MICHAEL KUDAK, JR. CLERK

IN THE

Supreme Court of the United States

October Term, 1975
No. 75-1657
STATE OF NORTH CAROLINA,

Petitioner,
v.
FEDERAL POWER COMMISSION,
Respondent,

APPALACHIAN POWER COMPANY, INC.,
COMMONWEALTH OF VIRGINIA,
STATE OF WEST VIRGINIA,

Intervenors.

ON WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF APPEALS FOR
THE DISTRICT OF COLUMBIA CIRCUIT

PETITION FOR V. RIT OF CERTIORARI

Rufus L. Edmisten
Millard R. Rich, Jr.
Norman B,. Smith*
Thomas J. Schoenbaum
Counsel for Petitioner

*704 Southeastern Building
Greensboro, N. C. 27401

ee eee

INDEX

Table of Citations 0.000000 0. EE TNT RS

Citations to Opinions Below -

Jurisdiction —0

Questions Presented |.

Constitutional and Statutory Provisions Involved
Statement of the Case

Reasons for Granting the Writ

I. In violation of the National Environmental Policy
Act, 42 U.S.C, sec, 4332, the Federal Power Commission
failed to give adequate consideration to the scenic river

alternative in its environmental impact statement —

II. This Court must enforce the statutory prohibition
against the Federal Power Commission's licensing and
otherwise assisting in the construction of the Modified
Blue Ridge Project. —.

A. The Secretary of the Interior's approval of the
New River for inclusion in the National Wild and Scenic
Rivers System renders the license invalid. _.

B. While the New River was a state-nominated study
river, the Federal Power Commission was also prohibit-
ed from licensing the project.

C. Because of the effective prohibition of 16 U.S.C.
sec. 1278, this case has become moot, and the Court
should direct the dismissal of the licensing proceeding
before the Federal Power Commission. .

III. The license for the Modified Blue Ridge Project

should be set aside because Appalachian Power Com-
pany caused the Federal Power Commission to violate
federal statutes and regulations pertaining to historical
and archaeological properties. .

22

27

29

30

33

er ee ee ee

Page Page
IV. In holding that the Federal Power Commission's Secretary of the Interior's approval of the New River as
consideration of the impact of energy conservation a 155
measures such as peak load pricing and reduced demand Affidavit of Robert SRO Ee ee a: 156
factors was adequate, the Court of Appeals disregarded
the teaching of this Court in Udall v. FPPC, 387 U.S. 428 Affidavit of Charlton G. Holland .........-..... 159
(1967) , as well as the duties imposed under the National
Environmental Policy Act. __ 40 core, beside and wesasand by Chariton G.
Holland - Ah Ee Se
V. The Court of Appeals should have reviewed . .
whether the FPC violated the National Environmental | Archaeological Resources Appraisal by Harvard Ayers... 200
Policy Act by failing to consider the designation of the Draft Comments by Interagency Archaeological Services. 237
New River as a “federal scenic river” as an alternative ,
to the project since petitioner raised the objection in its Preliminary Cultural Resources Reconnaissance by Na-
application for rehearing before the FPC. 45 | ee
Conclusion | Bt a Ee vo 49
: . ! TABLE OF CITATIONS
Appendix | .
on ” | CASES:
ne ey - An ary bs Court of Appeals for the Dis - | Application of Madison Gas and Electric Co., 2-U-
: ' | 7423 (Pub. Serv. Comm. of Wis. 1974) 0... 48
Opinion and Order of the Federal Power Cominission 62 Calvert Cliffs’ Coordinating Committee v. Atomic
Letter from Nathaniel P. Reed, Assistant Secretary of Energy Commission, 449 F.2d 1109 (D.C, Cir. 1971)... 40
the Interior for Fish and Wildlife and Parks to John N. Central Vt. Pub. Serv. _— . (Vt. Pub. Serv. Bd.
Nassikas, Chairman of the Federal Power Commission, 1974) . ri eisiaeeensiinieniicaicindiniaciacdaeniieniones pesnvenen 43
January 7, 1975 : | 145 .
City of Davis v. Coleman, 521 F.2d 661 (9th Cir.
Letter from Rogers C. B. Morton, Secretary of the In- EE a ee sabtainastniit
terior to James E. Holshouser, Jr., Governor of North ,
Carolina, March 25, 1974 149 De Funis v. Odegaard, 416 US. 312 (1974) 200000... 35
Letter from James FE. Holshouser, Jr.. Governor of gra oe pon v. Corps of Engineers, 1
North Carolina, to Rogers C. B. Morton, Secretary of ; { ” Fe sepirintinceheeton
the Interior, December 12, 1974 152 Environmental Defense Fund v. Froehlke, 473 F.2d
Letter from Rogers C. B. Morton, Secretary of the In- siestlinsnisdhuait betel gummeeer ememememammmmmmemianidas
terior, to James E. Holshouser, Jr., Governor of North Federal Power Commission v. Colorado Interstate
Carolina, December 24, 1974 154 eM
il ii

( \sks: Prue

Hhivelscon is er Pishermen’s Vescneuaitpon a becleral

Power Commission, #OS Pld set 2d Cie, pote, ho be

Pea licitics ned Miehtoun Bleetrie Gao. Bederal Power
(Commission, O02 Fad oe DC Cie pots

Natural Reese ores ]derfertyse C corprie tl \ Nbertoon bos
Peat set DC Cir tate *

(Mes \ 0 MeDenald too tos pj sss

Parker Dotted States, BES Boad tos both Cy
re

Soome Phiiedson Presser s atten Crnitereneen 4 beleral

Power Commission, (56 Fat Gos ad Gar foes Th

serra Clubs Frochithe, 86 Fog ote Tth Cin bas
“ilvaov. barn, $82 Ftd bese det Gar bots,

Ios. bes

Cdlall vo Federal Power Cotuntnetsston. 87
Diy 2. Wb. BOL oS

United states. Alaska Steamshiyp Go. 295 ES nb
hve

Voited States. Nnehor Coal €o. sto Es) spe
wa

Tited States v0 Phanburge ANmerikonieehe Cie. te
| ee © ee CT

STATUTES

16 TSC) see. Bina t i eee
6 USO wee, FF

i Tose “ie, SOD a Mth,
i TSO wee N25/ Ln ee ee
1M ESO wee DESE et ny

ts

MW

CASES: Page
16 USC. a _... 6, 22-23, 24, 34
16 US.C. sec. 1272 _... 6, 22, 24
16 USC. 1273 6-8, 28, 35, 46, 48, 57, 59

16 USC.
16 USC.
16 USC.
16 USC.
28 USC.
42 USC.

1274. pintnedeabetenies : 8, 28, 52
1275 8-11
1276 11-12, 28, 30-52
1278 12-15, 27, 30-54
1254/1) 2
4531 2, 15-17, 26, 36, 39, 45

£34432443%

422 USC. 4552 17-20, 22, 25, 40, 46, 47
Endangered Species Act of 1978 23
N.C.GS. see. 113A-35.1 - 24, 28
P.L. 93-279 | 32
Rule 4). Rules of Appellate Procedure 29

MISCELLANEOUS:

Executive Order No. 11595, 36 F.R. 8921 (May 13,

1971) |. 36, 39
Federal Power Commission, National Power Survey
0 ine : . 41
Guidelines of the Council on Environmental Quality,
40 C.F.R. sec. 1500.8 (1973) AR 26
H.Rept. No. 1623, 90th Cong., 2d Sess. (1968) . 23, 33

Jones, “Judicial Determination of Public Utility
Rates: A Critique,” 54 B.U.L. Rev. 873 (1974) ... 48

Note, “Case Moot on Appeal: A Limit on the Judicial
Power,” 103 U.Pa. L.Rev. 772 (1955) —.. - ~ 35

Note, “Lexonomics and the Electrival Utility Indus-
try: In Search of the Optimal Rate Structure,” 61
Ta.L.Rev. 134 (1975) _... nce 42-43

MUSCELLAN EOL S

Willrieh. "The leet rie Utility ated
Part 1" Pub. Chil, Bort. de

bie Diver ( risi-
dan. pets

S 2b 120 Cone. Row Wn 7
Lats ae oso

IS CORR wee bboek,

Vi

dematicny ©

:
‘
2
:
;
:

IN THE

Supreme Court of the United States
October Term, 1975
No. 75-1657
STATE OF NORTH CAROLINA,

Petitioner,
v.
FEDERAL POWER COMMISSION,
Respondent,

APPALACHIAN POWER COMPANY, INC.,
COMMONWEALTH OF VIRGINIA,
STATE OF WEST VIRGINIA,

Intervenors.

ON WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF APPEALS FOR
THE DISTRICT OF COLUMBIA CIRCUIT

PETITION FOR WRIT OF CERTIORARI

Petitioner prays that a writ of certiorari issue to review the
judgment of the United States Court of Appeals for the
District of Columbia Circuit entered March 24, 1976.

CITATIONS TC OPINIONS BELOW

The March 24, 1976, opinion of the United States Court of
Appeals for the District of Columbia Circuit is not yet pub-
lished. It is set out in the appendix, infra, pp. 50-61. The
opinion and order of the Federal Power Commission reviewed
by the Court of Appeals is not published, and is set out in the
appendix, infra, pp. 62-144.

2

JURISDICTION

The judgment of the United States Court of Appeals for the
District of Columbia Circuit was entered on March 24, 1976.
Jurisdiction of this Court is invoked under 28 U.S.C. sec.
1254(1) and 16 U.S.C. sec. 8251(b). Jurisdiction of the
United States Court of Appeals for the District of Columbia
Circuit was founded upon 16 U.S.C. sec. 8251 (b) . Jurisdiction
of the Federal Power Commission was founded upon 16 U.S.C.
sec. 797 (e) .

QUESTIONS PRESENTED

1. Did the Federal Power Commission fail to give adequate
consideration to the scenic river alternative in its environ-
mental impact statement in violation of the National Environ-
mental Policy Act?

2. Should the licensing proceeding be dismissed for moot-
ness as a result of either the Secretary of the Interior's
approval of the New River as a scenic river, or the application
of the Governor of North Carolina making the river a scenic
study river?

3. Should the license for the project be set aside because
Appalachian Power Company caused the Federal Power Com-
mission to violate federal statutes and regulations pertaining
to historical and archaeological properties?

4. Did the Court of Appeals misapply the Nationa] Erviron-
mental Policy Act and Udall v. Federal Power Commission
in upholding the Federal Power Commission’s consideration
of the impact of energy conservation measures such as peak
load pricing and reduced demand on the need for the project?

5. Was the question of the Federal Power Commission’s
consideration of the scenic river alternative adequately raised
to require judicial review by the application for rehearing?

Coreen Oe

Wee

3

CONSTITUTIONAL AND STATUTORY - PROVISIONS
INVOLVED

16 U.S.C. sec. 469a-1

Same; threat of irreparable loss or destruction of significant
scientific prehistorical, historical, or archaeological data by
Federal construction projects; notice to Secretary of Interior;
survey; recovery, preservation, and protection of data.

(a) Whenever any Federal agency finds, or is notified, in
writing, by an appropriate historical or archeological author-
ity, that its activities in connection with any Federal con-
struction project or federally licensed project, activity, or pro-
gram may cause irreparable loss or destruction of significant
scientific, prehistorical, historical, or archeological data, such
agency shall notify the Secretary, in writing, and shall provide
the Secretary with appropriate information concerning the
project, program, or activity. Such agency may request the
Secretary to undertake the recovery, protection, and preserva-
tion of such data (including preliminary survey, or other in-
vestigation as needed, and analysis and publication of the
reports resulting from such investigation), or it may, with
funds appropriated for such project, program, or activity,
undertake such activities. Copies of reports of any investiga-
tions made pursuant to this section shall be submitted to the
Secretary, who shall make them available to the public for
inspection and review.

(b) Whenever any Federal agency provides financial] assist-
ance by loan, grant, or otherwise to any private person, asso-
ciation, or public entity, the Secretary, if he determines that
significant scientific, prehistorical, historical, or archeological
data might be irrevocably lost or destroyed, may with funds
appropriated expressly for this purpose conduct, with the con-
sent of all persons, associations, or public entities having a
legal interest in the property involved, a survey of the affected
site and undertake the recovery, protection. and preservation
of such data (including analysis and publication) . The Secre-

\ 4

tary shall, unless otherwise mutually agreed to in writing, com-
pensate any person, association, or public entity damaged as a
result of delays in construction or as a result of the temporary
loss of the use of private or any nonfederally owned lands.

