# Suggestion of Mootness — Friends of Earth v. Laidlaw Environmental Services

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40385014_0244%3A11

## Record

- **Collection:** Supreme Court brief
- **Document type:** Suggestion of Mootness
- **Published:** January 1, 2000
- **Citation:** 528 U.S. 167

## Text

Supreme Court, U.S,

F it. E D

JUN 9 1999

IN THE

Supreme Court of the United States

FRIENDS OF THE EARTH, ef al.,
Petitioners,
Vv.

LAIDLAW ENVIRONMENTAL SERVICES (TOC), INC.,
Respondent.

On Writ of Certiorari to the
United States Court of Appeals
for the Fourth Circuit

SUGGESTION OF MOOTNESS

DONALD A. COCKRILL *

Nancy W. MONTS

OGLETREE, DEAKINS, NASH,
SMOAK & STEWART, P.C.

The Ogletree Building

300 North Main Street

P.O. Box 2757

Greenville, SC 29602

(864) 271-1300

Counsel for Respondent
Dated: June 9, 1999 * Counsel of Record

a RT ETD
WILSON - Erpzs PRINTING Co., INC. - 789-0096 - WASHINGTON, D.C. 20001

pat

TABLE OF CONTENTS

Page

LF ii

EERE STN A oe 2

a A, ee 3
Permanent Closure of the Facility Has Mooted

REE as SSR GS A a ’ 3

ERT JE EE coe ee RR — 7

mar

ii

TABLE OF AUTHORITIES
CASES Page

Friends of the Earth, Inc. v. Laidlaw Environ-
mental Services (TOC), Inc., 956 F. Supp. 588
CD.B.C. BBDDD ....ccecccccsccrecsesescesusensssiuneneee 2

Friends of the Earth, Inc. v. Laidlaw Seobaunne
tal Services (TOC), Inc., 149 F.3d 303 (4th Cir.

1998) .. vecceosueveesusessosvesecceasseanennnnnnn 3

Gwaltney ot ‘Smithfield, “Ltd. v Chesapeake Bay

Foundation, Inc., 484 U.S. 49 (1987)... 3
Los Angeles v. Lyons, 461 U.S. 95 (1983) ..... 4
Lujan v. Defenders of Wildlife, 504 U.S. 555
REE s. PE 4
O'Shea v. — ton, 414 U.S _ 488 (1974) . A
Steel Co. v. Citizens for a Better Environment,
523 U.S “'s ) Fe 2,3
U.S. Vancorp. v. Bonner Mall Partnership, 573
UB. 2B CIGDED onccccciccccocccecccncesessncnsnunenneaeeeean 7
United States v. W. T. Grant Co., 345 U.S. 629
| | setacoessesenslniaanl 3
STATUTES
33 U.S.C. § 1865 (a) ; usc oes 2
33 U.S.C. § 1865 (b) ...... ssdgaiaauiinia ae 2
UNITED STATES CONSTITUTION
Article III of the United States Constitution ___... 3
RULES AND REGULATIONS
oy 5 ae asia ioc 1
OTHER AUTHORITY
Affidavit of Roebuck Environmental Manager
Chariese G. BECE BOG ....0

to this submission). By June 2, 1997—when Laidlaw
and DHEC executed a Consent Agreement—the final de-
cision had been made. These facts make it patently clear
that the closure decision was not a ruse to avoid this
Court's review of the Fourth Circuit’s July 16, 1998
decision.

CONCLUSION

This case became moot prior to the grant of the Peti-
tion for Writ of Certiorari and, accordingly, the Writ
should be dismissed, and the Fourth Circuit decision al-
lowed to stand, because the Court had “no constitutional
power to decide the merits” when it acted on the petition.
U.S. Vancorp v. Bonner Mall Partnership, 513 U.S. 18,
27 (1994). The Respondent further requests that this
Court suspend the remainder of the briefing schedule in
this case pending its disposition of this Suggestion of
Mootness.

Respectfully submitted,

DONALD A. COCKRILL *

NANCY W. MONTS

OGLETREE, DEAKINS, NASH,
SMOAK & STEWarT, P.C.

