[SUMMARY OF APPLICATION

VERMONT YANKEE NUCLEAR POWER STATION
Ex. 3, pp. 2-5, AEC Dkt. No. 50-271]

SITE AND ENVIRONS

The site for the Vermont Yankee Nuclear Power Station
is located in the town of Vernon, Vermont in Windham
County on the west shore of the Connecticut River upstream
of the Vernon Hydroelectric Station. The site consists of
about 125 acres owned by the Vermont Yankee Nuclear
Power Corperation and a narrow strip of land owned by
New England Power Company and located between the
Connecticut River and the boundary of the Vermont Yankee
property and in which Vermont Yankee has perpetual
rights and easements granted by the New England Power
Company with the approval of the Federal Power Commis-
sion. The City of Brattleboro, Vermont is about five miles
upstream of the site. There are no residences on the site,
and the minimum distance from the reactor building to the
boundary of the exclusion zone, as defined in 10 CFR 100, is
910 feet. The nearest town with a population of 25,000 or
greater is Northampton, Massachusetts, about 30 miles to
the south. Much of the land around the site is undeveloped.
Most of the developed land is used for agriculture and dairy-
ing, with houses seattered or grouped in small villages. Ap-
pendix B appended hereto is a map showing the location of
the site with respect to adjacent areas (FSAR 2.2).

In July 1969 Vermont Yankee initiated a comprehensive
environmental radiation surveillance program designed to
monitor the atmospheric, terrestrial and aquatic environ-
ments in the vicinity of the station. This program was de-
veloped in cooperation with the Vermont State Department
of Health and reviewed by the Vermont Water Resources
Board.

402

It is Vermont Yankee’s intent that the environmental sur-
veillance program will be closely coordinated with condi-
tions of station operation by systematically correlating in-
formation developed through continuous in-plant monitor-
ing, effluent release records and environmental sample col-
lection and analysis. The primary purpose of the surveil-
lance program is to make station management and the State
Health Department aware of any conditions of station op-
eration which may have a significant effect on the environ-
ment. The operational surveillance program will be a
graded program subject to periodic critical review (FSAR
2.6).

Plant Design Bases Dependent Upon Plant Site
and Environs Characteristics

Information relating to the site and environs for the
Vermont Yankee Nuclear Power Station is presented in
Section 2 of the FSAR. The design features which were
dependent or affected by the site characteristics are sum-
marized below.

Condenser Off-Gas System

The condenser off-gases will be discharged to the atmos-
phere through decay piping and a stack 308 feet above
grade. The off-gas system is used during normal operation.
It is expected that the release of gaseous radioactivity will
be kept within small fractions of the limits specified in 10
CFR 20 based on the use of the off-gas system. However,
to further minimize the release of gaseous radioactive
wastes, Vermont Yankee will modify the off-gas system to
provide additional holdup and subsequent decay of air
ejector off-gases. The design of this advanced off-gas sys-
tem is currently underway and fabrication and installation

npn: CCN [6h ow it oo = —_— - -

403

will be completed by the end of the first refueling outage
(FSAR 9.4 and Appendix EF).

Liquid Waste E fluents

Liquid effluents will be released from the radwaste dilu-
tion system at a point downstream of the aeration blocks in
the station discharge structure. The liquid waste treatment
system has been designed so that those liquid effluents
which are released from the station are always well within
the limits specified in 10 CFR 20. This is a batch-type sys-
tem wherein the wastes are separately collected and pro-
cessed based upon the most efficient methods. Batches of
liquid radwaste are sampled and analyzed prior to dis-
charge. If suitable for discharge, radwaste effluents are
released at a rate such that the resultant concentration at
the point of release will never exceed 10 CFR 20 nor the
applicable state release limit. During each release, a con-
tinuous radiation monitoring device is set to alarm upon
excessive activity concentration in the radwaste discharge
line. Discharge records are maintained for all station
liquid radwaste effluents.

Wind Loading Design

Plant structures are designed to withstand the effects of
80 mph winds with gusts to 110 mph. Although the prob-
ability of a tornado occurring at the Vermont Yankee site
is small, all structures and equipment necessary to initiate
and maintain a safe plant shutdown are designed to with-
stand a tornado wind loading of 300 mph (FSAR 2.3 and
12.2).

Hydrology

The site is at mile 138.3 above the mouth of the Connecti-
eut River on the west bank on the pond formed by the

404

Vernon Dam and Hydroelectric Station, The maximum
recorded water level at Vernon was 231.4 feet mean sea
level whieh oceurred during the flood of Mareh 19, 1936,
The minimum elevation of access openings to buildings
housing important equipment is 252.5 feet mean sea level,
more than 20 feet above the maximum observed water level,
An analysis of water levels resulting from the probable
maximum flood, a postulated occurrence which is more
severe than the most significant historical event, has been
performed and shows that the station is suitably protected
against the maximum probable flood (FSAR 24 and Ap-
pendix 1),

Geology

The site area is overlaid by glacial deposits, with an
average of JO feet of glacial overburden above the local
bedrock. Major structures of the station, including the
reactor building and turbine building, are supported on
rock, Seismic velocity measurements at the site verified
the hard massive nature of the bedrock and there were no
indications of deeply weathered or faulted zones (FSAR
2.5).

Seismic Design

The maximum acceleration at the bedrock surface of the
plant site from an earthquake is expected to be from 0.08¢
to 0.04g. Although this acceleration is considered to be con-
servative, the seismic design for structures and equipment
important to safety are based on dynamic analyses using
acceleration response spectrum curves together with a
ground motion of 0.07g. The station is also designed so that
the plant can be shutdown in a safe and orderly manner
even if the ground acceleration were 0.14g (FSAR 2.5 and

12.2).

~aeselUCU POU El Fh h6h]— OO Pee — )
%4N eAD0y

(e)
YOReIUGR 4

ond

UM) Wy 19n4 peyerpers|

_—

(q)
BUN

> M7 O} 1eN4 YSel4

(e)

Buu

-_mtims Gn menses 1. sPenawesr as 6 WW

42

As discussed earlier, the environmental considerations
relating to the construction and operation of the individual
nuclear power plants, including transportation of radio-
active materials to and from the power plant, are considered
in detailed environmental statements in the separate licens-
ing actions for each individual facility.

The supporting manufacturing operations to the nuclear
fuel eyele have been reviewed and those that have been
judged to be relatively remote, indirect, and less signficant
contributors to the environmental impact of the nuclear fuel
eyele have not been included in this statement. Typical
operations in this category include production of commer-
cial reagents such as sulfuric acid, hydrogen fluoride, ammo-
nia, nitric acid, ete.

In many instances improvements in technology are avail-
able and plans are underway for incorporating these ad-
vanees into production facilities. However, the primary
basis of the present survey is today’s industry with only
minimal allowances for advances that may be accomplished
in the future. In line with Commission practice, standards
and criteria relating to fuel eyele facilities are continually
evaluated and modified as appropriate to reflect experience,
changing technology, and expansion of the industry. Thus,
future environmental evaluations should also reflect contin-
uing changes and advances as they affect the current mode
and level of operations. |

3. Nuclear Industry Models

(a) Model LWR

A “model LWR” was developed to relate the environ-
mental considerations of the supporting fuel evele to
the annual operation of a nuclear power plant. In the
development of this model, the requirements for each

BLEED THROUGH POOR COPY

O48

step of the fuel cycle have been reviewed for the current
generation of 1000 MWe boiling water reactors (BWR)
and pressurized water reactors (PWR). Both of these
classes of LWR'’s utilize fuel in the form of sintered
uranium dioxide pellets encapsulated in either stainless
steel or zircaloy tubing. The maximum requirements
in each step of the fuel cycle used to define the model
LWR are listed in the first two columns of Table S-1
for both an initial core loading and an annual fuel re-
load along with fuel performance parameters used to
define fuel requirements.

The useful life of LWR’s has been estimated at between
30-40 years. For purposes of this analysis, a 30-year
life has been conservatively assumed in defining the
“annual fuel requirement” for the model LWR. The
model LWR annual fuel requirement is defined as the
sum of one initial core loading plus 29 annual reloads,
averaged over the 30-year life of the plant, and is listed
for each step of the fuel cycle in the third column
of Table S-1. In discussing the environmental consid-
erations of the nuclear fuel evele steps in subsequent
sections, resource use and effluent quantities have been
related to this annual fuel requirement.

44

TABLE S-1

CHARACTERISTICS OF MODEL LWR (1000 MWe)
MAXIMUM FUEL CYCLE REQUIREMENTS

Average
Annual
Inrbal Annual F wei
Core Rewad Requirement

Irradiation level

(MWD, /MTU) x 10-3 “4 33 33
Fresh fuel assay

(wt U-235) 26 3.2 3.2
Spent fuel assay

(wt% U-235) 0.76 0.84 0.84
Ore supply

(MT) x10°3 332 82.5 91
Yellowcake

U,0, supply (MT) 665 165 182
Natural UF, (MT) 840 200) 270
Separative work

(MTSWU) 304 110 116
Enriched UF, (MT) 200 47 52
Enriched UO, (MT) 12 36 40
Fuel loading (MTU) 134 32 35
Bases MT = metric ton = 2205 Ibs.
Reactor plant load factor — 80% MTU = metric ton uranium
Enrichment tails assay — 0.25% MT SWU=separative work
No plutonium recycle units in metric tons

Reloads include recovered uranium
Losses of 1% each in fuel fabrica-

tion and reprocessing

pDoioccn TWH crwircw ——_-- —_— +... 7)

545
(b) Model Fuel Cycle Facilities

In some steps of the fuel ctcle, numerous plants utiliz-
ing a wide variety of alternative processes and opera-
tions are involved. To evaluate environmental! effects
on a generic basis, a model fuel cyele facility for each
component of the fuel eycle was defined.

Where industry has used one predominant method or
one type of facility, that method or facility has been
defined as the model facility. Where a single predomi-
nant operation has not been used, the mode of operation
that imposes the most significant impact on the environ-
ment has been selected as the model. In some cases,
where the nature of the impact from two or more modes
of operation differs significantly, the aggregate opera-
tion of all plants, normalized to an appropriate annual
capacity, has been selected as the model fuel cycle
facilitv. The model fuel cycle facilities are not in-
tended to represent particular plants. However, the
models were selected to be representative of the indus-
try and to lead to conservative or pessimistic assess-
ments of the environmental considerations.

