Nos. 91-155, 91-339 | FEB 7% 1992

In The ae
Supreme Court of the United States

October Term, 1991
+

INTERNATIONAL SOCIETY FOR KRISHNA
CONSCIOUSNESS, INC., AND BRIAN RUMBAUGH,

Petitioners and Cross-Respondents,

V.

WALTER LEE,

Respondent and Cross-Petitioner.
+

On Writ Of Certiorari To The United States Court
Of Appeals For The Second Circuit
+

JOINT APPENDIX
VOLUME II (Pages 292-551)

+

Barry A. FIsHER ArTHUR P. BERG

Counsel of Record Counsel of Record
sea ARNOLD D. Ko.uikort
FLEISHMAN, FISHER & Moss1 Mitton H. PACHTER
2049 Century Park East, Attorney for Respondent
Suite 3160 and Cross-Petitioner
Los Angeles, California 90067 One World Trade Center — 66E
(310) 557-1077 New York, New York 10048

Davip M. LipeRMAN (212) 435-6830

2049 Century Park East, Counsel for Respondent
Suite 3160 and Cross-Petitioner
Los Angeles, California 90067

(310) 277-9288

Jay ALAN SEKULOW

1000 Thomas Jefferson Street, N.W.,
Suite 520

Washington, D.C. 20007

(202) 337-2273

Counsel for Petitioners and Cross-Respondents

Petitions For Certiorari Filed July 24, 1991 (No. 91-155),
Aug. 26, 1991 (No. 91-339); Certiorari Granted Jan. 10, 1992

COCKLE LAW BRIEF PRINTING CO., (800) 225-6964
OR CALL COLLECT (402) 342-2831

a

TABLE OF CONTENTS

VOLUME |
Docket Entries

Complaint for Declaratory and Injunctive Relief,
dktd. Oct. 29, 1975

First Amended Complaint, dktd. Oct. 27, 1977

Exhibit A to Amended Complaint — Eastern Air
Lines Regulations

Answer of Defendant Walter Lee to Complaint,
dktd. Jan. 5, 1978

Affidavit of Philip Le B. Douglas in Opposition to

Motion for Protective Order, dktd. Nov. 1, 1984....

Exhibit L to Douglas Affidavit - Affidavit of
Carol Breidenbach

Exhibit M to Douglas Affidavit — Declaration of
Gloria Conklin

Exhibit N to Douglas Affidavit — Affidavit of
Victor C. Fernandez

Exhibit O to Douglas Affidavit —- Declaration of
Pierre Denard

Exhibit P to Douglas Affidavit - Declaration of
Paul Marks

Declaration of Brian Rumbaugh, in Opposition to
Motion to Dismiss, dktd. Aug. 23, 1985

Exhibit 1 to Rumbaugh Declaration —- Map of
Second Floor Central Terminal Main Lobby at
LaGuardia

3

Pe ee, ee eres | Fe. eee

ii
TABLE OF CONTENTS - Continued
Exhibit 2 to Rumbaugh Declaration - Map of
First Floor Central Terminal Circulation Areas

at LaGuardia

Exhibit 3 to Rumbaugh Declaration - Map of
First and Second Floor Delta Unit Terminal Cir-

culation Areas at LaGuardia...................

Exhibit 4 to Rumbaugh Declaration - Map of
Central First Floor Lobby Area of North Termi-
nal of Newark

Exhibit 5 to Rumbaugh Declaration - Map of
Departure Level Mezzanine/Lobby and Corri-
dor Areas of Terminal A at Newark

Exhibit 6 to Rumbaugh Declaration - Map of
Arrivals Level Lobby/Mezzanine Area of Ter-
minal B at Newark

Exhibit 7 to Rumbaugh Declaration - Map of

First Floor IAB Arrivals Lobby at JFK .........

Exhibit 8 to Rumbaugh Declaration - Map of
Second Floor IAB East and West Wing Building

Corridors and Lobby Areas at JFK.............

Exhibits 9-18 to Rumbaugh Declaration - Maps
of Various General Circulation Areas in the
Respective Unit Terminals at JFK

Plaintiffs’ Notice of Motion for Summary Judg-

ment or for a Preliminary Injunction, dktd. Nov.
12, 1988

Civil Rule 3(g) Statement of Plaintiffs’ in Support

of Motion for Summary Judgment, dktd. Nov.
12, 1988

eoeeeoeoeveeeseeweeeeseeeeeeeeeeseeeeeeee es

Bree 2 Ae Fe FT

\eeeoeaoes oon eae gceseseest ede eae © ae

eeesvsenean sp eoenrvae 6

e*e@eeeoeneveoeozc eceoeeeeeaesseeoseese eee eseeeeevne ses ss ee

Page

ili

TABLE OF CONTENTS - Continued

Page
Affidavit of Alan J. Attias in Support of Plaintiffs’
Motion for Summary Judgment, served Nov. 12,
TSEC ee See kcsedbeccvasececscceces 181
Exhibit 1 to Attias Declaration - Fact Sheet for
JFK International Airport................-.0.005. 194
Exhibit 2 to Attias Declaration — Fact Sheet for
LaGuardia Airport...............-2ceeeeeeeeneees 205
Exhibit 3 to Attias Declaration - Fact Sheet for
Newark International Airport..........-......++. 212
Exhibit 4 to Attias Declaration — Port Authority
Capital Program 1987-1991................0.-055- 222
VOLUME II
Exhibit 5 to Attias Declaration — 1986 Airport
DIUM RGE Wee Seu vssevecessccssrsesecccess 292
Exhibit 6 to Attias Declaration — Port Authority
Ey er 342
Exhibit 7 to Attias Declaration —- Port Authority
News, Mar. 12, 1987 (39-87) .............-..5565. 355
Exhibit 8 to Attias Declaration - Getting Around
at JFK, A Guide to John F. Kennedy Interna-
Sedna i wsscsvecvescessccssseses ++ JOD
Exhibit 9 to Attias Declaration - Getting Around
at LGA, A Guide to LaGuardia Airport.......... 392
Exhibit 10 to Attias Declaration - Getting Around
at NIA, A Guide to Newark International Air-
DU SWE U SNe sec e ne csecesscecceresscccrecceceees 419

iv
TABLE OF CONTENTS - Continued

Civil Rule 3(g) Statement of Port Authority in
Opposition to Plaintiffs’ Motion for Summary

Judgment, served Jan. 19, 1988 ................

Affidavit of Morris Sloan in Opposition to Plain-
tiffs’ Motion for Summary Judgment, dktd. Jan.

WEG eR eet bsncerccuesasessecunereneneseasess

Affidavit of Anthony A. Santangelo in Opposition
to Plaintiffs’ Motion for Summary Judgment,

es Sh I osc cK emnueneuaicuseet cies

Affidavit of William F. Boice in Opposition to
Plaintiffs’ Motion for Summary Judgment, dktd.

Jan. 19, 1988 0.0... coc ce ccc cece cece ccccceecees

Exhibit B. to Affidavit of William F. Boice — Civil
Rule 3(g) Statement of Air Canada Group
Defendants in Opposition to Plaintiffs’ Motion

for Summary Judgment........................

Affidavit of Leif Andersson in Opposition to
Plaintiffs’ Motion for Summary Judgment, dktd.

is a se nce eens Deas tenet eer eres

Transcript of Proceedings Before United States
Magistrate Michael A. Dolinger on March 25,

EPs GM. TOE, DE, FO nc ccc ecserecccccvecs

Supplemental Affidavit of Morris Sloane in Oppo-
sition to Plaintiffs’ Motion for Summary Judg-

MOE, GORE. FOU. TA, WOMB. 6 ooo vcccsccvcccvcccs:

Exhibit B to Sloan Affidavit - Amendment to
Airport Rules and Regulations Governing Non-
commercial Activity and Prohibiting Vending

re ee ae eee

Page

=
TABLE OF CONTENTS - Continued

Supplemental Declaration of Frederick V. Hurst,
Jr. in Opposition to Plaintiffs’ Motion for Sum-

mary Judgment, dktd. Apr. 22, 1988 ...........

Settlement Agreement and Release Between
ISKCON and Airline Defendants, dktd. May 10,

rrr Trey re Trt rer Serre

Port Authority’s Objections to Magistrate’s Report

and Recommendation, dktd. Dec. 14, 1988 .....
Judgment of District Court, dktd. Oct. 19, 1989 ....
Mandate of Court of Appeals, filed Feb. 25, 1991...

Page

999

EXHIBIT 5

1986 Airport Highlights

John F. Kennedy international Airport
Newark Interr ational! Aurport
LaGuardia Airport

293

1986: Rebuilding to Meet the
Challenge of the Future

[he year 1986 will be remembered as a pivotal year for
the airports serving the metropolitan area, a year in
which The Port Authority of New York and New Jersey
developed a multi-billion dollar capital plan to rebuild
and modernize Kennedy, Newark and LaGuardia Air
ports

Major components of the plan call for an expansion of the
airport roadway systems, reconfiguration of a number of
existing passenger terminals and construction of major
new terminal facilities. Together, they will enable the
airports to efficiently handle a 50 percent increase in
passenger demand forecast to take place by the end of the

century

logether with expanded ground access and terminal
capacity, capital improvements will be made to parking
facilities, inter-terminal connections and baggage han
dling systems. There will also be an array of new services

restaurants, meeting rooms, communication and finan
cial services, retail shops — that will make air travel to
and from the bi-state region a more efficient and conve

nient experience for all travelers

Equally significant to the redevelopment of the airports

will be improvements to the Capacity and quality of off

airport ground connections. To ensure that this aspect of
airport service is achieved, a key element of the Port
a | 1? ,

Authority plan will be promotion of high occupancy
vehicle and mass-transit options for travel to and from
the airports

294

The need for this extensive redevelopment of the metro
politan area airports was borne out in the region's levels
of air passenger and cargo traffic in 1986. The tri-airport
complex served a record 79 million passengers and han
dled more than 1.4 million tons of cargo last year. Both
Kennedy and Newark recorded gains in cargo volume
over the previous year. Increases in passenger demand
occurred at Newark and LaGuardia Airports. A slight
decline in passenger activity took place at Kennedy Inter
national. This was due mainly to the decline in overseas
travel that took place early in the year. This situation al
JFK had corrected itself to a great extent by the end of the

year

While major planning efforts continued throughout the
year, construction projects moved ahead.at all three air
ports. In addition, considerable effort was focused on
increasing aeronautica! capacity and reducing flight
delays at the airports. As a result of continuing efforts
with the Federal Aviation Administration and the air

lines. the FAA will imple ment a comprehensive plan t

295

reconfigure and greatly expand the region’s air routes
early in 1987. It is anticipated that this program will
reduce flight delays while providing for increased traffic
capacity at all three airports.

Advances were also made during the year in achieving
better utilization of airport gate positions. In 1986, work
continued with airport tenants, local officials and the U.S.
Immigration and Naturalization Service (INS) on reduc-
ing the processing time for arriving foreign travelers.
Introduction of a separate inspection line for U.S. resident
aliens and diplomats, increased staffing and training of
federal inspection personnel, installation of computerized
screening equipment and an expansion of passenger stag-
ing areas will contribute to marked improvement in this
area.

While it has been an active year, we anticipate even
greater challenges in the near future, as the Port Author-
ity begins implementation of an ambitious capital con-
struction program to revitalize the region’s air
transportation facilities.

1986 Airport Highlights

¢ Planning was completed for the major redevelopment
and improvement of JFK, Newark and LaGuardia Air-
ports

e Construction of Terminal C at Newark moved ahead,
while two new cargo terminals were completed

e Pan American World Airways inaugurated shuttle ser-
vice to Boston and Washington from LaGuardia Air-
port

296

Interior reconstruction of the Central Terminal Build-
ing at LaGuardia continued

An improvement program progressed at the Interna-
tional Arrivals Building at JFK with new interline

facility and conveyor system
Construction began on two new cargo terminals at JFK

The first U.S. international clearance center for air
couriers and first U.S. central cargo examination facil-
ity opened at JFK

Implementation of Alr Cargo Fast Flow progressed
with completion of system functional design

Consolidated Ground Transportation Counters in ser-
vice at all three airports

Air traffic results 1985-1986

Le.

pi

we ee tL. oe
onde :
“Seer

.
p * r y —_ —_ + .
~ >
4 a
~ v j ¥ x
ped
f
y _
~r —~ ; + i
ad
= ont
. —
' ; ) Oi » ¥
c ¥
vf r —-
~ “ - y ;
. a a f .
5 a al —_—- > -_>o
x Ty . “
x
.
*
“ -
a + -
a] f \
a = ‘ ,
= a ae ~
~ ro - + . >
e - a 7
— _— -- 7 °
- r U
e) - a . : — ~
~ - ; es = e
o DNs - C fs :
‘acl oo j — > a - a “
. — -/ ae we > = _ mn a
Le > “
me €& a & eT ¢ ‘
rae | - +~ ~— - ~ . > ~ + > s
“ « e - — ~~ -
a ” - ‘ > 3
1 a a -- = i + 3 = 4

= S TW 4 > = 2 > r
an - 4 a - a s 7 " -
—_—s -“ ~ “ — — 7
—

299

Port Authority police officer aids airy

* >

(;round

‘ } 7s.
a |
7 7
‘ as
.
: y
. ]
At
4 =
‘
. :
v
- ’ |
t i
; y
t t
rT x
*

[ransportation and Terminal Services

rriding goal of the Port Authority is to enabl

nmentally sound wav. Io this end, we aré

ying high-occupancy vehicle (HOV) use Dy

idle a significant increase in activity in

seeking out new bus and limousine services to

r > y . . y : ]
broader range of transportation alternatives t

ir say Olympia Trails, which links Newark an

Airports, including a stop at the World Trade

art express bus service to LaGuardia Airport. A

"
" , _— ' ‘ ry , by ; .
» ¥ r ‘ ‘ i bith i>i ‘ nas aggded
; ‘ - . ;
DS al i I v\ SeTves DOT i4 ms
‘
| a
r A we eW x
y , " y » + q y y ; ‘ 1 KK LA ‘
; ‘ I ] > 1 -( snort ‘4
t ‘ il . iit AUUILIONII LOT 4 iSiand Oonnecticu
f r ’ | ‘ + . bh osiis! > r " h _.
‘(,roup Nas Started scnedauiled service Detwee
i
’ + + ; > rr }
1 dal ne met! ) an area AIT por S witn tnree
; : . ’
¥ ¥ rhe ¥ aA an } } c itt cre res > o _ iT
_ . - ? , ,? ,
, , >? ¥ 7 — >? 7 “s ?
4 7 * [ I ‘ | A ui ail >} }
I
_ , _ ; nr + y+ >
il { ‘ s ' if I 4 T si ST ;
rr
‘ ; tiny ‘ rr ric t YT S at r
>
\

’

A

302

-d Customs counters were installed at JFK

>

‘

Sixty redesigne

303

additional Port Authority counters are planned at New-
ark and six are planned for JFK, all of which should be
operational in the spring. Staff at these counters provide
travelers with a single impartial source of accurate trans-
portation information and help them to make their
ground transportation reservations.

