Supreme Goud, U. 3,
FILED

DEC 13 1976

| MICHAEL RODAK, JR., CLERK

IN THE

Supreme Court of the United States

OCTOBER TERM 1976

NO. —t6-796

MISSISSIPPI POWER & LIGHT COMPANY,
Petiticner

Vv

UNITED GAS PIPE LINE COMPANY,
PENNZOiL COMPANY,
Respondents

STATE OF MISSISSIPPI,
Plaintiff-Intervenor

PETITION FOR A WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF APPEALS
FOR THE FIFTH CIRCUIT

SHERWOOD W. WISE

JOSEPH P. WISE

WISE, CARTER, CHILD,
STEEN & CARAWAY

925 Electric Building

Post Office Box 651

Jackson, Mississippi 39206

CLAYTON L. ORN

ANDERSON, BROWN, ORN & JONES

1122 Southwest Tower

Houston, Texas 77002

Attorneys for Petitioner

Mississippi Power & Light
Company

ES SS eA
Alpha Law Brief Co., One Main Plaza, No. 1 ‘ain St., Houston, Texas 77002

ee (Giteeecns
SI I Si si cede tie ee sie ccesdccccctccecces
ED Grd hd neue uh cn bavvcessdddectesésesdees
PEL. bodentd nue cdbheeesdetdethaneneéobuens coke
Reasons for granting the writ ............ceccesceecees
SD 0 dan cccutadsaceodkcddvsdwteeteks cececcnase:

Appendix A — Opinion of Court of Appeals ..............

Appendix B — Order of Court of Appeals of May 28, 1975
Granting Leave To Appeal From Order of

gerry errr
Appendix C -— Judgment of Court of Appeals ...........
Appendix D— Order of Court of Appeals Denying Peti-
SS GE EEE. 6 occ ccedsasteccsccees

Appendix E— Order of District Court Denying Motions
to Dismiss and Granting Motions to Stay

Appendix F — Memorandum Opinion of District Court ...
Appendix G—-Complaint of Mississippi Power & Light
GE écevngecesesccceceeoceseqesés

Appendix H — Order of District Court Granting Motion of
State of Mississippi for Leave to Intervene

Appendix I— Complaint in Intervention of State of Mis-
GE. we cancnccdncccceccocasasceueens

Appendix J— Motion of United Gas Pipe Line Company
To Dismiss or Alternatively To Stay All
EE Oevncceccennecessasceness eens

Appendix K — Motion of Pennzoil Company To Dismiss or
Alternatively To Stay All Proceedings ....

Appendix L— Answer of United Gas Pipe Line Company
Appendix M — Answer of Pennzoil Company ...........

Appendix N—FPC Order Partially Granting Petition for
Declaratory Order and Motion to Consolidate

A22
A23

A25

A27
A29

A32

A100

Al0l

A103

A107
All2
Al42

A154

II

Appendix O — Findings and Conclusions of The United
States Court of Appeals For the Fifth Circuit
in Southern Natural Gas Company et al v.

PUG. 6Wenesacsennncccacececcedaededey
Appendix P — F.P.C. Order Implementing Court Order and
ED EEE ccc ces cuevascccncess
CITATIONS
: CASES
Bisso v. Inland Waterways Corp., 349 U.S. 85 ..........

Breen Air Freight, Ltd. v. Air Cargo Inc., 470 F.2d 767
Brown & Sons Lumber Co. v. Louisville & N. R. Co., 299
ks le DO 6 hne5h 606s 0h 0bedneedebtseesencendees
Civil Aeronautics Board v. Modern Air Transport, 179 F.2d
se eg an le ee ac rk
County of Allegheny v. Frank Mashuda Co., 360 U.S. 185,
POONE. 1ncd cde cecesecctececedndeseaeciccsdbeponss
Fairfax Gas & Supply Co. v. Hadary, 151 F.2d 939, 941
FPC v. Louisiana Power & Light Co., 406 U.S. 621 (1972)
Gordon v. New York Stock Exchange, 422 U.S. 659, 686-690
Great Northern Railway Co. v. Merchants Elevator Co., 259
a Bis SED nbdbeeccnccccdccgnsensscopsnacncecets
Gulf Oil Corp. v. American Louisiana Pipe Line Co., 282
Seee -dnucevdees det cheaducbeteadesdvekwan vesdex
International Paper Co. v. Federal Power Commission, 476
Sle Be. 006960 00ced000006nn Comeedsbetuanaseenesee
Landis v. North American Co., 299 U.S. 248, 265 .......
Louisiana Power & Light Co. v. Federal Power Commission,
ee Se Gy TE kvieucesesahes eévensndudeanedscac
Meat Cutters Union v. Jewel Tea Co., 381 U.S. 676, 684
Merle E. Rowan v. Allied Chemical Company, 39 FPC 64
Mississippi Public Service Commission v. Federal Power
Commmeianm, SOB FG BOGS ccccccdccesccccccscceses
Monsanto Company v. Federal Power Commission, 463 F.2d
TO, Geo cccvendisecedndstcenviass svescesantecsss
Nader v. Allegheny Airlines, Inc., 96 S. Ct. 1978, 48 L.Ed.
Be MD io cuckedhadece sl euessesaeesnbecéesceuneeeen’
Pan American P. Corp. v. Superior Court, 366 U.S. 656,
GD xv veticecesusece venseasenbetsneusdananaekar

Page

Al6l

A169

9,11

9,18

7,19

14, 18

6,7, 10

Ill
CASES Page
Panhandle Eastern Pipe Line Co. v. Public Service Commis-

et ee Ee ED 6 0caescd scenes cosscccess 7
Ricci v. Chicago Mercantile Exchange, 409 U.S. 289, 304 7,16
Sey Ge GR. TG. Fite GOO Pete BFE ccccccccccescccces 14
State of Louisiana v. Federal Power Commission, 503 F.2d

MEE Ken eeecnncedceccgsenesncdsecesecocece 9, 18
Texas Gas Transmission Corp. v. Shell Oil Co., 363 U.S.

SL EE snes néhedeeel ened uWkdenenenenrestecsesescs 14
Texas & Pacific R. Co. v. Abilene Cotton Oil Co., 204 U.S.

SP whnwhes 6dbbus 650 096666 6d06dRdR dese Sov eereeeece 10
United States v. Western P. R. Co., 352 U.S. 59, 69 ..... 13
Warren Petroleum Corp. v. FPC, 282 F.2d 312 ........... 14
World Airways, Inc. v. Northeast Airlines, Inc., 349 F.2d

PET co checccccecevccccdvenésaasasccececcooocccees 14

STATUTES AND REGULATIONS
Natural Gas Act, 52 Stat. 821:

NS IE SAE ED 2, 3,8
Sec. 21, 22, 15 U.S.C. 717(t), 717(u) ......eceeeeeees 15
wa eat 2
a caeeuiace’ 3

Constitution of the United States:
i er ee, 2 ee. 6 edieuubeseececccdctencescees 9,10

Supreme Court of the United States

OCTOBER TERM 1976

NO.

MISSISSIPPI POWER & LIGHT COMPANY,
Petiiioner

Vv.

UNITED GAS PIPE LINE COMPANY,
PENNZOIL COMPANY,
Respondents

STATE OF MISSISSIPPI,
Plaintiff-Intervenor

PETITION FOR A WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF APPEALS
FOR THE FIFTH CIRCUIT

Mississippi Power & Light Company (MP&L) petitions
for a writ of certiorari to review the judgment of the
United States Court of Appeals for the Fifth Circuit in
this case.

OPINION BELOW

The opinion of the Court of Appeals (App. A, infra,
pp. Al-A21) is reported at 532 F.2d 412.

2
JURISDICTION

The judgment of the Court of Appeals (App. C, infra,
pp. A23-A24) was entered on May 27, 1976. MP&L’s
timely petition for rehearing was denied on September 27,
1976. (App. D, infra, pp. A25-A26). The jurisdiction
of this Court is invoked under 28 U.S.C. 1254(1).

QUESTIONS PRESENTED

1. Whether a common-law action by an electric utility
against a jurisdictional gas pipeline for the tortious making
and breaking of a long-term contract for the direct (non-
jurisdiction) sale of natural gas should have been stayed
pending reference to the Federal Power Commission for
a determination whether the contract was tortiously made
and breached, and if it was whether the Commission
could approve a tariff filing by the pipeline which would
exculpate it from liability.

2. Whether the stay while the Commission decides “a
major part of the litigation”, and makes “all findings that
it believes will aid the prompt resolution of the dispute”
has been kept in the bounds of moderation, or is a denial
of that promptness of decision which in all judicial actions
is one of the elements of justice.

STATUTE INVOLVED

Section 1(b), 15 U.S.C. 717(b) of the Natural Gas
Act, 52 Stat. 821 (1938) which provides:

“The provisions of this act shall apply to the trans-
portation of natural gas in interstate commerce, to
the sale in interstate commerce of natural gas for
resale for ultimate public consumption for domestic,
commercial, industrial, or any other use, and to

3

natural gas-companies engaged in such transportation
or sale, but shall not apply to any other transpor-
tation or sale of natural gas or to the local distribu-
tion of natural gas or to the facilities used for such
distribution or to the production or gathering of nat-
ural gas.”

STATEMENT

Petitioner Mississippi Power & Light Company
(MP&L) brought this action on August 30, 1974 against
United Gas Pipe Line Company (United) and Pennzoil
Company (Pennzoil) to recover damages in the sum of
$160 million for United’s breach of a long-term gas sales
contract entered into on Decémber 28, 1967. MP&L
alleged that United represented that it would be able to —
perform its obligations under the contract; that the repre-
sentation was false, and that MP&L, believing it to be
true, expended large sums of money in constructing and
maintaining power plant facilities designed to burn natural
gas as a primary fuel. MP&L also alleged that Pennzoil,
the former parent of United, directed and induced United
to breach the gas sales contract (App. G, infra, pp. A32-
A90).

The State of Mississippi’s motion to intervene as a party
plaintiff was granted (App. H, infra, p. A100), and it
filed its complaint in intervention, adopting MP&L’s com-
plaint in its entirety (App. I, infra, pp. A101-A102).

Jurisdiction of the district court was invoked on the
ground of diversity of citizenship, 28 U.S.C. 1332(a)(1).

United and Pennzoil filed separate motions to dismiss
MP&L’s complaint, or alternatively to stay the action
(App. J, infra, pp. A103-A106; App. K infra, pp. AiO7-
A111). They gave as grounds for their motions that the

4

complaint raised numerous issues within the competency
and primary jurisdiction of the Federal Power Commis-
sion.

Following oral argument on the motions, the District
Court ordered United and Pennzoil to file answers, which
they filed on March 24, 1975 (App. L, infra. pp. A112-
Al41; App. M, infra, pp. Al42-A153). The District
Court thereafter in a memorandum opinion delivered on
April 2, 1975 denied the motions to dismiss, but granted
the motions to stay (App. F, infra, pp. A29-A31). It
accordingly entered an order to that effect on April 4,
1976 (App. E, infra, pp. A27-A28).

In the memorandum opinion the District Court stated
that MP&L’s common law action for damages was oc-
casioned and necessitated, according to MP&L’s conten-
tions, by the misfeasance of United and Pennzoil, in that
United knowingly and deliberately oversold its supply of
natural gas well knowing that the ultimate effect would
be an insufficient supply of gas to discharge its contrac-
tual obligations to MP&L. It concluded, though, that
the Federal Power Commission probably had jurisdiction
of MP&L’s action, and that for that reason the District
Court should defer to the Commission a decision of the
controversy. It stayed the action to await a decision of
the Commission as to its primary jurisdiction.

While the Court of Appeals held that the District Court
“acted properly in staying the procedures and in referring
the case to the Federal Power Commission so that that
agency might exercise primary jurisdiction” it also held
that on remand “the District Court should prepare an
order which outlines with some specificity both the pro-
ceedings before the Commission that should be con-

5

cluded before the damage litigation should continue and
the issues upon which the Commission’s opinion is sought”
(App. A, infra, p. A21; p. Al9). Consequently it re-
manded with direction the case to the District Court for
the limited purpose of that Court modifying its stay order
(id, p. A21). Even so, though, the Court said “For a
court to attempt to determine whether it or the FPC
had final authority over all aspects of the damage action
on the record before the District Court would be singularly
unwise”; (id. p. Al7) and that “By requiring the Dis-
trict Court to prepare an order in which certain issues are
referred to the FPC, we do not intend to unduly restrict
that agency’s ability to assist the District Court. The
agency is free to make all findings that it believes will aid
the prompt resolution of the dispute”. (id, p. A19, n.14).

The Court of Appeals, however, in attempting to deter-
mine the aspects of the damage action which it believed
an informed opinion of the Commission would be of ma-
terial aid to the District Court, discussed what it con-
sidered were five components of the dispute. (id, pp.
A16-Al7).

It held that the Commission could determine whether
a tariff provision, such as Section 12.3 proposed by United,
would immunize United from liability and provide it with
a defense to the action by MP&L. (id, p. A 16). It
pointed to its opinion in State of Louisana v. Federal
Power Commission, 503 F.2d 844, 865-868 (1974) where
it, in reversing a curtailment order of the Commission,
also reversed a holding of the Commission that the cur-
tailment order would provide an absolute defense to the
damage actions against United, rendering unnecessary an
exculpatory tarit, such as Section 12.3 proposed by
United. (id, p. A7).

6

The Court of Appeals referred to a petition for declara-
tory order filed by United with the Commission a day or two
before oral argument in the District Court on the motions
to dismiss or alternatively to stay. It concluded that the
Commission had not clearly articulated what, if any, its
action would be on United’s petition. (id, p. A8). The
Commission’s order clearly shows it will not determine
whether United’s shortage was caused by negligent or
willful misconduct on United’s part (App. N infra, pp.
A154-A160).

Other determinations which the Court of Appeals ex-
pressed the belief might be of aid to the District Court
will be discussed under reasons for granting the writ.
Suffice it to say the Court said that “referral encompasses
the major part of the litigation”. (App. A, infra, p. A20).

REASONS FOR GRANTING THE WRIT

1. The Court of ‘Appeals decided in a way in conflict
with the decision of this Court in Nader v. Allegheny
Airlines, Inc., U.S. ___. (1976), 96 S.Ct. 1978, 48
L.Ed.2d 643' an important federal question regarding
the primary jurisdiction of the Federal Power Commission
of a common-law action for fraudulent misrepresentations
which induced the plaintiff to enter into a long-term natu-
ral gas sales contract with the defendant.

