# Petition — Arkla, Inc. v. Hall

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40385010_1064%3A1

## Record

- **Collection:** Supreme Court brief
- **Document type:** Petition
- **Published:** January 1, 1983
- **Citation:** 464 U.S. 822

## Text

82 ' 1968 wy :

No. LER-

IN THE
Supreme Court of the Anited States

OCTOBER TERM, 1982

ARKLA, Inc. (formerly ARKANSAS LovisiANA GAs COMPANY),
Petitioner,
Vv.
Frank J. Hai, W. E. Hau, Jk., Mrs. W. E. Haut, Sr., Tre
H. M. HARRELL TeESTAMENTARY Trust, JAMES E. HARRELL, JOHN
K. HARRELL, Sr., Asa BENTON ALLEN, Stoney G. MEYERS, JR.,
W. O. Cocuran, THomas F. Puoityaw, Mrs. Enaine ALLEN, JAMES
A. Nor, D. B. McConnett, Mrs. Eva L. Weiss, Sot. KapLan and
NATIONAL AMERICAN BANK, NEW ORLEANS, Co-TESTAMENTARY
EXECUTORS OF THE SUCCESSION OF SEYMOUR WEISS
FEDERAL ENERGY REGULATORY COMMISSION,
Re spondents.

PETITION FOR WRIT OF CERTIORARI TO
THE UNITED STATES COURT OF APPEALS
FOR THE FIFTH CIRCUIT

Rowert Rowerts, JR. (counsel of record)
W. Mickake. ADAMS

Kay CowbeEN MEDLIN

BLANCHARD, WALKER, O’QUIN & Ropers
First National Bank Tower

Post Office Drawer 1126

Shreveport, Louisiana 71165

Telephone (318) 221-6858

REUBEN GOLDBERG

GLENN W. LETHAM

GOLDBERG, FrieLpMAN & LeTtHam, P.C,
1100 Fifteenth Street, N.W.
Washington, D.C. 20005

Telephone (202) 463-8300

Attorneys for Petitioner

PRESS OF BYRON S. ADAMS PRINTING, INC... WASHINGTON, D.C,

QUESTIONS PRESENTED

1. Whether the court below exceeded its review authority
by (a) ordering the Federal Energy Regulatory Commission to
grant the application of the natural gas producer respondents,
Frank J. Hall, et al., for waiver of the notice and filing require-
ments of Section 4(d) of the Natural Gas Act instead of remand-
ing the case to the Commission for further consideration, and
(b) substituting the court's judgment for that of the Commis-
sion on matters within the Commission's expertise.

2. Whether the decision of the court below is in conflict
with, and the claim of respondents Hall, et al., is barred by, the
decision of this Court in Arkansas Louisiana Gas Company v.
Hall, 453 U.S. 571 (1981).

3. Whether waiver of the requirements of Section 4(d) of
the Natural Gas Act is available for collection of a retroactive
rate increase notwithstanding the prohibition of that Act
against retroactive rate increases and reparations.

4. Whether it was error for the court below to fail to
provide a remedy to permit consideration of Petitioner’s and
the Commission's suggestions for rehearing en banc or to refer
the matter to this Court for an appropriate remedy in the
exercise of this Court’s supervisory powers, when, because of
the recusal of nine of the thirteen members of the court below,
the opportunity for en banc rehearing as provided in the Judi-
cial Code (28 U.S.C. § 46(c)) and the rules of the court below
was denied as the result of an absence of quorum even for
consideration of the suggestions for rehearing en bane.

TABLE OF CONTENTS

Page

Se i ]

STATUTES AND REGULATIONS INVOLVED ............... z

OM ee cc, 3

Bren aeee OF FE CAM is kee 3
A. Origin Of The Claim For A Retroactive Rate In-

i ei vb oo ec wencn cc. 3

&. Proceedings In The State Courts ............... 5

i. err Proceedines In This Court ............... 6
D. The Commission's Order Denying Hall’s Application
For Waiver Of The Notice And Filing Requirements

im pero i) Or ee a Cj... 7

BE. Proceedings In The Court Below ............... 10

REASONS FOR GRANTING THE WRIT ................... ll

ee 28

APPENDIX:

oe vik cae la

Me ee 37a

a oe ch, 50a

fae A ee eee ae 9a

me Ll0a

iil

TABLE OF AUTHORITIES

CASEs: Page
Ame mn Tel phone & Telegraph Co. v. United States,

og 17
Arkansas Louisiana Gas Co. v. Hall, 453 U.S. 57]

coe? 6 ici. mo, ¢. 40, Ii, 32, 19, 2, SS Be we
Banks v. FAA, 687 F.2d 92 (5th Cir. 1982) .......... 14
City of Piqua v. FERC, 610 F.2d 950 (D.C. Cir.

ee ee Zi, 2
Continental Oil Co. v. FPC, 236 F.2d 839 (1956). cer-

tioran denied, 352 U.S. 966 (1957) ........ 12, 2, 2
Eastern Petroleum Co. v. Kerr-McGee Corp., 447 F.2d

es EA So) ng ie ene oe 4.5
FCC v. Pottsville Broadcasting Co., 309 U.S. 134 (1940) 14

FPC vy. Hope Natural Gas Co., 320 U.S. 591 (1944) .. 25
FPC v. Idaho Power Co., 344 U.S. 17 (1952) ........ l4

FPC v. Interstate Natural Gas Co., 3386 U.S. 597 (1949) 25
FPC v. Sierra Pacific Power Co.. 350 U.S. 348 (1956) 12
FPC v. Tennessee Gas Transmission Cv.. 371 U.S. 145
— crc ssi‘; li, 18
FPC v. Transcontinental Gas Pipe Line Corp., 4538 1) &
— l,l, sCsaCdsaCCC..... l4-lo

FPC v. United Gas Pipe Line Co., 393 U.S. 71 (1968) 15
Gillring v. FERC, 566 F.2d 1323 (Sth Cir.), cert. denied,
go vce noes kines, 21
Vv. Arkansas Louisiana Gas Company, 359 So.2d
Wee CE Be CAE, FT) ono ov vo even ccncens 5
Hall v. Arkansas Louisiana Gas Company, 368 So.2d
ite coe ccc er eee ae ara e 6
Hall v. Arkansas Louisiana Gas Company, 379 So.2d
Oe CE FO, FE i ook vows wo ceccs ccs, 6
Huber Corp. v. Denman, 367 F.2d 104 (5th Cir. 1966) 5
Indiana & Mich wan Electric Co. v. FPC, 502 F.2d 336
nce co cence 26
Mobil Oil Corp. v. FPC, 463 F.2d 256 (D.C. Cir. 1971),
certioran denied, sub. nom., Webi! Oil Corp. v. Mat-
cacti Paso be a ts 5

Hall

iv

Table of Authorities Continued
Page

Montarna-Dakota Utilities Co. v. Northwestern PA .
Mee Cle, Oe ook.

Nilsen v. City of Moss Point, 701 F.2d 556 (5th Cir. 1983)
Permian Basin Area Rate Cases, 390 U.S. 747 (1968) . 17

Presbyterian Hospital of Dallas V. Harris, 638 F.2d 1381
(5th Cir. 1981), certiorari denied, 454 U.S. 940 (1981) 14

pee O. Be SOe ieee) og ook cick... 5
Shell Oil Co. v. FPC, 334 F.2d 1002 (1964) .... 12. 24. 25
l'nited Gas Pipe Line to Vv. Mobile Gas ( ‘Orp., 350 Uy S.

I ee ciecaakc.... 24, 25, 26
Vermont Yankee Nuclear Power Corp. v. Natural Re-

sources Defense Couneil, Ine., 4835 U.S. 519 (1978) 14
West Texas Gathe rene Co., SO PPC 610 (1962) ....... a
Western Pacific Railroad ( ‘orp. Vv. Wi stern Pacitie Rail-

eee Ca. Seo tS Ber IGS) jn. vce kk ee: 27

STATUTES:

Federal Power Act:

mecwon 2g) (1G U.S.C. § Beddid)! .... ... 12
Natural Gas Act:

OE RO 888 eS I ee :

section 4(d) [15 U.S.C. § 717e(d)] 2, 5, 6, 7, 8, 12, 24. 25

meeceems 1G) 110 (1 0, GTO) gk ok ccc ecu 22, 25

peeteons bm to Ue, St) ................. rae
Judicial Code (28 U.S.C.):

eee CCB... 27
Federal Energy Regulatory Commission Regulations (18

C.F .R.):

a A 2

ewe roeee..ttCtCs‘(It is not unlikely that Hall’s deliberate decision to ignore the
requirements of the NGA and to seek a retroactive rate increase
through the state courts in the guise of damages for an alleged breach
of contract was influenced by the prospect of an adverse interpreta-
tion by the Commission of the favored nation provision since Com-
mission precedents then in existence clearly established that royalty
payments do not constitute a purchase and sale transaction. Morris
Mizel, et al., 30 FPC 1103, 1104 (1963); Shell Oil Co., 29 FPC 498
(1963); West Teras Gathering Co., 29 FPC 510 (1962): Huber ‘orp. Vv.
Denman, 367 F.2d 104 (5th Cir. 1966): Mobil Oi! Corp. v. FPC, 463
F.2d 256 (D.C. Cir. 1971), cert. denied. sub nom., Mohil Oi] ¢ ‘orp. v.
Matzen, 406 U.S. 976 (1972).

” By October 1972, Hall had obtained the status of a small producer
which under the Commission's regulations (18 CFR § 157.40) ex-
empted Hall from the filing requirements of Section 4(d) of the NGA.
provided the increased rates are within the just and reasonable area
rates established by the Commission.

6

Court,’ it was held that Hall was excused from compliance with
the filing requirements of the NGA and, therefore. entitled to
recovery for the period between 1961 and 1972 because Arkla
failed to inform Hall of the royalty payments and thereby
prevented Hall from complying with the NGA. The Louisiana
Supreme Court ruled that had Hall filed a rate increase with
the Commission, it would have been approved, and remanded
the case to the trial court for the calculation of damages for that
period. Hall v. Arkansas Louisiana Gas Company, 368 So.2d
984 (La. 1979). On remand the trial court entered judgment in
accordance with the Louisiana Supreme Court's decree which
was affirmed by the Louisiana Court of Appeal. Hall vy. Arkan-
sas Louisiana Gas Company, 379 So.2d 1142 (La. App. 2d Cir.
1980).

C. Prior Proceedings In This Court

Arkla filed petitions for writs of certiorari in Case No. 78-
1789 challenging the judgment of the Louisiana Supreme
Court and in Case No. 79-1896 challenging the Louisiana Court
of Appeal’s affirmance of the trial court's money judgment on
remand from the Louisiana Supreme Court.

After the Louisiana Supreme Court's award of damages but
prior to this Court's grant of Arkla’s petition for certiorar in
No. 78-1789, Hall, on May 24, 1979, filed with the Commission
an application for waiver of the notice and filing requirements
of Section 4(d) of the NGA to permit Hall to collect retroactive
rate increases relating back to 1961 - some 18 years before Hall
made its filing with the Commission. In response to this
Court’s invitation, in Case No. 78-1789, the United States in
February 1980 filed its brief as amici curiae. in which the

‘The Louisiana Supreme Court granted Hall's and denied Arkla’s
petition for review of the intermediate appellate court’s decision.
Arkla sought certiorari in this Court on the question of whether the
interpretation of the favored nation clause should have been referred
to the Commission. This Court denied the petition. 444 U.S. 878
(1978).

~

government advised the Court of the pending application for
waiver and suggested that the Court “may wish to hold the
petition to await the Commission's action” since grant of the
waiver might moot the case. Arkla’s petition in No. 78-1789
remained pending and on November 5, 1980, the Commission
denied the waiver application, 13 FERC © 61,000 (1980) (App.
B, infra, pp. 37a to 49a). Thereafter, the United States filed its
supplemental memorandum in which it advised the Court of
the denial of the application for waiver and recommended “that
the Court grant the petition for a writ of certiorari and reverse
the judgment of the Supreme Court of Louisiana.”

This Court subsequently granted Arkla’s petition in Case
No. 78-1789 (449 U.S. 1109(1981)), and on July 2, 1981 in Arkla
v. Hall, supra, reversed the Louisiana Supreme Court, ruling
that the Louisiana court's award of damages amounted to an
“award of a retroactive rate increase based on speculation
about what the Commission might have done had it been faced
with the facts of this case” which was barred by the filed rate
doctrine and the prohibition of the NGA against retroactive
rates. Arkla v. Hall, 453 U.S. at 578-579, 580. In a separate
order also issued July 2, 1981 (453 U.S. 917), the Court granted
Arkla’s petition in Case No. 79-1896, reversed the Louisiana
Court of Appeal’s monetary judgment against Arkla and re-
manded the case for further consideration in light of the
Court’s decision in Arkla v. Hall, supra.

D. The Commission's Order Denying Hall's Application For
Waiver Of The Notice And Filing Requirements Of Sec-
tion 4(d) Of The NGA

Hall's application for waiver of the notice requirements of
Section 4(d) of the NGA* was conditional. Hall contended that a

* Hall's application did not comply with Section 4(d) which requires
that notice of the change in rates shall be given by filing and posting a
new rate schedule plainly stating the changes. No new rate schedule
was filed by Hall with the application and none has ever been filed by
Hall.

8

waiver of the filing requirements was not necessary because
Section 4(d) has no applicability to a judicial award of damages
for breach of contract and requested a ruling from the Commis-
sion to that effect (App. B, infra, p. 39a). Alternatively, Hall
alleged as good cause for granting the waiver that timely
compliance with the requirements of Section 4(d) “was im-
possible” because Arkla “had concealed the facts that would
have made timely notice possible” and that Hall was “now for
the first time, able to file the appropriate information with the
Commission.’”