16 U.S.C. sec. 8251
Rehearings; court review of orders

(a) Any person, State, municipality, or State commission
aggrieved by an order issued by the Commission in a proceed-
ing under this chapter to which such person, State, municipal-
ity, or State commission is a party may apply for a rehearing
within thirty days after the issuance of such order. The appli-
cation for rehearing shall set forth specifically the ground or
grounds upon which such application is based. Upon such
application the Commission shall have power to grant or deny
rehearing or to abrogate or modify its order without further
hearing. Unless the Commission acts upon the application for
rehearing within thirty days after it is filed, such application
may be deemed to have been denied. No proceeding to review
any order of the Commission shall be brought by any person
unless such person shall have made application to the Com-
mission for a rehearing thereon. Until the record in a proceed-
ing shall have been filed in a court of appeals, as provided in
subsection (b) of this section, the Commission may at any
time, upon reasonable notice and in such manner as it shall
deem proper, modify or set aside, in whole or in part, any find-
ing or order made or issued by it under the provisions of this
chapter.

(b) Any party to a proceeding under this chapter aggrieved
by an order issued by the Commission in such proceeding may
obtain a review of such order in the United States Court of
Appeals for any circuit wherein the licensee or public utility to
which the order relates is located or has its principal place of
business, or in the United States Court of Appeals for the Dis-
trict of Columbia, by filing in such court, within sixty days
after the order of the Commission upon the application for

Bia

ries

5 tay.

rehearing, a written petition praying that the order of the
Commission be modified or set aside in whole or in part. A
copy of such petition shall forthwith be transmitted by the
clerk of the court to any member of the Commission and
thereupon the Commission shall file with the court the record
upon which the order complained of was entered, as provided
in section 2112 of Title 28. Upon the filing of such petition
such court shall have jurisdiction, which upon the filing of the
record with it shall be exclusive, to affirm, modify, or set aside
such order in whole or in part. No objection to the order of the
Commission shall be considered by the court unless such objec-
tion shall have been urged before the Commission in the appli-
cation for rehearing unless there is reasonable ground for failure
so to do. The finding of the Commission as to the facts, if
supported by substantial evidence, shal] be conclusive. If any
party shall apply to the court for leave to adduce additional
evidence, and shall show to the satisfaction of the court that
such additional evidence is material and that there were reason-
able grounds for failure to adduce such evidence in the pro-
ceedings before the Commission, the court may order such
additional evidence to be taken before the Commission and to
be adduced upon the hearing in such manner and upon such
terms and conditions as to the court may seem proper. The
Commission may modify its findings as to the facts by reason
of the additional evidence so taken, and it shall file with the
court such modified or new findings which, if supported by
substantial evidence, shall be conclusive, and its recommenda-
tion, if any, for the modification or setting aside of the orig-
inal order. The judgment and decree of the court, affirming,
modifying, or setting aside, in whole or in part, any such order
of the Commission, shall be final, subject to review by the
Supreme Court of the United States upon certiorari or certifi-
cation as provided in sections 346 and 347 of Title 28.

(c) The filing of an application for rehearing under sub-
section (a) of this section shall not, unless specifically ordered
by the Commission, operate as a stay of the Commission’s

6

order. The commencement of proceedings under subsection
(b) by this section shall not, unless specifically ordered by
the court, operate as a stay of the Commission’s order.

Wild and Scenic Rivers Act
16 U.S.C. sec. 1271 et seq.

$ 1271. Congressional Declaration of Policy

It is hereby declared to be the policy of the United States
that certain selected rivers of the Nation which, with their
immediate environments, possess outstandingly remarkable
scenic, recreational, geologic, fish and wildlife, historic, cultural,
or other similar values, shall be preserved in free-flowing con-
dition, and that they and their immediate environments shall
be protected for the benefit and enjoyment of present and
future generations. The Congress declares that the established
national policy of dam and other construction at appropriate
sections of the rivers of the United States needs to be com.
plemented by a policy that would preserve other selected rivers
or sections thereof in their free-flowing condition to protect the
water quality of such rivers and to fulfill other vital national
conservation purposes.

§$ 1272. Congressional Declaration of Purpose

The purpose of this chapter is to implement the policy set
out in section 1271 of this title by instituting a national wild
and scenic rivers system, by designating the initial components
of that system, and by prescribing the methods by which and
standards according to which additional components may be
added to the system from time to time.

$1273. National Wild and Scenic Rivers System; Congres-
sional Authorization For Inclusion; Designation By
State Legisiatures; Permanent Administration By
States; Application For Inclusion By Governors;
Satisfaction Of Criteria; Eligibility For Inclusion.

(a) The national wild and scenic rivers system shall com-
prise rivers (i) that are authorized for inclusion therein by

3
+

7

Act of Congress, or (ii) that are designated as wild, scenic or
recreational rivers by or pursuant to an act of the legislature
of the State or States through which they flow, that are to be
permanently administered as wild, scenic or recreational rivers
by an agency or political subdivision of the State or States
concerned without expense to the United States, that are
found by the Secretary of the Interior, upon application of the
Governor of the State or the Governors of the States concern-
ed, or a person or persons thereunto duly appointed by him
or them to meet the criteria established in this chapter and
such criteria supplementary thereto as he may prescribe, and
that are approved by him for inclusion in the system, includ-
ing, upon application of the Governor of the State concerned,
the Allagash Wilderness Waterway, Maine, and that segment
of the Wolf River, Wisconsin, which flows through Langlade
County.

(b) A wild, scenic or recreational river area eligible to be
included in the system is a free-flowing stream and the related
adjacent land area that possesses one or more of the values
referred to in section 1271 of this title. Every wild, scenic or
recreational river in its free-flowing condition, or upon restora-
tion to this condition, shall be considered eligible for inclusion
in the national wild and scenic rivers system and, if included,
shall be classified, designated, and administered as one of the
following:

(1) Wild river areas—Those rivers or sections of rivers
that are free of impoundments and generally inaccessible
except by trail, with watersheds or shorelines essentially
primitive and waters unpolluted. These represent vestiges
of primitive America.

(2) Scenic river areas—Those rivers or sections of
rivers that are free of impoundments, with shorelines or
watersheds still largely primitive and shorelines largely
undeveloped, but accessible in places by roads.

(3) Recreational river areas—Those rivers or sections

8

of rivers that are readily accessible by road or railroad,
that may have some development along their shorelines,
and that may have undergone some impoundment or
diversion in the past.

$ 1274. Component Rivers and Adjacent Lands; Establish-
ment of Boundaries; Classification; Development Plans.

(a) The following rivers and the land adjacent thereto are
hereby designated as components of the national wild and
scenic rivers system:

{Remainder of subsection (a) omitted.)

(b) The agency charged with the administration of each
component of the national wild and scenic rivers system
designated by subsection (a) of this section shall, within one
year from October 2, 1968, establish detailed boundaries there-
for (which boundaries shall include an average of not more
than three hundred and twenty acres per mile on both sides
of the river); determine which of the classes outlined in sec-
tion 1273(b) of this title best fit the river or its various
segments; and prepare a plan for necessary developments in
connection with its administration in accordance with such
classification. Said boundaries, classification, and development
plans shall be published in the Federal Register and shall not
become effective until ninety days after they have been for-
warded to the President of the Senate and the Speaker of the
House of Representatives.

$ 1275. Additions to National Wild and Scenic Rivers System
—Reports by Secretaries of Interior and Agriculture;
Recommendations to Congress; Contents of Reports.

(a) The Secretary of the Interior or, where national forest
lands are involved, the Secretary of Agriculture or, in appro-
priate cases, the two Secretaries jointly shal] study and sub-
mit to the President reports on the suitabiliy or nonsuitability
for addition to the national wild and scenic rivers system of
rivers which are designated herein or hereafter by the Congress

as potential additions to such system. The President shall re-
port to the Congress his recommendations and proposals with
respect to the designation of each such river or section thereof
under this chapter. Such studies shall be completed and such
reports shall be made to the Congress with respect to all rivers
named in section 1276(a) (1) through (27) of this title no
later than October 2, 1978. In conducting these studies the
Secretary of the Interior and the Secretary of Agriculture shall
give priority to those rivers with respect to which there is the
greatest likelihood of developments which, if undertaken, would
render the rivers unsuitable for inclusion in the national wild
and scenic rivers system. Every such study and plan shall be
coordinated with any water resources planning involving the
same river which is being conducted pursuant to the Water
Resources Planning Act.

Each report, including maps and illustrations, shall show
among other things the area included within the report; the
characteristics which do or do not make the area a worthy
addition to the system; the current status of land ownership
and use in the area; the reasonably foreseeable potential uses
of the land and water which would be enhanced, foreclosed,
or curtailed if the area were included in the national wild and
scenic rivers system; the Federal agency (which in the case
of a river which is wholly or substantially within a national
forest, shall be the Department of Agriculture) by which it is
proposed the area, should it be added to the system, be ad-
ministered; the extent to which it is proposed that such ad-
ministration, including the costs thereof, be shared by State and
local agencies; and the estimated cost to the United States of
acquiring necessary lands and interests in land and of ad-
ministering the area, should it be added to the system. Each
such report shall be printed as a Senate or House document.

Study of Report By Affected Federal and State Officials;
Recommendations and Comments; Transmittal to Presi-
dent and Congress.

10

(b) Before submitting any such report to the President
and the Congress, copies of the proposed report shall, unless
it was prepared jointly by the Secretary of the Interior and
the Secretary of Agriculture, be submitted by the Secretary of
the Interior to the Secretary of Agriculture or by the Secretary
of Agriculture to the Secretary of the Interior, as the case may
be, and to the Secretary of the Army, the Chairman of the
Federal Power Commission, the head of any other affected
Federal department or agency and, unless the lands proposed
to be included in the area are already owned by the United
States or have already been authorized for acquisition by Act
of Congress, the Governor of the State or States in which they
are located or an officer designated by the Governor to receive
the same. Any recommendations or comments on the proposal
which the said officials furnish the Secretary or Secretaries who
prepared the report within ninety days of the date on which
the report is submitted to them, together with the Secretary's
or Secretaries’ comments thereon, shall be included with the
transmittal to the President and the Congress. No river or
portion of any river shall be added to the national wild and
scenic rivers system subsequent to October 2, 1968, until the
close of the next full session of the State legislature, or legis-
latures in case more than one State is involved, which begins
following the submission of any recommendation to the Presi-
dent with respect to such addition as herein provided.

Publication in Federal Register

(c) Before approving or disapproving for inclusion in the
national wild and scenic rivers system any river designated as
a wild, scenic or recreational river by or pursuant to an act
of a State legislature, the Secretary of the Interior shall sub-
mit the proposals to the Secretary of Agriculture, the Secretary
of the Anny, the Chairman of the Federal Power Commission,
and the head of any other affected Federal department or
agency and shall evaluate and give due weight to any recom-
mendations or comments which the said officials furnish him
within ninety days of the date on which it is submitted to

a

11

them. If he approves the proposed inclusion, he shall publish
notice thereof in the Federal Register.

£1276. Rivers Constituting Potential Additions to National
Wild and Scenic Rivers System—Enumeration of
Designated Rivers.

(a) The following rivers are hereby designated for potential
addition to the national wild and scenic rivers system:

[Remainder of subsection (a) omitted.]
Studies and Reports

(b) (1) The studies of rivers named in subparagraphs (28)
through (55) of subsection (a) of this section shall be com-
pleted and reports thereon submitted by not later than October
2, 1979: Provided, That with respect to the rivers named in
subparagraphs (33), (50), and (51), the Secretaries shall not
commence any studies until (i) the State legislature has acted
with respect to such rivers or (ii) one year from January 3,
1975, whichever is earlier.

(2) The study of the river named in subparagraph (56) of
subsection (a) of this section shall be completed and the re-
port thereon submitted by not later than January 3, 1976.

(3) There are authorized to be appronriated for the purpose
of conducting the studies of the rivers named ir. subparagraphs
(28) through (56) such sums as may be :siecessary, but not
more than $2,175,000.

State Participation

(c) The study of any of said rivers shall be pursued in as
close cooperation with appropriate agencies of the affected
State and its political subdivisions as possible, shall be carried
on jointly with such agencies if request for such joint study
is made by the State, and shall include a determination of the
degree to which the State or its political subdivision might
participate in the preservation and administration of the river

12

should it be proposed for inclusion in the national wild and
scenic rivers system,

Continuing Consideration By Federal Agencies to
Potential National Wild, Scenic and Recreational
River Areas.

(d) In all planning for the use and development of water and
related land resources, consideration shall be given by all
Federal agencies involved to potential national wild, scenic
and recreational river areas, and all river basin and project
plan reports submitted to the Congress shall consider and
discuss any such potentials. The Secretary of the Interior and
the Secretary of Agriculture shall make specific studies and
investigations to determine which additional wild, scenic and
recreational river areas within the United States shall be
evaluated in planning reports by all Federal agencies as po-

tential alternative uses of the water and related land resources
involved,

[Section 1277 omitted.]