In the case of mining, milling, fuel fabrication, and
radioactive waste management, the above approach
resulted in the adoption of representative individual
facilities as the model facilities. The UF, production
model is a composite of the total industry complex of
two plants that are presently in operation. The iso-
topic enrichment model is the total government-owned,
contractor-operated complex of three plants as it essen-
tially exists today. The reprocessing model is a com-
posite of the total industry complex of three plants as
they are planned for operation in the middle of this
decade. Table S-2 gives the annual capacity of each

546

model fuel eycle facility and relates this capacity to
the annual fuel requirement of the model LWR.

TABLE 58-2

NUCLEAR FUEL CYCLE
CAPACITIES RELATIVE TO THE
ANNUAL FUEL REQUIREMENTS OF A MODEL LWR

Equivaient Number
of Model LWR
js ¢ oem Annual Fuel
Capaaty Requirements
Range Mode:
Uranium Mine
(MT ore) x 1073 250-750 480 5.3
Uranium Mill
(MT U,0¢) 500-11009° 960 5.3
UF Production
(MTU) 5000. 10,000 5000 27.5
Isotopic Enrichment
(MTSWU) 6000-17000 10,500° 90
UO, Fuel Fabrication
(MTU) 300-1000 900 26
Spent Fuel
Reprocessing
(MTU) 300-1500 900 26

* Current operating level of industry and assumed model plant capacity.
** Characteristic of about 70% of current facilities.

The lifetime of each model fuel cycle facility was esti-
mated to relate the land use to the model LWR annual
fuel requirement. These estimates are generally 20
years which are on the low side of the expected life-
times, so that the resulting land use numbers are con-

servative.

BLEED THROUGH DADS COPY

547

4. Approach to the Assessment of
Environmental Considerations

A detailed environmental review of an industrial process
effluents involves the consideration of three components.
These are (1) a source term or rate of effluent release, (2)
a dilution term, or dispersion of the effluent throughout the
medium under consideration, and (3) a population term,
giving the distribution of human beings or biota affected
by the efluent. To evaluate environmental impact, these
factors must be combined.

In this broad survey of environmental considerations, the
nuclear fuel cycle is treated on a generic basis. This ap-
proach permits an overview of the entire industry without
keying the study to particular plants and manufacturers.
In order to compensate for the lack of specific detail, effluent
concentrations, radiation dose rates, and human population
densities appropriate to the model fuel evele facilities are
estimated in each section.

Whenever possible, the environmental considerations
have been related to the annual operation of a model LWR.
This has been accomplished by normalizing the land use,
water use, fossil fuel use, and effluent releases (including
chemical, radiological, and thermal) to the model LWR an-
nual fuel requirement, defined above in part 3.a of this
section. The summary tables in each section, and the main
summary table in this section, present the environmental
considerations on this normalized basis.

It is recognized that the considerations presented in the
summary tables may not adequately express the actual en-
vironmental impact of the fuel cycle. Accordingly, this in-
formation has been supplemented with concentrations and
dose rates and compared with applicable and available

548

standards.' These additional considerations are presented
in the summary text in each section, as well as in the sum-
mary text in part 5 of this Section. Whereas the informa-
tion presented in the summary table is normalized to the
annual operation of a model LWR, it is unrealistic to ex-
press concentrations, dose rates, and postulated accident
effects on this basis. Accordingly, these considerations are
based upon the nominal operation of the model fuel cycle
facilities.

Estimates of effluent concentrations and radiation doses
at the site boundaries of the model fuel evele facilities are
based upon experimental data or calculated values. Where
measurements are available these data have been used. In
most cases, however, it has been necessary to calculate
these quantities, based upon estimated release rates and a
model for dispersion. For the fuel reprocessing step, de-
tailed analyses have been made of atmospheric dispersion
in conjunction with the NEPA review and the preparation
of the detailed environmental statement for specific plants.
Therefore for that step in the nuclear fuel cycle the diseus-
sion is based upon actual meteorological conditions at the
specific sites. For other components of the fuel evele, for
which no such data were available, an atmospheric disper-
sion model suitable for reactor accident analyses has been
employed. This model utilizes X ‘Q values which are 1/10
of those given in AEC Safety Gnide No. 3,2 as recom.
mended for realistic environmental evaluation in proposed
Annex to Appendix D of 10 CFR 50

‘Most commonly used Federal, State and international standards were
utilized for both radiological and non-radiological effluents.

° 4-30 day release curves in Safety Guide 3, Assumptions Used for FEval-
nating the Potential Radiological Consequences of a Loss of Coolant Acei-
dent for Boiling Water Reactors, (SAEC, 2 Nov. 1970.

* Consideration of accidents in Implementation of the National Environ-
mental Policy Act of 1969; Proposed Annex to Appendix D, 10 CFR 50;
1 December 1971.

BLEED THROUGH POOR COPY

549

Where measured or estimated concentrations of chemi-
cals in surface waters were available, these concentrations
have been compared with the recommended criteria con-
tained in the Water Quality Criteria “Green Book.” This
volume represents the most comprehensive document on
water quality requirements, and is used as a basic reference
by agencies engaged in water quality standards setting ac-
tivities. The recommended criteria are for source water
which is to be subjected to normal water supply treatment
prior to consumption as drinking water.

Airborne effluent concentrations have been compared with
current EPA National Secondary Ambient Air Quality
Standards,’ where these are available. Secondary stan-
dards are designed to protect the public welfare from any
known or anticipated adverse effects associated with the
presence of air pollutants in the ambient air. For sulfur
oxides, the secondary standard is 0.02 ppm, annual arith-
metic mean, and for nitrogen dioxide it is 0.05 ppm annual
arithmetic mean.

It is important to note that the discussion of environ-
mental considerations in this document is confined to off-
site effects ; occupational health and safety of on-site work-
ers are given major consideration by the AEC in detailed
safety licensing reviews for individual facilities.

5. Summary of Environmental Considerations

The principal environmental! considerations for each com-
ponent of the nuclear fuel cycle, and the aggregate con-

* Water Quality Criteria; Report of the National Technical Advisory
Committee to the Secretary of the Interior; U. S. Federal Water Pollution
Control Administration; Washington, D. C., April 1, 1968.

* National Primary and Secondary Ambient Air Quality Standards, pub-
lished by the Environmental Protection Agency, Federal Register, Volume
36, Number 84, April 30, 1971.

550

siderations, normalized to the annual fuel requirement of
a 1000 MWe model LWR, are summarized for the nuclear
fuel cycle in Table S-3. Table S-3A similarly summarizes
the considerations for each step in the nuclear fud cyele.

(a) Use of Natural Resources

(1) Land

The temporary land commitment amounts to 63
acres per annual fuel requirement for the model
IL.WR. More than 70% of this land is an undis-
turbed area or which maybe withdrawn by fencing
from active use by human habitation. “he fene-
ing also restricts migration of large animals. Ap-
proximately 18 acres are transformed fiom their
original state by the construction of facilities.
Less than 5 acres of land are permaneatly com-
mitted to the production of the annua! fuel re-
quirement for a model LWR.

At any time, the total temporary land commit-
ment required by the fuel eyele to support a 1000
MWe LWR is about 750 acres. The tots] perma-
nent land commitment, assuming a 30-year reactor
life is about 140 acres.

To cast the land requirements into furher per-
spective, a coal-fired power plant of 100 MWe
capacity requires the disturbance of appreximately
200 acres per vear for strip mining alone. The
disturbed area for the nuclear fuel cycle amounts
to approximately 18 acres per annual fue require-
ment of a model LWR, which is less than 10% of
the equivalent annual coal mining land commit-
ment or equivalent to a 90 MWe coal-fired power-
plant fuel requirement.

BLEED THROUGH POOR COPY

yndyno ABi9Ue YAN] OM OOO'T POU Jo wZO> £01 (o-OL ¥ Jos) sed juanqey
yuu demod pouy

“T8Oo OMA SFY JO UoRdusUOD aq) O) JUePRAInby git ‘e-O1 * LIQ) [800 yuejearnby
wdINO YA] PAW OOO'L [POUT Jo 4 > Lig (e-O1 ¥ AYUMI) ABs0u9 peorsqooig
‘Ta04 “USs04
Bul joo .
yBNALYI-20UO YL YAY’ PALIN OOO'L [POU Jo 45> = —
&ZI punad oO} pasavqosy |
ZS0'11 SHPO open OF paBByostc]
49M0) BUTYOOD YM YM] OMIA OO0'L [PPOU Jo 27~ egl 418 0} podawyosy(|
™ (o-O1 X SUO|jS) wary
8 jueid tamed posy{Poo oA IE OG OF JUOTRAInbYy Lz 9 OL*® LA) pesow uepanqgieayy
oF po WWOS AUIURULIAY
yuBld Jamod pary-[HOo + WX OG OF JUerwarnby 8! BAW poqanysi(]
oF Ve peqsnystpy,)
£9 parrummos ApuBod way

(88198) GNV']
as.) ae. OMG TWIN
3m) SMR 0001 eo eo,
Wwewes DEY OF 4 eEMULY 18d Dey] WOwE
(Mowssnbey jony jeRUUy YA] [PPO] OF PeTTPeULION )
24) PNY sepOA 404 sUO|eLapHsUO) ;eyUsMUOZAUY yo Coeur,
Ss TMVL

952

‘weo00ad paw on sud peunqwu wor Wry,
“UONBIVIUAD dawod 40} [Woo yusTVAINbs Jo UORSNqWios UOdn pesYg s,UaN We paywUuIE] ,

-eiti- x |
8}2 OZ “ON r0 24
83° 009 "HIN ol “HN
ae Joye gel +¥N
uORnIpP JO MOY ey) PUB uotNn;IpP aambes yu) zs i
SUIN SUD OY] | SPUPURS aqrestuLied mopeq tec 48
S[PA9] OF J9UBM JO BOIPOd DUlAtsoo Aq UworpNyTp ro eplon|
[PUCK PPE arts PUL SUOTPRAJUSOUOS ayNyIP Ut 9% ®ON
juss Be JooOye [RpUUIUO’I AUS MIGAPH 205 PwTy sg ¢ - tos
“uajod &@ oNIWRUOS yey) SyueUOdWO,) ‘Ssdoy Fur spinbry]

‘mooidal pus ‘UOT}WOLEqR) Jony ‘jueUTyOIIUe Woly
‘ya[wey URWNY UO sega s¥Yy yey) )

[PA] MOfOQ-SPLepurys ajeys jo ours UNM oUO,) LO — = MH MYL SNIpws arur-g¢
UI Uoeindod Jo; Wes-uvUI FF st BOP Apoq
994.4 —— syuuid Sumeooidas jong wos ayes
sop [ehUUY WKUIXeyY — situ wos Aypedmwuug

‘yuewUOILAUS

OF Suaniye JUwOYyIUss ou — SIT WOLy A]yedroULLY
“quaUTUOITA

Ue OF] SpueNwe juvOYyTUsS ou — Ajuo si Woy

6M) OM 0001 ”
womasnbey jon 4 jenuvy 16d poy] anwuey

;

