximately $100 million.

The hotel will be situated on the northernmost section of
the site. The re. sential development will be located on the
southeastern portion of the site, adjacent to the existing
Coast Guard rescue station facility and north of Fort
Trumbull. The commercial development will be located on
the southwestern portion of the site; an existing Italian
Dramatic Club located here will be kept and incorporated
walk” a waterfront park along the shoreline. It will con-
nect to the Fort Trumbull State Park, and provide

33

opportunit®.» for the general public to walk, bike and
picnic alo» * se water.

Hotel/Conference Center

The proposed hotel development is a key component to the
overall transformation of the Fort Trumbull area. An
extension of Nameaug Street, to be built as a tree-lined
boulevard, will be the gateway to the hotel, leading guests
from Walbach Street to the hotel. The planned hotel will
be built in two phases and will consist of 225 rooms, a
12,000 square foot of conference/meeting facility, and a
restaurant when completed. Construction will commence
on the first phase of 100 rooms as soon as possible, which
is anticipated to be August 2001. The hotel will be de-
signed with considerable green space around it, as well as
lots of glass to take advantage of sweeping views of the
Thames River, Long Island Sound, and downtown New
London.

Residential

The proposed residential development consists of a three-
story, 24-unit extended stay inn with furnished apart-
ments, a six-story, 48-unit apartment building; and 40
two- and three-story townhouses arranged in three tradi-
tional urban clusters near the cove. The residential devel-
opment will be used to focus activity toward the water.
The Riverwalk, which will be a dedicated public pedes-
trian and bicycle path that runs along the water's edge
and connects the Fort Trumbull development with Fort
Trumbull State Park and the Pfizer development, will be a

valuable amenity for the residential development.

Commercial

At present, approximately 300,000 square feet of commer-
cial space is envisioned for the site. This will be comprised
of an existing commercial building containing approxi-
mately 91,000 gross square feet, identified as Building 2
by the U'S. Navy, and two proposed buildings of 100,000
square feet each. The MDP called for the inclusion of office
er bioscience-related commercial space. While the new
buildings could be developed for either use depending
upon market conditions, the existing Building 2 is best
Building 2 is a four-story, steel frame, brick and glass
structure completed in 1991 as sonar research and devel-
opment space for the Navy. It is in reasonably good condi-
tion and can be easily renovated to Class A office space for
the New London market. The new buildings will be sited
between Building 2 a d Walbach Street and will be devel-
oped as market conuitions warrant.

Figure 1.1-2
Project Location Map

+

OFF.

tv of New London FEMA ad US Navy (aerated for piawurg

cere. 4

'Alore & MacSmcr --

m. ifumbul] MDP Area - New London, Connecticut
“aft Environmental impact Evaluation - November 1998
- ea HA ic Sows ocike

as DS overages 2-cioped 5

Site Plan
Fort Trumbull Development Plan

Corcoran Jennison Companies

William Rawn Associates, Architects
10 Tremont Street

Bos'on MA
02108

October 10, 2000

Q0U000

LEGENO
PROPOSED MOTEL nets —
PROPOSED MOTEL SUPPORT ——s
PROPOSED MOTE! (O88 Cc)
PROPOSED OTF. OES leumant
PROPOSED MOTEL FiTHESS

LE

38

Market Study Summary
OFFICE MARKET

The New London commercial real estate market is con-
tinuing its recovery from the last recession of the early
1990s. While rental rate and occupancy trends have been
generally positive over the past few years, market values
are still well below replacement cost and new construction
is generally not feasible. As a result, little new construc-
tion has taken place over the last decade in the New
London area. The following discussion provides a sum-
mary of the New London commercial/office market. The
chart on the following page presents a snapshot of the
New London office market as of October 2000.

Supply

New London contains approximately 815,000 square feet
of Class A and B office space, with approximately 545,000
square feet considered Class A and approximately 270,000
considered Class B. Most of New London’s Class A space
was built in the 1980s. Roughly one-half of the Class A
space is located in Shaw’s Cove Business Park, which
currently consists of six buildings containing approxi-
mately 275,000 square feet. Shaw’s Cove is located be-
tween downtown New London and the Fort Trumbull
development. The vast majority of the Class B space is
located in downtown New London.

New construction activity in the market has been minimal
and generally limited to end-user/owner-occupant facili-
ties, such as the new space under construction for Pfizer.
There are two proposed developments of Class A space
that are commonly mentioned in the marketplace, one in

39

New London and one in nearby Groton. These develop-
ments are as follows:

Shaw’s Cove 7 & 8, New London

Propesed 60,000 to 70,000 s/f in 2 buildings
Developer — Julian Enterprises

No pre-leasing activity to date

Asking $20.00 Gross

Considering ground floor retail due to greater
demand

U.S. Prop >rties, Inc. —- marketing/leasing agent

Mystic Executive Park, Groton

Proposed 104,000 s/f

4 Stories (26,000 s/f floorplates)

Located at Exit 88 off Rt. 95 adjacent to Mar-
riott Hotel under construction

¢ Developer —- Wolman’s/Waterford Hotel Group
¢ No pre-leasing activity to date
* Asking $23.00 Gross (includes basic tenant

improvements)
CB Richard Ellis — marketing/leasing agent

40

NEW LONDON OFFICE MARKET SURVEY

October 2000
Source: U.S. Properties, Inc.
Available
Property _ Address Built Size (S/F) S/F Vacancy Rate Comments
ClassA 1 Shaw’s Cove One 1984 12,492 - 0.0%
1 Shaw’s Cove Two 1986 31,228 790 2.5% $20.00 Gross
1 Shaw’s Cove Three 1988 70,286 8,300 11.8% $20.00 Gross
1 Shaw’s Cove Four 1988 32,731 - 0.0% Medical Building
1 Shaw’s Cove Five 1989 37,114 2,155 5.8% $20.00 Gross
1 Shaw’s Cove Six 1990 89,000 2,841 3.2% $20.00 Gross
2 Columbus Corner 470 Bank Street 1989 21,632 - 0.0%
3 Mariner Square 125 Eugene O’Neill Dr. 1982 84,000 1,000 * 1.2% $20.00Gross 26,000 s/f for sublease
4 Citizens Bank 63 Eugene O'Neill Dr. 37,414 1,400 3.7% $14.00NNN
5 194 Howard Street 1984 47,000 - 0.0%
6 Union Plaza 1 & 2 1968 52,480 4,000 7.6%
7 400 Bayonet Street 1987 30,617 4,800 15.7% $19.00 + Elec.
Subtotal 545,994 25,286 4.6%
ClassB 8 A & T Technical 238-258 Bank Street 58,518 21,000 35.9% $12.00 NNN
9 Columbus Park Howard Street 1988 25,000 1,300 5.2% $13.50 Gross
10 Harris Place 165 State Street 1885 66,354 13,985 21.1% $14.00 + Elec.
Manwaring Building 225 State Street 25,848 25,848 100.0% $14.00 + Elec.
Exchange Building 190 Governor Winthrop 1935 41,000 26,950 65.7% $11.00 + Elec.
Dewart Building State Street 1914 43,896 43,896 100.0% N/A Temporarily off market
19 Jay Street 9,300 9,300 100.0% $14.00 NNN
Subtotal 269,916 142,279 52.7%
Class A & B Totals 815,910 167,565 20.5%

* . Excludes sublease space

41

Another proposed development that could impact the New
London market is the planned development of the former
Norwich State Hospital, located north of New London in
Norwich, CT. A master plan was recently unveiled for
turning the 470-acre site into a 3 million square foot office
park. No prospective tenants have been announced,
although discussions reportedly have occurred in the past
with Pfizer. Spaulding & Slye Colliers is marketing this
site.

While New London has limited land available for new
commercial construction, some additional parcels will be
made available in the Fort Trumbull MDP area for devel-
opment subsequent to the development of the Fort Trum-
bull site. Additionally, the surrounding region has
abundant land available for commercial development
should future market conditions warrant it.

Based on conversations with people connected with the
proposed office developments, replacement cost for new
office development is estimated to be between $120 and
$150 per square foot, depending upon construction, type of

Demand

As can be seen in the preceding chart, although the overall
market exhibits a 20.5% vacancy rate, the Class A market
is quite healthy, with only 4.6% of the Class A space not
leased. If the 26,000 square feet available for sublease in
Mariner Square were included, then the Class A vacancy
rate would rise to 9.4%, which is still not an unhealthy
level for the market.

42

The Class B market, on the other hand, is clearly strug-
gling with over half of the space presently unoccupied.
Brokers, however, report that much of the Class B space is
functionally obsolete and has inadequate and/or inaccessi-
ble parking, which exacerbates the vacancy level.

A report published by Miner & Silverstein Appraisal
Company (see Addenda) indicates that there has been
positive demand for Class A & B office space over the past
four years. Between October 1996 and October 1999,
approximately 185,000 square feet were absorbed in New
London. As of November 1999, Miner & Silverstein had
forecast additional absorption of approximately 25,000
square feet through mid-2000; based on market informa-
tion provided by U.S. Properties, actual absorption
through October 2000 appears to have exceeded this
projection.

Brokers indicate that typical tenants in the market re-
quire between 3,000 and 7,500 square feet of space. While
there are some requirements between 10,000 and 20,000
square feet, reportedly there are relatively few above
20,000 square feet. Given the relative size of the New
London market, this would appear reasonable.

Typical office tenants in the New London market include
the “Main Street” mix of lawyers, accountants, and medi-
cal practitioners, as well as other service-oriented compa-
nies, community organizations, and government agencies.
Some of the larger users in New London are Pfizer, Gen-
eral Dynamics, CSC (Computer Science Corp.), and Or-
tronics. Ortronics, which reportedly recently tripled in size
to 36,000 square feet, is in the telecommunications and
structured cable industry.

43

It should be noted that over the past few years, Pfizer has
represented one of the largest sources of demand in the
southeastern Connecticut region, buying or leasing large
blocks of space outside of its Groton campus and its New
London campus that is under construction. Reportedly,
Pfizer will remain in the vast majority of this space as it
occupies its new Global Development Facility being built
in New London.

According to local brokers and business people, New
London has experienced limited organic growth, aside
from Pfizer, in recent years. In addition, the region has
experienced very limited growth as a result of companies
relocating to the area to be proximate to Pfizer or other
companies. Nonetheless, one source of future demand for
commercial space may be the result of companies doing
business with Pfizer that desire proximity to the new
Global Development Facility. Brokers have noted a few
inquiries from companies representative of Pfizer-related
demand, but no significant demand has been evidenced
over the past several years.