In its order of November 5, 1980, denying Hall’s application
for waiver, the Commission first rejected Hall’s contention
that Section 4(d) was inapplicable, ruling that the filed rate
doctrine applied to the award of damages for the 1961-1972
period since the damage award constituted a retroactive rate
increase without the Commission having determined that the
new rate is just and reasonable to the detriment of the Federal
statutory scheme (App. B, infra, pp. 40a-46a).

The Commission then ruled that good cause had not been
shown and denied the waiver on a number of grounds (App. B,
infra, pp. 46a-49a). The Commission noted that there is a
strong “statutory bias” against retroactive rate increases
under the NGA. The Commission found that the retroactive
rate increase in this case would be “particularly unacceptable”
because of the “uncommonly severe nature of the retroactivity
imposed” since consumers would be exposed to liability for
higher rates beginning in 1961 and continuing for some 11
years thereafter—a result the Commission found it “simply
cannot sanction” (App. B, infra, p. 46a).

¢

* May 24, 1979, was not, of course, the first time Hall was “able to
file the appropriate information with the Commission.” Hall was
obviously possessed of all the information necessary to comply with
Section 4(d) in 1974 when Hall made a conscious and deliberate
decision to by-pass the Commission and initiate an action for damages
in the state courts to secure the retroactive rate Increase

9

The Commission found further that the waiver should be
denied because of the “possible unsettling effect that a waiver
in this case might have on other gas purchase transactions”
since the grant to Hall of a higher rate for its gas effective in
1961 posed “a strong likelihood that claims would arise assert-
ing that this increase triggered the operation of indefinite price
escalator provisions in other contracts in the Sligo Field geo-
graphical area,” involving pipeline companies other than
Arkla, and opening “the door to additional rate increase re-
quests and to requests for waiver for the same period” (App. B,
infra, pp. 46a-47a)."” |

The Commission found, as a matter of policy, that it is not “in
the public interest to take actions in the name of equity that
have the potential for reopening transactions which took place
almost 20 years ago.” (App. B, infra, p. 47a).

The Commission held that it could not assume that if Hall had
made a timely filing in 1961 that the Commission would have
approved the increase, noting that the Commission might well
have concluded that the royalty payments did not trigger the
favored nation clause and that even if they did trigger the
clause, in light of the Commission outlawing indefinite pricing
provisions in 1961 in new contracts, the Commission might
have determined that the public interest would not permit the
grant of rate increases based on indefinite price escalation
provisions in existing contracts (App. B, infra, p. 48a; see also,
n. 5, supra, p. 45).

Finally, the Commission rejected Hall's only claim of good
cause, pointing out (1) that the Louisiana courts did not find
fraud or deceit in Arkla’s failure to disclose information and (2)

Hall represents only 48 percent of the total interests committed
to Arkla in the Sligo Field. If the waiver sought by Hall were
granted, the other 57 percent interests would be entitled to the same
retroactive rate increase sought by Hall. Non-litigants in the Sligo
Field have made such claims upon Arkla. Additionally, royalty own-
ers, at the instigation of Hall, have made claims upon Arkla for
“compensatory damages.”

10

that the Commission's “own review of the record before us
leads us to conclude that Arkla could have reasonably assumed
that the government royalty payment did not trigger the in-
definite price escalator in the contract with the Hall group”
(App, B, infra, pp. 48a-49a)."’

E. Proceedings In The Court Below

After the Commission denied rehearing on January 2, 1981,
of its order denying the application for waiver, 14 FERC
© 61,003 (1981), Hall filed a petition for review of the Commis-
sion’s order in the court of appeals. Hall’s petition for review
was pending when this Court granted Arkla’s petition for
certiorari in case No. 78-1789, and was still undecided when
this Court’s July 2, 1981 opinion was rendered. Arkla v. Hall,
453 U.S. at 576, n. 6."

In a2 to 1 opinion rendered November 26, 1982, Chief Judge
Clark dissenting, the court below reversed the Commission’s
order denying the waiver, and remanded the case to the Com-
mission with specific instructions to grant the waiver and the

'! This Court in Arkla v. Hall took a similar view of Hall's appeal to
equitable considerations to escape the filed rate doctrine arising out
of Hall’s claimed misconduct of Arkla in failing to inform Hail of the
royalty payments. This Court said (453 U.S. at 583, n.13): "We do not
find this argument compelling. The court below did not’find that
Arkla intentionally failed to inform respondents of its lease payments
to the United States in an effort to defraud them. Consequently, we
are not faced with affirmative misconduct, and we need not consider
the application of the filed rate doctrine in such a case,” agreeing with
the Commission’s finding that Arkla “could have reasonably assumed
that the government royalty payment did not trigger the [favored
nation clause. |”

2 On July 21, 1981, this Court denied Hall's motion for a stay of the
mandate and extension of time for filing a petition for rehearing in
Case Nos. 78-1789 and 79-1896. Hall’s request was made principally
on the ground that the Fifth Circuit review proceeding was pending
and that this Court should withhold the mandate until that proceed-
ing was complete.

1]

retroactive rate increase, leaving to the Commission only the
determination of the level of the retroactive rate increase. The
court held that the waiver should be granted because this case
does not involve a retroactive rate increase but rather delayed
implementation of a contractually authorized rate increase.
The court also held that the waiver provision of Section 4(d) of
the NGA is available to permit a rate increase for a past period
even though retroactive rate increases are barred by the
NGA."

In an order issued March 14, 1983, the court “denied” both
Arkla’s and the Commission’s suggestions for rehearing en
banc, and Arkla’s petition for rehearing (App. A, infra, p.
30a). Chief Judge Clark dissented from the denial of panel
rehearing, stating that due to the fact that nine of thirteen
regular active service judges had disqualified themselves from
the case, the denial of the suggestion for rehearing en banc
gave an “erroneous impression” that the suggestions were
considered on their merits by the thirteen judges, when, in
reality, because of disqualifications the suggestions for rehear-
ing en banc of the panel’s decision could not even be considered
due to the absence of a quorum of the court (App. A, infra, p.
33a). Arkla’s motion for relief from the court’s order denying
en banc rehearing was denied on April 27, 1983 (App. A, infra,
p. 34a).

REASONS FOR GRANTING THE WRIT

The decision of the court of appeals presents multiple ques-
tions of substantial importance with respect to the proper role

‘ Arkla’s motion to dismiss the review proceedings on the grounds
of res judicata and collateral estoppel was preliminarily denied by the
Court (App. A, infra, p. 36a) but carried along with the case on the
merits. The Court's November 26, 1982 opinion denied the motion,
principally on the ground that Hall had an “administrative action” for
“rates” as distinguished from the claim for “damages” rejected by the
Supreme Court in Ark/a v. Hall, although the Supreme Court had
ruled that the claim for damages was, in fact, a claim for a retroactive
rate increase. 453 U.S. at 578-579, 580.

12

of the courts in reviewing the Commission’s orders under the
NGA. Moreover, since the relevant review provisions of the
Federal Power Act (“FPA”) “are in all material respects sub-
stantially identical” to the NGA, the decision will affect review
of the Commission’s orders under the FPA. The decision. if
allowed to stand, will substantially undermine the Commis-
sion’s administraton of both statutes. FPC v. Sierra Pacific
Power Co., 350 U.S. 348, 353 (1956).

The decision of the court of appeals also presents important
questions of law as to whether it is in conflict (1) with the
decision of this Court in Arkla v. Hall, supra, (2) with the
decision of another panel of the Fifth Circuit in Continental Oil
Co. v. FPC, 236 F.2d 839, 843 (1956), cert. denied, 352 U.S. 966
(1957), and (3) with the decision of the Third Circuit in Shell Oil
Company v. F PC, 334 F.2d 1002 (1964). These conflicts in-
volve fundamental errors committed by the court below in
having reversed the Commission's order denying Hall's appli-
cation for waiver and in awarding to Hall the same retroactive
rate increase it was denied by this Court’s decision in Arkla v.
Hall.

Additionally, the decision of the court of appeals presents an
important question involving the meaning and scope of Section
4(d) of the NGA, the outcome of which will significantly affect
the Commission's administration of the NGA as well as the
FPA. See Section 205(d) of the FPA. The question is one which
this Court noted but did not find necessary to address in Arkla
v. Hall, namely, whether waiver of the notice requirements of
Section 4(d) “is available for retroactive collection of a higher
rate than the one on file” with and approved by the Commission
(453 U.S. at 578, n.8).

The decision of the court of appeals denying the suggestions
for rehearing en banc of the Commission and Arkla because of
the unusual circumstance of the recusal of 9 of the 13 members
of the court of appeals presents the important question of
whether a remedy is available to enable litigants seeking re-
view of orders issued under the NGA to have the full opportun-

13

ity for en banc review as provided by the Judicial Code and the
rules of the court below.

These important questions reach beyond this immediate
case and its litigants. With respect to the proper role of the
courts vis-a-vis administrative agencies, the questions pre-
sented may arise in any review of Commission orders under
the statutes it administers and, indeed, may arise in any re-
view of the orders of any of the federal administrative agen-
cies. As for the availability of waiver of the notice provisions of
the statutes administered by the Commission, the question
presented can arise in any ratemaking proceeding involving
natural gas pipeline companies and producers and in ratemak-
ing proceedings involving electric companies. The court-
ordered waiver of the Commission’s regulations could under-
mine the statutory scheme as well as the regulations developed
by the Commission to implement its responsibilities under the
statute.

1. The court below usurped the Commission's statutory
authority in reversing the Commission's order denying Hall's
application for waiver and failed to accord proper deference to
the Commision’s findings and expertise.

The court ruled that the Commission’s reasons for denving
the waiver were based on an erroneous premise that the
retroactive rate increase violated the NGA; the court also
ruled that the Commission's policy against retroactive rate-
making was not involved. The court further found that the
Commission’s reasons for denying the waiver were not rational
(App. A, infra, pp. 12a-22a). Instead of reversing and remand-
ing the order to the Commission for further consideration
consistent with the court’s opinion, the court below made the
finding that Hall had shown good cause for the waiver and
directed the Commission to grant the waiver and the increase,
leaving to the Commission only the determination of the level
of the increase based on restrictions from the court on that
matter (App. A, infra, pp. 22a-26a).

14

a. Even assuming, arguendo, that the court was right in
overturning the Commission’s order as an abuse of discretion,
the court nonetheless exceeded its authority by substituting
itself for the Commission in determining that “good cause”
existed to grant the waiver and prohibiting Commission
reconsideration of the matter on remand. Rather than permitt-
ing the Commission to supply record support where the major-
ity found the present record inadequate or to reconsider
whether other reasons might militate against the waiver, the
court completely foreclosed that result oy deciding, on its own,
that good cause existed for the waiver and directed grant of the
waiver and rate increase.

The function of a court of appeals on review of an administra-
tive agency’s order is to lay bare and correct an error of law.
When the appellate court has done that. it has exhausted the
only power which Congress gave it. The court's review func-
tion is at an end and the agency's order is to be remanded to the
administrative agency for reconsideration in light of the court’s
opinion.

As this Court said in FPC v. Idaho Power Co., 344 U.S. Lt,
21 (1952), the “power ‘to affirm, modify or set aside’ the order
of the Commission in whole or in part’ is “not power to exercise
an essentially administrative function.” As another panel of
the Fifth Circuit said in Banks v. FAA, 687 F.2d 92, 96-97 (5th
Cir. 1982), citing Vermont Yankee Nuclear Power Corp. v.
Natural Resources Defense Council, Inc., 435 U.S. 919, 524-
025 (1978):

“We are ill-equipped to decide whether new hearings
could be productive in this proceeding, or whether the
appellants must be made whole without further hearings.
We leave this to the administrative agency.”

Seealso FCC v. Pottsville Broadcasting Co., 309 U.S. 134, 145
(1940); Presbyterian Hospital of Dallas v. Harris, 638 F.2d
1381, 1389 (5th Cir. 1981), cert. denied, 454 U.S. 940 (1981),
The court below overstepped the bounds of its review author-
ity in issuing its order in this case and improperly propelled
itself into the domain reserved to the Commission. Pry ¥.

15

Transcontinental Gas Pipe Line Corp., 423 U.S. 326 (1976):
FPC v. United Gas Pipe Line Co., 393 U.S. 71 (1968).

The Court’s error in this case is manifested in the rationale
that it used to justify the grant of the waiver, arationale which
is at war with the basic scheme of rate regulation under the
NGA. The court in determining that the waiver and retroac-
tive rate increase should be granted sought to avoid the
adverse impact that the increase would have on consumers by
Suggesting to the Commission that it could protect the con-
sumers if Arkla were denied the right to recover the increase
from its customers and suggested that Arkla’s failure to inform
Hall of the royalty payments warranted denial of such recov-
ery. The court’s reasoning would stand NGA rate regulation on
its head. Judge Clark’s dissent (691 F.2d at 1199) set the
matter straight:

“The majority assumes that the Commission, in its discre-
tion, may and should deny Arkla the rate increase it will
surely seek as a result of today’s decision. I respectfully
disagree, Under the due process clause no public utility
may be compelled to absorb its own costs. The most basic
of such costs are expenditures for gas purchases, whether
incurred routinely or, as here, as thee final product of
protracted litigation. Because Arkla’s ratepayers rather
than Arkla received the benefit of its noncompliance with
the ‘most favored nation’ clause in the 1960s, it follows
inevitably, in my view, that the ratepayers must bear the
burden of Arkla’s belated compliance now.”