Contributing to the effective use of public transportation
to the airports is the Port Authority’s AIR-RIDE tele-
phone information service. Last year, a total of 70,000
calls were received, a 17 percent increase over the pre-
vious year. This toll-free service for the metropolitan area
is operated on a 24 hour basis throughout the week, and
provides detailed information about public transporta-
tion to and from Kennedy, Newark and LaGuardia Air-
ports. As part of the system, a special toll-free
information number is available only for the travel indus-

try

Port Authority plans include the development of “satel
lite ground transportation terminals” in Long Island and
New Jersey. The terminals would offer parking and drop-
off areas for air passengers who would then take regu-
larly scheduled limousines and buses to the airports. This
could represent an effective alternative for many air pas-
sengers who now use private automobiles. To initiate this
service, the Port Authority issued requests for proposals

during 1986

One of many convenient retail shops
operating at the airports

[he Port Authority is also developing a ride-sharing pro
gram for JFK that would encourage airport employees to
use high-occupancy vehicles for commuting to and from

the airport

Part of the effort to upgrade the three airport system
includes improving mass transit access to all three air
ports, now and in the future. At Kennedy, for example, a
new rail/bus station for the JFK Express train opened in
the summer. Most significant are our plans for the future
[he JFK 2000 plan is designed to improve mass transit
use by creating a Central Terminal Area transportation
center, where buses and limousines would pick up pas
sengers after they had taken a two minute people. mover

trip from their airline terminal

[he Port Authority also plans to improve the connection
between the Central Terminal Area and the Howard

Beach train station to encourage greater use of the JFK

‘
=
~—
é
>
S

Ss service Is provided around the clock from the terminal buildings to the long-term parking lots at all three airports

ee hi

=

Express. The first phase of these improvements cculd
include improved bus service - possibly an exclusive bus

lane rom the train to the transportation center

In 1986 the Port Authority, in conjunction with New York
City officials, issued a request for proposal to establish a
bus service from the LIRR station in Jamaica to bo
Kennedy and LaGuardia, to encourage further use of
mass transportation for air passengers and airport
employees. In addition, an extension of the Metropolitan
[ransit Authority’s Q3 bus service into JFK will start this

spring

At LaGuardia, new connections to mass transit are being
examined by the New York City Department of Transpor
tation and the Queens Borough President’s planning
office. In addition, the establishment of a high-speed
ferry service from Manhattan to the airport is under

( onsideration

At Newark, we are examining the possibility of providing
a connection from the planned on-airport people mover
system to regional public transportation systems. We also
plan on giving preferential placement of high occupancy
vehicles on sections of curb frontage. This is being dons
to enhance the level of ground transportation service
provided to the traveling public

An additional part of our ground access strategy is
reduce automobile congestion and delays by improvil
the roadway systems at Kennedy, Newark and LaGuardia
Airports. Now underway at Kennedy Airport is a projec
to upgrade 150th Street into an expressway, thereby pro
viding JFK with a second major entrance for traffic

’ y ’ , ; isvct . . ; . i
yroaching from the east, including direct connections

TT)
a}

307

P fe -
-onceptual model of the JFK 2000 redevelopment pro

gram. Roadway construction at JFK.

308

to the major expressways adjacent to the airport. Upon
completion in early 1988, this system of roads will enable
more traffic to be diverted from the now overburdened
Van Wyck Expressway, the airport’s sole major access

route.

Equally significant, the roadways in Kennedy’s and New
ark’s Central Terminal Areas will be reconfigured and
expanded under each airport’s capital program. At
LaGuardia, work will start on a major roadway improve
ment program next year in order to split airport traffic
evenly between the Central Terminal Area and the East
End Area

We undertook several initiatives during 1986 to upgrade
the quality of customer services. A comprehensive eval
uation of all public food and beverage operations within
the passenger terminals at the three airports was com
pleted in 1986. This analysis is designed to achieve imme
diate improvements to existing establishments, as well as
to develop a more consumer-oriented direction for air

port food services over the longer term

During 1986, we also added to the quality and variety of
merchandise sold at the metropolitan area airports, with
the opening of two Bloomingdale’s stores at JFK. One is
in the International Arrivals Building, the other in the

Pan American World Airways lermina!

The Future of John F. Kennedy
International Airport

During 1986, work was completed on plans to rebuild

John F. Kennedy International Airport, to enable the

309

airport to efficiently handle a fifty percent increase in

passenger growth expected by the year 2000. The total
cost Is estimated at between $2 and $3 billion.

Early in 1986, PRC Engineering, Inc. and I.M. Pei &
Partners delivered to the Port Authority a master func-
tional plan for the redevelopment of JFK. At our request
Bechtel Civil, Inc. undertook a constructibility review of
the plan. Bechtel concluded that the JFK 2000 program
was feasible as planned, the Proposed eight-year sched-
ule was practicable and the Project’s construction cost
would be within the estimated range.

Incorporating their comments along with input from the
airlines, the federal agencies involved, transportation
operators and the Urban Land Institute (an independent
organization which conducts research into urban plan-
ning), the Port Authority finalized its plans for rebuilding
Kennedy International Airport. The agency will be work-
ing closely with local officials and communities to assure
that the needs of airport-area communities will also be
considered throughout this massive rebuilding effort.

The heart of the new JFK plan is a speedy, high-tech
System for transporting travelers and their baggage
between airline terminals. A fully automated Passenger
Distribution system will be designed to shuttle pas-
sengers between the terminals and the centrally located
Transportation Center by the use of state-of-the-art auto-
mated vehicles traveling on elevated guideways. The
Transportation Center will serve as a front door for the
Serpent, providing a convenient terminal for patrons
arriving or departing the airport by various transporta-
tion modes. At the same time, it will also provide quicker,

310

more convenient transfer service for passengers connec-
ting between terminals. A user friendly baggage handling
system will also be designed to improve speed and
reliability for all passengers, but especially for interline
passengers.

The Transportation Center, to be located in the heart of
the Central Terminal Area, will be connected to the Inter-
national Arrivals Building by a new and enlarged Federal
Inspection Services Hall designed to handle up to 6,000
passengers per hour, double its present capacity. This
linking of the Transportation Center and the IAB is
expected to provide for better pedestrian flow patterns
and an improved level of passenger service.

The Transportation Center may include such additional
services as restaurants, shops, a business service center, a
new heliport, a new air traffic control tower and possibly
hotel and conference facilities.

Another important aspect of the JFK 2000 plan involves
the capability of the passenger terminal buildings to han-
dle the expected increase in air passenger traffic. On-
going efforts to address this issue include the acquisition
of a computerized gate utilization model to help deter-
mine future gate requirements, as well as improvements
and expansions to the existing terminal facilities.

While design and construction proceed on various ele-
ments of the master plan, several projects are being car-
ried out to provide service improvements to both the
International Arrivals Building and the airport roadway
system, as well as upgrade the level of mass transit
service to the airport. These include a joint program with
New York State to provide a second major entrance to the

311

airport at its eastern approach, a comprehensive improve-
ment program for the International Arrivals Building,
and improvements to the JFK Express, the New York City
Transit Authority’s express train to the airport from
Brooklyn and Manhattan.

The 150th Street entrance to the airport is being rebuilt
into a limited access, median separated expressway. Each
direction will have two lanes, paved shoulders and paral-
lel service roads for public use. Also included is a
restricted service road that will connect the North Cargo
Area to the airport’s Central Terminal Area, thereby
improving commercial access to Kennedy International.
When completed in the spring of 1988, this system of
roads is expected to eliminate much of the intermixing of
slow moving aeronautical vehicles with normal traffic.
Moreover, when combined with the new expressway (the
JFK Expressway), they will provide a second major access
route to Kennedy with direct connections to the Van
Wyck Expressway, the Belt Parkway, and the Nassau
Expressway. This is the first stage of a comprehensive
reconfiguration of the airport roadway system.

Future plans call for the reconfiguration and reconstruc-
tion of the Central Terminal] Area’s roadway network to
increase efficiency and ease congestion. Direct roadway
connections will be provided between each of the four
main terminal areas and the two main airport access
highways, the Van Wyck and JFK Expressways.

The $24 million renovation of the International Arrivals
Building now underway will Significantly upgrade the
facilities there and is expected to be finished in 1987

Two views of conceptual plans for a new east end pas-
senger terminal at LaGuardia.

314

Already in operation is a new automated baggage con

veyor system that dramatically improves the transfer of
luggage between overseas and connecting domestic
flights. The Immigration passenger processing areas are
being expanded for greater efficiency and improved pas-
senger flow. New Customs counters and lighting, better
Signs, additional restrooms and more escalators, are all
designed to speed up processing for passengers at the
International Arrivals Building.

In the summer, a new bus station connecting to the JFK
Express train station at Howard Beach opened to trav-
elers. The new station replaces a provisional facility that
previously had served passengers who connected to the
airport

To complement the up yrading of terminal and transporta
} 5 5 r

tion services, staff advanced with plans to maximize the

airport's runway and taxiway Capacity. Since airside
Capacity will be a key element in determining the future
of Kennedy International, plans are focusing on ways to
increase the flexible use of runways and taxiways and

help tO maintain Kennedy as the Nation’s premier inter
national airport

The Future of LaGuardia Airport

Due to its proximity to Manhattan and wide choice of
domestic flights, LaGuardia Airport is popular, especially

with business fliers. In 1986, LaGuardia’s compact site

handled more than 22 million passengers. Current projec
tions are for 30 million passengers by 1995-2000 - a 40
percent increase in passenger traffic. To accommodate

this projected increase, the Port Authority plans to

r=
oO
a.
a
6 == —
airport to comfortably handle projected increases in pas- yy)
senger demand.

Construction of a new East End Passenger Terminal will
be complemented with a roadway program that will
reconfigure and expand on-airport roads, while provid

ing new access to LaGuardia’s East End area with con

Struction of new, off airport roadway connections

Starting in 1987, the airport East End roadways will be
realigned and expanded to provided more efficient ser-
vice to travelers. To improve airport access to the East
End, off-airport road work will commence in 1990. Con-
struction of ramps will tie in the 102nd Street Bridge as
arm exit and entrance to the airport. In addition, a new
flyover roadway east-bound from the Grand Central
Parkway to the East End Terminals (Delta Airlines, East
ern Airlines Shuttle and the planned East End Terminal).

will allow the total Separation of Central Terminal] area

and East End vehicle traffic and ease congestion on the

Grand Centra] Parkway

Late in 1986, air service at LaGuardia was augmented
with the inauguration of Pan American’s shuttle flights to
Boston and Washington from a new wing of the Marine

Air Terminal. (New York Air had Previously provided the

320

same service from the Central Terminal.) Built by Pan Am
on an expedited basis in early fall, the new terminal
building includes four new gates and 40,000 square feet
for patron services. Pan Am also provides shuttle pas-
sengers at its terminal with a-courtesy bus that provides
connections to the other terminals at LaGuardia.

The Future of Newark International Airport

Nineteen eighty-six was another banner year for Newark
International Airport in passenger and cargo traffic. It
was also a year in which Newark surpassed Kennedy
Airport to become the region’s busiest airport’in the total
number of passengers handled.

Passenger growth is expected to surge by fifty percent by
the year 2000, and the Port Authority has developed a
program of major improvements to enable these increas-

ing passenger volumes to be served with quality and
comfort.

The centerpiece of the Port Authority’s program is an
ambitious capital redevelopment plan te improve New-
ark international Airport, known as NIA 2000. The NIA
2000 plan reconfigures the airport’s roadways, parking
lots and terminal frontages to provide an optimum bal-
ance between airside development and landside access,
providing for maximum flexibility and expansion to
accommodate future operational needs.

The major elements of the NIA 2000 plan include mod-
ifications to the airport’s main entrance and exit road-
ways, reconstruction of the roadways in the Central
Terminal Area, serving each individual terminal; and a

321

people mover system to enhance the level of service
between Terminals A, B, and C and the existing long term
parking lots. The people mover will also be capable of
connection with off-airport transit systems in place or
under study.

Other elements of the redevelopment program include
dualization of roadways in front of each terminal, with
priority in accommodating high occupancy vehicles; and
construction of structural parking within the CTA, with
direct access to and from the terminal frontages.

While not part of the NIA 2000 plan, a principal project
currently underway is the construction of Terminal C, the
completion of which will contribute 42 new gates and
850,000 additional square feet of space for expanded ser-
vice. At year end, more than two-thirds of the project's
construction had been completed, and we expect the ter-
minal to be operational in 1987.

As an interim improvement measure, construction sta rted
on an additional lane to the existing express road, which
will facilitate vehicular access to and egress from Termi-
nals A, B and C. Construction is scheduled for completion
in 1987. Modifications are also planned to provide public
access to the new terminal’s parking level frontage.