Even if the Commission’s informed opinion might “be
of material aid in the resolution of the damage action”,
as the Court of Appeals opined, that is not adequate
grounds for referring this action to the Commission for

1. Although Nader was decided after the Court of Appeals de-
livered its opinion on May 27, 1976, MP&L in its motion for rehear-
ing, urged the Court to follow federal law laid down in Nader.

7

trial and decision. In Ricci v. Chicago Mercantile Ex-
change, 409 U.S. 289, 304 (1973) the majority of a
5-4 divided court said that although it need not finally
define the administrative jurisdictional issue, nevertheless
in order for a governmental agency to exercise primary
jurisdiction, there must be sufficient statutory support
for it to decide the issues referred to it. And in Meat
Cutters Union v. Jewel Tea Co., 381 U.S. 676, 684
(1965) it said that the primary jurisdiction doctrine
comes into play only when enforcement of the claim in
a court “requires the resolution of issues which, under a
regulatory scheme, have been placed within the special
competence of an administrative body.”

The Natural Gas Act has not placed within the special
competence of the Federal Power Commission a common-
law action involving the question whether a jurisdictional
pipeline falsely misrepresented its gas supplies in order
to induce an electric utility to enter into a long-term gas
sales contract. Indeed the Act does not even confer juris-
diction of the direct sale on the Federal Power Commis-
sion, Panhandle Eastern Pipe Line Co. v. Public Service
Commission, 332 U.S. 507, 516-517 (1947). Nor does
the Act abrogate state law claims, such as the claims of
MP&L. MP&L’s claims, as were those in Nader, and the
statute (here the Natural Gas Act) are not “absolutely
inconsistent.” They, too, may coexist.

MP&L has not sought to restrain the Commission or
United from curtailing deliveries of gas to it, nor has it
interfered with the Commission in the exercise of its
curtailment jurisdiction. The curtailment orders are not
the gravamen of MP&L’s claim. They were issued because
United could no longer meet its contractual obligations.
MP&L’s claim is for United’s false misrepresentations of

the adequacy of its gas supplies. Whether United falsely
misrepresented the adequacy of its gas supplies is not
an issue in the curtailment proceedings. The power of
the Commission to issue curtailment orders stems from
its transportation jurisdiction under Section 1(b). This
limited jurisdiction does not vest the Commission with
authority to determine whether false misrepresentations
were made in a nonjurisdictional sale of natural gas.

2. The Court of Appeals, in holding that the Com-
mission’s resolution of five specific components of the
dispute, will materially aid the District Court has so far
departed from the accepted and usual course of judicial
proceedings as to call for an exercise of this Court’s
power of supervision.

First, the Court of Appeals has incorrectly held that
a component of the dispute is the cause of United’s short-
age. Even if it were necessary to determine the facts and
circumstances giving rise to United’s gas shortage, a
determination could be made only on the basis of evidence
received at a public hearing; and this would be true
whether the determination was made by the Commission
or a District Court.* The Commission’s expertise would
not be a deciding factor. Courts have greater expertise
than the Commission in weighing conflicting testimony,
and in resolving common-law actions involving applica-

2. The Court of Appeals says that the Commission is reviewing
the facts and circumstances that resulted in the shortage in order
to determine what is a fair, equitable, permanent curtailment plan
(App. A, infra, pp. Al5-A16). The Court is mistaken. The Commis-
sion is engaged in determining, in context of a curtailment plan,
whether a curtailment plan is unduly discriminatory which does not
place in the lowest priority new and enlarged service initiated at a
time when United knew it would soon be curtailing (App. N, injra,
p. A158).

9

tion of state law. Moreover, courts are unbiased in actions
against regulated industries.°

The cause of United’s gas shortage in the context of
the damage suit is a matter for the courts, and in the end
must be determined by the courts, Gordon v. New York
Stock Exchange, 422 U.S. 659 (1975).

The Court of Appeals was mistaken when it said that
the Commission had not clearly articulated what, if any,
its action would be on United’s petition for declartory
order. The petition was filed in an effort to persuade the
Commission to decide MP&L’s claims (App. A, infra,
p. A8). The Commission declined to issue a declartory
order on three of the four issues, One of the issues it
refused to include in its order was whether United’s
shortage was caused by its willful misconduct. This is
unmistakably shown by the following concluding para-
graph: “Good cause has not been shown for granting
United’s petition for declaratory order and motion to
consolidate, except as to the consolidation of the issue
of the effect of United’s tariff Section 12.1 on its general
liability to curtail direct sales customers.” (App. N, infra,
p. A160).

The Court of Appeals gives as a reason for referral,
“no federal policy or statute entrusts the decision to courts
in the first instance”, (App. A, infra p. Al7). The action,
in the constitutional sense, is a case or controversy within
the jurisdiction of the courts, Art. III Sec. 2 Cl. 1 Con-

3. In International Paper Co. v. Federal Power Commission, 476
F.2d 121, 125-126 (Sth Cir. 1973) and State of Louisiana v. Federal
Power Commission, 503 F.2d 844, 865-866 (Sth Cir. 1974) the court
reversed decisions of the Commission exonerating United from
liability on the ground of no record support, and further on the
ground that United might be liable for creating the need to curtail.

10

stitution of the United States. Courts have traditionally
exercised jurisdiction of actions for false representations.
It is not a question of whether a statute has entrusted a
decision to the courts in the first instance, but whether
a Statute has entrusted a decision to the Federal Power
Commission.

Second, the Commission cannot accept a tariff exculpat-
ing United from past liability for false misrepresentations.
The Natural Gas Act does not abrogate state-law or
common-law claims, nor does it authorize the Commission
to immunize a jurisdictional pipeline from claims arising
after, or even before the wrong was committed. No power
to immunize can be derived from the Commission’s au-
thority to curtail under its transportation jurisdiction.
The power to curtail is not coextensive with the right to
vindicate a wrong under state law. As was pointed out in
Nader, where Congress has sought to confer the power
to immunize “it was done so expressly.” It was there said:

The Court [Texas & Pacific R. Co. v. Abilene Cotton
Oil Co., 204 U.S. 426] conceded that a common-law
right, even absent a saving clause, is not to be
abrogated “unless it be found that the preexisting
right is so repugnant to the statute that the survival
of such right would in effect deprive the subsequent
Statute of its efficacy; in order words, render its
provisions nugatory.”

Whether the Natural Gas Act authorizes the Com-
mission to approve, as a part of a curtailment plan, a
tariff provision, such as proposed Section 12.3, which
would exculpate United from liability for state-law or
common-law claims is a question of law for the courts
and not the Commission.

11

The decision of the Court of Appeals is in conflict
with the principle announced in Gordon v. New York
Stock Exchange, 422 U.S. 659, 686-690 (1975). There
the Court held that in a treble damage antitrust suit
the question whether the system of fixed Commission
rates, over which the Securities and Exchange Commission
had active supervision under the Securities Exchange Act,
was beyond the reach of the antitrust laws, was a question
of law for the courts to decide, and in particular for the
court in which the antitrust claim was raised.

The decision of the Court of Appeals is also in conflict
with the principle enunciated in Breen Air Freight, Ltd.
v. Air Cargo, Inc., 470 F.2d 767 (2nd Cir. 1972) cert.
den. 411 U.S. 932 in which it was held that in a treble
damage antitrust suit where the issue was whether agree-
ments approved by the Civil Aeronautics Board (CAB),
immunized an air carrier from antitrust violations, the
courts would determine in the treble damage action
whether the agreements approved by the CAB met the
requirements of 49 U.S.C. Section 1384, which relieves
air carriers from antitrust laws on agreements between
air carriers approved by the CAB. It was there said at
p. 774

“Finally, we see no need to direct the district court
to stay, in its discretion, the proceedings in court
pending administrative action by the CAB. The issues
are not technical in nature, and there is no need
to seek uniformity. Compare Trans World Airlines,
Inc. v. Hughes, supra, with Pan American World
Airways, Inc. v. United States, supra. Furthermore,
the CAB cannot award damages, the only relief
which the plaintiffs request. Apgar Travel Agency
v. International Air Trans. Association, 107 F. Supp.
760, 711 (SDNY 1952); Slick Airways, Inc. v.

12

American Airlines, Inc., 107 F. Supp. 199, 211
(D.N.J. 1952). Whenever possible courts shoul

avoid duplicated or drawnout proceedings. The ef-
ficient administration of justice demands it. See
Allied Air Freight, Inc. v. Pan American World
Airways, Inc., supra, 393 F.2d at 445; Japan Line,
Ltd. v. Sabre Shipping Corporation, 407 F.2d 173
(2 Cir.), cert. denied, 395 U.S. 922, 89 S.Ct. 1774,
23 L.Ed.2d 239 (1969).

Likewise, whether the Commission can approve a tariff
provision exculpating United from past liability for false
misrepresentations is a question of law for the courts and
not the Commission. Public utilities cannot by tariff or
contract escape liability for their own negligence, false
misrepresentations or past wrongs. Bisso v. Inland Water-
ways Corp., 349 U.S. 85, 91-94 (1955); Fairfax Gas &
Supply Co. v. Hadary, 151 F.2d 939, 941 (4th Cir.
1945); 175 A.L.R. 38-74.

Nothing, therefore, would be gained by awaiting a
decision of the Commission on the proposed Section 12.3
tariff provision. Approval or disapproval of an exculpa-
tory tariff provision is not a matter within the discretion
of the Commission.*

Nor would anything be gained by awaiting a decision
of the Commission as to whether Section 12.1 of United’s
tariff exculpates United from liability for false misrepre-

4. In Pan American P. Corp. v. Superior Court, 366 US. 655,
665-66 the Court held that a pipeline company could recover an
overcharge under a gas purchase contract in an action filed in a state
court, even though the contract had been filed as the producer’s sate
schedule. It said that the rights under the contract were “traditional
common law claims” and they did not “iose their character because
it is common knowledge that there exists a scheme of federal regula-
tion of interstate transmission of natural gas.”

13

sentations. United must not believe that Section 12.1
exculpates it, otherwise it would not have urged the
approval of proposed Section 12.3.

Mr. Justice Brandeis, speaking for a unanimous court
in Great Northern Railway Co. v. Merchants Elevator
Co., 259 U.S. 285, 290 (1922), said: “Every question
of the construction of a tariff is deemed a question of
law; and where the question concerns an interstate tariff
it is one of federal law” (Emphasis added). He went on
to say at p. 294, that “The task to be performed is to
determine the meaning of words of the tariff which were
used in their ordinary sense and to apply that meaning to
the undisputed facts. That operation was solely one of
construction; and preliminary resort to the Commission
was, therefore, unnecessary.”

The rule laid down in Great Northern was reaflirmed
in United States v. Western P. R. Co., 352 U.S. 59, 69
(1956) and Brown & Sons Lumber Co. v. Louisville &
N. R. Co., 299 U.S. 393, 397 (1937). It was said in
Civil Aeronautics Board v. Modern Air Transport, 179
F.2d 622, 624 (2nd Cir. 1950), that “it has been con-
tinuously asserted that courts have original jurisdiction to
interpret tariffs, rules, and practices where the issue is one
of violation, rather than reasonableness.” The reasonable-
ness of Sections 12.1 and 12.3 is not an issue in MP&L’s
action.

Third, the gas sales contract, if it need be construed,
should not be referred to the Commission for construction,
but should be construed by the courts. It is a Mississippi
contract, and must be construed under the laws of that
State and in accordance with the canons of contract con-
struction. A construction of the contract by the Commis-

14

sion would not be binding on the courts.’ Moreover in
Merle E. Rowan vy. Allied Chemical Corp., 39 FPC 64
(1968) the Commission declined to decide contract ques-
tions referred to it by a federal district court on the ground
that it was not the policy of the Commission to decide
contract questions involved in a lawsuit being tried by a
court. The Court of Appeals clearly departed from the
accepted and usual course of judicial proceedings when
it held that questions regarding the interpretation of a
Mississippi contract for the nonjurisdictional sale of nat-
ural gas should be referred to the Commission.

Fourth, the Court of Appeals concluded that a fourth
component of the dispute which should be referred to the
Commission is MP&L’s request for compensation from
the customers of United who receive higher priorities. The
Court had reference to its opinion in Mississippi Public
Service Commission v. Federal Power Commission, 522
F.2d 1345 (Sth Cir. 1975) cert. den. 50 L.Ed. 149
(1976) where it held that the imposition of compen-
sation payments as a condition for the receipt of higher
priority gas is within the statutory power of the Commis-
sion over the movement of such gas in interstate com-
merce.

MP&L and the Mississippi Public Service Commission
have not asked that the compensation plan be made retro-
active. If a plan were adopted, as a part of a curtailment
program, it could not apply retroactively to curtailments

5. Texas Gas Transmission Corp. v. Shell Oil Co., 363 U.S. 263,
270 (1960); World Airways, Inc. v. Northeast Airlines, Inc., 349
F.2d 1007, 1011-1012 (1st Cir. 1965), cert. den. 382 U.S, 984;
Skelly Oil Co. v. FPC, 532 F.2d 177 (10th Cir. 1976); Gulf Oil
Corp. v. American Louisiana Pipe Line Co., 282 F.2d 401 (6th Cir.
1960); Warren Petroleum Corp. v. FPC, 282 F.2d 312 (10th Cir,
1960).

15

under prior plans because reparations are impermissible
under the Natural Gas Act.* A plan, if included in a
permanent curtailment program for United’s system, would
not immunize United from liability for accrued damages
suffered by MP&L. It might, at the most, reduce future
damages by the increased amounts paid by high priority
customers to United for the credit of MP&L and other low
priority customers. Consequently the trial of this action
for damages already suffered should not be stayed until
all of the issues in a permanent curtailment program are
tried and decided by the Commission and the courts on
petitions for review.

Fifth, the Court of Appeals would refer to the Com-
mission for determination whether the payment of dam-
ages for false misrepresentations might “significantly affect
the allocation decision.” There is no nexus between claims
for false misrepresentations and the Commission’s power
to curtail, or its power to determine the order of priority
of service. MP&L’s common-law claims should not be
extinguished on some theory that if United were held
liable it might violate the Commission’s curtailment orders
in an effort to mitigate the damages by delivering MP&L
greater volumes of gas than it was entitled to under
the curtailment orders. A reduction in liability to one
customer would expose United to liability to customers
who were excessively or unlawfully curtailed. Moreover,
a violation of the curtailment orders would expose United
to heavy criminal penalties under Sections 21 and 22, of
the Natural Gas Act, 15 U.S.C. 717t, 717u.