[ $00'0 sorUwINSUBL |
ot sONpoLg UO |
{ 20 ell
Ose (e-O1*) $84M
. LST (e-O1 *) umnuy
9600 winrue)
po OST
ws 922-"Y
ts 22o-UY

(UsWUTRI Ue BUIpNjoul) sewer)

(S2LUNd) TVOIDOIOIGVY — SLNEI 44g

000' 16 sprog

Oz (¢-O1 ¥) suoKgnypog sBurrey
me

(aomesnbey jong fenuTy YA] POW OF PeztTeus0y )
2Ph) PNY AeepNA 404 sUONBsspIsUO) [wJUsMUOZIAUY JO CawuUNy

(402) — &S TMV

—_ a > es A eee eo 2S

‘UM’ OMA 000'T [Ppow jo %) > OLEE (6-01 X 1g) IWewany

JUPWUOTIAUY JY) OF JUSNYge JUBOYIUTIS OU j9Ae] YY UVYyY sayIED
“punoud Of pouinjes sBul/1e) ul pepujour-s[jru Wo 4 00s! ( PeLINg ) sprjog
‘UM’ [Ppow 40; shUsWaIINbes jany jenuue oe (e-O1 =) wmmmeg
9 JO Buywwooordad (¥y0} 405 OZ YAO O1 5° %F> . e018
“ORBUI0UOD WWRWIXeU-sjUBid Burmeooddes wos 4 j
‘UM’ [Ppoul 40) syueuarmbes
any [wnUUY gz FuIBIDOId [I0} 405 OZ YAO OL JO ve — ieee
%OL> BHC U2s.U0O-UBId UONBLqEs [any Woy -
‘wyusuiainbes jong jwnuue 120 oez-u,
UM'T POU GLZ JO Surmmoooad pwyoy 205 OZ YAO 1200 poe
OL 3° %¢> UoRNIQUI.UC2-UORHINpod %4y Wor -—
WOWUOIIAU® UO eyo OU ‘aIOjaseyy
‘uenye OU — punads 0, pewinjar puv sonbry 2 siajysnep yY wns)
sure, Ul pepnpur— Suyjyu wor 170 OE
Loo _ . . L700 966-8
re - a wo wo ee0 a soyyonu, y wanes}
sprnbuy
£000 - — 1000 om _ _ soluBsnsues |
ol —_ — ol ™ — - - Spoupoid UOLSSI
c00 . - goo : -_ etl
200°0 - — Zo000 — : bell
Ost — = Ot — : ; (¢-O1 *) C84M
Le -- rel — —_ : (s-O1 ¥) Way
9F0 0 —_ —“ = cOOOO ZOU rl0o 86800 wniues }
200 -- _ — - 00 O&A
c00 = eo = ree 900 FH
es + : pate - te cco UN

(}UCWUTRIYU FUIpNpout) seses)
(s91an)) Daboynpuy

"aaa aw a (p.juoo) syuondg
be ate aos ss aes
a] 3 4 3 Q 2 a v

Wuawasnbey Png fOUuaY YA] POW OF PeztTeULs0EN
apt) PRY seep, 404 sUOTesepIsUO ) feEyUsUOsTAUY Jo Caeuny
(pawo2) — Ves WHIVL

_ nor hv lvoe Ae 8 OF

(2) Water

Water is used in the nuclear fuel cycle both as a
coolant and for process requirements. Water uses
have been grouped into three categories based
upon the method of return of the water to the bio-
sphere. Water is evaporated into the air, dis-
charged into water bodies or is returned to the
ground.

The largest quantity of water involved is the 11
billion gallons required to remove the waste heat
from the power stations supplying electrical
energy to the enrichment step of the nuclear fuel
cycle in the production of an annual fuel require-
ment. Assuming once-through cooling at these
power stations, all of this water is returned to sur-
face water bodies. An additional 338 million gal-
lons of water are directly involved at the fuel cycle
plants for cooling, process, and dewatering re-
quirements, totaling 11.3 billion gallons of water
moved in producing the annual fuel requirement
for the model LWR.

In order to remove the waste heat from a 1000
MWe nuclear power plant on a once-through basis,
approximately 300-400 billion gallons of water are
pumped annually. Thus, the total demand for
water in the components of the nuclear fuel cycle
constitutes less than 4% of the water requirement
of a 1000 MWe LWR.

The largest single direct dissipation of water by
evaporation in the nuclear fuel cycle is for process
cooling in the enrichment step. The gaseous diffu-
sion plants evaporate approximately 90 million
gallons of water to the atmosphere per model

BLEED THROUGH POOR COPY

(3)

999

LWR annual fuel requirement. This constitutes
approximately 55% of the 163 million gallons of
water discharged to the atmosphere in the nuclear
fuel cycle. As a point of reference, a 1000 MWe
LWR utilizing cooling towers would evaporate ap-
proximately 7 billion gallons of water per year to
the atmosphere or more than 40 times the evapora-
tive use of water by the nuclear fuel cycle to pro-
duce the fuel for a year’s operation.

The requirement for uranium mine drainage moves
over 120 million gallons of water per model LWR
annual fuel requirement. However, minimum de-
pletion is involved, since the water is pumped from
the bottom of the mine pit to the ground surface
for return to ground water at some other location
with some being returned to the atmosphere by
evaporation.

Other

The uranium enrichment component of the nuclear
fuel cycle requires over 98% of the electrical
energy required by the fuel cycle. The total elec-
trical requirements are 317 x 10° MW-hr for the
annual fuel requirement of a model LWR. A 1000
MWe LWR would produce 7 million MW-hr in
annual operation at a load factor of 80%. Thus
the electrical requirements of the nuclear fuel
cycle to produce fuel for this reactor are less than
5% of the energy produced by the reactor in a
year’s operation.

At present most of the electricity generated in the
United States is produced in plants that burn fos-
sil fuels. Assuming that coal comprises the bulk of
fossil fuel utilization, the electrical energy require-

ments of the fuel cycle correspond to the consump-
tion of 116 x 108 MT of coal. A 1000 MWe coal-
fired station consumes approximately 2540 x 10%
MT of coal annually. Thus, the nuclear fuel cycle
for a model 1000 MWe LWR consumes about the
quantity of coal required for a 45 MWe fossil-
fueled plant.

Additionally, approximately 100 x 10° sef of nat-
ural gas are consumed for process heat, most of
which is used in the milling operation. This quan-
tity of natural gas could be used to generate
roughly 10,000 MW-hr of electricity, which is less
than 0.2% of annual output of the model LWR.

(b) Effiuents
(1) Chemical
(i) Gaseous

At present, most of the power plants that
supply electricity to the fuel eyele operations
burn coal. Consequently, the combustion prod-
ucts of coal comprise nearly all of the air-
borne chemical effluents attributable to the
fuel eyele and approximate the effects from
the operation of a 45 MWe coal-fired power
plant for a vear. The main contributor to
these gaseous effluents is the uranium enrich-
ment step, which consumes over 98% of the
electrical energy required by the fuel cycle.
The existing plants draw power from the grids
of large utilities ; thus, no single power supply
source ean be identified with the gaseous efflu-
ents. To the extent that power is supplied by
nuclear power plants, the total quantity of sul-

BLEED THROUGH POOR COPY

SS

561

fur dioxide, nitrogen oxides, hydrocarbons,
carbon monoxide, and airborne particulates
would be greatly reduced.

Fluorine is introduced into the fuel cycle dur-
ing the UF. production step and is removed
from the fuel material in the fuel fabrication
step. As a result, fluorine becomes an airborne
effluent from several steps of the nuclear fuel
eyele. Although most of the fluorine gaseous
wastes are effectively removed by scrubber
treatment systems, approximately 0.7 MT per
model LWR annual fuel requirement is re-
leased to the environment as an airborne con-
taminant. To put this quantity into perspec-
tive, the estimated fluoride emissions from
four major industries are given in Table S-4.

TABLE S4

ESTIMATED FLUORIDE EMISSIONS
FROM MAJOR U. S. INDUSTRIES

Source Emissions MT /yr.
Phosphate Industry 17,000
(principally fertilizer
manufacture)
Aluminum Manufacture 15,000
Steel Manufacture 39,000
Brick, tile, glass manufacture 19,000
VOTAL 90,000

Assuming a nuclear power generation indus-
try of 140 model LWR’s by 1980, approxi-

062

mately 100 MT of gaseous fluorides would be
released annually by the entire nuclear indus-
try at that time. This constitutes about 0.1%
of the total annual quantity of fluoride emis-
sions from the total of the industries noted in
Table S-4.

Despite the trivial nature of this effluent in
comparison with other major industries, the
airborne fluoride release from the nuclear fuel
cycle could constitute a potential for adverse
environmental impact. Measurements or cal-
culations of airborne fluoride concentrations
at the site boundaries of specific plants fall
within the range of 0.005-2.0 »g/in3. For per-
spective, these concentrations are well below
the level of observed adverse effects on human
health, and they span the range of existing
state standards.* State standards are used for
comparison because there are no applicable
Federal Standards.

At uranium mills and UF. production plant
sites, the combustion of natural gas for proc-
ess heat is a source of nitrogen oxide release
to the environment. Dispersion calculations
indicate that annual mean NO, concentrations
are within the EPA air quality standards of
100 »g/m’. That standard, according to the
Environmental Protection Agency, is adequate
to protect the publie welfare from any known
or anticipated adverse effects associated with
the presence of oxides of nitrogen in ambient
air.

* State of Washington : 0.5 ug/m*
State of Pennsylvania: 5.0 ug/m*

BLEED THROUGH POOR COPY

a on ea eo

te

563

(ii) Liquid

The largest quantity of liquid effluents, 240 x
108 MT of waste solutions per annual fuel re-
quirement, contains sulfuric acid and other
spent chemicals from the milling processes.
This waste liquor, however, is discharged to
the tailings pond, and since it does not nor-
mally contaminate unrestricted ground or sur-
face bodies of water, it does not actually
become an effluent stream.

Significant quantities of a number of chemi-
cals are discharged in liquid effluents from the
enrichment, fuel fabrication and reprocessing
steps. The concentrations of fluorides, ni-
trates, and ammonia contained in the liquid
waste streams from the model fuel fabrication
plant are a possible source of adverse environ-
mental effect. Dilution of these constituents
by the receiving body of water by 1-3 orders
of magnitude may be required to achieve
drinking water source quality, depending upon
the flow rate of the receiving body of water,
its upstream quality and its downstream use.
Efforts are in progress to minimize these re-
leases from existing plants.