$1278. Restrictions On Water Resources Projects — Con-
struction Projects Licensed By Federal Power Com-
mission,

(a) The Federal Power Commission shall not license the
construction of any dam, water conduit, reservoir, powerhouse,
transmission line, or other project works under the Federal
Power Act, as amended, on or directly affecting any river which
is designated in section 1274 of this title as a component of
the national wild and scenic rivers system or which is hereafter
designated for inclusion in that system, and no department or
agency of the United States shall assist by loan, grant, license,
or otherwise in the construction of any water resources project
that would have a direct and adverse effect on the values for
which such river was established, as determined by the Secre-
tary charged with its administration. Nothing contained in the
foregoing sentence, however, shall preclude licensing of, or

13

assistance to, developments below or above a wild, scenic or
recreational river area or on any stream tributary thereto
which will not invade the area or unreasonably diminish the
scenic, recreational, and fish and wildlife values present in the
area on October 2, 1968. No department or agency of the
United States shall recommend authorization of any water
resources project that would have a direct and adverse effect
on the values for which such river was established, as deter-
mined by the Secretary charged with its administration, or re-
quest appropriations to begin construction of any such project,
whether heretofore or hereafter authorized, without advising
the Secretary of the Interior or the Secretary of Agriculture,
as the case may be, in writing of its intention so to do at least
sixty days in advance, and without specifically reporting to
the Congress in writing at the time it makes its recommenda-
tion or request in what respect construction of such project
would be in conflict with the purposes of this chapter and
would affect the component and the values to be protected
by it under this chapter.

Construction Projects On Rivers Designated For
Potential Addition to System.

(b) The Federal Power Commission shall not license the
construction of any dam, water conduit, reservoir, power-
house, transmission line, or other project works under the
Federal Power Act, as amended, on or directly affecting any
river which is listed in section 1276(a) of this title, and no
department or agency of the United States shall assist by
loan, grant, license, or otherwise in the construction of any
water resources project that would have a direct and adverse
effect on the values for which such river might be designated,
as determined by the Secretary responsible for its study or
approval—

(i) during the ten-year period following October 2, 1968
or for a three complete fiscal year period following any
Act of Congress designating any river for potential addi-

14

tion to the national wild and scenic rivers system, which-
ever is later, unless, prior to the expiration of the relevant
period, the Secretary of the Interior and, where national
forest lands are involved, the Secretary of Agriculture, on
the basis of study, determine that such river should not
be included in the national wild and scenic rivers system
and notify the Committees on Interior and Insular Affairs
of the United States Congress, in writing, including a copy
of the study upon which the determination was made, at
least one hundred and eighty days while Congress is in
session prior to publishing notice to that effect in the
Federal Register: Provided, That if any Act designating
any river or rivers for potential addition to the national
wild and scenic rivers system provides a period for the
study or studies which exceeds such three complete fiscal
year period the period provided for in such Act shall be
substituted for the three complete fiscal year period in the
provisions of this clause (i); and

(ii) during such additional period thereafter as, in the
case of any river the report for which is submitted to the
President and the Congress, is necessary for congressional
consideration thereof or, in the case of any river recom-
mended to the Secretary of the Interior for inclusion in
the national wild and scenic rivers system under section
1273 (a) (ii) of this title, is necessary for the Secretary’s
consideration thereof, which additional period, however,
shall not exceed three years in the first case and one year
in the second.

Nothing contained in the foregoing sentence, however, shall
preclude licensing of, or assistance to, developments below or
above a potential wild, scenic or recreational river area or on
any stream tributary thereto which will not invade the area
or diminish the scenic recreational, and fish and wildlife values
present in the potential wild, scenic or recreational river area
on the date of approval of this chapter. No department or

DLN 0 i Rede Sale

|
a

15

agency of the United States shall, during the periods hereim-
before specified, recommend authorization of any water re-
sources project on any such river or request appropriations to
begin construction of any such project, whether heretofore or
hereafter authorized, without advising the Secretary of the
Interior and, where national forest lands are involved, the
Secretary of Agriculture in writing of its intention so to do
at least sixty days in advance of doing so and without specific-
ally reporting to the Congress in writing at the time it makes
its recommendation or request in what respect construction of
such project would be in conflict with the purposes of this
chapter and would affect the component and the values to be
protected by it under this chapter.

Activities in Progress Affecting River of System:
Notice to Secretary.

(c) The Federal Power Commission and all other Federal
agencies shall, promptly upon enactment of this chapter, in-
form the Secretary of the Interior and, where national forest
lands are involved, the Secretary of Agriculture, of any pro-
ceedings, studies, or other activities within their jurisdiction
which are now in progress and which affect or may affect any
of the rivers specified in section 1276(a) of this title. They
shall likewise inform him of any such proceedings, studies, or
other activities which are hereafter commenced or resumed
before they are commenced or resumed.

Grants Under Land and Water Conservation
Fund Act of 1965.

(d) Nothing in this section with respect to the making of a
loan or grant shall apply to grants made under the Land and
Water Conservation Fund Act of 1965.

[Sections 1279-1287 omitted.|
42 US.C. sec, 4331

Congressional Declaration of National Environ-
mental Policy.

16

(a) The Congress, recognizing the profound impact of man’s
activity on the interrelations of all components of the natural
environment, particularly the profound influences of population
growth, high-density urbanization, industrial expansion, re-
source exploitation, and new and expanding technological ad-
vances and recognizing further the critical importance of re-
storing and maintaining environmental quality to the overall
welfare and development of man, declares that it is the con-
tinuing policy of the Federal Government, in cooperation with
State and local governments, and other concerned public and
private organizations, to use all practicable means and meas-
ures, including financial and technical assistance, in a manner
calculated to foster and promote the general welfare, to create
and maintain conditions under which man and nature can
exist in productive harmony, and fulfill the social, economic,
and other requirements of present and future generations of
Americans.

(b) In order to carry out the policy set forth in this chapter,
it is the continuing responsibility of the Federal Government
to use all practicable means, consistent with other essential
considerations of national policy, to improve and coordinate
Federal plans, functions, programs, and resources to thesend
that the Nation may—

(1) fulfill the responsibilities of each generation as
trustee of the environment for succeeding generations;

(2) assure for all Americans safe, healthful, productive,
and esthetically and culturally pleasing surroundings;

(3) attain the widest range of beneficial uses of the
environment without degradation, risk to health or safety,
or other undesirable and unintended consequences;

(4) preserve important historic, cultural, and natural
aspects of our national heritage, and maintain, wherever
possible, an environment which supports diversity and
variety of individual choice;

i

17

(5) achieve a balance between population and resource
use which will permit high standards of living and a wide
sharing of life’s amenities; and

(6) enhance the quality of renewable resources and
approach the maximum attainable recycling of depletable
resources.

(c) The Congress recognizes that each person should enjoy
a healthful environment and that each person has a respon-
sibility to contribute to the preservation and enhancement of
the environment.

42 U S.C. sec. 4332

Cooperation of Agencies; Reports; Avatiability of
Information, Recommendations; Inte national aid
National Coordination of Efforts.

The Congress authorizes and directs that, to the fullest ex-
tent possible: (1) the policies, regulations, and public laws of
the United States shall be interpreted and administered in
accordance with the policies set forth in this chapter, and (2)
all agencies of the Federal] Government shall—

(A) utilize a systematic, interdisciplinary approach which
will insure the integrated use of the natural and social sciences
and the environmental design arts in planning and in decision-
making which may have an impact on man’s environment;

(B) identify and develop methods and procedures, in con-
sultation with the Council or Environmental Quality estab-
lished by subchapter IT of this chapter, which will insure that
presently unquantified environmental amenities and values
may be given appropriate consideration in decision-making
along with economic and technical considerations;

(C) include in every recommendation or report on proposals
for legislation and other major Federal actions significantly
affecting the quality of the human environment, a detailed
statement by the responsible official on—

18

(i) the environmental impact of the proposed action,

(ii) any adverse environmental effects which cannot be
avoided should the proposal be implemented,

(ii) alternatives to the proposed action,

(iv) the relationship between local short-term uses of
man’s environment and the maintenance and enhancement
of long-term productivity, and

(v) any irreversible and irretrievable commitments of
resources which would be involved in the proposed action
should it be implemented.

Prior to making any detailed statement, the responsible Fed-
eral official shall consult with and obtain the comments of any
Federal agency which has jurisdiction by law or special exper-
tise with respect to any environmental impact involved. Copies
of such statement and the comments and views of the appro-
priate Federal, State, and local agencies, which are authorized
to develop and enforce environmental standards, shall be made
available to the President, the Council on Environmental Qual-
ity and to the public as provided by section 552 of Title 5, and
shall accompany the proposal through the existing agency re-
view processes;

(D) Any detailed statement required under subparagraph
(C) after January 1, 1970, for any major Federal action fund-
ed under a program of grants to States shall not be deemed to
be legally insufficient solely by reason of having been prepared
by a State agency or official, if:

(i) the State agency or official has statewide jurisdic-
tion and has the responsibility for such action,

(ii) the responsible Federal official furnishes guidance
and participates in such preparation,

(ii) the responsible Federal official independently

Gt whlidinei!

19

evaluates such statement prior to its approval and adop-
tion, and

(iv) after January 1, 1976, the responsible Federal
official provides early notification to, and solicits the views
of, any other State or any Federal land management entity
of any action or any alternative thereto which may have
significant impacts upon such State or affected Federal
land management entity and, if there is any disagreement
on such impacts, prepares a written assessment of such
impacts and views for incorporation into such detailed
statement.

The procedures in this subparagraph shal! not relieve the
Federal official of his responsibilities for the scope, objectivity,
and content of the entire statement or of any other respon-
sibility under this chapter; and further, this subparagraph does
not affect the legal sufficiency of statements prepared by State
agencies with less than statewide jurisdiction.

(E) study, develop, and describe appropriate alternatives
to recommended courses of action in any proposal which in-
volves unresolved conflicts concerning alternative uses of avail-
able resources;

(F) recognize the worldwide and long-range character of
environmental problems and, where consistent with the foreign
policy of the United States, lend appropriate support to initi-
atives, resolutions, and programs designed to maximize inter-
national cooperation in anticipating and preventing a decline
in the quality of mankind’s world environment;

(G) make available to States, counties, municipalities, insti-
tutions, and individuals, advice and information useful in re-
storing, maintaining, and enhancing the quality of the environ-
ment;

(H) initiate and utilize ecological information in the plan-
ning and development of resource-oriented projects; and

20

(I) assist the Council on Environmental Quality established
by subchapter IT of this chapter.

STATEMENT OF THE CASE

The Federal Power Commission's Opinions and Orders Nos.
698 and 698-A granted a license to Appalachian Power Com-
pany to construct a pumped storage hydroelectric project on
the New River in Northwestern North Carolina and South-
western Virginia.

Appalachian Power Company was granted a two year pre-
liminary permit in March, 1963, by the Commission. In
February, 1965, Appalachian applied for a license for the “Blue
Ridge Project”, much smaller than the project ultimately
approved. At hearings conducted in 1967, considerable oppo-
sition developed to the project. In response to the objections
the Commission staff proposed and Appalachian accepted, the
present “Modified Blue Ridge Project’, consisting of a lower
reservoir of 12,390 acres and an upper reservoir of 26,000
acres. Hearings on the modified project were held in 1969. On
Octobr 1, 1969, Examiner (now Administrative Law Judge)
Levy issued his initial decision. Oral arguments were held,
further briefs were filed, and a supplemental initial decision
was issued by Judge Levy on June 21, 1971. Further excep-
tions were filed, and additional ora] arguments were held.

Following publication of a draft environmental impact state-
ment and receipt of comments thereon, the Commission's staff
filed its final environmental impact statement on June 18,
1973. The parties were granted an opportunity to cross examine
staff witnesses with respect to the final environmental impact
statement.

Judge Levy issued a third decision on January 23, 1974.
This decision was approved by the Commission for the most
part and adopted in the Opinion and Order No. 698. The
order required further modification of the project, consisting
of a slight reduction in size of the lower reservoir and limiting

21

the drawdown on the upper reservoir to no more than ten
feet.

North Carolina and other parties filed objections to Opinion
and Order No. 698. On July 15, 1974, North Carolina filed a
petition for rehearing. The petition was denied by Opinion No.
698-A, dated August 12, 1974. North Carolina filed a timely
notice of appeal to the United States Court of Appeals for
the District of Columbia Circuit.

Opinion No. 698 made the license effective January 2, 1975.
On December 13, 1974, North Carolina petitioned the Com-
mission for a stay of the effective date of the license pending
the appeal. The petition was denied by the Commission on
December 31, 1974. On January 27, 1975, North Carolina
petitioned the Commission for a rehearing of this order, which
was denied. North Carolina appealed from this order, as well,
but the appeal was dismissed as moot by the Court of

Appeals.

Appalachian Power Company, the Commonwealth of Vir-
ginia, and the State of West Virginia were allowed to inter-
vene by the Court of Appeals.

On December 23, 1974, North Carolina petitioned the
Court of Appeals for a stay of the Commission’s licensing
order pending review. This petition was granted on January
31, 1975.

By application for leave to adduce additional evidence
dated September 11, 1975, North Carolina brought to the
attention of the Court of Appeals material evidence relating
to significant archaeological items in the proposed area of the
impoundment, which was allegedly suppressed by Appalachian
Power Company.

The Court of Appeals’ Opinion and Judgment affirming the
grant of the license was entered on March 24, 1976.