Rental Pricing

Recent leases for Class A office space in New London show
rents ranging between $18.00 and $21.00 per square foot,
on a gross basis with the tenant only paying for the
additional cost of janitorial cleaning within the leased
premises. A summary of comparable lease data over the
past three years has been included in the Addenda for
reference purposes. Lease terms are typically between 5
and 10 years, with smaller tenants sometimes wanting 1-
to 3-year terms and larger tenants sometimes executing
15-year terms.

44

Tenant improvement allowances vary based on recent
deals. With the market tightening, some deals have been
done with no or minimal (painting and carpet cleaning)
tenant improvements. On the other hand, some deals in
Shaw’s Cove Business Park have had tenant improvement
allowances around $15.00 to $17.00 per square foot.

Operating Expenses

Brokers indicate that operating expenses, including real
estate taxes and utilities, for office buildings in New
London generally vary between $6.00 and $7.00 ~per
square foot. Of this amount, real estate taxes general!»
range between $1.00 and $2.00 per square foot. Typical
real estate taxes for buildings in Shaw’s Cove are between
$1.70 and $2.00 per square foot. Utilities usually comprise
between $1.50 and $2.00 per square foot, with the balance
reflecting common area and other operating expenses.

Sale Prices

Recent sales of office buildings in New London have
ranged between roughly $40 and $70 per square foot. The
two most recent sales of larger Class A buildings sold for
prices ranging between approximately $57 and $67 per
square foot. The only office buildings curren‘*ly being
marketed for sale are Class B properties with asking
prices ranging between $26 and $63 per square foot.

BIOTECH/BIOSCIENCE MARKET

The biotech/bioscience market is in its infancy in Con-
necticut. Aside from Pfizer, a biotech/bioscience market
does not really exist in the New London area. Connecticut

45

is promoting a bioscience cluster concept, with New
Haven, Hartford, and New London being the three loca-
tions targeted for developing the cluster concept. Although
New Haven is making some progress in attracting biosci-
ence companies, New London and Hartford have not had
any meaningful success to date.

New Haven has two major developments either underway
or proposed. One is Science Park, an 80-acre master
planned site that will include renovation and new con-
struction of office, laboratory, and research and develop-
ment space. Lyme Properties has recently been selected to
take over development of the project, which will be in
excess of 1 million square feet. The other development is
the Hamden Bioscience Campus, a proposed 1 million
square foot park for biotech/bioscience companies.

The general impression in the market is that, at this time,
it is difficult for New London to compete with New Haven
for biotech/bioscience users. New London has a competi-
tive disadvantage in that it lacks a major university that
grants post-graduate degrees and a major research hospi-
tal, as well as significant venture capital money to support
emerging companies. SECTER, a southeastern Connecti-
cut business recruitment organization, indicates that they
have been unable to generate any interest for bioscience in
the New London area for the past few years.

With development costs for bioscience space generally in a
broad range between $250 and $350 per square foot,
depending on the tenant improvements required, it is not
economically feasible to develop this space at this time
without an end user in hand that will pay the rent neces-
sary to support the cost. Ultimately, corporate or govern-
ment sponsorship will be required to create a feasible

46

environment for development of biotech/bioscience space
in New London. Connecticut Innovations, a_ state-
sponsored agency, has a $40 million Bioscience Facilities
Fund to support development of biotech, wet laboratory
space. To date, reportedly $20 million have been commit-
ted, almost entirely for companies in the New Haven area.
Funds are mainly for tenant improvement loans and
residual balance guarantees for lenders, and have yet to be
used to fund speculative real estate development.

Commercial Development Program

The commercial development program for the Fort Trum-
bull development will consist of at least two phases, and
possibly more depending upon the amount and type of
demand that is generated for the 200,000 square feet of
proposed commercial space. The first phase of commercial
development will involve the renovation and redevelop-
ment of the existing Navy Building 2 into a multi-tenant
Class A office building for the New London market. Future
phases will involve new construction of either Class A
office space or biotech/bioscience space, as demand war-
rants. The present plan for the proposed commercial space
includes the development of two 100,000 square foot

buildings along Walbach Street, south of the existing
Building 2.

Phase 1 ~ Office

Building 2 was built in 1991 and consists of a four-story,
steel-frame brick and glass office building containing
91,000 gross square feet. Preliminary analysis indicates
an approximate net rentable area of 86,000 square feet.
The building was constructed for single-tenant occupancy

47

and will require renovation to accommodate multi-tenant
occupancy as appropriate for the New London office
market. A first-floor lobby will need to be added, as well as
common area on each floor depending upon the space
requirements of future tenants. Also, the entrance to the
building is currently on the east side and most likely will
need to be relocated to orient it to the street grid planned
for the Fort Trumbull development. In designing the space
for multi-tenant occupancy, it should be kept in mind that
loss factors for common area, as generally accepted and
paid for by tenants, typically do not exceed 15%.

Building systems will need to be evaluated to determine
their appropriateness for reuse. It is known that a heating
system will need to be added because Building 2 was
previously heated by a system supporting several other
Navy buildings. Also, analysis will need to be completed to
determine whether the existing elevator and rest rooms
are adequate for multi-tenant office use in the current
market, or whether additions are required.

arking will be provided around the building, with excess
ae for the on future provided on the adjacent land
that will support the future commercial development. It is
anticipated that parking will be provided at market-
oriented levels, approximately 3.5 spaces per 1,000 square
feet of rentable area.

Future Phases - Office and/or Bioscience
The program for the future phases is uncertain and will
depend upon the type and quantity of demand that is

generated through marketing efforts. It is currently
envisioned that there will be two 100,000 square foot
buildings, most probably multi-story buildings. Given the

48

uncertainty regarding the demand/feasibility of bio-
tech/bioscience space, as well as the fact that any addi-
tional office development, in all likelihood, will be
subsequent to completion of Building 2, any design should
be kept flexible to accommodate various types of demand.

If biotech/bioscience space is programmed, the typical
product type involves single or multi-story space with floor
heights between 18 and 20 feet, wet lab improvements
(sinks, cabinets, and hoods), animal areas, filtration
systems, a small amount of office area, high HVAC capac-
ity, and heavy floor load capacity.

Consideration should be given to initially programming a
good quality “flex”-type building that could be expanded in
phases as demand warrants. This building would most
likely be one story and would have the look and feel of an
office building. However, it would have high floor heights
(20 +/- feet) to accommodate a variety of uses, such as
office, research and development, laboratory, and assem-
bly. Depending upon the interest generated through
broker marketing efforts, a small initial phase of 15,000 to
20,000 square feet could be built to test the market. This
strategy would allow for less upfront investment than pure
biotech/bioscience space, enhancing the potential feasibil-
ity, and would help compensate for the uncertain demand
at this time. _

49

Navy Bidg. 2.

50

Financial Feasibility Study
Of
Commercial Development

In analyzing the feasibility of the commercial development
space at Fort Trumbull, we have focused on the renovation
of Building 2. Considering market conditions, as well as
anticipated development costs and net operating income
levels, new construction of office and/or biotech/bioscience
space is not feasible at this time.

On the following pages, three scenarios are presented for
the renovation of Building 2. Each scenario involves a
different level of cost for the rehabilitation. A summary of
the major assumptions for each scenario is as follows:

Minor Moderate Major
Rehab Rehab Rehab

Total Development Cost $5,094,339 $6,737,530 $8,664,291

Per S/F $59.24 $78.34 $100.75
Hard Costs (Per S/F) $38.22 $51.95 $70.63
Soft Costs (Per S/F) $18.06 $22.48 $25.08
Construction Period 4months 6months 6 months
Lease-up Period 20months 18months 18 months
Market Rent $16.00 $20.00 $20.00
Equity Required $652,310 $105,581 $2,032,342
Unleveraged
Return on Development
Cost 13.9% 16.1% 12.0%
IRR (3-year Hold) 20.7% 30.3% 12.0%
Leveraged
Return on Equity 33.8% 318.7% 16.6%

IRR (3-year Hold) 46.1% 95.0% 10.2%

51

As illustrated, all three scenarios indicate the general
economic feasibility of redeveloping Building 2 given
current and anticipated future market conditions.
analysis presupposes that the remainder of the
Trumbull development proceeds as planned and
Building 2 is not an isolated development.

CORCORAN JENNISON COMPANIES

Confidential
FORT TRUMBALL
Building 2 Feasibility Analysis
Development Assumptions MINOR REHAB
Gross Area 91,000 s/f Market Rent $16.00 Per s/f
Rentable Area 86,000 s/f Operating Expenses $7.25 Per s/f (base year)
Capital Reserve $0.30 Per s/f
Initial Equity $500,000 Stabilized Vacancy 10.0%
Permanent Equity $652,310
Permanent Financing
Construction Period 4 Months Mortgage Interest Rate 9.25%
Lease-up Period 20 Months LTV Ratio 70%
Amortization 25 Years
Valuation at Sale Cap Rate — Financing 11.5% -
Cap Rate 12.0% nN
Sale Costs 5.0%
Preliminary Development Cost Budget
Amount PerS/FF % Comments
Hard Costs
Building $ 1,820,000 $20.00 On Gross Area
Site $ 450,000
Tenant Improvements $ 860,000 $10.00 On Rentable Area
Contingency $ 156,500 5.0%
Subtotal $ 3,286,500 $38.22
Soft Costs
Design/Engineering $ 180,000
Permits/Insurance $ 49,298 1.5%
Legal/Professional $ 75,000
General, Admin. & Overhead $ 100,000
Taxes/Fees $ 20,000
Financing Costs $ 72,000 2.0% $3,600,000 Loan Estimate for Calculation
Marketing/Leasing $ 430,000 $5.00
Concessions/Free Rent 3 -
Construction Interest $ 462,500 $2,500,000 Average Balance for 24 Months
Miscellaneous/Contingency $ 164,325 _— 5.0%
Subtotal $ 1,553,123 $18.06 47.3%
Development Fee $ 254,717 5.0%
Total Development Cost $ 5,094,339 $59.28
Development Period NOI $ 856,203
Net Development Cost $ 4,238,136 $49.28
Capital Sources
Permanent Financing $ 3,585,826 70.4%
Equity $ 652,310 12.8% nate
Development Period NOI $ 856,203 16.8%
Total Development Cost $ 5,094,339 $59.24 100.0%