The effort of the court below to convince the Commission
that it could at one and the same time grant a retroactive rate
increase to Hall and deny Arkla recovery of that increase from
its customers is not only groundless but emphasizes the error
of the court in overstepping its bounds and improperly project-
ing itself into the Commission's domain. In its suggestion for
rehearing en banc, which was not considered for lack of a
quorum, infra, pp. 26-28a, the Commission advised the court
below that it could not legally deny Arkla recovery of the
increase in costs flowing from the waiver because Arkla had

16

acted properly under the NGA. The Commission stated (Com-
mission suggestion for rehearing en banc, pp. 8-9):

“To be sure, the Commission may disallow ‘imprudent’
expenditures from being "mean on to ratepayers. See,
e.g., Missouri ex rel. Southwestern Bell Telephone Co. v.
PSC, supra, at 289 n. 1, (Brandeis and Holmes, JJ. con-
curring). But there was no imprudence in this case. As the
panel majority acknowledged, Arkla’s ‘delay’ resulted
from the fact that the pipeline acted on an opinion of
counsel that the royalty payment did not bring into the
play the ‘favored nation clause.’ Slip op. at 780. The ‘delay’
stemmed from the pipeline’s ‘non-fraudulent’ (id. at 787)
attempt to hold rates down.”

The Commission noting the anomolous result produced by the
court’s decision under the NGA, went on (id. at 9):

“To hold that such conduct is imprudent, is to em ty that
standard of any real meaning. * iaboonty it would lead to
anomolous results. Thus, under the approach suggested
by the majority in this case, pipelines would be dis-
couraged from resisting producer demands in acting on
behalf of customers to keep rates down in close cases. For,
as the majority concedes, had Arkla agreed at an early
stage that the royalty triggered a rate increase to Hall and
made timely payment, the pipeline could recoup its costs
from customers. However, by resolving doubts in favor of
customers and litigating the issue, Arkla’s conduct some-
how can be termed ‘imprudent,’ thus, barring any recov-
ery from its ratepayers when it is determined that it is
obliged to pay its seller. Such an incongruous result stands
in marked contrast to the Supreme Court's statement that
the Commission must counter the lack of incentives pipe

lines have ‘to bargain prices down.’ F PC vy. Te.raco, supra,
417 U.S. at 391.”

b. In addition to exceeding its review authority in direct-
ing the commission to grant the waiver and the rate increase,
supra, pp. 14 to 16, the court of appeals also exceeded its
review functions by failing to give proper deference to the
Commission's findings, expertise and experience and in sub-

stituting the court's judgment for that of the Commission. As

17

stated by this Court in Permian Basin Area Rate Case, 390
U.S. 747, 767 (1968):

“Congress has entrusted the regulation of the natural gas

industry to the informed judgment of the Commission,

and not to the preferences of reviewing courts.”
And see: American Telephone & Telegraph Co. v. United
States, 299 U.S. 232, 236-237 (1936): “This court is not at
liberty to substitute its own discretion for that of administra-
tive officers who have kept within the bounds of their adminis-
trative powers... What has been ordered must appear to be
“the expression of a whim rather than an exercise of judg-
ment.”

One example of the many instances of the court’s failure to
respect the Commission's informed and expert judgment, and
the substitution of its judgment for that of the Commission in
an area where the court has no expertise is the rejection of
what the court below described as the “most compelling
reason” for denial of the waiver, i.e., that consumers would be
exposed by the waiver to a potential liability for higher rates
for 11 past years (1961-1972), a retroactive effect of
“uncommonly severe nature.” The court below stated that the
Commission's concern was “that 1980 consumers might be
exposed to liability for rates attributable to 1961 consumers”;
that “a different group of consumers will pay for the gas than
the one which used it.” (691 F.2d at 1193). While conceding that
logic supports this concern, the majority opinion concluded
that the “Commission's reasoning lacks a firm basis of support”
because “the record is devoid of information in this regard.”
But no evidence is needed to support the concededly logical
proposition that the 1961 consumers are not identical with the

pay the increase. FPC v. Tennessee Gas Transmission Co.,
371 U.S. 145 (1962). In Tennessee, this Court, reversing the
Fifth Circuit which had held that the Commission abused its
discretion, affirmed a Commission order providing for prompt

refunds, noting that “the transient nature of our societs

18

often prevents refunds from reaching those to whom they are
due.” 371 U.S. at 154-55. There was no evidence to support this
statement and none was necessary. Logic is enough."

In addition to being wrong on this count, the court also
misstated the Commission’s concern which was the exposure of
consumers to liability for 11 years of higher charges whether
the consumers were the same or not the same as the dissenting
opinion of Chief Judge Clark correctly pointed out (691 F.2d at
1199). As the dissent demonstrated, the majority opinion
mistakenly focused on the equities between Arkla and Hall
when “the balance must be struck between the ratepayers and
Hall” for the primary purpose of the NGA is protection of the
consumers (691 F.2d at 1199). The Commission’s concern
regarding the severe impact on consumers was a reasonable
and rational exercise of the Commission's discretion and is
Strengthened, not weakened, by the fact that in a period of
more than 20 years there are bound to be changes in the
identity of the consumers as the dissent points out (691 F.2d at
1199). The Commission could legitimately take into account in
exercising its discretion to deny the waiver that if the waiver
Was granted the Commission would be forced to permit Arkla
to recover the increase from its ratepayers (691 F.2d at 1199).

2. The decision of the court below is in direct conflict with
the decision of this Court in Arkla vy. Hall. supra, on matters

'* The egregious nature of the court's substitution of its judgment
for the Commission's is shown by its reliance on an unsupported
assertion during oral argument by Hall's counsel that “to the best of
his information, the gas purchased from Hall was sold by Arkla to line
industries in Southwest Arkansas wherein the possibility that con-
sumers over the twenty-year period would be similar is more prob-
able.” 691 F.2d at 1193, n.15. The assertion is an absurdity. Arkla is
an integrated utility with multiple sources of gas which are comming-
led in its lines. In such circumstances the ability to trace particular
molecules of gas from a point of production in Louisiana to particular
customers in Arkansas is impossible.

19

that are critical to the court of appeals’ reversal of the Commis-
sion’s order denying Hall's application for waiver.

Acknowledging that in light of this Court’s decision in Arkla
v. Hall, “the only avenue available to Hall, ifany exists at all,
is the administrative one arguably provided by Section 4(d),”
the court of appeals ruled that such an “administrative compo-
nent to this case . . . remains alive” because “[{a]lthough Hall is
not entitled to contractual damages by virtue of the filed rate
doctrine, it is entitled to the rates which it contracted with
Arkla to receive over which the Commission has authority to
regulate” and because the rate increase sought by Hail is not a
retroactive rate increase (App. A, infra, p. 13a; 691 F.2d at
1191-1192; emphasis supplied).

The court of appeals’ effort to distinguish between “con-
tractual damages” and “rates” was made by Hall to this Court
in Arkla vy. Hall. Hall argued that the award of the Louisiana
courts was one for compensatory damages for breach of con-
tract to which the filed rate doctrine has no application. This
Court held that the compensatory damages, which repre-
sented the difference between the contract rates paid by Arkla
and the contract rates Hall contended Arkla should have paid
had the favored nation clause gone into effect, were an award of
a retroactive rate increase barred by the filed rate doctrine and
the NGA’s prohibition against retroactive rates. 453 U.S. at
974, 578-579, 580. Thus, the distinction attempted by the court
below between the compensatory damages (or contractual
damages) and rates is non-existent. They are one and the
same—a claim for a retroactive rate increase. The lower court
has engaged in a futile attempt to separate the inseparable, Cf.
Montana-Dakota Utilities Co. vy. Northwestern P.S.C.. 34]
U.S. 246, 251 (1951); and its decision is in a head-on collision

with the ruling of this Court in Arkla v. Hall.

The court's effort to avoid the bar created by this Court’s
decision on the ground that the parties are not the same and the
actions are not identical is also without merit. In each action
the parties are Hall and Arkla as the court below recognized
when it referred to the “present action,” i.e., the administra-

20

tive action, as “involving Hall and Arkla” (App. A, infra, p.
11a; 691 F.2d at 1194). The actions are also identical. Each is
based on and arises out of the same gas purchase contract, the
same favored nation clause, and the same facts. In each the
objective is the same, to secure nothing less than a retroactive
rate increase. The conflict between the decision of the court
below and of this Court in Arkla v. Hall results entirely from
the effort of Hall to relitigate the same issues." Hal] made his
selection freely, to seek damages in the state courts and not to
seek a waiver from the Commission. Hall is bound by that
election and is not entitled to two bites at the cherry because
the first bite was unsuccessful.

Hall's determination not to pursue any remedy through the
Commission is particularly illustrated by Hall's vigorous oppo-
sition to Arkla’s 1975 filing with the Commission, in FERC
Docket No. RI76-28, requesting issuance of a declaratory
order asserting the Commission’s primary jurisdiction over
the dispute. Hall successfully defeated Arkla’s efforts to have
the matter heard by the Commission, but did not make the
“conditional” filing for a waiver until 1979 and. ironically, made
it in the same declaratory order proceeding initiated by Arkla.
It is clear that in opposing Arkla’s 1975 filing, Hall was deter-
mined to pursue its remedy on/y in the state court. Hall has
done so and lost, and is not entitled to start over with an alleged
administrative remedy. The court below ordered the FERC to
raise the price during the period involved. This Court’s judg-
ment prohibits the award of damages during the period that
Hall was subject to Commission jurisdiction. The two decrees
are irreconcilable.

In a case decided en banc since its decision in the present case,
Nilsen v. City of Moss Point, 701 F.2d 556. 560 (oth Cir. 1983), the
Fifth Circuit stated that “. . . one who has a choice of more than one
remedy for a given wrong .. . may not assert them serially, in
successive actions, but must advance all at once on pain of bar.” In
Nilsen, the Court held a subsequent claim was barred when a job bias
claimant whose Title VII claim was dismissed for failure to make the
requisite EEOC filing, attempted to assert a new action arising out of
the same transaction and alleging the same discrimination.

Equally futile is the court of appeals’ effort to avoid a conflict
with this Court’s ruling by attempting to transform the
retroactive rate increase into a prospective rate increase, on
the authority of City of Piqua v. FERC, 610 F.2d 950 (D.C.
Cir. 1979)."° A retroactive rate increase is no more transformed
into a prospective rate increase by a waiver than the retroac-
tive rate increase was transformed into compensatory dam-
ages by resort to a court lawsuit. 453 U.S. at 579, n. 8. Piqua
does not support the court of appeals’ decision, assuming,
arguendo, Piqua was correctly decided.” In Piqua, as the
D.C. Circuit emphasized, an agreed upon rate and agreed upon
effective date were involved; there was no substitution
retroactively of a different rate (610 F.2d at 955). In this case.
in contrast, as the court below concedes (App. A, infra, p. 22a;
691 F.2d at 1196), there is no agreed upon rate." A rate will
have to be determined retroactively and substituted by the
Commission.

The court of appeals’ decision also collides with Arkla v. Hall
when it asserts (691 F.2d at 1189) that this Court recognized
the availability of the waiver provisions to permit an alteration
of rates without a timely filing (691 F.2d at 1189). This Court's
reference in a footnote to the waiver provision of section 4(d)
did not recognize the use of that power to grant a retroactive
rate increase (453 U.S. at 578, n. 8). Indeed, the Court in that
same footnote expressly disavowed any intention to suggest

'* The court of appeals criticized the Commission’s citation of Gill-
ring V. FERC, 566 F.2d 1323, 1325 (5th Cir.), cert. denied, 439 U.S.
823 (1978), as support for the reference in its order to its “long-
established ‘statutory bias’ against retroactive rate increases” ( App.
B, infra, p. 46a). The criticism is mistaken. As the court of appeals’
own analysis of Gillring confirms, the Commission’s citation of Gi//-
ring was on the mark (691 F.2d at 1191; App. A, infra, p. 13a).

'’ See infra, pp. 24-26.

'* The court below while conceding that the facts of Piqua “are not
totally analogous to this case” dismissed the distinctions as insignifi-
cant. (691 F.2d at 1191, n.13). The difference in facts between Piqua
and this case is the difference between day and night.

22

that the waiver power is available for a retroactive rate in-
crease, Saying, “[a]ssuming, arguendo, that waiver is available
for retroactive collection of a higher rate than the one on file

19

Even the court of appeals’ finding of good cause is in conflict
with this Court’s decision in Arkla vy. Hall. Although the court
below did not provide any reasons for its finding, it apparently
agreed with Hall that Arkla’s failure to inform Hall of the
higher royalty payments to the United States was the only
reason why Hall failed to make the administrative filing for
waiver with the Commission and to receive the higher rates
(691 F.2d at 1191, 1193. 1198-99), *°

Hall made the same appeal to equitable considerations in
Arkla v. Hall, contending that the filed rate doctrine should
not bar recovery when Arkla’s misconduct in failing to inform
Hall of the higher payments prevented filing of a higher rate
(453 U.S. at 583). This Court did not find “this argument
compelling,” pointing out that Arkla did not intentionally fail to
inform Hall in an effort to defraud Hall and agreeing with the
Commission, which had also rejected the same argument in

‘We show later that waiver is not available for retroactive rate
increases as the Supreme Court. the Third Circuit, and the Fifth
Circuit have held, infra, pp. 24-26.