6. In F.P.C. v. Louisiana Power & Lighi Co., supra, the Court,
in upholding the curtailment jurisdiction of the Commission said in
406 U.S. at p. 644; “In addition a prescribed remedial order can
have only prospective application.”

16

3. The stay has not been kept within the bounds of
moderation. As was said in Landis v. North American
Company, 299 U.S. 248, 265 (1936) “The limits of a
fair discretion are exceeded.” The stay also, as was said in
County of Allegheny v. Frank Mashuda Company, 360
U.S. 185, 196-197 (1959) denies “that promptness of
decision which in all judicial actions is one of the elements
of justice”. In Ricci v. Chicago Mercantile Exchange,
supra Justices Marshall, Douglas, Stewart and Powell, in
their dissents, said in 409 U.S. at pp. 320-321 “And
surely the right to a ‘meaningful opportunity to be heard’
comprehends within it the right to be heard without un-
reasonable delay”.

It is self-evident that a referral of this action to the
Commission for it to determine “a major part of the liti-
gation” and make all findings “that it believes will aid the
prompt resolution of the dispute” will unduly delay a trial
in the District Court. First, the District Court, under the
opinion of the Court of Appeals, must prepare an order
which outlines with some specificity both the proceedings
before the Commission that should be concluded before
the litigation can continue, and the issues upon which
the Commission’s opinion is sought. Such an order could
be prepared only after an evidentiary hearing for the Court
of Appeals said that it would be singularly unwise for a
court to attempt to determine whether it or the FPC had

final authority over all aspects of the damage action on

the record before the District Court.

Second, the Commission would need to determine, after
notice and hearing, which of the issues referred to it by
the District Court it had an adequate staff and the ex-
pertise to make the determinations. It also would have to
determine whether there were other issues it could try

¥ one ainrenhCndll

17

where its findings might in its opinion aid the court in
resolving the dispute. Of even greater importance it needs
to decide whether the new issues could be determined
without unduly delaying a resolution of the issues for
which the proceedings were instituted.

Third, the Commission would have to find a time when
it could try the damage suit issues without interferring
with its statutory duties.

Fourth, the Commission would then have to try and
determine the damage suit issues.

Fifth, then there would be the delay incident to an
appeal to the court of appeals of the Commission’s find-
ings and order.

With all of this delay, still the Commission would not
have jurisdiction to right the wrongs done MP&L and its
customers. Moreover the District Court held in its memo-
randum (App. F, infra, p. A30) that the findings and
determination of the Commission would not be binding
on the courts in the damage suit actions.’ However the
Court of Appeals cautioned “We have been careful not
to articulate the exact effect of the findings of the Com-
mission upon the subsequent litigation. . . . We believe
that it is singularly inappropriate to determine at this
point in this complex litigation what the effect of the
Commission’s decision will be before the nature and
extent of the Commission’s action is ascertainable”, App.
A, infra, p. A20. Trial of the damage suit issues before
the Commission may, therefore, be an exercise in futility.

7. In Monsanto Company v. Federal Power Commission, 463 F.2d
799, 807 (D.C. Cir. 1972) it was held that the FPC’s determination
would only be “advisory”.

18

The Fifth Circuit in Louisiana Power & Light Com-
pany, supra, said in 526 F.2d at p. 910: “The Commis-
sion’s delay in acting on a permanent plan for the United
system is, of course, discouraging.” It also said in State
of Louisiana, supra, 503 F.2d at p. 864:

FPC should bear in mind that the question is not
whether United should ‘bear responsibility for the
shortage on its system’; rather it is who would get
the gas that is now available. FPC seems to have
been concerned with deciding the issue of United's
culpability. It would seem to us that that question
should be resolved in a damage suit.

The Federal Power Commission has not yet concluded
hearing commenced on December 21, 1970 for the pur-
pose of delineating a permanent curtailment plan for
United. Its curtailment orders have been reviewed and
reversed in International Paper Company v. Federal
Power Commission, 476 F.2d 121 (Sth Cir. 1973);
State of Louisiana v. Federal Power Commission, 503
F.2d 844 (Sth Cir. 1974); Mississippi Public Service
Commission v. Federal Power Commission, 522 F.2d
1345 (Sth Cir. 1975); and Louisiana Power & Light
Company v. Federal Power Commission, 526 F.2d 898
(Sth Cir. 1976). The failure of the Commission to obey
the mandate of the Fifth Circuit in Louisiana Power &
Light Company v. Federal Power Commission, supra,
resulted in the Court entering an order on November 13,
1976 modifying an interim curtailment plan for United’s
system, and directing obeyance of the Court’s mandate.
(App. O, infra, pp. A161-A168). The Commission by
order issued November 24, 1976 has taken steps to deter-
mine, as the Court had mandated, whether to continue in

RMS Eee ue io we

oa?

en ee

19

force the four-priority plan, which the Fifth Circuit held
had not been lawfully vacated, or to vacate the plan
(App. P, infra, pp. A169-A171). Referral to the Com-
mission of common-law damage action issues to be tried
and decided in the curtailment proceedings will further
delay the delineation of a permanent curtailment’ plan
for United’s system.

The Commission is understaffed and overworked.” The
need to expeditiously resolve the issues in this lawsuit
greatly outweighs any aid the FPC may be able to give
the District Court.’

This case has now been pending for more than two
years, and the curtailment proceedings for more than
six years, but the Commission is still attempting to deline-
ate a permanent curtailment plan for United. The evi-
dentiary record in the curtailment proceedings (RP71-29
et al Phase II) was recently closed on December 2, 1976.
The record contains 24,621 pages of testimony and 852
exhibits. Relatively short briefing schedules have been set
by the Presiding Administrative Law Judge. Obviously

8. The Chairman of the Commission in testifying before the
Senate Committee on Government Operations on May 27, 1976 said
that in January 1976 10,480 cases were pending before the Com-
mission; that the number had grown to 11,426 cases at the end of
February and to 14,454 cases at the end of March 1976. He testified
that the Commission was able to decide about 62 cases per week
or about 3,224 per year. He said the Commission was on a treadmill
and rapidly going backward; that the “system is in serious danger
of breaking down.” Obviously, the Commission is already four or
five years behind with its docket and getting further behind each
month.

9. The Courts must always balance the benefits of seeking agency’s
aid with the need to resolve disputes fairly yet as expeditiously as
possible. Meat Cutters Union v. Jewel Tea Co., 381 US. 676, 686
(1965).

20

the damage suit issues cannot be tried in that proceeding.
Trial of United’s petition for a declaratory order (Phase
III) has not commenced, but as pointed out earlier, supra,
p. 6, p. 9 the Commission has declined to issue a declara-
tory order on three of the four issues raised by United
(App. N, infra, pp. A154-A160), leaving only the ex-
culpatory tariff questions for determination. The stay
has not been kept within the bounds of moderation, and
MP&L has been denied promptness of decision which in
all judicial actions is one of the elements of justice.

CONCLUSION
The petition for a writ of certiorari should be granted.

Respectfully submitted,

SHERWOOD W. WISE

JosEPH P. WISE

WIsE, CARTER, CHILD,
STEEN & CARAWAY

Post Office Box 651

925 Electric Building

Jackson, Mississippi 39206

CLAYTON L. ORN

ANDERSON, BROWN, ORN & JONES
1122 Southwest Tower

Houston, Texas 77002

Attorneys for Petitioner
Mississippi Power & Light
Company

Al
APPENDIX A

MISSISSIPPI POWER & LIGHT COMPANY,
Plaintiff-Appellant
v.
UNITED GAS PIPELINE COMPANY
et al., Defendants-Appellees,

STATE OF MISSISSIPPI,
Plaintiff-Intervenor.

No. 75-2316.

UNITED STATES COURT OF APPEALS
Fifth Circuit.
May 27, 1976

Utility brought action against pipeline company and its
former parent for breach of contract. The United States
District Court for the Southern District of Mississippi at
Jackson, William Harold Cox, J., granted stay of all pro-
ceedings to await response of the Federal Power Commis-
sion as to its primary jurisdiction of curtailment question
and utility appealed. The Court of Appeals, Lewis R.
Morgan, Circuit Judge, held that referral was appropriate
inasmuch as FPC was presently resolving issues related to
curtailment plans, FPC assistant would be of material
aid to the District Court and the resolution of damage
action and none of the factors mitigating applicability of
the primary jurisdiction doctrine were preseat; and that
District Court should have been more precise in its stay
order by outlining with some specificity both the proceed-
ings before the FPC that should be concluded before
the damage litigation should continue and the issues upon
which the FPC’s opinion was sought.

Remanded with directions.

A2

Appeal from the United States District Court for the
Southern District of Mississippi.

Before THORNBERRY, COLEMAN and MORGAN,
Circuit Judges.

LEWIS R. MORGAN, Circuit Judge:

This appeal involves another facet of the problems
created by the nationl energy shortage. Specifically, this
litigation was commenced by Mississippi Power and Light
Co. (MP&L) for breach of contract against one of the
major natural gas pipeline companies, United Gas Pipe-
line (United) and its former parent, Pennzoil Co. Al-
leging failure to supply the amounts of gas provided by
the contract and basing its action solely on state law,
MP&L brought a diversity action against United and
Pennzoil in the United States District Court for the
Southern District of Mississippi. After filing their answers,
United and Pennzoil asserted the primary jurisdiction of
the Federal Power Commission. The district court granted
a stay of all proceedings “to await the response of the
Federal Power Commission as to its primary jurisdiction
of this curtailment question. . . .”’ MP&L appeals’ the

1. The district court order states in relevant parts:

It is the opinion of this Court that under the Natural Gas
Act that the Federal Power Commission probably has jurisdiction
of this curtailment controversy, and that the Court at this time
should defer to its decision as to the authority of the Commission
in this controversy, which is in the process of being handled by
that agency; and while the agency’s decision is not final and
binding on the court, it must be sought at this time.*

The motion of the defendants to dismiss will be denied. The
motion to stay proceedings here to await response of the Fed-
eral Power Commission as to its primary jurisdiction of this
curtailment question will be granted. In the meantime, all other
and further processes of this Court will be stayed to await the
ultimate answer of the Commission as to this paramount and
controlling question of law.

* Federal Power Commission v. Louisiana Power & Light

A3

district court’s order basically arguing that the Federal
Power Commission does not have primary jurisdiction
over any of the issues raised in this action. MP&L argues,
moreover, that even if the FPC does have primary juris-
diction, the district court erred in not making its order
more specific by stating which issues should be referred to
the FPC. Finally, MP&L objects to the district court’s
stay of discovery. While we agree that the district court
order should be more specific, we hold that the court was
correct in staying the proceedings in order that the Federal
Power Commission may exercise primary jurisdiction in
this matter.

I. THE CURTAILMENT CONTROVERSY:

In order to more clearly understand the issues presented
by this complex litigation, a review of the natural gas

shortage controversy and the litigation accompanying it is
helpful.’

Company, et al, 406 U.S. 621, 92 S.Ct. 1827, 1842, [32 L.Ed.
2d 369] the Court among other things held: “In that circum-
stance, the District Court and the Court of Appeals were obliged
to defer to the FPC for the initial determination of its jurisdic-
tion. See Myers v. Bethlehem Shipbuilding Corp., 303 U.S. 41,
58 S.Ct. 459, 82 L.Ed. 638 (1938). The need to protect the
primary authority of an agency to determine its own jurisdiction
‘is obviously greatest when the precise issue brought before a
court is in the process of litigation through procedures originating
in the [agency]. While the [agency’s] decision is not the last
word, it must assuredly be the first.’ ”

2. This court granted leave to appeal from an interlocutory order
on May 28, 1975.

3. See, e. g., FPC v. Louisiana Power and Light Co., 406 U.S.
621, 92 S.Ct. 1827, 32 L.Ed.2d 369 (1972); Louisiana Power and
Light Co. v. FPC, 526 F.2d 898 (Sth Cir. 1976); Fort Pierce Utility
Authority of City of Fort Pierce v. FPC, 526 F.2d 993 (Sth Cir.
1976); Mississippi Public Service Commission v. FPC, 522 F.2d
1345 (Sth Cir. 1975); State of Louisiana v. FPC, 503 F.2d 844 (Sth

A4

By the spring of 1971, several pipeline companies, in-
cluding United, had notified the Federal Power Commis-
sion that their supplies were inadequate to meet commit-
ments to their customers. United, as well as other pipeline
companies, proposed to meet this shortage situation by
instituting curtailment plans that would allocate the avail-
able gas among their customers. Most of these plans had
been adopted by the pipelines during a temporary short-
age created by the Korean war. Needless to say, these
plans were often unsuitable as a method of curtailing
supplies during the present period of continual and severe
shortage. The FPC, in Order No. 431,* Statement of Gen-
eral Policy, ordered the pipelines to institute all necessary
steps to alleviate the shortage and to submit new tariffs
which would incorporate revised curtailment plans. Under
United’s temporary curtailment plan filed pursuant to
Order 431, MP&L, a utility who used natural gas as a
fuel to generate electricity, was placed in the category
to be curtailed first.’ Therefore, MP&L has been receiving
substantially less natural gas than it had before curtail-
ment.

The necessity for curtailment gave rise to two distinct
problems. The first question was how much of the avail-
able supply of natural gas each of the pipeline’s customers

Cir. 1974); Atlanta Gas and Light Co. v. FPC, 476 F.2d 142 (Sth
Cir. 1973); International Paper Co. v. FPC, 476 F.2d 121 (Sth Cir.
1973).

4. 49 FPC 85 (1973).

5. Originally, MP&L was given a preference over other customers.
The Commission, however, ordered that utilities like MP&L be placed
in the lowest priority for gas supplies. While this court has remanded
to the Commission for further evidence on this point, the court has
allowed United to operate through the present heating season under
a plan that denied MP&L any priority. See Louisiana Power and
Light Co. v. FPC, 526 F.2d 898 (Sth Cir, 1976).

AS

would receive. The second question was who would bear
the economic consequences of the shortage. Those cus-
tomers who were curtailed in whole or in part would have
to seek alternative sources of energy which would gene-
rally be available at significantly increased cost, and some-
how this additional cost would have to be allocated. The
various parties, therefore, sought to insure that others bore
the financial burden of curtailment.