FORT TRUMBULL
Building 2

Pro Forma — Commercial Development Feasibility

Development Costs

Development Period NOI
Net Development Cost

Gross Potential Rent
Allowance for Vacancies
Effective Gross Rent

Operating Expenses

Year3 =#Comments

1,376,000 Level Rent for First 5 Years of Lease

(623,500) Pass Through Increases Over Base Year

MINOR REHAB
Sanhilionti
Year 0 Year 1 Year 2
$ (254,717) $ (3,820,755) $ (1,018,868)
5% 75% 20%
$ 181,303 $ 674,900
$ (254,717) $ (3,639,451) $ (343,968) $
$
s (137,600)
1,238,400
%
$ (25,800)
. 589,100
13.9%
$ 267,250 $ 267,250
$ 4,868,478
$ (254,717) $ (3,372,201) $ (76,718) $ 5,455,578
20.7%
Sanbilionts
Year 0 Year 1 Year 2 Year 3
$ (254,717) $ (245,283)
$ (152,310)
$ 589,100
$ (368,500)
1.60
$ 220,600
33.8%
$ 1,319,065
$ (254,717) $ (245,283) $ (152,310) $ 1,539,665
46.1%

FORT TRUMBULL

Building 2
Supporting Calculations MINOR REHAB
Stabilized Value Estimate

Amount Per S/F
Stabilized NOI $ 589,100 $ 6.85
Cap Rate - mo 11.5%
Value Estimate $ 5,122,609 $ 59.57

Permanent Financing
Estimated Value for Financing $ 5,122,609

LTV Ratio 70%
Permanent Loan $ 3,585,826 $ 41.70
Interest Rate 9.25%
Amortization 25
Annual Debt Service $ 368,500
Debt Coverage Ratio 1.60
E Cash Flow f P t Fi ,
Permanent Loan $ 3,585,826
Net Development Costs $ 4,238,136
Cash Flow from Financing $ (652,310)
- Initial Equity $ 500,000
Cash Out (In) from Financing $ (152,310)

Building
Opening ~~
5 6
7,600
4,500
3,760
8,260 - 7,600

Year 2 — Month
10 1l 12 1 2 3 4
7,600
7,750
22,750
4,500
4,750

22,750- 7,600 4,500 - -

12,600
8,260 8,260 16,750 15,750 15,750 38,600 38,500 46,000 50,500 50,500 50,500 63,000
73.3%

96% 90% 103%

Per s/f
Per s/f

Per a/f

FORT TRUMBALL
Building 2
Occupancy/Absorption Projections MINOR REHAB
Rentable Year 1 —- Month
Floor Tenant Square Lease
Feet Term 1 2 3 4

1 1 7,600 7

2 7,500 6 a

3 7,750 7.
2 4 22,750 10
3 5 4,500 6

6 4,500 6

7 4,500 7

8 4,800 7

9 4,750 6
- 10 10,000 10

11 - 7

12 4,000 6

13 3,750 5
Totals $80,000 - = - -
Occupancy Rate 00% 00% 00% 00%
Average Occupancy Year 1 27.1% 8 Months
Average Occupancy Year 2 70.0% 12 Months
Average Occupancy During Lease'Up 87.0% 20 Months
Development Period NOI
[legible] Year 1
Market Price $16.00 $16.00
Operating Expenses (Stabilized) $7.25 $7.25
Expense Percentage in Lease-Up 60% 80%
Operating Expense (Lease-Up) $4.36 $6.80
Net Market Price $11.05
Net Market Price - Monthly $0.97 $0. 6
Average S/F Occupied 23,344 66,167
Number Months of Occupancy 8 12
Development Period NOI $181,303 $874,900
Total Development Period NOI $856,203

10.3% 103% 448% 448% 53.6% 58.7% 58.7% 80.7%

63,000 63,000

12

7 8 9 10 11
4,500
4,500
10,000

4,000
4,500 - 10,000 ‘ ‘ 8.600
67,500 67,500 77,500 77,500 77,500 80,000

78.5% 78.5% 90.1% 90.1% 90.1% 100.0%

FORT TRUMBALL
Building 2 Feasibility Analysis

Development Assumptions MODERATE REHAB
Gross Area 91,000 s/f Market Rent $20.00 Per s/f
Rentable Area 86,000 s/f Operating Expenses $7.25 Per s/f (base year)
Capital Reserve $0.30 Per s/f
Initial Equity $500,000 Stabilized Vacancy 10.0%
Permanent Equity $105,581
Permanent Financing
Construction Period 6 Months Mortgage Interest Rate 9.25%
Lease-up Period 18 Months LTV Ratio 70%
Amortization — 25 Years
Valuation at Sal Cap Rate — Financing 11.5%
Cap Rate 12.0%
Sale Costs 5.0%
Preliminary Development Cost Budget
Amount PerS/F % Comments
Hard Costs
Building $ 2,730,000 $30.00 On Gross Area
Site $ 450,000
Tenant Improvements $ 1,075,000 $12.50 On Rentable Area
Contingency $ 212,750 5.0%
Subtotal $ 4,467,750 $51.95
Soft Costs
Design/Engineering $ 250,000
Permits/Insurance $ 67,016 1.5%
Legal/Professional $ 75,000
General, Admin. & Overhead _$ 100,000
Taxes/Fees $ 20,000
Financing Costs $ 120,000 2.0% $6,000,000 Loan Estimate for Calculation
Marketing/Leasing $ 430,000 $5.00
Concessions/Free Rent $ -
Construction Interest $ 647,500 $3,500,000 Average Balance for 24 Months
Miscellaneous/Contingency $ 223,388 5.0%
Subtotal $ 192,904 $22.48 43.3%
Development Fee $ 336,877 5.0%
Total Development Cost $ 6,737,530 $78.34
Development Period NOI $ 1,161,601
Net Development Cost $ 5,575,929 $64.84
Capital Sources :
Permanent Financing $ 5,470,348 81.2%
Equity $ 105,581 1.6%
Development Period NOI $ 1,161,601 17.2%
Total Development Cost $ 6,737,530 $78.34 100.0%

57

FORT TRUMBULL
Building 2

Year3 #§ Comments

1,720,000 Level Rent for First 5 Years of Lease

(623,500) Pass Through Increases Over Base Year

Pro Forma —- Commercial Development Feasibility MODERATE REHAB
- Stabilization
Year 0 Year 1 Year 2
Development Costs = $ (336,877) $ (5,053,148) $ (1,347,506)
5% 75% 20%
Development Period NOI $ 222034 $ 939,567
Net Development Cost $ (336,877) $ (4,831,113) $ (407,939) $ -
Gross Potential Rent $
Allowance for Vacancies $ (172,000)
Effective Gross Rent 1,548,000
Operating Expenses $
Capital Reserve $ (25,800)
Net Operating Income $ 898,700
Return on Development Cost 16.1%
Add Back Constr. Int. & Financing $ 383,750 $ 383,750
Net Sale Proceeds $ 7,424,043
Unleveraged Development Cash Flow $ (336,877) $ (4,447,363) $ (24,189) $ 8,322,743
Internal Rate of Return 30.3%
Leveraged Analysis
Stabilizati
Year 0 Year 1 Year 2 Year 3

Initial Equity Investment $ (336,877) $ (163,123)
Cash Out (In) — Perm. Financing $ (394,419)
Net Operating Income $ 898,700
Permanent Debt Service $ (562,165)

Debt Coverage Ratio 1.60
Cash Flow after Debt Service $ 336,535
Return on Equity 318.7%
Net Sale Proceeds after Debt $ 2,012,296
Net Equity Cash Flows $ (336,877) $ (163,123) $ 394419 $ 2,348,832
Equity IRR 95.0%

FORT TRUMBULL

Building 2
Supporting Calculations MODERATE REHAB
Stabilized Value Estimate

Amount Per S/F
Stabilized NOI $ 898,700 $ 10.45
Cap Rate 11.5%
Value Estimate $ 614,783 $ 90.87

Permanent Financing
Estimated Value for Financing $ 7,814,783

LTV Ratio 70%

Permanent Loan $ 5,470,348 $ 63.61
Interest Rate 9.25%

Amortization 25

Annual Debt Service $ 562,165

Debt Coverage Ratio 1.60

Excess Cash Flow from Permanent Financing

Permanent Loan 5,470,348
Net Development Costs 5,575,929

$
$
Cash Flow from Financing $ (105,581)
$
$

Initial Equity 500,000
Cash Out (In) from Financing (394,419)

FORT TRUMBALL
Building 2
Occupancy/Absorption Projections MODERATE REHAB
Buildi
Rentable Year 1 - Month Opening
Floor Tenant Square Lease
~ Feet Term 1 2 3 4 5 6 7
1 1 7600 7 7,500
2 7500 6
3 7,750 7
2 4 22,750 10
3 5 4,500 6
6 4500 6
7 4500 7
x 4800 7 4,500
9 4,750 6 .
4 10 10,000 10
11 - 7
12 4,000 6
13 3,750 5 3,750
Totals $80,000 - - 15,750
Cumulative - - - - - - 15,750
Occupancy Rate 00% 00% 00% 00% 00% 00% 10.3%
Average Occupancy Year | 33.0% 6 Months
Average Occupancy Year 2 70.0% 12 Months
Average Occupancy During LeaseUp 62.3% 18 Months
Development Period NOI
(legible) Year 1 Year 2
Market Price $20.00 $20.00 Per s/f
Operating Expenses (Stabilized) $7.25 $725 Peref
Expense Percentage in Lease-Up 60% 80%
Operating Expense (Lease-Up) $4.35 $8.80 Peraf
Net Market Price $15.55 $14.20 Per s/f
Net Market "nce —- Monthly $1.30 $1.18 Per s/f
Average S/F Occupied 20,375 66,167
Number Months of Occupancy 8 12
Development Penod NO! $222,034 $830,607
Total Development Pernod NOI $1,161,601

Year 2 - Month
8 9 10 11 12 1 2 3 4 5 6 7 8 4 10 11 12
7,600 7.750
— 4,500
4,500
4,500
4,750
10,000