” As already noted, n.9, Supra, p. &, Arkla cannot possibly be
blamed for Hall's failure to file for a Waiver between 1974 and 1979.
Additionally, contrary to the court’s assumption that Hall would
have received the higher rates if it had made a filing therefor, if Hall
had made a rate change filing in 1961 as required by Section 4(d) ofthe
NGA, the receipt of the higher rates was not a certainty. The filing
would have been subject to suspension and refund and Hall would
have had the burden of proof to show that the new higher rate was
authorized by the favored nation clause and Was just and reasonable.
15 U.S.C. § 717¢(e). The Commission, consistent with its precedents,
could well have held that the favored nation clause was not triggered
or, if triggered, that the higher rate exceeded the allowable ceiling
rate. See n.5, supra.

23

denying waiver, that Arkla “could have reasonably assumed
that the government royalty payment did not trigger the”
favored nation clause (453 U.S. 583 and n. 13).

Similarly, in assuming that this Court in Arkla v. Hall
merely noted the Commission's reasons for denying the waiver
but neither adopted nor relied on them, the decision of the
court below is again in conflict with Arkla v. Hall. With re-
spect to Hall’s contention that the filed rate doctrine was
inapplicable to the case because the state court only deter-
mined “damages” suffered as a result of breach of contract and
because no “federal interests ... are affected by the state
court’s action,” this Court rejected that contention on the
ground that the Commission in its order denying waiver (citing
the order) “found that permitting this damages award could
have an ‘unsettling effect . . . on other gas purchase transac-
tions’ and would have a ‘potential for disruption of natural gas
markets.’ ” 453 U.S. at 579. This Court did not thereby merely
note the Commission's reason. This Court relied on the Com-
mission’s finding to reject Hall’s contention.

With respect to the Commission's refusal to sanction the
waiver because it would expose consumers to a multi-million
dollar liability for higher rates beginning in 1961 and continu-
ing for some 11 years thereafter, this Court rejected Hall's
assertion that the damages awarded would be paid entirely
from Arkla’s corporate assets and would not be passed on tothe
consumers, saying (453 U.S. at 579, n. 10):

“the record does not support respondents’ assertion that
Arkla could not pass the damages award along to its cus-
tomers. In its order denying respondents’ request for a
waiver of the § 4(d) notice requirement, the Commission
conceded that Arkla would have the right to do so, even
though all the natural gas for which Arkla would be paying
was long since sold. 13 FERC, at 61, 213.”

Here, again, this Court relied on the Commission’s finding and

did not merely note the action taken by the Commission.

Thus, as has been demonstrated, the lower court's opinion is
in direct conflict with Ark/a v. Ha// in many respects crucial to

24

its decision, particularly the lower court’s finding that no
retroactive rate increase is involved and this Court's finding
that the damage award of the Louisiana courts was “nothing
less than a retroactive rate increase” forbidden by the NGA.

3. The effort of Hall to secure the retroactive rate increase
denied by Arkla vy. Hall presents the important question of
whether “waiver is available for retroactive collection of a
higher rate than the one on file” with the Commission. 453 U.S.
at 578, n. 8.

As this case demonstrates, the waiver provision of the notice
requirement of Section 4(d) of the NGA is not intended, and
should not be used, to authorize retroactive rate increases
because of the adverse impact that retroactive increases have
on consumers.”' The court of appeals’ decision, if allowed to
stand, will seriously undermine the consumer protection in-
tended to be provided by the prospective rate increase struc-
ture of the NGA.

The waiver provision of Section 4(d) of the NGA has received
the attention of this Court in United Gas Pipe Line Co. v.
Mobile Gas Corp., 350 U.S. 332 (1956): of the Fifth Circuit in
Continental Oil Co. v. FPC, 236 F.2d 839. 843 (1956), cert.
denied, 352 U.S. 966 (1957); and of the Third Circuit in Shell Oil

“The waiver provision of Section 4(d) of the NGA provides as
follows:

“The Commission, for good cause shown. may allow changes to
take effect without requiring the thirty days’ notice herein pro-
vided for by an order specifying the changes so to be made and
the time when they shall take effect and the manner in which
they shall be filed and published.”
The Commission's regulations (Is CFR § [55.4s implementing
Section 4(d) provide

“Upon application and for good cause shown. the (ommission
may by order provide that a rate schedule or a change in rate
schedule shall be effective on less than 20 days’ notice. The
(ommission Upon request and for wood Cause -nown May permit
a rate schedule for a change in rate schedule to be filed prior to 40

davs before the effective date

25

Co. v. FPC, 334 F.2d 1002 (1964). Each of these courts has
interpreted Section 4(d) of the NGA as meaning that the effec-
tive date of a change in rate cannot precede the date on which
the notice is filed.

The decision of the court below and the decision of the D.C.
Circuit in Pigua, as interpreted by the court below, are in
direct conflict with these decisions. In Wobile, this Court ex-
plained that the 30 days’ “advance notice of changes is essential
to afford the Commission a reasonable period in which to
determine whether to exercise its suspension powers under
Section 4(e)” (350 U.S. at 342; emphasis supplied). In Con-
tinental Oil, citing Mobile, the Fifth Circuit said: “since it thus
affirmatively appears that prior notice is required, it necessar-
ily follows that the effective date of a change in rate cannot
precede the date on which notice is filed” (236 F.2d at 843;
emphasis in original). Similarly, in She// Oil the Third Circuit
affirmed an order of the Commission holding that the NGA
prohibits any change in existing rates except in the manner
provided in Section 4(d) and specifically holding that changes in
filed rate schedules “must be prospective in operation” (334
F.2d at 1009). The Third Circuit went on to hold as follows (id. ):

“We find nothing in the Act which authorizes a natural gas
company to retroactively amend existing rates either by
contract or otherwise.”

The fundamental purpose of the NGA and the companion
FPA is to protect the ultimate consumers. F PC v. Hope Natu-
ral Gas Co., 320 U.S. 591, 610 (1944); FPC v. Interstate Natu-
ral Gas Co, 336 U.S. 597, 581 (1949). Retroactive ratemaking
and reparations are incompatible with that fundamental
statutory purpose and are, therefore, barred by the NGA and

FPA.

Waiver of the notice period to permit a rate increase to be
effective retroactively nullifies important aspects of consumer
protection incorporated into the NGA and FPA. Suspension of
the increased rate is an important element of consumer protec
tion for, unless the effective date of the rate change is sus
pended, the Commission is without power to order refunds

26

even if the Commission determines at the end of the investiga-
tion that the increased rates are unjust and unreasonable. The
notice requirement in advance of the effective date serves the
“essential” function of affording the consumers the opportun-
ity to advise the Commission of their views respecting suspen-
sion of the rate change (whether it should be suspended and for
what period) and “is essential to afford the Commission a
reasonable period in which to determine whether to exercise
its suspension powers under § 4(e).” Mobile, supra, 350 U.S.
at 342. The Commission has no statutory power to suspend a
rate change after the proposed effective date has passed. /n-
diana & Michigan Electric Co. v. FPC, 502 F.2d 336, 342-343
(D.C. Cir. 1974).

Congress intended that the just and reasonable rate stand-
ards of the NGA and the FPA should be prospective in effect.
To that end the Commission was armed with powers to provide
itself with the information needed to evalute the rate increase
before it becomes effective and thereby to protect consumers
through its suspension and refund powers. To misuse the waiv-
er provision, as the court below has done, so as to authorize
collection of a retroactive rate increase will frustrate the con-
sumer protection intended by Congress in the prospective rate
structure of the NGA.

4. Review by this Court is particularly necessary because
the Fifth Circuit was not able to complete the appellate process
in this case.

In dissenting from the denial of panel rehearing, Chief Judge
Clark called attention to the fact that, because of disqualifica-
tion of nine of the thirteen Fifth Circuit judges in regular active
service, the court could not pass on the suggestions for rehear-
ing en bane filed by Arkla and the Commission. The problem
deseribed by Chief Judge Clark is a serious one as it affects
every case before the Fifth Circuit in which the Commission is
a party. In order to avoid regular problems with recusals in
these cases, the Fifth Circuit established a “Gas Panel” to hear
all cases before the court in which the Commission is a party.
While the Fifth Circuit still has enough regular active service

judges to constitute a panel, the number of judges who con-
sider themselves capable of serving on these gas cases has
dwindled to four. Consequently, when read with the rules on
en banc rehearings, the clear result in every case is that the
parties are denied the opportunity even to have a suggestion
for rehearing en banc considered because the remaining four
judges do not constitute a quorum under 28 U.S.C. § 46(¢).
Thus, they can technically neither grant nor deny any such
suggestion.

Although Arkla recognizes that this Court has stated in
Western Pacific Railroad Corp. v. Western Pacific Railroad
Co., 345 U.S. 247 (1953), that the litigants do not have a “right”
to have their appeal reviewed by every one of the circuit judges
and that the device of rehearing en banc looks primarily to-
ward avoiding intracircuit conflicts, the Court also stated that
even though not a right, it is important that the rules should be
applied in such manner as to accomplish their objective (345
U.S. at 258-261).

In this case, when Hall appealed to the Fifth Circuit in
January 1981, for review of the Commission’s order, Arkla
promptly intervened and joined with the Commission in mov-
ing the court for an order, pursuant to 28 U.S.C. § 2112(a),
transferring the case to the United States Court of Appeals for
the District of Columbia Circuit where one branch of this same
case was pending and where another branch of the case had
already been decided. The Fifth Circuit, in an order issued
March 13, 1981, denied the transfer (App. A, infra, p. 35a).

Arkla’s motion to transfer was briefed and denied without
the litigants’ knowledge that a Commission case could not,
under the court’s rules and their application by the court,
obtain en banc consideration. Because of judge disqualifica-
tion, the Fifth Circuit was unable to complete the appellate
process in this case as provided by 28 U.S.C. § 46(c) and the
court’s rules or, as Judge Clark suggests (App. A, /fra, p.
33a), In any Gas Panel Case. These extraordinary circum-
stances have made consistent application of all the rules of

Ds

judicial procedure impossible. Judge Clark in his dissent (App.
A, infra, p. 33a) suggested that resort to this Court's
supervisory power may be the only recourse.

Arkla submits that the importance of the en banc rehearing
is sufficient to justify consideration of some alternative to
permit consideration and review of the intercircuit and intra-
circuit conflicts present in this case.

CONCLUSION

For the reasons stated, a writ of certioram should be granted
in this case to review the judgment rendered on November 26,
1982 by the United States Court of Appeals for the Fifth
Circuit; and that judgment should be reversed.

Respectfully submitted,

ROBERT Roserts, JR. (counsel of record)
W. MICHAEL ADAMS
Kay COWDEN MEDLIN
BLANCHARD, WALKER, O'QUIN & ROBERTS
First National Bank Tower
Post Office Drawer 1126
Shreveport, Louisiana 71163
Telephone (318) 221-6858

REUBEN GOLDBERG

GLENN W. LETHAM

GOLDBERG, FIELDMAN & LETHAM. P.C.
1100 Fifteenth Street, N.W.
Washington, D.C. 20005
Telephone (202) 463-8300

Attorne ys for Petitioner

APPENDIX

la

APPENDIX A
UNITED STATES COURT OF APPEALS,
FIFTH CIRCUIT.

November 26, 1982

No. 81-4011.
Frank J. HALL, et al., Petitioners.
Vv.

FEDERAL ENERuY REGULATORY COMMISSION,
Respondent.

Natural gas producers petitioned for review of an order of
the Federal Energy Regulatory Commission denying their
application for a waiver of the filing requirements of the Natu-
ral Gas Act. The Court of Appeals, Garza, Circuit Judge, held
that Federal Energy Regulatory Commission abused its dis-
cretion in denying natural gas producers’ application for a
waiver and corresponding rate adjustment.

Reversed and remanded with instruction.

Clark, Chief Judge, filed dissenting opinion.

Petition for Review of an Order of the Federal Energy
Regulatory Commission

Before CLARK, Chief Judge, GARZA and JOHNSON, Cir-
cuit Judges.

GARZA, Circuit Judge:

This case presents for review an order of the Federal Ener-
gy Regulatory Commission’ (FERC) denying the application

' The Federal Energy Regulatory Commission assumed most of
the duties of the Federal Power Commission on October 1, 1977. In
this opinion, the term “Commission” refers to either FERC or its
predecessor agency, whichever was active during the time period
referenced.

).
owt

of appellants, the Hall group (Hall), for a waiver of the notice
requirements contained in § 4(d) of the Natural Gas Act? so as
to permit the Hall group to collect from intervenor, Arkansas
Louisiana Gas Company (Arkla), the difference between the
purchased gas rate which the Hall group charged Arkla from
September, 1961, to October, 1972, and the rate which Arkla
paid the United States in royalties for gas obtained on leases
during the same period. The instant action is but apart of a
complex series of actions’ in which Hall has attempted to
enforce its contractual rights against Arkla as set forth in a
1952 contact. After eight years of contractual litigation in the
Commission, the Louisiana state courts and the Supreme
Court of the United States, it appears that Hail’s only avenue
for relief with respect to the time period between 1961 and 1972
is through the administrative provisions of the Natural Gas
Act. Such relief was denied by the Commission and those
orders are now presented to us for review. Because of the
complexity of this case and its unusual posture before us, we
set forth the facts and procedural background in detail.

* NGA § 4(d), 15 U.S.C. § 71 7e(d), provides:

Unless the Commission otherwise orders. no change shall be
made by any natural gas company in any such rate, charge,
classification or service, or in any rule, regulation or contract
relating thereto, except after thirty days’ notice to the Commis-
sion and to the public . . . . The Commission for good cause
Shown, may allow changes to take effect without requiring the
thirty days’ notice herein provided for by an order specifying the
changes so to be made and the time when they shall take effect
and the manner in which they shall be filed and published.