Work began in 1986 to reduce roadway congestion, espe-
cially in front of the terminals, including construction ofa
ground transportation stack area for taxis and limousines.
Additionally, completion of Parking Lot F this fall will
provide 3,000 more long-term parking spaces, bringing
the airport’s total parking capacity to 23,000 cars. In other
work at Newark International, we initiated a new pre-
cashiering system that saves time for parking patrons by

eke,
322

At Newark. Federal Express opened its new Metroplex

while the Port Authority opened a new cargo terminal

324

allowing pre-payment in the terminals for cars parked
less than 24 hours. Existing delays for those parked on a
hourly and daily basis were also reduced with the con-
struction of three additional toll lanes in the Central
Terminal Area. Further improvements are planned for

1987 with the construction of six additi i
tional toll |
peg oll lanes in

Newark International is fast becoming a major terminus
for the small package carrier industry, a fact borne out by
construction undertaken at the airport during 1986. Two
new cargo terminals were completed, one by the Port
Authority, a 50,000 square foot warehouse and office
building, the other the regional headquarters for Federal
Express., A third terminal is now being constructed by
United Parcel Service on an expedited basis, and is
expected to be completed in the spring of 1987. Last year
we also began planning to establish a centralized conge

examination facility at Newark to expedite the clearance
of international cargo.

Overleaf: Terminal C will provide 42 new gates

and 850,000 Square feet of space for expanded
service when completed in 1987.

The Future of Air Cargo

As air cargo continued its growth in 1986, the Port
Authority moved ahead with a five year program of
capital improvements at all three airports. This 100 mil-
lion dollar program in 1986 has already produced new

325

cargo terminals at Newark and construction of additional
cargo terminals at Kennedy.

Last year was also a period in which great strides were
made advancing Air Cargo Fast Flow, the Port Author-
ity’s computerized inventory control and clearance sys-
tem. Finally, the Port Authority opened two buildings at
Kennedy International which marked a first for U.S. air-
ports - the first international clearance center for air
couriers and the first central cargo examination facility.

The combination of these capital and service improve-
ments will increase the cargo handling capabilities of the
three airport systems, and enable Kennedy, Newark and
LaGuardia to efficiently process the more than three mil-
lion tons of cargo expected per year by the end of the
next decade.

Kennedy International, already the world’s biggest and
busiest cargo airport, is forecast to more than double its
present cargo volume by the year 2000. To provide the
airport with the most modern facilities and services to
process these increasing cargo volumes, the Port Author-_
ity began a major building program in the airport’s North
Cargo Area in the spring with groundbreaking for a $20
million cargo terminal complex. The two new terminals
are being built by King Interests, the nation’s largest
third-party air cargo developer, which will also operate
and sublease the facilities. The first building of 175,000
square feet has already been leased and is expected to
open this year. The second facility of 200,000 square feet
is scheduled for completion in 1988. When both facilities
become operational, they will be able to accommodate
four Boeing 747 freighters.

326

The airport’s North Cargo Area will be host to a second
facility scheduled to start construction in 1987. The $13
million Halmar Equities building will be located adjacent
to Springfield Gardens for freight forwarders, agents and
brokers who do not require ramp facilities. The 200,000
Square foot project combines requirements for both cargo
processing and office space. It will consist of 100,000
~ Square feet of warehouse space on the ground floor, with

41 truck docks, and 100,000 square feet of office space on
the second floor.

Other initiatives at Kennedy International included a new
international clearance center for 18 air couriers, which
handle half the air courier traffic at Kennedy. (The
remaining half is handled by DHL, which opened its own
clearance facility at Kennedy in 1985.) The facility, located
in Building 81, is now clearing between 750 and 800 bags
of small packages per week. Its operation not only
relieves congestion in the passenger areas, but expedites
clearance for the air couriers and allows Passengers to
benefit from the shorter federal inspection lines and less
congested roadways in the Central Terminal area.

In another effort at consolidating U.S. Customs inspection
and clearance at the airport, the Port Authority and U.S.
Customs opened a central cargo examination facility at
JFK in the autumn U.S. Customs will release all cargo
formerly cleared at numerous container stations located
around JFK by selectively inspecting only high risk cargo
at the control site. It is estimated that one-third of the 1.1
million tons of cargo handled at JFK will be processed at
this 24,000 square foot facility in Building 88. Its success-
ful operation will enable more container stations to be

i uss

327

licensed without an increase in Customs staff, as inspec-
tors will not have to be assigned to the individual sta-
tions. The resulting efficiencies should attract more
business for Kennedy, now and in the years to come.

ACCEPT, a joint Port Authority and U.S. Customs cargo
automation program for the NY/NJ region, is in opera-
tion at 7 cargo terminals at Kennedy International, which
together account for 50 percent of the airport's cargo
capacity. Use of ACCEPT has reduced the number of
inspections performed by U.S. Customs by nearly 70 per-
cent by enabling the assessment of shipments as either
high risk or low risk. This program is scheduled to be
replaced this spring by the risk assessment component of
U.S. Customs’ Automated Commercial System (ACS),
allowing for speedier cargo clearance for the entire
import community.

Among the more significant changes in the regional air
cargo market was the transformation of Newark Interna-
tional Airport into a major player in cargo handling. For
the ten year period ending in 1985, air cargo volume at
Newark International has grown from 112,000 to 274,000
tons. Last year, the airport handied almost 300,000 tons of
cargo. The Port Authority estimates that by the year 2000,
the airport’s air cargo activity will nearly triple.

One of the major reasons for this resurgence is the phe-
nomenal growth of the overnight small package delivery
industry. Newark’s early concentration on this aspect of
air cargo service, as well as its easy access to and from the
heart of the New York/New Jersey Metropolitan area, has
made it the overnight small package and document cen-
ter for the northeast United States.

328

Anticipating the importance of expanded and technologi-
cally advanced facilities to serve this market, Federal
Express embarked upon the development of a huge and
modern facility - the $53 million Metroplex Hub. The
Metroplex, a regional sorting center for the northeast
United States, is the first major facility outside the Fed-
eral Express headquarters in Memphis to be built on an
airport.

The Metroplex, which opened early in 1986, houses a
state-of-the-art document sorting center capable of han-
dling 18,000 packages and documents per hour. Also new
at the Metroplex are electronic transmission facilities and
Federal Express offices, including substantial ramp and
parking space for aircraft and container transport vehi-
cles. All this has doubled the capacity of Federal Express
to service its stations in 20 cities located throughout the
region.

In another boost to the air cargo industry at Newark
International, United Parcel Service leased 28 acres at the
airport on which to construct and operate a major parcel
distribution facility, expected to open this spring. The
company’s aircraft movements at Newark are expected to
continue to grow from an estimated 1,550 movements in
1986 to some 1,800 by 1990.

Also significant was the mid-year opening of a cargo
terminal constructed on the airport by the Port Authority.
Now occupied by Virgin Atlantic, Continental and Sum-
mit Airlines, together occupying 50,000 square feet, the
new facility is located within the cargo complex on the
north side of the airport.

;

330

To enhance the efficiency of LaGuardia’s capacity to han-
dle current cargo operations, in late 1986 an operator
began converting 35,000 square feet of hanger space into
a cargo handling facility. Work included installation of
truck docks; storage areas and refrigeration facilities for
airlines already operating at LaGuardia.

Tying together the entire Port Authority Air Cargo Center
will be Air Cargo Fast Flow. In June 1986, the Port
Authority signed a contract with Arthur Anderson and
Company to design and develop a state-of-the-art inven-
tory control and clearance system for cargo, and to oper-
ate and maintain it for two years. When the system
becomes operational this autumn, it will significantly
reduce the time for processing of cargo within the region
by allowing for real time communication between car-
riers, container stations and customhouse brokers, and by
establishing an interface with ACS of U.S. Customs.
ACFF is designed to allow for the creation of a paperless
air cargo documentation process with more expeditious
clearance. It will also enable electronic filing of entry
declarations from brokers’ offices, even while the ship-
ment is en route.

By the end of 1986, the detailed functional design of the
ACFF system had been completed and system program-
ming had been initiated. When operational, Air Cargo
Fast Flow promises to benefit everyone — importer,
exporter and airline, Customs and customhouse broker,
terminal operator and even the surface transport opera-
tors, wk.o will now be able to achieve faster turn-around
times for their trucks.

The Future of Heliports

Helicopters will play a central role in the future of trans
portation in the New York/New Jersey region. A new
heliport for Kennedy Airport will be an important feature
of the master plan for rebuilding JFK. Another example of
the Port Authority’s commitment to helicopter service is
the reconstruction and expansion of the Downtown Man

hattan Heliport, now in progress

\ vertical-takeoff-and landing (VTOL) aircraft in demon
stration flight over New York

When completed in the spring of 1987, the Wall Street
Heliport will be one of the country’s most modern heli
ports The old Wall Street | leliport was closed in 1983 for
complete reconstruction of the pier on which it was sit

ated. Operations were temporarily relocated to the World

[rade Center/Battery Park City Heliport

(he new heliport will have triple the parking area of the
old one and be able to handle helicopters weighing 50,000
pounds. By contrast, the weight limit at the old heliport
was 10,000 pounds. Further the new heliport is expected
to handle additional scheduled flights to the airport

Philadelphia and to Atlantic City, New lersey

lhe projec t has been selected by the Federal Aviatior
Administration as one of four sites in the nation for a
National All-Weather Demonstration Heliport that will
equip the facility with state-of-the-art electronic and
visual landing aids. The program will also formulat

procedures for landing in poor weather that may eventu

ally be applied to other helipor ts around the nation

Work also progressed in 1986 on a Port Authority study

}

investigating the potential of vertical takeoff and landing

333

(VTOL) aircraft as a means of alleviating airport conges-

tion while increasing air transportation Capacity at Ken

nedy, Newark and LaGuardia Airports. The use of VTOL
aircraft promises to create totally new short-haul air

transportation systems in the region, operating from city

center to city center. This short haul market is estimated
to be as much as 30 percent of the total at some air hubs

TT

—

i Hil

iN Nite
=

~ Ti i}
PUTT

i

4 Ag wwe
~-

U
Te

Reconstruction of the Wall Street Heliport will
triple its capacity when completed in 1987.

[he particular type of VTOL aircraft being studied is
commonly referred to as “tilt rotor.” The aircraft com-
bines the wings of an airplane with the rotors of the
helicopter, an advanced design that is fuel-efficient, vet
offers twice the speed and range of a helicopter. Conse
quently, it allows the craft to take off and land like a
helicopter yet operate as a conventional fixed wing air
craft in flight

As part of the study, the Port Authority will investigate

the viability of other types of aircraft as well as the cost

334

economics of aircraft, potential markets and carriers, reg
ulatory controls and possible site locations for airports to
serve VTOL aircraft. This effort, which is being coordi-
nated with VTOL studies being conducted by NASA and
the FAA, is to be completed this spring.

As part of this effort, the Port Authority cosponsored
with the FAA a Civil Rotorcraft Forum early in 1986.
Prominent leaders in industry and government attended
the conference in order to assess the potential of tilt-rotor
aircraft in creating a new major segment of the public air

transportation system.

Airports and the Communities

The Port Authority continued in 1986 to be actively
involved in issues affecting the bi-state region, as our
community relations programs touched a wide audience
with a broad range of activities. From employment to
environment, from noise abatement to education, we are
involved in a variety of programs to improve the quality

of life in the New York/New Jersey region

Efforts to alleviate the problem of flight delays made
dramatic progress in 1986, as we worked with the airlines
and the Federal Aviation Administration on a plan to
restructure and expand the air space assigned to the three

airports

Late in 1986, the FAA implemented a preliminary phase
of the plan at Newark International Airport. The next
stage will be the restructuring of airspace along the East
Coast this February. This expansion scheme will assign

more departure routes to Newark, while redistributing

335

other air routes between Kennedy and LaGuardia. The
FAA’s Expanded East Coast Plan will offer parallel and
alternate paths for aircraft now bottlenecked by single-
route systems, and is expected to alleviate airport delays
and improve safety

In 1986, we initiated development of a Flight Track Mon
itoring System in cooperation with the FAA. Using radar
information, the Port Authority will be able to monitor
aircraft adherence to prescribed flight paths in an effort
to reduce noise from flights Straying over residential

areas

In the same spirit of achieving safer and quieter airport
operations, the Port Authority is working closely with
community groups and an outside consultant on
assessing the design of a noise abatement wall, to be
located along the western edge of LaGuardia Airport
[his would reduce noise levels from both aircraft and

ground operations

A significant event in 1986 was the more “Stage 3” air-
craft, employing new technology for quieter operation
began operating out of the three airports. This trend is
expected to continue, as the major air carriers continue to
upgrade their fleets with purchases of the latest aircraft
models. The increased use of quieter widebody aircraft,
which will carry more people per plane than in the past
leads the Port Authority to forecast lower noise beast
despite the growth in passengers. At the same time, we
are urging the federal government to establish a timetable
for phasing out Stage 2 airplanes aircraft that meet

nrecent nn} , ,
present noise standards but remain the root of the noise

336

We also continued with our School Soundproofing Pro
gram during 1986. At present, 17 schools in New York
and New Jersey, affected by noise from aircraft opera
tions, are slated from soundproofing work at a cost of $17
million. This extensive noise abatement program is being
carried out with the support of the Federal Aviation
Administration through Airport Improvement Grants

Port Authority tour guide accompanies community
school children on airport visit

Other efforts in the area ol! environmental protection

continued to move forward during the year The Port

Authority continued its long-term environmental protec

tion program at the three airports in order to minimize

the impact of airport operations on the surrounding com

munities. Among these activities, we continue to bring

together the Flushing Bay lask Force, made up of repre

sentatives from New York State, New York City borough

agencies an
2 and community boards, to monitor projects and

activities affecting Flushing Bay. Similarly, we have par
ticipated with various agencies and community boards
near JFK in a Jamaica Bay Task Force.