The Ogletree Building

300 North Main Street

P.O. Box 2757

Greenville, SC 29602

(864) 271-1300

Counsel for Respondent

Dated: June 9, 1999 * Counsel of Record

APPENDICES

la
APPENDIX A
Spartanburg Herald Journal—1-28-97
LAIDLAW MULLING OPTIONS

Incinerator talking closure with DHEC

By GARY HENDERSON
Staff Writer

A Laidlaw Environmental Services official said Monday
the company is considering shutting down its Roebuck
incinerator because the facility is producing “poor finan-
cial results.”

Henry Taylor, vice president of legal and regulatory
affairs, said the plan to close the incinerator could be
worked out with state officials by February.

But it will be much longer before the incinerator ac-
tually stops operating.

“It might take a year, but certainly less than two
years,” Taylor said.

The decision about the possible shutdown of the in-
cinerator came during negotiations with §.C. Department
of Health and Environmental Control over Laidlaw’s
operating permit, Taylor said.

Laidlaw is currently permitted to burn 4.5 tons of haz-
ardous waste per hour year around. During the permit
process, samples of gases being emitted from a trial burn
of the incinerator must be submitted to the state’s health
authorities.

“There was a dispute about the capacity we could
burn,” Taylor said. “They wanted to go down to 3.7 tons,
and they didn’t think we provided quality samples. We
felt we did.”

2a

Taylor said Laidlaw officials then decided to approach
DHEC about closing the incinerator.

“I think they were happy to see us come with the idea,”
Taylor said, “but they were shocked.”

Taylor said it is difficult to make a profit at the Roe-
buck facility because there are so many incinerators oper-
ating in the United States. He said kilns used for making
cement now burn hazardous materials as fuel, reducing
the demand for incinerators even further.

“It is highly competitive,” Taylor said. “There is a
real over-capacity—more incinerators than there is ma-
terial to burn.”

Taylor said if the incinerator closes, Laidlaw would
still use the Roebuck site as a transfer and holding facility.

“This would become a collection point for small quan-
tities that would be combined and shipped to another in-
cinerator site,” Taylor said.

Dever Melton, a Roebuck resident who has worked
with other community activists to get the Laidlaw incin-
erator shut down, said he wants the entire facility closed.

“We will not be satisfied until there are no more toxic
chemicals brought to Roebuck,” Melton said, “We will
not be satisfied until they stop hauling the stuff down the
road or bringing it in on the rail cars.”

Taylor said that if the incinerator is shut down, the
facility’s work force of 48 employees would probably be
reduced.

“We don’t have a feel for that yet,” Taylor said, “We
will need some different skills from the ones we have now,
but the people working there will have an opportunity to
continue working with Laidlaw.”

Hazardous wastes are shipped to the Spartanburg County
facility from more than 40 states. Laidlaw, a Canadian-

3a

based company, operates collection and transfer sites in
11 states and in Canada.

A merger between Laidlaw and Rollins Environmental
was announced earlier this month, which would give the
merged company 120 facilities. Rollins Environmental is
a New Jersey-based hazardous waste management com-
pany.

‘We will not be satisfied until there are no more
toxic chemicals brought to Roebuck.’

Dever Melton

Taylor said the merged company has 120 facilities

around the country, which will probably be reduced to
100.

Explosions have occurred twice at the Roebuck plant
in the last five months after several types of hazardous
waste were transferred to a holding tank.

Officials evacuated eight homes in the area last week
and advised residents of another 65 homes to stay inside
after a 500-gallon tank exploded. The explosion emitted

a large cloud of sulfurous vapors, which the wind blew
about one-half mile from the site.

“If we have caused any fears or concern among the
citizenry, we hope it will vanish,” Taylor said. “We want

our operation to be one that protects the people and the
environment. It will continue to be.”

Taylor said the negotiations with DHEC about the in-
cinerators will continue.

“It’s not final, even though we are moving in that di-
rection,” Taylor said.

4a
APPENDIX B

IN THE SUPREME COURT
OF THE UNITED STATES

No. 98-822

FRIENDS OF THE EARTH, INC.,
Petitioners
Vv.