‘ By this Court's count, the present action represents the six
“1 on an

teenth time a court or agency has either affirmatively rule
issue in this case or has declined to review thereby affirming the
lower court. See Appendix A, jnfra

3a

Background’

Appellants, the Hall group, are producers of natural gas;
Arkla is a customer who purchases their gas. In 1952, Hall and
Arkla entered into a contract under which Hall agreed to sell
Arkla natural gas from the Sligo Gas Field in Louisiana. The
contract contained a fixed price schedule and a “favored na-
tions clause.” The favored nations clause provided that if Arkla
purchased Sligo Field natural gas from another party at a rate
higher than the one they were paying Hall, then Hall would be
entitled to a higher price for their sales to Arkla.’ In 1954, Hall
obtained a certificate from the Commission to sell the gas
under this contract. Pursuant to the relevant provisions of the
NGA, Hali filed the contract containing the scheduled in-
creases and the favored nations clause as its rate schedule with
the Commission. In September, 1961, Arkla purchased certain
leases in the Sligo Field from the United States and began
producing gas on its leasehold. Arkla’s payments to the United
States for gas and liquids produced from that leasehold were
higher than Arkla’s payment to Hall under the 1952 contract.
Prior to entering into this agreement, Arkla sought a legal
opinion from its attorneys as to whether a favored nations
clause would be triggered by its contract with the United

‘ The facts at issue in this litigation have been largely decided in
the contractual action between Hall and Arkla in the Louisiana state
courts and in Arkansas Louisiana Gas Co. vy. Hall, 453 U.S. 571, 101
S.Ct. 2925, 69 L.Ed.2d 856 (1981). Our restatement reflects these
findings.

> The favored nations clause provided:

If at any time during the term of this agreement buyer should
purchase from another party seller gas produced from the sub-
ject wells or any other well or wells located in the Sligo Gas Field
at a higher price than is provided to be paid for gas delivered
under this agreement, then in such event the price to be paid for
gas thereafter delivered hereunder shall be increased by an
amount equal to the difference between the price provisions
hereof and the concurrently effective higher price provisions of
such subsequent contract.

da

States. Content that such escalation clauses were not trig-
gered, Arkla made no effort to inform Hall about its payments
to the United States.

The Hall-Arkla Contractual Litigation

In 1974, Hall discovered the higher payments which the
United States was receiving from Arkla as royalties for the gas
produced from the Sligo Field contract. Hal] instituted suit in
the Louisiana state courts seeking damages for Arkla’s
asserted breach of contract amounting to the difference be-
tween the prices which Arkla paid the United States and those
which it paid Hall. The state trial court found that Arkla’s
payment had triggered the favored nations clause. but held
that the filed rate doctrine’ precluded an award of contractual
damages for the period prior to 1972. The court entered an
award of damages for the post-1972 period during which appel-
lants were “small producers” and. therefore, not bound by the
filing requirement of the NGA. The Louisiana Court of
Appeals affirmed the trial court with modifications, Hall y.
Arkansas Louisiana Gas Co.. 359 S0.2d 255
(La.Ct.App.1978), and both parties appealed. The Louisiana
Supreme Court denied Arkla’s petition for review, Hall y.
Arkansas Louisiana Gas Co., 362 So.2d 1120 (La. 1978), and
certiorari was denied by the United States Supreme Court on
the question of whether the interpretation of the favored na-
tions clause should have been referred to the Commission.
Arkansas Louisiana Gas Co. v. Hall, 444 U.S. S78, 100 S.Ct.
166, 62 L.Ed.2d 108 (1980) (Docket No. 78-796).

The Louisiana Supreme Court, however. did agree to re-
view the lower court's findings with respect to the contractual
damages sought by Hall for the 1961-72 penod. The court

" The filed rate doctrine “forbids a regulated entity from charging
rates for its services other than those properly filed with the appro-
priate federal regulatory agency.” Arkansas Louisiana Gas Cu. \
Hali, 453 U.S. 571. 577. 101 S.Ct. 2925, 2930, 69 L.Ed 2d 84561148]

da

reversed the Louisiana lower court's holding that the filed rate
doctrine barred Hall’s contractual right to relief for Arkla’s
breach.’ Hall v. Arkansas Louisiana Gas Co., 368 So.2d 984
(La.1979). The United States Supreme Court granted Arkla’s
petition for a writ of certiorari and reversed the Louisiana
Supreme Court. The Court held that Hall's action seeking
contractual damages was barred by the filed rate doctrine.
Arkansas Louisiana Gas Co. v. Hall, 453 U.S. 571, 101 S.Ct.
2925, 69 L.Ed.2d 856 (1981) (hereinafter, Arkla v. Hall).

The Primary Jurisdiction Action Before The Commission

After Hall initially filed suit in the Louisiana state court,
Arkla petitioned the Commission for a declaratory order
requesting them to take exclusive jurisdiction and declare that
Arkla’s royalty payments to the United States did not trigger
the favored nations clause of the 1952 contract with Hall. The
Commission declined, however, to exercise primary jurisdic-
tion stating in three successive and “clarifying” opinions” that
it would adhere to its policy against assuming jurisdiction over
matters pending before a court. Arkla sought review of the
Commission's orders in the United States Court of Appeals for
the District of Columbia who, upon request of the Commission,
remanded the administrative record to the agency for further

* In aecordance with its opinion, the Louisiana Supreme Court
remanded the measure of damages question to the state district court
to enter judgment. The state court entered such judgment, and
Arkla appealed its determination through the state system and
ultimately to the United States Supreme Court in Docket No. 79-
18%. After the Supreme Court reversed the Louisiana Supreme
Court in Arkla vy. Ha/l, Docket No. 78-1789, it remanded No. 79-1896
for action consistent with its opinion. Arkansas Lowisiana Gas Co. \
Hall, 453 U.S. 917, 101 S.Ct. 3152, 69 L.Ed.2d 999 (1981)

i Nee Arkansas Lowisiana (7S Co. ¥ Hall, Docket No R] 76-28,
Order Denying Petition (March &, 1976); Order Denying Application
for Rehearing (June 4, 1976); Order Clarifving Commission Order

Denving Rehearing (November 11, 1976

6a

consideration on May 25, 1978. FERC subsequently declined
to exercise primary jurisdiction in an order issued May 18,
1979. The agency ultimately decided that the interpretation of
the favored nations clause presented no issue upon which the
Commission had particular expertise. Arkansas Louisiana
Gas Co. v. Hall, Docket No. RI 76-28. Order Declining
Jurisdiction (May 18, 1979) at 6-7. Arkla again petitioned the
D.C. Circuit for review during which time the United States
Supreme Court decided the contractual action against Hall in
Docket No. 78-1789. On motion of [intervenor] Hall, the D.C.
Circuit dismissed Arkla’s appeal on the issue of primary
jurisdiction without opinion.’

Hall's Application For A Waiver

The present action arose as a corollary to the contract action.
Following the Louisiana Supreme Court's decision that Hall
Was entitled to contractual damages, notwithstanding the filed
rate doctrine, for the period between September, 1961 and
October, 1972, the Commission informed Hall that in order to
collect such damages, they would have to apply for a formal
Waiver of the notice filing requirements of NGA § 4(d). Hall
filed its application conditionally asserting that a waiver of
notice requirements was not necessary since § 4(d) did not
apply to a judicial award of damages. Alternatively, they
argued that “good cause” existed justifying the grant of the
waiver.

The Commission denied Hall’s request asserting four bases
for its decision. Arkansas Louisiana Gas Co. v. Hail, Docket
No. RI 76-28, Order Denying Application for Waiver (Novem-
ber 5, 1980). First, the Commission contended that a grant of

* The court declined to dismiss a corollary issue which Arkla had
continuously raised in the administrative proceedings concerning the
“small producer” status of the Hall group. That case has now been
affirmed in an unpublished memorandum opinion issued May 28,
1982. See also Arkansas Louisiana Gas Co. v. FERC, 679 F.2d 260
(D.C. Cir. 1982) (affirmance reported without opinion).

7a

waiver would violate its “long-established ‘statutory bias’
against retroactive rate increases.” Jd. at 10. Second. the
Commission believed that the granting of Hall's request would
expose present consumers to a potential liability for higher
rates which should have been collected beginning in 1961, /d.
Third, the Commission uttered its concern about “the possible
unsettling effect that a waiver... might have on other gas
purchase transactions.” Jd. Finally, FERC was “troubled by
the prospect of speculating as to what the Commission would
or would not have done in 1961 had it been confronted at that
time with a rate increase filing by the Hall group.” /d. at 11.
Although the Commission recognized that the “equities [were]
favorable to the Hall group,” it concluded that in the context of
its “broader regulatory responsibilities,” the waiver should be
denied.

Hall now appeals from that order contending that it is
arbitrary and capricious, unsupported by substantial evidence
in the record, contrary to precedent and the Commission's
long-standing policy of protecting contractually authorized
prices, and based upon speculation and conjecture on the part
of the Commission. Intervenor Arkla contends that further
action in this administrative proceeding is precluded by the
Supreme Court’s subsequent decision in Ark/a v. Hall, supra.
Arkla contends that the issues presented here were deter-
mined in the contractual litigation and are precluded from
further consideraticn by the doctrines of res judicata and col-
lateral estoppel." It is also asserted that the present con-
troversy is moot. The Commission contends that its decision is
a proper exercise of its discretion and should, therefore, be
affirmed. In the context of our opinion below, we dispose of
each of these contentions.

Arkla moved to dismiss this action on September 21, 1981. After
the parties briefed the issue, this court denied Arkla's motion by
order entered November 16, 1981, but agreed to carry the motion
with the case.

Sa

The Vitality Of The § 4 Proceeding

We turn first to Arkla’s motion to dismiss this review
proceeding. Arkla asserts that the Hall group's attempt to
obtain a waiver of the NGA filing requirements and a corre-
sponding rate adjustment from the Commission is an attempt
to relitigate their action for contractual damages which the
Supreme Court held was barred under the filed rate doctrine.
Arkla, however, misreads and construes too broadly the Su-
preme Court’s decision in Arkla vy. Hall, supra. In Arkla vy.
Hall, the Supreme Court did not hold, as Arkla contends. that
the filed rate doctrine barred a grant to Hall of a waiver of the
$4 notice filing requirements and subsequent collection of
rates; rather, the Court found that the filed rate doctrine
barred Hall’s claim for contractual damages (amounting to a
retroactive rate increase). The Court stated that Hall could not
obtain in a civil action for breach of contract what the Commis-
sion could not “impose” itself. Arkla v. Hall, 453 U.S. at 578 &
n. 8, 101 S.Ct. at 2953 (emphasis in original). In the same
statement, however, the Court clearly recognized the waiver
provisions of § 4(d) and the power of the Commission to “waive
the usual requirement of timely filing of an alteration ina rate.”
Id. Additionally, the Court expressly recognized that review
of the Commission’s November 5 Order denying waiver was
pending before the United States Court of Appeals [for the
Fifth Circuit]. 7d., n. 6. If indeed, Arkla v. Hall precluded
further consideration of the waiver application, then there
would have been no need for the Court to acknowledge the
current proceedings. It would have been appropriate instead
to recognize the mootness of the proceedings.

The Supreme Court’s opinion is further instructive with
respect to this question. We note that the Court specifically
acknowledged the preemptive authority which FERC holds in

' The Court’s opinion mistakenly cites to the order as pending
before the District of Columbia Circuit. The Commission, however,
subsequently notified the Court of the pendency of those proceedings
in this Circuit.

Ya

rate cases. /d. at 577-78, 101 S.Ct. at 2930-31. Furthermore,
citing to § 4(d) ofthe NGA, the Court went on to state, “E.rcept
when the Commission permits a waiver, no regulated seller of
natural gas may collect a rate other than the one filed with the
Commission.” /d. (emphasis added). This statement clearly
evidences the Supreme Court's recognition of the vitality of
the proceeding before us. Arkla v. Hall does not, as intervenor
asserts, expressly foreclose the current administrative action.

Arkla also asserts that the issue before us—whether the
Commission erred in denying Hall’s request for waiver under
§ 4(d)—is moot since each of the reasons cited by the Commis-
sion for denying the waiver were expressly approved by the
Supreme Court in its opinion. Again, Arkla overreads the high
Court’s decision. While the Supreme Court acknowledged the
reasons set forth by the Commission in its November 5, 1980
Order denying Hall’s waiver, it did not address the merits of
the Commission’s reasoning in the context of Hall’s application
for a waiver nor was that issue before the Supreme Court or
determinative of the issue before it. Indeed, most of the
Court’s discussion of FERC’s November 5, 1980 Order was
merely in reference to what actions the Commissien had taken,
not whether such actions supported denial of Hall's applica-
tion."* The thrust of Arkla’s motion to dismiss is based upon its

*. For example, the Court expressly disapproved of the Louisiana
Supreme Court’s assumption that the higher rates sought by Hall
would have been found reasonable by the Commission. In so doing,
the Court stated, “{F Jar from approving the rate here in issue, the
Commission has expressly declined to speculate on what its prede-
cessor might have done.” 453 U.S. at 581, 101 S.Ct. at 2932. Clearly,
this statement does not evidence the Court's belief that the above
reason supported the denial of Hall's waiver application; rather, it is
acknowledged to support the Court's finding that the Louisiana
Supreme Court improperly attempted {by assumption) to perform a
duty expressly reserved to the Commission—the determination of
the reasonableness of rates.