Petitioner North Carolina and certain of its citizens (who

22

are not parties to this proceeding) commenced a civil action
in the United States District Court for the Middle District
of North Carolina on December 18, 1974, seeking injunctive
and declaratory relief against the Federal Power Commission
and Appalachian Power Company, to enforce the Wild and
Scenic Rivers Act, 16 U.S.C. sec. 1271 et seq. The district
court dismissed this action on May 7, 1975, on the theory that
the court was without jurisdiction, and that exclusive juris-
diction was possessed by the court of appeals reviewing the
Federal Power Commission license. This judgment was appeal-
ed to the United States Court of Appeals for the Fourth Cir-
cuit, but proceedings in that appeal have been stayed, pend-
ing final judgment in the instant case.

REASONS FOR GRANTING THE WRIT;

I. IN VIOLATION OF THE NATIONAL ENVIRON-
MENTAL POLICY ACT, 42 U.S.C. sec. 4332, THE FED-
ERAL POWER COMMISSION FAILED TO GIVE ADE-
QUATE CONSIDERATION TO THE SCENIC RIVER
ALTERNATIVE IN ITS ENVIRONMENTAL IMPACT
STATEMENT.

Some 70 miles of the 220 mile New River would be in-
undated by the Modified Blue Ridge Project. (Opinion and
Order Granting a License, June 14, 1974, p. 48.) The entire
river, particularly that part which would be flooded, possesses
characteristics making it ideally suited for ciassification as a
scenic river under the Wild and Scenic Rivers Act, 16 U.S.C.
sec. 1271, et seq. Scenic rivers are those “that are free of
impoundments with shorelines and watersheds still largely
primitive and shorelines largely undeveloped, but accessible
in places by roads,” which, “with their immediate environ-
ments, possess outstandingly remarkable scenic, recreational,
geologic, fish and wildlife, historic, cultural, or other similar
values, .. .” 16 U.S.C. sec. 1271, 1273 (b) (2).

The New River is the oldest river in the Western Hemis-
phere, and is exceeded in age only by the Nile River among

—_——_—_— LS Tg eee ge

ee ee

23

all the world’s rivers. The proposed impoundment would flood
the New, below the point where the North Fork and South
Fork meet, nestled between the Blue Ridge and the first ridge
of the Appalachians. (R. 11,104.) The river, as it meanders
through lush bottomlands and among graceful mountains, is
a setting of extraordinary natural beauty.

The New River is essentially free from pollution, and as the
Commission found, is one of the largest free-flowing, least
polluted rivers in the region. (R. 11,118, 11,121.) The Wild
and Scenic Rivers Act was passed with a view toward giving
“special attention . . . to the dwindling number of American
streams that are still in a relatively natural state.’ H. Rept.
No. 1623, 90th Cong., 2d Sess. (1968) , U. S. Cong. and Admin.
News 3801, 3802.

The United States Fish and Wildlife Service has identified
23 species of plants and animals in the New River, which are
found nowhere else in the world. Eight of these species, in-
cluding a crayfish, a snail, a plant, and five species of fish,
would be adversely affected by the impoundment, and would
likely become threatened or endangered. The Secretary of the
Interior sought unsuccessfully to delay authorization of con-
struction of the project in order to allow additional study of
these species, as required by the Endangered Species Act of
1973, and to permit consideration of scenic river designation,
which would have the effect of protecting these species. (Letter
from Nathaniel P. Reed, Assistant Secretary for Fish and
Wildlife and Parks to Federal Power Commission Chairman

John N. Nassikas, dated January 7, 1975, Appendix, infra, pp.
145-148) .

Smallmouth bass, and brown, rainbow, and brook trout
inhabit this river system. (R. 11,121, 11,452.) Development
of the project would result in extensive losses of wildlife pop-
ulation, including deer, fox, turkey, and grouse. (R. 11,122,
11,412.)

Construction of the reservoir would entail the permanent

24

loss of innumerable prehistoric artifacts and sites, as well as
several important historic buildings and sites. These losses
are discussed in Part ITI, infra.

Development of the project would have a profound effect
on local cultural values, substituting an intense tourist-oriented
recreational development for a stable, traditional society,
descended from original settlers, who live in harmony with the
land and make their livelihood from the pastures, croplands
and woodlands which border the river. (R. 11,232-6, 11,497-
527.)

The New River in its natural state provides excellent oppor-
tunities for stream fishing and white water-wilderness canoe-
ing, that would be lost if the project were constructed. (R.
11,561-2.)

The Wild and Scenic Rivers Act was passed on October 2,
1968. Pursuant to 16 U.S.C. sec. 1273 (a) (ii) the North Caro-
lina General Assembly on March 21, 1974, enacted N.C.GS.
sec. 113A-35.1, designating the New River as a scenic river,
and on March 5, 1974, North Carolina Governor James Hols-
houser made a preliminary application to the Secretary of the
Interior for classification of the New River as a scenic river.
On March 25, 1974, in a letter to Governor Holshouser, Secre-
tary of the Interior Rogers B. Morton stated that he is “reason-
ably sure that physically and aesthetically [the New River]
qualifies for inclusion in the National [Scenic River] System.
(Appendix, infra, pp. 149-151). The Federal Power Commis-
sion’s Opinion and Order Granting a License for the project
was issued on June 14, 1974, some three months later. Also
prior to the Commission’s licensing order, the United States
Senate on May 28, 1974, passed $.2439, designating a portion
of the New River where the project would be located as a
subject for study for inclusion in the National Wild and
Scenic Rivers System. (120 Cong. Rec. 9077.)

In the section of the environmental impact statement deal-
ing with alternatives, the alternative of “no action” is’ briefly

2 5

discussed, and there it is said that no action would “preserve
the river for possible selection in the future as a wild or scenic
river.” (R.11,168-9.) This is the only reference to scenic
river classification set forth in the body of the impact state-
ment. The Environmental Protection Agency in its comments
on the environmental impact statement for the project, sug-
gested that the statement should address those features of the
New River that would make it desirable for inclusion in the
Wild and Scenic Rivers System. (R.11,425-6.) The response
of the Federal Power Commission to this comment was that
a description of the New River and its relevant characteristics
is given in Section IT of the document; no changes were made

in that part of the statement dealing with alternatives. (R.
11,188-9.)

The potential environmental and economic benefits that are
unique to this alternative require that it be distinguished from
the simple “no action” alternative and that it be separately
presented. As stated in the Council on Environmental Quality’s
letter of comment to the Federal Power Commission:

Although EPA in its comments on the draft to EIS,
specifically requested the Commission to discuss features
of the New River that would make it desirable as a Wild
and Scenic River, Section VI of the Final EIS |.mits
discussion of this important alternative to two sentences.
The potential environmental and economic benefits of
this alternative should have been presented in sufficient
detail to allow comparison with, and subtraction from,
the numerous benefits claimed for the proposed action.

The National Environmental Policy Act, 42 U.S.C. sec.
4332 (2) (E) requires that agencies “study, develop, and de-
scribe appropriate alternatives to recommended courses of
action in any proposal which involves unresolved conflicts con-
cerning alternative uses of available resources; . . .” It is di-
rected in sec, 4332 (2) (C) (iii) that the environmental impact

statement contain a “detailed statement on .. . alternatives to
the proposed action.”

26

The authoritative Guidelines of the Council on Environ-
mental Quality pertaining to the explication of alternatives
require a “rigorous exploration and objective evaluation of
alternative actions that might avoid, some or all of the ad-
verse environmental effects. . . .” This analysis of each alter-
native must accompany the proposed action through the re-
view process to prevent premature foreclosure of options that
might be less detrimental to the environment. 40 C.F.R. sec.
1500.8 (a) (4) (1973). The Federal Power Commission's own
regulations require that environmental impact statements
“fully deal with alternative courses of action to the proposal
and, to the maximum extent practicable, the environmental
effects of each alternative.” 18 C.F.R. sec. 2.80 (b) .'

The environmental] impact statement in this case is mani-
festly deficient with respect to the scenic river alternative.
There is no detailed statement of the possible classificaion and
management of the New as a scenic river. It is clear that this
alternative has not been studied, developed, and described.
The offhand reference in the environmental impact statement
to the scenic river alternative certainly does not amount to
the rigorous exploration and objective evaluation required by
the Council on Environmental Quality Guidelines.’ Likewise,
the required analysis of the costs and impact on the environ-
ment of this alternative, are altogether missing. Further, the
Commission fell far short of the demands of its own regulations

1 Further, the Commission's regulations require with respect to alternatives:
“(T)he systematic procedure [used to arrive at the proposed action by
considering all the alternatives) should include the decision criteria used,
the information weighed, and an explanation of the conclusion at each
decision point. The decision criteria must show how environmental bene-
fits/costs, even if not quantifiable, are weighed against economic bene-
fits/costs and technology and procedural! constraints. All realistic alterna-
tives must be discussed even though they may not be within the juris-
diction of the Commission or the responsibilities and capabilities of the
applicants. .. . Describe the timeliness and environmental consequences
of each alternative discussed.” 18 C.F.R. sec. 2.80, App. A, par. 8.

2 Even without regard to the National Environmental Policy Act, the Com-
mission has a judicially enforceable duty to give full consideration to
alternatives under 16 U.S.C. sec. 803(a). Scenic Hudson Preservation Con-
ference v. Federal Power Commission, 354 F.2d 608 (2d Cir. 1965).

wens So eee

a ae a er OS

27

dealing with the presentation of alternatives in environmental
impact statements.

The Court of Appeals failed to discuss this issue in its
opinion, although the issue was thoroughly briefed in that
court, and treatment of the scenic river alternative in thiis case
appears to be altogether inconsistent with the great weight of
authority in the other circuits, e.g., City of Davis v. Coleman,
521 F.2d 661 (9th Cir. 1975); Silva v. Lynn, 482 F.2d 1282
(Ist Cir. 1973); Environmental Defense Fund v. Froehlke,
473 F.2d 346 (8th Cir. 1972); and with its own decision in
Natural Resources Defense Council v. Morton, 458 F.2d 827
(D.C. Cir. 1972) . As stated in Environmental Defense Fund v.
Froehlke, 473 F.2d at 350, “[T]he impact statement should
not just list the alternatives to the proposed project but
should also include results of the [agency’s] own investigation
and evaluation of alternatives so that the reasons for the choice
of a course of action are clear.” This court ought to grant
certiorari and reverse, requiring that the Federal Power Com-
mission adhere to the staiutory and regulatory requirements
for presentation of the scenic river alternative in the environ-
mental impact statement.

II. THIS COURT MUST ENFORCE THE STATUTORY
PROHIBITION AGAINST THE FEDERAL POWER COM-
MISSION’S LICENSING AND OTHERWISE ASSISTING
IN THE CONSTRUCTION OF THE MODIFIED BLUE
RIDGE PROJECT.

The Wild and Scenic Rivers Act, 16 U.S.C. sec. 1278 (a),
forbids the Federal Power Commission to license the construc-
tion of any dam or other project works, and to assist by license
or otherwise in the construction of any water resources project
that would adversely affect a designated scenic river. By sub-
section 1278(b) this prohibition is extended to rivers which
have been designated for potential addition to the wild and
scenic rivers system.

28

There are two ways by which rivers can become a part of
the wild and scenic rivers system:

1. By Act of Congress enlarging the list contained in 16
US.C. sec. 1274.

2. By designation by a state legislature, application by the
governor of the state, and finding by the Secretary of
the Interior, that the river meets the criteria established
by the Act. 16 U.S.C. sec. 1273 (a) (ii) .

It is permissible, but not required, that additions to the
system be selected from the rivers designated by Congress for

potential addition to the system in Section 1276. 1
sec. 1273 (a) (i). a

On March 21, 1974, the North Carolina General Assembly
enacted N.C.GS. 113A-35.1, designating the New River as a
scenic river. On December 12, 1974, North Carolina Governor
James Holshouser made formal application to the Secretary
of the Interior pursuant to 16 U.S.C. sec. 1273 (a) (ii) for in-
clusion of a 26.5 mile part of the river into the wild and scenic
rivers system. (Appendix, infra, pp. 152-153). On December
24, 1974, the Secretary of the Interior declared that the applica-

tion was valid and would be considered by the Department
‘Appendix, infra, p. 154) . ;

On April 13, 1976, Secretary of the Interior Thomas S.
Kleppe designated the 26.5 mile section of the river as a
scenic river and a component of the National Wild and Scenic
Rivers System, pursuant to 16 U.S.C. sec. 1273 (a) (ii). (Ap-
pendix, infra, pp. 163-164). A large part of the proposed im-
poundment of the Modified Blue Ridge Project would be on
that part of the river designated a scenic river.

The Federal Power Commission in the opinion which is here
for review extended the effective date of the license for the
Modified Blue Ridge Project to January 2, 1975, pending pos-
sible action by the Congress for potential addition of the New
River to the Wild and Scenic Rivers System. (Opinion and

aoe ee ee

29

Order Granting a License, June 14, 1974, Appendix, infra, p.
126). Denying petitioner’s motion for a stay of this order on
December 31, 1974, the Commission stated the license would
become effective on January 2, 1975, “unless otherwise delayed
by judicial review.”