United feared liability on two separate theories. First,
a curtailed customer might bring a general breach of con-
tract action alleging failure to deliver the amounts of gas
stated in the contract. Second, a customer could bring an
action under a specific clause—the substitute fuel clause—
contained in many of United’s contracts, including its
agreement with MP&L. That provision arguably requires
United to compensate a customer for the additional cost
of obtaining other types of fuel to meet the customer’s
energy needs. While United contended that the substitute
fuel clause did not apply in a general curtailment situation
and if it did the language of the clause limited liability to
the amount of fuel purchased by the customer for only
a few days, should these contentions fail, United faced
a possibility of over a billion dollars in liability.

Even before suit was instituted, United sought by means
of proceedings before the Federal Power Commission to
insure that it would not bear the financial cost of curtail-
ment. In 1970, United sought a declaratory order from
the Commission which would hold that § 12.1 of its
tariff on file with the Commission immunized United from
liability. That section provided that curtailment could

6. See United Gas Pipe Line Company, FPC Docket No. RP71-
29. MP&L has contended from the beginning that no tariff provision
can affect its agreements with United,

A6

be instituted “without liability.” United also sought to file
with the Commission proposed § 12.3 of the tariff that
stated in relevant part,

. nor shall seller (United) be obligated to pay
or credit such customers any sums with respect to
substitute fuels burned by such customers during
such a period of proration or interruption.

The Commission rejected United’s proposal in Opinion
606’ and stated that,

implementation of the curtailment plan itself, pur-
suant to our procedures, would be an absolute de-
fense for United against all claim for specific per-
formance, damages, or other requests for relief under
these contracts affected by curtailment that may be
initiated in the courts.
In /nternational Paper Co. v. Federal Power Commission,
476 F.2d 121 (Sth Cir. 1973), however, this court
vacated that statement in Opinion 606 as “mere dicta”
totally lacking evidentiary support. /d. at p. 125.

Subsequently, United resubmitted § 12.3, but in Opin-
ion 647-A* the Commission again rejected United’s pro-
posed exculpatory language. This time, the Commission
reasoned that United would only be vulnerable under a
general breach of contract theory if the curtailment had
resulted from its own negligence, bad faith, or other
wrongful conduct. The Commission had found, however,
that United had not acted “improvidently” and that it
would not therefore be held liable for damages. Next, the

7. 46 FPC 786 (1971); See also, Opinion Nos. 606-A, 46 FPC
1290 (1971).

8. 49 FPC 1211 (1973). See also, 49 FPC 179 (1973).

A7

Commission stated that substitute fuel clauses required
United at most to reimburse its customers the extra costs
of substitute fuels for only “a maximum of seven days.”
Then, the Commission opined that if a court found that
the clause created “open ended” liability, the FPC would
be “compelled to find such clauses are unduly preferential.”
The Commission reasoned that the prospect of open ended
liability might cause United to disobey FPC orders and
in some way favor customers who had substitute fuel
clauses in their contracts.

Once again, in State of Louisiana v. Federal Power
Commission, 503 F.2d 844 (Sth Cir. 1974), this court
vacated the FPC’s findings. The court pointed out that
the proper determination of whether United was liable
for breach of contract absent an exculpatory tariff such
as § 12.3 would be decided by a court in the contract
actions. Then, the court found the FPC’s interpretation
of the substitute fuel clauses to be an “assertion (which)
cannot stand without supporting reasons.” Jd. at 868.
Furthermore, the court instructed the FPC not to assume

that United was not liable for breach of contract but

to evaluate the proposed § 12.3 in light of possible con-
tract liability. The court stated at page 867:

We think the Commission should have determined
what would happen with the proposed change in
effect. Can a tariff provision remove general con-
tractual liability? If the provision would remove
liability, would the unavailability of damages subject
United’s curtailed customers to ‘any undue prejudice
or disadvantage?’ In short, since the Commission
cannot adjudicate contract liability, it should evalu-
ate section 12.3 on the assumption that United faces
possible liability—not on the assumption it is immune,

A8

In State of Louisiana, the court also reversed the Com-
mission’s decision on various other aspects of United’s
curtailment plan. On remand, the FPC established pro-
cedures to meet the objections of this court.’ Part of
these procedures, delineated Phase III by the Commission,
were specifically designed to determine the advisability of
adopting § 12.3 as a part of United’s tariff. At present,
hearings are being conducted as a part of these Phase III
proceedings.

United also filed with the Commission on March 3,
1975, a petition requesting a declaratory order. Under
United’s request, the Commission would determine, inter
alia, (1) whether the availability of damages to some of
United’s curtailed customers would create an undue prefer-
ence in violation of the Natural Gas Act, (2) whether
§ 12.1 of United’s tariff would preclude liability to certain
customers such as MP&L and (3) whether the shortage
was caused by the negligence or willful misconduct of
United. The Commission has not clearly articulated what,
if any, its action will be on United’s petition.’

On August 5, 1974, Mississippi Public Service Com-
mission (MPSC) filed a petition for extraordinary relief
before the Commission on behalf of MP&L and other
Mississippi utilities. In this petition, the utilities sought

9. Order on Remand Denying Motion for Immediate Modification
of Curtailment Plan, United Gas Pipe Line Company, FPC Docket
Nos. RP71-29 and RP71-120, March 7, 1975 on rehearing May 2,
1975.

10. See Order partially granting petition for declaratory order
and motion to consolidate, United Gas Pipe Line Company, (Phase
Ill) FPC Docket Nos. RP71-29, RP75-71, RP75-69, August 20,
1975; Supplemental Order modifying order issued December 9, 1975
and referring ruling to Commission for review, United Gas Pipe Line
Company, (Phase III) FPC Docket Nos. RP71-29, RP75-69 and
RP75-71, December 16, 1975.

A9

compensation from those customers of United who re-
ceived a higher preference for gas. Under their proposal,
a customer who received full gas supplies would have to
make payments to customers of United who had been
curtailed. In this way, the utilities sought to allocate
among all the customers of United the burden of cur-
tailment. The Commission denied MPSC’s petition on the
ground that it was without jurisdiction to require such
compensation. This court in Mississippi Public Service
Commission v. Federal Power Commission, 522 F.2d
1345 (Sth Cir. 1975), rejected the Commission’s jur-
isdictional argument and remanded for determination of
whether compensation payments should be a condition
for receipt of a higher priority in a gas curtailment plan.

On August 30, 1974, MP&L brought this present action
against United and its former parent Pennzoil. As has
been outlined above, MP&L sought damages of approxi-
mately $160,000,000 from United for breach of contract.
The district court stayed these proceedings pending the
exercise of primary jurisdiction by the Federal Power
Commission, and MP&L objects to that stay.

Il. PRIMARY JURISDICTION:

[1] The doctrine of primary jurisdiction has evolved as
a means of reconciling the functions of administrative
agencies with the judicial function of the courts.'' When

11. See generally, Travis, Primary Jurisdiction, A General Theory
and Its Application to the Securities Exchange Act, 63 Calif. L. Rev.
926 (1975); Jaffe, Primary Jurisdiction, 77 Harv. L. Rev. 1037
(1964); Handler Regulation v. Competition, 44 U. Conn. L. Rev.
191 (1975); King, The “Arguably Lawful” Test of Primary Jurisdic-
tion in Antitrust Litigation Involving Regulated Industries, 40 Tenn.
L. Rev. 617 (1973); Robinson, Antitrust Developments: 1973, 74
Colum. L. Rev. 163 (1974); Note, Primary Jurisdiction in Antitrust
Cases. Three recent decisions, 42 U. Cinn. L. Rev. 725 (1973).

Al0

legal disputes develop that directly affect an industry sub-
ject to regulation, the need arises to integrate the regula-
tory agency into the judicial decision making process.
One method to accomplish integration is to have the
agency pass in the first instance on those issues that are
within its competence. In short, the agency should have
the first word. Marine Engineers Beneficial Assn. v. Inter-
lake Steamship Co., 370 U.S. 173, 185, 82 S.Ct. 1237,
1243, 8 L.Ed.2d 418, 426 (1962).

Reference to administrative agencies was first estab-
lished in those cases where Congress by statutory pro-
vision had allocated to the agency the power to con-
clusively decide the contested issue. For example, the In-
terstate Commerce Commission is the exclusive agency
for determining the reasonableness of rates; therefore, a
court must defer to that agency when a party challenges
a rate in a legal proceeding. Texas and P. R. Co. v. Abi-
lene Cotton Oil Co., 204 U.S. 426, 27 S.Ct. 350, 51
L.Ed. 553 (1907). Under this methodology, before in-
voking the doctrine of primary jurisdiction it was impera-
tive that the court determine whether the agency’s deci-
sion would be definitive. There was the implication that if
the agency’s conclusion did not finally resolve the issue,
reference would not be warranted. Public Utilities Com-
mission v. United States, 355 U.S. 534, 539, 78 S.Ct.
446, 450, 2 L.Ed.2d 470, 475 (1958); Montana-Dakota
Utilities Co. v. Northwestern Public Service Co., 341 U.S.
246, 254, 71 S.Ct. 692, 696, 95 L.Ed. 912, 920 (1951).

Applying the doctrine of primary jurisdiction only in
those situations where the issue was solely within the
agency's competence created difficulties in integrating the
administrative agency’s position with the judicial process.
First, the court would have to determine, often on the

Al}

barest of pleadings and in the most complicated litigation,
to which decision making body—the court or the agency
—Congress had allocated the resolution of the issue. Ad-
ministrative jurisdiction, however, is difficult to determine
without some factual underpinnings and often depends
upon the particular context in which the issue arises. Cf.
Federal Power Commission v. Louisiana Power and Light,
406 U.S. 621, 647, 92 S.Ct. 1827, 1841, 32 L.Ed.2d 369,
388 (1972). This difficulty in determining jurisdiction is
particularly acute where the agency, such as the Federal
Power Commission, has only a limited grant of jurisdic-
tion from Congress. Compare Federal Power Commission
v. Panhandle Eastern Pipeline Co., 337 U.S. 498, 69 S.Ct.
1251, 93 L.Ed. 1499 (1949), with United Gas Improve-
ynent Co. v. Continental Oil Co., 381 U.S. 392, 85 S.Ct.
1517, 14 L.Ed.2d 466 (1965). Secondly, such limited
invocation of the doctrine of primary jurisdiction would
emasculate the agency’s ability to participate in those
cases where a final decision was left to the courts even
though the litigation had a profound impact on the regu-
latory process. Therefore, the courts have often required
the prior resort to an administrative agency before allow-
ing the litigation to proceed.”*

Recently, the Supreme Court has required reference to
the relevant regulatory agency without even deciding
whether that agency has jurisdiction to finally determine
the basic dispute in the case. In Ricci v. Chicago Mercan-
tile Exchange, 409 U.S. 289, 93 S.Ct. 573, 34 L.Ed.2d
525 (1973), the Court dealt with an antitrust complaint
attacking a commodity exchange’s decision to transfer a
membership of the exchange. The defendant had sought

12. Robinson, Antitrust Developments: 1973, 74 Colum. L. Rev.
163, 174-179 (1974).

Al2

reference to the Commodity Exchange Commission, but
there was considerable dispute over whether the Com-
mission had jurisdiction to resolve the contested issues.
The Supreme Court stated at page 304, 93 S.Ct. at page
582, 34 L.Ed.2d at page 537:

We need not finally decide the jurisdictional issue
for present purposes, but there is sufficient statutory
support for administrative authority in this area that
the agency should at least be requested to institute
proceedings.

The Court then went on to state that it was “very likely
that a prior agency adjudication of this dispute will be a
material aid in ultimately deciding” the issue. Jd. at 305,
93 S.Ct. at 582, 34 L.Ed.2d at 537.

Even before Ricci, this court had mandated referral to
the Federal Communication Commission even though
that agency decision might not have been “the end to the
matter.” Carter v. American Tel. & Tel. Co., 365 F.2d
486, 499 (Sth Cir. 1966). In Carter, we required that the
doctrine of primary jurisdiction be invoked where there
was only a “strong possibility” that the FCC decision
would resolve the dispute. Jd at 497. See also, Southern
Railway Co. v. Combs, 484 F.2d 145 (6th Cir. 1973).
Also, this court had referred to the very agency involved
in this litigation, the Federal Power Commission, the issue
of whether a particular dispute was encompassed by that
agency’s jurisdictional grant. J. M. Huber Corp. v. Den-
man, 367 F.2d 104 (Sth Cir.. 1966); see also, Agri-
cultural Trans. Assoc. of Texas v. King, 349 F.2d 873
(Sth Cir. 1965); Louisville and Nashville Railroad v.
Knox Home, 343 F.2d 887 (Sth Cir. 1965). See also,

A13

Monsanto Co. v. Federal Power Commission, 146 U.S.
App.D.C. 396, 463 F.2d 799 (1972).

[2] A court’s discretion to seek the administrative
agency’s input in those cases where the agency will be a
“material aid” to the ultimate decision is not unlimited. In
this period of expanding federal regulation, there are few
disputes in which reference to some federal or state
agency might not conceivably be of material aid to the
court."* As the Supreme Court stated in United States vy.
Western Pacific Railroad Co., 352 U.S. 49, 77 S.Ct. 161,
1 L.Ed.2d 126 (1956),

No fixed formula exists for applying the doctrine of
primary jurisdiction. In every case the question is
whether the reasons for the existence of the doctrine
are present and whether the purposes it serves will
be aided by its application in the particular litiga-
tion.

See also, Watts v. Missouri-Kansas-Texas Railroad Co.,

383 F.2d 571, 581 (Sth Cir. 1967); CAB v. Modern Air

Transp. Inc., 179 F.2d 622, 625 (2d Cir. 1950).

[3-10] The courts should be reluctant to invoke the
doctrine of primary jurisdiction, which often, but not al-
ways, results in added expense and delay to the litigants
where the nature of the action deems the application of
the doctrine inappropriate. While one cannot easily recon-
cile all the cases wherein referral was denied, there was a
few general situations in which referral is often unwar-
ranted. If, under no conceivable set of facts, the agency
could immunize what would be a clear violation of fed-

13. King, The “Arguably Lawful” Test of Primary Jurisdiction
in Antitrust Litigation Involving Regulated Industries, 40 Tenn. L.
Rev. 617, 657 (1974).