In another instance, the Court stated:

In asserting that the filed rate doctrine has no application here,
{the Hall Group] contend[{s] first that the state court has done no

l0a

erroneous and overbroad reading of the Supreme Court’s deci-
sion in Arkla v. Hall, and accordingly, it is without merit.

There are still other reasons to deny Arkla’s motion. Princi-
ples of res judicata bar relitigation of the same cause of action
between identical parties in which a valid final judgment has
been rendered on the merits. See Judgments and Orders,
Federal Procedure, L.Ed. § 51:189 (Interim Binder 1982).

more than determine the damages they have suffered as a result
of Arkla’s breach of the contract. No federal interests. they
maintain, are affected by the state court's action. But the Com-
mission itself has found that permitting this damages award
could have an ‘unsettling effect ... on other gas purchase
transactions’ and would have a ‘potential for disruption of natu-
ral gas markets.’
453 U.S. at 579, 101 S.Ct. at 2931. Again, the Court's statement only
recognizes, without express approval or disapproval, the actions
previously taken by the Commission in a separate, but related.
administrative proceeding.
On still another occasion, the Court made the following statement ina
footnote which bears upon the Commission's concern that current
ratepayers might potentially bear the burden of rates attributable to

prior customers:
a in an effort to challenge this determination, re-
spondents assert that the damages would be paid entirely from
Arkla’s corporate assets and would not be passed on to con-
sumers. We see no reason why this fact, even if true, would alter
our analysis. In any case, the record does not support respon-
dents’ assertion that Arkla could not pass the damages award
along to its customers. In its order denying respondents’ request
for a waiver of the § 4(d) notice requirement, the Commission
conceded that Arkla would have the right to do so, even though
all the natural gas for which Arkla would be paying was long
since sold.
453 U.S. at 579 n. 10, 101 S.Ct. at 2931. No one, however, challenges
Arkla’s right to seek a rate increase to account for any additional rate
payments it might have to make to Hall. The Court's statement does
not suggest whether the Commission would have to grant sucha rate
increase, nor does it intimate what weight this factor should carry in
consideration of Hall's application for waiver.

lla

Similarly, collateral estoppel precludes relitigation of identical
issues previously decided in an action. /d. § 51:214. The state
court action involved a dispute on a contractual claim between
Hall and Arkla. The present action involves an administrative
claim under the Natural Gas Act between Hall and the Com-
mission. The waiver issue was not and could not have been
litigated in the state court action. Accordingly, these princi-
ples do not support Arkla’s assertion that the present action is
barred.

We do, however, note the unusual posture in which this case
is presented to this court. When Hall originally filed its applica-
tion for a waiver, the Commission believed that the waiver was
“technically” necessary so that Hall’s recovery of contractual
damages (which at the time had been authorized by the
Louisiana Supreme Court) would not contravene the notice
filing requirements of the NGA. See, Arkansas Louisiana Gas
Co. v. Hall, Docket No. RI 76-28 (May 18, 1979 Order). After
the Supreme Court’s decision in Ark/a v. Hall, supra, this
proceeding took on a very different outlook. What was previ-
ously considered a technical requirement suddenly became the
an administrative one—for Hall to recover its

only method
contractually authorized rates.

This case was in some respects mooted by the Supreme
Court’s prior opinion. Since it was originally filed so that Hall
could comply with what FERC believed to be the technical
requirements of the NGA before petitioners could recover
contractual damages in the state court action, the Supreme
Court's decision that Hall could not recover contractua! dam-
ages negated the need for this court to rule on the propriety of
the Commission's denial of the “technical” waiver. If Hall could
not recover contractually, it did not need to technically comply
with the NGA.

There is, however, an administrative component to this case
which we believe remains alive. Although Hall is not entitled to
contractual damages by virtue of the filed rate doctrine, it is
entitled to the rates which it contracted with Arkla to receive

12a

over which the Commission has authority to regulate. The only
reason Hall has not received these rates is that it failed to
administratively file for them with the Commission because
Arkla did not inform them of the higher payments it was
making to the United States. Section 4(d) permits the Commis-
sion, for good cause shown, to waive the notice of filing require-
ment. Since the Supreme Court has foreclosed the civil action
remedy, it thus appears that the only avenue of relief available
to Hall, if any exists at all, is the administrative one arguably
provided by § 4(d).

The Propriety Of The Commission's Orders

We turn, therefore, to the orders presented for review to
determine if the Commission erred in denying the application
of Hall for a waiver of the notice requirements contained in
NGA § 4(d). In reviewing Commission orders granting or
denying waivers of rules or regulations, we have deferred to
the Commission when its decision did not represent an abuse of
discretion. See. e.g., Columbia Gas Transmission Co. v.
Allied Chemical Corp., 652 F.2d 503, 520 n. 16 (5th Cir. 1981);
Columbia Gas Deve lopment Co. v. FERC, 651 F.2d 1146. 1160
n. 18 (5th Cir.1981). A Commission order denying a waiver of
statutory re ements is similarly entitled to affirmance if
there exists « ational basis for the Commission's decision. and
it is supported by “substantial evidence.” /d.: see City of Pi-
qua, Ohio v. FERC, 610 F.2d 950, 955 (D.C. Cir.1979). It is
necessary then to examine the record and applicable law to
determine if the four reasons set forth by the Commission in its
order support its denial of Hall's application for a waiver. We
find that the record does not support the Commission’s order.

(1) Retroactive Ratemaking

The first reasons set forth by the Commission justifying its
denial of Hall's application for a § 4(d) waiver was its “long-
established ‘statutory bias’ against retroactive rate increases.”
As support for its position, the Commission cited to this court’s
decision in Gillring v. FERC, 566 F.2d 1323. 1325 (5th Cir),

l3a

cert. denied, 439 U.S. 823, 99 S.Ct. 91, 58 L.Ed.2d 115 (1978).
However, neither Gillring nor the Commission's policy against
retroactive ratemaking are applicable to the facts of this case.

In Gillring, the petitioner sought a retroactive increase in
the rates it had on file with the Commission during one time
period so that it could offset the amount obtained in that
increase against amounts the Commission had ordered Gillring
to refund for a different period in which the company’s rates
had exceeded area rate ceilings. Gillring sought to obtaina rate
increase up to the Commission’s ceiling to be applicable to a
time period in which Gillring had filed and collected a lower
rate in accordance with the gas purchase contract it had filed as
a rate schedule. There was no question in Gil/ring that when it
filed its schedule, it intended and had contracted to obtain a
designated rate. Subsequently, the company sought a rate
higher than that ever filed with the Commission or con-
templated by the rate schedule/contract. A purer example of
an action for a retroactive rate increase would be difficult to
imagine; a waiver of § 4(d) notice filing requirements was
neither involved nor applicable in Gillring.

The question in the present case—whether the grant of a
waiver to permit parties to effectuate their contractual agree-
ment violates a policy against retroactive ratemaking—was
squarely presented to the United States Court of Appeals for
the District of Columbia Circuit in City of Pigua, Ohio v.
FERC, 610 F.2d 950 (D.C. Cir. 1979).

‘3 While the facts of Piqua are not totally analogous to this case, we
do not find the distinctions significant for purposes of our analysis
here. Piqua involved application of the waiver provisions of the
Federal Power Act, 16 U.S.C. § 824d(d) (1976). It is well settled,
however, that the relevant provisions of the Federal Power Act and
Natural Gas Act “are in all material respects substantially identical.”
FPC v. Sierra Pacific Power Co., 350 U.S. 348, 353, 76S.Ct. 368, 100
L.Ed. 388 (1956); Accord, Arkla v. Hall, 453 U.S. at 577 n. 7. 101
S.Ct. at 2930. In Piqua, the waiver granted was for a time period less
than one year as opposed to the twenty-year period presented in this

l4a

In Piqua, the D.C. Circuit was presented with a case in
which FERC had granted a waiver of the analogous statutory
notice filing requirements of the Federal Power Act. The city
challenged FERC’s grant of the waiver and assignment of a
retroactive date to the rate increases on the grounds that the
grant was: (1) unauthorized by statute; (2) prohibited by the
policy against retroactive ratemaking; and (3) unsupported by
substantial evidence. The court affirmed on all three grounds.
Having found that the Commission was Statutorily authorized
to allow rates to take effect without requiring advance notice,
the court reasoned that it would not constitute retroactive
ratemaking, when good cause was shown. for the Commission
to give effect to the intent of the parties whose contractually
authorized rate schedules called for a rate increase to be effec-
tive at a designated time. The court stated:

In this case, two parties agreed on new rate schedules and
on the effective f ar for the new contract. The negotiated
rate change was not retroactive: it was prospective from
the date of the contract. Filing under section 205(d) al-
lowed the Commission to review the agreement to ensure
its reasonableness. Such review does not. when good
cause is shown, however, preclude enforcing the contract
provision as of the date specified therein. Moreover. the
Commission, in finding the Agreement reasonable, did
not retroactively substitute a rate: it merely approved the
rate change and effective date agreed upon by the parties.

case. We discuss the relevancy of the twenty-year delay sub-
sequently; however, we note that the interval for which a waiver is
sought does not affect the question of whether the grant of such
waiver violates a policy against retroactive rate increases. Finally,
we find no significance in the fact that the parties in Piqua had agreed
on new rate schedules and a new effective date for the new contract
and the present situation where the parties provided in the original
contract for new rates to take effect upon a date triggered by a
specified transaction (i.e., the payment by Arkla of higher prices for
gas to another party). In both cases, the intentions of the parties
were the same: the effectuation of new rates to be charged
prospectively from a date ascertainable in the contract.

loa

610 F.2d at 954-55 (emphasis added). A similar position was
espoused by FERC in the administrative proceeding in which
it had granted the waiver. See, Dayton Power & Light Co.,
Docket No. ER77-546, Order Granting Rehearing and
Correcting Prior Order (January 18, 1978); Order Denying
Rehearing (April 3, 1978).

The facts of this case have been established by prior litiga-
tion in this dispute. Those facts establish that the 1952 contract
between Hall and Arkla contained an escalation clause provid-
ing for the effectuation of an increase in rates should Arkla pay
an amount higher than those rates it submitted to Hall. It is
now also established that the parties intended the favored
nations clause in their contract to cover the present situation
thereby permitting the Hall group (had they filed) to recover
from Arkla the equivalent” of the rates it paid the United
States beginning in September, 1961. We agree with the D.C.
Circuit Court that the policy against retroactive ratemaking
which precludes Commission “substitution of an unreasonably
high or low rate with a just and reasonable rate” is “immediate-
ly distinguishable” from the present situation where the Com-
mission’s waiver gives prospective application to the rates
contractually authorized by the parties at the effective date
contemplated by the contract. The Commission erred in not
giving effect to this policy which it had previously distin-
guished and espoused.

(2) Exposure Of Present Consumers To Liability

The second and perhaps most compelling reason set forth by
the Commission justifying its denial of the $ 4(d) waiver was its
concern that 1980 consumers might be exposed to liability for
rates attributable to 1961 consumers. The clear import of this
reasoning is that a different group of consumers will pay for the

4 We use the term “equivalent” assuming for present purposes
that the rate sought by Hall would be just and reasonable. We discuss
this issue in more detail; infra.

l6a

gas than the one which used it. While the proposition is a logical
one, we note that there is little evidence in the record to
Suggest that Arkla’s 1961-72 customers are in fact different
from its 1980 customers.” To the extent that the record is
devoid of information in this regard, the Commission's reason-
ing lacks a firm basis of support.

It is also to be noted, however. that the Commission’s
reasoning admits that its concern is merely one of potential
liability to the consumer. It is far from clear that Arkla would
be entitled to pass along to its customers an amount represent-
ing its delayed payment for purchased gas when the delay,
particularly the length of the delay, was the result of Arkla’s
own, albeit non-fraudulent, actions. Before any rate paid by
Arkla to Hall could be passed on to the consumer, Arkla would
have to file with the Commission a schedule and notice of rate
change and bear the burden of establishing the just and
reasonableness of its request. FPC v. Tennessee Gas Trans-
mission Co., 371 U.S. 145, 83 S.Ct. 211, 9 L.Ed.2d 199, (1962):
Natural Gas Act § 4(e), 15 U.S.C. § 717e(e). It is well settled
that the Commission’s duty under the NGA statutory scheme
when considering the reasonableness of rates is “to afford
consumers a complete, permanent and effective bond of
protection from excessive rates and charges.” Atlantic Refin-
ing Co. v. Public Service Commission (CATCO), 360 U.S. 378,
388, 79S.Ct. 1246, 1253, 3 L.Ed.2d 1312. 1319(1959). The clear
import of Supreme Court decisions. as evidenced by CATCO,
is that the underlying purpose of the NGA is protection of the
consumer “even though this may result in some injustice to the
producers.” See Summers, Oil and Gas § 926 (1966) (emphasis
added). Although it is undisputed that the cost of purchased

> At oral argument, for example, Hall's counsel asserted that to
the best of his information, the gas purchased from Hall was sold by
Arkla to line industries in Southwest Arkansas wherein the possibil-
ity that consumers over the twenty-year period would be similar is
more probable.

17a

gas is a basic component of a regulated entity’s rate structure,
the Commission’s duty under the Act to protect consumers
together with the unusual delay attributable to Arkla’s own
actions present a scenario in which it is far from clear whether
Arkla could justify its requested rate increase. CATCO
teaches that as between Arkla and its customers, the Commis-
sion has a duty to protect the consumer even if such results in
some “injustice” to, in this case, Arkla."”