The liquid effluent quantities from enrichment
appear large but generally are of chemicals
that do not constitute a potential for adverse
environmental effect and are at much lower
concentrations. The enrichment step contrib-
utes the largest total quantity of liquid con-
taminants, but the concentrations of potential
contaminants in the effluent streams are gen-
erally within the range of permissible stan-

64

dards.’ Additional dilution by about 700 times
by the receiving body of water dereases the
concentrations well below acceptable levels.
The release of hexavalent chromiun, although
small in quantity ( oe : ee 1 ET: em eer — > =
sa

573

In addition to requirements for care in design, construc-
tion, and operations of nuclear fuel cycle facilities, each
licensee is required to report incidents to the cognizant AEC
Regulatory Operations office which either have or threaten
to cause any of the following types of events:

(i) Radiation exposure of individuals beyond stated
limits.

(ii) Release of radioactive materials in daily averaged
concentrations of more than 500 times limits speci-
fied in 10 CFR 20, Appendix B, Table II.

(iii) A loss of operations of any affected facility for a
period of greater than one day.

(iv) Damage to property of over $1000.

The information in these reports is used as a basis for
corrective action to prevent similar events from occurring
in existing plants and is taken into account in the licensing

actions on new or modified facilities of a similar nature.
Such information is also evaluated to determine the need
for new or modified standards and criteria.

The effectiveness of these measures to date is borne out
by the fact that the incidents which have occurred in fuel
evele facilities in this country to date have neither resulted
in significant injury nor endangered the health of any indi-
vidual in the general public. Nevertheless, for each li-
censed operation of the fuel eyele, a serie. of potential acci-
dents with environmental effects judged to range from
trivial to serious have been postulated and evaluated in
the safety analysis that is performed before the individual
facility license is issued. Records to date indicate few if
any of the routine type accidents involving special nuclear
material have had any measurable effects on the environ-
ment. Thus, the review of accidents for this statement has

Ni irrsenenscenninsaniennasiscnendaietanthiosl

_- _—-. om ee ~* ~ a an .

NE EE ae ee

623

result from nuclear fuel cycle operations, there is
essentially no heat release to the environment from
these wastes.

The storage of packages containing solid high-level
wastes at an engineered facility will result in the
release of a small amount of heat. The wastes in
each package (about 10 cubic feet) will generate
about 2-5 kw of heat, depending on the elapsed
time since the material was first created in the re-
actor.” During transfer and storage of packages
in the facility, some heat transfe medium will be
used to dissipate the heat from the sealed con-
tainers.

(ec) Accident Effects

There have been no accidents at burial grounds under
Federal or State jurisdictions that resulted in offsite envi-
ronmental effects. Some minor accidents have occurred in-
volving materials not utilized in any fuel evele.

Accidental opening of an other than high-level waste
package prior to burial and release of the package contents
could oceur, however, at a commercial land burial facility.
Normally the seattered waste materials would be confined to
the feneed facility and the impact on the environment would
he negligible. However, even if it is assumed that as much
as 14 of the waste contained in a 55-gallon drum is released
to the unrestricted area, the effect on the environment would
be insignifieant. The volume of a 55-gallon drum is approxi-
mately 2x10 eubie centimeters. Using the assumption
made previously of a waste concentration of 0.025 micro-
curie per gram and density of 1 g/ce, the total amount of
radioactivity involved is about 1.7 millieuries. If the waste
were uniformally dispersed over an area of one acre, the

624

concentration of the radioactive material would be about
0.04 microcurie per square foot or 4x 10-5 microcurie per
square centimeter. Dispersion over a greater area would
result in a proportionally lower concentration. Much of the
dispersed material would be in the vicinity of the site which
is normally uninhabited and unused. Recovery of the bulk
of the scattered waste could easily be accomplished. Radia-
tion surveys could be made and the area decontaminated.

With respect to the engineered structure facility for high-
level wastes, the major credible accident would be loss of
cooling with concomitant heating and possible failure of the
package in which solid high-level waste is contained. The
facility will be designed to protect against this type of acci-
dent. The facility will be designed to withstand all credible
natural forces and man-created accidents so there will be
no release of radioactive material outside the facility. The
high-level solid wastes are immobile, stable material, sealed
in containers. The presence of trace amounts of radioactiv-
ity in the cooling media would identify the failure of a waste
container. The cooling media will be routinely monitored
and treated to preclude any release of radioactivity to the
environment. A failed waste container would be repackaged.

[ta ae ae a ele ee 2 ——_ -- — a on
Se ee me -

me Me oe

676

presentations will by comparison be quite small. We are
trying to do the overall picture.

(iiven that, the representatives of the vendors of the
industry and of the Commission, to some extent are on the
opposite side and don’t think that the request for 160
minutes is particularly unreasonable to get a full presenta-
tion of our needs.

Finally, we are under the impression Mr. Smiley ad-
vised me of —

CHAIRMAN PAGLIN: Beg pardon?

MR. ROISMAN: Mr. Smiley advised me, I spoke with
him on the phone, the hearing had been reserved for seven
hearing days — two the first week and five’the second.

Based upon that, it would seem for the number of parti-
cipants we do have enough time even if we stay within the
outer bounds. Maybe that was the Commission’s conserva-
tive assumption regarding the length of the hearing and
they perhaps — we represent the unanticipated event.
[29]

In any case, we feel that the time we requested will be
essential to ake a meaningful participation and hope that
the Board will give it serious consideration.

Thank vou.
CHAIRMAN PAGLIN: Thank you, Mr. Roisman.

| might comment by way of a footnote that as far as the
Board members are concerned, we had not attempted to
make an estimate of the length of the hearing, awaiting
the very purpose of this planning session so we could get
some idea of the parameters of the proceeding.

| have no present idea how long we will need. T am
following the mandate of the Commission that this should
he an expeditions hearing albeit an informal one.

677

I thank you for your statement, Mr. Roisman.
We will certainly give it very serious consideration.

Do the Board members have any questions of Mr. Rois-
man at this stage, because it is a little unusual, if the other
participants will permit me, because of the rather unique
nature of Mr. Roisman’s comments now as contrasted with
the others? At this stage, the Board members would like
to ask questions, or would you prefer to go through the list
and come back up?

DR. GEYER: I would like to suggest to Mr. Roisman
that it might be helpful if he would give us a list [30] of the
people he is representing.

We had that in other hearings, but I think it would be
nice to have it here.

MR. ROISMAN: You mean the list of participants in
the National Intervenors?

DR. GEYER: Yes.

MR. ROISMAN: I will be glad to provide that to the
Board and we will do it in a number of days.

DR. GEYER: Thank you.

CHAIRMAN PAGLIN: May we now continue?

Next on the list is Westinghouse Electric Corporation.
MR. LINDLEY: I am Peter Lindley of Westinghouse.

Westinghouse would like the opportunity to enter a brief
oral statement, probably 15 to 30 minutes in length.

This staement will concentrate in the main on the areas
of the fuel eveling which we are interested in, but we would
like to offer comments upon the alternatives before the
Board.

678

Our presentation — we — will be given by Mr. W. J.
Dollard, General Manager of the Nuclear Fuel Division.
But we would like the opportunity, if necessary, because of
his schedule to put — to have the statement made by some
other designated person.

CHAIRMAN PAGLIN: That would be acceptable.
Thank you, sir.
[31]

Next on the list is the Edison Electric Institute, but my
recollection is that Mr. Upton indicated you would cover
that? You would cover for them?

MR. UPTON: Yes. I have already covered the extent
of the participation.

CHAIRMAN PAGLIN: Thank you.

Next is — with the new name being changed throughout

the country, Exxon Nuelear Company. Did you bring the
tiger?

MR. NELSON: Lam Roy Nelson. We will file a written
statement with possible oral statement that will take five
minutes.

CHAIRMAN PAGLIN: You said possible oral state-
ivent. You don’t know at this stage?

MR. NELSON: I don’t know at this stage.

CHAIRMAN PAGLIN: Is there some way the Board
can know whether or not you want oral time allocated?

MR. NELSON: We will let you know in a few days.

CHAIRMAN PAGLIN: Fine. Thank you very mueh.
I have the electrie utility group by Mr. Freeman.

MR. FREEMAN: I am George C. Freeman, Jr., with
the law firm of Hunton, Williams, Gay & Gibson, Richmond,
Virginia. I am appearing for the following electric utilities.

679

and also the counsel listed in our notice of appearance which
I will not repeat at this time:
[32]

Baltimore Gas & Electric Company. I might indicate,
though, Mr. Robert Buchanan of the legal department of
Baltimore Gas & Electrie Company is with us foday.

Boston Edison Company.

Consumers Power Company.

General Publie Utilities Corporation.
Long Island Lighting Company.
New England Electrie System.
Northeast Utilities Company —

CHAIRMAN PAGLIN: Excuse me. May I interrupt
you?

MR. FREEMAN: Yes, sir.

CHAIRMAN PAGLIN: Did we have the listing wrong?
You call it New England — we have New England Power
Service Company. Is that different from the one you just
read?

MR. FREEMAN: Yes, sir. It should be listed as New
England Eleetrie System.

Northeast Utilities Company.

Pacific Gas & Electric Company.

Philadelphia Eleetrie Company.

| might indicate that Public Service Company of New
Hampshire has indicated that they will not participate in
this rulemaking, and therefore they ask their name be
deleted.

But continuing the utilities that we are here represent-
ing — Public Service Electric & Gas Company.
[33]

San Diego Gas & Electric Company.

Southern California Edison Company.

Virginia Electric & Power Company.

Yankee Atomic Electrie Company.

On behalf of these companies, we have already submitted
written comments for the record. We would like to reserve,
if possible, 30 minutes of time. We would hope that we
would be permitted to come before the last of the persons
commenting for the following reasons:

First, we would not repeat in any oral statement the
details of our written comments. We would, however, like
to be available to briefly summarize our preference for
alternative two and to answer any questions the Board
might have of these utilities with regard to that preference.

Second, we are concerned, vitally concerned, with the
interface between this rulemaking and the proposed rule
and individual licensing cases.

The issue of the relationship of this proceeding and the
survey and individual licensing cases has been raised in
several pending licensing cases for members of our group.

Finally, we would like to be able to perhaps respond
and comment on crucial technical questions which might
particularly affect the utility industry as they may be
raised in the comments of others preceding us in the [34]
proceedings. We would estimate at a maximum 30 minutes
that would be required for that purpose, and if, indeed,
when the time came we felt it would not be in the public
interest or onr clients’ interest or to the Board’s interest
to take that time, we would, of course, not do so.

CHAIRMAN PAGLIN: Thank you, Mr. Freeman.