. Career opportunities were promoted by the
Port Authority during 1986 with Career Davs and
Mentoring programs at the airports

4
\s the metropolitan area airports continue to be devel

iped 7 } ) Ts)
[ each year to keep up with rising demand, new

employme r
| ent Opportunities are continually created Some

Hs LLM) +

people earned their livelihood at our three airports

TY 1ORG TY } 9G
sat : st ) , i
a
—
>
“a

1eTCce

COMM

b
~~
” —
a —~
- —
- —
_ : -
—
= ~~
o
\ / ~
- = —s
~~ >

THE PORT

= mt
—_.
—
- “
—
—~
amd -
—— —_
~
/ ~—
> /
a
~ 7
om ~~
oo ~
. —

343

comprehensive investment plan that meets the region’s
growing needs for moving people and goods between the
states and maintains the transportation and commercial
facilities essential to the region’s future economic health.”

Chairman Kaltenbacher continued, “These invest-
ments will promote mobility within the metropolitan area
and will help protect its pre-eminent role as American’s
aviation gateway, maritime-port, and national and inter-
national center of business and finance. They will be
funded by the Authority on a self-supporting basis, with-
out taxpayer subsidy.”

“Key to the implementation of this program are the
actions also taken today, pending public hearings, to
adjust tolls and fares on the Port Authority’s interstate
transportation network of vehicular crossings and transit
facilities,” the chairman said. “The increased revenues
would bring this network - now operating at a deficit -
closer to levels approaching its own operating and capital
needs over the next five years. With these facilities carry-
ing more of their own weight, current and projected
income levels from the agency’s other facilities, with
some expected adjustments, would be capable of support-
ing the balance of this ambitious and much needed capi-
tal program.”

The capital program anticipates commitments total-
ing approximately $5.8 billion from 1987 through 1991, of
which approximately $4 billion actually would be
expended during this period. Additional spending
beyond the five-year planning period would be needed to
compete the Kennedy and Newark Airport initiatives.

344

The $5.8 billion figure includes $2.4 billion for avia-
tion facilities, $1.5 billion on the interstate transportation
network, approximately $500 million for port commerce
projects, and about $650 million in other regional devel-
opment projects. Approximately $400 million is allocated
for other anticipated capital initiatives and rehabilitation
needs on an agencywide basis for the five-year period.

The remaining $350 million includes the balance of
the regional development projects agreed to by the two
Governors in June 1983, the balance of the funds commit-
ted for the Port Authority’s bi-state bus programs, and a
provision for emergency repairs to Port Authority facili-
ties.

The Port Authority operates six bridges and tunnels
connecting New York and New Jersey; the PATH inter-
state rail rapid transit system; two Manhattan bus termi-
nals; the three major regional airports, a general aviation
facility at Teterboro and two heliports; port commerce
facilities at Port Newark and Elizabeth in New Jersey, and
marine terminals at Howland Hook on Staten Island and
two sites in Brooklyn; and the World Trade Center.

Facilities under development include the Teleport on
Staten Island; the Newark Legal and Communications
Center; and industrial parks in the Bronx, Yonkers, Eliz-
abeth and Newark. Other anncunced projects include a
resource-recovery plant serving Essex County in Newark
and waterfront development projects in Hoboken and
Queens.

Port Authority Executive Director Stephen Berger
explained: “The proposed investments are required
because of the growing demand on our aviation and

345

vehicular and transit services, and the imperative of
maintaining safe and efficient operations on many aging
transportation facilities. We have an obligation to support
the region’s improved economic performance through
our traditional transportation functions and our job-creat-
ing investments in distressed communities in both states.
This is a strategic agenda for an economically integrated
region.”

Highlights of the Port Authority Capital program by
basic business area follow.

Interstate Transportation Network

The Port Authority has recommended a regional
strategy of improving and expanding trans-Hudson pub-
lic transit services as the only practical solution to wors-
ening vehicular congestion and transit system crowding
as economic growth has spurred rush-hour demand.
Working in cooperation with other transportation agen-
cies in both states, the Port Authority plans to undertake
major capital investments to accomplish this goal.

Specifically, the program provides funds necessary
for the completion of the comprehensive PATH transit
system rehabilitation and capacity expansion program
initiated in 1983. This effort, already well underway,
includes replacement or renewal of the entire PATH car
fleet, longer trains on the Newark-to-World Trade Center
and Journal Square-to-33rd Street lines, and moderniza-
tion of key components and stations in the 79-year-old
interstate rail system. An estimated 760 million is allo-
cated for these purposes in the five-year program, in
addition to the $165 million expended since June 1983.

_~

ces lama ga

346

Even with these extensive improvements in PATH’s
equipment and service, the expected continuation of 3
percent yearly growth in trans-Hudson commutation
points toward a shortfall of transit capacity in the lower
Manhattan market by the end of the decade. Anticipated
waterfront development in Hudson County also will
increase peak-period demand for PATH service.

To meet this challenge, the Port Authority has devel-
oped with New Jersey transportation agencies an inte-
grated plan to add substantial and flexible transit
capacity that can meet forecast demand in this market
through the early years of the next century. The plan
includes a new passenger ferry service connecting
Hoboken and lower Manhattan; further investment in
PATH’s Newark-World Trade Center line to accommodate
9-car and eventually 10-car trains in peak periods; and
implementation by New Jersey Transit of the “Reverse-
Kearny-Connection” project - which will enable some
NJT commuter trains now terminating at Newark to
travel on to the commuter rail hub at Hoboken.

The ferry plan calls for a fleet of modern vessels
capable of carrying 4,500 passengers per hour during the
peak period between the existing ferry terminal in
Hoboken and a new landing site and terminal to be
developed at Battery Park City in Lower Manhattan. The
capital program allocates approximately $150 million for
this initiative. The potential for private-sector involve-
ment in the ferry operation will be evaluated as develop-
ment of the system proceeds.

The PATH expanded service plan builds on the exis-
ting plan to extend peak-period trains on the Newark-

347

World Trade Center line from 7 to 8 cars in 1988. The five-
year program provides $70 million to extend station plat-
forms to accommodate trains up to 10 cars in length and
to purchase sufficient additional cars to run 9-car trains
on this line within the five-year planning period, if
demand warrants.

Meeting peak-period demand in the midtown trans-
Hudson market poses more complex problems because of
the larger number of facilities and services in this sector.
Present concerns focus on the Lincoln Tunnel Exclusive
Bus Lane system, which carries almost 65,000 commuters
every morning — more than any other component of the
interstate network. The Port Authority capital program
provides approximately $25 million to help finance devel-
opment in New Jersey of a Hudson Busway, a second
exclusive bus approach to the Lincoln Tunnel.

The Port Authority is also engaged in joint study
with agencies in both states of additional projects and
service improvements for the midtown Manhattan mar-
ket. In furtherance of this objective, the Port Authority
capital plan includes approximately $25 million for traffic
distribution improvements in Manhattan’s Central Busi-
ness District to help alleviate commuter congestion prob-
lems.

The capital program also provides $445 million in
capital investment for the agency’s tunnels and bridges,
the Midtown Bus Terminal, and related facilities. This
spending is aimed at maintaining the structural integrity
of these facilities and improving their operating effi-
ciency. For the five-year period, the plan anticipates capi-
tal commitments of $115 million at the Holland Tunnel,

348

$140 million at the Lincoln Tunnel, $55 million at the
George Washington Bridge, $55 million at the Port
Authority Bus Terminal, and $65 million on the Staten
Island Bridges System.

Annual traffic growth on the Port Authority’s three
bridges linking Staten Island with New Jersey is now
outpacing growth on the trans-Hudson crossings, and the
Port Authority in 1985 announced plans to assess future
needs on this system, which connects two of the region’s
most rapidly growing areas. The plan provides for up to
$20 million of the capital program allocation for the
Staten Island Bridges to be committed for start-up costs
associated with a possible capacity expansion, subject to
further analysis and consultation with transportation
agencies in both states.

Aviation

The aviation capital program reflects the need to
improve passenger circulation systems and other services
at the region’s three major airports to improve upon
present levels of service and to accommodate projected
growth in passenger demand to at least the year 2000.
The plan estimates the commitment of $2.4 billion at
these facilities over the next five years, with additional
spending needed to complete these improvements in the
1990's.

JFK 2000 is an integrated project plan that will recon-
figure the airport’s central terminal area, addressing the
circulation and service problems now evident at the air-
port, and enabling JFK to accommodate demand expected
to increase to 40-45 million passengers per year by the

349

end of the century. In 1986, JFK handled 27.2 million
passengers.

The project includes expansion of the International
Arrivals Building and Federal Inspection (Customs) Hall,
an automated baggage-handling system, a “people
mover” rail system linking terminals to a new central
transportation hub, a reconfigured roadway system, a
new control tower for the Federal Aviation Agency, and
other improvements. The Port Authority anticipates a
commitment by 1991 of $900 million for this project. Total
project cost is now estimated at $2.7 billion.

Passenger demand at Newark International Airport
is expected to grow on the same scale as at JFK, and the
NIA 2000 plan provides for circulation and landside
access improvements, including new roadways, struc-
tural parking facilities and a “people-mover system” for
improved on-airport circulation. The airport’s widely dis-
persed market will be accommodated by development of
satellite “park and fly” terminals, and a future connection
of the “people-mover system” to possible new transit
service linking Newark and Elizabeth. Approximately
$650 million is expected to be committed for NIA 2000 by
1991. Total project cost now is estimated to be $1.35
billion.

The aviation capital plan also provides $200 million
for projects at LaGuardia Airport that are designed to
accommodate expected increases in passenger demand.
Construction of a new passenger terminal and highway
access improvements at the east end of the airport will
create two separate terminal areas, one at the existing
Central Terminal complex and another at the airport's

350

east end, with each capable of handling 15 million pas-
sengers yearly.

In addition to these major capital improvement pro-
jects, the plan allocates funds for a variety of improve-
ments to Port Authority aviation facilities. At Kennedy,
$330 million is earmarked for improvements aimed at
easing congestion on roadway approaches and improving
on-airport cargo facilities. An estimated $210 million will
be used to complete Terminal C at Newark Airport and
construct new maintenance facilities. Modernization of
passenger and parking facilities and improvements to
airside facilities at LaGuardia will cost an estimated $120
million.

Port Commerce

The agency has earmarked $250 million in the capital
plan for improvements at Port Newark and Elizabeth,
which include establishment at Port Newark of a gypsum
processing plant, a second juice processing facility, and
the building of cargo distribution buildings at Elizabeth
to accommodate added cargo carried by larger container-
ships. The agency has allotted $110 million, of which $20
million has already been spent, to help finance renovation
of the Howland Hook Marine Terminal on Staten Island.

The Port Authority anticipates an initial capital out-
lay of about $60 million for essential channel deepening
in Newark Bay, the Kill van Kull and Arthur Kill, which
will help finance dredging of channels and berths serving
Port Newark/Elizabeth and Howland Hook on Staten
Island from 35-foot to 40-foot depths. The agency under-
took this commitment in a 1986 agreement with U.S.

351

Army Corps of Engineers, anticipating the passage of
federal legislation that requires local cost sharing for
channel dredging projects.

The capital plan includes $110 million for additional
port projects, including continuing work at the Fishport
under development in Brooklyn; support of the Oak Point
Rail Link construction in the Bronx, which is designed to
improve rail freight connections between upstate and
downstate New York; a facility in Jersey City and Bayo-
nne for preparation and transshipment of imported cars;
and the agency’s contribution to the planned US Navy
Homeport on Staten Island.

World Trade

The Port Authority’s capital spending plans in the
area of world trade focus on efforts to improve regional
telecommunications capacity and projects to support eco-
nomic development in Newark. The agency has allotted
$110 million between 1987 and 1991 for these efforts.

At the Teleport, the satellite communications center
and office park on Staten Island, two buildings have been
completed and antenna dishes for transmitting data via
satellite are already operating in the facility’s enclosed
earth station field. A fiber-optic cable network connecting
Teleport to points throughout the region has been com-
pleted.

With the City of Newark and the Newark Economic
Development Corporation, work has begun on the New-
ark Legal and Communications Center, a facility designed
for law firms with access to shared computer data banks
and special legal services.

352

Rehabilitation projects within the World Trade Cen-
ter, including fire safety projects, are also planned.

Economic Development

The agency’s capital spending plans in the area of
economic development target investment and the jobs it
produces to inner city areas that have not fully partici-
pated in the region’s overall economic recovery.

Construction continues at the Bathgate Industrial
Park in The Bronx, with completion of all 12 planned
blocks scheduled for 1988.

The Port Authority Industrial Park at Elizabeth has
attracted its first tenants, and paving and utility work is
underway on a major portion of the 125-acre site.

A new industrial park at Yonkers permits the Port
Authority to emphasize economic development directly
related to maintenance of its transportation system by
using part of the site for manufacturing and assembling
the newest PATH rail transit cars.

The agency will also establish an industrial park in
the South Ward of Newark. About $75 million will be
spent at the industrial parks beyond the approximately
$35 million committed to them prior to 1986.

A resource recovery plant in Newark to serve Essex
County will be constructed and operated by a private
firm with Port Authority financing. The facility, toward
which about $300 million is earmarked in the capital
plan, will convert solid waste into thermal and electrical
energy and sell the electricity to local utilities.

353

The agency continues to move forward with planning
for major waterfront development projects in Hoboken

and at Hunters Point, Queens.

At Hoboken, a development plan has been prepared
and discussions continue with the City of Hoboken on the

project timetable and operating issues.

Planning is also underway at Hunters Point, with prepa-
ration of master and alternate master plans in progress.

A total of $175 million has been allocated for water-
front development in the five-year plan, for a total in

economic development projects of $550 million.