We do not make these observations to foreclose FERC’s
consideration of a potential rate increase application by Arkla,
but only to emphasize that the reason proffered by the Com-
mission as to the “potential” liability of present consumers is
very much a speculative proposition at this point in time. This
reason, by itself, does not support the Commission’s denial! of

'* There are other considerations which weigh against the con-
clusion that Arkla would be entitled to pass on to its consumers a rate
increase resulting from increased payments to Hall. As between Hall
and Arkla, the Commission has admitted that the equities favor the
Hall group. The NGA was drafted to encourage and protect the right
of parties to establish rates by individual contract. The Act “evinces
no purpose to abrogate private rate contracts as such.” United Gas
Pipe Line Co. v. Mobile Gas Corp., 350 U.S. 332, 338, 76 S.Ct. 373,
378, 100 L.Ed. 373 (1956). In granting Hall’s waiver, the Commission
could promote the purposes of the Act and preclude Arkla from
breaching its contract by delaying Hall's notice filing and using the
length of delay to defeat Hall’s application. On the other hand, if the
Commission took this course but felt compelled to grant a rate in-
crease to Arkla, it would neglect in some respects its duty to protect
consumers. The dilemma is one which suggests that the Commission
deny any subsequent application for rate increase by Arkla arising
from these proceedings. In so doing, the Commission would effectu-
ate dual purposes of the Act. Clearly, the Commission could consider
these factors in ruling on whether a rate could pass on. We do not
intimate that this is the course which the Commission should take: we
only use this as an illustration of the uncertainty of the Commission's
reliance on potential liability to the consumer as a reason for denying
Hali’s application.

l&a

Hall’s waiver.'’ We, therefore, examine the remaining reasons
proffered by the Commission in determining whether it has
abused its discretion.

(3) Unsettling Effect On Other Contract Purchases

The third reason cited by the Commission for denying Hall's
application was “the possible unsettling effect that a waiver in
this case might have on other gas purchase transactions.” The
Commission found that if Hall were granted a higher rate for
its gas, a strong likelihood existed that other claims would
arise asserting that this increase triggered the operation of
indefinite price escalator provisions in other contracts in the
Sligo Field geographical area. Hall contends that this assertion
is speculation and conjecture on the part of the Commission
about unidentified pipeline companies and that there is no
substantial evidence to support this reasoning in the record of
the subject proceeding.

It is true that most of the arguments in brief to this court
with respect to this issue were drawn from information outside
the administrative record. It is conceded that the Commission
may draw from its own knowledge and expertise, as well as its
own records, information upon which to support this con-
clusion. Our review of such information does not, however,
support the Commission's concern that numerous transactions
would be affected.

'’ The authority of the Commission to deny any request by Arkla
for a rate increase was expressly recognized by Justice Stevens in his
dissent in Arkla v. Hall, supra,

The short answer to the first concern [that the burden of the
award might be passed on to consumers] is that there is no more
reason to assume that this award will justify an increase in utility
rates than any other damages judgment that a public utility may
be required to pay; if the regulatory concern is valid, the agency
having jurisdiction over Arkla’s sales has ample authority to
require its stockholders rather than its customers to bear this
edition! cost.

453 U.S. at 607, 101 S.Ct. at 2945-46.

19a

The Commission's reasoning is additionally flawed by the
unique posture of this case. In this action, the Louisiana courts
determined the effect of the royalty payments on the most
favored nations provision with the approval of Hall and the
sanction of the Commission. On two occasions, the Commission
declined to exercise primary jurisdiction” and decide the issue
for itself. The determination of the Louisiana courts, however,
is clearly precedential only in the present action involving Hall
and Arkla. Several factors compel this conclusion.

First, the Supreme Court has ruled that the only avenue
available to Hall to obtain the rates for which it contracted is
for the Commission to grant a waiver to permit the rate sched-
ule to take effect. This procedure. therefore, is the only
method available to other parties who might be entitled to
similar relief. Unlike the present action, however, other par-
ties would not be entitied to rely upon the Louisiana courts’
interpretation of the 1952 contract rate schedule at issue
presently. Those decisions simply have no res judicata or col-
lateral estoppel effect in a different administrative proceeding
between different parties.

If an issue similar to the present one were ever addressed to
the Commission again, the agency would have to decide it
rather than defer to a state court as occurred in this case. The
Commission has previously considered many factors which
effectuate the “triggering” of a most favored nations clause,
see Shell Oil Co.. Opinion No. 382, 29 F.P.C. 498, 499 (affirmed
Shell Oil Co. v. FPC, 334 F.2d 1002 (3d Cir. 1963)), and as the
Commission notes in brief, such factors do not suggest that, if
the Commission was deciding, a royalty payment such as the
present one would necessarily trigger operation of a most
favored nations clause. The Commission, in fact, has expressly
recognized that varying interpretations to favored nations
clauses result in differing outcomes. In its May 18, 1979 Order

~ See Appendix A, Chronology of Agency Court Action on Pri-
mary Jurisdiction Issue, infra.

20a

declining to exercise primary jurisdiction in this very action,
FERC argued:

Since the meaning of a favored nation clause depends upon
the intentions of the parties to the contract. we see noneed
for uniform interpretation of all favored nation clauses.
Indeed, uniform interpretation would seem to be
impossible."
There is little support then in the record for the Commission's
conclusion that the granting of Hall’s waiver would have an
“unsettling effect” on other gas purchase contracts. Indeed,
the applicable law leads to a conclusion quite the contrary.

Finally, we acknowledge the reasoning of Justice Stevens in
dissent in Arkla v. Hall who addressed the merits of the very
concern set forth by the Commission:

The second concern [that other claims might arise] seems
exaggerated because it applies only to contracts executed
before 1961, . . . and it seems unlikely that many large
purchasers of natural gas could successfully have con-
cealed violations of escalation clauses from their suppliers.
To the extent that this case does have counterparts in such
contracts, however, it seems to me that those cases should
be decided in the same Way.
453 U.S. 607-08, 161 S.Ct. at 2946. In summary, we find no
record support, legal support, or for that matter, practical
support for the Commission's conclusion that other gas pur-
chase transactions would be affected.
” Arkansas Louisiana Gas Co. \ Hall, Docket No. RI 76-28,
Order Declining Jurisdiction (May 18, 1979) at 8.
Citing to the above administrative case. this court similarly recog
nized the less-than-absolute meaning and effect that an interpreta-
tion of a favored nations clause in one case would have on others in
general. In Pennzoil ¢ ‘company NV. FERC, 645 F.2d 360, 386 (5th ¢ ‘Ir,
1981), cert. denied. ___ lo... S.Ct. 1000, 71 L.Ed.2d 293
(1982), we stated:
Since the escalation clause’s meaning depends on the contracting
parties’ intentions, which in turn depends on the circumstances
of its execution, identical language in different contracts could
be interpreted to have different meanings ....

Zla

(4) Speculation About 1961 Commission

The final reason set forth by the Commission to justify its
decision was its reluctance to speculate as to what the Commis-
sion would have done if confronted in 1961 with a Hall request
for enforcement of its most favored nations clause. The fact is
that FERC wholly ignores or refuses to recognize exactly what
the 1961 Commission decided when faced with an identical
question. In The Pure Oil Company, 25 F.P.C. 383 (1961), the
Commission concluded that although favored nations clauses
would be prohibited in the future, it would not eliminate such
provisions from previously executed contracts. Jd. at 388-89;
Order No. 232, 25 F.P.C. 379 (1961). Speculation as to what the
1961 Commission would have done, therefore, was wholly un-
necessary. FERC’s attempts at distinguishing The Pure Oil
Company are futile and without merit. Indeed, the Commis-
sion today concedes the legality of the 1952 contract when it
acknowledges Hall’s right to contractual damages following
1972. See, Hall v. Arkla, 453 U.S. at 606-07, 101 S.Ct. at 2945
(Stevens, J. dissenting).

We note that, even if some ambiguity as to what the 1961
Commission would have done existed, FERC has previously
speculated over long time periods about what a prior Commis-
sion would have done. See, €.¢@.., Plaquemines Oil and Gas
Company, Opinion No. 572-A (April 29, 1970) (1970 Commis-
sion found that 1961 Commission likely would have found rates
acceptable).

Finally, FERC’s argument that the 1961 Commission very
likely would have looked with disfavor on a Hall filing and
found no triggering of the escalation clause is not compelling.
Twice, FERC was asked to decide the issue and declined
thereby permitting the state court to consider it. It seems
particularly arbitrary that the Commission could (1) decline to
exercise primary jurisdiction over an issue, deferring to a state
court's power to interpret the contractual provision, (2) take
issue with the state court's determination contrary to what the

= ~

(Commission “may have found, and then (3) use the excuse

DO.

fee none

that they are unable to determine what a prior Commission
would have done to deny Hall’s waiver in the related adminis-
trative proceeding.

In conclusion, we find that the only reason set forth by the
Commission which even arguably suppports the denial of
Hall’s application for a § 4(d) waiver is the concern that present
consumers might potentially be subjected to lability for prior
rates if Arkla were permitted to pass on such rates. As previ-
ously noted, this concern is highly speculative at this time and
an impressive argument exists supporting the conclusion that
Arkla would not be permitted such a rate increase. Potential
liability to consumers, by itself, simply does not support the
Commission’s decision to deny Hall’s waiver request, particu-
larly when the equities of this action weigh more in favor of
Hall than Arkla. We find that the Commission abused its
discretion in denying Hall's application for a waiver.

Relief

Our decision that the Commission erred in failing to grant
Hall’s requested waiver does not end the proceeding before us.
On brief, Hall requests only that the Commission's orders be
reversed. As part of its rather convoluted argument, however,
Hall contends that the rates which it seeks to obtain (which it
asserts are equivalent in amount to the contractual damages
sought in the state court action) have been found by the Com-
mission to be below just and reasonable area rates in effect for
the time period involved, Accordingly, the question arises as to
whether this court can remand this case to the agency topermit
Hall to collect the rates which it seeks without allowing further
action by the Commission. We believe there are several
reasons to decline from so acting, and accordingly, we remand
this proceeding to the Commission to determine the just and
reasonableness of the rates sought by Hall.

First, it is to be noted that in the latter part of the state court
action, the Commission reversed itself and declined to specu-
late on the reasonableness of the rate schedule submitted by

23a

Hall. Hall asserts, however, that the Commission is bound by
earlier admissions in this action.

On several occasions, the Commission has stated that the
contractually authorized prices sought by Hall were within the
applicable just and reasonable area rates. Its first statement to
this effect came in its May 18, 1979 Order declining to exercise
primary jurisdiction over the contractual action. In its order,
the Commission discussed the impact of the contractual dam-
age action on its regulatory responsibilities. In finding such
impact to be minimal, the Commission stated, “on the facts of
this case, the damages do not exceed the applicable area rate
ceilings” and “the rates requested are within what the Com-

Sh A)

mission had determined to be the zone of reasonableness. ’™

The Commission again acknowledged the reasonableness of
the rates sought by Hall in its brief as Amici Curiae to the
United States Supreme Court in Docket No. 78-986. In that
action Arkla sought review of the question of whether the
interpretation of the most favored nations clause in the 1952
contract should have been referred to the Commission. In its
brief, FERC contended that Hall sought only to recover from
Arkla damages which did not exceed Commission applicable
area rate ceilings.

Finally, the Commission again recognized the reasonable-
ness of the rates seught by Hall in its original order before us on
review. In footnote 4 of its November 5 Order, the Commission
stated,

The rates (11.7432 cents per Mef to 14.0508 cents per Mcf)
would, however, be within the Commission ceilings in
effect during that time.
The following day, FERC issued an “Errata Notice” deleting
the text of footnote 4 from its opinion. In its Order Denying
Rehearing issued January 2, 1981, the Commission explaind

” Arkansas Louisiana Gas Co. v. Hall. Docket No RI 76-28,

Order Declining Jurisdiction (May 18, 1979) at 10.

24a

that “the deleted footnote was not a necessary part of the
Commission's decision” and that its inclusion “was an in-
advertent printing error.” While the latter explanation is ques-
tionable, we note that the deleted footnote is clearly not bind-
ing on the Commission.

The Commission now asserts that it has reconsidered its
prior determinations which were based on erroneous in-
terpretations of the 1952 contract and has concluded that the
Hall rates are not so clearly within the maximum, lawful area
rates. The Commission first indicated its reconsideration of
this question in its brief filed in November, 1980, as Amici
Curiae to the Supreme Court in Docket No. 79-1896. That case
Was the appeal from the Louisiana state court system award-
ing contractual damages to Hall consistent with the Lousiana
Supreme Court decision in Hal/ v. Arkansas Louisiana Gas
Co., 368 So.2d 984 (La.1979) (reversed subsequently in Arkla
Vv. Hall, supra, Docket No. 78-1789). Arkla sought review of
the Louisiana Court of Appeals’ ruling that the contractual!
damages awarded (for both the pre- and post-1972 periods) to
Hall exceeded Commission ceilings. In its brief the Commis-
sion explained the reasons for its reversal:

The decision of the Louisiana Court of Appeal rejecting
Arkla's contention is based in part on the Commission’s
conclusion, in its order refusing to exercise primary
jurisdiction, that “the damages do not exceed applicable
area ceiling rates.” Upon careful reexamination of the
information available to it, the Commission has deter-
mined that its earlier conclusion was based on an incorrect
understanding of the contract between Arkla and respon-
dents that is involved in this case. At the present time the
Commission is unable to determine conclusively whether
its ceiling rates have been exceeded as a result of the
damages awarded to respondents.

