# Appendix — Del-AWARE Unlimited, Inc. v. Baldwin

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40385011_0896%3A2

## Record

- **Collection:** Supreme Court brief
- **Document type:** Appendix
- **Published:** January 1, 1984
- **Citation:** 465 U.S. 1022

## Text

ORL-AMARE OMLIMITED INC., et al.,
Petitioners,

ve

ROGER MH. BALOWIN, District Engineer,
Onited States Corps of Engineers, et 41.
Respondents

ROBERT R. ELLIOTT

ELLIOT? AND BELL, P.C.

1201 PENNSYLVANIA AVE., . u.
SUITE 803

Washington, D.C. 20004

(202) 867-3836

ROBERT J. SUGARMAN
ROBIN T. LOCKE

Counsel for Plaintiffs

Philadelphia, PA 19107
(215) 546-0162

Dated: October 31, 1963

TABLE OF CONTENTS

Judgment Order and Order
Sur Petition for Rehesring............. 1

Order of the District Court
r %¶ͤ m

Bench Opinion with Correction Sheet
DUPE BUG BUEEee bdbtbebesiccceccoacce 7

Nuk Proposed Findings of Fact
(Adopted by the District Court)........ 71

Corpse of Engineers Statement of Findings
U.S. District Court November 30, 1982..114

Corps of Engineers Eaviornasental
neee eee ee eee eee 10

Tremecript, pages 1 - 8, 1003 161

UNITED STATES COURT OF APPEALS FOR THE THIRD CIRCUIT

No. 83-1010

DEL~AWARE UNLIMITED, INC.; SIGSTEOT, VAL; WELLS, COLLEEN;
SADOUX, MARC; MASLAND, MARION W.; TOWNSHIP OF BRISTOL;
TORKELSON, NORMAN and DIANE; THE PHILADELPHIA FEDERATICN OF
SPORTSMEN'S CLOBS; LANDIS, SAMUEL; GILMORE, CHARLES;
NOBLE, MARY ELLEN; THE PENNSYLVANIA STATE FEDERATION OF
SPORTSMEN'S CLUBS; BANNING, RITA c., HOWORABLE; WATERSHED
ASSOCIATION OF THE DELAWARE RIVER; GREENWOOD, JAMES C.,
BONMORABLE; FPOWNASH, CARL, HONORASLE,

Appellants
v.

ROGER n. BALDWIN, individually, and as District Engineer,
0.S. Acmy Corps of Engineers; ALEXANDER ALDRICH, individually,
and as Chairman of the Advisory Council on Sistoric
Preservation; WILLIAM GORDON, individually, and as
Assistant S 9. 8. Department of Commerce;
GERALD GAMSLER, individually and as Executive Director,

The Delaware River Sasin Commission; HAROLD
individually, and as Director, Division of Nuclear Reactor
Regulation, G. 8. uc! dar Regulatory Commission; THE NUCLEAR
REGULATORY COMMISSION; BOWORABLE PETER DUNCAN, as Secretary
of the Department of Environmental Resources of the
Commonwealth of Pennsylvania; NESHBAMINY WATER RESOURCES
AUTHORITY; and PHILADELPHIA ELECTRIC COMPANY

from the Onited States District Court
oc the Zastern District of Pennsylvania

(D.C. Civil Action Wo. 82-5115)
District Judge: Sonorable James Giles

Acgued June 13, 1983

ec, Onited States District Judge for
the — Distcict of Pennsylvania, sitting by designation

JUDGMENT ORDER

Appellants appeal from an interlocutory order of the district
court denying appellants’ motion for preliminary injunction.
Aftec consideration of all contentions caised by appellants, to
wit, that the court erred:

1) as a matter of law by excluding froa
evidence virtually all of appellants’
proferced testimony and documentation which
“was not included in the Corps’ administra-
tive record;

2) in holding that section 110(f) of the
National Historic Preservation Act did not
cequire the Corps to implement seasures and
consider alternatiyes which would sinn:
hare to the Pennsylvania Canal;

3) im tinding that the Corps had given
“great weight* to the views of the state and
federal fisheries ee as cequired by its
statute and regula 7

4) im finding insufficient likelihood of
success on the merits of the NEPA claias to
cequice injunctive rcelief,
Tt ig ADJUDGED AMD ORDERED that the judgment of the district

court be and is hereby affirmed.

Costs ‘tazed against sppellants.

0

UNITED STATES COURT OF APPEALS FOR THE THIRD CIRCUIT

No. 83-1010

DEL-AWARE UNLIMITED, INC.; SIGSTEDT, VAL; WELLS, COLEEN;
SADOUX, MARC; MASLAND, MARION W.; TOWNSHIP OF BRISTOL;
TORKELSON, NORMAN and DIANE; THE PHILADELPHIA FEDERATION OF
SPORTMEN'S CLUBS; LANDIS, SAMUEL; GILMORE, CHARLES;
WOBLE, MARY ELLEN; THE PENNSYLVANIA STATE FEDERATION OF
SPORTSMEN'S CLUBS; BANNING, RITA c., SONORABLE; WATERSHED
ASSOCIATION OF THE DELAWARE RIVER; GREENWOOD, JAMES C.,
HONORABLE; FONASH, CARL, HONORABLE,

Appellants

ROGER A. BALDWIN, individually, and as District Engineer,
0.8. Army Corps of Engineecs; ALEXANDER ALDRICH, individually,
and as Chairman of the Advisory Council on Historic
Preservation; —— ye individually, and as

Assistant ggg 9.8. tment of Commerce;
GERALD HANSLER, 1 ＋. as Executive Director, *
The Delaware 4— men 2 L. X HAROLD 5

° individually, and as Director, Division of Wuclear Reactor
Regulation, U.S. Nuclear Regulatory Commission; THE NUCLEAR
REGULATORY COMMISSION; BOWORABLE PETER DUNCAN, as Secretary

of the Department of Environmental Resources of the
Commonwealth of Pennsylvania; NESHAMINY WATER RESOURCES
AOTHORITY; and PHILADELPHIA ELECTRIC COMPANY

SUR PETITION FOR REHEARING

—
Present SEITE, ALDISERT, ADAMS, GIBBONS, HUNTER,
ls. ohana’ 1221. „ BECKER, Circuit es

wins

The petition for rehearing filed by
APPELLANTS

in the above entitled case having been submitted to the judges
who participated in tne decision of this court and to all the
other available circuit judges of the circuit in regular active
service, and no judge who concurred in the decision having asked
for cehearing, and a majority of the circuit judges of the
circuit in regular active service not having voted for rehearing
by the court in banc, the petition for rehearing is denied.

By the Court,

Judge

Dated sugust 2, 1983

“* IN TR. UNITED STATES DISTRICT co. Be 8
ron THE EASTERN DISTRICT OF PENNSYLVANIA . THE WUCLEAR REGULATORY COMMISSION, :
24 BOWORABLE PETER DUNCAN, as Secretary
7 of the Department of Environmental :
2 Resources of the Commonwealth of .
— ‘Pennsylvania, NESHAMINY WATER :
; * PHILADELPHIA ELECTRIC COMPANY, :
4 Defendants.

—
*

December 15, 1982

I

ron. SOWORABLE JAMES T. GILES, J. f

*

Reported by:
Sidney Rothschild OFFICIAL COURT REPORTERS
: dom 9722

—

: US. Courthesie
+ Philadelphia. Pa. 19106 A 7 .

WAlnut 55 9%

elende

1436

THE COURT: Good afternoon.

First of all, the record will be completed by
the following: By letter of submission of December 8, 1982,
DRBC sent in a copy of its Exhibit Number 15. That will be
admitted.

By letter of submission of December 13, the
plaintiffs submitted a copy of P-58, which is a memorandum
dated May 28, 1981, Archaeologist, office of Cultural Programs,
NERO, HRS to Assistant Regional Director, Office of Cultural
NERO, WS Subject: Trip Report, Point Pleasant Water Diversion
Project, Point Pleasant, Pennsylvania.

This document will be admitted.

Philadelphia Electric Company was given leave
to file certain documents pertaining to proceedings before
WRC, in response to plaintiffs’ submissions pertaining to
wac"atters. Those submissions will be admitted as PECO
exhibits, whatever the next PECO number is, according to the
record.

MR. CHANIN: If Your Ronor please, that is
Exhibit 4. ,

THE COURT: That will be admitted penne with
the certificate of service form which is attached thereto.

The hearing in this matter concluded Friday
evening, the Court has reviewed the entire administrative
record, all the exhibits introduced in this proceeding, the

A 8

— —— oe

Ss 8 6-8 8 8: 80828877 6@8 8 8

1437

various memoranda, responses, attachments thereto, legal
authorities cited, including statutes, regulations and
legislative history.

Counsel are to be commended for doing a fine
job in pulling together, in a short time, during and after
the conclusion of the proceeding, the evidence in the case
and focusing it in a manner helpful to the Court.

I have agreed to give a bench opinion because
both parties have asserted that by today, by virtue of the
actions proposed of the NWRA to commence construction, it
would suffer or begin to suffer irreparable harm. I devoted
my time to this point in reviewing the record and making my
decision and this opinion will constitute the opinion of the
Court with respect to the plaintiffs' motion for preliminary
injunction. The Court reserves the right to supplement,
amend or edit the same.

This action was commenced by plaintiffs
substantially as citizens action against various federal
agencies, the Pennsylvania Environment Resources Department,
DER, PECO, Philadelphia Electric Company, and ma, which is
the Neshaminy Water Resources Authority.

Individuals have also been named as defendants
in their individual and official capacities, where they are

the executive directors of the various defendant agencies.

The action is commenced against all defendants,

A 1

—
—

n U neee eee BB

aed

3 ‘Le. appears under the National Environmental Pol. y Act, the

National Historic Preservation Act, the Endangered Species
Act, the Delaware River Basin Compact, the Fish and Wildlife
Coordination Act, the substantative provisions of Section 110
of the River and Harbors Act of 1899 and Section 404 of the
Water Poliution Control and Federal Water Pollution Control
Act requirements for permits under Section 402 and for best
available technology under Section 316(b) and the Atomic
Safety and Licensing Act and regulations thereunder,
referring to page 2 of the complaint.

The plaintiff either orally or in the final
briefs in this matter has asserted that it intended to file
a claim under the Administrative Procedure Act, the plaintiff
does not assert a claim under the Administrative Procedure
Act. For purposes of this bench opinion, I shall assume that
the plaintiff has standing to assert and therefore is
entitled to amend the complaint to assert a claim under the
Administrative Procedure Act against the appropriate agency
defendants.

The complaint, while it names the Delaware
River Basin Commission as a defendant and its executive
director, in the caption fails to state a cause of action in
its body against the Delaware River Basin Commission.

The plaintiff was understood by the Court to

amend orally the complaint at the time of the hearing to

wh ey Aste Ahi

—
=

1439

ko- ert a claim against the DRBC, that its denial of the
Delaware petition for reconsideration was arbitrary and
capricious and therefore reviewable in this Court.

Various defendants have filed motions to
dismiss, either on jurisdictional grounds with respect to
certain allegations or with respect to failure to state a
claim upon which refusal can be granted.

With respect to the claims of the plaintiffs
-seerted under the National Historic Preservation Act, the
Endangered Species Act, the Clean Water Act and the River
and Harbors Act, I find thet this Court has no jurisdiction.

Those acts of Congress have specific provisions which limit

the right of citizens to bring suits in this Court. There are
notice and time provisions which are mandatory. There is no
implied cause of action under the River and Harbors Act, in
accordance with the decision of the United States Supreme
Court and using the same rationale, there is no implied cause
of action under either of the National Historic Preservation
Act and Endangered Species Act or Clean Water Act.

Congress has acted in these areas to
circumscribe the availability of the federal court to
plaintiffs unless and until certain statutory requirements
are met. Plaintiffs appear to concede as much in that they
argue in their beliefs that they would still have a right of

action under the Administrative Procedure Act, because either

A il

1440

thece is final agency action or that there is action by the
agency which is so threatening of immediate and irreparable
harm that resort to the Court is necessary to enjoin agency
action

With respect to plaintiffs’ claims against
the NRC and Harold Demton in his individual and official
capacities, I find that this Court is without jurisdiction
and it would be an abuse of discretion to exercise jurisdictian
in the context of this complaint, even assuming that the
Susquehanna case is still good lew in this circuit. First,
there is an ongoing administrative review of the „
application within the domain of the Nuclear Regulatory
Commission. Plaintiffs, through Delaware are participating
in that edministrative proceeding, which is not complete.
When completed, the plaintiffs, if agreed, will have a right
of appeal to the Third Circuit by statute.

Wumber two, the construction activity which is
the subject of this injunction action names WWRA as the
builder and constructor of the water system. NRC has no
jurisdiction to enjoin ma's construction. WAC will
determine when, if at all, the PECO water diversion to
Limerick I or II will be operational. That is not before
this Court.

Furthermore, the WRC has not refused to prepa
an environmental impect study. This situation is easily

A 74

r

1441

y ' '@istinguishable from the Susquehanna case cited by the
2] plaintiffs for the reasons just enumerated.
3 So, the claims asserted under the Atomic
4 | Safety and Licensing Act, are hereby dismissed.
5 with respect to the claims against Roger
@ | Baldwin, as an individual; Alexander Aldrich, as an individual)
7 | William Gordon, as an individual and Gerald Hansler, as an
8 | individual; I find that the plaintiffs’ complaint fails to.
8] state « cause of action and those actions will be dismissed

w | with prejudice for the following reasons. Although the

plaintiffs assert that Baldwin, Aldrich, Gordon and Hansler
are being sued in their individual capacities, a review of
the complaint discloses no action by those individuals which
amounts to individual actions, as opposed to action in their
official capacities.