4,000
- - 22,750 = 7,600 4,500 : ° 12,600 - - 4,500 - 10,000 - - 8,600
15,750 15,750 38,500 38,500 46,000 50,500 50,500 50,500 63,000 63,000 63,000 67,500 67,500 77,500 77,500 77,500 80,000
10.3% 103% 448% 448% 53.6% 58.7% 58.7% 80.7% 733% 73.3% 733% 785% 785% 90.1% 90.1% 90.1% 100.0%

FORT TRUMBALL
Building 2 Feasibility Analysis

Development Assumptions MAJOR REHAB
Gross Area 91,000 sff Market Rent $20.00 Per s/f
Rentable Area 86,000 = s/f Operating Expenses $7.25 Per s/f (base year)
Capital Reserve $0.30 Per s/f
Initial Equity $500,000 Stabilized Vacancy 10.0%
Permanent Equity $2,032,342
P Fi :
Construction Period 6 Months Mortgage Interest Rate 9.25%
Lease-up Period 18 Months LTV Ratio 70%
Amortization 25 Years
Valuation at Sale Cap Rate — Financing 11.5%
Cap Rate 12.0%
Sale Costs 5.0%
Preliminary Development Cost Budget
Amount PerS/F % Comments
Hard Costs
Building $ 3,185,000 $35.00 On Gross Area
Site $ 450,000
Tenant Improvements $ 2,150,000 $25.00 On Rentable Area
Contingency $ 289,250 5.0%
Subtotal $ 6,074,250 $70.63
Soft Costs -
Design/Engineering $ 250,000
Permits/Insurance 3 91,114 1.5%
Legal/Professional $ 75,000
General, Admin. & Overhead $ 100,000
Taxes/Fees $ 20,000
Financing Costs $ 110,000 2.0% $5,500,000 Loan Estimate for Calculation
Marketing/Leasing $ 430,000 $5.00
Concessions/Free Rent 4% -
Construction Interest $ 777,000 $4,200,000 Average Balance for 24 Months
Miscellaneous/Contingency $ 303,713 5.0%
Subtotal $ 2,156,826 $25.08 35.5%
Development Fee $ 433,215 5.0%
Total Development Cost $ 8,664,291 $100.75
Development Period NOI $ 1,161,601
Net Development Cost $ 7,502,690 $87.24
Capital Sources
Permanent Financing $ 5,470,348 63.1%
Equity $ 2,032,342 23.5%
Development Period NOI $ 1,161,601 13.4%

Total Development Cost

$ 8,664,291 $100.75 100.0%

61

FORT TRUMBULL

Building 2
Pro Forma — Commercial Development Feasibility MAJOR REHAB
Stabilizati
Year 0 Year 1 Year 2 Year 3 Comments
Development Costs $ (433,215) $ (6,498,218) $ (1,732,858)
5% 75% 20%
Development Period NOI $ 222034 $ 939,567
Net Development Cost $ (433,215) $ (6,276,184) $ (793,291) $ ra
Gross Potential Rent s 1,720,000 Level Rent for First 5 Years of Lease
Allowance for Vacancies | $ (172,000)
Effective Gross Rent 1,548,000
Operating Expenses s (623,500) Pass Through Increases Over Base Year
Capital Reserve $ (25,800)
Net Operating Income $ 898,700
Return on Development Cost 12.0%
Add Back Constr. Int. & Financing $ 443,500 $ 443,500
Net Sale Proceeds $ 7,424,043
Unleveraged Development Cash Flow $ (433,215) $ (5,832,684) $ (349,791) $ 8,322,743
Internal Kate of Return 12.0%
Leveraged Analysis
Pe Stabilizati
Year 0 Year 1 Year 2 Year 3
Initial Equity Investment $ (433,215) $ (66,785)
Cash Out (In) — Perm. Financing $ (1,532,342)
Net Operating Income - $ 898,700
Permanent Debt Service $ (562,165)
Debt Coverage Ratio 1.60
1. Flow after Debt Service $ 336,535
Return on Equity 16.6%
Net Sale Proceeds after Debt $ 2,012,296
Net Equity Cash Flows $ (433,215) $ (66,785) $ (152,342) $ 2,348,832
Equity IRR - 10.2%

Note: Short analysis period distorts IR%. IRR will increase with longer holding period because ROE > IRR.

FORT TRUMBULL
Building 2
Supporting Calculations

Stabilized Value Estimat
Stabilized NOI

Cap Rate
Value Estimate

Permanent Financing

Estimated Value for Financing

LTV Ratio
Permanent Loan
Interest Rate
Amortization
Annual Debt Service
Debt Coverage Ratio

Net Development Costs

Cash Flow from Financing
Initial Equity

Cash Out (In) from Financing

MAJOR REHAB
Amount Per S/F
$ 898,700 $ 10.45

11.5%

$ 7,814,783 $ 90.87

$ 7,814,783
70%

$ 5,470,348 $ 63.61
9.25%
25
$ 562,165
1.60

SREALIC UES
5,470,348
7,502,690

(2,032,342)
500,000

(1,532,342)

o9

FORT TRUMBALL
Building 2
Occupancy/Absorption Projections MAJOR REHAB
Rentable Year 1 - Month
Floor Tenant Square Lease
Feet Term 1 2 3 4
1 1 7,600 7
2 7,500 6
3 7,750 7°
2 4 22,750 10
3 5 4,500 6
6 4,500 6 :
7 4500 7
- 4,800 7
9 4,750 6
4 10 10,000 10
11 - 7
12 4,000 6
13 3,750 5
ies . : ‘ .
Occupancy Rate 00% 00% 00% 00%
Average Occupancy Year 1 33.3% 6 Months
Average Occupancy Year 2 78.9% 12 Months
Average Occupancy During Lease'Up 62.3% 18 Months
Development Period NOI
(Iegibie| Vows "2
Market Price $20.00 $20.00
Operating Expenses (Stabilized) $7.25 $7.25
Expense Percentage in Lease-Up 60% 80%
Operating Expense (Lease-Up) $4.36 $6.80
Net Market Price $15.05 $14.20
Net Market Price - Monthly $1.30 $1.18
Average S/F Occupied 26,378 66,167
Number Months of Occupancy 6 12
Development Period NOI $222,034 $838,587
Total Development Period NOI $1,141,801

Building
Opening
5 » 7
7,500
4,500
3,750
‘ ° 18,750
, : 15,750
00% 00% 183%
Per s/f
Per aff
Per s/f
Per s/f
Per aff

. 9 10 11 12
7,500
22,750
. - 22,750 - 7,500
15,750 16,750

4,500

4,500

4,750

12,500
38,500 38,500 46,000 50,500 50,500 50,500 63,000

18.3% 183% 440% 440% 836% s587q 58.7% 58.7% 73.3%

i

63,000 63,000 67,500 67,500 77,500 77,500 77,500
90.1% 90.1% 90.1% 100.0%

73.3% 73.3%

10,000

4,500 - 10,000

78.5% 78.5%

10

11

4,000
8,500
80,000

64

—

Conclusions of Financial and Market Study

Based on the market and feasibility analyses presented,
an opportunity exists to renovate the existing Building 2
at Fort Trumbull into Class A office space for the New
London market. While new office construction is not
feasible at this time, as evidenced by the inability of
Shaw’s Cove 7 & 8 and Mystic Executive Park to get off
the ground, the lower cost basis required to renovate
Building 2, coupled with relatively tight market conditions
for Class A space, create a feasible environment for rede-
veloping Building 2 at Fort Trumbull.

Except for the sublease space at Mariner Square, there is
currently only one option available for a tenant requiring
more than 5,000 square feet of Class A space. Brokers
report that a few tenants, Kendall Corp. for example, have
had to leave New London because sufficient Class A space
was not available recently to accommodate their growth.

At this time, however, market conditions do not justify
construction of new commercial space at Fort Trumbull on
a speculative basis. Financing will not be available unless
there is significant pre-leasing activity, on the order of 65%
to 70%, but tenants in the marketplace are generally
reluctant to commit to space 18 to 24 months out, as is
required for new construction. The Major Rehab scenario
for Building 2 illustrates the general feasibility parame-
ters for new multi-story office construction. As office rents
for new construction would not be expected to appreciably
exceed-the economic terms specified under this scenario,
the maximum development cost for feasibility would be
approximately $100 per rentable square foot, which is
below the estimated development cost range of $120 to
$150 per square foot for new construction.

65

Consideration should be given though to the possibility of
developing a small “flex” building capable of being built
out for office or biotech/bioscience space, and capable of
being expanded to accommodate future demand. This flex
building should be of good quality construction with an
attractive facade, and should have a floor height of at least
18 feet to 20 feet to accommodate the tenant improvement
requirements of potential biotech/bioscience users that
might demand space as a result of Pfizer’s Global Devel-
opment Facility. Flex space would appear to be marginally
feasible in the current market. With hard costs estimated
to be approximately $75 to $80 per square foot based on
brokers in the market, total development costs could
conceivably be kept around $100 per square foot.

Target Market For Commercial Space

For the existing Building 2, which will be redeveloped into
Class A office space, the target market will include the
following:

* Existing New London companies seeking to

* Exsting New London companies seeking to
expand that are unable to be accommodated
due to the limited amount of available Class
A space

* Newly recruited companies from outside the
region |

For the future commercial development space, the pr'mary
target market is expected to be newly recruited companies

idencing Pfizer-related demand, whether it is for general
office use or biotech/bioscience use. This demand will most
likely come from out-of-region companies that contract
with Pfizer and value proximity to Pfizer's Global Devel-
opment Facility.

Marketing Strategy
The key objectives of the marketing strategy are:

* To successfully position the commercial de-
velopment space in the market

° To fully lease Building 2 as quickly as possi-
ble

e To complete renovation and begin occupancy
of Building 2 the opening date of the hotel

® ‘To execute leases for Building 2 on terms
that meet or exceed pro forma

* ‘To further develop and refine the target mar-
ket for the future commercial development

67

infrastructure work for the whole Fort Trumbull develop-
ment, which is presently slated for August 2002. Hence,
assuming the current schedule is maintained, marketing
efforts should commence in April 2001.

In engaging a brokerage firm, approximately two months
should be budgeted to solicit proposals from targeted
brokerage firms, review the proposals, interview the firms,
and select the best firm or firms. Thus, the brokerage
firms identified herein (see Marketing Execution Plan)
should be contacted in early February 2001 to solicit
proposals for brokerage services.