Port Authority of New York and New Jersey
Capital Program Summary

1987-1991

(in millions)

Interstate Transportation Network

PATH !mprovement Program! $760
Hudson River Tunnels, Bridges &

PABT System Improvements 380
PATH Station Improvements and

Additional Cars (Newark Service) 70
Hoboken/Battery Park City Ferry Service 150
Staten Island Bridge Improvements? 65
Holland/Lincoln Tunnel Busway 25
Manhattan CBD Distribution

Improvements _ 25

$1,475

' Includes expansion to 8-car trains, Newark Service, and

7-car trains, JSTC/33rd St. Service.

2 Includes up to $20 million for preliminary stages of

possible SIB Expansion.

Aviation

JFK 20002
Other JFK
Newark 20004
Other Newark
LaGuardia

Economic Development
Waterfront Development®
Resource Recovery
Industrial Parks

World Trade

Port

Newark & Elizabeth
Howland Hook
Dredging

Other Projects

Allocation for Regional
Development Projects

Allowance for Projects
in Development

TOTAL

Balance - Bus Program

354

250
90
60

110

Balance — Bank for Regional Development

Provision for Emergency Repairs

TOTAL CAPITAL PLAN

3 Total Project Cost: $2.7 Billion
4 Total Project Cost: $1.35 Billion
> Total Project Cost: $250 Million

2,410

550
110

355

EXHIBIT 7
NEWS THE PORT AUTHORITY OF NY & NJ
39-87 FOR IMMEDIATE RELEASE

March 12, 1987

John F. Kennedy International, Newark International
and LaGuardia Airports served nearly 79 million air trav-
elers in 1986. That figure is expected to increase to more
than 110 million by the late 1990’s. The three airports
comprise the busiest and most heavily used metropolitan
airport complex in the world - and will undergo the
largest redevelopment program in aviation history.

Kennedy and LaGuardia Airports are currently han-
dling double the number of passengers they were
designed to handle. Newark, although virtually rebuilt in
the 1970’s has experienced explosive growth over the last
five years and is currently the seventh busiest airport in
the world in terms of passengers served. On-airport cir-
culation and off-airport ground connections are inade-
quate at all three facilities. Meanwhile, competing air
gateways are emerging as the airline industry changes
and multi-billion dollar investments in other regions
threaten this area’s pre-eminence as an international air
hub for the movement of both people and cargo.

That dominance is at the heart of a prodigious eco-
nomic impact on this region: The aviation industry in the
New York/New Jersey metropolitan area accounts for
nearly 300,000 jobs, $6.2 billion in wages and salaries, $19
billion in overall economic activity, $600 million in
regional taxes and 3.5 percent of the gross regional prod-
uct.

356

“This region’s air transportation services,” said Port
Authority Chairman Philip D. Kaltenbacher, “are critical
to maintaining our role as a national and international
center for business and finance. Even if they were not, the
74 percent increase in nationwide annual air travelers
projected by the Federal Aviation Administration to take
place by 1998 would constrain us to undertake these
measures.

“The size of this industry’s impact on the regional
economy underscores our need to take whatever steps are
necessary to facilitate the swift and convenient movement
of people and the rapid, efficient handling of air cargo
through our airports.

“We are now embarking on an exciting and innova-

tive capital improvement program designed to do just
that.”

NEWARK INTERNATIONAL AIRPORT

Newark International Airport served 29.4 million air
travelers in 1986, tripling its passenger volume in the last
six years. To accommodate this trend and the projected
growth to 40-45 million passengers annually at Newark
by the late 1990’s, the Port Authority has earmarked more
than $1 billion to meet the airport’s growth needs. The
main elements of this program include: major restructur-
ing of the airport’s roadway system; an on-airport “peo-
ple mover” system connecting Terminals A, B and C and
the existing long term parking lots, and having the poten-
tial to connect with an off-airport transit system; the
doubling of pick-up and drop-off capacity of roadways

357

serving Terminals A, B and C; and a structural parking
facility in the central terminal area.

Roadway improvements will incorporate modifica-
tions to the roadways serving the entire central terminal
area (CTA) to provide optimum traffic flow on-airport
and greatly improve the connection between on- and off-
airport roadway systems. Work will be done in a phased
manner to ensure continued operation of the roadway
network throughout the construction period with mini-
mal interference of traffic flow. The roadway modification
program is anticipated to begin by 1988. The configura-
tion and capacity of structural parking facilities will be
designed to complement the other elements of the
redevelopment program.

In addition, a principal project currently under way
and in which the Port Authority will continue to be
heavily involved is the completion of Terminal C and the
financing of construction of the Cl and C2 concourses
and the apron aircraft fueling system. The Port Author-
ity’s role in the terminal’s construction includes work on
adjacent taxiways and courtyards at both ends of Termi-
nal C. The C1 and C2 concourses will provide 41 aircraft
gates for Terminal C. This new terminal, being built at an
estimated cost of $175 million to $200 million, is expected
to be completed by the end of 1987.

As an interim improvement measure, the provision of
an additional lane to the airport’s existing express road
will facilitate vehicular access to and egress from Termi-
nals A, B and C. Modifications are also planned to extend
public access to the new terminal’s parking level fron-
tage.

358

Current efforts to reduce roadway congestion include
the development of a holding area for taxis and lim-
ousines to reduce congestion in front of the terminals.
The completion of Parking Lot F, already under construc-
tion, will provide 3,000 more long-term parking spaces,
bringing the airport’s total parking capacity to 23,000.
The addition of eight new and two reversible exit lanes
and the recent initiation of the pre-cashiering program
allowing for pre-payment in the terminals for those par-
ked for less than 24 hours will help reduce queuing at the
CTA parking lot tolls plaza.

In the aeronautical areas, new taxiway additions and
modifications will help reduce aircraft runway occupancy
times and provide greater flexibility for aircraft ground
movement. Other improvements include centerline light-
ing for Runway 11/29, an instrument landing system for
Runway 11 and a new aircraft noise monitoring system.
There is also provision for taxiway access and installation
of related paving and utilities to the airport’s United
Parcel Service site and other cargo and maintenance sites
at the south end of the airport.

A new maintenance facility will be constructed, pro-
viding 57,800 square feet of space to accommodate the
airport’s maintenance functions and a 38,800 square foot
garage to house the airport’s snow removal vehicles.

JOHN F. KENNEDY INTERNATIONAL AIRPORT

John F. Kennedy International Airport was con-
ceived, designed and constructed more than a generation
ago to serve what was then an extremely optimistic fore-
cast of 15 million air passengers a year. Although the

359

airport's airline terminals have been expanded and air-
field and roadway improvements have been made since
that time, the airport is recognizably the same as it was
when the International Arrivals and Wing Buildings and
nine individual airline terminals, comprising the central
terminal area, were completed in the early 1960's.

In 1986, Kennedy International handled more than
27.2 million air passengers, a volume that is expected to
grow to 40 to 45 million by 1995-2000. More than one-
third of all international air passengers arriving in the
United States enter through Kennedy, making it the
nation’s leading air gateway.

To meet the projected demands of the next decade
and into the 21st century and to provide superior levels
of service for all airport patrons, both domestic and inter-
national, The Port Authority of New York and New Jersey
is planning an extensive redevelopment and reconstruc-
tion program for Kennedy Airport over a ten year period
that will cost approximately $3 billion. More than $1
billion of this amount is included in the present five-year
capital plan. The components of this major capital pro-
gram include airport access improvements, terminal
expansion and the development of a new central pas-
senger services complex.

Transportation Center

A new Transportation Center will be at the heart of
the plan to redevelop the central terminal area. Its main
purpose will be to handle all passengers using public
transportation to or from the airport and travelers
making connecting flights. Buses and limousines will no

360

longer make stops at each airline terminal, but will make
a single stop to drop off or pick up passengers at the new
Transportation Center’s Arrivals and Departures level.

Other improvements will be an expanded Federal
Inspection Services facility, capable of processing twice as
many passengers per hour as currently handled; an auto-
mated baggage sorting system, tying each of JFK’s unit
terminals into a single baggage transfer system; auto-
mobile parking contained within the Transportation Cen-
ter; new food and retail services near a new Meeter/
Greeter Hall; and a new FAA control tower as part of the
complex. Center plans incorporate provision for a chapel
area to serve the spiritual needs of airport travelers and
employees.

Passenger Distribution System

At the Transportation Center, a new fully automated
Passenger Distribution System (PDS), or “people mover,”
will shuttle passengers to each airline terminal at two-
minute intervals, replacing the existing on-airport bus
and taxi operations, as well as providing service to those
who walk between terminals. The PDS will help reduce
traffic congestion and also facilitate the movement of
travelers and luggage between connecting flights.

Baggage Handling System

A major element of the proposed improved \pas-
senger services at JFK is a new and efficient inter-termi-
nal baggage service — a fully automated handling system
that is expected to sharply reduce baggage transfer time.

361

The primary components of this system will include a
central sorting facility located in the Transportation Cen-
ter; a series of high speed conveyers and/or destination-
coded vehicles that will replace the existing “tug and
cart” method; a state-of-the-art, laser-read tag system;
and a coordinated system of baggage collection and dis-
tribution between each airline terminal, the Transporta-
tion Center and the refurbished International Arrivals
Building.

Redeveloped Roadway Network

An entirely redesigned roadway network, con-
structed in phases to minimize traffic problems, will
reduce the most obvious form of airport congestion. This
redeveloped roadway network will include: 1) comple-
tion of the new JFK Expressway, providing direct access
to the passenger terminals from the Belt Parkway at 150th
Street; 2) more direct roadway connections to the pas-
senger terminals, replacing the existing loop road; 3)
direct roadways to the Transportation Center from the
Van Wyck and JFK Expressways, designed to improve
access for public transportation vehicles; 4) modifications
to roadways in front of each passenger terminal to reduce
traffic conflicts; and 5) the completion of a new taxi
holding area to provide a more efficient taxi dispatch
system.

These roadway improvements will result in shorter
travel distances and reduce traffic congestion and travel
times for all movements within the central terminal area.

In addition to the roadway work the Port Authority
is undertaking as part of the overall capital program,

~ soca ell

362

work is also being performed by New York State on the
new Nassau Expressway, at an estimated cost in excess of
$100 million. The State’s project, begun in 1983, will link
the Belt Parkway at Cross Bay Boulevard with the Atlan-
tic Beach Bridge in Nassau County.

Southwest Area Connector

Although it is not part of the improvements currently
programmed, the Port Authority will examine the fea-
sibility of constructing a passenger distribution system
linking the New York City Transit Authority’s JFK
Express station at Howard Beach station with the central
terminal area. Right-of-way provisions may also be made
to allow for future consideration of a single track subway
extension from the Howard Beach station to the central
terminal area.

LAGUARDIA AIRPORT

Due to its proximity to Manhattan and wide choice of
domestic flights, LaGuardia Airport is popular, especially
with business travelers. In 1986, LaGuardia’s compact site
was crowded with more than 22.2 million passengers.
Current projections are for 28 million passengers by
1995-2000, an almost 30 percent increase in passenger
traffic. To handle this projected growth, the Port Author-
ity will increase the capacity and ease of using the airport

through an ambitious modernization and development
program.

The current highly compartmentalized Central Ter-
minal Building (CTB) layout will be opened up to create a

363

more homogeneous terminal that will provide more space
for passenger circulation and amenities. Work has begun
to expand interior space and make it more open for freer
movement on both the first floor arrivals level and the
second floor departures level of the CTB.

On the arrivals level, the terminal’s streetside win-
dow wall will be moved out by more than 20 feet along
the entire length of the building, to provide additional
space for patron circulation, ground transportation ser-
vices and baggage claim areas. On the departures level,
work will include widening the roadways by at least an
additional land to reduce congestion in front of the CTB.
Construction on both these projects is scheduled to start
in 1988.

Another important component of the plans for the
central terminal area is provision of a direct entrance to
the parking garage from the 94th street entrance, which
would eliminate the need for circling the garage in order
to enter, and thereby reduce traffic in front of the CTB.
Construction for this segment of the plan will start in
1988.

The new east end terminal, to be used by one or more
airlines, would be built adjoining the Eastern Airlines
Shuttle Terminal. The new terminal would include
approximately 250,000 square feet of space on two levels
and incorporate all patron services facilities. Its construc-
tion, scheduled to start in 1989, should help to balance
passenger traffic between the central terminal area and
the east end area.

Construction of a new East End Passenger Terminal
will be complemented with a roadway program that will

ee a smell

364

reconfigure and expand on-airport roads while providing
new access to LaGuardia’s east end area with construc-
tion of new off-airport roadways.

Starting in 1987, the airport’s east-end roadways will
be realigned and expanded to provide more efficient ser-
vice to travelers. To improve airport access to the east
end, off-airport road work should commence in 1990.
Construction of ramp connections to the 102nd Street
Bridge, which will serve as an exit and entrance to the
airport, and a new fly-over roadway to provide access
from the eastbound Grand Central Parkway to the east
end terminals (Delta Airlines, Eastern Airlines Shuttle,
and the planned East End terminal), will allow the sep-

aration of central terminal area and east end vehicle
traffic.

Additional capital work at LaGuardia involves mis-
cellaneous improvements to the aeronautical areas; more
aircraft parking space; and construction of a safety over-
run area at the end of Runway 13-31, all of which will
serve to improve operations at the airport.

Also scheduled for construction is an underground
hydrant fueling system, which would improve safety and
obviate the need for fuel trucks in the ramp areas,
thereby reducing overall ramp congestion.

365

EXHIBIT 8

» GETTING
AROUND AT JFK

AGUDETO
JOHN F. KENNEDY
INTERNATIONAL AIRPORT

be oad

TITTITHCITitrT TH YT Ae rons

‘‘\ aor
~

NEW YORK/NEW JERSEY AIRPORTS

Kennedy Newark LaGuardia

WELCOME!