681

The S. M. Stoller Corporation? I recall now Mr. Stoller
called our office and indicated that he would not have
someone present — Dr. Leonard Geller?

DR. GELLER: I am here.

CHAIRMAN PAGLIN: May I tell Dr. Geller what's
involved?

We are calling the list of participants and asking them
to indicate whether they will want to make oral presenta-
tion in addition to the written submission; if so, what areas
will be covered and how much time they will need.

Can you— catch your breath — say something?
DR. GELLER: I would say five to 10 minutes.

CHAIRMAN PAGLIN: What areas do you think you
will cover?

DR. GELLER: I don’t know vet.
CHAIRMAN PAGLIN: Thank you very much.

For your benefit, sir, there is a transcript being made of
this planning session so that you can find out what went
on before you arrived,

[35]
The New York State Atomie Energy Council?

Anyone here on their behalf?
(No response. )

Consolidated Edison has indicated they will file a state-
ment and not requested —

MR. UPTON: Mr. Chairman, Consolidated Edison is
one of the group on behalf of which I filed a statement.

CHAIRMAN PAGLIN: I hope you have a_ better
chance at keeping track of your clients than I am.

(Laughter.)

Thank you, sir.

New York Public Service Commission?
(No response. )

The Natural Resources Defense Council, is that — that’s
the group I told you about that asked for the extension of
time.

Gulf United Nuclear Fuels has indicated they will only
file a statement.

And Franklin L. Gage has filed a statement and I don’t
know whether or not he’s indicated he wishes to appear.
1 won't take up the time of the group. We will look into
the question of whether or not his letter indicated he will
need time. If he does, we will schedule him accordingly.

Now are there any questions from the participants up
to this point as to the procedures which will be followed?
[36]

MR. FREEMAN: Mr. Chairman?

CHAIRMAN PAGLIN: Yes, Mr. Freeman?

MR. FREEMAN: I take it under the procedures which
will be followed here that there will not be the usual service
of various statements, motions, and papers, on counsel for
the various participants; that that is not in the overall
format. I would like to ask an —ask as a matter of cour-
tesy among counsel that are here that we agree on such an
understanding, and I, for my part, would he delighted to
furnish copies of any materials which we filed on behalf
of the 14 utilities which we are representing, and would

683

appreciate copies being sent to us. I think it—as far
as the Staff were concerned, they intend to do that.

MR. MURRAY: Yes, that’s right.
MR. FREEMAN: I think it would be very helpful for
all of us, though, if we could, because to the extent we

would make oral statements, having material in advance
would be of assistance and save the time of everyone.

CHAIRMAN PAGLIN: Does the Staff have a view on
that?

MR. MURRAY: Yes, Mr. Chairman. We fully intend,
as Mr. Freeman anticipates, to make available everything
we have in writing in this whole area to every participant
who indicates an interest in receiving this material. We
are assuming anyone who is on this list that we have before
us [37] has indicated such an interest. We think it is a
good idea. We don’t wish to impose that view on anybody.
It is not formally within the preseribed format for the pro-
ceeding, but we certainly will follow it ourselves, and we are
glad to hear that the utilities will be following it.

CHAIRMAN PAGLIN: You will do so in advance?

MR. MURRAY: Oh, ves. As soon as they are available.
[38]

DR. GEYER: Will you provide a list of the people

whom you are sending the material to, the other partici-
pants?

MR. MURRAY: Dr. Geyer, I am using the Chairman’s
list.

DR. GEYER: Mr. Murray indicates he will be sending
it to everybody on this list.

MR. UPTON: Well, Mr. Chairman, the Chairman’s list
has to he revised in part.

ee RN es ee ee EE ORE ee Fe EE EY eee ke ee eee ~

684

CHAIRMAN PAGLIN: Yes, we are going to take the
transcript and revise the list.

MR. UPTON: I can’t imagine why all the lawyers in-
volved — | hope the lawyers won't assume too much of a
role in this proceeding. I feel this is very much like — it
is a legislative type hearing and | think there’s a difference
in my role as a lawyer and — in a legislative type hearing
when | accompany a client who is going to testify before a
congressional committee and my role as a lawyer when I am
handling a licensing proceeding or a court case.

The two roles of course are very different. In the con-
gressional committee situation, the lawyer's role willingly
or unwillingly is somewhat more muted, and that’s some-
what the way I see the lawyer's role in this proceeding.

Certainly we are delighted to send copies of anything
that we file either on behalf of the Edison Electric Institute
or the eight organizations that | named to everyone else
who [39] appears on this list.

CHAIRMAN PAGLIN: Thank you.

MR. ROISMAN: I am all in favor of Mr, Freeman's
suggestion but | wonder if the staff would make available
a list of the addresses on it so that we could make the
services to the appropriate people and also where there are
multiple people listed — for instance | notice here that
individuals are listed who are with the individual com-
panies or concerns and are not in Washington, but they are
today represented by counsel from Washington.

If service is preferred on one or the other, maybe they
could indicate an address to which those documents could
be served.

CHAIRMAN PAGLIN: I think that’s a useful sug-

gestion.

el eee eel i i

| 685

Mr. Murray, would it be possible for us to get together
an exact and accurate list with the names of people and
addresses to whom they should be sent? I think it would
be useful to us as well.

MR. MURRAY: Lam sure we could do that, Mr. Chair-
man. When I said I am using the Chairman’s list, I per-
haps was aware of the fact that the Chairman, I believe
you indicated —

CHAIRMAN PAGLIN: Is an informal list.

MR. MURRAY: — had developed it based on the [40]
filings that the AEC secretariat office had, and of course
these filings have addresses on them.

I think they were left off here because they weren’t ger-
mane for this purpose.

CHAIRMAN PAGLIN: Also made up from some sig-
natures that were nog legible by the way.

(Laughter. )

I think perhaps, Mr. Murray, it would be useful once we
make up such a list to distribute it to the participants.

MR. MURRAY: We will do that.
CHAIRMAN PAGLIN: Thank you.

MR. GLEASON: In response to vour statement before,
about the oral statement, | should point out that the forum
does intend to file extensive written comments on this sur-
vey. However, we did not file them by January 15th as
was set out in the written notice and it is doubtful that we
will file them by February Ist and the reason for that is
the seope of our review.

We simply could not be concluded within that time frame
so that it may be that when we make our oral statement, we

will still not have written our extended written comment;
they will not have been submitted to you.

We would attempt not to repeat or to duplicate things
which would be more appropriate in written comments. [41]
The fact is you probably will not have our written com-
ments by that time and that may present somewhat of a
difficulty in the Board understanding what our position
is: and for that reason, it may require a little bit more
time to explain it than if we had had the time to file the
written statements and the Board had had the opportunity
to read it ahead of time.

| regret that is the situation. It is not as a result of in-
tentional procrastination on our part. It is the result of
the extensive review that we are subjecting the environ-
mental survey to,

CHAIRMAN PAGLIN: Mr. Gleason, may | make this
request of my fellow Board members? Would it be pos-
sible for vou—TI understand what vou are telling us —
would it be possible for vou to make some efforts to be of
assistance to the Board in this advance preparation because
again the only questioning will be by the Board.

Mr. Roisman, in making his statement this morning, in-
dicated with some specificity the areas that would be dealt
with in their presentation. Would it be possible for vou

to do that? Do the Board members think that would he -

useful?

(Loard conference. )
DR. GEYER: 1 think so.

CHAIRMAN PAGLIN: The Board seems to think that
would be useful. Would it be possible for you to give us
that assistance?

me ew mee ee — ee

——

687
[42]
MR. GLEASON: Mr. Chairman, I am not prepared to do
that today.

CHAIRMAN PAGLIN: Not today. T am saving before
February Ist.

MR. GLEASON: Before February Ist I will. T ean give
you a general outline right now whieh I attempted to do
before. We will concentrate in our statement on an
analysis of the substance of the environmental survey.
We think that there are areas that we would like to touch
on with respect to the accuracy of some of the material,
with respect to the seope of the doeument, with respect
to some of the methodological approaches, so that we
think that the evaluation of the survey will be in some
depth.

That would constitute the bulk of our presentation. We
would like to address ourselves also to the alternative
rules, but that will be done in a more general fashion.

[ believe Mr. Roisman indicated that their written com-
ments would not be submitted until some time after their
oral presentation and within the 30-day period thereafter.

We would intend to file ours as soon as possible, perhaps
prior to February Ist if it is feasible so that you will have
the benefit of the comments as soon as possible.

Nevertheless, T think we find ourselves somewhat in the
same situation with respect to being able to make an oral
[43] statement which will he helpful to the Board,

CHAIRMAN PAGLIN: Dr. Steindler?

DR. STEINDLER: T wonder if | might address my-
self to that comment and to the one Mr. Roisman made

AQ CRAIN AA atoms a Re = AE OT te IE NS _ ee A TTR ~ es memes arg

and also one of the gentlemen | think from Westinghouse
indicated that the statement may be made by an alternate.

One of the things we are interested in is being able to
examine the statements presumably on the basis of tech-
nical detail, and the alternate in particular; and | can
appreciate the problem he might well have, and the prin-
cipal speakers in general, | trust will be capable of field-
ing questions on the substance of their presentation in
such a way as to allow us to examine those areas in which
there is either serious disagreement or challenge or some
such so that we don't end up with unchallengeable or un-
explainable statements that kind of sit in the record and
that we can't really use; the intent being here obviously
to provide for as much information for the Commission as
we can possibly get,

in summary, then, what | am looking for is those people
who present technical discussions, either a eritique of the
environmental statement as issued or a supplemental state-
ment that deals with that topie should be prepared, it
seems to me, to be technically competent in the area—at
least to the point of being able to answer questions.

(44)

The other comment L would like to make is that in all
instances it seems to me appropriate that the presenta-
tions, particularly the oral ones, should focus as closely as
possible on the content of the Federal Register notice and
continue to foeus on the questions that are really before
the House; and if we can continue to bring back all of the
discussion to the main central issues, then | think we can
provide for the Commission a useful transeript they can
use in their subsequent deliberations.

[45
CHAIRMAN PAGLIN: Thank you, Dr. Steindler.

Did you have any comment? The gentleman there?

SE GE ERIE ave

689

MR. RESTRICK: It appears to us it may be difficult
for the Board to file—to ask questions where the people are
filing written statements after the Board is over. Is it
intended by the Board they would file written questions
with people on the supplemental statements et cetera? Or
are they going to go in as filed?

CHAIRMAN PAGLIN: We have not addressed that
question specifically. I know it is certainly not my present
intention to keep the record open in the matter. I think
it would depend upon how the reeord develops. I regret
that I can’t give vou a specific answer right now.