Once a brokerage firm is selected, a more detailed market-

ing strategy should be developed and the firm should~

marketing materials, including conceptual schemes,
should be prepared for the future commercial development
space in the event that sufficient excess demand is gener-
ated that cannot be accommodated in Building 2, and/or
an end user is identified for a build-to-suit development.
This information should also be disseminated to the
various state and local resources identified herein (see
Marketing Execution Plan).

In addition to hiring a brokerage firm, consideration
should be given to establishing a web site for the entire
Fort Trumbull development. This would need to be coordi-
nated with the various marketing/brokerage firms for the
different development components, and could conceivably
be paid for by these firms as part of their assumed market-
ing and advertising responsibilities. For Building 2, a
virtual tour, renderings, images of water views from the
upper floors, and other marketing information could be
placed on the site, thus providing prospective tenants with

instant access to information to help them evaluate the
property.

Once construction has started for Building 2, an on-site
marketing center should be established as soon as possible
to allow prospective tenants the opportunity to see the
space as they might occupy it. The fourth floor would be
the ideal location in order to take advantage of the sweep-
ing views of the water.

Targeted leasing milestones for Building 2 would be as
follows:
° 50% pre-leased before commencement of
renovation

° 75% leased upon completion of renovation

* 100% leased 6 months after completion of

renovation

iti early in the marketing campaign, a draft
ae teas emmdiies should be prepared for future
tenants.
Depending upon the level of rehabilitation ultimately
selected by Corcoran Jennison Companies, the standard
tenant improvement package should generally not exceed
scenario. Several recent leases have been done with all
tenant improvements paid for by the tenant. However,
some leases have been done with improvement allowances
of up to approximately $17 per square foot. The amount of
tenant improvements provided is a negotiating point and
will depend upon market conditions at the time of lease
negotiation, if tenants require additional improvements
over the standard package, then the cost over and above
that amount should either be amortized over the lease

69

term (typically with credit tenants only), or paid for by the
tenant up front.

Marketing Execution Plan

Broker Selection

There are four local brokerage firms and one national
firm, CB Richard Ellis, which are active in the New
London market. There is another national firm, Cushman
& Wakefield, with a Hartford office that could potentially
service the New London market. In addition, a Boston-
based firm, Thompson Doyle Hennessey & Everest has
experience with both office and biotech/bioscience space —
they are currently marketing BioSquare, which is adjacent
to the Boston University Medical Center. These firms
should be contacted in January/February 2001 and asked
to submit Proposals to provide brokerage services for the
commercial space. A sample draft of a Request for Propos-
als (RFP) for brokerage services has been included in the
Addenda. The table below identifies these firms and the
appropriate contact information.

CONTACT PHONE #
1. U.S. Properties, Inc. Susan Howard 860-4370101
Three Shaw’s Cove, ~ Jim White
Suite 202
New London, CT 06320
2. New England Real Jim Bach 860-444-7800
Estate Group, Ltd. Steve Percy
12 Masonic Street Jane Walsh é
New London, CT 06320

3. Pequot Commercial John Jensen 860-447-9570
711 Broad Street Ext. Norm Peck
Waterford, CT 06385

70

4. Connecticut Commercial Robert Zabarsky 860-444-7704
Realty
229 Howard Street
New London, CT 06320

5. CB Richard Ellis
100 Pearl Street
Hartford, CT 06103

6. Cushman & Wakefield Thomas Collins 617-204-4100

Dan Barber 860-987-4781

25th Floor
Hartford, CT 06103-3599

7. Thompson Doyle
Hennessey & Everest
101 Federal Street
Boston, MA 02110

To be sensitive to community issues, it would be appropri-
ate to include all four local firms in the Broker RFP
process. The preliminary recommendation would be to
utilize a local brokerage firm to market Building 2, or a
joint venture, if possible, between a local firm and a
national or regional firm. The typical tenant anticipated to
occupy Building 2 would likely be a local company looking
to relocate or expand its offices.

The inclusion of ar national or regional firm may be
appropriate though as the Pfizer-induced demand antici-
pated for construction of the proposed 200,000 square feet
might include uses other than office - e.g., biotech or
bioscience — for which these firms have greater experience.
For broker incentive reasons, and because it might be
appropriate to begin initial marketing of the proposed
commercial space simultaneously with the Building 2, it
might be warranted to use one of the non-local firms solely
for the marketing of al] Fort Trumbull commercial space.

Cathy Thompson 617-330-6900

eS ea ee ae

71

It should be noted that U.S. Properties, Inc. is the agent
for most of the space in Shaw's Cove Business Park, and
while due consideration should be given to them, they may
have potential conflict of interest issues in representing
Corcoran Jennison Companies to lease the Fort Trumbull
commercial space.

State and Local Resources

There are several state and local resources that should be
made aware of and that could provide assistance in the
marketing of the Fort Trumbull commercial development
space. These resources are as follows:

Resource Contact Number

New London Office Ned Hammond 860-447-5203
of Development & Economic

Planning Development
Coordinator
Connecticut Kevin Crowley 860-270-8069
Department of Director, Business
Economic & Recruitment
Community
Development
SECTOR John Markowitz 860-701-6054
Connecticut Carolyn Kahn 860-563-5851
Innovations Managing Director, www.ctinnovations.
Bioscience com
Connecticut United Debra Pasquale 860-679-1550
for Research President www
Excellence (CURE) oe
Connecticut Susan Winkler 800-392-2122
Economic Resource www.cerc.com

Center (CERC)

72

In e? ‘ition, Pfizer's real estate representative should be
ma © .ware of the commercial development program in
case the company has a need, or in case a contractor doing
business with them might have a need for a local presence.

Project and Marketing Schedule

With respect to the renovation of Building 2. Corcoran
Jennison Companies’ goal is to complete construction and
have initial occupancy at the same time as the infrastruc-
ture and site work is completed for hotel and residential
space. The current Fort Trumbull development project
schedule calls for commencement of site and infrastruc-
ture work in August 2001, with completion scheduled for

August 2002.

Working back from this date, construction for Building 2
should commence no later than March 2002 to allow for an
estimated 6 months of rehab work. The broker marketing
and leasing campaign should start no later than April
2001 to allow for sufficient exposure in the marketplace to
execute leases for as much of the space as possible prior to
completion of construction. Initial requests for proposals
from brokerage firms should occur in late January or early

February 2001.

On the following page, a Project and Marketing Timeline
is presented which illustrates the key dates and mile-
stones for the Fort Trumbull development, as well as
Building 2 renovation.

73

Fort Trumbull Development
New London, CT
x

Pm lean) wan) am | ©) Me) nee |) ee ae Ta |

| ! Wares.

74

Marketing Budget

Brokerage fees will comprise the vast majority of the
marketing budget for the Fort Trumbull commercial
development space. Most marketing and advertising costs
are included in the brokerage fee and are the responsibil-
ity of the broker. Based on conversations with several
brokers in the market, brokerage fees have been estimated
at $5.00 per square foot of rentable office space, which is
equivalent to $430,000 based on an estimated 86,000
rentable square feet. The brokerage fee will vary depend-
ing upon the length of the lease that is executed for each
tenant. Typically, brokerage fees are paid 50% at lease
execution and 50% at tenant occupancy.

Conceivably, some miscellaneous marketing expenses
could be incurred that would not be paid for by the broker-
age firm. In addition, although it is not feasible to develop
the proposed additional 200,000 square feet of commercial
space at this time, it would be beneficial to develop some
preliminary marketing materials for circulation simulta-
neously with Building 2’s marketing campaign. Moreover,
a brokerage firm might not be willing to pay for marketing
materials for the future commercial development space at
this juncture.

A budget of $50,000 would seem reasonable to cover
miscellaneous expenses associated with Building 2 and the
other preliminary marketing materials. This would be
exclusive, however, of any cost associated with the devel-
opment of a Fort Trumbull web site, if that option is
pursued.

It is important to note the need for high quality marketing
materials and architectural services associated with
marketing. Image and identity are key components for a

75

successful marketing plan. Marketing materials should

include, but not be limited to:

* Abuilding photo and/or rendering

* An aerial photo after demolition of all im-
provements not being retained

* Asample floor plan for each floor

* Sample module layouts

Hopefully, preparation of some marketing materials can be
coordinated with the marketing of the hotel and residen-
tial portions of the Fort Trumbull development to possibly
enable efficiencies and cost savings.

DRAFT
CORCORAN JENNNISON COMPANIES REQUEST
FOR PROPOSALS
For

REAL ESTATE BROKERAGE / LEASING SERVICES
FORT TRUMBULL COMMERCIAL SPACE NEW
LONDON, CONNECTICUT
FEBRUARY 2001
Introduction

Corcoran Jennison Companies is seeking Proposals from
real estate brokerage companies to provide marketing and
leasing services for the commercial development space to
be included in its Fort Trumbull mixed-use development.
Corcoran Jennison Companies intends to select a broker-
age firm no later March 31, 2001 and to commence the

76

marketing of the commercial space as soon as possible
thereafter.

Corcoran Jennison Companies is a diversified real estate
company with five main operating companies — Develop-
ment, Property Management, Construction, Hospitality,
and Exposition Center Management Services. Since its
founding in 1971, Corcoran Jennison Companies has
successfully developed in excess of $1.8 Billion of real
estate, including apartments, hotels, nursing homes,
municipal facilities, exposition centers, schools, health
facilities, golf courses, restaurants, resort facilities, mari-
nas, and office centers. The company’s corporate offices are
located in Boston, Massachusetts.

Background

The New London Development Corporation (NLDC), in
association with the Connecticut Department of Economic
and Community Development (DECD), has = ey :
municipal planning project targeting an area adjacen
nn. ccettes, Maen es
the Fort Trumbull Municipal Development Plan (MDP),
the MDP area encompasses approximately 90 acres
immediately south of downtown New London and adjacent
to historic Fort Trumbull, which will be developed into a
state park. The principal catalyst for development in this
area is the construction of Pfizer Inc.’s 790,000-square-foot
Global Development Facility immediately south of the
MDP area.

The NLDC selected Corcoran Jennison Companies as the
developer of a 30-acre waterfront parcel adjacent to Fort
Trumbull. The majority of the parcel consists of the U.S.
Navy’s closed Naval Undersea Warfare Center (NUWC).

77

The balance is made up of a number of residential and
commercial properties between NUWC and the Amtrak

rail.