LAIDLAW ENVIRONMENTAL SERVICES (TOC), INC.,
Respondent

AFFIDAVIT

1. My name is Charisse G. McLeod and I am em-
ployed by Safety-Kleen Systems, Inc. (formerly Laidlaw)
as the Environmental Manager at Safety-Kleen/Laidlaw’s
former hazardous waste treatment, storage and disposal
facility at 301 Railroad Street, Roebuck, South Carolina
29376.

2. Past operations at the Roebuck facility included a
liquid injection incinerator which was used to incinerate
hazardous waste. This incineration process created waste-
water which was passed through a wastewater treatment
system and thereafter discharged into the North Tyger
River pursuant to an NPDES permit issued by the South
Carolina Department of Health and Environmental Con-
trol (DHEC).

3. On June 2, 1997, Laidlaw and DHEC entered into
a consent agreement which provided, among other things,
that Laidlaw would cease operation of the liquid injection

5a

incinerator no later than August 31, 1998. A copy of
that consent agreement is attached to my affidavit as
Exhibit 1 and incorporated and made a part of this
affidavit.

4. Pursuant to the terms of that consent agreement,
Safety-Kleen/Laidlaw submitted a closure plan for the
incinerator to DHEC which was approved by DHEC on
September 15, 1998. Additionally, Safety-Kleen/Laidlaw
decided to discontinue all operations at the Roebuck fa-
cility and the closure plan for the remaining operations
was approved by DHEC on April 13, 1999.

5. At present, the entire facility is permanently closed
and for sale. The incinerator which generated the waste-
water that was discharged to the North Tyger River pur-
suant to Safety-Kleen/Laidlaw’s NPDES permit has been
removed and discarded, as have all waste feed systems
from ‘the tanks to the incinerator. The first and third
Stages of the wastewater treatment system have been re-
moved and/or sold. Only the second stage (the Lancy
metals removal system and filter press) remain and they
are for sale. The last discharge under the NPDES permit
was at 7:00 a.m. on September 1, 1998, and no customer
waste was received after August 31, 1998. Whenever
possible, we helped customers locate alternative disposal
sites. Apj oximately 60 employees have been terminated
and no employee who operated the wastewater treatment
system is currently on site. In fact, there are only five
employees (including myself) physically present at the
Roebuck site and all five employees report out of the
Company’s headquarters in Columbia, South Carolina.

6. It would be unlawful to discharge water to the
North Tyger River under the NPDES permit and Safety-
Kleen/Laidlaw has no intention of doing so. More prac-
tically, it would be impossible to do so because most of

6a

the system (including the incinerator) has been dis-
mantled and discarded or sold.

7. I have been shown footnote 7 at page 8 of the Pe-
titioner’s Brief in Friends of the Earth, et al. v. Laidlaw
Environmental Services (TOC) inc., No. 98-822, where
it is stated that “since Laidlaw’s NPDES permit is still in
effect, it may discharge in the future whenever it cares
to do so.” That is simply incorrect. It is impossible to
discharge wastewater at the Roebuck facility under the
NPDES permit since there is no waste to incinerate and
no incinerator to generate wastewater.

8. Safety-Kleen/Laidlaw took steps to keep the
NPDES permit in effect because to do so might make
the site more attractive to a prospective purchaser. The
permit has not been kept in effect in contemplation of
any future NPDES discharges by Safety-Kleen/Laidlaw.

Dated this 21st day of May, 1999.

/s/ Charisse G. McLeod
CHARISSE G. McLEop

[Notary Omitted]

_ nn

7a
APPENDIX C

THE STATE OF SOUTH CAROLINA
BEFORE THE DEPARTMENT OF HEALTH
AND ENVIRONMENTAL CONTROL

IN RE:
LAIDLAW ENVIRONMENTAL SERVICES (TOC), INC.
SCD 981 467 616
BAQ PERMIT No. 2060-0064

Spartanburg County

CONSENT AGREEMENT
97-15-HW
97-43-A

This Consent Agreement is being entered into by the
South Carolina Department of Health and Environmental
Control, hereafter the Department, and Laidlaw Environ-
mental Services (TOC), Inc., a South Carolina corpora-
tion, pursuant to the Department’s authority under 25
S.C. Code Ann. Regs. 61-79 (Supp. 1996), promulgated
pursuant to the South Carolina Hazardous Waste Man-
agement Act, S.C. Code Ann. § 44-56-10 et seq. (Supp.
1996) and the South Carolina Pollution Control Act
§ 48-1-10 et seqg., 1976, as amended.