A « + tr
‘AS one O} l¢ wions pusiest alr

handling some 5U million DaSst NVe’;s ¢
veal we re proud to be the world’s gat
to America. In order to ensure that JFI
remains Americas premier gateway

2\st century, we have embarked on ap
gram of redevelopment and reconstruc

without precedent in the history of the

port The groundwork is now being laid {
1 new JFK that will be among the world’s

most modern international! arp yrts
facilities and services that w —

improve the quality of air travel thr

our gateway

36, 0
This Visitor's Guide has been prepared ,

with your comfor and convenience If CONTENTS

mind—to help you find your way around Information for art

and to acquaint you with the many services On internation

available. In addition to the information On domestic {

offered in the following pages, please refer nformation for pa

to the insert in the back pocket of this r flight

Guide. It contains up-to-date information Information for departing

about the airport and its services, including Raeneeen eemiiene us Ot

complete parking rates and ground trans- i aeaaneiihies aninilione me
Health and human ser\

portation schedules. Whether you re land-
ing, taking off or just stopping by on your
way to catch another flight, we re happy to
have you with us and hope you ll come this
way again soon

Re ig

VIOUS SeETVICeS
rassenger convenilel!l
Covernment service
IFK /
K Airport Map

i K relerel fT
} (

Sincerely,
Webel 4 ture
Robert J. Aaronson

Director of Aviation
The Port Authority
of New York and New Jersey

Where t park Your i at Jirer

| transportatiol
Within JFK
lo and from JFK
sportation from JFK to Newark
ternational and LaGuardia air]
+} |

art with an area one-third tl

aT ) r? . ;
nattan A profile of one

tr

rocft r
LLeESi a?’ ] busiest airport

out The Port Authority

Yew jersey

VOW THAT You VE LANDED

INFORMATION FOR
ARRIVING PASSENGERS
ON INTERNATIONAL FLIGHTS

A

U.S. Immigration and Customs forms: \\

ia
Non-U.S. residents:

L.S. Customs: /

baggage inspection

Multilingual services

INFORMATION FOR ARRIVING
PASSENGERS ON DOMESTIC FLIGHTS

WHEN YOU'RE READ)

INFORMATION FOR PASSENGERS
CATCHING ANOTHER FLIGHT 10 TAKE OFT
INFORMATION FOR
DEPARTING PASS} VGERS
Please leave yourself enough time

rs )
’
ry? ; , ‘ |
Ex Play
r? rry ;
t : , ‘ i‘

1¢ rriire

FREE BAGGAGE TRANSFER SERVICI
| esa ry ng When you arrive at JFK: :

- it

ai

For everyone's security: |

rit

How to arrange it — | -
ior tree iweage tI ratJsre ' —
ISS al ind-he Was
r } gy Ke } oT X ra ichine
repress , ke
erred t je ont at i
rm that have been ticketed
| } ‘ Ve t
ting, re lar e pers IL
ggave that 5 wa Our Daggave
r connecting flight at JFK. A
nen de affixed your luggag
International flights: On arrival at JFK, pas
rat 1 Tignts si 1 Claim their Dage
¢

Domestic flights

373

PASSENGER SERVICES AT JFK

You may never require the services listed below.
But if you should, you'll be glad to know they re

available

NFORMATION a
SERVICES AND ASSISTANCE
Police: For general assistance, call
(718) 656-4668. In an emergency,

(718) 656-4333

Information Counters: A centrally-
located information counter—staffed by
bilingual personnel—is on the first floor
of the main lobby of the International
Arrivals Building, (7/8) 656- 7990. In
addition, you'll find information desks at
most other terminals. Consult the chart
on page 14 to determine whether your
airline has one. For information over the
phone, call (7/8) 656-4520.

Ground transportation information:
JFK's consolidated ground transportation
~ counter is located in the first floor lobby
of the International Arrivals Building.
There, knowledgeable staff provide accu-
rate information, free of charge, on how
to get to or from JFK.

s

HEALTH AND HUMAN SERVICES

Medical services: A medical clinic,
+ open 24 hours a day, is located in Build-
ing *198, at 150th Street and South

Cargo Road, (7/8) 656-5344. In an emer-
gency, contact the Airport Police on
(718) 656-4333

374

Dental services: A denta! Office, open
Mondays and Wednesdays from 10 a.m
to 5:30 p.m. and Thursdays from 10 a.m
to 3:30 p.m., is located in Suite 2311 on
the second floor in the East Wing of

the International Arrivals Building,
(718) 656-4747

Assistance for the disabled: Ji)
assure the disabled person maximum
comfort, convenience and ease of move-
ment through the airport, it is wise to
make all necessary arrangements in
advance—through your travel agent or
airline representative. For additional
information about facilities for the dis-
abled at the International Arrivals Build-
ing, contact The Port Authority of New
York and New Jersey at (7/8) 656-4476

Nursery facilities: A nursery, located
on the second floor of the International
Arrivals Building, offers a changing table
and lounge. Additional nursery facilities
are located in the British Airways and
TransWorld Airlines terminal buildings,
but are restricted to use by those airlines
ticketed passengers.

Traveler's Aid: This nationwide social!
service agency, offering various types of
assistance to the traveler, maintains an
Office in the International Arrivals Build-
ing. Its hours are 10 a.m. to 10 p.m.,
weekdays; and 3 p m. to 10 p.m., week-
ends, (7/8) 656-4870

Paging: This service can be arranged by
calling the airline on which the passen-
ger is arriving or departing

Religious services: JFK's tri-faith
chapel plaza, located near the center of
the airport, offers a Roman Catholic
chapel, (7/8) 656-5348. a Jewish interna-
tional synagogue, (7/8) 656-5044 and a
Protestant chapel, (7/8) 656-5693

375

PASSENGER SERVICES AT JPR

At the Catholic chapel, a mass is sched
uled each day at 12:15 p.m., at 5 p.m. on
Saturday and Sunday, and at 9 a.m. and
10 a.m. on Sunday. Confessions are
heard before each mass. For schedules of
services for the synagogue and the Prot
estant chapel, call the appropriate tele-
phone number, as shown above

The chapel plaza is accessible from
the International Arrivals Building by
walking through Parking Lot “2. From
other terminals, please use your Car Or
a taxi.

PASSENGER CONVENIENCES

Banks, cash machines and foreign

currency exchanges: You will find

these facilities in most terminal build-

ings.
= Baggage storage: Staffed baggage
[ia] storage is provided in two locations on

the second floor of the International
Arrivals Building, (7/8) 995-2228
Another baggage storage area is provided
on the third floor of the Pan American
Airlines terminal (7/8) 656-8617 \n
addition, several terminals provide lock
ers for baggage storage.
On-site lodgings: The Internationa!
Hotel, located right here at JFK, may be
contacted through free courtesy tele-
phones in all terminal buildings or at
(718) 995-9000. Other hotels and motels
may be reached through courtesy tele-
0) phones or airline representatives

Oo 8 &

Hotel reservations: A hotel resery4
tion service desk, operated by Meegan
Services, Inc., is staffed 24 hours a day
and is located in the International Arriy
als Building, (718) 995-9292 Hotel reser
vation desks or courtesy telephones are
available in al! other terminals as wel|

Animal shelter: A; animalport,
operated by the American Society for
the Prevention of Cruelty to Animals
(ASPCA), is available for the holding or
boarding of animals of ail sizes, 24 hour:
a day. It is located in Building “189 on
North Service Court in the Air Cargo
Center, (7/8) 656-6042 |

Lost and found: To recover items lost
aboard flights or in airline terminals
contact your airline representative first
If these items cannot be located, contact
the main Lost and Found office on
(718) 656-4120

’

GOVERNMENT SERVICES

Postal services: You will find pyai!
boxes and stamp vending machines at
various locations in all airline terminals
In addit on, there is 4 postal substation in
the East Wing of the Internationa! Arriy |
als Building and a post office in the Aur
Mail Facility. Building #250 on North

Boundary Road in the « argo area (7/8)
917-1438 .

» IRUNU]

fan

SOUT IVY Surpua,
FH) Gsopanwuy

sUMIBoFO]

eUuTYB0"US

MUO Og
ouTyleyy Buypus,
dureys peyeay

VSULTeU
LOM BI fe] ABW

A ARITA,

doys ayourK,
PUBIFE Mon,
»Bu1016 web Bey
1394 “yy

42)UTIO )

OQ PCULIOJU]

Urea i. |
SUOQRAI82y
0H

sdous
}HULIMNOF)

SIU OUT]
arent |

aBuey x { AovUaum»n )

uBjau0y
sdous
aar4 ANG

syIeUS / Hyo )
SITU] yoo )

UT Oey Use)
SIU s2)uUmO )
fejuoy 17)

wu o2je )

doys yry

oo"Y

doug A)ne ]
i aypIVy

yuey

378

Zle Ole bZ VbZe Cie Sle 89 Ze SADA
loys eng doys sng doys sng sdois sng doy sng dows sng doy. sng doy. sng sdois sng
vwuruu 7H + | wurunsoy | V t eu ui 7H reurtins " VUTULALD (Pura UTULIoy Surprng
sARMUTY pw PELIC | fRUOT RIL) U] SIUTPATY Wi] SOPUTEATY wUTpATY SUTPATY sTeALUY
ysnuug VAI YM | URouUsUTYy URRY PRAM LIOR, Lops y mh PouoUTy PUCTPRPUL UU]

pPuyubsoy

SODOTACES OF (TONSA AAA MOL LO

WHERE TO PARK YOUR CAR

AT JFK

Where you park depends on how long you park

here are lots designated for hourly, short

ng-term reduced-rate parking, as described be

All parking rates include New York City Sales Tax
For parking lot rates and information on free |

shuttle service from the reduced-rate lots, consult

he ‘Parking’ section of the insert in the back pocket

of this booklet

Hourly parking: Lot *6, on the Pan Americar
y pa

Airways rooftop is intended for use by drivers wi
ire picking up or dropping off passengers. Note ¢/
this ts the most expensive of the parking optior
wailable to you at JFK and is intended for use for
tivo hours or less

Short-term parking: Lots “|, 2 {and 5 are
travelers who intend to park their cars for per
not exceeding several days

Long-term reduced-rate parking: Lots “8 and 9
ire offered at reduced rates to travelers who plan t

park their cars for periods longer than several day

. . j
VOle that these rf WS are the IPAS ¢€ KDeETISILE vy thre
Ts . ‘ he ii | -~ ; . " ity
rring options availiable. but are aiso located far
thy t fron the t, rina res
af nro ed Tr nese

380

Parking accommodations for the disabled:
Facilities for the disabled vary from airline to airiine.
Therefore, disabled passengers who intend to park
their cars at JFK are advised to contact their airlines
well in advance of their arrival for information on
parking and other services.

Reserved spaces for the disabled—available at
reduced rates—are provided in Central Terminal
areas lots 1, 2, 3, 4, 5 and 6. For rate information,
consult the ‘Parking’ section of the insert in the back
pocket of this booklet.

For additional information on airport services for
the disabled, write The Port Authority of New York
and New Jersey, Aviation Customer and Public Serv-
ices Division, One World Trade Center, Room 65N,
New York, N.Y. 10048, or call (2/2) 466-7503.

AIRPORT PARKING AND DRIVING TIPS

- All parking facilities are provided on a first-come,
first-served basis.

- Allow sufficient time for driving and parking to
ensure that you arrive at your terminal at least one
hour before flight time.

- Always lock your car and take your keys with you.

- Check your lights.

- Do not leave articles—whether you consider them
valuable or not—in your Car.

- Take your parking ticket with you.

-On your parking ticket, be sure to write the lot and
section number where you've parked your Car.

- For assistance, contact the exit booth attendant.

- If you need towing or other types of automotive
services, call the garage or auto club of your choice

- If you intend to park for more than 30 days, you are

required to notify parking lot management. The exit
booth attendant will assist you.

381

PLEASE OBEY SEAT BELT LAWS
THEY'RE FOR YOUR PROTECTION.

isitors flying in to JFK and drivin stinat
| g to destinations
in rei York, New Jersey or Connecticut are required
by law to “buckle up.” Violators of state seat belt
laws are subject to fines.

For your safety, seat belts should be worn by:
«all front seat occupants -
. — under 10 anywhere in the vehicle
dren under four must be secured i

Safety restraint device. a

IF YOU'RE PARKING AT JFK G THESE
TELEPHONE NUMBERS CAN GETVOU
INFORMATION OR ASSISTANCE. FAST.

Current parking and roadway

ect message)............. (718) 495-5400
arking operator Pusaea ee anaes ean (718) 656-5699
a i (718) 917-6085
WU TONG 40% 65566 bd bdks edhe nel (718) 656-4668

5 383

HOW WE TAKE THE WALKING OUT OF
rk ALTO ACCESS ROI rES OW WE TAKE

} GROUND TRANSPORTATION SERVICES

For prices schedules ind a lusting of the my
es offering the services listed below. consult t!
« Major Auto Acges

sz

Ground Transportation’ section of the insert

thy ,

$7

i K por Ket i this booklet

WITHIN JFK

Free 24-hour terminal-to-terminal bus serv-
ice: If you're traveling between JFK's nine termina
board one of our climate-controlled, yellow and

white airline connection buses. These operate fre

;

i charge, 24 hours a day

Taxi service: At each termina! within JFK you
find a taxi dispatcher on duty during peak trave

periods, at designated taxi stands. The dispatcher

will summon a taxi licensed by the New York City
Taxi and Limousine Commission, for trips wit!