Moreover, the relief sought by the plaintiffs
is egeinst the agency. If plaintiffs are asserting len
under the Administrative Procedure Act, for example, the
proper claim is ageinst the egency, not the individual.

Moreover, I would find from a review of the
record and the complaint, that each of the individuals is
entitled to qualified immunity. I might say, as well, that
the proceeding is not really as on motion to dismiss.

It's after hearing.

With respect to the Pennsylvania Departsent of

A. “7g

»sesessteseetst#etstes sa

-Environmental Resources and Peter Duncan, I f. 4 that this
Court has no jurisdiction. The claims there asserted are
under the Clean Water Act. Again, there is a jurisdictional
requirement of notice.

Moreover, I doubt that this Court would have
jurisdiction in an APA claim against federal agencies, over
state agencies, with respect to their administrative agency
compliance. Further, the plaintiffs are pursuing in the
state administrative channels, challenges to the Pennsylvania
DER Acts with respect to various certificates or decisions
not to require permits of various kinds.

As a matter of comity, plaintiffs would be
required in this Court's estimation, to exhaust administrati s
remedies in the state procedure and seek whatever relief‘is
appropriate there.

So, even assuming that this Court has
jurisdiction with respect to the Pennsylvania DER defendants,.
it would not exercise that jurisdiction.

For those reasons, the complaint with respect
to Peter Duncan as secretary of the DER is dismissed. As a
footnote, I observe that there is no emergency situation
arising from the claimed inaction of the state official in
this instance. It is conceded that the Delaware River Water
will not in any way lower the standards of the water in the

Perkiomen Creek and that the best available technology is

1 A...

—
—

r hne eee se a

1443

being used for the intake at Point Pleasant.

Remaining, I find are claims asserted under the
National Environmental Policy Act and the Administrative
Procedure Act. Having studied all of the relevant material,
as well as that which might be irrelevant, but admitted and
reviewable, I have concluded that the plaintiffs’ motion for
preliminary injunction will be denied under both the NEPA
and the APA against each of the remaining defendants.

First, with respect to the NEPA and the Corps
of Engineers. Plaintiffs complain that the Corps of Engineers
in rendering its environmental assessment and negative
declaration with respect to the Point Pleasant intake and
water diversion system, either acted unreasonably or
arbitrary and capriciously in failing to require or failing
to conduct an environmental impact study or statement.

The standard of reasonableness is a higher
standard of review than arbitrary and capricious, but I find
under either standard, the plaintiffs at this juncture on this
record have not shown under the standard applicable to
considering requests for preliminary injunction have
entitlement to that extreordinary relief. This Court is
limited under the reasonableness standard to a review of the
actions of the defendant agencies and cannot engage in its
own personal evaluation of the mental processes of the agency
edninistrators.

ff.

n n D „ „ „ 3 „ 38 =

1444

So, it's not a matter of record of what this
Court would do if it were in the agency's position; it is
what the record shows reasonably was considered, taking not
only the findings but the administrative record as a whole
and considering the administrative record as a whole, I
find that with respect to a significant number of plaintiffs’
claims, they are collaterally estopped because of the Hansler
decision.

The plaintiffs have made out a prima facie
case with respect to identifying certain changes since the
Bansler decision, which would be of significant impact, if
the plaintiff@ allegations were taken as true, but considering
the defendant agency's evidence as this Court must at this
stage, I find that the plaintiff has not shown by a
preponderance of the evidence that there was either an abuse
of discretion or a failure to give a hard look at, seriously
consider, or give great weight to other agency opinion.

The plaintiffs here are collaterally estopped
by the Hansler decision to the extent that the Hansler
decision considered or was asked to consider and decided
matters which ere raised in this complaint. A study of the b
Complaint in the Bansler case demonstrates that it was wide
ranging and touched upon almost all the issues which are
raised here as if they were new.

The plaintiffs are bound because they are in

3

seses#sk#sts8 883 8&8 B&F BB

1445

peivity with those plaintiffs who initiated the action before
Judge VanArtsdalen in this respect: That the plaintiffs there
as the plaintiffs here represented the public interest and
their interests and injuries now rise no higher and are no
less than those asserted by the plaintiffs in Hansler for

the public interest.

Judge VanArtsdalen considered not the name of
the plaintiff but rather the issue, that is whether or not
certain actions or environmental effects were significant or
substantial so as to require of the DRBC the preparation of
an environmental impact statement as opposed to a final
environmental assessment. This Court incorporates all that
was decided and considered and therefore precluded here by
Judge VanArtsdalen in the Hansler case and as affirmed by the
Third Circuit.

What then is new?

1. Designation of the Army Corps of
Engineers as the lead agency in determining those matters,
environmentally, which were within its specific expertise:
navigation, construction in the river, and matters relating
to the construction as it would affect navigable waters.

2. A movement of the intake system away from
the shore bank and into the channel of the Delaware River.

3. A formal determination by the Advisory

Council on Historic Preservation that the village of Point

*

si

*

22 e

a
— — Ä totem, he

n

atm

Ta
*

-
—— —
— *

5
f
.
a

' 1446

Pleasant was eligible for and was then placed on the historic
register.

4. An assertion that Shortnosed Sturgeon
had been seen in the area of Point Pleasant intake although
the report was unconfirmed.

A decision by the Corps of Engineers to
segment its consideration of the NWRA permits between Point
Pleasant and the Pine Run rechannelization.

A salinity study performed by the DRBC, a
ground water study done for and by the DRBC.

Next, the most current good faith negotiations
between those states who are parties to the DRC.

Next, a statutory provision change, 110(f),

I believe, which the plaintiffs assert required the Corps to
take all possible steps to maximize non-impact on national
landmarks or historical sites. In the latter category,
assert that the authority hed the obligation independently to

consider other intake sites than Point Pleasant, so as to

“avoid the historical and archaeological sites altogether.

This Court is called upon, therefore, to
interpret that provision. In the findings of facts or the
statement of findings, the Corps made specific findings that
it had considered alternative routes around Point Pleasant
but these were unreasonable for the reasons stated therein.
Moreover, in sccordancejwith 33 CFR 800, a memorandum of

A

1

xte

—
~

1447

agreement was entered into between the Corps, the Advisory
Council and the State Historical Preservation officer, with
respect to procedures to minimize the impact of the historic
district, the channel, and all other areas disrupted by the
construction. The undertaking in the memorandum agreement
is to have continued monitoring by the Advisory Council,
state office, the states, Historical Preservation officer
and the Corps to insure that all possible steps are taken to
minimize the impact to the historical district canal. Indeed,
as I read the agreement, no irreversible action can be taken
out and a determination that the action is an action which
meets their requirements of 33 CPR 800. The plaintiffs argue
that Section 110(f) required the Corps to look for other
intake sites along the Pennsylvania canal, other than Point
Pleasant, once the historic district has been certified.

The Corps took the position in its findings,
that it was bound in terms of its consideration of what was
possible by the determination of the DRBC as to the appropria
point for water to be taken from the Delaware River.

In other words, it deferred to the DRBC with
respect to that judgment as to whether or not that point of
intake was most appropriate, given its other determinations
of civer resources, basin resources and the needs for water
in Bucks and Montgomery Counties, as well as for PECO at
Limerick.

A 1%

—

ea

335
a. «i

reer

—

u r U u A u 3 2 * 3 & =

*

I do not find that that deference was
unreasonable or arbitrary and capricious. There is a question
as to whether or not Section 110(f) applies to other than
federal or federally assisted projects. Assuming that it
does, it is not to be given the same scope of agency
determination requirement as was given and required by
statute in the Overton Park case. In that case, the statute
required that the agency make a determination that there was
no feasible or practical route for highway, other than |
through u park and only after such determination was made,
could be administrator go on to determine what steps should
be taken to minimize the impact on the park area.

Mere, the Congress decided to delete the
requirement for determination by the agency administrator as
to feasible or practical alternatives, leaving only that
section which required the administrator to determine what
steps would maximize or diminish the impact on the historic
district.

Considering the legislative history, I do not
find that — ceqeizenent un the Geune Gh tate 6
Geterminetion independently that there was some other ple
than Point Pleasant for the intake, assuming 110(f) applied.
I find that the Corps did consider and gave great weight to
the determination by ORBC, that Point Pleasant was the proper
site for the intake to accomplish the water supply permits

A 20

seeeses3ts8éeesesteast@és

1449

nich it had issued, pursuant to the entire history of the

Point Pleasant project, including those matters which were
before Judge VanArctsdalen.

To the extent that the Corps referenced and
included all of the proceedings by reference that had gone
before, I find on this record, that the Corps did consider
that history in determining the appropriatness to defer to
the DRBC decision to Point Pleasant as the intake location
and there is evidence in the record that the Corps did review
and consider all of the documentation pertaining to the Point
Pleasant project as considered by the DRBC and the AEC and
the WWRA. So, I do not find it reasonable to construe 110(f)
as requiring an administrator to do other than take all
possible steps open and available to it at that time to
minimize the impact on the historic district or canal. The
Corps considered all of the options open to it and on this
record, acted reasonably in arriving at a memorandum of
agreement.

Under the applicable regulations, there's a
presumption that the memorandum agreement satirfies the
obligation of the Advisory Council to advise. I believe the
language of the regulation is that the entering into a
memorandum of agreement satisfies the obligations of the
A@visory count!

For that reason, I would find that as to the

feo gf

1450

Advisory Council, that injunctive action is not appropriate
under the Administrative Procedure Act. The Advisory Council
has satisfied the requirements of the regulations. re has
not undertaken any final action with respect to any
irreversibly damaging action, with respect to the canal or
the historic district as certified.

and considered the effect of moving the intake 24S feet into
the Delaware River as it effects or is Considered in
conjunction with the black eddy, Salinity, the effect on the
oyster industry and fisheries, dissolved oxygen, shad,

at the intake, the effects of impingement and entrainment of

qi
q
j

4
—
—
—
0
we

eseesst:s8e#8eese#ast@s°s

: 1451
that is not said nian by existing gages. Critically =
important, it appears from the record, that to the
determination of the DRBC and the Corps, that the Point
Pleasant project would not have any adverse effect on the
salinity level being placed at Point Pleasant, is that with
the water returns, 50 percent of the water will be returned
to the Delaware River above or at the Schuylkill River mouth.

The Schuylkill River mouth is stated in the
literature in the record to be important as a stream flow to
the curtailment of the salinity level.

So, all the water taken out will be put back
in, at least that which is measureable. 80, to the extent
the plaintiffs argue that the diversions will adversely
affect salinity, I find that that is not borne out by the
record. Moreover, it was considered and discussed by Judge
VanArtsdalen.

with respect to dissolved oxygen, I find from
this record, that there are studies available to the Corps
which were available to the Corps which showed that these
diversions or this diversion at Point Pleasant would have no
significant environmental impact.

Flows less than that which would be caused
by the diversions even at maximum diversion would not
significantly change the dissolved oxygen level at any point
along the river.

1432

ö ro with respect to the flow velocity at the
2 intake level, I find that the evidence is, in this record,
3 satisfies the reasonableness and the arbitrary and capricious
7 test in that there were studies to show that given the
& | placement of the intake, the kind of intake, the placement
@ | of the intake tubes close to one another and so forth, that
7 there would be no significant impact on fish.
a The studies made were put on a worse case -
9 | basis, assuming that there was a spawning ground and the
%@ | Point Pleasant eddy, that shad would be there as well as

Shortnosed Sturgeon either spawning or moving past that

point.

The size of the intake screens are two
millimeters, that size was considered in relationship to the
larva of shad and sturgeon and other fish, although no tests
were made on shad per se, there were tests made on fish eggs
smaller in size than shad eggs, leading reasonably to the
conclusion that shad eggs would not be impinged.

Moreover, the scimming ability of shad was

considered. The flow velocity is calculated to be two to
one at the intake but the intake structure as presently

designed, in cooperation with the Pennsylvania Pish Commission
and the United States Fish and Wildlife Service is a state of

the art intake, which has very little impact upon early stages

r D n „„ „ „ aes

of fish, even assuming less than 2-to-l velocity flow at —

A au

1453

The intake velocity diminishes dramatically as one moves one
foot from the intake.

There wee a netting operation in the vicinity
of the intake for Shortnosed Sturgeon, which in 1981 disclosed
no sturgeon. Wo sturgeon had been caught in the immediate
vicinity of the bnd.

The Shortnosed Sturgeon is an endangered

species, there was a determination by the U.S. Department of

Commerce that the Point Pleasant water diversion project woul
not endanger species in the river; further made determination
that the proposed operations would not constitute significant
environmental impact with respect to that endangered species.
It made a determination that its biological W not
related to river flow, rather to what was known about the
Shortnosed Sturgeon and that is, that its eggs fall to the
river bottom, attach to rocks, or fall or find their way
under rocks, and hence, are not subject to intake velocity
considerations. g

Moreover, there was a determination made but
there would be ongoing studies by the applicant, so that
monitoring would be made to insure that the project in no way
endangered Shortnosed Sturgeon.

As I id before, the intake is designed
anticipating the presence of Shortnosed Sturgeon, though the
is no evidence of Shortnosed Sturgeon in the area. 4

A as

* 7

1454
~, On the basis of this record, 1 find there is
no basis for injunctive action with respect to the Department
ot Commerce either under NEPA, under the APA.

Plaintiffs really have not offered anything to
refute the biological Opinion rendered.

MR. LERNER; Excuse me, Your Honor, can we
take a brief recess?

THE COURT: You may.

With respect to esthetics, which would include
the height of any buildings, the noise of any transformers,

including the bluff, the evidence shows that there is a
memorandum of *greement to blend the underground Piping and
buildings in the environment.

Apparently, Plaintiffs complain that the bluff
Outside of the Certified historic district is not being
considered. However, 1 understand from this record that the
Pipeline as to the bluff will be underground and covered.

in the area. meee 40 £0 evidence ot that time thet there és

Pertaining to the esthetics. and, the Pennsylvania Historica)

13

u |

| Preservation officer is there to approve any and all action.