On December 23, 1974, before the license became effective,
petitioner State of North Carolina, filed a motion in the Court
of Appeals for a stay of the effective date of the license, and
a stay order was entered by that court on January 31, 1975.
The decision of the Court of Appeals affirming the license was
announced on March 24, 1976. The Court of Appeals stated
that the license was not then effective, but granted authority
to the Federal Power Commission to decide whether or not to
make the license presently effective. (Appendix, infra, p. 61).
A motion for stay of that court’s mandate was timely filed.
The mandate has been withheld pending determination of the
motion, and this petition for writ of certiorari is filed before
the mandate of the Court of Appeals has issued. In accordance
with Rule 41 of the Rules of Appellate Procedure, the mandate
of the Court of Appeals remains stayed until this Court acts
on the certiorari petition.”

A. The Secretary of the Interior's Approval of the New
River for Inclusion in the National Wild and Scenic Rivers
System Renders the License Invalid.

Following proper designation by the North Carolina General
Assembly and application by the Governor of North Carolina,
the Secretary of the Interior on April 13, 1976, designated the
New River as a scenic river component of the National Wild
and Scenic Rivers System, as provided in 16 US.C. sec. 1273
(a) (ii). This action by the Secretary of the Interior has the

3 On March 26, 1976, two days after the Court of Appeals opinion was
issued, the Federal Power Commission purported in an order to make the
license effective immediately. However, because the mandate of the court
of appeals had not issued, the Commission was without jurisdiction.
Obey v. McDonald, 109 US. 150 (1883). Petitioner has filed a timely
application for rehearing, pursuant to 16 U.S.C. 825!, and a motion that
the Commission rescind its March 26 order for want of jurisdiction.

30

effect of prohibiting the Federal Power Commission to license
the construction of the dam and reservoir. “The Federal Power
Commission shall not license the construction of any dam,
water conduit, reservoir, powerhouse, transmission line, or
other project works under the Federal Power Act, as amended,
on or directly affecting any river . . . which is hereafter desig-
nated for inclusion in [the wild and scenic rivers] system, . . .”
16 U.S.C. sec. 1278 (a). The Court of Appeals conceded that
once the Secretary of the Interior accepted the river for in-
clusion in the system, it is illegal to create the dam and reser-
voir. (Appendix, infra, p. 61, n. 2).

B. While the New River was a State-Nominated Study
River, the Federal Power Commission was also Prohibited
from Licensing the Project.

The act of the Governor of North Carolina in making
formal application on December 12, 1974, to the Secretary of
the Interior to have the New River designated as a scenic
river, was the last act necessary to classify the river as a state-
designated study river pursuant to 16 U.S.C. sec. 1273 (a) (ii).

State-designated study rivers are subject to the same pro-
tections against impoundments and other development by 16
US.C. sec. 1278(b), to which components of the wild and
scenic rivers system are subject by subsection (a) of the same
statute. The Court of Appeals incorrectly held that Section
1278(b) was inapplicable to the New River while it was a
state-designated study river, and that the protection of this
subsection is limited to those rivers designated in 16 U S.C.
sec. 1276 (a) by Congress for study as potential wild or scenic
rivers.

If this interpretation were correct, then there would be ab-
solutely no reason for inclusion in subsection (b) of the
reference to the state-designation method of including a river
in the system by the terms of 16 U.S.C. sec. 1273 (a) (ii). Yet
subsection 1278(b) specifically accords protection to rivers

~e

31

recommended to the Secretary of the Interior under Section
1273 (a) (ii). The proper interpretation of subsection 1278 (b)
is that it protects state-designated rivers during the study pe-
riod, although the maximum term for protection is one year
instead of three years after the initial ten-year period follow-
ing October 2, 1968.

The interpretation contended for by petitioner is clear from
a close reading of the statute. The first clause of subsection
1278 (b) is clearly limited to study rivers designated by Con-
gress in Section 1276 (a):

The Federal Power Commission al] not license the
construction of any dam .. . or other project works under
the Federal] Power Act . . . directly affecting any river
which is listed in Section 1276 (a).

However, petitioner relies upon the second clause of sub-
section 1278 (b):

[Njo department or agency of the United States shall
assist by loan, grant, license, or otherwise in the con-
struction of any water resources project that would have
a direct and adverse effect on the values for which such
river might be designated .. . or, in the case of any river,
recommended to the Secretary of the Interior for inclusion
in the system under section 1273 (a) (ii) of this title,...
[Emphasis supplied].

Clearly the New River has been designated a 1273 (a) (ii)
study river, and if the FPC allows the license to become
effective, it will be wrongfully assisting in the construction of
a water resources project during the study period. This pro-
vision, not only prohibits the Federal Power Commission from
licensing the project, but also bars it from assisting in the
development in any way, including allowing the license to be-
come effective, approving plans, authorizing studies.

The use of the term “such river” in the second clause does
not refer to the phrase “any river which is listed in Section

32

1276 (a). The term “such river” can properly refer either to
the overall heading of Subsection 1278(b), which is “Con-
struction Projects on Rivers Designated for Potential Addition
to System”, or alternatively, this term can refer to the phrase in
subsection 1278 (b) (2) “any river recommended to the Secre-
tary of the Interior for inclusion in the national wild and scenic
rivers system under Section 1273 (a) (ii) of this title”. More-
over the use of the term “any river’, without limiting language
in paragraph 1278 (b) (ii) means that no limitation to Section
1276 Congressional Study Rivers was intended.

This is a case of first impression under the Wild and Scenic
Rivers Act. Since subsection 1278(b) is not free from am-
biguity, a consideration of legislative intent is appropriate.
The legislative history of the act favors the interpretation
recommended by petitioner:

(Subsection 1278(a)] forbids the Federal Power Com-
mission to license any project on or directly affecting any
river designated for inclusion in the scenic rivers system.
While this prohibition is immediately applicable only to
the six scenic rivers named in section 3 of the bill [Section
1274), it will become applicable to other rivers as they
are hereafter added to the system by act of Congress or
under the provisions of section 2(a) (ii) of the bill [section
1273 (a) (ii) |. Subsection (a) also prohibits other Federal
departments or agencies from making loans or grants for,
and from licensing, water resources projects on such a
river if the project would have an adverse effect on its
scenic river values. . . . Subsection (b) imposes similar
prohibitions and requirements with respect to rivers in thy
study category for the five years [Amended to ten years
by P.L. 93-279, sec. 1(b) (3).] after the date of the act
and for an additional period 3 years in the case of study
rivers which the Secretary of the Interior or the Secretary
of Agriculture recommends be added to the authorized
category or for an additional period of 1 year in the case
of a State-named river which is recommended to the

33

Secretary of the Interior for inclusion in the system. —
House Report No. 1623, 3 US. Code and Admin. News
3811-2812, 90th Cong. 2d Sess. (1968) .*

For these reasons, the Court of Appeals incorrectly inter-
preted subsection 1278(b). The logical reading of this pro-
vision, and an interpretation of it in light of its statutory his-
tory, compels the holding that the New River was protected
against licensing and other activities by the Federal Power
Commission for the period specified in the statute, once the
governor's application was filed with the Secretary of the In-
terior on December 12, 1974.

C. Because of the Effective Prohibition of 16 USC. sec.
1278, this Case has become Moot, and the Court should Direct
the Dismissal of the Licensing Proceeding Before the Federal
Power Commission.

At no time has the license for the Modified Blue Ridge
Project become effective. In its June 14, 1974, licensing order,
the Federal Power Commission suspended the effective date
of the license until January 2, 1975. The Court of Appeals
entere: its order on January 31, 1975, staying the effective
date of the license. The stay order was dissolved and the Fed-
eral Power Commission was authorized to “make the license

4 Subsection 1278(b) as applied to the New River as a state-designated
study river, is to be read:

“no department or agency of the United States [the Federal Power
Commission) shall (shall not) assist by loan, grant, license, or other-
wise [permit the license to become effective or assist Appalachian
Power Company in any other way) in the construction of any water
resources project {in the construction of the Blue Ridge Project)
that would have a direct and adverse effect on the values for which
such river might be designated [that would create an impoundment),
as determined by the Secretary responsible for its study or approval—

“(i) during the ten-year period following October 2, 1968 .. . and

“<(ii) during such additional period thereafter as,... in the case of

any river recommended to the Secretary of the Interior for inclu-

sion in the wild and scenic rivers system under section 1273 ‘a)

(ii) of this title [in the case of the New River recommended to the

Secretary of the Interior for inclusion in the wild and scenic rivers

system under section 1273(a)(ii) of this title}, is necessary for the

Secretary's consideration thereof, which additional period, how-

ever, shall not exceed... one year... .”

34

effective immediately” in the Court of Appeals March 14, 1976,
opinion. However, the mandate of the Court of Appeals has
been stayed, the Federal Power Commission remains without
jurisdiction, and the license is not in effect.

Under these circumstances the Secretary of the Interior’s
April 13, 1976, designation of the New River as a scenic river
is fully operative. Alternatively, the Governor of North Caro-
lina’s application for scenic river status submitted on December
12, 1974, even before the Commission ordered the license effec-
tive, antedates the license. Not only is the Federal Power Com-
mission prohibited by 16 U.S.C. Sec. 1278(a) from licensing
the project, but it is also prohibited with respect to both in-
cluded rivers and study rivers by subsections 1278 (a) and (b)
from assisting by “loan, grant, license, or otherwise in the con-
struction of any water resources project that would have a
direct and adverse effect on the values” for which a scenic
river has been established or might be designated. This pro-
hibition covers all on-going activities of the Commission in
assisting and regulating a licensee with its activities. Even if
the initial grant of the license had been effective prior to the
time that the river came under the protections of section 1278,
the license would be a nullity because continuing activities of
the Commission pursuant to the license will be illegal.

The Wild and Scenic Rivers Act, designed to protect the
nation’s unspoiled and undeveloped waterways, is the counter-
part of the Wilderness Act, 16 U.S.C. sec. 1131 et seq., the
purpose of which is to protect the nation’s primitive land areas.
Enforcement of the Wild and Scenic Rivers Act, like the
Wilderness Act, requires that the agencies of the government
responsible for carrying out the law be given a meaningful
opportunity to designate new areas for protection from spoila-
tion. It is so held in Parker v. United States, 448 F.2d 793
(10th Cir. 1971) , enforcing the Wilderness Act. Pending study
and consideration for protected classification, agencies engaged
in development of the area should be compelled to stay their

35

hands. New dams can be buiit anytime, but ancient rivers can
be destroyed only once.

Because the Federal Power Commission has become effective-
ly precluded from granting and making effective a license for
the Modified Blue Ridge Project, this proceeding and the pro-
ceeding before the Federal Power Commission have become
moot. Where either supervening administrative action, United
States v. Anchor Coal Co., 279 U.S. 812 (1929) , or legislation,
United States v. Alaska Steamship Co., 253 U.S. 114 (1920),
renders an administrative license or regulation ineffective,
there is no case or controversy, and the proceedings must be
dismissed on the ground of mootness. The proper procedure
is to remand to the agency and direct the dismissal of the pro-
ceeding. United States v. Hamburg-Amerikanische Co., 239
US. 446 (1916); United States v. Alaska Steamship Co.,
supra. See Note, “Cases Moot on Appeal: A Limit on the
Judicial Power,” 103 U.Pa. L.Rev. 772 (1955); DeFunis v.
Odegaard, 416 U.S. 312 (1974) . Accordingly, the Court should
direct the Commission to dismiss the application for license.

III. THE LICENSE FOR THE MODIFIED BLUE
RIDGE PROJECT SHOULD BE SET ASIDE BECAUSE
APPALACHIAN POWER COMPANY CAUSED THE FED-
ERAL POWER COMMISSION TO VIOLATE FEDERAL
STATUTES AND REGULATIONS PERTAINING TO HIS-
TORICAL AND ARCHAEOLOGICAL PROPERTIES.

On September 11, 1975, North Carolina filed with the Court
of Appeals an application for leave to adduce additional
evidence, pursuant to 16 U.S.C. sec. 8251 (b). This application
was made on the basis of a discovery by North Carolina on
August 31, 1975, that three archaeological surveys were carried
out in the New River valley in the 1960’s under contract with
Appalachian Power Company, that these surveys disclosed
that the area to be flooded is an extremely rich and important
archaeological repository, and that Appalachian Power Com-
pany suppressed the results of these studies and failed to bring

36

them to the attention of the Federal Power Commission. This
motion was considered by the Court of Appeals at oral argu-
ment. The Court of Appeals required only that the Federal
Power Commission order Appalachian to provide the necessary
time and funding for archaeological research, excavation and
salvage as a condition of the licensing. (Appendix, infra, p. 61) .
Petitioner submits that the response of the Court of Appeals
does not cure the clear cut violations of federal statutes and
regulations by the Commission as a result of the conduct of
Appalachian.