IFK and its vicinity

Transportation for the disabled: Au -

n-demand transportation service provided by
uirlines as a courtesy to disabled passengers, pro
des fast point-to-point connections between ter
nals. i his service, which employs vehicles specially
lesigned to accommodate disabled passengers and
ry > . ‘ |
, \ rr ws Br er whee | ilTS iS © alta wed througn VOUT alrilne
: arre
4chington Bridge F Verrazano Na a ipo mnie it
\ George Washing , , epres¢ ative 1,avance of your arrival!
Manhattan Bridge
. Rridos Vidlliia
r r iit ik -
A ’ =
k

384 385

1) AND FROM JFK Taxi service: You wil! find taxis a

each terminal. To assist YOu IN securing one

r if |
VaHAaVIC OUTSICE

> general! ormation aa
rhe listings that follow provide general informati

ormed ax! dispat« 1e S afe On ¢ UTY iT Ine’ p i}
; I ik } ‘
| ground ind local al anspo!l ation se Vi > ava

travel hours at the International Arrivals Building
ble to you at JFK. For specifics, consult the “Ground

ind at the other central terminal area buildings. Ii

lransportation’ section of the insert in the back you arrive during a non-peak period and find 1

if
nocket of this booklet dispatcher on duty, request assistance from a
[ K

mi
' Ull

formed terminal guard or uniformed police officer

For your secunty: Your taxi dispatcher will provide

4t JFK. you can also obtain information by con you with a taxi information flyer with multilingual!
sulting personnel at the Consolidated ( round Trans text. After you nave read it ane secured a taxi, write
portation Counter, located on the first floor of the on this flyer your cD Peguerey ation number
lobby of the International Arrivals Building Know! 1Or ated on the roof of the cab, between the “on” and
edgeable staff will assist you, providing schedules - duty — In Case you have a problem
prices and specific drop-off points with the service provided
Express bus service: Express bus service ts availa Car rental services: You wil! find car rental
ble between JFK and Manhattan and Brooklyn. Bus nse operated by Avis, Budget | o~er Hertz ind
stops are located outside each terminal building National in the International Arrivals Building. At

other locations, use the courtesy telephones pro
. - » - ‘ train T é‘
The JFK Express: This high-speed bus and tr vided. The rental car return facility for all of these

combination links JFK with Manhattan and Brooklyn companies is located at JFK's Federal Circle. eas
ind runs about every 20 minutes. Outside your air accessible from the Van Wyck Expressway and al
line terminal, look for a sign reading ‘Bus/Train to terminal buildings. And remember: Buckle up for
New York City’ At this location, you board a shuttle safety. It’s the lau
bus which takes you to a nearby subway station

? i ; ~ / > ) . ? f
where vou board a train bound for Manhattan and Helicopter service: He lic pter service is availab!
eeaiiets between JFK and the 34th Street Heliport, in midtow:

TOM)

Manhattan. Helicopter service is also available

between JFK and Newark International and LaGuar
dia airports

Limousine service: Upon request, limousine sen
ices offer a single passenger or a group of passengers a
wide array of vehicles—buses, vans, sedans, conier
ence cars—to or from most destinations. Fares are

hased Ol

| | ‘ ri
a per person, hourly or flat rate. Arrange lor

\ \ »cyT sil
1 limousine by calling a company in advance Or Vis!

'

the Consolidated Ground Transportation Counter in
the International Arrivals Building. At other term

; nmnoy}r

nals, use free limousine company courtesy |

_,

near the baggage Ciaim areas

386

PRANSPORTATION FROM JFK TO .

NEWARK INTERNATIONAL AND START WITH AN AREA ONE-THIRD
LAGUARDIA AIRPORTS THE SIZE OF MANHATTAN

lf you want to reach Newark International! or
|aGuardia Airport in a hurry, there are four conve!

ent transfer services to choose from

Express bus service: Express buses operate — atk
between JFK and Newark International and LaGuar ee ynE O SES
lia airports on fixed schedules att LF or « 5
' 4
inter-airport connections on a daily, regularly sched wO port 7 ynret™ - mnie
ed D iSiS NS > yenne” es WO" yO
j j ’ > ¢ T\\\ . \
\y 1° Wwh¢ , ‘y
eh . . . jo 4 on - Ol 4%) t \e > ‘
laxi service: See ‘Jaxi service’ listing on page 22 are’ ic OV se OF .
' \O% ‘ stats © . Bec? FK I .
J P , n
ae
(ILLE WOOY) GNI) 4Opessequy VMI «+
.

(LOE M WOOY) Qn{D [e4ywWPY seuypTy UB IUTy

400[4 PAE — SQNT) Uj /4IV

18am

eed

yonpmnseg |

| peupusay

Yon j4eynuM)C)
419)883 |

i

yoopensay |

anes

sauspayy | peuyuuay
Wsajseq] | Ayyoupep

]

-
——1

10014 YIP | sanuedeg

EEE

28ino uo )| e84noouo0 )

jeapuy

| | |
be cH | i#

lf
198044 | sBut4| saBul4

saBuy4
jeusuisa] Uyep|

a UBINSU] |aAei]

sousyoep Sujpucs,
$4224) 8,42] aAe2]

wesBo}2)

2ujys2oys

sUBsNe}s2y
sauoygg Asano)
$12}UN0) 18D /WU2y
'

|

221330 190d
sousyoep Buypus,
dwIBiG [eI80g

— —

bak

Aoeuueyd
‘ALAR

Asaeiny

doys 2q0uW5
/puResmon
2Be1015 aBeBBeg
$1240]

0*)-0]-81218Q0]

4aquno)
uo;eULOjU]

a ~~ #UOMeAI82y
193°H

pues
TON PM

wea) 22]

sau0ud
omy] 2214

aBueyoxry
uByjas04

$9 BUG /225j0)
S]IFI_IO)
auyyoep yse)
ep2)2j8)
doys

yin woc”g

doys s2queg

queg
SIIAIIS

rere cree een ENT ARE er mm meme rn eee A ee

jPusMisoy

SUOLAMAS OL AONAM

4Aaey WOLIO

406

WHERE TO PARK YOUR CAR
AT LAGUARDIA

LaGuardia has a parking garage, grade level lots
and metered parking facilities for its patrons
Free bus service to the Main Terminal building
is provided from 5 a.m. to 2 a.m. Extra-wide
parking spaces for disabled motorists, identified
by the international symbol for the disabled, are
available in all parking facilities

Detailed parking information and rates are in |
the insert in the back pocket of this book. |

If you're parking at LaGuardia, dialing
these telephone numbers can get you
information or assistance fast.

Parking operator............. (718) 429-5380
Current parking and roadway

status (taped message)....... (718) 476-5105
Auto service .............. (718) 478-1812
Airport information ...... _. (718) 476-5000
YE ne (718) 476-5115
Airport operations ..... _.. (718) 476-5072

16

SEAT BELT LAW

PLEASE OBEY SEATBELT LAWS

MHEY'RE FOR FOUR PROTECTION

Visitors flying into LaGuardia and driving t
other destinations are required by law to “bucks
up In New York, New Jersey and Connecticut

AIRPORT PARKING AND DRIVING TIPS

. >
¢ All parking is on a lirst-come, lirst-served bas

’

A

¢ Allow sufficient parking and driving time to

wrive at your terminal one hour before flight

time Violators of state seat belt laws are subiect
e Alwa ck Y r Car and take your K¢ itt lines
For your safety, seat belts should be wort
¢ Check your light * all front seat occupants
¢ Do not leave articles in the car

* all children under 10 anywhere in the vehicle
Children under four should be secured in a
child-safety restraint device

lhe driver is responsible for all passen

e« Note the section where vou Dark on vour ticket
¢ Take the parking ticket with you

¢ For assistance, contact attendant at exit boot!
¢ Motorists requiring towing or assistance are

mn ot

under age 16 Passengers 16 and over ir¢
; . . sf
free tr ¢ il the SeTVICE station or auto Ci responsible for themselves Violat 77 Ot the

heir choice

laws are subject to fines of up to $50

409

MAJOR ALTO ACCESS ROUTES

lO LAGUARDIA

A - George Washington Bridge F -

B - Triborough Bridge G
C - Lincoln Tunnel H
D - Holland Tunnel
t srooklyn Battery Tunne
b

vark interna al Airport

immediately adjace

Verrazano Narrows Bridge
Manhattan Bridge
Queens Midtown Tunne
Whitestone Bridge

(joethals Bridge

|

Throgs Neck Bridge

‘?

410

HOW WE TAKE THE WALKING OU
OF FLYING AT LAGUARDIA

GROUND TRANSPORTATION SERVICES

For prices, schedules and a: omplete listing
of the ¢ ompamies offering the services liste qd
below, consult the “Ground lransportatior
section of the insert in the back pocket of
this booklet

WITHIN LAGUARDIA

Free parking lot and inter-terminal bus
service: Free bus service is provided from th
parking lots to the Main Terminal building every
10 to 15 minutes from 5 a.m. to 2 a.m. Since
these yellow and white buses Stop at all termi
nals, with the exception of the Marine Air Termi
nal Building, you can also use them to make a
connecting flight. Passengers transferring to o1
irom the Marine Air Terminal can request trai
portation by calling Butler Aviation at

(718) 476-5200

TO AND FROM LAGUARDIA

The listings that follow provide general informa
tion on ground and local air transportation
services available to you at LaGuardia. For sp:
cifics, refer to the “Ground Transportation
section of the insert in the back pocket of this
booklet

Bus Service: Express bus service is available

to mid-Manhattan with a stop near Grand Central
Station and shuttle service to the Port Authority
Bus Terminal and Rockefeller Center. Bus serv
ice is also available to Brooklyn and the World
lrade Center, located in downtown Manhattan
(financial district). Public transit buses also
provide service to the local community in
Queens and connections to the New York City
Subway

Taxi service: Taxis are available outside each
terminal. To assist you in securing one, uni
formed taxi dispatchers are on duty during peak
travel hours. If you arrive during a nonpeak
period and find no dispatcher on duty, you can
hail a taxi on your Own or request assistance
from a Port Authority police officer

For your security: Multilingual taxi information
liyers are available at each taxi stand. After you
have read it and secured a taxi, please note on
this flyer your cab's identification number
located on the root of the cab, between the “on
and “off” duty sign — in case you have a prob
lem with the service provided

Limousine service: Upon request, limousine
services offer a single passenger or a group ol
passengers transportation in a wide array ol
vehicles buses, vans, sedans, conlerence
cars — to or from many destinations in the New
York metropolitan area. Fares are based on a
per person, hourly or flat rate. Arrangements Ca
be made by visiting aGround Transportation
Counter in the baggage claim area of each
terminal building

Helicopter service: Helico

avaliaDie between LaGuardia and midtow

pier Sery
Manhattan. Connections via helic: ypter are a
available between LaGuardia and John |
Nennedy and Newark International! airports

Car rental services: |n most of the termina
you will find car rental counters « perated by
Avis, Budget, Dollar. Hertz and National. At
other locations, use the courtesy telephones
provided. Rental car return facilities for Avis and
Hertz are located near the Marine Air Termina|
Upon returning to the airport, follow the road
way signing for rental car return. The Budget
Dollar and National car rental c mMpanies are
located off-airport. And remember: Buckle

Up

for safety. It's the lau

413
414

rRANSPORTATION FROM LAGUARDIA = “—
ro JOHN E. KENNEDY AND NEWARK ONCE AN AMUSEMENT PARK. Now ame

: AIRPORTS ) OF THE D'S BUSIES
INTERNATIONAL AIR DNE OF TE

4 The present site of LaGuardia w
first occupied by an amusement park
reach JFK or NIA in a hurry, there wg ansformed in 1929 into a 10
t transfer services to choos¢ acre private flying field, it was later
‘ae the insert the back of this booklet enlarged by purchasing adjoining
) land and filling in 357 acres of water
_— front
Express bus service: Express Duses oper The airport bears the name of
tte between LaGuardia and IFK and NIA Fiorello H. LaGuardia, one of New
fixed schedules York's most admired mayors who

“ served from 1934 to 1945
LaGuardia is located only & higt
way miles from midtown Manhatta!

‘fe
} i ; £
: . ' by : ’ a
reguiany SM re a ned VAaSisS be Although it is only 650 acres i
vT
by;
.

Limousine service: Limousines are ava

’ ’ y oe |
ible for inter-airport connections ON a Galt)

, , 149 ; etal
Taxi service: [axis are readily av wlaDie size, it handled 20 million passenge

oec
tside the arrivals area at all terminals ler during 1985
its! 4 7
i There are two main runways
| Helicopter service: Many airlines offer tree % each 7,000 feet long |
r reduces te inter-airport transier via hel |
pter. For more information, ¢ ontact you! |

representative or travel agent

Seree @eeccetgecag@ us

Almost 8,000 people are employed

at LaGuardia to serve you

LaGuardia has five passenger
terminals: The Main Terminal accom
modates most of the airport's flight
activity; the Eastern Commuter Termi
nal is used by commuters for hourly
flights to such destinations as Boston
and Washington; and two new term:
nals have recently opened in the
eastern section of the airport to meet
the growing passenger demands of

Eastern and Delta airlines, the Marine

Air Terrninal handles general aviation

416

ABOUT THE PORT AUTHORITY OF
NEW YORK AND NEW JERSEY

LaGuardia Airport is operated by the Port
Authority of New York and New Jersey

Created in 1921, the Port Authority is a bi
State agency which undertakes port and regional
improvements; provides dock facilities for the
harbor shared by the states of New York and
New Jersey; and, in general, promotes and « per
ates trade and transportation projects to main
tain the Port of New York/New Jersey's position
as America’s preeminent gateway in the world’s
most dynamic region

ABOUT THE PUBLICATION
This booklet is produced by The Port Authority
of New York and New Jersey in the public inter
est for the widest possible dissemination of
useful information to air travelers. It is not ¢ Opy
righted. We encourage reprinting in any appro
priate form, including reproduction of this
booklet in its entirety, or through adaption of the
visuals or text

Extra copies of this publication — as well as
published guides to Newark International and
Kennedy International Airports — can be
obtained by writing to the Aviation Customer
and Public Services Division, The Port Authority
of New York and New Jersey, One World Trade
Center, Room 65N, New York, NY 10048. or by
telephoning (2/2) 466-7503

Published by the Aviation Customer and Publ —
Divi ion, Avi won Departme nt The Port Auth rity ‘

New York 10d New Jersey

IN OUR POCKET

LJ ay 9 sot f ry
. Ow ft 4 ( irOtl

, my? ’
° iy Tentai Into}!