FINDINGS OF FACT

1. Laidlaw Environmental Services (TOC), Inc., here-
after TOC, USEPA ID No. SCD 981 467 616, operates
a commercial hazardous waste treatment, storage and dis-
posal facility in Spartanburg County, South Carolina.

The local address of the facility is 301 Railroad Street,
Roebuck, South Carolina 29376. State regulations au-
thorize the facility to manage hazardous waste. In No-
vember 1980 the facility received interim status under the
Resource Conservation and Recovery Act (RCRA). On
September 30, 1988, the Department’s Bureau of Solid
and Hazardous Waste Management (BSHWM) issued a
Part B permit to the facility and the U.S. Environmental
Protection Agency (USEPA) issued a Hazardous and
Solid Waste Amendments (HSWA) permit to the facility.
The Part B permit issued by the Department was modified
in 1991 to require post-closure care of closed hazardous
waste surface impoundments and to include additional
waste codes. The Part B permit has not become effective
because of appeals by the permittee and others. Conse-
quently, the facility operates under interim status. The
HSWA permit has become effective and has been amended
several times.

2. The Department’s Bureau of Air Quality (BAQ) is-
sued Air Construction Permit No. 2060-0064-CA on
December 12, 1985 to TOC. The Construction Permit
authorized the modification and operation of a hazardous
waste incinerator system with an incineration capacity of
4.5 tons per hour. On November 21, 1990, the BAO
issued Air Operating Permit No. 2060-0064 to TOC. The
Operating Permit was appealed and has not become effec-
tive. On December 15, 1996, TOC submitted a Title V
Air Operating Permit Application to the BAQ. This ap-
plication is currently under review.

3. Operations at the facility include a liquid injection in-
cinerator with a steam generating boiler system and air
and water pollution control systems. The incinerator has
an interim status thermal destruction treatment limit of
4.5 tons per hour. The air pollution control system for

9a

the incinerator includes a baghouse and a wet scrubber.
Other equipment at the facility is controlled by either
carbon absorption units or is subject to emission limits
established to comply with South Carolina Air Pollution
Control Regulation 61-62.5, Standard Number 8. The
water pollution control system is a scrubber waste water
treatment system composed of a pH adjuster, Lancy unit,
carbon adsorption and other types of filtration. The fa-
cility has been determined by the BSHWM to have
839,500 gallons of tank storage capacity and 64,230 gal-
lons per day of treatment in tank capacity. Presently, the
facility has 48,840 gallons of interim status container
storage capacity.

4. On January 16, 1986 when TOC was purchased from
its prior owner, the site had groundwater contamination
believed to have been caused by contamination from sev-
eral ponds or surface impoundments previously operated
at the site. TOC entered into a 3008(h) RCRA Cor-
rective Action Order with the USEPA to address the con-
tamination. TOC has constructed and installed a system
to remediate affected groundwater. This system will be
operated until all statutory and regulatory requirements
with respect to corrective action are achieved.

5. It is TOC’s position that marketplace realities have
had a significant effect on the commercial success of in-
cineration activities at TOC. Many of the hazardous and
nonhazardous liquid waste streams that can be incinerated
at TOC are now being burned at cement kilns and other
boilers and industrial furnaces. This competitive incinera-
tion market has driven pricing below that level which can
profitably support the high costs associated with the opera-
tion of a RCRA regulated incinerator at the Roebuck,
South Carolina location.

10a

6. After making its marketplace analysis, TOC informed
the Department’s Bureau of Land and Waste Manage-
ment, formerly known as the Bureau of Solid and Haz-
ardous Waste Management (BSHWM), that it desired
to modify its operational platform at the facility. To
effect this result, TOC submitted a revised Part A appli-
cation on April 10, 1997. The revised Part A application
was approved by the Department on April 17, 1997.