Al4

eral law, referral would be inappropriate. Federal
Maritime Board v. Isbrandtsen Co., 356 U.S. 481, 78 S.
Ct. 851, 2 L.Ed.2d 926 (1958). In implementing the na-
tional policy of free competition as embodied in the anti-
trust laws, the court normally should not defer where the
issue is not dissimilar from that encountered in nonregu-
lated industries. See United States v. Philadelphia National
Bank, 374 U.S. 321, 339, 83 S.Ct. 1715, 1728, 10 L.Ed.
2d 915, 930 (1963); California v. Federal Power Com-
mission, 369 U.S. 482, 82 S.Ct. 901, 8 L.Ed.2d 54
(1962). Deference is particularly inappropriate where the
litigation deals with a single event which requires no con-
tinuing supervision by the regulatory agency. Cf. Federal
Maritime Commission v. Seatrain Lines, Inc., 411 U.S.
726, 93 S.Ct. 1773, 36 L.Ed.2d 620 (1973). The nature
of relief sought, moreover, is also relevant consideration
in deciding whether to refer to the agency. The court in
instituting injunctive relief may be able to provide ade-
quate flexibility to coordinate its decision with subsequent
regulatory action. Otter Tail Power Co. v. United States,
410 U.S. 366, 93 S.Ct. 1022, 35 L.Ed.2d 359 (1973). In
addition, in those cases where Congress has determined
by statute that the courts should decide the issue in the
first instance, primary jurisdiction should not be invoked.
Mercury Motor Express v. Brinke, 475 F.2d 1086 (Sth
Cir. 1973). Likewise, when the agency’s position is suf-
ficiently clear or nontechnical or when the issue is peri-
pheral to the main litigation, courts should be very reluc-
tant to refer. Great Northern Railway Co. v. Merchants
Elevator Co., 259 U.S. 285, 42 S.Ct. 477, 66 L.Ed. 941
(1922); Shew v. Southland Co., 370 F.2d 376 (Sth Cir.
1966); Strickland Transportation Co. v. United States,
334 F.2d 172 (Sth Cir. 1964). Finally, the court must

Al5

always balance the benefits of seeking the agency’s aid
with the uced to resolve disputes fairly yet as expedi-
tiously as possible. Cf. Local 189, Amalgamated Meat
Cutters v. Jewel Tea Co., 381 U.S. 676, 686, 85 S.Ct.
1596, 1600, 14 L.Ed.2d 640, 647 (1965); Foremost In-
ternational Tours v. Quantas Airways Ltd., 525 F.2d 281
(9th Cir. 1975), petition for cert. filed, 44 L.W. 3533
(March 23, 1976).

Ill. THE PRESENT LITIGATION:

{11, 12] In this litigation, referral is particularly ap-
propriate. While the Federal Power Commission’s juris-
diction is somewhat limited, the Natural Gas Act, as in-
terpreted by the Courts, has provided the Commission
with the statutory basis for pervasive regulation of the
curtailment question. See Louisiana Power and Light v.
Federal Power Commission, supra; see also Fort Pierce
Utility Authority v. Federal Power Commission, 526 F.
2d 993 (Sth Cir. 1976); Consolidated Edison Co. v. Fed-
eral Power Commission, 168 U.S.App.D.C. 92, 512 F.2d
1332, modified, 171 U.S.App.D.C. 55, 518 F.2d 448
(1975). The Commission is presently involved in resolv-
ing issues which have a direct impact on civil litigation in-
volving curtailment plans. The advisability of invoking
primary jurisdiction is greatest when the issue is already
before the agency. Louisiana Power and Light v. Federal
Power Commission, supra, at 910; Industrial Communica-
tions System Inc. v. Pacific Tel. & Tel. Co., 505 F.2d
152, 157 (9th Cir. 1974); MCI Communications Corp.
v. American Tel. & Tel. Co., 496 F.2d 214, 223-24 (3rd
Cir. 1974). The Commission, moreover, is reviewing in
some detail the facts and circumstances that resulted in
the present shortage in order to determine what is a fair,

Al6

equitable, permanent curtailment plan. Indeed, this court
has already stated in a similar action that referral to the
FPC is preferred. Atlanta Gas and Light Co. v. Federal
Power Commission, 476 F.2d 142, 151 (Sth Cir. 1973).

[13, 14] There also can be no doubt that the Com-
mission’s informed opinion will be of material aid to the
district court in the resolution of the damage action. In
five specific components of the dispute the Commission’s
assistance would be significant. First, the Commission
can determine in detail the facts and circumstances that
resulted in the severe shortage United is experiencing.
Development of the factual context by those expert in the
area, is an established basis for primary jurisdiction. Far
East Conference v. United States, 342 U.S. 570, 72 S.Ct.
492, 96 L.Ed. 576 (1952). Second, the Commission
could determine whether to accept an exculpatory tariff
from United such as proposed § 12.3. In reaching this de-
cision, the Commission could also determine whether a
tariff provision can immunize United from liability and
particularly whether such a tariff would provide United
with a defense in this suit by MP&L. Certainly, the in-
terpretation and implementation of a tariff is a question
properly passed upon in the first instance by the Commis-
sion, and reference by a court to a regulatory agency may
not even be discretionary on such an issue. /nterstate
Commerce Commission v. Atlantic C.L.R. Co., 323 U.S.
576, 600-601, 86 S.Ct. 1000, 1014-1015, 16 L.Ed.2d
109, 126 (1966); United States v. Western P. R. Co.,
352 U.S. 59, 77 S.Ct. 161, 1 L.Ed.2d 126 (1956);
Watts v. Missouri-Kansas-Texas Railroad Co., supra.
Third, the Commission’s interpretation of the United-
MP&L contract provisions that might possibly limit dam-
ages would aid a court in the ultimate decision. See, J. M.

Al7

Huber Co. v. Denman, supra. Fourth, the Commission
is presently reviewing a request by MP&L for compensa-
tion from the customers of United who receive higher
priorities. In that proceeding, MP&L seeks payment for
some of the very damages which it claims in this damage
action. Finally, the Commission could clearly articulate
whether in its view the presence or absence of damages
significantly affects the allocation decision. While the
Commission has at times stated that it believes such an
impact is evident, see, State of Louisiana v. Federal
Power Commission, supra, referral of this damage action
would give the Commission an opportunity to articulate
its rationale and support it with relevant findings of fact.
In short, there are several aspects of the damage action
that the Commission decisions may either resolve for or,
at a minimum, be of material assistance to the trial court.
See, Ricci v. Chicago Mercantile Exchange, supra; Carter
v. American Tel. & Tel. Co., supra.

None of the factors mitigating the applicability of the
primary jurisdiction doctrine are present. First, the cur-
tailment question is extremely complicated, affecting
energy policy throughout the entire nation. For a court
to attempt to determine whether it or the FPC has final
authority over all aspects of the damage action on the
record, before the district court would be singularly un-
wise. Second, here there are circumstances such as the
addition of § 12.3 to United’s tariff that might immunize
United from liability. Third, no federal policy or statute
entrusts the decision to courts in the first instance. Cer-
tainly, these curtailment damage actions are vastly dis-
similar to the bulk of federal diversity contract litigation.
Finally, the FPC has stated that damage actions could dis-
rupt its resolution of the curtailment problem—a problem

A18

which all parties agree is likely to be a continual difficulty
for quite some time. In balance, we believe that the Com-
mission’s assistance will be of “sufficient aid to the court
that the action should not go forward without making
reasonable efforts” to obtain the FPC’s assistance. Chicago
Mercantile Exchange v. Deaktor, 414 U.S. 113, 115, 94
S.Ct. 466, 467, 38 L.Ed.2d 344, 347 (1973).

MP&L’s reliance on our opinions in /nternational
Paper, supra, and State of Louisiana, supra, for the propo-
sition that no issue in this case is subject to the primary
jurisdiction of the FPC is misplaced. There the court
dealt with the Commission’s refusal to institute United’s
proposed exculpatory tariff. The Commission, acting upon
an inadequate evidentiary basis, had concluded that such
a tariff was unnecessary because United was immune from
damages. We vacated such statements by the Commission
because they lacked evidentiary support. We also stated
that the contractural liability of United, absent an excul-
patory tariff, should be finally determined in a court of
law. Nothing we said in either case, however, implied
that although a court will make the final determination,
that court could not and should not seek the Commission’s
assistance pursuant to the doctrine of primary jurisdiction
before resolving the litigation.

[15] While we agree that the district court properly
stayed proceedings pending the decision of the Federal
Power Commission, we believe the district court should
have been more precise in its order. The district court
simply stayed all proceedings pending future action by
the Federal Power Commission. In its present posture,
the United proceedings before the Commission could ter-
minate with several of the issues that might be relevant
to the damage action still unresolved. For example, the

Al19

Commission might determine that an exculpatory pro-
vision such as proposed § 12.3 could not immunize
United from liability and terminate all proceedings con-
cerning the damage question. In such a situation, it would
be even more important for the Commission to state
its interpretation of United’s contract provisions. In addi-
tion, the Commission is presently resolving the issues
concerning the facts underlying United’s shortage in pro-
ceedings intended to develop a permanent curtailment
plan. We believe it would be beneficial for the Commission
to address the issue of contract liability in a proceeding
where the damage action was clearly before it. Reference
by the district court of an order to the Commission which
specifically outlines those issues in which the courts seeks
assistance would provide the Commission with a context
to focus on the damage action. Part of the difficulty that
has resulted in the United litigation has been the tendency
of the Commission, in almost an aside, to resolve the
question of United contract liability while its focus has
been primarily on developing a curtailment plan. On
remand, the district court should prepare an order which
outlines with some specificity both the proceedings before
the Commission that should be concluded before the dam-
age litigation should continue and the issues upon which
the Commission’s opinion is sought.** See, International
Ass'n, Etc. v. United Contractors, Etc., 483 F.2d 384,
400-401, 404, modified 494 F.2d 1353 (3rd Cir. 1974).

[16] In its final contention, MP&L argues that the
district court erred in not allowing discovery to continue

14. By requiring the district court to prepare an order in which
certain issues are referred to the FPC, we do not intend to unduly
restrict that agency’s ability to assist the district court. The agency
is free to make all findings that it believes will aid the prompt
resolution of the dispute.

A20

and proceeding to trial on those issues which were not
referred to the Commission. While the district court
has an affirmative obligation to resolve those issues in
the litigation which, if they are sufficiently distinct, are
not referred to the Commission, Louisville and Nashville
Railroad Co. v. Knox Homes Corp., supra at 895 (Sth
Cir. 1965), in a suit such as this one where referral
encompasses the major part of the litigation the district
court has discretion to stay all proceedings.’® Chronicle
Publishing Co. v. NBC, 294 F.2d 744, 749 (9th Cir.
1961).

Finally, we add a note of caution. We have been care-
ful not to articulate the exact effect of the findings of
the Commission upon the subsequent litigation. The dis-
trict court stated in its order that the Commission’s de-
cision would not be binding upon the court. We believe
that it is singularly inappropriate to determine at this point
in this complex litigation what the effect of the Commis-
sion’s decisions will be before the nature and extent of
the Commission’s action is ascertainable. While, as we
have stated before, the court will finally determine United's
liability in the damage action, we express no opinion as
to the degree to which the trial court in reaching its
decision will be bound by prior agency determination.
Once the Commission decides the issues referred to it by
the district court, there will be adequate time to determine
the proper procedures for reviewing such findings and their

15. According to United’s brief, discovery is proceeding in various
other similar actions brought against United in federal and state
courts. Nothing we say here is meant to deny the district court the
power to allow discovery if after preparing a new order the court
believes that allowing discovery will aid in the resolution of the
dispute.

A21

effect on the subsequent litigation. Cf. Carter v. American
Tel. & Tel. Co., supra at 499-500.

In conclusion, we believe the district court acted prop-
erly in staying the procedures and in referring the case to
the Federal Power Commission so that that agency might
exercise primary jurisdiction. We also believe that the
district court should have been more precise in its order
staying the litigation. We therefore remand to the district
court for the limited purpose of modifying its order.

Remanded with directions.

A22
APPENDIX B

IN THE
UNITED STATES COURT OF APPEALS
FOR THE FIFTH CIRCUIT

No. 75-8134

(Filed May 28, 1975)

MISSISSIPPI POWER & LIGHT COMPANY, and
STATE OF MISSISSIPPI, Petitioners,

versus

UNITED GAS PIPE LINE COMPANY and
PENNZOIL COMPANY, Respondents.

On Application for Leave to Appeal from an
Interlocutory Order

Before THORNBERRY, MORGAN and RONEY Cir-
cuit Judges.

BY THE COURT:

IT IS ORDERED that leave to appeal from the inter-
locutory order of the United States District Court for
the Southern District of Mississippi entered on April 4,
1975, is

GRANTED.

A23
APPENDIX C

UNITED STATES COURT OF APPEALS
For The Fifth Circuit

October Term, 1975

No. 75-2316
D. C. Docket No. CA-J74-185(C)

MISSISSIPPI POWER & LIGHT COMPANY,
Plaintiff-Appellant,

versus

UNITED GAS PIPE LINE COMPANY, ET AL.,
Defendants-Appellees,

STATE OF MISSISSIPPI,
Plaintiff-Intervenor.

Appeal from the United States District Court for the
Southern District of Mississippi

Before THORNBERRY, COLEMAN and MORGAN,
Circuit Judges.

JUDGMENT

This cause came on to be heard on the transcript of the
record from the United States District Court for the
Southern District of Mississippi, and was argued by
counsel;

A24

ON CONSIDERATION WHEREOF, It is now here
ordered and adjudged by this Court that the order of the
District Court appealed from, in this cause be, and the
same is hereby, remanded to the said District Court with
directions in accordance with the opinion of this Court;

It is further ordered that plaintiff-appellant pay to
defendants-appellees, the costs on appeal to be taxed by
the Clerk of this Court.

May 27, 1976
Issued as Mandate:

A25
APPENDIX D

‘UNITED STATES COURT OF APPEALS
Fifth Circuit
Office of the Clerk

Edward W. Wadsworth Tel. 504-589-6514
Clerk 600 Camp Street
New Orleans, La. 70130

September 27, 1976
(Received October 1, 1976)
TO ALL COUNSEL OF RECORD

No. 75-2316—NMississippi Power & Light Co. vs.
United Gas Pipe Line Co., et al.; State
of Mississippi

Dear Counsel:

This is to advise that an order has this day been entered
denying the petition( ) for rehearing, and no member of
the panel nor Judge in regular active service on the Court
having requested that the Court be polled on rehearing
en banc (Rule 35, Federal Rules of Appellate Procedure;
Local Fifth Circuit Rule 12) the petition( ) for rehearing
en banc has also been denied.