The National Environmental Policy Act requires that the
Commission use all practicable means to preserve our historic
and cultural heritage. 42 U.S.C. sec. 4331 (b).

By Executive Order No. 11593, 36 F.R. 8921 (May 13,
1971), the Commission is required to institute procedures to
insure that its programs “contribute to the preservation and
enhancement of non-federally owned sites, structures and ob-
jects of historical, architectural or archeaological significance.”
By its own regulations, 18 C.F.R. sec. 4.40(k) , the Commis-
sion requires that the license application contain “a description
of any historical or archaeological properties . . . eligible for
listing in the National Register which are or may be affected
by the project... .”

The Commission also has a duty under 16 U.S.C. sec.
469a-1, if it finds or is notified that its federally licensed
project “may cause irreparable loss or destruction of significant
scientific, prehistorical, historical, or archaeological data,” to
“notify the Secretary [of the Interior], in writing, and shall
provide the Secretary with appropriate information concern-
ing the project, program, or activity.” The Commission is
given the alternative by the statute either to request the
Secretary of the Interior to, or to proceed on its own to, under-
take the protection, preservation, and recovery of these items.

An examination of the Commission’s Opinion and Order
granting a license for the Modified Blue Ridge Project, the

37

license application, the final environmental impact statement,
and the applicant’s environmental impact statement discloses
that the only attention given to items of archaeological and
architectural significance are the mention of the proximity of
the Ripshin National Historic Landmark in the impact state-
ment (R. 11,156) and the condition in the license requiring
that the licensee consult with the Smithsonian Institution to
determine the extent of archaeological surveys and salvage
operations that may be necessary, with an amount not to
exceed $7500.00 being specified for this purpose (Appendix,
infra, p. 133-134) .

North Carolina’s newly discovered evidence was that there
were three archaeological surveys carried out in the New River
valley in the 1960’s by archaeologists Harvard Ayers and
Charlton Holland. (Appendix, infra, pp. 156-218) . These sur-
veys were only preliminary field work to determine whether
sites relating to activities of prehistoric cultures were present
within the project area. From a preliminary analysis of the
artifacts, projectile points, and pottery sherds found at these
sites, these experts concluded that the New River valley is one
of the most important archaeological areas in the Eastern
United States. Of particular significance are artifacts found in
the project area that make it possible to reconstruct aspects
of the “Hopewell Interaction System”, a long-distance trade
network that operated during the period 300 B.C._—700 A.D.,
linking societies of the southeastern and midwestern part of
the continent by means of the New River, the only waterway
which crosses the Appalachian mountain chain from east to
west. These cursory examinations of the area disclosed some
65 prehistoric sites, including camps, villages, rockshelters,
soapstone quarries, burial grounds, and in addition some 11
fish weirs.

Although both the Ayers and Holland surveys were com-
missioned by Appalachian Power Company, they were never
transmitted to the Federal Power Commission. They are not
a part of the FPC record. Paul Johnson, a project engineer for

38

Appalachian, stated that the surveys were kept secret and
were never transmilted to the Commission. (Appendix, infra,
p. 158). Because of this deception by Appalachian, the Com-
mission did not comply with 16 U.S.C. sec. 469a-1(a), and
did not give written notification to the Secretary of the In-
terior about the archaeological treasures which were threaten-
ed. The Secretary, like the petitioner, received his information
after the Commission made its licensing decision. Nevertheless,
the Secretary acted in a timely manner and undertook to
evaluate archaeological findings, and to make a cultural re-
search survey on properties of historical and architectural
significance in the project area. Copies of this preliminary work
of the Department of the Interior are set forth in the Appen-
dix, infra, pp. 218-261.

This work indicates that if Appalachian and the Commission
had complied with applicable laws and regulations, an abun-
dance of cultural resources would have been discovered and
disclosed in the environmental impact statement. A preliminary
reconnaissance survey resulted in the assessment that the en-
tire area to be flooded “appears to qualify for listing in the
National Register as a district because of its historic, cultural,
and architectural cohesiveness and because of its integrity and
lack of intrusions. The area embodies the distinctive character-
istics of the late 18th and 19th centuries rural life as exempli-
fied in the architecture, industry and rural isolation. In addi-
tion, a number (32) of the buildings appear to qualify in-
dividually for listing in the National Register. . . . The Field’s
Manufacturing Company may be of national significance.”
(Appendix, infra, p. 249). Field’s Manufacturing Company is
possibly a unique industrial complex in which some of the
old 19th century water-powered machinery remains. Cochran
Grist Mill on Dog Creek is a 19th century water-driven mill
and has one of about a half a dozen extant Fitz wheels. The
site of a spa and hotel at Healing Springs, source of historic-
ally important curative mineral waters, would also be in-

39

undated. Some 18th and early 19th century log houses were
also found. (Appendix, infra, pp. 249-252) .

North Carolina, following discovery of the surveys sup-
pressed by Appalachian, has initiated the process of nominat-
ing at least 18 prehistoric sites within the impoundment area
to the National Register of Historic Places. On the basis of
more adequate data, it is likely that a number of additional
historic sites would be discovered that would qualify for the
National Register.

In clear violation of 18 C.F.R. sec. 4.40(k), Appalachian
failed to furnish the Commission a description of historical
and archaeological properties eligible for listing in the National
Register. Appalachian knew of some of the archaeological
properties that would qualify for the Register, but deliberately
kept them secret. Appalachian apparently did not undertake
even the most cursory examination of historical and architec-
tural properties, required by the same regulation, that neces-
sarily would have disclosed a number of other items that
should have been listed in the National Register. It would
be manifestly inequitable for Appalachian to profit by its de-
ception with regard to the archaeological findings. Although
the Federal Power Commission perhaps cannot be held equally
at fault with regard to this suppressed archaeological data,
the Commission certainly did not fulfill its responsibilities
under Executive Order No. 11593, requiring programs for the
preservation of obqects of historical and architectural signifi-
cance, by failing to require Appalachian to undertake even a
preliminary survey of this material.

Because Appalachian and the Commission failed either to
undertake or disclose the studies of archaeological, historical,
and architectural data, as required by the statutes and regula-
tions referred to in this part of the petition, the environ-
mental impact statement did not present information or dis-
cussion on this important subject. This is contrary to the
National Environmental Policy Act requirement that all prac-

40

ticable means be used to preserve our historic and cultural
heritage.

Had all of the relevant information been developed and
presented in the impact statement, it is entirely conceivable
that the Commission would have been compelled not to grant
the license, but to embrace the “no action” aiternative as the
only rational way of preserving the cultural treasures of the
New River valley. The impact statement could not serve its
statutory function in this instance, which is to insure that
“agency decision maker has before him and takes into proper
account all possible approaches to a particular project (includ-
ing total abandonment of the project) which would alter the
environmental impact and the cost-benefit balance.” Without
all relevant information before the decision maker, it is not
“likely that the most intelligent, optimally beneficial decision
will ultimately be made.” These procedures of NEPA, 42 U.S.C.
sec. 4332, are not discretionary, but must be rigorously enforced
by reviewing courts. Calvert Cliffs’ Coordinating Committee
v. The Atomic Energy Commission, 449 F.2d 1109, 1114-1115
(D.C. Cir. 1971). Accord, Environmental Defense Fund v.
Froehlke, 473 F.2d 346 (8th Cir. 1972); Environmental De-
fense Fund v. Corps of Engineers, 492 F.2d 1123 (5th Cir.
1974) ; Sierra Club v. Froehlke, 486 F.2d 946 (7th Cir. 1973).

The Court of Appeals’ requirement to give greater atten-
tion to the removal! of artifacts was not a sufficient remedy.
The procedural deficiencies in this instance can be cured only
by setting aside the license and ordering new hearings. As
correctly determined in Hudson River Fishermen's Association
v. Federal Power Commission, 498 F.2d 827 (2d Cir. 1974),
newly discovered material evidence (even after a license is
issued) requires additional hearings and a reconsideration of
the license, consistent with this Court’s decision in Udall v.
Federal Power Commission, 387 U.S. 428 (1967).

IV. IN HOLDING THAT THE FEDERAL POWER
COMMISSION'S CONSIDERATION OF THE IMPACT

41

OF ENERGY CONSERVATION MEASURES SUCH AS
PEAK LOAD PRICING AND REDUCED DEMAND
FACTORS ON THE NEED FOR THE PROJECT WAS
ADEQUATE, THE COURT OF APPEALS DISREGARD-
ED THE TEACHING OF THIS COURT IN UDALL V.
FPC, 387 US. 428 (1967), AS WELL AS THE DUTIES
IMPOSED UNDER THE NATIONAL ENVIRONMENTAL
POLICY ACT.

The Court of Appeals relied on the “rule of reason” doctrine
of Natural Resources Defense Council v. Morton, 148 US.
App. D.C. 5, 458 F.2d 827 (1972), to uphold the Federal
Power Commission's consideration of energy conservation
measures in relation to the need for this project, quoting the
FPC’s statement that:

Even if all U. 5S. consumers were to adopt stringent
conservation practices with respect to electricity, the de-
mand for electric power would continue to increase to
such an extent that all of the production of Blue Ridge
would be essential and, in fact, would meet only a small
part of the foreseen future need.

The Court of Appeals also cites the discussion of the FPC in
Opinion 698-A, denying petitioner's application for a rehearing,
in which the only study the FPC cites is its own 1970 National
Power Survey.

This holding is in irreconcilable conflict with this Court’s
decision in Udall v. Federal Power Commission, 387 US. 428
(1967) in which it is stated that the Federal Power Com-
mission’s obligation under section 10 (a) of the Federal Power
Act, 16 U.S.C. sec, 803(a), is to closely scrutinize changing
demand projections for the useful life of a proposed project.
This Court specifically rejected the “we can use all we can
produce even with conservation” argument advanced by the
FPC, stating that “we cannot assume that the Act commands
the immediate construction of as many projects as possible.”
387 US. at 449. The Court of Appeals’ implicit approval of

42

the FPC’s refusal to go beyond its 1970 demand study is also
in conflict with the Second Circuit's decision in Hudeon River
Fishermen's Association v. Federal Power Commission, 498
F.2d 827, 833 (2d Cir. 1974), wherein the court held the FPC
abused its discretion by “donning . . . complete blinders . . . to
a new situation” (new hearings compelled because of new
evidence of danger to fish through the operation of a licensed
project) .

The “new situation” on which petitioner seeks FPC’s recon-
sideration is the impact of the “energy crisis” and conservation
alternatives on the need for the project. The current “energy
crisis” not only produced, beginning in 1974, a pause in the
acceleration of demand for electricity, which had been in-
creasing at a steady rate of seven percent per year (Willrich,
The Electric Utility and the Energy Crisis Part II, Pub. Util.
Fort., January 6, 1975, at 26) , but also caused regulatory com-
missions and economists to examine ways of reducing demand
during that period of time when the rate of customer demand
is highest—at peak demand, or peak load.

Unrestrained peak-demand has been recognized as a major
problem:

Peak demand results in an inefficient allocation of re-
sources, increased pollution, and economic waste. In the
short run, peak demand requires the use of inefficient peak
load equipment, and expensive, greater polluting fuels. In
the longer run, it requires the plant to expand to meet
the peak load. Such expansion uses a great deal of land,
to create a facility which sits relatively idle at off-peak
times. Furthermore, the increased on-peak customer de-
mand means higher costs to the utility which if not ade-
quately compensated will engender requests for rate in-
creases before the state regulatory commission. — Note,
“Lexonomics and the Electrical Utility Jndustry: In
Search of the Optimal Rate Structure”, 61 Ja.L.Rev. 134,
136 (1975).

43

Time-differentiated rate design or “peak-load pricing” has
been recognized as a potential major energy conservation tool
because it creates the possibility of specifically ameliorating
peak-load demand:

The higher cost burden imposed by customer demands
for electricity at time of peak load would seem to be
amenable to price constraint. That is, the costs to the
utility of on-peak demand could be reduced by imposing
e rate which is high enough to restrain demand at the
system peak. At the very least, the rate imposed for peak
electricity consumption should be high enough to com-
pensate the utility for incurring the increased costs of peak
production. Although the cost-compensation function of
rate design has in the past been given primary focus, both
economists and an emerging cadre of regulatory com-
missions are recognizing that the demand-control function
is just as significant. Thus, rate design is beginning to be
considered as not simply a method of allocating costs
among the customers, and extracting revenues to cover
these costs, but also as a device for leveling off peak de-
mand by channelling scarce resources into their most
productive uses and by discouraging the wasteful use of
electricity. Id. at 136-137.

Several state regulatory commissions have already taken
steps to implement or study time differentiated rate design as
a conservation measure. A pplication of Madison Gas and Elec-
tric Co., Findings of Fact and Order, 2-U-7423 (Pub. Serv.
Comm. of Wis., August 8, 1974) ; Central Vt. Pub. Serv. Corp.,
Doc. No. 3744, at 27-28 (Vt. Pub. Serv. Bd. Sept. 27, 1974).
See Jones, Judicial Determination of Public Utility Rates: A
Critique, 54 B.U.L. Rev. 873 (1974).