Fort Trumbull Project Description

Corcoran Jennison Companies has proposed a mixed-use
development, to include a four-star hotel, housing, and
commercial space, for the 30-acre parcel. The attached site
plan, labeled the Fort Trumbull Development Plan, depicts
the latest proposed development plan for the Fort Trum-
bull site. New roadways and infrastructure will be built to
support the development. Total development costs are
projected to be approximately $100 million.

The hotel will be situated on the northernmost section of
the site. The residential development will be located on the
southeastern portion of the site, adjacent to the existing
Coast Guard facility and north of Fort Trumbull. The
commercial development will be located on the southwest-
ern portion of the site; an existing !-alian Dramatic Club
located here will be kept and incorporated into the devel-
opment plan. Plans also include a paved, half-mile river-
walk, which will connect to the Fort Trumbull State Park,
and a village green that will be accessible to the public.

Commercial Development Program

At present, approximately 300,000 square feet of commer-
cial space is envisioned for the site. This will be comprised
Cen en of Suiiien austatet "
mately 91,000 gross square feet, identified as Building 2
by the U.S. Navy, and two proposed buildings of 100,000
square feet each. The MDP called for the inclusion of office

78

or bioscience-related commercial space. While the new
buildings could be developed for either use depending
upon market conditions, the existing Building 2 is best
utilized for office use given its current construction.

The commercial development program for the Fort Trum-
bull development will consist of at least two phases, and
possibly more depending upon the amount and type of
demand that is generated for the 200,000 square feet of
proposed commercial space. The first phase of commercial
development will involve the renovation and redevelop-
ment of the existing Navy Building 2 into a Class A office
building for the New Loadon market. Building 2 is a four-
story, steel frame, brick and glass structure completed in
1991 as sonar research and development space for the
Navy. It is in reasonably good condition and can be easily
renovated to Class A office space for the New London
market.

Because the building was constructed for single-tenant
occupancy, it will require renovation to accommodate
multi-tenant occupancy as appropriate for the New Lon-
don office market. A first-floor lobby will need to be added,
as well as common area on each floor depending upon the
space requirements of future tenants. Also, the entrance to
the building is currently on the east side and most likely
will need to be relocated to orient it to the street grid
planned for the Fort Trumbull development.

Building systems are being evaluated to determine their
appropriateness for reuse. It is known that a heating
system will need to be added because Building 2 was
previously heated by a system supporting several other
Navy buildings. In addition, analysis will need to be
completed to determine whether the existing elevator and

79

rest rooms are adequate for multi-tenant office use in the
current market, or whether additions are required. Park-
ing will be provided around the building, with excess
parking for the near future provided on the adjacent land
that will support the future commercial development.

Future phases will involve new construction of either
Class A office space or biotech/bioscience space, as demand
warrants. The present plan for the proposed commercial
space includes the development of two 100,000 square foot
buildings along Walbach Street, south of the existing
Building 2. The new buildings will be developed as market
conditions warrant.

Submittals

Interested parties should submit a Proposal to provide
marketing/leasing services for the commercial develop-
ment space at Fort Trumbull. Respondents should outline
their general approach to providing marketing/leasing
services and should demonstrate capacity and expertise to
develop and implement a marketing program that will
minimize lease-up periods, maximize rents, and enhance
project values.

In the Proposal, respondents are encouraged to propose
and/or provide recommendations relative to the proposed
commercial space at Fort Trumbull, both the existing
Building 2 and the planned 200,000 square feet, with
respect to:

Marketing Strategy

Project Identity

Marketing Timeline

Type and F of Advertisina/Marketi
Target Market for Tenants

* State and Local Resources for Attracting Ten-
ants

¢ Pricing — Rent, Lease Term, Tenant Improve-
ments

¢ Credit Quality of Tenants
* Specifications for Tenant Improvements
Projected Absorption/Occupancy Milestones
In addition, respondents should provide:
¢ A company overview/business history (de-

tively involved in the project, including iden-
tification of relevant professional licenses
* References and contact information (at least
two for each key personnel)
* Sample marketing materials, including bro-
chures, advertisements, etc. ;
* Asample lease proposal for a prospective ten-
ant :
e Examples of comparable firm experience as
owner's agent for commercial space
Respondents are also encouraged to provide information
on current market conditions for commercial space in the
New London market area, including an overview of supply
and demand trends, comparable lease and sale informa-
tion, competitive projects planned and/or under construc-
tion, etc.

proposed
Respondents should include in their submittals a

fee structure for the services to be provided. Respondents
should be specific as to what marketing materials and

81

advertising expenses are included as part of the services
provided.

Insurance

Respondents should include in their Proposal a brief
description of the firm’s general liability insurance cover-
age, including limits and deductibles.

Selection Schedule
Request for Proposals available February 1, 2001

Pre-submission Meetings & Tours ween February 5 -
(To be scheduled individually) 6, 2001

Proposals Due ebruary 28, 2001
5:00 p.m.)
Corcoran Jennison Companies een March 1 — 15,
Review/Inquiry 1
Selection of Brokerage Company o later than March
1, 2001
Commencement of Marketing/ April 1, 2001
Leasing Campaign _ i
Evaluation Criteria

Corcoran Jennison Companies shall consider the following
criteria in evaluating Proposals (not listed in any specific
order of importance):

Responsiveness to Request for Proposals
Company/Broker Experience

~ Time and Place of Submission

Respondents must submit five (5) copies of their Proposal
to Corcoran Jennison Companies. Proposals must be
received by 5:00 p.m. on Wednesday, February 28, 2001.
Proposals should be addressed to:

Marty Jones

President
Corcoran Jennison Companies
Bayside Office Center

150 Mount Vernon Street
Boston, MA 02125

Corcoran Jennison Companies reserves the right to modify
or withdraw this Request for Proposals at any time and to
reject any and all Proposals.

83

DEFENDANTS’ EXHIBIT 38

FORT TRUMBULL
MUNICIPAL DEVELOPMENT PLAN
New London, Connecticut

August 1999
Revised Administrative Draft

Prepared on behalf of:
The City of New London
by:
New London Development Corporation
New London, Connecticut

Sponsoring Agency:
State of Connecticut
Department of Economic and Community Development

Implementing Agency:
New London Development Corporation
New London, Connecticut

Administrative Contributors:

The Downes Group — Program Management
Milone & MacBroom, Inc. — Plan Coordination

Technical Contributors:

Diversified Technology Consultants, Inc. -
Civil Engineering

Harrall-Michalowski Associates, Inc. -
Neighborhood Relocation and Land Use Planning

HRP Associates, Inc. - Hazardous Waste and
Contamination Assessment

Milone & MacBroom, Inc. - Environmental Impact
Evaluation

RKG Associates, Inc. - Economic Analysis

Wallace Roberts and Todd — Land Use Planning

1.0
1.1
1.2
1.3

2.0
2.1
2.2
2.3

3.0
3.1
3.2
3.3

3.3.1
3.3.2
3.3.3
3.3.4
3.3.5
3.4

3.5

3.5.1
3.5.2

84
TABLE OF CONTENTS

ENITRODUCTION ..ccccccsccsscssscccccccsscesssscscssccssrscesores 1-1
MDP Proceee .......ccccccessseescscsssevessssssssesesssesesseseneoees 1-1
Project Background .............:c:ssseeeeerereerernerennenes 1-2
Summary of Major EIE Issues .............:::00ee 1-8
RTT occcxececsenrsecssnessecscncetessosensenssconecssoansconscesson 2-1
Topography .........ccscesseseesssersensensensrereensersanenennennes 2-1
Legal Description of Project Boundary ................. 2-1
Description of Interior Parcels .............:.0:0:000+ 2-5
EXISTING SITE CONDITIONS ............:cccceeeee 3-1
Existing Land Uses ............:.::sssssseseereennrennenenrennens 3-1
Existing ZOming..........::cscssesseseeeeesennesecenseersneernenees 3-2
Existing Public Utilities, Services, and

Roadway Network...........::::sssseseeeeeneneesnnnnsnnnenes 3-4
WIP necccccecccvcccccocccccccccccscecccscccscocsosnooscesosenssssseosones 3-4
Sanitary Sewer .........::cccccssessesesesesseeenensnensesnensneenens 3-5
Baaren BOWES 000000cccccececcosersssevccccsccsssescsssssevcsscsscoseees 3-8
Gas, Electric, Telephone, and Cable ................+ 3-11
Streets and Sidewalks ............::cccceeseeeeeeereneeeenes 3-12
Test Borings and Soil Analysis ..............000:00:00++ 3-16
Environmental Conditions ..............:ccceereeeee 3-17
Environmental Evaluation................:0000eeeree 3-17

Environmental Impact Evaluation (under
SEPATALE COVET).......0-..csceseeserserneesererereneteneneneenenens 3-24

4.0

5.0

5.1
5.2
5.2.1
5.2.2

5.2.3

5.3
5.3.1
5.3.2
5.3.3
5.4

5.4.1
5.4.2
5.4.3
5.4.4
5.4.5
5.4.6
5.4.7
5.4.8

5.5

85

MARKETABILITY STUDY..............cccccsceseeseseeseeee 4-1
PROPOSED IMPROVEMENTS..............ccccccc0c0000. 5-1
EE eT TS 5-1
OI ih anttacenleacticnaittceeerte 5-4
Proposed Zoning Designation Changes................. 5-4
Applicability of Proposed Zoning Amend-

BB ccecsccsssanncscesesseceensensssnnscsnassesssnccsnsssessnstecsnstanes 5-6
Proposed Zoning Amendments for the MDP

__—_ ESE nem IOS NESE EN SIU oT 5-6
Proposed Land Use Controls ...............cccccccccec0e0es 5-23
Overall Framework for Development.................. 5-23
Design Control Mechanisms and Processes ....... 5-24
IS Sa 5-25
Proposed Public Utilities, Services, and
Roadway Improvements ...................ccceeceeeeeeeeees 5-34
STITT Asonisisnnieebieichideseseuenenetninninstadinbianmnibieebiedanteeninadeiti 5-34
IIIT iaccnneiensetneniidnethiiiehtabatdeeisibiatiameataieal 5-37
EE a a eT ETP 5-39
Gas, Electric, Telephone, and Cable.................... 5-45
Streets and Sidewalks ................:ccccccsssceccsseesseeees 5-46
Sareea TnTUIIE iieiielinericteiabadeniaienaiihidadetapehiteameniatcceinaietiedl 5-57
nS 5-58
Estimated Cost of Site/Infrastructure Im-
TIED ccnsncenscscessescenensssusnsennsmnistiensummnsscensensnts 5-58
ES See RT 5-60