7. Of the 839,500 gallons of interim status tank storage
capacity (S02) referenced in paragraph 3 above, to date
547,780 gallons of tank storage capacity has been con-
structed. The remaining 291,720 gallons of tank storage
capacity has not been constructed. TOC desires to oper-
ate additional container storage capacity (SO1) equal to
the as yet unconstructed tank storage capacity.

8. TOC desires to convert the incineration capacity
(TO3) of 4.5 tons per hour to an equivalent amount of
treatment capacity defined by the process codes of TOI,
treatment in tanks, and T04, other treatment.

9. Since the issuance date of Air Construction Permit
Number 2060-0064-CA, the facility has complied with
state emission limits during source evaluations as required
by the Construction Permit and by South Carolina Air
Pollution Control Regulation 61-62.5, Standard Number
3. The facility has obtained additional construction per-
mits for a replacement baghouse and other new air emis-
sion control devices.

10. Upon execution of this Agreement, TOC is willing to
initiate the design and subsequently the construction of a
new traffic route to the facility.

11. TOC has outstanding matters which involve the
USEPA. On September 29, 1994 TOC executed a 3013

ee

lla

Order with USEPA. To date, this Order has not been
modified. TOC also has a HSWA permit renewal appli-
cation pending with USEPA, Region IV.

NOW, THEREFORE, IT IS AGREED pursuant to
S.C.Code Ann. §§ 44-56-40, et seq. (Supp. 1995) and
the South Carolina Pollution Control Act § 48-1-10 ef
seq., 1976, as amended, that:

1. TOC shall cease operation of the liquid injection in-
cinerator no later than August 31, 1998. Until that date,
TOC may continue to operate the incinerator provided
that all regulatory requirements for operation of the incin-
erator are met.

2. Nothing in this Consent Agreement will excuse TOC
from complying with all applicable generator and interim
Status treatment, storage, and disposal facility operating
regulations, as well as, any other state and federal en-
vironmental regulations and permitting requirements.

3. As of August 31, 1998, TOC will no longer have in-
terim status for treatment of waste by incineration (T03).
The 4.5 tons per hour of incineration capacity may be
converted to an equivalent amount of treatment capacity
which is defined by the process codes, T0O1, treatment in
tanks, and T04, other treatment, provided that a process
design proposal from TOC is approved by the Depart-
ment. The Department recognizes that TOC would like
to complete construction of the converted treatment ca-
pacity before the date it surrenders its interim status in-
cineration capacity and will therefore review the process
design proposal in a timely manner. The process design
proposal shall consist of a description of the proposed
process design and the calculated caacity as derived from
all or part of the 4.5 tons per hour of incineration ca-
pacity. The cumulative total of the converted treatment
capacity, which shall consist of fuels blending, shredding,

12a

stabilization /solidification, and metals precipitation, shall
not exceed the equivalent of 4.5 tons per hour. The con-
verted treatment capacity may be utilized in addition to
the existing 64,230 gallons per day of approved treat-
ment in tank capacity (TO1) or utilized in whole or part
for other treatment (T04). TOC may construct the
equivalent treatment capacity after the effective date of
this agreement, receipt of approval of the process design
proposal, and receipt of the appropriate permits from
other entities including, but not limited to, the BAQ. All
changes to the faciilty pursuant to this Agreement must
comply with R.61-79.270.72(b) which refers to recon-
struction. TOC can not use this newly constructed equiva-
lent capacity until it ceases to operate the incinerator and
compliance with R.61-79.270.72(b) is demonstrated.

4. No later than 60 days from the execution date of this
Agreement, TOC shall submit to the Department’s Bu-
reau of Land and Waste Management a closure plan for
the liquid injection incinerator, boilers, the stack, bag-
house, induction fan and associated duct work, venturi
quench and wet scrubber. The plan shall satisfy the ap-
plicable requirements of R. 61-79.265 Subpart G.

5. No later than 180 days from the execution date of
this Agreement, FOC shall submit to the Department’s
Bureau of Land and Waste Management a revised Part
B permit application for the facility consistent with the
Part A application approved by the Department on April
17, 1997 and the Part B application will not include a
request to operate an incinerator. Any interim status in-
cineration capacity included in this permit application
will be terminated.