These factors should have been relevant to the consideration
of the need for the Blue Ridge Project, which has very little
base load capacity and is almost totally intended to fulfill
system peak demand. This explains why Blue Ridge was li-

44

censed although it is a net user of electricity, as is shown by
the following table taken from the Environmental Impact
Statement, p. 17:

Energy Output Pumping Require-
MWII ments—M WIT
1975 4,100,000 5,500,000
1980 3,900,000 5,175,000
1985 3,250,000 4,255,000
1990 2,525,000 3,250,000
1995 1.800.000 2.175.000

The facility is thus predicated on the existence of a large
differential between peak demand and base demand; during
peak demand times, it will be generating electricity, whereas
during non-peak demand periods it will be using electricity
for pumping requirements. This in itself will lessen the differ-
ential between peak and non-peak demand, but only through
the device of allowing the utility to become a major con-
sumer—perhaps the major consumer—of its own output.

The Court of Appeals, in using the “rule of reason” doc-
trine to gloss over these issues and in holding that “Opinion
698-A contains a thorough discussion of the impact of energy
conservation on the nation’s energy needs in general and on
the need for the Blue Ridge Project. in particular’, mis-
applied this legal standard. The court committed the fallacy
of assuming that a pumped-storage project such as Blue Ridge
is equally efficient in meeting both peak-load demand and in-
crease in overall demand. The court fails to see the absurdity
of its claim that future increases in overall electrical energy
demand can be met by a project that consumes more power
than it produces. It is no answer at all to cite the FPC’s claim
(based on 1970 projections) that even with conservation
measures, all t!e power produced by Blue Ridge would be
essential since this fails to distinguish between the verv real
possibility of an increase in overall demand but a decrease in
peak-load demand caused by time-differentiated pricing. This

45

may totally remove any justification for the Blue Ridge
Project. The Court of Appeals’ decision on this issue holds the
FPC, in effect, to no standard at all in justifying the need for
future projects, and this cannot be reconciled with the statu-
tory duties imposed by NEPA or this Court’s holding in
Udall.

The Court of Appeals also justified its holding on this issue
on the ground that petitioner did not go into detail about
specific conservation measures in its petition for rehearing
(although the Court held that the energy conservation meas-
ures argument was raised with the degree of specificity nec-
essary to satisfy 16 U.S.C. sec. 825/(b)) and in such circum-
stances a summary discussion by the FPC was sufficient. This
is wholly untenable since it in effect puts petitioner and those
like it who are attempting to require agencies to consider pub-
lic interest factors, in the position of having to carry an ad-
versary burden. This is contrary to the idea expressed in
Scenic Hudson Preservation Conference v. Federal Power Com-
mission, 354 F.2d 608, 614 (2d Cir. 1965), cert. denied sub
nom Consolidated Edison Co. of New York v. Scenic Hudson
Preservation Conf., 384 U.S. 941 (1966), that the FPC in its
licensing process must act as a representative of the public
interest; it should not merely assume the role of umpire bland-
ly calling balls and strikes for adversaries appearing before it.
Accord: Udall v. Federal Power Commission, supra.

V. THE COURT OF APPEALS SHOULD HAVE RE-
VIEWED WHETHER THE FPC VIOLATED THE NA-
TIONAL ENVIRONMENTAL POLICY ACT BY FAILING
TO CONSIDER THE DESIGNATION OF THE NEW
RIVER AS A “FEDERAL SCENIC RIVER” AS AN AL-
TERNATIVE TO THE PROJECT SINCE PETITIONER
RAISED THIS OBJECTION IN ITS APPLICATION FOR
REHEARING BEFORE THE FPC.

The Court of Appeals refused to review the adequacy of the
FPC’s consideration of the New River as a “federal scenic

46

river” as an alternative under the National Environmental
Policy Act (NEPA), 42 US.C. sec. 4332 (2) (E), on the
ground that petitioner had not raised this issue in an applica-
tion for rehearing directed to the FPC as required by section
313(b) of the Federal Power Act, 16 U.S.C. sec. 8251 (b).
Thus the petitioner was completely deprived of a court deter-
mination of whether the FPC violated NEPA by attempting

to arbitrarily cut off study of the New as a federal scenic
river.

Petitioner's Petition for Rehearing of July 12, 1974, specific-
ally objected to the two findings of the FPC in its order grant-
ing the license that its procedures were in compliance with
NEPA and that the Final Environmental Impact Statement
complied with the requirements of NEPA. Under the circum-
stances, this should be, as a matter of law, sufficient objection
to satisfy section 313(b). First, the consideration of alterna-
tives is, of course, an important and specific legal duty imposed
upon federal agencies by NEPA. Second, as the FPC’s order
issuing the license makes perfectly clear, from the time of the
issuance of the license, there could be only one other possible
use-option for the resources of the New River—federal scenic
river status. The FPC in its order of June 14, 1974, took official
n ice of possible further study of the New as a scenic river
pursuant to legislation which at that time was pending in Con-
gress to designate the New River a subject of study as a
potential component of the National Wild and Scenic Rivers
System. The only concession the FPC made to this was to
delay the effective date of the license granted until January
2, 1975, unless otherwise delayed by judicial review. The Fed-
eral Power Commission thus not only gave Congress a dead-
line, but also completely ignored the possibility of a study of
the New triggered by a state application pursuant to 16 US.C.
sec. 1273 (a) (ii), preparation for which was already underway
before the FPC’s issuance of the license.

Petitioner also raised the scenic river study alternative in its
second petition for rehearing filed on January 27, 1975. This

47

petition was filed in response to the FPC’s Order of December
31, 1974, denying the petitioner’s motion filed with the FPC
on December 16, 1974, seeking a delay in the effective date of
the license until the Secretary of the Interior could complete
his then begun study of the New as a federal scenic river. In
the petition for rehearing of January 27, 1975, petitioner spe-
cifically pointed out to the FPC, as it had in its original mo-
tion, the duty to suspend the effective date of the license to
allow consideration of the scenic river alternative. This second
petition for rehearing was brought to the attention of the Court
of Appeals. Petitioner first filed a separate petition for review
in the Court of Appeals (State of North Carolina v. Federal
Power Commission, No. 75-411), and then filed a motion for
consolidation with the present case. The Court of Appeals not
only ignored the second petition for rehearing and the motion
for consolidation, but also, dismissed the appeal on the second
Federal Power Commission order as moot.

The case relied on by the Court of Appeals, Federal Power
Commission v. Colorado Interstate Gas Co., 348 US. 492
(1955), is inapposite. The teaching of that case is that the
Court of Appeals cannot sua sponte consider an objection. In
the present case, however, petitioner raised the objection in
two petitions for rehearing of two separate orders of the Fed-
eral Power Commission.

Moreover, the policy behind section 313(b) dictates that
the violation of NEPA issue should have been considered by
the Court of Appeals. This Court has stated that policy to be
that a party must exhaust his administrative remedies before
seeking judicial review and give the FPC an apportunity to
correct its errors. Federal Power Commission v. Colorado Intcr-
state Gas Co., supra, at 498-499. This policy was fulfilled
since FPC’s order issuing the license was clear in stating that
it would brook no further consideration of the scenic river
alternative (“we are persuaded that the Blue Ridge Project is
necessary now, and . . . we therefore hope it will not be de-
layed or foreclosed by Congressional action .. .” (Appendix,

48

infra, p. 136) .] In its second order of December 31, 1974, the
FPC also made it abundantlv clear that its refusal to consider
or wait for study of the New as a scenic river was final.
Ignoring the petitioner's concededly valid application for a
study of scenic river status for the New filed pursuant to 16
U.S.C. sec. 1273 (a) (ii), the FPC stated:

The 93rd Congress has adjourned without enacting legis-
lation that would foreclose or delay the Blue Ridge Project.
Accordingly, the license we granted on June 14, 1974 will
become effective on January 2, 1975, unless otherwise de-
layed by judicial review.

In accord: Indiana and Michigan Electric Co. v. Federal
Power Commission, 502 F.2d 336, 339-340 (D.C. Cir. 1974),
wherein it was held sufficient to overcome the sec. 313(b) bar
that the FPC declined to correct its alleged error and expressly
defended the validity of its position, although the petition for
rehearing did not explicitly raise the point involved.

Moreover, because of the impact on the public interest, it is
accepted law that the courts should not seek to narrowly con-
strue the scope of judicial review of FPC licenses. In Udall v.
Federal Power Commission, 387 U.S. 428, 450 (1967), this
Court stated:

A license under the Act empowers the licensee to con-
struct, for its own use and benefit, hydroelectric projects
utilizing the flow of navigable waters and thus, in effect,
to appropriate water resources from the public domain.
The grant of authority to the Commission to alienate fed-
eral water resources does not, of course, turn simply on
whether the project will be beneficial to the licensee. Nor
is the test solely whether the region will be able to use
the additional power. The test is whether the project
will be in the public interest. And that determination can
be made only after an exploration of all issues relevant
to the “public interest,” including future power demand
and supply, alternate sources of power, the public interest
in preserving reaches of wild rivers and wilderness areas,

49

the preservation of anadromous fish for commercial and
recreational purposes, and the protection of wildlife.

This Court mandated FPC consideration of the public in-
terest in preserving “wild rivers and wilderness areas”, although
petitioner apparently only made a general objection of the
failure of the FPC to consider the issue of federal development
of the waterway in question. 387 US. at 450-451.

Thus, in summary, although the section 313(b) bar may
be rigidly adhered to in the case of a private applicant for a
license who is attempting to flyspeck an FPC decision denying
a license, this section was never intended to deprive the
courts from reviewing the FPC’s consideration of public in-
terest factors upon application of a non-economic § petitioner
as in the present case.

CONCLUSION

For the reasons stated in part III of the petition, this pro-
ceeding should be remanded to the Federal Power Commis-
sion with the directions that it be dismissed as moot. Other-
wise, for the reasons stated in Parts I, IT, IV, and V, of the
petition, the petition for certiorari should be granted, the Court
of Appeals’ decision reversed, and this proceeding remanded
with directions that the license for the Modified Blue Ridge
Project be set aside.

Respectfully submitted, Norman B. Smith

Rufus L. Edmisten Smith, Patterson, Follin,

Attorney General of N. C. Curtis & James

Justice Building 704 Southeastern Building

Raleigh, N. C. 27602 Greensboro, N. C. 27401

Telephone: 919-829-3377 Telephone: 919-274-2992

Millard R. Rich, Jr. Thomas J. Schoenbaum

Assistant Attorney General Smith, Patterson, Follin,
of North Carolina Curtis & James

Justice Building 704 Southeastern Building

Raleigh, N. C. 27602 Greensboro, N. C. 27401

Telephone: 919-829-3377 Telephone: 919-274-2992

Counsel for Petitioner

30

APPENDIX
Notice: This opinion is subject to formal revision before publication in
the Federal Reporter or U. S. App. D. C. Reports. Users are requested to

notify the Clerk of any formal errors in order that corrections may be
made before the bound volumes go to press.

United States Court of Appeals

FOR THE DISTRICT OF COLUMBIA CIRCUIT

No. 74-1941
STATE OF NORTH CAROLINA, Petitioner
Vv.
FEDERAL POWER COMMISSION, Respondent

APPALACHIAN POWER COMPANY
COMMONWEALTH OF VIRGINIA
STATE OF WEST VIRGINIA, Intervenors

Petition for Review of an Order of the
Federal Power Commission

Argued October 23, 1975
Decided March 24, 1976

Millard R. Rich, Jr., Assistant Attorney General of the
State of North Carolina, Norman B. Smith and Thomas J.
Schoenbaum, with whom Rufus L. Edmisten, Attorney General
of the State of North Carolina, was on the brief for petitioner.

Steven A. Taube, Attorney, Federal Power Commission,
with whom Drezel D. Journey, General Counsel and John R.
Staffier, Attorney, Federal Power Commission, were on the
brief for respondent. George W. McHenry, Jr., Solicitor, Fed-
eral Power Commission at the time the record was filed also
entered an appearance for respondent. Alan Abbot Tuttle,

51

Solicitor, Federal Power Commission, entered an appearance
for respondent.

William J. Madden, Jr. with whom Donald K. Danker, was

on the brief for intervenor Appalachian Power Company.

James E. Ryan, Jr., Assistant Attorney General of the
Commonwealth of Virginia, for the intervenor, Commonwealth
of Virginia. Anthony F. Troy, also entered an appearance for
intervenor Commonwealth of Virginia.

Frank M. Ellison, Deputy Attorney General for the State
of West Virginia was on the brief for intervenor State of West
Virginia. Nicholas W. Johnson, also entered an appearance for
intervenor State of West Virginia.

Edmund I. Adama, filed a brief on behalf of the Committee
for New River et al. as amici curiae urging reversal.