1455

Plaintiff claims the Corps acted arbitrarily and
capriciously or unreasonably in failing to consult or to
consult in good faith with the Pish and Wildlife Service which
opposed the Point Pleasant diversion. I find that Corps did
consult and did consider all of the positions advanced by the
Fish and Wildlife Service as well as the Pennsylvania Fish
Commission. Simply because the Fish and Wildlife Service had
a reluctance to agree with the Corps, that the permit issue,
it was the Corps’ decision and not Fish and Wildlife's, with
respect to permit issuance. The Fish and Wildlife Service did
not elevate the matter as it had a right to do and its failure
to do so is evidence that it did not on appeal see any
significant environment impact.

Nothing new was raised by the Fish and Wildlife)
Service that had not been considered by the Corps.

Plaintiffs argue that the Corps erred in not
considering that with respect to the permit application the
Pennsylvania Utility Commission had rejected PECO's
application there for a license to commence operation ot
Limerick II. The record shows that reasonable it would have
been engineering-wise unsound to treat the application and
permit or construction as involving only water for Limerick
II. Limerick I had been authorized and encouraged by the

PUC. Moreover, NWRA, and independent water requirement and

4 27

deco possible withdrawal with respect to Limerick II, would

1456

not have greatly enlarged the project of NWRA.

Plaintiffs argue that the Corps erred in
issuing its permit while NRC or other local state agencies
had not acted with respect to their permits which might be
required. I believe counsel conceded during the hearing,
that there is no statutory or regulatory requirement in that
regard.

Plaintiff's main argument is that the Corps
erred in segmenting the Point Pleasant project from the
Pine Run rechannelization.

There is a regulation which requires W
to submit applications for an entire project as opposed to
piecemeal submission, that regulation came into effect in
1982, two years after the applications had been filed by NWRA;
that regulation does not take away the discretion of the Corps
to determine that objectively there should be a division of

the project and here there is evidence that the rechannelizatibn

though beneficial too, is not essential to the operation of
the water diversion system project. Therefore, even if there
is some environmental effects relative to the rechanellization
it is not essential to the operation of the system. With
respect to the canal, itself, Pennsylvania authorities have
review the proposed construction and have determined that

the proposed construction under the canal will benefit the

4 29

r ee

‘canal. The Commonwealth of Pennsylvania owns the canal. The

1457

*

kind of intrusions into the canal or under the canal, a not
uncommon along its route.

Now, with respect to the plaintiffs’ claim chad
the Corps did not consider a final level B study or a ground
water study done for the DRBC in making its determinations,
I find that again, it was reasonable for the Corps to defer
to the DRBC and this is consistent with the determination by
Judge VanArtsdalen in the Hansler case. The level B study
is not inconsistent with the management powers of the DRBC
to limit the withdrawals for PECO, if river flow is below
3000 CFS and to manage ts withdrawal of the potable water
by mn in times of drought, nor is it inconsistent with the
declared management objectives of the DRBC at Montgomery-Bucks
County or other areas having ground water, develop a better
system for utilization of ground water in conjunction with
surface water.

With respect to the ground water study
completed in September of 1982, it does appear from the
report that the rechargeable rate for wells in the kind of

rock which is prevalent in these counties is very slow and
unpredictable.

With respect to plaintiffs' contentions that
PECO or NWRA could get their water from Philadelphia or other
places, including ground water wells, I find that the

7

owe = 8: 8 8: s-8 6 & 8s

plaintiffs’ Claim of arbitrary and unreasonable would fail

| corps and encompassed in its findings. Perhaps not in detail,

1458

based on the Pennsylvania DER assessments and studies wn,
that possibility as being unworkable, both water-wise and
in terms of its hope for industry or population growth
patterns to diminish the effect on consumption of water.
Plaintiffs argue, as well, that the Corps or DRBC did not
consider the Schuylkill River or upstream Schuylkill River
storage as an alternative to taking out of the Delaware ares
again, the record shows that there was consideration by DRBC
and Pennsylvania DER of upstream storage possibilities, along
with PECO, as well as the availability of water at times
required by the Limerick operation from the Schuylkill and
those alternatives were rejected.

With respect to the Schuylkill in terms of
temperature of the water or low flows or adverse environmental
conditions which would arise from a diversion, now, I do not
find as a matter of law that the Corps was obligated to do
an independent study of every matter that might have been
raised by the plaintiffs. The Corps was entitled to review,
to consider the source of the liability, the ä and
its own experience in evaluating information developed by
others, whether it was the mn or the DRBC or PECO. A
review of the administrative record shows that information

from these various sources was in the file available to the

8

1459
but sufficiently so, as to persuade this Court that it would
be erroneous to conclude that the Corps acted unreasonably or
arbitrary and capriciously.

With respect to the DRBC, the plaintiffs’ cla
against the Corps overlap, but to the extent that they do, “|
any discussion with respect to the DRBC will be equally
applicable to the Corps. With respect to the Corps, I find
that it's actions on the state of this record satisfy the

reasonableness test. Because the DRBC entertained and

specifically treated the plaintiffs’ petition for reconsiderath«
one could analogize that to affording the plaintiffs a We

Therefore, the standard of review in that
instance would appear to be the arbitrary and capricious
standard as opposed to the reasonableness standard. The
arbitrary and capricious standard is usually accorded to a
reviewing agency in decisions where there has been an
administrative hearing. The reasonableness standard may be
more approprinte in reviewing agency action that was taken
not pursuant to a hearing or after a hearing or for
promulgation of a regulation. In reviewing the assumed
Claim against the DRBC, I must assume that the claim is
being asserted under the Administrative Procedure Act or
under — you tell me, Mr. Sugarman. Under what statute or
regulation are you proceeding as to the DRBC?

MR. SUGARMAN: It's under common law, Your

A 3,

i

eseosess 8 8@e8638 8&8 &© 8

1460
nonor.

MR. GOLDBERG: Your Honor, if I may, the U.S.
Administrative Procedure Act specifically of the DRBC's
compact is not applicable to it and that fact is so noted in
Judge VanArtsdalen's opinion. So, we are not governed by that
procedure specifically.

THE COURT: All right. I will look at the
claim against the DRBC in terms of whether or not the DRBC
acted ‘reasonably or arbitrarily and capriciously, because I
am satisfied that under those tests, no matter how the
plaintiffs might be proceeding, injunctive relief is not
appropriate. Judge VanArtsdalen found, and I agree, that the
DRBC has particular expertise to which the Corps could defer
to the DRBC as lead agency to determine all locations of
water, the need for water and the management of the river.
The Delaware River is a managed flow river. All agree. The
DRBC has the exclusive responsibility for the management of
this river and water in the basin. The thrust of plaintiffs’
charges as to DRBC, is that given its analysis of river flows,
that the 3000 CFS objective at Trenton is unreasonable and
known to be a mirage by the DRBC for purposes of the Point
Pleasant project.

In short, plaintiffs argue that DRBC acknowledg:
that there's not enough water in the river and that any
| diversions without augmented flows from dams or reservoirs

A 422

pt/xt

tke

uw

wuesess3s8868e8sese see v B&B

|

1461
to be constructed in the future, will be detrimental to
marine life, to the fishing industry and all of the objectives
with respect to salinity control, dissolved oxygen and the
like.

The plaintiffs’ arguments on this record
overlook several important factors with respect to the level
B studies, the salinity studies and the good faith
negotiations. First, the level B study, that's not taking
into consideration in its analysis that there would be no
controls by PECO if the flows are below 3000 CFS in terms of
future projections, nor the management ability of DORBC with
respect to the withdrawal by NWRA in times of low flow, nor
is there plaintiffs’ evidence or argument which considered
the fact that the level B report states, I believe, that
given existing storage capacities, there is still 110 Crs
available for allocation, nor does the plaintiffs’ argument
take into consideration that the diversion at Point Pleasant
would result in consumptive loss of only 8 CFS. To equate
the effects of withdrawal of 95 o with a consumptive loss
of 95 MGD, is misleading. ;

DRBC has the responsibility to administer the
river flows to meet the permanent application requirements
and restrictions as well as one of the public needs served
by the river.

Mr. McCoy's presentation basically was a

As

My é
ie

eeesst?8eéeezstse#@é@stesa

' 1462

challenge to DRBC or an attempted challenge to DRBC to fulfill

its commitments; that is through good faith. This Court is
not in a position from this record to place suspicion on the
the ability of DRBC to manage the river nor would it be
appropriate for this Court to in effect attempt the manage
the river for the DRBC. It's management abilities with
respect to PECO and NWRA would reasonably appear to give it
the manageability to control the withdrawal of those
applicants in accordance with the good faith negotiations
results, whatever they may be, which as I understand it from
the material reviewed will be to look at the drought of the
*60's as the drought of record as a plateau, the record
suggests that the drought of the ‘60's is recurrent on 100
to 300 years as opposed to the drought of the ‘30's, that
occurs maybe once every ten years.

Plaintiffs allege, among other things, that
the DRBC has already put into effect the recommendations
from the good faith on negotiations with respect to the
pon down of water from New York storage unit and hence,
argues the plaintiffs their must be a bad faith attempt

undertaking to ramrod- into effect all the other tea:

including a relaxation of the salinity objectives.

The record shows, however, that the good faith
negotiation recommendations are subject to public hearing and
comment and that is an ongoing process, and hence, there is

A 34

24
i a

“ — —_— — — — 75 — ae — — ——— 3 2 —— — — —
1
1463

no room for this Court to find, on this record, that there
2] has been a relaxation in fact of the salinity objective.

This Court is not the proper forum for an
attack on the proposed salinity level, if there is any change,
that should be done through the proper administrative 6
available to plaintiffs or others through the DRBC.
7 I have reviewed that the plaivtiffs' objectiong
8 | raised to the DRBC and the responses to each. In light of
® | the record before the DRBC or that as considered by the DRBC

% | through its own contractors or supplied through studies

contracted for through the m. I do not find any reason
to conclude that in denying the plaintiffs’ petition for
‘Teconsideration, the DRBC acted arbitrarily, capriciously or
unreasonably.

I could go through each of these in terms of
the objections and the responses on this record but I will
not.

I have studied the objections and I have
studied the responses and found in the record support for the
responses.

Based upon my independent findings and ‘
discussion here, the Court adopts and incorporates in this
bench opinion the following proposed findings of facts as
prepared by NWRA, because they are consistent with the Court's
foregoing findings.

|
|
|

A 385

——

————_

sesesszst: 8 @sesestse#eeteeteasp &

1464

The Court adopts 1 through 25; 27 through 40,
those are background historical as to which there should be
no objection.

41 through 65. 66 through 76. 77 through 82.
83 through 116. 117 through 134. 135 through 147. 148
through 150.

I find that those findings of facts are
supported by the record evidence available to the Corps and
the DRBC.

Plaintiffs final argument with respect to all
of the agency defendants and un and PECO is that there was
a commitment to the Point Pleasant location such that the
Corps merely rubber stamped the desire of the NWRA and PECO
to use the Point Pleasant site because it was titled to
WWRA and that thereafter all of the efforts of the Corps
amounted to no more than going through the motions and was
not a good faith environmental assessment.

The plaintiffs suggest that the hiring or
the contracting of Miss Mints was designed to result in a
historical district whose boundaries would not include the
bluff or the esthetic charm of the village as opposed to
selecting the Bucks County Conservancy as advisor on the
historic certification beca: se or whereas the later had a
broader sense of the boundaries of the historic district.

I find that the record shows that the Bucks

1

a

zseseesests8eeetezstse#eeerta sa

1465

County Conservancy took the position that it was unavailable
as a contractor to complete the project within 30 days, Miss
Mintz was. |

The plaintiffs argue that Miss Mintz did not
consult with the Bucks County Conservancy.

It is apparent from the record that the Bucks
County Conservancy did review and critique Mints report
evaluation. The Court submitted to the Advisory Council both
the Mintz report as well as the Bucks County Conservancy's
critique comments of the Advisory Council had both Mintz’
report and the Bucks County Conservancy's views as well as
the views of the State Historical Preservation officer in
determining the extent of the boundary of the historic :
district.

Plaintiffs argue that Colonel Baldwin refused
to meet with representatives of Delaware on sito. The
record does not support the view of Colonel Baldin as one who
took the tact of avoiding contact with the public or with
the plaintiffs; the record does show meetings with counsel
of Delaware and Colonel Baldwin and Colonel Baldwin acting as
a moderator on a public hearing of the project.

I do not regard, based upon what I reviewed
in the record, the Corps’ correspondence with the Fish and
Wildlife Service as being arbitrary and capricious.

The Wildlife Service did not specify the basas

1

. ’
et,
2 ec/kt 3
in
*
a
L
*
*
7 1
[Fe
* 1
bad 0
*
ee
%
2 8
„
*
„
* 1
18
* *

1 5 - — .
—— her . NZ 2 . 22 W 7 * r *

n — — Ä— ~y. .
—_* — — — * — — — —

1466

of its objections to the project with any backup data. It's
speculative positions did not raise any concerns not already

addressed by the Corps.