6.0
6.1
6.2
6.3

7.0
7.1
7.2
7.3
7.4

8.0

9.0

10.0
10.1
10.2

11.0

12.0

13.0

13.1
13.2

86
ACQUISITION/DISPOSITION OF PARCELS ......6-1
Description of Parcels to be Acquired...............+++». 6-1
Description of Parcelization for Disposal ............. 6-4
Description of Appraisals and Title Searches
Comdneted ....0cccccccscscscsscscesessescesssccssccsscesssonssooseseooes 6-6
RELOCATION PLAN .......::scssssvsssssserreeeresseeresesees 7-1
Families and Individualls...............:::eeeeeeeeeees 7-1
Businesses and Non-profit Agencies .................-++ 7-2
Availability of Relocation Housing ..................0+ 7-2
Availability of Relocation Facilities...................+ 7-3
FINANCING PLAN SUMMARY.............:::c:0ee00e 8-1
ADMINISTRATIVE PLAN SUMMARY................ 9-1
JOBS AND HOUSING. ..........::cccceceeeeeeeeeeeneeneenenes 10-1
Jobs Anticipated to be Created.............:00:0s0+ 10-1

Housing Units Available................0:00cseseseereenen 10-1
PEDOIIEDOG .....0cccccccccccccccccecesecsesevescssosssssssssorsosnsees 11-1
PROJECT PLAN PROVISIONS TO RE-

MAIN IN EFFECT. ..........:c0cccscserseessreseerensereesnens 12-1
MINORITY PARTICIPATION .............:0c0e0eeeeeees 13-1
Minority Participation Statement ..................+ 13-1

Commitment, Performance Standard, and
Government Requirements. ............:::cseeeeeeeees 13-1

87
13.3 Area of Minority Participation ..................ccc00000. 13-2
SET” PIII ioeniiiintaniiadlianstnintssiiaciceci 13-8
re RI iccictinericnibiiiec ia 13-8
LIST OF TABLES

Table 3-1 Requirements by Zoning Classification

Table 3-2 Sanitary Sewer Mains for the Fort Trumbull
MDP Area

Table 3-3 Existing Street Conditions
Table 3-4 Summary of Test Boring Results
Table 3-5 Recommended Phase II ESA
Table 3-6 Potential CTA Regulated Sites

Table 5-1 Smith Street Option 2 - Proposed Pressure for
Maintaining 3,000 gpm Fire Flow

Table 5-2 East Street and Trumbull Street Intersection —
Proposed Pressure for Maintaining 3,000 gpm
Fire Flow

Table 5-3 Summary of Proposed Street Characteristics
Table 5-4 Probable Costs for Infrastructure and Special

Construction

Table 6-1 NLDC Owned Properties (May 1999)

Table 7-1 Households to be Displaced
Table 7-2 Non-Residential Displacement

Table 10-1 Summary of Jobs Anticipated to be Created

88

LIST OF 8 1/2 x 11 FIGURES
Figure 1 Location Map - City of New London

Figure 2 Fort Trumbull MDP Area
Figure 3 Composite Land Use Plan
Figure 4 Evacuation Route Map
Figure 5 Existing Flood Plain Areas
Figure 6 Proposed Flood Plain Areas
Figure 7 Pedestrian Route Map

LIST OF APPENDICES
Appendix A Relevant Correspondence and CEPA Record

of Decision
Appendix B_ Soil Boring Logs
Appendix C Marketability Study
Appendix D List of Properties to be Acquired
Appendix E_ Relocation Plan
Appendix F New London City Council Resolutions

ndixG Executive Summary — Request for Flood
— Management Certification Exemption

LIST OF APPENDED MAPS
Map 2.1 Topographic Map
Map 2.2 Project Boundary Map (Maps 2.2.1 through 2.2.4)
Map 3.1 Existing Land Use Map
Map 3.2 Existing Zoning Map
Map 3.3 Existing & Proposed Water System
Map 3.4 Existing & Proposed Sanitary Sewer System

89

Map 3.5 Existing & Proposed Storm System

Map 3.6 Existing and Proposed Gas System

Map 3.7 Existing & Proposed Electric and Telephone
Map 3.8 Proposed Streets

Map 3.9 Test Boring Locations

Map 5.1 Proposed Land Uses

Map 5.2 Proposed Zoning Map

Map 6.1 Acquisition Map

Map 6.2 Disposition Map

10 INTRODUCTION
1.1 MDP Process

The New London Development Corporation (NLDC),
in association with the Connecticut Department of
Economic and Community Development (DECD), is
undertaking a municipal development planning proj-
ect adjacent to the Thames River in New London,
Connecticut. NLDC is a nonprofit, private economic
development organization originally formed in 1978.
The corporation was established with the authority to
raise and borrow funds, manage projects, acquire and
sell properties, and engage in any activity related to
the progress and general welfare of the community.

This Municipal Development Plan (MDP) has been
prepared under Chapters 130, 132, and/or 588(1) of
the Connecticut General Statutes. The New London
City Council gave authority to NLDC to prepare the
MDP for the Fort Trumbull area in a resolution
passed in May of 1998. The resolution also estab-
lished the boundaries of the planning area.

Prior to initiating the municipal development plan-
ning process, an Environmental Assessment (BA) and

90

an Environmental Impact Evaluation (EIE) were
completed in accordance with the Connecticut Envi-
ronmental Policy Act (CEPA), established in Sections
22a-1 through 22a-lh of the Connecticut General
Statutes and Sections 22a-1 through 22a-1a-12 of the
Regulations of Connecticut State Agencies.

In June of 1998, the Connecticut Department of Eco-
nomic and Community Development issued an Envi-
ronmental Assessment for the Fort Trumbull MDP
area which concluded that the project could poten-
tially have a significant effect on the environment.
Several major areas of concern were identified in the
EA, including the possible acquisition of residential
properties and relocation of residents, adequacy of the
existing water supply; congestion and traffic safety is-
sues; historic importance and archaeological signifi-
cance of the project area; flooding, and stormwater
t. As a result of DECD’s finding, an Envi-
ronmental Impact Evaluation was undertaken.

The EIE process began in late June 1998. Numerous
consultations were engaged to assist in specific phases
of the work. Preliminary findings were discussed at
numerous neighborhood meetings. Input and review
comments were solicited from the community and in-
terested public on the Draft EIE. Input was also solic-
ited from local, state and federal agencies.

Following completion of a 45 day public comment pe-
riod of the Draft EIE, the Connecticut Department of
Economic and Community Development forwarded to
the Office of Policy and Management the Final EIE
and Record of Decision (dated March 1999), consisting
of all public notice documentation, comments received
from all interested parties, the agency decision rela-
tive to proceeding with the proposed action, and a dis-
cussion of the intentions for initiation of actions for

1.2

91

minimizing impacts, for determination of the ade-
quacy of the evaluation.

The CEPA process concluded with the review of the
Final EIE and Record of Decision by OPM and their
April 20, 1999 determination that regulatory re-
quirements were satisfied, with several conditions.
Appendix A contains a copy of selected relevant corre-
spondence and documentation from the Record of De-
cision and the April 20, 1999 OPM approval letter.

The Final EIE and Record of Decision is the basis for
the implementation of the project. The subject Mu-
nicipal Development Plan has been developed to be
consistent with the findings of the CEPA process.

A mandatory public hearing will be held prior to local
adoption of the MDP by the City of New London. Pro-
cedures for the adoption of the MDP are set forth in
Section 32-224(c) of the Connecticut General Statutes.
This process must include a finding by the OPM that
the plan is not inimical to the overall goals and objec-
tives of the state. Upon obtaining such a finding, the
plan would then be legally adopted by the city and
approved by DECD.

Project Background

The City of New London is a waterfront community
along the tidal estuary of the Thames River and Long
Island Sound in southeastern Connecticut. Figure 1 is
a location map of the City of New London. New London
is only 5.79 square miles in size, making it geographi-
cally the second smallest municipality in the State of
Connecticut. Nearly 54% of the total land area of New
London is exempt from local property taxes.

The Fort Trumbull MDP area is approximately 90
acres in size and includes residential and commercial
areas comprised of approximately 115 parcels. The

area includes the 32-acre U.S. Navy's closed
Naval Undersea Warfare Center (NUWC), the regional
Water Pollution Control Facility (WPCF), and the ad-
jaeent Fort Trumbull area as shown in Figure 2.

The driving force behind this project is the City of
New London's desire to revitalize its economy by fo-

proposed Pfizer, Inc. Global Development Facility
a te teated tmenattany to Gan eth of Go SP
boundary. In an effort to induce private investment
into the Fort Trumbull area, considerable funding has
been committed to this redevelopment project by vari-
ous offices of the State of Connecticut and the City of
New London.

In order to the redevelopment of the Fort Trum-
se rege ny sty Fee in ae tind me
after numerous public meetings and consultation with

Federal, State, regional and local organizations, identi-

fied four major goals for the redevelopment of the site.

These goals are presented below:

e To create a world-class development that will
complement the undertakings of Pfizer, Inc. and
set a standard for development in New London;

e ‘To create an economic asset for the City of New
London that will create jobs, generate tax reve-
ue, and result in spin-off economic activity,

e To maximize public access to the waterfront and,
in doing so, encourage uses which are water de-
pendent or which will be enhanced by water ac-
cess and views; and

e To develop a project which will help build momen-
tum for the revitalization of downtown New Lon-
don and the balance of the city to the benefit of
the City’s residents and visitors

— Ge — City of New London
—_I

Figure 1
Location Map - City of New London
Fort Trumbull MDP Area - New London, Connecticut 4

Draft Environmental Impact Evaluation - November 1998 ——

‘ort Trumbull MDP Area - New London, Connecticut

Figure 2

95

The Environmental Impact Evaluation evaluated
six land use alternatives with an array of land uses.
While there is some overlap and common elements
in the six land use alternatives, each has a distinct
theme as noted below:

Alternative No. 1 — No Action

Alternative No. 2 — Recreation/Tourism
Alternative No. 3 — Residential/Commercial
Alternative No. 4 — Business Campus
Alternative No. 5 — Mixed Use 1
Alternative No. 6 — Mixed Use 2

The analysis contained in the Draft EIE evaluated
the impact of the various components associated with
the six land use plans. It was recognized that the ul-
timate preferred land use plan could borrow land use
components from any or all of the plans. As stated in
the Draft EIE: “The alternative plans represent gen-
eral land use areas and density of development. They
are not intended to be exact geographic limits or con-
figurations. A preferred alternative has not been se-
lected and it is anticipated that the ultimate selected
preferred plan may be a hybrid of several alterna-
tives.”