417

Ai

418

419
EXHIBIT 10
GETTING AROUND
AT NIA
AGUIDE TO

NEWARA INTERNATIONAL
AIRPORT

NEW YORK/NEW JERSEY AIRPORTS

420

WELCOME!

Welcome to Newark International A rl
We hope You emoy your stay

Newark International Airport is constant},
growing in order to serve you with conve
nient passenger and ground transportati:
services. Newark handled nearly 29 millio
passengers in 1985, making it one of the na
tion's fastest growing international airports

Great strides are being made to keep uj
with this strong growth of air passenger an
cargo traffic. Terminal C is currently being
expanded so that by 1987 all passenger
activity, including that currently at the North
lerminal, will be handled in the Centra!
lerminal Area. To satisfy the ProwiIng need
lor parking, new lots have been added an
1dditional ones are planned. Plans are als
underway to provide needed taxiw iVS, TO
and
underway

This Airport Guide has also been rede
signed to better inform you and to hel;
lind your way around our fast growing air
port. In addition to the information offers
the following pages, please refer to th
in the back pocket of the Guide. It contai
the latest information about parking rate:
and ground transportation services

Whether you re taking off or landing. we're
happy to have you with us and h ype you |i
come this way again soon

sincerely
1 f 4 , aah
, loteJ A ttrria- ~? —

Rohe r? | Aare rycy

‘

utilities to service the new building

421 422
VOW THAT YOUVE LANDED...
CONTENES
formation for arriving |
| international | ight ’
in domestic thehts
nformation tor passenger! itching

nother flight
SOTIRERGR TE CEPGTONG PESSENG: INFORMATION FOR ARRIVIN®. PASSENGERS
NIA ON INTERNATIONAL FLIGHTS

Passenger services al INIA

i

Information services and assistanc international flights requiring federal clearanc:
Health and human service arrive at Terminal |

} assenger conveniences

U.S. Immigration and Customs forms: Whi|:

Government services
in flight, you will receive U.S. Immigration and

NIA A t Map
NIA Airpor [ Customs forms. To avoid delays, please fill out

Where to park your Car at NIA these forms before you land. And be sure to
have your passport and health certificate in

Ground transportation service
hand when you leave the plane

Within NIA , _ .
lo and from NIA Non-U.S. residents: If you are not a U.S. resi
. dent, a review of your passport and other docu

lransportation from NIA to Kennedy | ments is required by the U.S. Public Health

International and LaGuardia airports service and the Immigration and Naturalization
Froma pioneering past toa splendl ] service

present U.S. Customs: All! international passengers
Ahout The Port Authority ol New York both U.S. residents and nonresidents then
1 to the baggage claim area and to U.S
Customs. At Newark, U.S. Customs has devised

spec lal pro edures to help speed you through

ind New Jersey

pri Cee

¢ Green lines are for those having nothing to
declare to U.S. Customs

¢ Red lines are for those with meats. fruits
plants or large amounts of currency who are
required to undergo baggage inspection
because of occasional spot checks you may

be required to pass through the Red ling

424

INFORMATION FOR PASS] NGERS
CATCHING ANOTHER FLIGHT

INFORMATION FOR ARRIVING PASSENGERS wn |
ON DOMESTIC FLIGHTS peal ted eae 4

425

WHEN YOURE READY TO TAKE OFF...

INFORMATION FOR

DEPARTING PASSENGERS

Please leave yourself enough time. To
ensure ample time for parking, security screen
ing and unanticipated delays, we urge you to
arrive at your terminal at least one hour prior to
the scheduled departure time of your flight

When you arrive at NIA: Drop off your luggage
at your airline's ticketing counter. Then proceed
to the gate from which your flight is scheduled
to depart

Free baggage transfer service: |f you're con
necting to another flight at NIA, we urge you to
take advantage of the free luggage transfer ser
vice offered by many airlines.

For everyone’s security: To help ensure every
one’s safety, the Federal Aviation Administration
requires all passengers to undergo security
screening. You must walk through a security
device before boarding your flight and pass any
hand-held baggage through an X-ray machine
(Caution: if you have unexposed film in your
carry-on luggage, notify the guard at the security
check point. Some X-ray devices may damage
unexposed film.)

426

PASSENGER SERVICES AT NIA

Just in case you need any of the services below
here's where they're available

INFORMATION

SERVICES AND ASSISTANCE
Police: For general assistance, tele
phone (201) 961-2235. In an emer-
gency, telephone (201) 961-2233.

Information: Information counters
are located near doors 5 and 6 on the
lower (arrivals) level in Terminals A
and B, and next to exit door 8 in Ter
minal C. Staff provide accurate genera!
information free of charge.

Ground Transportation Counters are
located in the baggage claim areas of
Terminals A and B, and next to door 8
on the lower (arrivals) level of Terri
nal C. Passengers using the North
Terminal will find a Ground Transpor
tation Counter staffed by Port Authority
personne! next to door | in the bus
waiting area.

Ground Transportation: NIA's

HEALTH AND HUMAN SERVICES
Medical services: Private medica!
services are available at the Medica!
Clinic (Building 5) on Inner Port
Street. Cali (201) 961-2525

Assistance for the disabled: |t's
‘oN always best to arrange in advance for
the movement of a disabled person
through the airport. When making
your travel arrangements, notify your
travel agent or airline representative if
any member of your party has a dis

. ability and requires special assistance

For information about NJ Transit’s lift
equipped buses call 1-800-772 2287
For additional information concern:
ing facilities for the disabled at NIA,
telephone (201) 961-2154. A booklet,
Airport Facilities and Services for the
Disabled, detailing facilities at Ken
nedy International, LaGuardia and
NIA. is available from the Port Author-
ity of New York and New Jersey by
calling (212) 466-7503.

Nursery facilities: Lounges contain
ing changing tables and chairs are
located in the women’s restrooms on
the concourse level in Terminals A
and B and on the concourse level in
the North Terminal

Lost and found: To recover items
lost aboard flights or in airline areas
within terminals, contact your airline
representative first. If your items can-
not be located, call the main Lost and
Found at (201) 961-2235.

Paging: You can have someone paged
by calling the airline on which the
passenger Is arriving OF departing.

10)

428

PASSENGER CONVENIENCES
Banks, cash machines and foreign
currency exchanges: These facilities
are in most terminal buildings. For

specific locations, consult the grid on
page 14. |

Baggage Storage: Baggage lockers
are located in Satellites B1, B2 and B3
of Terminal B. Luggage can be stored

for a maximum of 24h é
ours at a charge
of 50 cents. -

On-site lodgings: The Newark Inter
national Airport Marriott is located in
the Central Terminal Area and may be
reached by calling (201) 961-2860.
Other nearby hotels and motels may
be reached through courtesy tele. _
phones conveniently located through
out the arrivals level in Terminals A
and B and the North Terminal.

429 ios

GOVERNMENT SERVICES

Postal Services: Mail slots and
stamp vending machines are In fermi
nals A and B and the North lerminal

TERMINAL VAP

NIA HIGHWAY

peuruiu A | Yon

ee —

i @
]
°

7 SS

|

gq peuruiiey

Val AitTTayes

‘
ISANOIUO ) )

Pa4y Saunyiedag ad
Rasy S[RAuy \

; 6

L

|

T

T

tT

>

y eur 2 |

peupmisay

aut tistuy [eACA

PUIQIeW Buipua.,

SYA +) S4ata eu]

euUTUS ao

seUuIoeW dwejss
A2euue YY

Al 4eq

. eel

sdous

VOUL Puelissw .*
SIOTS [TREK

84940)

SIU0OUd 842juUNO ) OWT ]

49jUNO ) UOTJEWOjUY

mesijyea |

Seu0uUd
SUOTCALIBIy [AIO

aBueyoxy
A2U344N_) UBas04

SIZ 196 1182 soue;e1e88 204
P21qesig 40] 40) B Ady

dous e044 AING
syoeusg 42j)j0)
SIIB YOO )
2ulyoep use )
seU0Ud s42)UN0 )
[eu ay ue)
Siesjaje )

doys YIN yoo,

12aQ seq

yueg

SPIITATASN

LAM MOLI

WHERE TO PARK YOUR CAR
AT NEA

\ Tye [ a. ( (
ts are designated as hourly, daily a
term to sult r ne is described be
Parking lot rates and the hedulte tor the t
WKINg lot Dt mboel } ine i ert /
back of this booklet
Hourly Lots: Hourly Lots A, B and C, in the
Central Terminal Area, and Lot |, across the

street from the North Terminal, are intended for
not more than three hours of parking and ar
primarily a convenience for picking uf

ing off passengers. Note that this ts the most

expensive parking option avatlable Ti NIA md

sil I. ris 7) , ; j
oO keep spaces available for picRUI ; ld j

, ; ; an.
frotlte

we must impose penalty fee ‘ai

narking for more than one day

Daily Lots: Daily Lots A, B and C, in the f i

or no Lrea._ and Lot 2 Vest of orti ery

Long-Term Reduced-Rate Lots: Long-Term
Lots D and E, serving Terminals A, B and C, and
Long-Term Lots 3 and 4, serving the North Ter-
minal, are located on the airports outer bounda-
ries. These lots offer reduced rates for the
convenience of patron parking for more than
three days. Note that these are the least expen-
sive of the parking options available, but are
also located farthest from the terminals. Free
round-the-clock bus transportation is provided
from these lots to the Central Terminal Area and
the North Terminal. In some instances transfers
may be required between parking lots and ter-
minals. Refer to the insert at the back of this
brochure.

Parking accommodations for disabled
drivers: Reserved spaces specially designated
for the disabled are available at reduced rates in
Hourly Lots A, B and C immediately adjacent to
Terminals A, B and C in the Central Terminal
Area, and in Hourly Lot 1, across the street from
the North Terminal. Only vehicles with appro-
priately marked license plates and/or municipal
identification are eligible to park in these
spaces. For additional information on parking
and other airport services for the disabled, tele-
phone (201) 961-2154 or write Aviation Customer
and Public Services Division, The Port Authority
of New York and New Jersey, One World Trade
Center, Room 65N, New York, NY 10048.

18

If you're parking at NIA, dialing these
telephone numbers can get you informa-
tion or assistance, fast.

Current parking and roadway

Status (taped message)....... 201) 961-2012
Parking operator............. (201) 961-4751
Airport Auto Service ......... (201) 961-5352
a Re ee (201) 961-2235

When you park, take your car keys, registration
and parking ticket with you. Lock your car. Don't
leave items on your seat; lock them in the trunk.
And remember, when you're driving, buckle
your seat belt — it's the law.

4 Af,
435

7 HOW WE TAKE THE WALKING OUT OF
MAJOR AUTO ACCESS ROUTES EEYING AT MA

TO NIA

GROUND TRANSPORTATION SERVICES

nrice ct ] ‘ ; |
?
Aah) oe If ffering the l I
( ) iit the Lal) q I | yy i!
1 the ert thie rac K r |

| WITHIN NIA
Free 24 hour bus service: |!

between NIA’s Central Terminal! Area
A BandC) and the North Terminal, tak
brown and white connection b ry the
(departures) level of Terminal!
) side doors 6 and 7, or from the bu ad
| at the North Terminal. Buses prov
connection service betwee!
| top outside door 6 on the lower (art
' eve]

Taxi service: [ax stands are
ower (arrivals) lev it Tern

ind at curbside in front of the Nortt

: tands are attended dur! peak per
1 2 ;
7 . arrows DMG’

, Ceorge Washington Bridge i. Verrazano Nar

\ J ]

tart | 4 pal her wh Wilt das
G Manhattan Bridg

, hy br je
R lriborough B 1d¢ 7 eens Midtov
T nme a

|
|
'
) |

Transportation for the disabled: /

|
. ; iy I ; ; rY
| ‘ ndividual etwer eri
"
. : eq nped to i 1 wits ?
: 7} I
n r
il VV il f '
, + >}
r
t } j pt
r r ‘ yrotr ’ ?
r 4
l ;
r
”

rO AND FROM NIA laxi service: You will find ta»

f tings that Ww provide general intor ix mds « de each terminal |
ground and local alr transportatio lO a lestinat ind represe t
ervices available to you at NIA. For additiona lares are posted at the taxi stands. Fr °
formation, refer to the insert in the back of tO midnight, special hare and save’ gor
U publicatior or consult personne! at NIA are ire available for up to Tour | enge
,olidated Ground Transportation Counter traveling to Manhattan. Informat
cated in the North Terminal and on the lower tance are available from the taxi dispat
irrivals) level of Terminal C. Knowledgeable ice officer at each taxi stand
taff will assist you, providing schedules and Car rental service: Car rental c ter
pecilic drop-olf points ocated on the lower (arrivals) leve er
Bus service: Several companies within the A and B and on the Concourse level in the
tri-state region provide bus service to and I! ermmenas When unattended, direct line tel
NIA. For an up-to-date listing of bus companie phones are available at these counters a
ind areas served, see the insert in the back of erminal C. Avis, Budget, Dollar, Hertz ai
this brochure National have car rental facilities at NIA

Helicopter service: Helicopte: ervics
e lower Or arriva ivailable between NIA and Kenned\
tional and Lat jUardia alrp yr

Airlink: Airlink mini-coaches connect lerm

|

ils A, B and C (stops on tl

vel) and the North Terminal with downtow!

Newark. Airlink runs a continuous schedule
18 hours a day and provides access to the Ne
rk/New Jersey area via eight rail lines and |
imerous bus routes operating from Pen:

tation. N

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40385013_0181%3A06. Public record. Not legal advice.