Its request for information are puzzling, n

as it had as much access to the DRBC information as did the

Corps with respect to impact on biotics. Likewise, it had
access to the NWRA material. It did not conduct any

studies. The oxygen demand and segmentation appears to have
been a factor considered by the DRBC and the NWRA in the
Gissolved oxygen studies in respect to the flows in the river.
I do not observe that the Pish and Wildlife Service took the
position in the case before Judge VanArtsdalen that the
project was bad, but did not raise any issue then which was
not considered and studied to Judge VanArtsdalen's n
by the Corps.
As Judge VanArtsdalen found there, just because
one agency has a difference of mind with the permitting
agency, is not a basis for saying that an environmental
impact statement is required. In considering whether or not
the plaintiffs have borne their burden of proving entitlement
to injunctive relief, the Court must consider whether or not
the plaintiffs will suffere irreparable harm if relief is not
granted, ox whether the defendants will be harmed if relief
is granted, whether the public, generally, will be harmed if

Telief is granted and whether the plaintiffs A likely to

—

—

W Nane ene e sas

prevail on the merits of the clain.
| I have found that considering the evidence
Lefore me, that the plaintiffs have not shown that they are
likely to prevail on the merits of the claim. I have
considered whether or not the construction in the Delaware
River or environs should be enjoined until such time as the
WRC acts or the Corps acts upon the rechannelization project
in terms of permitting or not. The PUC has determined
Limerick I's construction is in the best interest of the
public and it has directed that PECO complete that construc-
tion at the earliest possible time consistent with public
safety. The requirements placed upon the applicant NWRA by
the Pennsylvania DER is to complete all construction by the
end of 1964. The work in the river has to take place within
a specified time during any winter, reducing the period of
time that can be devoted to construction and with construction)
with deliberateness, with a view towards public safety and
compliance with the minimization of loss of water in transport,
The DRBC has determined a need for water in Bucks and a
Montgomery Counties, based upon the experience in 1980 and
1981 of water problems in those areas with wells running dry.
Balancing the harm that would occur to the
public if the project is not available mechanically for the
supply of water to Delaware and Montgomery Counties through

men to supplement the well water and considering the harm to

A». 37

—— —
—
UFD oa

1468

the public if the Limerick I is not available for operation

on time because of the lack of completion of the mechanical
project, versus the harm to the river, to the canal, to the
environs, including the bluff, I find that on balance, the
public would suffer more harm if the project presently is
enjoined than if it continues. One, there is no harm to
the river presently if there is construction. Two, the work
under the canal will benefit the canal in terms of its
ultimate strength, according to the Pennsylvania Authorities.
Three, there is an architect available there and there are
procedures outlined for the photographing and replacement of
each aspect of the canal: dirt or stones removed. The piping
is intended to be underground. The effect on the wetlands
will be minimal and of no significant: impact and that really
has not been pressed az an issue here and the harm to the
bluff with blasting will be subject to the same conditions
as blasting in the district. The pipes will be underground
and covered. I agree with plaintiffs that if they have shown
that there was a significant environmental impact that has
been swept under the rug, then, that would be eee to
show 83 harm.

nere, it is not enough to say, well, the NRC
has not acted and Limerick might not operate. There is an
independent applicant, MWRA, whose needs have independent
justification through the DRBC.

A 00

eseeesstsee 3&8 8 F&F BSB

1469

Are there any points any counsel believe now
the Court failed to consider in its opinion?
MR. SUGARMAN: I am not able at the moment to
think of any point which the Court has failed to consider.
I did note some concerns that I had with respect to some of
the Court's statements, interpretations and so forth.
I don't know if Your Honor means to encompass
that within your question.
THE COURT: Well, concerns you can argue later.
If I misstated some fact, you should bring it to my attention.
MR. SUGARMAN: Yes, thet's what I really meant,
Your Honor.
If I may, the Court indicated that the Historic
Preservation Act has a provision for notice before suit was
filed and I don't have the statute with me, but I am not
familiar with any such provision. The same with respect to
the River and Harbors Acts. I am not familar with any
provisions in either of those statutes for public notice.
With respect to the Clean Water Act, because
I didn't ali a it for a preliminary injunction, I didn’t
put it in evidence, but we did in fact give notice to file +
a citizen’s suit action with respect to the DER actions under
the Clean Water Act. The one that we gave notice on was the
Department's determination not to require a permit for the
discharge into the Neshaminy North Branch. Your Honor stated

„„

2

n „neee e

1470

that we conceded that the water quality of the Delaware River
is such that it won't hurt the Perkiomen and we don't concede
that.

THE CouRT: Well, it doesn't make any
difference. I have really not assumed jurisdiction over the
clain.

MR. SUGARMAN: I understand that. The same
with respect to best applicable technology with respect to
the intake. We concede, if you will, arguendo, that the
design is BAT, but we do not concede that the location is and
the statute relates to both location and design.

THE COURT: Well, all right, I did find here
that the location, considering the design, is not unreasonable.

MR. SUGARMAN: Your Honar, also in that area,
and maybe this maybe is an area of omission, did not refer to
the fact that the documents reflect that one of the considera
in the location of the intake was to avoid crossing the state
line into New Jersey.

I don t know if Your Honor deliberately
decided — that you did not intend to refer to that.

THE COURT: Well, I read that as a possible
concern, but what was important was that the design, plus
the location had objective support for the conclusion that
there would be no significant environmental impact. in fact,
largely because of the design, the location became less «

Au

1 | Problem.
I will not get into the NRC materials, but I

3 | am satisfied that it would be unfair to say that the location
4 | of the pipe didn't go 255, because of New Jersey. I am

e }| satisfied that the record shows it didn't go to 255 because
@ | it was thought reasonable and sufficient to have it go to

7 | 245, considering the design of the intake and the location of
8 | the intake pipes.

„ MR. SUGARMAN: Another matter that the Court
% | didn't refer to was the fact that the Corps refused to

secure or consider or to abide by and await the information

that was being developed in the preliminary hearings before
the WRC prior to issuing its permit, although we had informed
then of the intention of the NRC to hold those hearings and
they were otherwise aware of them. The Corps --

THE COURT: Well, I think I covered that by
saying there was no requirement on the Corps by the statute
of regulations to await the permit decision of any other
agency.

I might say there has been no record
determination that there has been a denial of a permit by any
permitting agency.

MR. SUGARMAN: I think there's some confusion

as to what happened with respect to the historic -- with |

respect to the national historic landmark. It is our positi

- A 43

- — 2

aie

2 landmark and not to the historic district and that it was not

1] that Section 110(f) relates only to the national historic

3] the designation of the district that created the duty to

4] minimize harm, but rather the statutory amendment.

1 N82 s 6 23 3 * 33

ivf

1

*

*.
3
1
—
12 ö
15

— .
42
—

»eeoesstseseseeteteéeé«séé

1472

THE COURT: With respect to the canal?

MR. SUGARMAN: Yes, sir. Well, the statutory
amendment was general with respect to all landmarks
and it, of course, referred specifically to the, as we say,
I don’t think there is any dispute about it.

MS. SIEGEL: The canal is the only landmark.

MR. SUGARMAN: The statute refers only to
landmarks.

THE COURT: I understand that. I gave you
the benefit of the doubt, I suppose, since the canal had
not been crossed at any point of taking from the Delaware.

I thought you had argued here that this
particular point of the canal --

MR. SUGARMAN: Yes, sir.

THE COURT: — was so pretty but it's the
canal which is the historic landmark.

MR. SUGARMAN: That is right, sir.

THE COURT: I assumed that you were arguing
the duty really applied to the district so, I think I treated
it.

MR. SUGARMAN: The point I was getting to,
your Honor, is that the Corps, your Honor, says that the

was entitled to rely on the DRBC. I am not sure if
Honor meant in that way to dispose of our argument that
„ the DRBC specificaliy deferred on the issue ot historic

A 45

key

LaDy 28? YORES

9

esesesst? 8 #@e@e# tee ste & &B

1473

compliance to the Corps, and, if your Honor weant to say
that in tose circumstances the Corps was still entitled

to rely on the DRBC determination as to interpret the DRBC
determination as requiring or as determining where on the
Delaware River the water should be drawn and then relying

on that, even though a statute had been passed and if that is
the case then --

THE COURT: I don't understand what you
are saying.

The Corps, I found had a right to rely upon
the DRBC in determining by its Section 3.8 approval that
Point Pleasant was the place for the intake of water to
facilitate the delivery of water to Bucks and Montgomery
Counties and the Corps had a right to find reasonably that
that determination was conclusive.

Actually it was probably conclusive in that
there had been a long study of that project, even through a
final environmental impact statement, reviewed by the
Third Circuit with respect to the location and the location
considering that the historic landmark would have to be
crossed. And that there are archaeological sites and that
indian relics possible in the area and that practical steps
should be taken to minimize the harm to the canal, to the
historic site, including the village district.

* MR. SUGARMAN: The only point I am making,

A A

| your Honor, the DRBC made all of those decisions without

1474

taking into account, without complying with the National
Historic Policy Act, the National Historic Preservation Act,
the DRBC passed all of those issues to the Corps of Engineers,
#0, what the Court is in effect holding, therefore and I
just wanted, 1 guess to clarify that your Honor is aware that
the Court is in effect holding that the prec could make a
final decision on compliance with Section 110 which determine
compliance with Section 110(f) while at the same time passing
that responsibility to the Corps of Engineers.

THE COURT: I didn't Say that. I don't agree
with you that 110(f) requires that there be a determination
by either the Corps or by the prac of feasible and practical
alternate routes as in Placement of highways through parks.

The obligation is, once a historic landmark
is confronted, that all steps be taken to minimize the
harm and the Corps found that the canal had to be crossed.

MR. SUGARMAN: But, your Honor, what we
are talking about then is --

THE COURT: As well as the DRBC. The issue
then was how to minimize the harm to the landmark. .

MR. SUGARMAN: What we are talking about is
assuming that the landmark has to be crossed, the selection

of the location to cross the landmark that would minimize
harm.

7 17

ee e

od WE!

tr atta od mr Be
r n W ²¾ 2 2 12 8

„n. * :

1475

THE COURT: To what, the canal?

MR. SUGARMAN: To the canal, right.

THE COURT: Well, the canal is important
wherever it goes.

MR. SUGARMAN: The harm might be less at
different locations.

THE COURT: I will say this. At this point
on this record, this is a preliminary injunction hearing,
not a final hearing, I have determined that considering
your concern as raised, the presumption of regularity according
to the agencies is sufficient to meet that.

MR. SUGARMAN: To meet what, your Honor?

THE COURT: Your concern, you have raised a
concern that there might be a better place along the canal
for it, there is no evidence that there is.

MR. SUGARMAN: Your Honor, there was evidence
before the Corps that there would be other locations that
would be better. There was evidence in the sense that the
— there was evidence that the point was made to the Corps.

THE COURT: The issue is not just the impact
on the canal but the impact on the delivery system of vater,
you know, it might be, you might go 57 miles north and come
back, but you still have to consider what it means in terms
of laying pipe and so forth along 57 miles to get to the

particular reservoir. As it turns out going this route is

A 4g

1476

only three-tenths of 4 mile.

MR. SUGARMAN: We are not arguing, your
Honor, that the --

THE COURT: 2.3 miles, whatever it is.

MR. SUGARMAN: We are not arguing that the
consideration of minimizing impact to the landmark is the
only consideration that the agency is allowed to take into
account.

We recognize that there can be other con-
siderations under that statute and as your Honor indicated,
that your Honor is interpreting the statute.

What we are Saying, there is no evidence that
any other locations along the route were ever considered in
order to determine whether they would minimize harm to the
landmark and whether they would be otherwise acceptable.
There is no -- and, your Honor, t just want to make sure that
your Honor was intending to hold that didn't have to be done,
Alen de what I understood your Honor to say.

THE COURT: I am holding there does not have
to be a determination in the findings that there was some
other feasible or practical route; that once the bistorica!
landmark is confronted, the agency must consider all

Possible means of minimizing the hare to the landmark.

MR. SUGARMAN: Does that include other
locations, other ways to cross the canal, other Places along

A 49

rs ay

se
ya

vet
ry

N

> or

AAD TM,
” gC Me

18

* ‘

— eA ory ty

*

rer n wrest,

te

1477

the 57 miles?

THE COURT: It could, but in my opinion
it doesn't have to.

MR. SUGARMAN: And, your Honor, further holdi
that the Corps can rely on the DRBC on that point, even thoug
the DRBC did not take into account minimizing harm to the
landmark under that statute? ;

THE COURT: I will find that the DRBC did
take into consideration minimization of harm to the canal
at that point, even before there was a deferral to the
Corps.

There is record evidence showing there were
plans minimizing the harm and determination and findings
that no significant hare would occur to the canal from the
procedures proposed by um were carried out.

So, I cannot say that the DRBC deferred.

Moreover, Section 111(f) was not in effect.

MR. SUGARMAN: Exactly.

THE COURT: But, nevertheless, I am satisfied
in this record that the DRBC treated the canal as a historic
landmark.

T am also satisfied on the record that the
DRBC choice of location was entitled to great deference for
the intake, considering the plan for the Overall project.
Por example, the Plan for the water to reenter the Perkiomen

1

7

1478

Creek, so as to enter into the Delaware River at important
points for control of salinity.

So, that's what I meant by saying there is a
Presumption of regularity with respect to DRBC's consideration
of the point of location of the intake.

There's also the consideration of where
Shortnosed Sturgeon are located in the river.

MR. SUGARMAN: By the DRBC, your Honor?

THE COURT: Mo, I am just Saying generally.

I mean, the Corps was aware that Shortnosed
Sturgeon had been Caught ten miles up river and when I say
to you that environmentally and need-wise, the DRBC determina-
tion of intake is entitled to great deference, such that
the Corps was entitled to conclude that the intake had to be
in the Point Pleasant area and was not at liberty to in
effect assume the role of DRBC in Getermining the wuter
intake location.

MR. SUGARMAN: Is your Honor then making
any holding concerning the responsibility of DRBC to review
its prior determination in the light of the statutory change?

THE COURT: The DRBC deferred to the Corps 5
to make sure that it complied, the Corps complied, to be the
lead agency on historical landmark impact minimization and
I am finding that based upon the Corps’ determination of
minimization, there was no need for the DRBC to reconsider

he

Poke Nee 0

iy *

n

29 . zur.

5

1 Rhee, PR ce

*
ae ee ee Se Bg ee ee. 6.