See Rule 41, Federal Rules of Appellate Procedure for
issuance and stay of the mandate.

Very truly yours,
EDWARD W. WADSWORTH, Clerk

By /s/ CLARE S. SACHS
Deputy Clerk

A26

cc: Messrs. Sherwood W. Wise

Joseph P. Wise

Mr. Clayton L. Orn

Messrs. W. DeVier Pierson
Peter J. Levin

Mr. E. L. Brunini

Mr. Alvin M. Owsley, Jr.

Mr. Joe H. Daniel

Messrs. Giles W. Bryant
Marshall G. Bennett

A27
APPENDIX E

UNITED STATES DISTRICT COURT
SOUTHERN DISTRICT OF MISSISSIPPI
JACKSON DIVISION

CIVIL ACTION NO. J74-185(C)

(Filed April 4, 1975)

(Received April 8, 1975)

MISSISSIPPI POWER & LIGHT COMPANY, Plaintiff
and )
STATE OF MISSISSIPPI, Plaintiff-Intervenor

vs.

UNITED GAS PIPE LINE COMPANY and
PENNZOIL COMPANY, Defendants

ORDER

This cause having come on for hearing on the separate
motions of the defendants to dismiss this civil action, or,
in the alternative, to stay this civil action until further
order of the Court, and the Court with the consent of all
parties having retained jurisdiction of said motions for
tiie purpose of ruling thereon, and the Court having
received oral and documentary evidence, having received
the briefs of the parties, having heard the argument of

A28

counsel, and being fully advised in the premises, is of the
opinion that the motions to dismiss should be denied and
that the motions to stay should be granted for the reasons
set forth in the Court’s April 2, 1975, opinion.

It is, therefore, ordered and adjudged that the separate
motions of the defendants to dismiss this civil action
should be and the same are hereby denied.

It is further ordered and adjudged that the separate
motions of the defendants to stay these proceedings should
be and the same are hereby granted, and it is further
ordered and adjudged that all other and further processes
of this Court will be and they are hereby stayed until
further order of the Court.

IT IS SO ORDERED AND ADJUDGED, this the 4th
day of April, 1975.

/s/ HAROLD COX
United States District Judge

A29
APPENDIX F

UNITED STATES DISTRICT COURT
SOUTHERN DISTRICT OF MISSISSIPPI
JACKSON DIVISION

CIVIL ACTION J74-185(C)

(Received April 3, 1975)

MISSISSIPPI POWER & LIGHT COMPANY, Plaintiff
v.

UNITED GAS PIPE LINE COMPANY and
PENNZOIL COMPANY, Defendants

The plaintiff instituted this diversity suit to recover
damages for the alleged breach of a contract to supply
it with natural gas. This is basically an action to recover
actual damages for the alleged breach of a contract to
sell and deliver to the plaintiff natural gas for its use and
consumption.

The defendants have answered and both contend in
effect that they have no liability for the present allotments
of natural gas which are supplied under curtailment orders
of the Federal Power Commission, and in strict compliance
with its mandate. The plaintiff contends that this action

‘is one at common law for damages and was and is oc-

casioned and necessitated by misfeasance of the defend-
ants in that the defendants knowingly and deliberately

A30

oversold its supply of natural gas well knowing and
understanding the ultimate effect to be that it lacked
sufficient natural gas to comply with their contract re-
quirements and obligations.

The defendants first seck a dismissal of this suit for
lack of jurisdiction, or alternatively, for a stay of this
proceeding to await a decision by the Federal Power
Commission as to its primary jurisdiction or not of this
controversy. A detailed discussion of the myriad orders
and opinions of the Commission in its exercise of primary
jurisdiction is not necessary or helpful to a disposition of
the motions here.

It is the opinion of this Court that under the Natural
Gas Act that the Federal Power Commission probably
has jurisdiction of this curtailment controversy, and that
the Court at this time should defer to its decision as to
the authority of the Commission in this controversy, which
is in the process of being handled by that agency; and
while the agency’s decision is not final and binding on the
Court, it must be sought at this time.’

The motion of the defendants to dismiss will be denied.
The motion to stay proceedings here to await response
of the Federal Power Commission as to its primary juris-

1. Federal Power Commission v. Louisiana Power & Light Com-
pany, et al, 406 U.S. 621, 92 S.Ct. 1827, 1842, the Court among
other things held: “In that circumstance, the District Court and the
Court of Appeals were obliged to defer to the FPC for the initial
determination of its jurisdiction. See Myers v. Bethlehem Shipbuilding
Corp., 303 U.S. 41, 58 S.Ct. 459, 82 L.Ed. 638 (1938). The need to
protect the primary authority of an agency to determine its own
jurisdiction ‘is obviously greatest when the precise issue brought
before a court is in the process of litigation through procedures
originating in the [agency]. While the [agency’s] decision is not the
last word, it must assuredly be the first.’ ”

A3i
diction of this curtailment question will be granted. In

the meantime, all other and further processes of this #.

Court will be stayed to await the ultimate answer of the
Commission as to this paramount and controlling question
of law.

The defendants may present an appropriate order to
the Court consistent with such views within five days
after this date.

April 2, 1975

/s/ HAROLD COX
United States District Judge

A32
APPENDIX G

UNITED STATES DISTRICT COURT
SOUTHERN DISTRICT OF MISSISSIPPI
JACKSON DIVISION

CIVIL ACTION NO. J74-185(C)

JURY TRIAL REQUESTED

(Filed August 30, 1974)

MISSISSIPPI POWER & LIGHT COMPANY, Plaintiff
v.

UNITED GAS PIPE LINE COMANY and
PENNZOIL COMPANY, Defendants

COMPLAINT

1. The Plaintiff, Mississippi Power & Light Company
(MP&L), is a corporation incorporated under the laws
of the State of Mississippi having its principal place of
business in the State of Mississippi; Defendant, United
Gas Pipe Line Company (United), is a corporation in-
corporated under the laws of the State of Delaware having
its principal place of business in a state other than the
State of Mississippi; and Defendant, Pennzoil Company
(Pennzoil), is a corporation incorporated under the laws
of the State of Delaware having its principal place of

A33

business in a state other than the State of Mississippi.
The matter in controversy exceeds, exclusive of interest
and costs, the sum of $10,000.00.

2. MP&L is engaged in generating, transmitting and
distributing electricity, principally in the western half of
the State of Mississippi where it serves approximately
273,000 retail customers and 62 wholesale customers.
The Defendant United is engaged in transporting and
selling natural gas. MP&L has purchased natural gas for
use as a boiler fuel at its Rex Brown Steam Electric
Station in Jackson, Mississippi, and its Baxter Wilson
Steam E'ectric Station in Vicksburg, Mississippi, from
United as hereinafter appears. The Defendant Pennzoil
was, at all relevant times, the parent corporation of
United and was in control of United and directed its ac-
tivities in United’s dealings with MP&L.

3. On or about December 8, 1967, United and MP&L
entered into a contract denominated a “Gas Sales Agree-
ment” a copy of which is attached hereto as Exhibit “A”
and made a part hereof. The Gas Sales Agreement was
subsequently amended by United and MP&L as follows:

(a) by a Letter Agreement dated December 8,
1967, a copy of which is attached hereto as Exhibit
“B”;

(b) by an Amendatory Agreement dated January
15, 1969, a copy of which is attached hereto as
Exhibit “C”;

(c) by an Amendatory Agreement dated April
29, 1969, a copy of which is attached hereto as
Exhibit “D”;

A34

(d) by a Letter Agreement dated June 19, 1969,
a copy of which is attached hereto as Exhibit “E”;

(e) by an Amendatory Agreement dated March
12, 1970, a copy of which is attached hereto as
Exhibit “F”; and

(f) by a Letter Agreement dated March 12, 1970,
a copy of which is attached hereto as Exhibit “G”.

The Gas Sales Agreement, as amended, imposes upon
United the firm obligation to deliver up to 190,000 Mcf
of gas to MP&L each day for use as boiler fuel at its
Rex Brown and Baxter Wilson Steam Electric Stations
referred to above. MP&L may receive the entire maximum
daily delivery obligation of 190,000 Mcf at its Baxter
Wilson Steam Electric Station, or it may elect to take up
to 80,000 Mcf per day at its Rex Brown Steam Electric
Station, so long as the aggregate at both stations does
not exceed the maximum daily obligation of 190,000 Mcf.

COUNT ONE

4. In negotiating the Gas Sales Agreement of Decem-
ber 8, 1967, and the amendments thereto, United repre-
sented to MP&L that it had the ability to perform its obli-
gations pursuant to such Agreement. As a consequence,
MP&L, in reliance upon the Gas Sales Agreement and
United’s representations, expended substantial sums in
constructing and maintaining power plant facilities de-
signed to burn natural gas as a primary boiler fuel. United
has breached the Gas Sales Agreement of December 8,
1967, as amended, and failed to furnish MP&L with all
of the gas which it is obligated to furnish to MP&L pur-
suant to said Agreement. As a result of the breach of

Tr

_—_—eeX—
ery :
oo +

———" 1

a be
. * \ .

_, YaCKSON AREA

el eee |

A78

EXHIBIT “B”

UNITED GAS PIPE LINE COMPANY
Shreveport, Louisiana

December 8, 1967

Mississippi Power & Light Company
Electric Building
Jackson, Mississippi 39205

Gentlemen:

We have, as of even date herewith, entered into a Gas
Sales Contract with you relating to the sale and purchase
of gas for the fuel requirements for your Rex Brown
plant at Jackson, Mississippi, and the Baxter Wilson plant
near Vicksburg, Mississippi.

The hereinabove described contract provides for a
monthly “step rate” which is computed on the basis of
the monthly quantities of gas delivered at each delivery
point. The lowest rate available at any delivery point is
during months in which the volumes delivered exceed
400,000 Mcf. You have advised that you will have peri-
odic shutdowns for inspection and maintenance of your
machinery so as to properly maintain all of your equip-
ment as well as minimize the possibilities of any break-
downs, and you have inquired as to whether such events
are covered under the provisions of Article VIII (force
majeure) of our contract so as to assure you of the same
rates you would have had if such shutdowns had not oc-
curred. We are of the opinion that these events do not
come within the provisions of Article VIII of our con-
tract. However, we are willing, in computing the monthly
rate provided for in Article XIV of the contract, to give
you credit for the down time occasioned by such inspec-
tions and shutdown periods so that when the monthly rate
is computed you will pay for gas on the same basis as you
would have paid if the plant had been operating during

A79

such shutdown periods, provided that you give us proper
notice relating to such shutdowns in the same manner as
provided in said Article VIII. You will then be assured
that such shutdown periods will not in anywise increase
the price to be paid by you for gas delivered under the
contract.

If the above is satisfactory with you, please signify your
acceptance on the duplicate originals hereof in the space
provided below and return one of the duplicate originals
to us, thus constituting this letter an agreement between
us. This letter shall be considered a part of the contract
between us of even date herewith.

Yours very truly,

UNITED GAS PIPE LINE
COMPANY

By SIGNATURE ILLEGIBLE
President

Accepted and agreed to:
MISSISSIPPI POWER & LIGHT COMPANY

By /s/ R. B. WILSON
President

A80
EXHIBIT “C”

AMENDATORY AGREEMENT
Between
UNITED GAS PIPE LINE COMPANY
and
MISSISSIPPI POWER & LIGHT COMPANY
Dated January 15, 1969

THIS AGREEMENT made and entered into this 15th
day of January, 1969, by and between UNITED GAS
PIPE LINE COMPANY, a Delaware corporation, here-
inafter called “Seller”, and MISSISSIPPI POWER &
LIGHT COMPANY, a Mississippi corporation, herein-
after called “Buyer”;

WITNESSETH:

WHEREAS, Seller is selling and delivering to Buyer
and Buyer is purchasing and receiving from Seller natural
gas for all of the fuel requirements of Buyer’s Rex Brown
Power Plant located at Jackson, in Hinds County, Mis-
sissippi, and Buyer’s Baxter Wilson Power Plant located
near Vicksburg, in Warren County, Mississippi, under
the terms and conditions of that certain agreement dated
December 8, 1967, between Seller and Buyer;

WHEREAS, the above mentioned agreement of De-
cember 8, 1967, provides that in the event Seller and
Buyer have not by July 1, 1970, obtained the necessary
governmental authorizations either Seller or Buyer shall
have certain cancellation rights; and

A81

WHEREAS, Seller and Buyer desire to amend Article
XVII, Regulatory Requirement, of the above mentioned
agreement to reflect more fully the understanding be-
tween Seller and Buyer in connection with the filing and
prosecution of the necessary governmental applications;

NOW, THEREFORE, in consideration of the mutual
covenants and obligations. herein contained and assumed
by each party, the parties hereto covenant and agree as
follows:

1.

From and after the date of execution hereof, Article
XVII, Regulatory Requirement, of the above mentioned
agreement of December 8, 1967, shall be changed and
amended so that said Article shall thereafter, in its en-
tirety, read as follows:

“XVII.
“REGULATORY REQUIREMENT

“It is expressly recognized that before Seller may pro-
ceed with the construction of any necessary facilities to
enable Seller to make deliveries of the additional quanti-
ties of gas contemplated to be delivered hereunder to
Buyer’s Baxter Wilson Power Plant, Seller must apply
to the Federal Power Commission for a Certificate of
Public Convenience and Necessity, authorizing the con-
struction of said facilities and delivery of natural gas to
Buyer.