6. No later than August 31, 1998, TOC will withdraw
its appeal of the BAQ November 21, 1990, air permit
decision.

13a

7. TOC shall submit to the Department’s Bureau of
Land and Waste Management quarterly progress reports
discussing how the 291,720 gallons of unconstructed tank
storage capacity (S02) is being converted to container
storage capacity (SO1) and how the treatment capacity
converted from the 4.5 tons per hour of incineration ca-
pacity is being established. The first progress report will
be due September |, 1997 and the final report will state
how the converted tank storage capacity exists as con-
tainer storage capacity and how the converted treatment
capacity has been established. In no event will container
storage under interim status exceed 340,560 gallons which
represents the combination of 48,840 gallons of existing
container storage capacity and the 291,720 gallons of un-
constructed tank storage capacity.

8. Should TOC desire to change its operation methods
to affect a source of air pollution, i.e., to install or modify
control equipment or remove a source of air contamination
from service, TOC shall submit a request for an air per-
mit determination, or a request to modify the facility's
Title V permit, and/or submit a construction permit ap-
plication or such other appropriate authorization request.
TOC shall not proceed with the change or addition with-
out obtaining either a written response approving the re-
quest or without obtaining a construction permit in ac-
cordance with South Carolina Air Pollution Control Regu-
lation 61-62.1, Section II, A, if necessary.

9. TOC shall continue to comply with all conditions and
provisions of outstanding orders entered into with the
Department and effective permits issued by the Depart-
ment (including the BAQ Title V permit, if applicable)
until otherwise authorized by the appropriate Department
entity.

10. Within five (5) days of the execution date of this
Agreement, TOC will provide the Department with notifi-

14a

cation that it has contacted USEPA to confer with the
Agency about the matters referenced in paragraph 11 of
the Findings of Fact.

11. TOC shall advise the Department of the general loca-
tion of the new traffic route and associated design and
construction milestones within one hundred eighty (180)
days of the execution of this Agreement.

12. The Department and TOC recognize that circum-
stances may arise which may affect due dates and dead-
lines set out in this Agreement. Should such circum-
stances arise, TOC shall notify the Department in writing,
(fax transmission being acceptable) no later than four-
teen (14) days after the discovery of the occurrence of
any event which TOC would contend is a circumstance
causing an unavoidable delay or need for a schedule ad-
justment. The written notification to the Department shall
attempt to anticipate the length of delay, generally de-
scribe the cause or causes of the circumstance, and indi-
cate the measures, if possible, to be taken by TOC to
minimize the effect on any schedule. In the event the
Department concurs that an unavoidable situation has
occurred, this Agreement, including incorporated docu-
ments and any affected schedules, shall be modified in the
event the unavoidable situation affects such schedules.
Any such modifications or revised schedules shall be in-
corporated by reference as part of this Consent Agree-
ment.

IT IS FURTHER AGREED that failure to meet dead-
lines established herein or any other violation of the pro-
visions of this Agreement may be deemed a violation of
the South Carolina Hazardous Waste Management Act
and the South Carolina Pollution Control Act and there-
fore shall be deemed unlawful. Upon ascertaining any

15a

such violation, the Department may initiate action to ob-
tain compliance with this Agreement and the aforesaid
Acts.

THE SOUTH CAROLINA DEPART-
MENT OF HEALTH AND ENVIR-
ONMENTAL CONTROL

Date: 6/2/97 By: /s/ Douglas E. Bryant
DOUGLAS E. BRYANT
Commissioner

We Consent:

LAIDLAW ENVIRONMENTAL SERVICES (TOC), INC.

Date: 5-30-97 By: /s/ [Illegible]

THE SOUTH CAROLINA DEPARTMENT OF HEALTH
AND ENVIRON MENTAL CONTROL

/s/ Hartsill W. Truesdale Date: 06/02/97
HARTSILL W. TRUESDALE, P.E.
Chief
BUREAU OF LAND & WASTE
MANAGEMENT

/s/ Richard D. Sharpe Date: 06/02/97
for JAMES A. Joy, P.E.
Chief
BUREAU OF AIR QUALITY
CONTROL

/s/ [Illegible] Date: 6-2-97
Approved by: Legal Office

pab :bkb

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40385014_0244%3A11. Public record. Not legal advice.