Dan R. Murray, filed a brief on behalf of the Committee for
the Improvement of Alleghany et al. as amici curiae urging
affirmance.

Frederick E. Miller, Jr., filed a motion on behalf of West
Virginia Division of the Izaak Walton League, et al. for leave
to file a brief as amici curiae and the brief was filed.

Before: Bazelon, Chief Judge, Robinson and Robb, Circuit
Judges

Opinion for the Court filed by Circuit Judge Robb.

Robb, Circuit Judge: This is a petition by the State of
North Carolina to review an order of the Federal Power Com-
mission, granting the Appalachian Power Company a license
to build a hydroelectric project on the New River.

The New or New-Kanawha River rises in the Appalachian
Mountains of North Carolina and Tennessee and flows north
through southwestern Virginia and into West Virginia where
it becomes part of the main channel of the Kanawha River.
In 1962 Appalachian Power Company (Appalachian) sought

52

and received permission from the Federal Power Commission
to study the river as a potential site for a hydroelectric dam.
On the basis of this study, Appalachian in 1965 applied to the
FPC for a license to build a dam, to be known as the Blue
Ridge Project, on that part of the New River located in North
Carolina and Virginia. Hearings on the application commenced
in May 1967 and continued for two years.

In October 1969 the Administrative Law Judge (ALJ)
rendered a decision recommending the issuance of a license
for the Blue Ridge Project. The Project was to include a
650,000 acre-foot water storage capacity, the stored water to
be used for downstream water quality control. The states of
North Carolina and Virginia generally supported the project,
but objected to the ALJ’s recommendation that drawdowns
up to twelve feet in the level of the reservoir be permitted at
certain times of the vear. North Carolina also objected to the
use of stored water for downstream pollution dilution.

The Commission ordered further hearings before the ALJ
on the issues raised by the objections of North Carolina and
Virginia. After the hearings the ALJ issued a “Supplemental
Initial Decision” recommending the limitation of drawdowns
to ten feet and reducing the size of the releases permitted for
downstream pollution dilution. North Carolina and Virginia re-
peated their objections to the size of the permissible drawdowns
and North Carolina once again objected to the inclusion of
any storage capacity for downstream pollution control. The
two states sought and were granted perm/’ssion to argue be-
fore the Commission on their objections to the Supplemental
Initial Decision.

While the case was pending before the Commission the
decision came down in Greene County Planning Board v. FPC,
455 Fd 412 (2d Cir.), cert denied, 409 US. 849 (1972).
Under that decision the FPC is required by the National En-
vironmenta! Policy Act of 1970, 42 U.S.C. § 4321 et seq., to
prepare an environmental impact statement in advance of

a re eS ele ee --oeoo, ~ 2

53

hearings on a proposed project so that the statement may be
scrutinized in the course of the hearing. The FPC accordingly
remanded the Blue Ridge proposal to the ALJ for further
hearings, to afford an opportunity for cross-examination on the
impact statement. Prior to these hearings the State of North
Carolina withdrew its support of the Blue Ridge Project, cit-
ing potential adverse impact upon the land and way of life
of the people in the area near the proposed dam.

North Carolina participated in the hearings on the impact
statement and filed briefs which concerned themselves primar-
ily with the adequacy of the statement’s discussion of the
social and economic effects of the project. In January 1974
the ALJ issued a decision finding the impact statement ade-
quate and recommending the issuance of the license. On June
14, 1974 the FPC, in its Opinion No. 698, approved the Final
Decision of the ALJ and issued a license for the Blue Ridge
Project. The FPC postponed the effective date of the license
in view of pending legislation which would have designated
the New River as a wild and scenic river under the Wild and
Scenic Rivers Act, 16 U.S.C. § 1271 et seq. The proposed legis-
lation was not enacted by Congress.

On July 15, 1974 North Carolina and others petitioned the
FPC for a rehearing on its opinion granting the license, citing
several alleged errors in the opinion and in the FPC’s con-
sideration of the Project. The FPC on August 12, 1974 denied
the petition for rehearing. North Carolina then filed this peti-
tion for review.

Section 313(b) of the Federal Power Act, 16 U.S.C.
$ 825/(b), provides that any party aggrieved by an order
of the FPC may seek review in this court. The statute fur-
ther provides, however, that no objection to an order of the
FPC may be considered on review unless the same objection
was first raised in an application for rehearing directed to the
FPC. As the Supreme Court has stated, it is the purpose of
this provision to give the FPC notice of its alleged errors so

54

that it may have the opportunity to correct them. FPC v.
Colorado Interstate Gas Co., 348 US. 492, 500 (1955).

In its petition for review in this court North Carolina raised
the following issues:

(1) whether the FPC failed to consider the alternative of
energy conservation;

(2) whether the FPC had authorized inclusion in the
project of water storage capacity for pollution dilu-
tion;

(3) whether the FPC failed to analyze adequately cer-
tain costs of the Project;

(4) whether the FPC failed to consider as an alternative
to the Project the possibility that the river should be
made a component of the National Wild and Scenic
Rivers System.

North Carolina suggests that each of these arguments was’

raised with the necessary specificity in the petitions for rehear-
ing directed to the FPC. We disagree.

The specific issue of water storage for pollution dilution is
not foreshadowed by the evidentiary objection to Finding of
Fact 18 which states that the Project will provide benefits
such as flood control, low flow augmentation, recreational
development, fishing opportunities and water supply. Neither
are the references to the petitions of Alleghany and Ashe
Counties sufficient. Those petitions only question whether the
original smaller Project should have been reconsidered. No
reference is made in them to the allegedly illegal inclusion of
water storage for pollution dilution.

Similarly, Paragraph 4 of North Carolina’s petition for
rehearing simply attacks, in general terms, five of the Com-
mission’s findings of fact. These findings state that the Project
will provide desirable public benefits, will enhance the aesthetic
values of the area and that the Commission complied with

ee ee

aw ee em we ee

55

the provisions of the National Environmental Policy Act in the
licensing proceedings. The National Wild and Séenic Rivers
Act is not mentioned. Neither is the Act mentioned in the
petition of Ashe and Aileghany Counties. The portions of the
petition cited to us by North Carolina, while containing a
reference to the pendency in Congress of legislation pursuant
to the Act, do not state that the Commission failed to consider
designation of the New River as an alternative to the Project.

North Carolina contends that three of the specific issues
raised in its argument concerning consideration of costs and
benefits of the Project were also raised in the petitions for re-
hearing. These issues are (1) the purported consideration of
the gross benefits rather than the net benefits of the Project;
(2) the loss of natural stream flow due to the Project; and
(3) the cost of electricity to pump water from the lower
reservoir to the upper reservoir. None of these issues was spe-
cifically discussed in the petitions for rehearing.

North Carolina purports to have raised the “gross benefits”
issue in portions of its petition that deal with whether the
Project will be beneficial on balance. The cited part of the
Ashe and Alleghany Counties petition contains only a general
discussion of the need for the Project. The “loss of natural
stream flow” issue is said to have been raised in the same
parts of the petitions in which the Wild and Scenic River
alternative was raised. A reading of those passages referred to
shows that no such specific matter is raised. The same is true
of North Carolina’s argument concerning the cost of water
pumping. This issue is said to be subsumed in the discussion
of energy conservation as an alternative to the Project, but it
is not mentioned there. We think that section 313(b) of the
Federal Power Act requires something more concrete and spe-
cific than the vague references cited to us by North Carolina.

We think two issues were raised in the petitions for rehear-
ing with the degree of specificity necessary to call the FPC’s
attention to them or “stimulate [its] consideration of” them.

56

Indiana & Michigan Electric Co. v. FPC, 163 U.S. App. D.C.
334, 337, 502 F.2d 336, 339 (1974), cert. denied, 420 US. 946
(1975). The two issues are (1) the FPC’s alleged failure to
consider energy conservation measures as an alternative to
the Project and (2) the FPC’s alleged failure to give adequate
consideration to one of the social costs of the Project, specific-
ally the relocation of persons displaced by the Project. We
think however that North Carolina’s contention that these
issues were not adequately considered by the Commission is
without merit.

Section 102(2) (D) ef the National Environmental Policy
Act of 1970, 42 U.S.C. $ 4332 (2) (D) requires all agencies of
the federal government to “study, develop and describe appro-
priate alternatives to recommended courses of action in any
proposal which involves unresolved conflicts concerning alter-
native uses of available resources.” North Carolina argues that
the FPC failed to comply with this requirement of the Act in
that it failed to consider whether the adoption of energy con-
servation measures such as reduced consumption and “peak
pricing” would make unnecessary the power to be supplied by
the Blue Ridge Project. The argument does not persuade us.
The Commission staff’s final environmental impact statement
makes it clear that the FPC did consider this alternative. The
statement notes:

Even if all U. S. consumers were to adopt stringent con-
servation practices with respect to electricity, the demand
for electric power would continue to increase to such an
extent that all of the production of Blue Ridge would be
essential and, in fact, would meet only a small part of the
foreseen future need.

The Commission again discusses the matter of energy con-
servation in its Opinion No. 698-A, denying North Carolina's
application for rehearing. Opinion No. 698-A contains a thor-
ough discussion of the impact of energy conservation on the
nation’s energy needs in general and on the need for the Blue

57

Ridge Project in particular. The discussion makes it clear that
the consideration of the energy conservation alternative is
sufficient under the standard established by this court. in
Natural Resources Defense Council v. Morton 148 US. A

D.C. 5, 458 F.2d 827 (1972) : si. -

We reiterate that the discussion of environmental
effects of alternatives need not be exhaustive. What is
required is information sufficient to permit a reasoned

choice of alternatives so far as environmental aspects are
concerned.

eo 4 ©

. . the requirement in NEPA of discussion as to
reasonable alternatives does not require “crystal ball”
inquiry. ... The Statute must be construed in the light
of reason if it is not to demand what is, fairly speaking,
not meaningfully possible, given the obvious, that the
resources of energy and research—and time—available to
meet the Nation’s needs are not infinite. [Emphasis sup-
plied]. Id. at 14-15, 458 F.2d at 836-37.

A relatively brief discussion of an issue might not always
be sufficient to satisfy the “rule of reason” test laid down in
Natural Resources Defense Council v. Morton, supra. In the
present case, however, the parties raised only the most general-
ized concern about “conservation of energy” in their petitions
for rehearing and never specifically brought such matters as
“peak load pricing” to the Commission's attention. In these

circumstances the discussion of these issues by the Commis-
sion is sufficient.

North Carolina's second argument is that the FPC’s analysis
of the costs and benefits of the Blue Ridge Project is inade-
quate to show that the benefits exceed the costs. The specific
issue that North Carolina is permitted by section 313(b) of
the Federal Power Act, 16 US.C. § 8251 (b) , to raise in ihis
regard relates to the relocation of persons who will be dis-
possessed by the creation of the reservoirs adjacent to the Blue

58

Ridge Dam. North Caroli: 1 argues that the proviso attached
to Appalachian’s license by the Commission does not guarantee
that replacement housing will be provided.

The question here is not whether the FPC may require
guarantees of replacement housing; rather the question is
whether the FPC adequately considered the projected social
cost of the project. We think it clear that the Commission did
consider it thoroughly. The Final Environmental Impact State-
ment contains precise data concerning the numbers of persons
to be dispossessed; and recognizing the problem the FPC spe-
cifically provided in the license that Appalachian would carry
the burden of assisting in relocation under the continuing
scrutiny of the FPC and pursuant to the recommendations of
the Department of Housing and Urban Development. Thus
the license provides:

Article 55. The License shall establish a relocation ad-
visory service and give reasonable financial assistance to
assist in the relocation of persons now located in the
project area and to minimize any hardship to such per-
sons arsing from such relocation and, within six months of
the effective date of the license and annually thereafter
during the construction of the project, shall report to the
Commission on the success of its efforts. The provision of
the Uniform Relocation Assistance and Reel Property
Acquisition Policies Act of 1970 shall be used as a guide
to implement this article.

The Wild and Scenic Rivers Act provides two methods by
which a river may be included in the national wild and scenic
rivers system: (1) by Act of Congress, section 2(a) (i), 16
U.S.C. § 1273 (a) (i) and (2) by designation by the legislature
of the state through which the river flows followed by a de-
termination by the Secretary of the Interior, upon application
of the governor of the state, that the river meets the criteria
established by the Act, Section 2(a) (ii), 16 U.S.C. § 1273 (a)
(ii). Rivers designated by the state are to be administered

eee

59

by the state without expense to the United States. In section
3, 16 U.S.C. § 1274, Congress itself designates ten rivers as
components of the system; and in section 5(a), 16 US.C.
$ 1276 (a), Congress designates certain additional rivers “for
potential addition” to the system. Section 4, 16 U.S.C. § 1275,
directs the Secretary to study and the President to submit to
the Congress no later than October 2, 1978 reports on the suit-
ability for addition to the system of the rivers designated in
section 1276 (a) as potential additions.

Pursuant to 16 U.S.C. § 1273 (a) (ii), f

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---