“Seller and Buyer agree to proceed with reasonable
diligence with the filing and prosecution of applications for
such governmental authorizations as may be respectively
required of them for the construction of the facilities

A82

which each is required to construct under the provisions
hereof and for the sale and purchase of gas hereunder;
provided, however, that shouid Seller not have filed with
the Federal Power Commission an application for a Cer-
tificate of Public Convenience and Necessity on or before
May 1, 1969, Buyer shall have the right, upon written
notice delivered to Seller before Seller should have filed
such an application, to cancel this contract. Each party
otherwise reserves the right to pursue its applications
in such manner as it deems to be in its best interest,
including the right to file whatever pleadings and motions
it deems desirable. Neither party shall be obligated to
accept any authorization which contains, in the opinion
of the party receiving such authorization, unreasonable
or onerous terms and conditions. In the event that Seller
and Buyer have not by January 1, 1970, obtained such
authorizations upon terms and conditions which are not
unreasonable or onerous to the party receiving such au-
thorization, then Seller or Buyer shall have the right at any
time thereafter, but prior to the parties having been issued
such authorization, to cancel this agreement by giving
the other party written notice of such cancellation. In
the event Buyer exercises its option to cancel this contract
because Seller has not timely applied to the Federal Power
Commission for a Certificate of Public Convenience and
Necessity, as provided above, or in the event either party
exercises its option to cancel this contract because either
party has not timely received acceptable regulatory au-
thorization, as provided above, then, and in any such
event, both parties and either party shall be relieved of all
liability hereunder, including liability for damages, if
any, incurred by the other party as a result of the can-
cellation.”

A83

2.

Except as herein specifically changed and amended
the above mentioned agreement of December 8, 1967,
shall remain in full force and effect as written.

IN WITNESS WHEREOF, the parties hereto have
caused this agreement to be executed by their respective
corporate officers thereunto duly authorized and their
respective corporate seals to be hereunto affixed in two
(2) counterparts, each of which shall constitute an origi-
nal, on the day and year first above written.

UNITED GAS PIPE
ATTEST: LINE COMPANY
/s/ Signature Illegible By /s/ Signature Illegible
Assistant Secretary President
MISSISSIPPI POWER &
ATTEST: LIGHT COMPANY
/s/ Signature Illegible By /s/ R. B. WILSON
Secretary Vice President

AB4

EXHIBIT “D”
AMENDATORY AGREEMENT
Between
UNITED GAS PIPE LINE COMPANY
And
MISSISSIPPI POWER & LIGHT COMPANY
Dated April 29, 1969

THIS AGREEMENT made and entered into this 29th
day of April, 1969, by and between UNITED GAS
PIPE LINE COMPANY, a Delaware corporation, here-
inafter called “Seller”, and MISSISSIPPI POWER &
LIGHT COMPANY, a Mississippi corporation, herein-
after called “Buyer”;

WITNESSETH:

WHEREBAS, Seller is selling and delivering to Buyer
and Buyer is purchasing and receiving from Seller natural
gas for all of the fuel requirements of Buyer's Rex Brown
Power Plant located at Jackson, in Hinds County, Mis-
sissippi, and Buyer's Baxter Wilson Power Plant located
near Vicksburg, in Warren County, Mississippi, under
the terms and conditions of that certain agreement dated
December 8, 1967, as amended, between Seller and
Buyer; and

WHEREAS, Seller and Buyer desire to amend Article
XIV, Rates, of the above mentioned agreement to reflect
more fully the understanding between Seller and Buyer;

NOW, THEREFORE, in consideration of the mutual
covenants and obligations herein contained and assumed
by each party, the parties hereto covenant and agree as
follows:

a A lta:

A85

From and after the date of execution hereof, Article
XIV, Rates, of the above mentioned agreement of De-
cember 8, 1967, shall be changed and amended so that
said Subsection (A) of Article XIV shall thereafter read
as follows:

“(A) For the period commencing on the date of exe-

cution of this agreement and extending to January 1,
1973, for all gas delivered by Seller to Buyer at Buyer's
Rex Brown Power Plant and for gas delivered in quantities
each day of 110,000 Mef or less at Buyer's Baxter Wilson
Power Plant, the following monthly rate for all gas shall

apply:
“MONTHLY RATE

76.25¢ per Mc! when total deliveries are between
0 and 150 Mef
35.75¢ per Mcf when total deliveries are between
151 and 300 Mef
32.75¢ per Mcf when total deliveries are between
301 and = 1,500 Mef
27.75¢ per Mcf when total deliveries are between
1,501 and 5,000 Mef
25.75¢ per Mcf when total deliveries are between
5,001 and 10,000 Mef
25.25¢ per Mcf when total deliveries are between
10,001 and 50,000 Mef
24.75¢ per Mcf when total deliveries are between
50,001 and 85,000 Mef
23.75¢ per Mcf when total deliveries are between
85,001 and 125,000 Mef
22.75¢ per Mcf when total deliveries are between
125,001 and 160,000 Mef
21.75¢ per Mcf when total deliveries are between
160,001 and 400,000 Mef
21.25¢ per Mcf when total deliveries are over
400,000 Mef

A86

provided, however, that the above prices shall be increased
or decreased, by the amount by which Seller's weighted
average purchase price of gas for the preceding billing
month in the Jackson Area, as outlined in Exhibit B
(Drawing UB21566 1-1-69) attached hereto, exceeds or
is less than 15¢ per Mef; provided, further, that the
maximum amount payable in each of the above steps shall
never be more than the minimum amount which would
be payable in the step next below, Seller's weighted aver-
age purchase price of gas in the Jackson Area, shall be
determined by: (1) adding together all the volumes of
gas which Seller purchased in the area and transferred
into the area during the preceding billing month; (2)
adding together the cost payable by Seller for the gas
it purchased in the area and the cost assignable to the
gas transferred into the area during the preceding billing
month, and (3) dividing the total of said costs payable
by the total of said volumes purchased in and transferred
into the area, The resulting quotient shall be the weighted
average purchase price of gas in the area, In computing
weighted average purchase price, costs as used in the
steps outlined above shall be:

“(a) Subject to the provisions of paragraph (b) here-
of, the cost of gas purchased by Seller shall be the amount
payable by Seller to the producer, pipeline or other seller;
except that the cost of gas purchased on the seaward
side of the shorelines of Florida, Alabama, Mississippi,
Louisiana, and Texas, under contracts executed after
January 1, 1968, shall be the amount payable to the
producer, pipeline or other seller thereof, plus the amount,
if any, payable by Seller to others for delivery of the gas
onshore; or, if Seller's facilities are used to deliver such
gas onshore, an amount obtained by (i) dividing 1/12th

A87

of 25% of the depreciated investment, at the beginning
of the preceding billing month, in Seller's facilities used
to deliver such gas onshore by the total volume of gas
delivered through such facilities during said billing month,
und (ii) multiplying the result so obtained by the volume
of gas purchased by Seller under contracts executed after
January 1, 1968, and delivered through such facilities
during said billing month.

“(b) The cost of gas purchased by Seller shall include
as a part thereof all taxes (as hereinafter defined) which
may be levied upon and paid by Seller, or which Seller
under contractual or legal obligation pays to or for the
person or company on which such taxes are levied, on
or with respect to such gas prior to the receipt thereof
by Seller in its Main Pipe Line System, but shall not
include any deductions for compression of such gas or
any payments for special services which may be provided
for in Seller's gas purchase contracts.

“(c) Cost assignable to gas transferred into the Jack-
son Area shall be the result obtained by multiplying the
weighted average price paid by Seller for gas purchased
in its South Louisiana Area, as outlined in Exhibit B
(Drawing UB21566 1-1-69) attached hereto, and in the
Gulf of Mexico for delivery onshore in the South Louisi-
ana Area, by the volume of gas transferred into the
Jackson Area.

“(d) In the computation of the weighted average pur-
chase price for the Jackson Area neither the cost nor
volumes of gas purchased by Seller for Tennessee Gas
Pipeline Company for sale in northern Mississippi shall
be included in the computation in the computation,”

2.

Except as herein specifically changed and amended,
the above mentioned agreement of December 8, 1967,

as heretofore amended, shall remain in full force and
effect as written.

iN WITNESS WHEREOF, the parties hereto have
caused this agreement to be executed by their respective
corporate officers thereunto duly authorized and their
respective corporate seals to be hereunto affixed in two
(2) counterparts, each of which shall constitute an origi-
nal, on the day and year first above written.

UNITED GAS PIPE
ATTEST: LINE COMPANY
/s/ Signature Illegible By /s/ Signature Illegible
Assistant Secretary President
MISSISSIPPI POWER &
ATTEST: LIGHT COMPANY

/8/ Signature Illegible By /s/ R. B. WILSON
Assistant Secretary President

A88-a

. 7 a Se or
oe, ARKANSAS 3 a¢t
ie x”
Os ett P od ag e P \
il : e” y —e
LABAMA

“7
¥.

” SB
,

“tie,

UNITED GAS PIPE LINE COMPANY

¢x~eT ‘so

v8 2:566

A89
EXHIBIT “E”

UNITED GAS PIPE LINE COMPANY

Post Office Box 1407
Shreveport, Louisiana 71102
318 422-8631

June 19, 1969

Mr. R. Baxter Wilson, President
Mississippi Power & Light Company
Electric Building

Jackson, Mississippi 39205

Dear Mr. Wilson:

By our letter of May 22, 1969, we advised you that
certain provisions of Subparagraph (B) of Article XIV
of our agreement with you dated December 8, 1967, as
amended, would become effective March 1, 1969.

While you have taken exception to our position in this
matter, we feel that the notification given you in our
above mentioned letter of May 22, is correct and expresses

the intent of the contract as written. However, in order
t to resolve our differences, we are willing to agree with
you that, in lieu of our said position, the next time after
date of this letter that our deliveries of gas to you at
your Baxter Wilson Power Plant exceeds 110,000 Mcf
on any day then such happening shall activate the begin-
ning of the 365 day period referred to in said Subpara-
graph (B) of Article XIV, entitled Rates, of the above
mentioned contract between us dated December 8, 1967,
as amended.

If the foregoing is agreeable to you, kindly acknowledge
your agreement by signing in the space provided below
and return a copy hereof to us for our file.

A90
Yours very truly,

UNITED GAS PIPE LINE
COMPANY

/s/ V. 8. BRENNAN
V. S. Brennan
Vice President
Accepted and Agreed to:
MISSISSIPPI POWER & LIGHT COMPANY

By /s/ R. B. WILSON
President

A91
EXHIBIT “F”

AMENDATORY AGREEMENT
Between
UNITED GAS PIPE LINE COMPANY
And ,
MISSISSIPPI POWER & LIGHT COMPANY
Dated March 12, 1970

THIS AGREEMENT made and entered into this 13th
day of March, 1970, by and between UNITED GAS
PIPE LINE COMPANY, a Delaware corporation, here-
inafter called “Seller”, and MISSISSIPPI POWER &
LIGHT COMPANY, a Mississippi corporation, herein-
after called “Buyer”;

WITNESSETH:

WHEREAS, Seller is selling and delivering to Buyer
and Buyer is purchasing and receiving from Seller natural
gas for the fuel requirements of Buyer’s Rex Brown Power
Plant located at Jackson in Hinds County, Mississippi,
and Buyer’s Baxter Wilson Power Plant located near
Vicksburg in Warren County, Mississippi, under the terms
and conditions of that certain agreement dated Decem-
ber 8, 1967, as amended, between Seller and Buyer; and

WHEREAS, Seller and Buyer desire to amend Articles
XI, XIV and XVII of the above mentioned agreement to
reflect an agreement between the parties due to circum-
stances now existing.

NOW, THEREFORE, in consideration of the mutual
covenants and obligations herein contained and assumed

A92

by each party, the parties hereto covenant and agree as
follows:

1,

From and after the date of execution hereof, the above
mentioned agreement of December 8, 1967, shall be
changed and amended so that Article XI, Scope and
Quantities, shall thereafter in its entirety read as follows:

“XI.
“SCOPE AND QUANTITIES

“Subject to the terms, conditions, and limitations hereof,
Seller agrees to sell and deliver or cause to be delivered
to Buyer and Buyer agrees to purchase and receive from
Seller and pay Seller for, natural gas for use by Buyer
as fuel in Buyer’s Rex Brown Power Plant, Hinds County,
Mississippi, and Buyer’s Baxter Wilson Power Plant, War-
ren County, Mississippi, in an aggregate daily quantity
not to exceed 190,000 Mcf for both plants, which quan-
tity shall be the Maximum Daily Delivery Obligation
hereunder.

“During the period commencing with the date of exe-
cution hereof, and extending to October 1, 1971, or such
earlier date as Buyer places into operation its said new
750,000 KW generating unit now being installed at said
Baxter Wilson Power Plant, Seller shall not be required
to deliver to Buyer and Buyer shall not be required to
purchase and receive from Seller hereunder at said Baxter
Wilson Power Plant, more than a total maximum of
110,000 Mcf of gas in any one day.

“During the period commencing on October 1, 1971,
or such earlier date as Buyer places into operation its

A93

said new 750,000 KW unit at said Baxter Wilson Plant,
Seller shall not be required to deliver to Buyer at Baxter
Wilson Plant, and Buyer shall not be required to purchase
and receive from Seller hereunder at such plant more
than a total maximum of 190,000 Mcf of gas in any one
day.

“Seller shall not be required to deliver to Buyer and
Buyer shall not be required to purchase and receive
from Seller at said Rex Brown Power Plant more than
a total maximum of 30,000 Mcf of gas in any one day.

“It is understood and agreed that Buyer may, upor
reasonable notice to Seller, and subject to the obligation
set out in subsection (1) of Article XIV, vary its taking
of gas from Seller as between said Rex Brown Power Plant
and said Baxter Wilson Power Plant provided that in no
event shall the total aggregate take for both plants exceed
the Maximum Daily Delivery Obligation of 190,000 Mcf
nor shall the total daily take at each of Buyer’s said
plants exceed the respective maximum quantities as spe-
cifically hereinabove set forth.”

2.

From and after the date of execution hereof, Article
XIV, Rates, shall be amended so as to add at the end
of said Article ar additional paragraph designated “(I)”
which shall read as follows:

“(I) It is recognized that upon the completion and
placing into operation of Buyer’s said new 750,000 KW
Unit at said Baxter Wilson Plant, Buyer will purchase a
portion of its fuel requirements from other sources. In
recognition thereof. Buyer agrees, effective on the first
day of the month following the placing into commercial

A94

operation of said new 750,000 KW unit, to take or pay
Seller for, whether taken or not, a minimum annual
quantity of gas of 34,674,000 Mef during any calendar
year, In the event less than a year is involved in calculat-
ing the minimum quantity, then such minimum quantity
for such portion of a year shall be determined by multiply-
ing the number of days in such period by 95,000 Mef.
In the event Buyer is so required to make an annual mini-
mum payment, Buyer may make up such deficiency dur-
ing the following calendar year by promptly notifying
Seller of its intention so to do; provided, however, that in
making up such deficiency, Buyer may not in any one day
take in excess of 190,000 Mef of gas, the Maximum
Daily Delivery Obligation as provided for in Article XI
hereof.”