The Commission's previous conclusion that “the dam-
ages does not exceed applicable area ceiling rates,” was
premised upon the erroneous belief that Arkla’s contract

Zoe

with respondents was based on sales at the plant, and not
at the wellhead. *' As a result of this incorrect interpreta-
tion, the Commission eliminated from its calculations
those damages that apparently represented payment for
removable liquids, and found that the damages awarded
for the actual gas (/.e., residue gas) were within the area
ceiling rates. That premise is now undermined by the
ruling of the Louisiana courts ... that Arkla’s contract
with respondents provided for sales of the entire gas
stream at the wellhead, including removable liquids.
On the same day that the United States Supreme Court re-
versed the Louisiana Supreme Court in Arkla v. Hall, supra
(Docket No. 78-1789), it granted certiorari in Docket No. 79-
1896, vacated the damage computation awarded by the
Louisiana Court of Appeals, and remanded the case in light of
its decision in Docket No. 78-1789. Ark/a v. Hall, 453 U.S. 917,
101 S.Ct. 3152, 69 L.Ed.2d 999 (1981). With respect to Hall's
contention that the FERC is bound by its prior statements
acknowledging the reasonableness of Hall's requested rates,
the Court’s decision in Docket No. 79-1896 undermines and
defeats whatever weight such reasoning possessed.

Even more fundamental, however, to this court’s decision to
remand this case to the Commission on the question of the
reasonableness of rates, is the statutory scheme of the Natural
(;as Act itself. The regulation of rates for the sale of natural gas

*! All natural gas produced at the wellhead contains varying
amounts of liquefiable hydrocarbons (LHC's) in a gaseous state.
Natural gas including these LHC’s is known as wet gas. At the plant,
LHC’s can be extracted from the wet gas and after processing can be
sold as a separate product. Natural gas from which LHC’s have been
removed is known as dry gas. Under the contract Hall sold Arkla wet
gas. The Commission's rate regulations prescribe the same max-
imum rate for the sale of dry and wet gas. Arkla contends that the
contractual damage award granted Hall the market value of the
LHC’s in addition to the price of gas as though the sale only involved a
plant sale of dry gas. As a result, it is asserted that the rate previous-
ly acknowledged as reasonable exceeds by almost two times the
maximum rate for wet gas to which Hall is entitled.

26a

for resale in interstate commerce by producers of natural gas
was vested by Congress exclusively in the Commission under
the Natural Gas Act. Federal Power Commission v. Hope
Natural Gas Co., 320 U.S. 591. 6] 1-12, 64S.Ct. 281, 291-92. 38
L.Ed. 333 (1944): Colorado Interstate Gas Co. vy. FPC, 324
U.S. 581, 65 S.Ct. 829, 89 L.Ed. 1206 (1945): Phillips Pet-
roleum Co. v. Wisconsin, 347 U.S. 672, 748.Ct. 794, 98 L.Ed.
1035 (1954). In the context of this administrative action, our
finding that the Commission should have granted Hall's appli-
cation for waiver of the notice provisions of § 4(d) does not end
the Commission's duty to determine the just and reasonable-
ness of those rates. It is, therefore. necessary that we remand
this action to permit the Commission to grant Hall's waiver and
to provide Hall with the opportunity to file its rates for Com-
mission review on their reasonableness.

In so doing, we make the following observations. First. the
Commission's determination of the reasonableness of Hall's
rates should not be inconsistent with the computation of Hall's
damage recovery for the post-1972 period, at least to the
extent that these computations are analogous. Second, should
the Commission find the rates requested by Hall to exceed the
applicable area rate ceilings, it would appear that the Hall
group would at least be entitled to the ceiling rate.

Final Considerations

Two final considerations merit attention with respect to our
decision. First, unlike the situation presented in Hall y. Arkla.
supra, in which the “filed rate” doctrine precluded the award of
contractual damages amounting to a retroactive rate increase,
the grant of a waiver by the Commission does no violence to the
filed rate doctrine. The D.C. Circuit addressed this contention
in City of Piqua v. FERC, supra, and we adopt their reason-
ing:

“[T )he filed rate doctrine provides that a utility] can claim
no rate as a legal right that is other than the filed rate :
This court, in discussing the doctrine, stated: “The con-
siderations underlying the [filed rate] doctrine ... are

27a

preservation of the agency’s primary jurisdiction over
reasonableness of rates and the need to insure that reg-
ulated companies charge only those rates of which the
agency has been made cognizant.” City of Cleveland v.
FPC, 174 U.S.App.D.C. 1, 10, 525 F.2d 845, 854 (1976).
This purpose is unaffected by the Commission's waiver of
the notice requirement rg good cause, thus allowing
rate changes, found by the Commission to be just and
reasonable, to become effective on the date agreed by the
parties.
610 F.2d at 955.

Second, our decision today promotes each of the policies
underlying the Natural Gas Act, particularly } 4. Congress in
drafting these provisions sought to preserve the integrity of
private contractual arrangements. At the same time, Con-
gress required companies to comply with its requirements of
notice for a rate change so as to provide the Commission with
the opportunity to review rates. In so doing, Congress ex-
pressed both “its conviction that the public interest require:
the protection of consumers from excessive prices” and its
“(manifest] concern for the legitimate interests of natural gas
companies.” United Gas Pipe Line Co. v. Me mphis Light, Gas
& Water Division, 358 U.S. 103, 113, 79 S.Ct. 194, 200, 3
L.Ed.2d 153 (1958). The granting of a waiver by the Commis-
sion gives effect and preserves the integrity of the private
contractual arrangement entered into by Hall and Arkla. The
granting of a waiver, but only for good cause shown, gives
credence to the § 4 notice filing requirements drafted by Con-
gress. In remanding to the Commission, we acknowledge the
authority of the agency to review rates so as to protect con-
sumers from unauthorized, excessive prices. Finally, our deci-
sion recognizes the legitimate interests of the Hall group

whose showing of good cause entitles them to the waiver o
notice filing requirements.

REVERSED and REMANDED WITH INSTRUCTIONS

28a

Appendix “A”

A. Chronology of decisions on the contractual issues:

(2)

October 14, 1977—Louisiana state court renders ori-
ginal opinion.

May 1, 1978—Louisiana Court of Appeals affirms
with modifications.

September 22, 1978—Louisiana Supreme Court de-
nies Arkla’s petition on the interpretation of the fa-
vored nations clause.

March 5, 1979—Louisiana Supreme Court reverses
lower courts on damages for the 1961-72 contractual
period and remands.

May 17, 1979—-On remand, Louisiana state district
court enters award of damages for Hall.

October 1, 1979—United States Supreme Court de-
nies Arkla’s petition for certiorari on interpretation
of favored nations clause.

January 22, 1980—Louisiana Court of Appeals
affirms state district court entry of damages.

May 2, 1980—Louisiana Supreme Court declines to

review damages question.

(9)

(10)

July 2, 198i1—United States Supreme Court re-
verses Louisiana Supreme Court's ruling in (4)
above.

July 2, 1981—United States Supreme Court re-

mands damages question in (7) above.

B. Chronology of agency court action on primary jurisdiction

Issue:

(11)

March 8 Jie oe November %, 1976—The ( ‘ommis-
sion declines to grant Arkla’s motion fora declarato-
ry order

May 25, 19785—United States ( ourt of Appeals for
the District of Columbia Circuit remands ( ommis

s10n s orders at their request

May 18, 1979-—FERC declines to exercise primar’
jurisdiction

29a

(14) October 19, 1981—The D.C. Circuit grants motion
to dismiss appez].
C. Chronology of present action on waiver issue:
(15) November 5, 1980—The Commission denies Hall’s
request for a walver.

(16) Hall appeals in present action to United States
Court of Appeals for the Fifth Circuit.

CLARK, Chief Judge, dissenting.

The majority assumes that the Commission, in its discretion.
may and should deny Arkla the rate increase it will surely seek
as a result of today’s decision. I respectfully disagree. Under
the due process clause no public utility may be compelled to
absorb its own costs. The most basic of such costs are ex-
penditures for gas purchases, whether incurred routinely or,
as here, as the final product or protracted litigation. Because
Arkla’s ratepayers rather than Arkla received the benefit of its
noncompliance with the “most favored nation” clause in the
1960s, it follows inevitably, in my view, that the ratepayers
must bear the burden of Arkla’s belated compliance now.

This conclusion alters the analysis of this dispute for me.
Rather than weighing the equities between Arkla and Hall. the
balance must be struck between Arkla’s ratepayers and Hall.
When the Commission made this inquiry, it decided that
imposing the costs of compliance on today’s ratepayers would
be inequitable. I cannot disagree. If these ratepayers are not
the same as those who should have borne the cost twenty years
ago, the inequity is obvious. Even if the identity of the rate-
payers has remained constant, however, the effects of a
retroactive increase on the jong-completed business affairs of
innocent ratepayers would be equally unjust. In either case.
there is sufficient evidence to support the Commission's con

‘ Fi — a ;
clusion Therefore without reaching the other grounds dis

cussed by the majority. | respectfully dissent

30a
UNITED STATES COURT OF APPEALS.
FIFTH CIRCUIT.
March 14, 1983.

No. 81-4011.

Frank J. HALL. et al. P. titioners.

V.

FEDERAL ENERGY REGULATORY COMMISSION,
Respondent.

Petition for Review of an Order of the Federal Energy
Regulatory Commission.

ON PETITION FOR REHEARING AND SUGGESTIONS FOR
REHEARING EN BANC
(Opinion November 26, 5 Cir., 1982, 691 F.2d 1184)

Before CLARK, Chief Judge, GARZA and JOHNSON, Cir-
cuit Judges.

PER CURIAM:

The Petition for Rehearing is DENIED. and no member of
this panel nor judge in regular active service on the court
having requested that the court be polled on rehearing en bane
(Rule 35, Federal Rules of Appellate Procedure: Local Fifth
Circuit Rule 16), the Suggestions for Rehearing En Banc are
DENIED.

CLARK, Chief Judge, dissenting:

For the reasons stated in my dissent to the panel opinion, I
dissent from the denial of panel rehearing.

To avoid an improper implication of agreement from the

aliure of any member of the pane! or judge In regular active

sla

service on the court to request that the court be polled on
rehearing en banc, I must note that only four members of this
now thirteen active judge court could initiate or participate in
such a poll. Since no senior judge is a member of the panel, none
is eligible to participate in the en banc process. In any event,
they would not have a vote in the en bane polling process. 28
U.S.C. § 46(e).

Nine judges in regular active service have disqualified them-
selves in this case. There are sound reasons for this situation.
Rulings of regulatory agencies often have a pronounced ripple
effect. This causes 28 U.S.C. § 455(b)(4) and Canon 3(C)(1) of
the Code of Judicial Conduct for United States Judges to erect
very broad barriers to a judge’s participation in appeals from
the Federal Energy Regulatory Commission.! This is in-
tensified by the only opinion of the Advisory Committee on

'28U.S.C. § 455. Disqualification of Justice, Judge, Magistrate or
Referee in Bankruptcy.

(a) Any justice, judge, magistrate, or referee in bankruptcy of
the United States shall disqualify himself in any proceeding
in which his impartiality might reasonably be questioned.

(b) He shall also disqualify himself in the following cireum-
stances:

(4) He knows that he, individually or as a fiduciary, or his
spouse or minor child residing in his household, has a finan-
cial interest in the subject matter in controversy . . .:

(d) For the purposes of this section the following words or
phrases shall have the meaning indicated:
(4) “financial interest” means ownership of a legal or equi-
table interest, however small, . . .;

(e) No = judge, magistrate, or referee in bankruptcy
shall accept from the parties to the proceeding a waiver of
any ground for disqualification enumerated in subsection
(b).

32a

Codes of Conduct specifically relevant to appeals from this
agency.”

The inclusion of such appeals in the general mix of cases
assigned to randomly selected panels of this court created an
abnormal number of disqualifications and resulted in numerous
docketing problems. In response, the court administratively
created a special panel of judges whose property ownership
would not regularly cause disqualification in Federal Power
Commission and Federal] Energy Regulatory Commission
cases. *

This “Gas Panel” solution worked acceptably until the num-
ber of judges who were not disqualified dwindled to three. At
least one judge thinks the court’s consensus interpretation for
participation standards in this class of cases is uniquely too
narrow.’ Even though it has recently risen to four, that num-

* A paragraph of Advisory Opinion 62 reads:

A judge who was the beneficial owner ofa fractional interest in
land under mineral lease to two oil companies, raised the ques-
tion as to his serving on a special panel that would have cases
before it, the disposition ot Which could result in increasing
wae of oil or gas. There is presently no production from the
and in which the judge has an interest, but he does share in
annual lease payments. Since the outcome of the proceeding
could substantially affect his beneficial interest in the leases, the
Committee concluded he had a disqualifying financial interest in
the subject matter in controversy (Doc. 180).

* Fifth Circuit Internal Operating Procedures © 6(c).
‘ The Judge observes:

When we decide a matter of cor orate taxation, we potentially
affect almost any corporation. When, as in this case, the panel
decides—or strongly infers—that retroactive rate increases
can't be passed on to consumers. that may well have as much
potential economic effect on panel members (as consumers of
Gas) as it does on another judge whose spouse owns a little
production, or as it does on a Judge who owns shares in a mutual
fund owning stock in a corporate party to the case before the
judge, or as it does on a ft who owns a life insurance policy

and sits on a diversity case in his own state construing life
insurance policies.

33a

ber seems to me to constitute an entirely unacceptable judicial
base to permit this court to continue to review significant
challenges to the broad-ranging and financially impactive
affairs involved in many of these appeals. Litigants are entitl

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40385010_1064%3A1. Public record. Not legal advice.