MR. RESTRICK: It appears two major groups will not
be filing detailed comments until after the hearing.

CHAIRMAN PAGLIN: That is true and it does pre-
sent some difficulty. It may be that a further session
may have to be held. I just don’t knov at this stage.

How do my brethren feel about it?

DR. GEYER: Well, it seems to me that if we could have
something from the Atomie Industrial Forum prior to their
oral comments, jt might help us in discussing the problems
they are having.

MR. GLEASON: Dr. Geyer, we will submit as much as
we can to the Board prior to the commencement of the
hearing [46] and if that is no more than a general outline of
what we will cover, we will at least do that. We will make
every effort to give you the benefit of our thinking prior
to our oral statement.

DR. STEINDLER: The present apparent lack of open-
end time for submission of statements, I think, makes it
even more important that the written comments are en-

OR ee ei

tirely self-explanatory and reasonably carefully edited so
as to stand on their own feet. I think if that is done, as the
Chairman pointed ont, the reeord itself may, in faet, be
sufficient as it 1s submitted.

MR. UPTON: Mr. Chairman, | am still not entirely
clear about what is going to come first in connection with
these statements and comments and | would just like to
suggest to the Board the way it sort of runs in my mind
and see if | am right or if the Board has some other idea
in mind and so forth. It seems to me that, again T keep
trving to think in the context of a Congressional committee
hearing because that is the way I try to think in this kind
of proceeding. Ordinarily when someone appears at a
Congressional committee hearing they have to submit in
writing the testimony they are going to give before they
appear at the committee hearings.

Sometimes they read the testimony which is usually
pretty much a waste of time, | can assure you. And
at other times they are allowed to summarize orally various
aspects of the [47] testimony and point out other things
that they think should be pointed out that didn’t appear in
the testimony.

Now, I don’t see why we can’t all be expected — and
maybe I am taking this too lightly because at the moment
I don’t expect to make any oral presentation at the hearing,
but | don’t see why we can’t all follow that procedure here
by submitting what | would call our position in chief in writ-
ing before the hearing begins and then summarizing or
clarifying or highlighting that written position while the
hearing is being conducted, and then not trying to anticipate
at that point what our response is going to be to what the
position of all the other parties is, but trying to make those

Re . a

691

responses after the hearing in the comments which every-
one is permitted to file, written comments, after the hearing
record is coneluded.

What I am afraid of is if we don’t watch out we are
going to wind up with a situation where everyone is jockey-
ing for position to come last in appearing at the hearing
because he wants to be sure he has got the last word on what
the other fellow said. I would hope that could be avoided.

CHAIRMAN PAGLIN: I think those are significant
comments and I thank you for them. In fact, they seem
to be at base contemplated by the supplemental notice and
| quote to you from the notice and this is the notice of
December 27, | believe. Yes, the supplemental notice in
which [48] the Commission contemplated that — and I am
quoting, “Relevant written statements may be received for
the record and those participating may, depending upon the
niunber of requests received and the time available, be per-
mitted to make brief oral statements of their views either
in addition to or in lieu of written submissions.”

Again going back to my opening remarks, it is my under-
standing of the intention of the Commission that written
comments on the survey, on the proposed amendments, to
Wit the alternatives, were to be filed by January 15.

It seems to me the Commission contemplated this would
be a legislative type hearing, oral presentation, which
would be in addition to the written submission and would
permit the highlighting of the main points of the written
submissions and permit the Board to question — in order to
point up the issues. It is true we will be faced with the
dilemma about the situation that von have described and
Dr. Steindler has indicated one of the things that should be
followed in making this a more meaningful and expeditious

i EES ET ee EL ON ek et me

record. It may be that the Board may find it necessary to
prescribe that written submissions be put in before the oral
hearing and then proceed the way the Commission wanted
us to proceed.

We will have to take that under advisement. I under-
stand the problems of the organizations which have indi-
eated [49] they have got problems in preparing this stuff
in time, and it may be that the time schedule may have to
allow itself some flexibility. I don’t know yet.

[50]
MR. ROISMAN: Mr. Chairman?

CHAIRMAN PAGLIN: Mr. Roisman?

MR. ROISMAN: If I could, I would like to indicate —
perhaps there has been misunderstanding on what we have
been doing and | hope this will respond to the questions
by Dr. Steindler and Dr. Geyer — we do intend, at least
within the time frame that vou indicated at the commence-
ment of the hearing today, 48 hours before the commence-
ment of the oral hearing, to give a fairly detailed state-
ment of what our “position” is. I think Mr. Upton put it
our position in chief; what we will not be prepared to sub-
mit at that time simply because of the technical problems
of getting this together and putting it in the final form
is the completed document, something that will look like this
in form, which will incorporate into it our comments on the
various positions taken by parties at the hearing and so
forth, and try to represent the definitive position of our
two groups, National Intervenors, and Union of Concerned
Scientists.

I should hope the Board will be well aware of not only
the areas which I gave vou this morning, but also our posi-
tion with respect to each of those areas and the major

22 OEE - A RO ok. ”

questions and concerns that we have in those areas well in
advance of the hearing.

Secondly, no matter what witnesses we bring down, they
will be more than well qualified to answer the [51] questions
in the area in which they are testifying. It happens that in
several areas we have more than one person working and
the chief person may not be available, but someone who’s
been available — but someone who's been working with
that person will be available. Certainly we will not be
bringing down witnesses who cannot respond to questions
asked by the Board in the technical area that is pertinent
to that particular area.

Finally, the written document that will be submitted both
hefore the hearing, as well as the final one, will stand on
its own. It will not be — not need to be referenced other
than references in the technical document outside of the
purposes of this proceeding.

CILAIRMAN PAGLIN: Mr. Gleason wanted to be ree-
ognized, | thought? No?

Okay. Mr. Freeman.

MR. FREEMAN: Mr. Chairman, since in our written
document we made certain procedural recommendations
which the Board had contemplated and indeed addressed
itself to, and we have discussed some of the procedures to
he followed, I just simply would like to make certain on the
record that we correctly understand the position of the
Board,

The Board indicated that while questions and answers by
participants and the general Staff would not be appro-
priate to this hearing, to the extent, I believe the Chairman
said, [52] the participants want to raise questions or have
concerns, they may reflect them in their written comments,

A Ne A ON AE OI I NL I EAT OT NILE i te PR PTOI

694

in their oral comments, and in the supplemental written
statements.

| would hope that the Board in fashioning any require-
ment for the submission of written statements in advance
of oral statements, would still permit parties the flexibility
to voice concerns which may have been raised in the interim.

CHAIRMAN PAGLIN: Oh, yes.

MR. FREEMAN: About statements by other persons,
and indeed if they still have concerns that are voiced in the
supplemental written statements and in the opinion of the
Board these raise substantial factual situations, it seems to
me the Board, as the Chairman just indicated, might enter-
tain a further hearing session if it felt that the record
needed supplementing on this line, so that the concerns,
legitimate concerns of everyone, could be covered both in
terms of being expressed and answered in substance on this
record; and that would be a help to the Commission and
to the public.

CHAIRMAN PAGLIN: Thank you, Mr. Freeman. IT
take it vou were making reference to the document you
handed me this morning?

MR. FREEMAN: Yes, sir.

CHAIRMAN PAGLIN: Yes. We will keep that in mind,
[53] the points vou make.

Are there any other comments by the participants? Mr.
Gleason?

MR. GLEASON: Mr. Chairman, there is an issue item
that has come up in our thinking about the position we
might take with respect to alternatives one and two. I
addressed a letter to Mr. Muncie on January 9 which T re-

sar

gret I did not also send to the Board. I did not do it be-
cause it was in the nature of asking a clarifying question.
Basically it deals with the interpretation which the Regu-
latory Staff puts on alternative one and I think it would
serve — save a great deal of time in the oral presentations
if the Staff was prepared to state its position on the inter-
pretation of alternative one, either at this time or at some
time prior to the start of the hearing, because otherwise
I think we will spend a great deal of time in oral diseussion
trying to figure out what the Staff’s position is.

CHAIRMAN PAGLIN: Mr. Murray, would you re-
spond?

MR. MURRAY: I think I can help Mr. Gleason on that,
Mr. Chairman. There is an error in the alternative number
one. Looking at the reprint from the Federal Register, page
24192, containing the notice of proposed rulemaking, look-
ing at the third column where alternative one appears,
going to the middle of that column to the end of alternative
one, that is, and counting up, one, two, three, four, five, [54]
six, seven, eight lines, there is a line that begins, “Cvele
and when factored into the cost,” the “when” appearing in
that line should be an “if.”

695

This is a substantive change in the nature of alternative
number one. It is the original intention.

MR. GLEASON: Would you also change the “are” in
the next line to “would be”?

MR. MURRAY: If I were a stickler for proper English,
| would.
( Laughter.)

CHAIRMAN PAGLIN: And you are changing it,
right?

RO ET re A EO A EOC OE ES MP LOLS. et ~

696

MR. MURRAY: I shall.
(Laughter. )
MR. GLEASON: Thanks a lot.

Mr. Chairman, I take it that, therefore, that there is no
need in the hearing for us to address ourselves to alterna-
tive one in its uncorrected version. We will just assume,
for purposes of the hearing, that it reads as it was just
corrected.

CHAIRMAN PAGLIN: And all other participants may
so regard it as well.

Mr. Roisman?
[55]

MR. ROISMAN: Mr. Gleason’s question seems to raise
a point that I am not sure we need to get into, in the hear-
ing. As I understand it, whatever the Staff may have
thought Alternative One meant, any party is free to sug-
gest vet a third alternative to the Staff or to explain how
they would be interpreting Alternative One or Two, if they
were supporting them, or opposing them.

I take it we are not being faced with a fait accompli by
the Commissioner, did I understand that to be the nature
of the hearing which is that they said, you must choose
between Alternative One or Two.

If vou don’t like it, that is tough.

They are willing to consider an Alternative Three, Four,
Five, or Six.

Secondly, if | understand what the Board has indicated
will happen after this prehearing conference is over, that
the Board will issue a statement identifying the people who
will testify at the hearing or rally, the amount of time

——

i. See oe eee

697

given, and for our purposes, I hope a specified time when
that will happen; a day certain, and within some amount of
leeway, a time certain, on that particular day.

Quite to the contrary of what Mr. Upton suggestea, we
have no interest in going last. If he prefers, we would be
happy to go first, deferring, of course, to the Staff’s gen-
eral desire to do so.

[56]

All we need to know is, since we are bringing a lot of
people in from out of town, we need to know what day
we are going to go. When we know that, we can schedule
accordingly.

Am I correct in assuming that is what the Board will be
doing after this hearing?