3.

From and after the date of execution hereof the above
mentioned agreement of December 8, 1967, shall be
changed and amended so that Article XVII, Regulatory
Requirement, shall thereafter, in its entirety, read as fol-
lows:

“XVI
“REGULATORY REQUIREMENT

“It is expressly recognized that before Seller may pro-
ceed with the construction of facilities, if any, to enable
Seller to make deliveries of the additional quantities of
gas contemplated to be delivered hereunder to Buyer's
Baxter Wilson Power Plant, Seller must apply to the
Federal Power Commission for a Certificate of Public
Convenience and Necessity, authorizing the construction
of any such facilities and delivery of natural gas to Buyer.

5
;

i
Hl
Hf
if
2}
FE
ett

In the event either party exercises its option to cancel this
contract because either party has not timely received ac-

ceptable regulatory authorization, as provided above, then,
and in any such event, both parties and either party shall

Except as herein specifically changed and amended, the
above mentioned agreement of December 8, 1967, as
heretofore amended, shall remain in full force and effect

as written,

*

A96

IN WITNESS WHEREOFP, the parties hereto have
caused this agreement to be executed by their respective
corporate officers thereunto duly authorized and_ their
respective corporate seals to be hereunto affixed in two
(2) counterparts, each of which shall constitute an
original, on the day and year first above written.

UNITED PIPE LINE

ATTEST: COMPANY
/s/ Signature Illegible By /s/ Signature Illegible
Assistant Secretary Vice President
MISSISSIPPI POWER &
ATTEST: LIGHT COMPANY
/s/ Signature Ilegible By /s/ Signature Illegible
Assistant Secretary President

A9?7
EXHIBIT “G”"

UNITED GAS PIPE LINE COMPANY
Post Office Box 1407
Shreveport, Louisiana 71102
318 422-8631

March 12, 1970
Mississippi Power & Light Company

|
:
i

minimize the possibilities
any breakdowns, and you have inquired as to whether

you tor gas
the calculation of the annual minimum quantity of
gas to be taken under the contracts.
This Letter Agreement supersedes in all respects the
ow mentioned Letter Agreement of December 8,

If the above is satisfactory with you, please signify your
on the duplicate originals hereof in the space

to us, thus constituting this letter an agreement between

A99

us. This letter shall be considered a part of the contract
between us of even date herewith.

Yours very truly,

UNITED GAS PIPE LINE
COMPANY

/s/ V. 8. BRENNAN

V. S. Brennan
Vice President

MISSISSIPPI POWER !

PI POWER & LIGHT
COMPANY

By /s/ Signature Illegible

President

A100
APPENDIX H

UNITED STATES DISTRICT COURT
SOUTHERN DISTRICT OF MISSISSIPPI
JACKSON DIVISION

CIVIL ACTION NO, J74-185(C)
(Filed February 20, 1975)

MISSISSIPPI POWER & LIGHT COMPANY,
Plaintiff

v.

UNITED GAS PIPE LINE COMPANY, ET AL,
Defendants

ORDER ON MOTIONS TO INTERVENE

On timely motions duly filed and presented, the Court
being fully advised in the premises: The motion of the
City of Jackson and the motion of the Mississippi Public
Service Commission to intervene herein under Civil Rule
24 are denied. The motion of the State of Mississippi to
intervene under Civil Rule 24 and to participate in all
proceedings as a party is well taken and is granted.

ORDERED, this February 20, A. D., 1975.

/s/ HOWARD COX
United States District Judge

A101
APPENDIX I
(Filed February 20, 1975)

UNITED STATES DISTRICT COURT
SOUTHERN DISTRICT OF MISSISSIPPI
JACKSON DIVISION

CIVIL ACTION NO. J74-185(c)

MISSISSIPPI POWER & LIGHT COMPANY and
THE STATEOF MISSISSIPPI, Applicant for Intervention,
Plaintif®

Vv.

UNITED GAS PIPE LINE COMPANY and
Defendants

COMPLAINT IN INTERVENTION
1.

This is a civil action by the State of Mississippi as
Plaintiff-Intervenor in order to protect its interest as a
major customer of the original Plaintiff, Mississippi Power
& Light Company (MP&L) and, as parens patriae, to
protect the interest of the citizens of the State of Missis-
sippi. This Court has ancillary jurisdiction by virtue of
the close relationship between Plaintiff-Intervenor’s in-
terest and those of the original Plaintiff in the main
action.

2.

Plaintiff-Intervenor incorporates herein by reference the
Complaint of Mississippi Power & Light Company

_

A102

(MP&L) in the main action and adopts such Complaint
in its entirety as its own, and as if fully set forth herein.

WHEREFORE, Plaintiff-Intervenor prays for such re-
lief as requested by the original Plaintiff, Mississippi
Power & Light Company (MP&L), in Counts Three
and Four of its Complaint and for all costs of this action
and all other relief to which the Plaintiff-Intervenor is
entitled.

/s/ A. F. SUMMER
A. F. Summer, Attorney General
State of Mississippi

/s/ WILLIAM A. ALLAIN
William A. Allain
First Assistant Attorney General

/s/ MARSHALL G. BENNETT
Marshall G. Bennett
Assistant Attorney General

/s/. GILES W. BRYANT
Giles W. Bryant
Special Assistant Attorney General
Attorneys for Plaintiff-Intervenor,
State of Mississippi

et ee + eet

ee re ie hierar reer Pe) on ties es te De ear

eet A at NB tn om

A103
APPENDIX J

IN THE
UNITED STATES DISTRICT COURT
FOR THE SOUTHERN DISTRICT OF MISSISSIPPI
JACKSON DIVISION

CIVIL ACTION NO. J74-185(C)
(Filed January 9, 1975)

MISSISSIPPI POWER & LIGHT COMPANY,
Plaintiff
vs.

UNITED GAS PIPE LINE COMPANY
and PENNZOIL COMPANY,
Defendants

MOTION TO DISMISS OR,
ALTERNATIVELY, TO STAY

Comes now the defendants, United Gas Pipe Line
Company, appearing through its undersigned counsel, and
moves the Court to dismiss without prejudice the Com-
plaint filed herein against it or, alternatively, to stay all
further proceedings herein, on the ground that the Com-
plaint presents numerous issues within the competence
and primary jurisdiction of the Federal Power Commis-
sion for initial determination. Therefore, the Complaint
herein should be dismissed without prejudice or, alter-
natively, all proceedings herein should be stayed, because
primary jurisdiction over the subject matter is vested in
and should be exercised by the Federal Power Commis-
sion.

A104

WHEREFORE, defendant prays that the Complain
herein be dismissed without prejudice at plaintiff's cost
or, alternatively, the proceedings herein stayed until fur-
ther order of the Court.

DATED: January 9, 1975.
Respectfully submitted,

WILLIAM B, CASSIN

PHILLIP D. ENDOM
United Gas Pipe Line Company
1500 Southwest Tower
Houston, Texas 77002

W. DeVIER PIERSON
1054 Thirty-first Street, N.W.
Washington, D. C. 20007

E. L. BRUNINI

NEWT P. HARRISON

JOHN R. HUTCHERSON
1440 First National Bank Bidg.
Post Office Drawer 119
Jackson, Mississippi 39205
Telephone: (601) 948-3101

ATTORNEYS FOR
DEFENDANT, UNITED GAS
PIPE LINE COMPANY

By: /s/ E. L. BRUNINI
E. L. Brunini

A105

OF COUNSEL:

BRUNINI, GRANTHAM, GROWER & HEWES
i440 First National Bank Bidg.

Post Office Drawer 119

Jackson, Mississippi 39205

SHARON, PIERSON, SEMMES, CROLIUS
AND FINLEY

1054 Thirty-first Street, N.W.

Washington, D. C. 20007

NOTICE OF MOTION

TO: HONORABLE SHERWOOD W. WISE
HONORABLE THOMAS G. LILLY
HONORABLE RICHARD B. WILSON, JR.
Post Office Box 651
925 Electric Building
Jackson, Mississippi 39205

HONORABLE CLAYTON L. ORN
122 Southwest Tower
Houston, Texas 77002

Please take notice that counsel for defendant, United
Gas Pipe Line Company, will bring on for hearing the
foregoing motion before the Court at the Federal Court-
house in Jackson, Mississippi, at 9:00 A.M., Central
Time, on Friday, January 24, 1975, or as soon thereafter
as counsel may be heard.

DATED: January 9, 1975.

/s/ EDMUND L. BRUNINI
Edmund L. Brunini

A106

CERTIFICATE OF SERVICE

I hereby certify that I have mailed, by United States
Mail first class postage prepaid, to Honorable Sherwood
W. Wise, Honorable Thomas G. Lilly and Honorable
Richard B. Wilson, Jr., Post Office Box 651, Jackson,
Mississippi 39205, and to Honorable Clayton L. Orn,
122 Southwest Tower, Houston, Texas 77002, counsel
for plaintiff, a true copy of the above and foregoing
motion and notice of motion, this the 9th day of January,
1975.

/s/ EDMUND L. BRUNINI
Edmund L. Brunini

Bile evade Des. ewe

no

a ee ee

A107
APPENDIX K

IN THE
UNITED STATES DISTRICT COURT
FOR THE SOUTHERN DISTRICT OF MISSISSIPPI
JACKSON DIVISION

CIVIL ACTION NO. J74-185(C)
(Filed January 9, 1975)

MISSISSIPPI POWER AND LIGHT COMPANY,
Plaintiff
vs.

UNITED GAS PIPE LINE COMPANY
AND PENNZOIL COMPANY
Defendants

MOTION TO DISMISS, OR IN THE
ALTERNATIVE, TO STAY

Comes now Pennzoil Company, defendant herein, by
its attorneys, and moves the Court to dismiss this cause,
without prejudice, or, in the alternative, to stay all fur-
ther proceedings in this cause until further orders of the
Court, and in support of said motion, would respectfully
show the following, to-wit:

1. As shown by the plaintiff's complaint, the principal
issue in this case is a determination of the rights, duties
and obligations of plaintiff and United, under the Gas

A108

Sales Agreement, Exhibit “A” to the complaint, and
Amendments thereto, Exhibits “B-G” to the complaint,
in that United, an interstate gas pipeline regulated by
the Federal Power Commission (FPC), has complied
with FPC orders for the curtailment of deliveries of
natural gas to plaintiff.

2. United’s delivery obligations, and plaintiff's entitle-
ment to receive deliveries of natural gas, are subject to
and controlled by the Natural Gas Act, 15 U.S.C., §717,
et seq., and to the control and regulations of the FPC.

3. Primary jurisdiction for consideration of the major
issues raised by this case has, by federal law, been vested
in the FPC. Further, the FPC has the initial and primary
jurisdiction to consider in the first instance said major
issues which are relevant in this case.

4. In view of the exclusive and original jurisdiction
delegated by the Congress to the FPC to determine the
curtailment authority of FPC with respect to deliveries
of natural gas by United to its customers, including plain-
tiff, and the tariffs under which such deliveries shall be
made, this Court lacks present jurisdiction over the sub-
ject matter of this action, and the plaintiff's complaint
fails to state a claim, at this time, upon which relief may
be granted.

WHEREFORE, Pennzoil Company, moves the Court
to dismiss this cause, without prejudice, or, in the alterna-
tive, to stay all further proceedings in this cause until
further orders of the Court.

A109
Respectfully submitted,
PENNZOIL COMPANY

/s/ JOE H. DANIEL
JOE H. DANIEL
THOMAS A. BELL
P. O. Box 1084
Jackson Mississippi 39205
OF COUNSEL:

DANIEL, COKER, HORTON,
BELL AND DUKES

ALVIN W. OWSLEY

3000 One Shell Plaza

Houston, Texas 77002
BAKER & BOTTS

G. BRUCE MALLUM
Associate General Counsel
Pennzoil Company

900 Southwest Tower
Houston, Texas 77002

ATTORNEYS FOR PENNZOIL
COMPANY

A110
NOTICE OF MOTION
TO: SHERWOOD W. WISE;.ESO:
THOMAS G. LILLY, ESQ.
RICHARD B. WILSON, JR., ESQ. .

Post Office Box 651
Jackson, Mississippi 39205

CLAYTON L. ORN
122 Southwest Tower
Houston, Texas 77002

Please take notice that ‘counsel for defendant, Pennzoil
Company, will bring on for hearing the foregoing Motion
to Dismiss, or, in the Alternative, to Stay, before this
Honorable Court at the Federal Courthouse in Jackson,
Mississippi, at 9 A.M., on the 24th day of January, 1975,
or as soon thereafter as counsel may be heard.

This, the 9th day of January, 1975.

/s/ JOE H. DANIEL
Joe H. Daniel

ee eee eee ee a

Alll
CERTIFICATE OF SERVICE

I, Joe H. Daniel, attorney for defendant, Pennzoil Com-
pany, hereby certify that I have this day caused to be
delivered to Sherwood W. Wise, Esq., Thomas G. Lilly,
Esq., and Richard B. Wilson, Jr., Esq., counsel for plain-
tiff, a true and correct copy of the foregoing Motion to
Dismiss, or, in the Alternative, to Stay, and Notice of
Motion, and that I have this day mailed, by United States
mail, first class postage prepaid, a true and correct copy
of said Motion and Notice to Clayton L. Orn, Esq., 122
Southwest Tower, Houston, Texas 77002, and to E. L.
Brunini, Esq., Post Office Drawer 119, Jackson, Missis-
sippi 39205.

This, the 9th day of January, 1975.

/s/ JOE H. DANIEL
Joe H. Daniel

A112
APPENDIX L

IN THE
UNITED STATES DISTRICT COURT
FOR THE SOUTHERN DISTRICT OF MISSISSIPPI
JACKSON DIVISION

CIVIL ACTON NO. J74-185(C)
(Filed March 24, 1975)
MISSISSIPPI POWER & LIGHT COMPANY,
Plaintiff
vs.

UNITED GAS PIPE LINE COMPANY
and PENNZOIL COMPANY,
Defendants

SEPARATE ANSWER OF DEFENDANT
UNITED GAS PIPE LINE COMPANY

Comes now UNITED GAS PIPE LINE COMPANY
(hereinafter referred to as “United”), and for answer to
the Complaint filed against it by MISSISSIPPI POWER
& LIGHT COMPANY (hereinafter referred to as
“MP&L”), responds as follo