1479

its grant.
MR. SUGARMAN: Thank you, your Honor. That
Clarifies it.
| with respect to the bluff, your Honor, I
believe --
THE COURT: I got a lot of bluffs out of
your brief, that's why I referred to the brief, I mean the
bluff, I am not saying that you are bluffing, but you made
a big point in your brief that the bluff is somehow outside
of the district and is going to be harmed.
MR. SUGARMAN: Yes, sir.
Well, yes and no. We did talk a lot about
the bluff or a fair amount about it, but I believe we
said in our brief and incidentally that the record shows that
the bluff is in the historic district, and not outside of it.
THE COURT: Outside or inside, the Memorandum
of Agreement accords it the same protection as it was inside.
MR. SUGARMAN: Sir, I think I explained and
I offered testimony to the Court, to have Miss Auerbach
ob tae ese that I was present at a meeting and she was
present at a meeting where the Corps of Engineers specifically
they would not consider the bluff, would not define the
project as including the bluff and would not address then
selves to any impact on the bluff and they would not and did

not.

9 5d

n M * 2 „ 3 33 „* 38 8

1480

THE COURT: My reading of the agreement is
that the bluff is to be accorded protection as though it
were in the district, is consistent with the representations
of PECO and NWRA and the Corps here at this hearing and that
is, that the pipes will be underground and covered and subject
to the review of the powers that be to that agreement to make
sure there is conformity with the aesthetic objections and
landscaping objectives to blend as much as possible into the
existing environment.

MR. SUGARMAN: Well, I think, your Honor, I
needn't belabor the point, since your Honor has made his
determination on it.

I just wanted to call the Court's attention
to that specific fact, on that point, that the historic
district, I believe does include the bluff, and that the
Corps in its documents, to my understanding of those
Gocuments, did not afford any protection to the areas across
River Road, which means, including the bluff. They defined
their area of jurisdiction as running only to River Road.

THE COURT: Well, the Memeorandum of Agreement
though places the Advisory Council in a position, as well
as the State Historical Preservation Officer, in a position
to review all of the construction impacts affecting the
district, as well as the canal.

MR. SUGARMAN: I think, your Honor, that the

i

~*~
4
—
—
—
*
*

~

=~

Anevitably as a result of the construction, and we have taken

agreement and other counsel, I don't have the agreement with
me, and I haven't looked at it -- I have looked at it from
that point of view, but I don't want to say, in response to
the Court's expression --

THE COURT: Again, I have given you what
appears to be a reasonable interpretation.

MR. SUGARMAN: Right. ‘

THE COURT: Based upon my reading and the
representation of the applicants and the permitting party.

MR. SUGARMAN: Ag I Say, there is no reason
in belaboring the point,

not failed to act or failed to carry out some non-discretionary
function and, , it seems to me, that it may be appropriate,
if in effect the Pipes are put above ground, or not covered,
to complain, but right now, it sens to me that no one is
taking the Position that you are taking except you.

MR. SUGARMAN: Well, your Honor, we take the
position that having -- the Scaring of that bluff, by clear

it and keeping it Cleared, and blasting through the bluff,
to put — they will never be able to restore the rock base,
they will not revegetate it the way it is, and it will not
be a natural rock face, as it is now, and that will occur

A $4

a ae ee ee ee ee ee ee ee.

1482

that position all along and I agree with you. And, it is
true that the other agencies haven « -- were hot and it’s
true, that the agencies have not taken the position that we
have, and that's why we are here.

Well, the only other point I would make, in
response to your Honor's question is that I am not sure as
I listen to your Honor, whether you are aware that the DER
assessment is under appeal as part of the permit appeals that
we have filed with the state.

THE COURT: I am.

MR. SUGARMAN: I wasn't sure about that.

THE COURT: That's why you shouldn't be here
on that clain.

MR. SUGARMAM: Well, your Honor, we are only
trying to maintain the status quo until these things can be
resolved and we did not select the dates for these things to
happen, and the WWRA and PECO could have applied for the
permits a long time ago and by doing it in the way that they
did, the permits came out after they had already advertised
for bids in the case of the Corps permit, the DER permits
out just about the date that they went to bid, by waiting
that log, and by shortening the time that we could obtain
final adjudications, they have put us and the Court in this
short time frame situation. So, to say we shouldn't be here,

your Honor when --

ft S

*

reer eee es ee.

14 A

-HE COURT: That's an opera..onal consequence,
and the facility is not operating, I mean, so you have plenty

of time to have review before the --

2 ——«W* — —

r nen ee

8 MR. SUGARMAN: That is correct, ar Honor,
and the only problem is that some of the harms due in our
view result from the inception of construction and we also
are concerned that it would be too late to have an open-minded
reassessment once construction is far advanced and they
certainly --

THE COURT: Open-minded by whou?

MR. SUGARMAN: By the agencies involved.

THE COURT: Well, the harm that the
environment faces presently is a disruption of the canal,
the filling in of some areas and scarring for purposes of
constructing, but even the construction plans are being held
in terms of adverse impact to a minimua.

MR. SUGARMAN: Your Honor, that's their
contention.

THE COURT: Well, the permit, for example, has
a requirement that the dredging equipment be barged. 80,
I agree with you that there is a risk to the environment that
there will be some temporary scarring and some of which may
not be put back in perfect order, but on balance, the risk
of harm to the environment where there is no significant --
no projection of significant, permanent disfigurement to the
canal or to the surrounding environment or to the esthetics
of the area, do not outweigh the risk of great public
inconvenience if by virtue of delay, the project is not

A s

5 2

A

—
~

} 1484
ready for operation to supply water to various sources.

MR. SUGARMAN: On that point, Your Honor,
there is no evidence in the record of any date of inception
of mn service, that is, public water supply service and
there is no -- and the PECO witness on irreparable harm
admitted that PECO has not even looked at alternative water
supply sources that would enable them to operate Limerick
unit one.

THE COURT: My understanding is that the
water need in Bucks and Montgomery Counties is ASP and that
while there has been no sale of water by contract, no water
can be sold until other permits are obtained by the NWRA.

MR. SUGARMAN: My point, Your Honor, is that
they have not -- the record is silent as to when they can --
when they can institute service and -- but the record does not
show that they need a water treatment plant in order to do
that.

THE COURT: Well, that may be so, but still --

MR. SUGARMAN: What I am saying, Your Honor --

THE COURT: tn terns of belensing the here to
the environment, based upon the record, versus the risk of
harm to the completed objectives of the bc in terms of
supplying adequate water to the basin, I find that injunctive
relief is not appropriate.

MR. SUGARMAN: My point, Your Honor, on that,

A sg

n!

1
*
+
7
*
J.

.

3

and I think it 90 to the -- the DRBC desire. to provide
water to Bucks and Montgomery Counties. That‘s not controlled
by the approval of this project. It's controlled as well
independently by NWRA's ability to complete and get permitted
and get into Operation and water treatment plant and Your
Honor may recall that NWRA provided no testimony that
indicated in any way that it would be able to institute
service upon completion of this project or put the other way,
that any delay in the construction in Point Pleasant would
delay them in instituting public water supply service. They
provided no testimony to that effect, whatsoever.

THE COURT: I am satisfied on the record that
I have balanced the equities.

I considered the prco equities and the a
loss there as Projected is credible in terms of delay costs.

MR. SUGARMAN: But, they provided no evidence
that they could not get water from another source.

THE COURT: I an satisfied that given the
state of the record that the irreparable harm issue has to be
measured from what the expectation of PECO is and that is for

the completion of this Project by the particular date and we.
are not in any NEPA considerations, but rather, in irreparable
Rem considerations end those are measured by vhat the
“pplicant has reason to expect, given the permits that have
beer issued.

u r D ts ees ste BSE GBB

s400

Do you have anything else?

MR. SUGARMAN: No, sir; only -- may I get
Clarification on Your Honor's disposition of the -- of our
Claims against the agencies? For example, under the River and
Harbors Act, joined with the Administrative Procedure Act,
Your Honor's indication that the Court has no jurisdiction,
was that intended to relate to our claims against the Corps
of Engineers for issuing the permit in which we say that they
acted arbitrarily and capriciously in violation of the River
and Harbors Acts under the standards of the APA?

Is the Court meaning --

THE COURT: There's no implied right of action.

MR. SUGARMAN: We agree there's no implied
right of action.

° THE COURT: That's what I intended to say.

MR. SUGARMAN: Insofar as they come in under
the APA, Your Honor is saying there is a cause of action?

THE COURT: Yes, and with respect to that, I
do not see that you made out a prima facie case of violation
of procedure by the Corps with respect to the Rarbors Act.

You are really claiming that the Pennsylvania authorit!

Torres 4 VIL Oe AL YF

ES
785
j

„

1 *

i

>>?

VALOR SY AIT N Aen?

FA *>

1499
‘matter. ;

THE COURT: Anything that you find to be
significant, you should bring it to my attention now. I
will certainly correct anything that is obvious, whether it
is legal or factual, because I do not know the intent of any
party here.

There is a right of appeal from my decision
and I do not want to take the position that while I am not
enjoining construction, for example, the plaintiffs have to
wait until I have entered a final order before considering
appellate review. If you do have something in terms -- if
you feel I have made a misstatement of the law, straighten me
out my tomorrow and I will incorporate it and so there will
be a final order, but I am sdtisfied that however the Court
of Appeals looks at it, if it looks at it under whatever
theory, it has to look at the factual review of the evidence
submitted and the standard of review applied.

All right, anything else?

(Wo response.)

THE COURT: Thank you.

(Whereupon, Court was adjourned at 6:20 p.m.) ,

BS
L
3
Ker
8
a

IN THE UNITED STATES DISTRICT COURT
FOR THE EASTERN DISTRICT or PENNSYLVANIA

DEL-AWARE UNLIMITED, INC., et al. : CIVIL ACTION
1 .
Vv. *
:
ROGER M. BALDWIN, et al. : WO. 82-5115 :

BENCH OPINION CORRECTION SHEET

AND NOW, this 23rd day of December, 1982, it is here-
by ORDERED that the following correction sheet shall be in-
corporated into the court's bench opinion rendered in. this
matter on December 15, 1982.

1. P. 1438, line 4 - change “Section 110" to
"Section 10°.

2. P. 1439, line 7 - change “refusal" te “relief.

3. p. 1439, lines 9-11 - delete “the National His-
toric Preservation Act," and “and the River and Harbors
Act,". Insert and“ after et“ on line 10.

4. „. 1439, line 15 - after “Harbors Act," add “see
California v. Sierra Club, 451 0.8. 287 (1981), na,“.

3. p. 1439, line'17 - after “Court add “in 11212
sex City Sewarace Authority v. National Sea Clammers
Association, 453 U. 8. 1. (1561)...

6. p. 1439, line 24 - change “beliefs* to
"briefs".

ENTERED: ee to

CLERX OF COURT Ar

rit
—

7. v. 1440, line 10 - after ease add 619 F.24
231 (34 Cir. 1980), cert. genigd, 449 U.S. 1096 (1581).

8. . 1440, line 15 - change “agreed” ‘to “aggriev-
ed". |

9. P. 1440, line 25 - change study.“ to “state-
nent.

10. P. 1443, line 20 - delete deve“

11. P. 1443, line 22 - change “the reasonableness*
to either“ 3

12. P. 1444, line 1 - delete “a matter of record
ot“.

13. P. 1444, line 8 - after decision,“ add, 536 r.
Supp. 26 (. Dp. Pa. 1981), aff'd, 681 r. 24 805 (34 Cir.
1982).°

14. v. 1445, line 24-25 - change “Advisory Council
on Historic Preservation" to “Keeper of the National Regis-
try*.

13. P. 1446, line 1 - add after was“, “determined
to be.* assed on th
Dissolved Oxygen Leveis or on the Salinit

veveis in the Delaware River as a Result

c.

THE U.S. ARMY CORPS OF ENGINEERS FULLY COMPLIED
WITH THE MANDATES OF SECTIONS 106 ens 110(f) oF
THE MATIOWAL HISTORIC PRESERVATION rr 22

COORDINATION Dee eee eee eee ee

THE BIOLOGICAL OPINION OF THE roam MARINE FISHERIES
SERVICE, DETERMINING WO SIGNIFICANT ADVERSE IMPACT ON

THE ENDANGERED SHORTWOSED STURGEON, EVIDENCES FULL
COMPLIANCE WITH THE ENDANGERED SPECIES ACT BY THE U.S.

ARMY CORPS OF Wim 95

ALL OF THE ADMINISTRATIVE AGENCIES CARRIED OUT THEIR
an AND DECISION MAKING RESPONSIBILITIES IN GOOD 39

IN THE UNITED STATES DISTRICT COURT
FOR THE EASTERN DISTRICT OF PENNSYLVANIA

DEL-AWARE UNLIMITED, IWC.

Plaintif *

CIVIL ACTION
WO. 82-5115

BALDWIN, et al.,

Defendants.

WESHAMINY WATER RESOURCES AUTHORITY'S
Pp PROPOSED _PIMD I NGS OF FACT

I, MISTORY OF PRIOR ACTIONS, ENVIRONMENTAL REVIEWS AND
APPROVALS ee

O A water study of the Neshaminy Creek Basin was
undertaken under the co-sponsorship of the predecessor to
Pennsylvania Department of Environmental Resources, the 0.8.
9011 Conservation Service, Bucks County and Montgomery County.
As a result, the Neshaminy Creek resource plan wes developed.
Thies study included recommendations to construct, inter alias, «a
Point Pleasant Pumping Station, a taking point for water supply
purposes at Chalfont, and ten dam structures along the
Weshaminy Creek, including the dam that has created Lake Galina,
(WWRA Exhibit 13, p. 14).