CHAIRMAN PAGLIN: You have anticipated, cor-
rectly, Mr. Roisman.

My next point is to close the session, if there were not
anything else.

That is, the Board will issue a further notice, as soon
as possible in order to give the participants as much ad-
vance notice as possible.

What we propose to do is set up schedules, if we can,
devoted to day and date and time, if we can organize them,
in a logical manner, for the convenience of the parties; and
also for the making of a decent record.

We will indicate in this notice, the time to be allotted to
each group, participant, or individual.

| might indicate if there is nothing else, or no other
questions, just by way for the record, the record that is
being made; the transcription of the proceedings this
morning, will not be made a part of the record in the pro-

OIE EL BL A OO CS NE AN TE I A TC nee - = a

698

ceedings, the formal record, which the Commission has
requested be certified to it.
[57]

Our purpose in holding this session was, as I have in-
dicated, and what has begun to come out, and that is for
the convenience of the Board and the participants and in
order to organize an effective and expeditious proceeding.

We don’t see the need at this stage, to make this a formal
part of the record, which will be certified.

If there are no other comments, | just want to indicate,
for the record, the Board will apparently without objee-
tion, grant the request for extension of time by Sierra and
Natural Resourees defense counsel, for a reasonable ex-
tension of time.

| think | indieated it was either ten days or two weeks.

If there is nothing else, this procedure planning session
— Lsee Mr. Murray?

MR. MURRAY: I thought it might be useful to remind
everyone here that the hearing itself, is, I believe, in the
room next door.

CHAIRMAN PAGLIN: Thank vou for reminding me.

It will be in this area, but it will be in the Closed-Con-
ference Room, next door, at 10 a.m.

Mr. Freeman?

MR. FREEMAN: Mr. Chairman, | hope the Board will
reconsider its decision about not having this — the trans-
cript of this prehearing conference made a part of the
official reeord.

[58]

I think it would be important that it be so, because the

Board has, in further discussions this morning, illuminated

_—_—

699

and clarified the extent to which people will be permitted
to participate and the ways in which the substantive con-
cerns that they have, might be clearly put before the Board,
and made a part of this proceeding, and I think that, if, at
some future date, a court is concerned with the procedural
interface of this rule-making and the procedures being
followed by the Commission here, with individual licensing
cases, it will be very helpful to have that part of the record.

CHAIRMAN PAGLIN: Well, you raise a good point,
Mr. Freeman. I say, initially, it was our intention that this
was for the convenience of the Board, so that we would have
an accurate record of what the understandings were, and
so on.

The point you raise is a reasonable one. It may very
well be that it may serve a purpose, making it part of the
record,

We can take that under advisement. I don’t feel strongly,
one way or the other. As I say, it was our intention, this
being a rather novel procedure, that we had intended this
to be kind of informal, and as I say, for purposes of ac-
curacy, to have a record made.

I don’t, at this stage, see any basic objection. We will
take it under advisement.

MR. FREEMAN: Thank you, very much.
[59]

CHAIRMAN PAGLIN: All right, if there is nothing

else, | thank all of you for coming, and you will be hearing
from us by way of formal notice, soon.

Thank vou, again.

(Wherenpon at 11:20 a.m., Wednesday, January 17, 1973,
the Prehearing was adjourned. )

a

SRT A EE Ee TR REET SOMERS R NE 4S

700
(60)

UNITED STATES OF AMERICA
ATOMIC ENERGY COMMISSION

In THE MATTER OF:

Docket No. RM-50-3
URANIUM FUEL CYCLE

“New Executive Office Building
Room G2008

17th & H Streets

Washington, D. C.

Thursday, 1 February 1973

The above-entitled matter came on for hearing, pursuant
to notice, at 10 a.m.

BEFORE:

M. D. Pacis, Ese., Chairman.
Dr. Joun C. Geyer, Member.
Dr. M. J. SteinpLer, Member.

APPEARANCES:

(As heretofore noted.)
ADDITIONAL APPEARANCES:

Arvin E. Upton, Esq. and James P.
Mc Granery, Jr., Esq. Lebauf,
Lamb, Leeby & MacRae, 1821 Jef-
ferson Place, N. W., Washington,
D. C., on behalf of Alabama Power
Company, et al.

“- —

701
[61]
CONTENTS
STATEMENT OF:
Page
(OF TRANSCRIPT }
S. H. Sminey,
Deputy Director for Fuels and Materials — Director
ate of Licensing, Regulatory Staff, Atomic seeneed
Commission 72
Dr. Frank K. Pittman,
Director, Division of Waste Management & Transpor-
tation, USAEC S eae cat 96

W. D. Rowe,
on behalf of the U.S. Environmental Protection Agency 151

Sreve J. Gapier, P.E.,
St. Paul, Minnesota,
on behalf of the Mapleton Intervenors of Midland,

Michigan 165
Peter A. LINDLEY,

Assistant to General Manager, Nuclear Fuel Division, 190

Westinghouse Electric Corporation 199

Antnony A. Rowman,
on behalf of the Consolidated National Intervenors and
the Union of Concerned Scientists, 206
accompanied by

Dr. Epwarp P. Raprorp, and 219

Dr. Henry W. Kenda 263

702
[62]
PROCEEDINGS

CHAIRMAN PAGLIN: Good morning, ladies and gen-
tlemen. May we come to order, This is an informal rule-
making hearing in Docket RM-50.3, which is being held
pursuant to notice of proposed rulemaking published in the
Federal Register on November 15, 1972, by the Atomie
Energy Commission. The Commission's notice of proposed
rulemaking concerns possible amendments to Part 50, Ap-
pendix D of its rules, which would deal specifically with the
question of consideration of environmental effects associ-
ated with the uranium fuel evele and the individual cost /
benefit analyses for light water cooled power reactors.

In conjunction with this rulemaking, the Commission’s
Regulatory Staff at the same time issued for comment and
environmental survey of the effects associated with produc-
ing the annual requirements for uranium nuclear fuel of a
model light water cooled reactor, capable of producing
1,000 megawatts of electricity.

The environmental survey, which was to serve as the
basis for the rulemaking hearing, describes the effect of
each stage of the evele, from the mining and milling of
natural uranium to the ultwnate disposal of high-level
radioactive wastes resulting from reprocessing of the used

fuel.

The notice of rulemaking invited the comments of [63]
interested persons and scheduled an informal rulemaking
hearing on February 1, 1973, to permit the presentation of
views, both oral and written, on two alternative approaches
to consideration of the environmental effects of the ura-
nium fuel evele and environmental statements in terms of
possible amendments to Part 50.

703

The alternatives were set out in the Commission’s notice
of November 15. It is to be noted for the record that the
language of Alternative 1 is to be considered amended, in
accordance with a letter dated January 22, 1973, from Mr.
Murray of the Regulatory Staff, in the following respects:
The language to be amended appears in the right-hand
column of page 24192 of the Federal Register of November
15, 1972, and concerns the revision of language in the
penultimate sentence in paragraph (1).

The latter part of that sentence as amended will read,
“Activities as related to a particular light water cooled
nuclear reactor have been analyzed in the Commission’s
environmental survey of the nuclear fuel cycle, and if fac-
tored into the cost/benefit analysis, would be sufficiently
sinall 2° not to affect significantly the resultant conclusion.”

Thereafter in a supplemental notice of rulemaking issued
on December 27, 1972, the Commission set forth the pro-
cedural conditions which would be followed in this [64] in-
formal legislative type rulemaking hearing. It was speci-
fied, among other things, that since this would be part of a
rulemaking rather than an adjudicatory proceeding, the
provisions of subpart (g), “Rules of General Applicability,”
of Part 2 of the Commission’s rules of practice, would not
be applicable and that no discovery or cross-examination
would be utilized in this proceeding. However, the notice
provided that the participants in the hearing would be
subject to questioning by the presiding Hearing Board.

Thereafter, on January 17, 1973, and pursuant to the
supplemental notice, to authorization in the supplemental
notice, the Hearing Board named by the Commission con-
ducted a procedure planning session at which all partiei-
pants in this proceeding were iny ited.

704

As a result of that session, a further notice of rulemak-
ing hearing was issued by the Hearing Board on January
19, setting forth, among other things, the schedules of ap-
pearances for participants who are to make oral presenta-
tions, in addition to written submissions, and a statement
of the understandings and agreements expressed by the
participants at that session.

There was attached to that further notice of hearing a
list of names and addresses of all of the participants who
had filed statements in this proceeding, and it was agreed
by those present that the written submissions to [65] be
offered by the participants would be provided to the other
participants in ths proceeding named on the list.

Subsequent to the issuance of the further notice of hear-
ing, certain changes were made in the schedule for appear-
ances set out in that notice by the agreemert of the
participants and the consent of the Board. Th> principal
change is that the Consolidated National Intervenors and
the Union of Concerned Scientists will make their presenta-
tion on the afternoon of Thursday, February 1, that is
today, instead of their previously scheduled appearance on
Friday morning, it having been agreed among the parties
that they would exchange positions with the Thursday
afternoon scheduled participants.

In addition, I have been advised by Mr. Dzugan of the
Minnesota Pollution Control Agency that he will appear at
the conclusion of the session on Friday, February 2, in lieu
of his scheduled appearance this morning.

In commencing this rulemaking hearing, the Board has
determined the following documents shall be incorporated
by reference in the reeord of this proceeding, as though
they ha@pbeen set forth at length at this point in the pro-

705

ceeding, namely, the Commission’s notice of proposed rule-
making, published in the Federal Register on November 15,
1972; the environmental survey of the nuclear fuel cycle
issued by the Regulatory Staff of the Commission ; the [66]
Commission’s supplemental notice of rulemaking hearing
issued December 27, 1972; and the further notice of rule-
making hearing issued by the Hearing Board on January
19, 1973.

| would like now to call for the appearances of the par-
ticipants and their counsel, if they are accompanied by
counsel, in the order in which they appear in the January
19 further notice of hearing. And thereafter, I will ask for
appearances by any others who wish to make oral presenta-
tions and for whom provision has not been made in the
further notice of hearing. However, it is to be understood,
of course, that these latter will be heard if time is avail-
able in the sessions that have been scheduled for the next
two days.

May I now, for the record, have the appearances of the
Regulatory Staff of the Commission.

MR. MURRAY: M: Chairman, my name is James
Murray; I am appearing as counsel for the Regulatory
Staff of the Commission. Our principal witnesses are with
me here at the table. We will have back-up personnel to
help them in response to any questions the Board may ask.
The principal witnesses are, immediately to my left, Mr.
S. H. Smiley, and two persons removed, Dr. Frank Pittman.