Following the 45 day review and comment period of
the Draft Environmental Impact Evaluation for the
Fort Trumbull MDP area, review of public and state
agency comments, and consideration of the adminis-
trative record, technical data and other relevant in-
formation, the Record of Decision was developed and
a preferred composite land use plan was selected as
presented in Figure 3. The four goals identified for
this project which highlight economic development
through the creation of jobs, tax revenues, and spin-off

1.3

96

economic activity, played a major role in the ultimate
selection of the preferred composite land use plan. A
conditional approval was subsequently issued on
April 20, 1999 by the Office of Policy and Manage-
ment (See Appendix A).

Balancing the competing needs and impacts of this
project led to the ultimate selection of a modified
mixed use alternative. A compromise of economic de-
velopment with environmental impacts resulted in an
alternative which takes advantage of the economic
potential of business development, coupled with the
positive aspects of a mixed use community develop-
ment. The result is a positive outcome with fewer
negative impacts.

* * *

Summary of Major EIE Issues

The following discussion briefly summarizes the ma-
jor issues raised during the Draft EIE review process.

Regional W. Pollution C | Facili | the Ac-
tive Amtrak Rail Line - The western Fort Area sup-
ports a sewage treatment plant and the active
Amtrak railroad. The adjacency of these land uses to
the planned land uses in the MDP area posed a chal-
lenge with respect to compatibility and aesthetic is-
sues. Placement of less sensitive land uses in
combination with planned improvements to the
WPCF have been incorporated into the MDP to lessen
the impacts of these utilities.

Proposed Fort Trumbull State Park - A 16-acre State
Park will be located at the inactive NUWC site along
the Thames River. The MDP has been prepared in an
effort to complement and be compatible with the pro-
posed park.

97

Traffic - The MDP and other planned projects in the
vicinity of the Fort Trumbull area will result in addi-
tional traffic. Mitigation measures have been pro-
posed to offset these impacts.

Cultural Resources - Several studies have revealed
that areas of low, medium, and high archaeological
sensitivity exist within the MDP area, both within
and outside of the NUWC site. An overview of the
recommendations of the Connecticut Historical Com-
mission and related studies can be found in the Final
Environmental Impact Evaluation and associated Re-
cord of Decision dated March 1999 (EIE/ROD), in sec-
tion 2.7.3, entitled “Cultural Resources in the MDP
Area.”

All necessary mitigation will be reviewed by the Con-
necticut Historical Commission and State Historic
Preservation Office, and performed to their standards
in areas that will be disturbed due to the implemen-
tation of the MDP.

Studies to date include “Cultural Resources Survey:
Naval Undersea Warfare Center,” prepared by TAMS
Consultants, Inc. for the Northern Division Naval Fa-
cilities Engineering Command Department of the
Navy, April, 1998 and “Archaeological Assessment
Survey: The Fort Trumbull MDP Area,” prepared by

Associates, LLC, September, 1998 for NLDC.
The results of these surveys have been reviewed, and
the proposed course of action incorporates their rec-
ommendations. Both of these surveys are cited in the
composite land use plan recommended in February
1999 “Selection of and Rationale for the Preferred Al-
ternative — Fort Trumbull MDP Area,” which noted
areas of low, medium, and high archaeological and
cultural sensitivity. Certain areas within the MDP
will require mitigation work to be completed before
these areas are disturbed. This work has already been

98

initiated with the concurrence of the Connecticut His-

torical Commission and State Historic Preservation
Office.

Floodplain Issues - As shown in Figure 5, much of the
Fort Trumbull MDP area is located in the flood haz-
ard zone. An exemption from current DEP floodplain
policy is required in order to pursue the proposed de-
velopment within a portion of the MDP area that is
currently classified as floodplain. The MDP plan in-
volves the addition of fill to elevate portions of devel-
opment areas in Parcels 1 and 2 that are currently
classified as floodplain, and raise the land in those
areas above the 100-year flood plain.

A Floodplain Management Certification exemption is
being requested through the Department of Environ-
mental Protection concurrent with the MDP approval
process. A copy of the exemption package is included
under separate cover to the MDP (see Appendix G for
the Executive Summary). The exemption is merited

due to the following unique existing conditions at the
site:

* Existing flood plain elevations in the hotel and
residential development sites are high, within one
to three feet of the predicted 100-year flood eleva-
tion. A relatively small amount of fill is required to
remove these hotel and residential development
sites from the flood plain. The hotel site will re-
quire approximately 1,700 cubic yards of fill, and
the residential site will require approximately
7,700 cubic yards of fill. The cost of fill to raise site
to the 100-year base flood elevation of 10.0 feet
NGVD will be borne by the private developer. Fig-
ure 6 shows the future proposed floodplain.

° Floodplain area is attached to large area of higher
ground. Therefore the proposed grade changes will
not create “islands” during flooding events.

99

The floodplain area in its current state is com-
pletely eal with asphalt and buildings which
must be demolished. It is likely that site and soil
remediation alone will increase elevations on por-
tions of the property, placing them above the 100-
year floodplain.

The completed project will reduce the impervious
coverage of the site to approximately one-half of
the current coverage.

The NUWC site, which comprises a large portion
of the waterfront land in the MDP area, is a for-
mer military base. The existing buildings are not
flood proofed and it is economically infeasible to
upgrade them to FEMA standards for re-use.

j i iable
The project goal is to promote economically via
development that restores this land to the tax
base of the City of New London.

The proposed project has no impact on flood stor-
age a enna issues because this area of the
Thames River is tidally influenced and not subject
to riverine flooding.

A flood evacuation route will be provided on
streets that are at elevation 7.1 feet NGVD or
higher, as shown in Figure 4. This meets the
FEMA flood level standard for a 10-year storm,
and is 0.7 feet higher than the U.S. Army Corps of
Engineers 10-year flood level of 6.4 feet NGVD.

ing the 100-year design storm, the evacuation
oy be ra ee to vehicles for only one
hour and 35 minutes, and will be impassable to
emergency vehicles for only 50 minutes out of the
12 hour cycle.
Proposed hotel and residential development will
comply with the provisions of the National Flood
Insurance Program. Finished grades in those

100

development sites will be at or above 10.0 feet
NGVD. The lowest floor of residential structures
(including the hotel) will be built at or above 13.4
feet; one foot higher than the 500-year flood level
of 12.4 feet NGVD (see Figure 4).

Revisions to FEMA flood maps will be completed prior to
the occupancy of any structures within the parcel areas.

Emergency Evacuation - An evacuation plan outline
has been created, and is included in Section 5.5. Also
refer to Figure 4.

| ~ The proposed
development of the Fort Trumbull peninsula is in-
tended and committed to providing maximum water
access and water dependent uses. The project plan in-
cludes a network of public access walkways along the
entire waterfront. For boating and water access, the
plan includes an improved and enhanced Fort Trum-
bull marina on Bentley Creek, which will be incorpo-
rated into a future marina training center, as well as
a site for a future marina (including piers for larger
vessels) along the Columbia Cove waterfront. Addi-
tionally, Parcel 6 includes a waterfront development
site on Shaw’s Cove, shorefront that is currently oc-
cupied by a non-water dependent use.

An additional marina site, which will be set aside for
mixed use (including commercial fishing vessels), is
intended for the waterfront portion of Parcel 1 be-
tween the Columbia Cove Marina and the Shaws
Cove Railroad bridge.

Commercial fishing and lobstering vessels are cur-
rently homeported in the MDP area. Some of these
vessels will be accommodated at Fort Trumbull Ma-
rina. Should any other of the fishing related busi-
nesses currently operating in the MDP area need to
relocate outside of the MDP area, the Relocation Plan
(included herein as Appendix E) anticipates providing

101

financial and other relocation assistance in accor-
dance with Chapter 135 of the Connecticut General
Statutes. This information is highlighted in section
7.4, entitled “Availability of Relocation Facilities.

The MDP is committed to no overall diminishment of
water dependent uses. This includes no displacement
of water dependent uses without relocation support as
indicated above, involving either integration with the
development program or finding of an alternative
suitable site.

Conclusions

The areawide Phase I environmental site assessment
has been completed for the MDP area. Based on con-
ditions encountered, it is believed that environmental
contamination of soils and groundwater exists within
the project area. The likely contaminant/waste types
expected to be encountered during the investigation
and remediation of the properties within the MDP
area generally include:

* Petroleum ucts (gasoline, heating oil, waste
oils, wed oils) associated with a gasoline
station, several auto and marine repair facilities,
several currei.* and former underground oil tanks
and a former wi terminal.

* Commercial/industrial solvents in a7
cleaning, autobody and painting) associated wi
auto and marine repair facilities, former dry
cleaning operations, wood furniture refinishers
and autobody/painting operations.

* Metal-containing wastes associated with former
foundry operations and a junkyard

* Polychlorinated Biphenyls (PCBs) associated with
a former junkyard, a railroad maintenance facility
and a former barrel storage facility.

102

Further inv «ry ations will be required to confirm and de-

fine suspected contamination sources, possibly including:

¢ soil gas analysis to screen for areas of contamina-
tion in soils and groundwater;

* a ground penetrating radar survey (GPR) on cer-
tain sites where unidentified USTs are suspected;

* collection of surface soil or waste samples to de-
termine if surficial soils are contaminated from
operations spillage or disposal;

* installation of borings and sampling of subsurface
soils to determine if USTs have leaked and to de-
termine sources and extent of groundwater con-

* sampling of waste and debris piles, abandoned

¢ asbestos surveys;

° survey buildings for lead paint using x-ray fluo-
rescence; and
* sampling of stained or potentially contaminated
building surfaces.
Phase II Environmental Site Assessments will be
performed at the 15 locations in the project area
indicated in Table 3-5. These 15 specific areas include
multiple land parcels where the current or former use
of the property spans two or more defined municipal
tax lot designations. Also, although included in the
MDP area Phase I review, the following properties are
currently being addressed under different state or
federal programs in terms of environmental investi-
gation and remediation: The former Naval Undersea
Warfare Center (NUWC) and the two parcels adjacent
to the south half of the Calamari Brothers
Yard.

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---