2. on October 26, 1966, the Watershed Project for
Neshaminy Creek was approved by the Delaware River Basin
Commission and was added to the Delaware River Basin
Comprehensive Plan. The decision was supplemented on January
25, 1967, by adding the entire multi-purpose project as
Gescribed in the 1966 Water Resources Study to the DRBC
Comprehensive Plan. (Neshaminy Creek Watershed Project, Bucks
and Montgomery County, Pennsylvania, DRBC Docket No. D-65-76CP

DRBC Docket No. D-65-76CP(2), mn Exhibit 13, pp. 14-15).

J. On December 8, 1970, the Pennsylvania Water and
Power Resources Board issued to Bucks County Water Allocation
Permit o. WA-649 authorising the withdrawal of Delaware River
water for public water supply purposes. (NWRA Exhibit 13, p.
15). 4

4. On March 17, 1971, the DRBC amended its
Comprehensive Plan to include an enlarged Point Pleasant
Pumping Station to supply additional amounts of water for
public water supply and, in addition, to provide water to PECO
for Limerick. ‘This amendment was as a result of a feasibility
Study prepared in 1970 at the request of DRBC. (NWRA Exhibit
13, pp. 15-16). 5

3. In February, 1973, DRBC completed and submitted to
the counsel on Environmental Quality the Environmental Impact
Statement on the Point Pleasant Diversion Plan, a project which
included the withdrawal of up to 150 million gallons per day

wie A 2

(mgd) of water from the Delaware River at Point Pleasant to be
conveyed to the Chalfont Water Treatment Plant and to

Limerick. (Pinal Environmental Impact Statement on the Point
Pleasant Diversion Plan, Bucks and Montgomery Countys,

Pennsylvania, mn Exhibit 13, p. 16).

6. DRBC concluded in its Final Environmental Impact
Statement that the proposed project would be beneficial to the
Neshaminy and Perkiomen Watersheds and not detrimental to the
Delaware River Basin. (ma Exhibit 13, p. 16).

7. %In January, 1977, Bucks County completed a study
of water supply needs of Central Bucks County and the
alternatives for meeting those needs. The study concluded that
the Neshaminy Water Supply System was the best overall.
(Central Bucks County Water Supply Study, WWRA Exhibit 13, p.
16).

8. In February, 1977, Montgomery County completed a
study of the water supply needs in Central Montgomery County
and the alternatives for meeting those needs. Said study
concluded that the Neshaminy Water Supply System was the best
overall. (Water Supply Study for Montgomery County, MWRA
Exhibit 13, p. 16).

9. In March, 1977, the Delaware Valley Regional
Planning Commission completed its Interia Population Projection
Report including, therein, projections for the population by
the year 2000 in Central Bucks and Central Montgomery Countys.

Montgomery, Philadelphia Countys, Pennsylvania, NWRA Exhibit
13, p. 16).

10. In conjunction with the results of the three
last-referenced reports, NWRA initiated the preparation of its
Environmental Report which included re-evaluation of the
Weshaminy Water Supply Project as described in the DRBC
Comprehensive Plan and an evaluation of the information
contained in the DRBC Environmental Impact Statement on the
Point Pleasant Diversion Plan. In conjunction with the
preparation of this Report, mn drew on the expertise of
acquatic biologists, environmental engineers, archeologists and
other consultants. (mn Exhibit 13, p. 17).

11. On the basis of the above-referenced studies and
reports, the designed capacity of the Treatment Plant at
Chalfont was selected to remain at 20 mgd for the initial
installation; however, the ultimate capacity of the Treatsent
Plant was reduced from 80 to 40 mgd to meet the supplemental
water needs of the service area of Central Bucks and Montgomery
Countys. (WWRA Exhibit 13, p. 16). :

12. In September of 1978, mn submitted to the
Department of Environmental Resources an application for a
modification to the Water Allocation Permit along with an
updated report. The report concleded that there is a need for
less supplemental water supply then originally projected in
1970. (MMA Exhibit 13, p. 17).

13. ta Bovember, 1978, the Department of
Bnvironmental Resources issued Water Allocation Permit Ho.

i %

0978601 to NWRA, superseding the originally issued Water
Allocation Permit. This Permit was issued together with an
exhaustive report prepared by the Department of Environmental
Resources supporting and justifying the issuance of the new
permit. The new permit granted um, under certain conditions,
the right to withdraw water from the Delaware River at Point
Pleasant as well as from Pine Run and Worth Branch of Neshaminy
Creek to provide up to 40 mgd of potable water to Central Bucks
and Central Montgomery Countys. This potable water would
supplement the existing limited groundwater supplies. (DER
Water Allocation Report, November 1, 1978, MWRA Exhibit 13, p.
17).

14. Concurrent with all of the above-mentioned
reviews of the basic Point Pleasant ®roject and Neshaminy Water
Supply Systen, the Atomic Energy Commission completed the
preparation of its Pinal Environmental Impact Statement on the
Limerick Generating Station which incorporates, by reference,
the Environmental Impact Statement prepared by the DRBC. 8

Electric Company, MWRA Exhibit 13, pp. 17-18).

15. Based-on the Final Environmental Impact Statement
prepared by the Atomic Energy Commission, the previous
BEnviconmental Impact Statement prepared by the bc, and the
records compiled at public hearings held before the Atomic
Safety and Licensing Board and the Appeal Board of the Nuclear
Regulatory Commission, the Muclear Regulatory Commission issued

gs Ae 2

to Philadelphia Electric Company construction permits for the

Limerick Plant in March, 1975. (In the Matter of Philadelphia

Blectric Company (Limerick Generating Station, Units I and If),
Docket Nos. 50-352 and 50-353 (March 19, 1975), mm Exhibit

13, p. 18).

16. An appeal was taken to the Third Circuit Court of
Appeals and they decided, inter alia, that the Environmental
Impact Statement prepared by the Atomic Energy Commission and
DRBC met the requirements of the National Environmental Policy
Act. ( L AL ’
Docket Ho. 75-1421 (November 12, 1975), mm Exhibit 13, pp.
18-19).

17. In February 1979, mum issued its draft
Environmental Report. (mmm Exhibit 14).

18. on May 30, 1979, WWRA held public hearings on its
Graft Environmental Report. (lum Exhibit 14).

19. on July 5, 1979, m filed its application for
Section 3.8 approval under the Delaware River Basin Interstate
Compact with DRBC which was accompanied by its Environmental
Report, the transcript of the Public Hearing of May 30, 1979,
and a report prepared by NWRA responding to the comments
received at the May 30, 1979 Public Hearing. (mm Exhibit 13,
p. 20).

20. When WWRA filed its application for Section 3.8
approval with DRBC, DRBC had available to it three Pinal
Zavironmental Impact Statements, together with all the
supporting data. They were: (1) “Point Pleasant Diversion

-6- A 78

Bar.

Plan, Bucks and Montgomery Countys,” prepared by DRBC in 1973;
(2) “Limerick Generating Station, Units I and 11, prepared by
the Atomic Energy Commission in 1973; and (3) “Neshaminy Creek
Water Shed," prepared by the U. 8. Department of Agricultural,
Soil Conservation Service in 1976. (NWRA Exhibit 13, p. 20).

21. In February, 1980, pursuant to the Rules of
Practice and Procedure §2-4.3, DRBC issued its Environmental
Assessment of the Neshaminy Water Supply System and related
components and, at the same time, the Executive Director issued
a notice of his intent to issue a “Negative Declaration." DRBC
invited public comment to these documents. lot ee of the
Executive Director's intent was forwarded to all relevant
federal and state agencies; also notice of the Executive
Director's action was given at the DRBC public meeting of March
10, 1980. (MWWRA Exhibit 13, pp. 20-21).

22. In August, 1960, pursuant to DRBC's Rules of
Practice and Procedure, §2-4.4, DRBC issued its Final
Bnvironmental Assessment for the Neshaminy Water Supply Systes
including the issuance by the Executive Director of a “Negative
Declaration.” Public notice of his recommendation to issue a
“Negative Declaration® was sent to all the relevant state and
federal agencies; also, said action was announced at the DRBC
public meeting of August 27, 1960. (m Exhibit 13, pp.
20-21).

23. on Movember 18, 1980, pursuant to public notice
and DRBC's Rules of Practice and Procedure, §2-1.5, a public
hearing was held on DRBC's proposal to amend its Comprehensive

855 Bow

Plan and to grant Section 3.8 approval under the Interstate
Compact to NWRA and PECO to construct the components of the
Neshaminy Water Supply System. (m Exhibit 13, p. 21).

24. On February 18, 1981, DRBC authorized an
amendment to the Comprehensive Plan and granted the Section 3.8
applications of both PECO and mn, subject to certain
expressed conditions and limitations. (NWRA Exhibits 2 and 3).

25. The actions taken by DRBC in February, 1981 were
reviewed by the 0.8. District Court, Eastern District of |

Pennsylvania, in the matter of Delaware Water Emergency Group,
ot al., v. Gerald M. Hansler, et al., 536 F. Supp. 26(E.D. Pa.
1981). The primary issue before the court was whether the DRBC
had fully and fairly considered the environmental impact of the
proposed project in conformity with the National Environmental
Policy Act of 1969. 75
26. In rendering his decision rejecting the

challenges that the DRBC Environmental Assessment failed to
comply with the National Environmental Policy Act, Judge
VanArtsdalen concluded:

The record in this case makes four

matters quite obvious. First, there

have been at least three prior EBISs on

the basic plan and concept, all of

which were available and considered by

Doc. With the Level B Study, there
have been at least four BISs prepared.

approved the plans based on pr ſor
Bnvironmental Impect Statements and
other studies, is a substantial

* Not adopted by the Court re A 90

reduction in the quantity of water to
be withdrawn from NWRA's Water
Treatment Plant. Fourth, the
Environmental Assessment prepared is
Getailed, up-to-date and adequately
considers any changed circumstances.
27. On Appeal to the Third Circuit Court of Appeals,

the Third Circuit affirsed, without opinion, Judge

VanArtsdalen's decision. (Delaware Water Emergency Group, et

al, v. Gerald M. Bansler, et al., 681 7. 26 805 (3d Cir. 1982).
28. Following a preliminary meeting among PECO, NWRA

and the 0.8. Army Corps of Engineers Staff (Corps), by letter
Gated September 8, 1980, PECO and m provided to the Corps a
joint submission describing the Point Pleasant Pumping
Facilities and Associated Systems. Said submission provided
Getailed information of all facilities including the treatment
plant and all transaission mains. „ (Plaintites® Exhibit 15 and
60). 5
29. By letter dated October 28, 1980, after review of
all material submitted by PECO and WWRA, the Corps advised PECO
and WWRA that it had determined that two (2) permit
applications were to be submitted; one (1) for the Pine Run
rechannelizetion and one (1) for the Point Pleasant intake
structure. All other facilities were covered by the
*nationwide* permit progras. , ;
30. As a result of the Corps directive, in December,
1980, n applied to the 0.8. Army Corps of Engineers for a
permit (Application Bo. MAPOP-R-800534-3) to construct a water
intake structure in the Delaware River and under the
Pennsylvania Canal at Point Pleasant and for a permit

33

(Application No. NAPOP-R-80-813-3) to rechannel a portion of
Pine Run adjacent to the site for the water treatment plant.
(Corps of Engineers, Exhibit 5).

31. on April 6, 1981, the Corps issued a public
notice that mm had applied for the above-referenced permit.
(Corps of Engineers Exhibit 3, p. 1).

32. On August 10, 1981, the Corps issued a notice of
public hearing concerning NWRA's application for permits and
scheduled said hearing for September 15, 1981. (Corps of
Engineers Exhibit 2, p. 8).

33. On September 15, 1981, a public hearing was held
on the mmm applications at the Bucks County Community College,
Newtown Township, Pennsylvania. The public hearing was
attended by approximately 1000 concerned persons. (Corps of
Engineers Exhibit 2, p. 8).

34. A record of the public hearing was prepared and
notice of its availability was published on January 11, 1982.
(Corps of Engineers Exhibit 2, p. 8).

35. The Commonwealth of Pennsylvanis, Department of
Environmental Resources, in conjunction with its evaluation of
N applications for, inter alia, the water intake structure,
prepared an “Environmental Assessment." (NWRA Exhibit 13).

36. Said Environmental Assessment was issued in
August of 1982 contemporaneously with the issuance of permits
to m and PECO. m Exhibit 13).

37. Said Environmental Assessment was forwarded to
the Corps and reviewed by the Corps. (Corps of Engineers
Bxhibit 2).

38. on October 14, 1982, the Corps of Engineers
issued an Environmental Assessment in conformity with the
Wational Environmental Policy Act of 1969. (Neshaminy Water
Resources Authority, Point Pleasant Diversion Project, Point
Pleasant, Bucks County, Pennsylvania, a ssmen
Corps of Engineers Exhibit 3).

39. The Environmental Assessment prepared by the
Corps concluded, inter alia, that the issuance of a §10/404
permit did not constitute “major federal action" and that the
installation of the water intake, conduit and pumphouse will
not “significantly effect the environment." (Corps of
Engineers Exhibit 3, pp. 17-18.) 85

40. on October 25, 1982, the U. 8. Corps of Engineers
issued permit Ho. BAPOP-R-80-534-3 to m permitting un to
construct a water intake structure in the Delaware River/
Delaware Canal at Point Pleasant, Bucks County, Pennsylvania.
(Corps of Engineers Exhibit 2).

11. THERE HAVE BEEN NO SIGNIFICANT CHANGES IN THE POINT
PLEASANT PROJECT OR SURROUNDING ENVIRONMENTAL CIRCUMSTANCES
SINCE JUDGE VANARTSDALEN'S DECISION IN DELAWARE I.

A.

* * be No Ad se Impact c h_ and Aq
Hota Prom The Change In the Location of the Ini

41. A 1978 Report prepared by RMC Corporation and the
WWRA Environmental Report prepared in 1979 evaluated the effect
that a shoreline intake would have on the aquatic life in the
Delaware River. (H.T. 206, mmm Exhibit 14).

42. The Environmental Assessment prepared by DRBC in
February of 1980 concluded that such a shoreline intake would
not cause a significant impingement or entrainment of aquatic
life and as a result there would be no significant adverse
effects. (DRBC Exhibit 3, page 2-37, 2-38).

43. During the pendancy of the DRBC evaluation of
WWRA's pending 3.8 application, a report was submitted by NWRA
to DRBC entitled "Biological Evaluation of the Proposed Water
Intake in the Delaware River at Point Pleasant, Pennsylvania.”
Said report was prepared by P. L. Harmon of the Pottstown
Boological Laboratories. (Harmon, 1980 Report, WWRA Exhibit
35).

44. ‘The Harmon 1980 Report evaluated the effects of a
wedge-wire intake structue located 200 feet from the

Pennsylvania shore on 91] forms and stages of aquatic life ;
located in the area of Point Pleasant; the evaluation included

an analysis of the impacts on all stages of American Shad, from
the larvae stage up to adult. For purposes of his evaluation,

he assumed it was a nursery and spawning area for shad. (NWRA

Exhibit 35 pp 8-12).

45. The Harmon 1980 report concluded that the
wedge-wire intake will effect a marked reduction in potential
entrainment and impingement losses of aquatic life when
compared to a conventional travelling screen design (shoreline
intake). The operation of the proposed intake will not result
in biologically significant impacts of the resident or
migratory fish populations (NWRA Exhibit 35 p. 1).

Nen 46. At the time of the approval of the Docket
Decision D-65-76 CP (8) by DRBC in February 18, 1981, DRBC
engineering division and environmental unit staff had already
reviewed the intake des{gn change. (mn Exhibit 34; NWRA
Exhibit 3, p. 8).

46. The only environmental impact not considered by
DRBC of the intake structure on aquatic life was the effect
said intake structure would have on shortnosed sturgeon. The
existence of shor tnosed sturgeon eight miles downstream from
Point Pleasant was not determined until after the completion of
the DRBC Environmental Evaluation. (Delaware I p. 46).

48. Subsequent to the DRBC Environmental Evaluation,
mm proposed to extend the intake structure further into the
river where velocities are greater. It was proposed to extend
the intake an additional 45 feet into the river. (WWRA Exhibit
5).

A 85

49. The flow velocities of the river 245 feet from
shore are greater than those velocities 200 feet from shore
(NWRA Exhibit 6; NWRA Exhibit 35 p. 15).

30. Based upon a review of velocity measurements and
the river contours, the back eddy in the river extends out
150-160 feet from the west bank. (NWRA Exhibit 4, Exhibit 6
and Exhibit 35).

$1. ‘The Fish and Wildlife Service concluded, in a
letter dated March 26, 19862, that the location of the intake 45
feet farther out into the Delaware River and use of Johnson
wedge-wire screens with a maximum inflow velocity of .5 feet
per second and 2mm spacing will reduce localized adverse affect
on the fishery. If a flow greater than 2,000 cfs can be
maintained in the river at Point Pleasant, Fish and Wildlife
Service expects very little negative effect on flow patterns in
the back eddy caused by the change in the location of the
intake structure (uma Exhibit 4 and DEBC Exhibit 16).

52. Wen under the worst possible case conditions,
the effect on aquatic life of a maximum withdrawal of 95 mgd,
at a river flow of 2,500 cfs, will be practically nil. (NWRA
Exhibit 7). . |

33. The eddy area is located at least 62 feet
shoreward of the intake structure, at least 62 feet away from
the intake location. (WWRA Exhibit 10).

54. Upon the completion of review by the Corps’
Bydrology-flydraulics Branch of materials submitted by Del-Aware
and by GKY and Associates, Inc., it concluded that the subject

1 doe

ay

report does not provide any substantive or significant
arguments for requiring additional investigation. Further, it

was concluded that said reports tended to reveal a bias. (NWRA

Exhibits 8, 9 and 10).

33. There is substantial and reasonable evidence in
the record to support the Corp's conclusion that the proposed
intake alignment intercepts the actual river channel and thus
the main river at about a right angle and approximately 800
feet downstream of the mouth of the Tobickon Creek. (Corps of
Bngineers Exhibit 2 p. 20).

36. The maximum intake velocity of the intake
structure will be .5 feet per second only when the maximum 95
mgd is being withdrawn. The average intake velocity, at that
time, is .35 feet per second, and as the amount of water
withdrawn reduces, the intake velocity reduces in a linear
relationship. (am Exhibit 7 and Plaintiff Exhibit 66).

37. The average flow velocity toward the screens, at
1 foot away from the screens, at the maximus rate of
withdrawal, will only be approximately .1 feet per second.
(Plaintiffs' Bxhibit 66 p. 3).

$8. When DRBC is not able to achieve a flow of
Trenton of 3,900 cfs through the management of water stored
within the Basin complementing natural flows, only water for
public water supply purposes will be able to be withdrawn at
Point Pleasant until PECO is able to provide its own storage
facilities. (DRBC Exhibit 1 and 9, mm Exhibits 1, 2 and 3).

&7

59. When flows are below 3,000 cfs, it is highly
unlikely that NWRA will be able to withdraw the maximum amount
it is allowed to withdraw for public water supply, 49 mgd, due
to numerous factors, including DRBC Regulations and Conditions
included in Docket Decision No. D-65-76CP(8), ( Exhibit 3,
Conditions T and 1, WWRA Exhibit 7, DRBC Exhibit 9, DRBC
Exhibit 1).

60. mn will not be able to withdraw the maximus
amount for public water supply purposes unless such withdrawals
are subsequently approved by DER through subsidiary water
allocation permits (WWRA Exhibit 13, p. 65).

61. There was substantial evidence in the Corps
record for it to conclude that the withdrawal of water as
permitted and regulated by the DRBC will have no significant
adverse impact on the Delaware River System. Withdrawal of
water, even during low flow conditions, will result in no
significant adverse impact on acquatic organisms due to
entrainment and inpingement; such intake represents the “State
of the Act" technology with respect to intake structure
design. (Corps of Engineers Exhibit 2 p. 15).

62. If, under unforeseen circumstances, an adverse
impact upon acquatic life is noted, both DRBC and DER will 1
require such corrective action as appropriate to mitigate such
impact. (MWWRA Exhibit 13, p. 32, m Exhibit 3, Condition M).

63. Wo significant dangers are anticipated as a
result of the backwashing of the intake structure (ma Exhibit
1l).

64. The minimum surface elevation at a flow of 3,000
cfs is in excess of 70 feet and thus there will be at least a
minimum of 4 feet of water between the top of the intake and
the surface of the river at 3,000 cfs (mn Exhibit 5,
Plaintiffs’ Exhibit 66).

463. There is substantial evidence in the record to
support DRBC conclusion that the design changes to the intake
structure should reduce the degree of adverse biological impact
from that already approved as of February, 1981. (p. 11, Staff
Response, DRBC Exhibit 1).

— Lt ~an mpact — — :
Duygen Leveis Or On The Salinity Levels in The
57. aware River As A Result Of The Withdrawa!

66. There have not been any substantial changes in
circumstances from February 18, 1981, that would cause any
Gifference in the impacts caused by the withdrawal of water
from Point Pleasant upon the dissolved oxygen and salinity
levels in the Delaware River. (DRBC Exhibit 1: DRBC Resolution
$82-22 and Staff Response to Petitioners’ Factual Allegations
of 9/24/82). 88 b - .

67. DRBC concluded in February, 1981, based upon its
analysis of the affects of withdrawals, including materials
contained in the Level B Study, that the effects of withdrawal
at Point Pleasant when flows at Trenton are 3,000 cfs or lower,
on salinity levels would be virtually immeasurable. (DRBC

2

45

Exhibit 3, p. IV-16, DRBC Exhibit 1, p. 3 of Staff Response,
MWRA Exhibit 13, p. 84).

68. Because there is no change in the rate of
withdrawal projected by NWRA or the use of the water as
projected by NWRA from that which was proposed in 1981 and,
further, in light of the fact that there is no change in the
circumstances concerning the flow of Delaware River water, the
impacts on salinity, as evaluated in 1981, are unchanged.
(DRBC Exhibit 1).

69. The withdrawal of water at Point Pleasant will
have an insignificant impact upon dissolved oxygen levels in
the Delaware River even at flows as low as 2,000 cfs. (DRBC
Exhibit 2, pp. 26-28, n Exhibit 13, pp. 84, 88 and de
Bzhibit 3).

70. The withdrawal of water at Point Pleasant will
not affect the shad runs because the dissolved oxygen levels
are substantially reduced at approximately river mile 93 based
upon pollution discharges to the Deleware River which have a
significant impact on the dissolved oxygen levels. (DRBC
Bxhibit 2).

71. The dissolved oxygen model used by DRBC did
consider the effects of accumulated sediment deposits. (DRBC
Exhibit 2, p. 26

72. It is not possible to significantly ameliorate
the impacts of pollution ‘cads upon dissolved oxygen
concentration throughout the estuary by releasing stored water,

ar A 7⁰

because of the vast amounts required to have a significant
impact. (DRBC Exhibit 2, p. 76).

73. Only 3% of the time, since 1971, has the flows in
the Delaware River been below 3,000 cfs. (Staff Response, p.
3, doc Exhibit 1).

74. There has been no change in the amounts of water
to be withdrawn at Point Pleasant, the use of the water to be
withdrawn, or the flows in the Delaware River from those
considered in 1981. (DRBC Exhibit 1).

75. There is substantial evidence in the record to
support the Corp's conclusion that the withdrawal of water as
permitted and regulataed by the Delaware River Basin Commission
will have no significant adverse impact on the Delaware River
Systen. The project, with conditions imposed by the DRBC, will
have no significant affect on salinity intrusion of well fields
and surface water users of the Delaware River. Withdrawal of
water, even during low flow conditions, will have a
biologically insignificant effect on downstream dissolved
Oxygen concentrations. (Findings of Fact p. 15, Corps Exhibit
2).

76. Flows in the East Branch Perkiomen Creek and
north Branch Neshaminy Creek will be augmented by the project
releases and minimum flows will be maintained under the project
operating plan. The natural flow of the streams will not be
Giminished but will be augmented and enhanced, especially
dur Ing low flow periods. (NWRA Exhibit 14, pp V-26-V-23; DRBC
Bzhibit 3, pp. 2-39-2-43; 2-51-2-53; IV-39; and appendix B;

ae 1

ea. |

eS
* *
g

mmm Exhibit 13, pp. 46-59, 89; DRBC Exhibit 1, Staff Response,

77. In studies undertaken prior to February, 1979, it
vas found that groundwater was inadequate to meet all of the
future public water supply needs of Central Bucks and
Montgomery Counties. The “no-action alternative* would deprive
the residents of these counties of a safe, adequate water
supply system and adverse economic and environmental conditions
could be anticipated. The most prominent adverse conditions
would be the lack of water for domestic, commercial and
industrial needs, the drying up of surface water streams of the
areas, and the contamination of the groundwater aquifer by over
pumping of wells in an attempt to meet the water demands.
(Environmental Report on the Neshaminy Water ·
Beshaniny Water Resources Authority, February 1979, p. VII-7,
WWRA Exhibit 14). 5

78. In August 1980, the Delaware River Basin
Commission concluded that further development of groundwater
was considered the “least desirable water supply alternative®
for Central Bucks nd Montgomery Countys. (Final Environmental
Assessment for the Neshaminy Water Supply System, Delaware
River Basin Commission, August 1980, pp. 2-28, DRBC Exhibit 3).

79. In 1980 and early 1981, the Eastern Pennsylvania
Region endured a period of moderate to serious rainfall

A 4

shortages. By March 1981, over 4,000 domestic wells in this
region had gone dry as a result of this drought. Four thousand
families found themselves without water for essential drinking,
sanitation and other domestic uses; costs of replacing these
supplies represented an economic loss of over $6.7 million.

* ntal Assessment R ings, Point
Pleasant Water Supply Project, August 1982, p. 69, mn Exhibit
13).

p 80. In a special groundwater study of the Middle
Delaware River Basin prepared by R. . Wright Associates, Inc.
for the Delaware River Basin Commission, Wright Associates
concluded that groundwater withdrawals exceed dry year recharge
in large areas of Bucks and Montgomery Counties. (Special
Groundwater Study of the Middle Delaware River Basin, x. E.
Wright Associates, Inc., July 1982, Vol. III, Chapter XIII,
Plaintiffs’ Bxhibit 14).

61. Based on the information contained in the R. B.
Weight Associates Groundwater Study prepared for the Delaware
River Basin Commission, the Department of Environmental
Resources Getermined in August, 1982, that further development
of groundwater, as an alternative to a supplemental surface
water supply, was an unacceptable option for the Central Bucks
and Montgomery County Region. (Environmental Assessment,
Report and Pindings, Point Pleasant Water Supply Project,
Department of Environmental Resources, August 1962, p. 71, na
Bzhibit 13).

- 21 -

2g
- “ey
1

2

82. In September 1982, the Delaware River Basin
re-evaluated the groundwater alternative to the Neshaminy Water
Resources Authority Water Supply Project. The DRBC concluded,
inter alia, that further development of the groundwater is an
unacceptable option for the Central Bucks and Montgomery
Counties. (Staff R a tioners' Factual Allegations

of September 24, 1982, Allegation 4-H, pp. 17-19, DRBC Exhibit
1).

III. THE U.S. ARMY CORPS OF ENGINEERS FULLY COMPLIED WITH THE
MANDATES OF SECTIONS 106 and 110(F) OF THE NATIONAL
HISTORIC PRESERVATION ACT.

63. A 1978 report, commissioned by mn and written
by two University of Pennsylvania Archeologists, Urban and
Schortman, concluded that the Point Pleasant Pumping Station
would not adversely effect potential archeological resources or
historical resources, including the Delaware Division of the
Pennsylvania Canal ("Canal") and the Village of Point Pleasant,
if mitigation procedures as outlined in the report are
followed. (Plaintiffs' Exhibit 44, pp. 35-37).

64. WWRA, based upon the Urban and Schortman Report,
set forth in its 1979 Environmental Report procedures to be
followed for placing of the intake conduit under the Canal,
including the on-site presence of an archeologist. mn also
proposed to design the Pump Station Building in a manner to
conform with its surroundings. (m Exhibit 14, Appendix C).

85 AW

8S. ORBC evaluated the Urban and Schortman Report and
WWRA's Environmental Report and concluded that the Point
Pleasant Pumping Station would result in no adverse impact upon
nearby cultural resources, including the Canal. (DRBC Exhibit
3, pp. 340).

866. The Gesignated State Historic Preservation
Officer ("SHPO") in Pennsylvania is the Pennsylvania Historical
and Museum Commission.

87. After reviewing DRBC's Final Environmental
Assessment, the SHPO advised DRBC that the SHPO agreed that the
Point Pleasant Pumping Station would have no adverse impact
upon archeological resources in the area. The SHPO further
said that the Point Pleasant Pumping Station would have «
technical adverse impact upon the Canal which could be
adequately mitigated by archeological monitoring of the project
excavation as proposed. (MWRA Exhibit 16).

88. DRBC's approval under Section 3.8 of its Compact
was conditioned upon adoption of the measures in Appendix C of
WMRA's Environmental Report. (MWRA Exhibit 3).

89. OMBC was advised that consultation with the
A@visory Counsel on Historic Preservation ("ACHP") under the
nat tonal Historic Preservation Act of 1966 would be required in
conjunction with review of the Point Pleasant Pumping Station.
(WA Exhibit 16, Plaintiffs’ Exhibit 45).

90. DRBC deferred to the Army Corps of Engineers in
conjunction with the latter agency's review of m' permit
pplication for the N ot the intake structure, to

—

A 45

act as lead agency for the purpose of consultation with ACHP.
(Plaintiffs' Exhibit 45).

91. Upon the recommendation of the SHPO, the Corps
commissioned Ms. Elizabeth Mints to prepace a@ report on the
proposed Point Pleasant Historic District to be submitted to
the Keeper of the National Register in support of a request by
the Corps for a determination of eligibility of the Point
Pleasant Historic District for inclusion in the National
Register. (NWWRA Exhibit 29-1).

92. on December 15, 1981 the Corps submitted to the
keeper of the National Register said report along with its
request for determination of eligibility and comments on the
report prepared by the Bucks County Conservancy, n and the
Pennsylvania Historical and Museum Commission ("PHMC*).
(Plaintiffs' Rxhibit 48).

93. on December 29, 1961, the Point Pleasant Historic
District was determined eligible for the National Register of
Bistoric Places by the Keeper of the Register. Upon receipt of
the Determination of Eligibility, the Corps began its

tation with ACHP in fulfillment of the responsibilities
imposed by the National Historic Preservation Act of 1966 and
its implementing regulations. (Plaintiffs' Exhibit 49).

94. In the meantime, there was an on-going
consultation among the SHPO, n, the Corps and the Heritage
Conservation and Recreation Service (*SCRS*) to develop plans
for the aboveground elements of the Point Pleasant Pumping

at

Station which — either avoid or mitigate any potential
adverse effects upon the Village of Point Pleasant.

95. On May 27, 1981, representatives of NWRA, the
Corps, SHPO, and the BCRS attended a meeting at the site of the
proposed Point Pleasant Pumping Station at which NWRA's plans
for the design of the Pump Station Building and its attendant
landscaping were reviewed and approved. (mm Exhibit 18).

96. On September 28, 1981, the SHPO formally approved
WWRA's plans for the design of the Pump Station Building and
its attendant landscaping and advised the Corps that, in the
opinion of the SHPO, the proposed structure would not have an
adverse impact upon the Village of Point Pleasant should it be
Getermined eligible as an historic district. (am Exhibit 19,
Appendix Y).

97. WWRA's plans for the design of the Pump Station
Building and its attendant landscaping were also subaitted to
the ACHP. (Letter dated January 19, 1962 from . . Bouquard
to Charlene [sic] Dwin, attached to letter dated March 18, 1962
from Ann A. Wevel to Richard Hassel, Army Corps of Engineers.
(Certified Record, Part 8B).

98. The Corps commissioned Ms. Elizabeth Mintz to
prepare a Preliminary Case Report which, when completed, was
circulated, inter alia, to the SHPO, the ACHP and the Bucks
County Conservancy. (NWRA Exhibit 19).

99. The Preliminary Case Report included the opinions
of the Bucks County Conservancy and of Del-AMARE, Unlimited,
Inc. as representative of the views of others who had expressed

concern about the potential affect of the proposed water intake
facilities on historical and archeological resources in the
vicinity and stated that those opinions had been noted by the
Corps. (WWRA Exhibit 19, p. 15).

100. The Preliminary Case Report was submitted to the
ACHP with a determination by the Corps that the Point Pleasant
Pumping Station would have no adverse impact upon the Point
Pleasant Historic District but would have a technical adverse
effect upon the Canal which would be adequately mitigated if
. u. A. A. 6 proposed construction procedures were implemented.
(WWRA Exhibit 20).

101. The SHPO praised the Preliminary Case Report,
however, reversed its earlier approvals and called for
Pre-Construction Archeolog!i«»l Testing and Evaluation at the
site. m Exhibit 21).

102. ‘The ACEP, in conjunction with the Corps and the
SHPO, with input from the Bucks County Conservancy and the
BCRS, developed e Memorandum of Agreement designed to mitigate
oc avoid any potential adverse affects that may be caused by
the Point Pleasant Pumping Station. The development process
included a meeting attended by representatives of Del-AWARE
Unlimited, Inc., the Bucks County Conservancy, the Corps, the
ACEP, the SHPO and the SCRS.

103. The Memorandusm of Agreement was signed by
representatives of the Corps, the SHPO, and the ACHP. The
Memorandum of Agreement is an attachment to and a condition of,
WWRA's Permit from the Corps. (Corps of Engineers Exhibit 5).

7 A 98

104. In its Preliminary Case Report, the Corps noted
that “every effort has been made to minimise harm to the Canal
which may result from the present proposal for the location,
design and construction of the_water intake facilities. In
light of the alternatives discussed and mitigation procedures
outlined, the present proposal represents the most feasible and
prudent course of action." (NWRA Exhibit 19, p. 14).

108. There has been and will be no Federal Funding
for the Point Pleasant Pumping Station. (mm Exhibit 19, p.
17). 4 1 0% vrtee or «48. re

106. The Canal is neither federally owned nor
federally controlled. (WWRA Exhibit 22).

107. Alternatives to the Neshaminy Water Supply
System as a whole as well as to the Point Pleasant Pumping
Station were evaluated and rejected as infeasible by MHRA in
the 1979 Environmental Report and by DRBC in its Final
Bavironmental Assesement of 1960. (WWRA Exhibit 19, Appendix
Dd).

108. On June 14, 1982, in response to « report
written by Del-AMARE Unlimited, Inc. outlining proposed
alternatives to the Point Pleasant Water Diversion Project,
WWRA advised the Corps that m and the expert regulatory
agencies in their respective reviews and evaluation of the
Weshaminy Water Supply Systen, have long been aware of, have
fully studied and evaluated, and have rejected as infeasible,
all the alternatives specifically suggested by Del-AWARE
Unlimited, Inc. nn Exhibit 23).

sabe i

109. On August 13, 1982, the Secretary of the
Pennsylvania Departrent of Environmental Resources ("DER")
advised the ACHP that DER, in the process of preparing its
Environmental Assessment in conjunction with the issuance of a
Dams and Encroachment Permit to un for the Point Pleasant
Pumping Station, considered every alternative raised by
Del-AWARE Unlimited, Inc. and other opponents of the project
and that “none of the alternatives, or combinations of
alternatives, was found to be more cost-effective or involved
substantially less environmental impacts" than the proposed
project. (MWRA Exhitit 13, pp 67-80; WWRA Exhibit 22).

110. The Corpse was provided with the results of the
Department of Environmental Resources 1982 evaluation of
alternatives. (WWRA Exhibit 22; m Exhibit 13). ;

lll. The Corps’ Preliminary Case Report concludes
that the specific site selected for the Point Pleasant Pumping
Station is virtually the only feasible one. (WWRA Exhibit 19,
p- 12).

112. Om September 9, 1962, the Corps advised the ACHP
of the Corps confidence that there is no alternative but to
cross the Canal for which planning steps had been taken to
minimize any potential hare. (WWRA Exhibit 24). 3

113. ‘The bepertsest of Enviromental Resources, the
owner of the Canal, after its review and analysis of the
construction procedures to be utilised in conjunction with the
Canal crossing, granted approval of said procedures and
concluded “that construction of the Point Pleasant project,

A 70

followed by restoration in accordance with the specifications
approved by this agency, will leave the Delaware Canal in the
vicinity of Point Pleasant in better shape than it is today.
(WWRA Exhibit 13, pp. 43-46; WWRA Exhibit 22).

114. The Memorandum of Agreement requires NWRA to
undertake an extensive archeological testing program prior to
commencement of construction. (Corps of Engineers, Exhibit 5).

115. ‘The Memorandum of Agreement requires man to
utilise specific construction and restoration procedures
incident to the pipeline crossing under the Delaware Canal.
(Corps of Engineers, Exhibit 5).

116. ‘The Memorandum of Agreement requires NWRA to
Gesign the above ground facilities in consultation with the
SHPO, landscape the area in a manner to minimize the visual
impacts of the pumping station and boundary fence in the
surrounding area. (Corps of Engineers Exhibit 5).

117. Im December, 1980, the U.S. ten and Wildlife
Service submitted substantive comments to the Delaware River
Basin Comission for review in conjunction with the Delaware
River Basin Commission's processing of WWRA's application for
Section 3.8 approval. (Letter dated December 16, 1980 from
Borman R. Chupp, Area Manager, 0.8. Department of Interior,

7 A lol

Fish and Wildlife Service to the Delaware River Basin
Commission, Corps of Engineers Exhibit 1).

118. From December 1980, to February 1981, the
technical staff of the Delaware River Basin Commission reviewed
and assessed the substantive concerns expressed by the Fisch and
Wildlife Service in their correspondence of December, 1980.
(Staff Response to Chupp, December 16, 1980, statement in
regard to the Neshaminy Water Resources Authority Project,
Corps of Engineers Exhibit 1).

119. Ta February 1981, the Executive Director of the
Delaware River Basin Commission notified the Honorable Sherman
Tribbet, the Federal Representative on the DRBC, of the
Delaware River Basin Commission's staff evaluation of the
concerns expressed by the Fish od Wildlife Service. Contained
therein was a detailed response to each and every issue raised
by the Fish and Wildlife Service. (Letter dated February 4,
1961, from Gerald u. Hansler, Executive Director of the
Delaware River Basin Commission to the Honorable Sherman *.
Tribbet, Department of the Interior, with attachments, Corp of
Bngineers Exhibit 1). .

120. ‘The February 18, 1981 Docket Decision of the
Delaware River Basin Commission clearly evidences DRBC's
sensitivity to the issues that had been raised by the Fish and
Wildlife Service. (WWRA Exhibit 3).

121. Condition “7 of the DRBC Docket Decision
requires WWRA to cooperate with the Fish and Wildlife Service

in the choice of an intake structure design. (NWRA Docket
Decision Wo. D-65-76CP(8), February 18, 1981, MWRA Exhibit 3).

122. Condition 1 of the bc Docket Decision
requires m to construct the intake structure in the river
dur ing the per ſod between November through March “to reduce the
potential for impact on mitigrating juveniles and adult shad."
(WWRA Docket Decision D-65-76CP(8) February 18, 1981, NWRA
Exhibit 3).

123. Condition d of the DRBC Docket Decision
requires construction of the Delaware River intake and intake
conduit to be controlled to minimize any and all impacts on
existing wetland areas. (NWRA Docket Decision §D-65-76CP(8),
February 18, 1981, m Exhibit 3).

124. The Delaware River Basin Comission
consultation, review and conclusions with respect to the
substantive concerns raised by the Fish and Wildlife Service
were judicially approved by the United States District Court
for the Eastern District of Pennsylvania and the Third Circuit

Court of Appeals, (Del-Aware Water Emergency Group, et al. v.

Gerald HM. Bansler, et al., $36 . Supp, 26 (B.D. Pa. 1981)
aH d., 661 7.24 805 (34 Cir. 1982).

125. In June 1981, the 0.8. Fish and Wildlife Service
submitted to the 0.8. Army Corps of Engineers substantive
comments for consideration in the Corp processing of NWRA's
permit application to build a water intake structure in the
Delaware River at Point Pleasant. (Letter dated June 19, 1981,
from the 0.8. Department of the Interior, Fish and Wildlife

* A 19s

Service, to Colonel Ton, U.S. Army Corp of Engineers,
Plaintiffs’ Exhibit 65).

126. In July 1981, the Army Corp of Engineers
requested the applicant, NWRA, to respond to the substantive
comments raised by the 0.8. Department of Interior, Fish and
Wildlife Service. (Letter dated July 2, 1981, from Roy
Dermark, Jr., Chief of the Corps, Permits Branch, to E. l.
Bourquard, Engineer for Neshaminy Water Resources Authority,
Corps of Engineers Exhibit 1).

127. By letter dated January 22, 1982, the applicant,
WWRA, provided detailed substantive responses to the concerns
expressed by the Fish and Wildlife Service in June 1981. The
issues raised related to secondary impacts which

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40385011_0896%3A2. Public record. Not legal advice.