CHAIRMAN PAGLIN: Thank you, Mr. Murray.

Next on the schedule in the further notice is [67] listed
General Electric Company. We have been since advised that
they do not desire to make an oral presentation, but will

706

be present for questioning. Is there an appearance for
General Electric?

MR. RESTRICK: John Restrick, counsel for General
Electric. We do have people here who can answer ques-
tions of the Board if they have any.

CHAIRMAN PAGLIN: Thank vou, Mr. Restrick.

Next, U. S. Environmental Protection Agency. Is there
someone present from EPA?

(No response.)

CHAIRMAN PAGLIN: We will cheek later on. [| men-
tioned, but I will have the appearance now, the Minnesota
Pollution Control Ageney, | believe Mr. Dzugan is here
now.

MR. DZUGAN: My name is Ken Dzugan, and I am here
on behalf of the Minnesota Pollution Control Ageney.

CHAIRMAN PAGLIN: Mr. Steve J. Gadler.

MR. GADLER: Mr. Chairman, | am Steve J. Gadler.
I am here from St. Paul, Minnesota. | represent the Maple-
ton Intervenors and myself at this hearing.

CHAIRMAN PAGLIN: Thank vou, Mr. Gadler.
Westinghouse Electrie Corporation.

MR. DAUGHERTY: I am Thomas Daugherty, West-
inghouse, and our principal witness, Mr. Peter Linley, is
present.

CHAIRMAN PAGLIN: On behalf of the National [68]
Intervenors and Union of Concerned Scientists.

MR. ROISMAN: Anthony Z. Roisman. | am appearing
on behalf of the Consolidated National Intervenors and the

bird atch Title PLEASE POP BLS IA ee

707

Union of Concerned Scientists. Our two technical witnesses
will be here this afternoon, Dr. Henry Kendall, Dr. Hlenry
Radford.

| would like to make a correction. In response to a ques-
tion by Dr. Geyer, we sent in a list of the participants, and
the name of the Mapleton Intervenors was included in that
list interested, inadvertently. As vou heard, Dr. Gadler is
here and will be speaking on their behalf.

CHAIRMAN PAGLIN: Thank vou, Mr. Roisman. The
record will be corrected accordingly.

Going back up again, the Atomic Industrial Forum, Ine.?

MR. WIGGIN: | am Edwin Wiggin. I am with the
Forum: [ will be making a statement tomorrow morning.
I will be aceompanied by counsel, who is not yet here.

CHAIRMAN PAGLIN: Thank you, Mr. Wiggin.

Next on our list is Exxon Nuelear Company. They have
also advised us that they do not desire to make an oral
presentation, but will have someone present. Are they
here?

MR. NILWON: Roy Nilson, representing Exxon Nu-
clear, We would like to have our written statement entered
[69] into the record.

CHAIRMAN PAGLIN: Yes. Exxon has submitted a

statement and it will be considered introduced into the
record at this point.

S. M. Stoller Corporation.

DR. GELLER: | am Leonard Geller from S. M. Stoller
Corporation, I will not be making an independent submit-
tal or oral presentation. I will, instead, be working with
the 14 utility group represented by Mr. Freeman.

708

CHAIRMAN PAGLIN: So, as I understand it, you will
not make an individual oral presentation?

DR. GELLER: That is correct.
CHAIRMAN PAGLIN: Thank you.

Now, skipping down, Baltimore Gas & Electric Company
and the other named utility companies appearing jointly.

MR. FREEMAN: George C. Freeman, Jr., of Hunton,
Williams, Gay, Powell & Gibson of Richmond, Virginia,
appearing here on behalf of that group of utilities, accom-
panied by Mr. David Brollier of my firm. Also Dr. Leonard
Geller of S. M. Stoller Corporation is assisting us as a
technical expert.

CHAIRMAN PAGLIN: Next, the New York State
Atomic Energy Council. Do we have an appearance for
them this morning?

[70]

MR. CASHMAN: Thomas J. Cashman, appearing on
behalf of the New York State Department of Environ-
mental Conservation. | anticipate counsel from the Atomic
Energy Council will be here tomorrow. In view of the
changed schedule, | cannot guarantee he will make it.

CHAIRMAN PAGLIN: Thank you, sir.

That completes the list of participants named in the
notice of January 19 who sought the privilege of oral
presentation.

Are there any other persons present today who are not
listed, who were not here at the planning session on Janu-
ary 17, who would wish to make an oral presentation, pro-
vided time will be available? If so, can you state your
name and your affiliation?

re Uh.

ee Pi ae ee ee ey

Siberia

709

MR. ROWE: I wasn’t here when you called the roll,
but W. D. Rowe from EPA.

CHAIRMAN PAGLIN: Thank you. You will be appear-
ing this morning, Mr. Rowe.

Mi. ROWE: Yes.

CHAIRMAN PAGLIN: Hearing no response to my
earlier question about additional oral presentations, we
will now move along.

The first appearance, on behalf of the Regulatory Staff
of the Commission, | will call on Mr. Murray.

MR. MURRAY: Yes, Mr. Chairman. Thank you very
(71] much. Mr. Smiley will present the opening statement
of the Commission, and followed by Dr. Pittman, who will
address himself to the subject of high level waste disposal.
Since we do have a number of back-up personnel here, who
will possibly be answering questions, I am wondering if I
shouldn’t submit, for the record, at this time, the statements
of qualifications of all of our people, including Mr. Smiley
and Dr. Pittman, and the back-up folks, and have them
incorporated in the record physically as if read.

CHAIRMAN: PAGLIN: Without objection, Mr. Murray,
they will be accepted.

(The documents follow.)

EDUCATION
BS

1 Yr. Graduate
Work

EXPERLENCE
1972 to date

1970-1972

DONALD A. NUSSBAUMER
U.S. Atomie Energy Commission
Washington, D.C. 20545

Chemistry-biology Union College, Schenectady, N.Y. 1950
Biochemistry Cornell University, New York, N.Y. 1951
Assistant Director for Fuel Cyele Directorate of Licensing

U.S. Atomie Energy Commission
Washington, D.C. 20545

Plan, direct and supervise nonreactor fuel cycle licensing activities of the AEC
Regulatory program as carried out by the following Branches — Fuel Fabrication
and Reprocessing, Transportation, Technical Support, and Materials and Plant
Protection. Activities include licensing of nonreactor production and utilization
facilities, including their operate ‘s, licensing of special nuclear material in quanti-
ties greater than a critica, mass, approval of radioactive material shipping con-
tainers, approval of controls for safeguarding strategically important nuclear
materials against diversion and protection against acts of industrial sabotage, and
assessment of environmental impact of fuel evele plants pursuant to the National
Environmental Poliey Act.

Chief, Fuel Fabrication and Division of Materials Licensing
Transportation Branch U.S. Atomie Energy Commission
Washington, D.C. 20545

OTL

1961-1970

1957-1961

1955-1957

Administer the technical evaluation and processing to final action all applications
for and conumunieations coneerning lic, .2es for special nuclear material in quanti-
ties greater than a eritieal mass. Administer the evaluation and approval of
proposed designs of shipping casks for transportation of irradiated reactor fuel
elements and other radioactive material from the standpoint of their adequacy to
comply with regulatory standards.

Chief, Souree and Special Nuelear Division of Material Licensing
Materials Braneh U.S. Atomic Energy Commission
Washington, D.C. 20545

Administer the technical evaluation and processing to final action of all applica-
tions for and communications concerning Ecenses for source material and special
nuclear material.

Division of Licensing and Regulations
U.S. Atomie Energy Commission
Washington, D.C. 20545

Radiation Safety Specialist

valuation of potential radiation hazards associated with the use, storage, dis-
posal, and transport of radioactive materials and the adequacy of engineering and
administrative controls to protect against such hazards. Assists in the develop-
ment of criteria, standards and operating procedures in radiation protection for
use in establishing regulations and evaluating license applications.

Field Representative Oak Ridge Operations Office
U.S. Atomie Energy Commission
Oak Ridge, Tennessee

Tt

Visited firms and institutions licensed by the AEC to use radioisotopes. Advised
radioisotope users in special radiation protection problems involving shielding,
monitoring, instrumentation, laboratory design, ventilation and waste disposal.
Cheeked programs to determine compliance with proper radiation safety practices.

1951-1955 Senior Health Physics Inspector Knolls Atomic Power Laboratory
General Electric Company
Schenectady, New York

Health physies responsibilities in environmental monitoring, chemical processing
of irradiated uranium, radiochemical research laboratories. Also health physies
responsibilities in reactor design, startup, operation and refueling. Duties in-
cluded evaluation of facility and equipment design, radiation monitoring, and
establishing administrative controls for radiation safety.

SIGNIFICANT PUBLICATIONS

“Safety Controls Over Uses of Radioactive Materials.” Sympositm on the Ad-
ministrative and Regulatory Problems Connected with Atomie Energy Programs
— University of Puerto Rico — 1959.

“USAEC Regulatory Control Program for Uranium Milling.” International
Symposium on Radiological Health and Safety in Mining and Milling of Nuclear
Materials — International Atomie Energy Agency — Vienna, Austria — 1963.

MILITARY STATUS

1946 to 1948 Veteran U.S. Army Medical Corps
PERSONAL
U.S. Citizen Born October 15, 1927

Married 5 Children

4 6

EDUCATION
BS

EXPERIENCE
1968 to present

1961 to 1968

195S to 1961

THEODORE R. WORKINGER
USAEC, Bethesda, Md.

Chemical Engineering Univ. of Wisconsin 1950

Fuel Fabrication & Reprocessing Fuels & Materials Div.
Regulatory, USAEC

Primary responsibility is the evaluation of the engineering and radiological safety
design criteria and design bases for the proposed Barnwell Nuclear Fuel Plant.

Chemical Processing USAEC

Assisted the development and implementation of programs and policies for Govern-
ment and industrial activities in the chemical reprocessing segment of the nuclear
fuel eyele. Overall staff responsibility for program planning, budgeting and man-
agement of the AENC’s research and development programs, projects, and produe-
tion operations pertaining to the chemical processing of irradiated reactor fuels
and target materials to recover, purify, manufacture and supply special nuclear
materials, fission products, transuranie products and other radioisotopes, at the
AKC’s separation facilities at Hanford, Idaho and Savannah River. Responsi-
ble for assisting technical exchanges with international \ Pi

Division of Lsotopes Development USAFG

Responsible for adininistering the Commission's radioisotope production and dis-
tribution program. Implemented the development of solvent extraction processes

4 2

ater a?

1950 to 1958

for the recovery, separation and purification of fission products and other radio-
nuclides, the development of methods to ensure the safe shipment of large quanti.
ties of fission products and the development of technology for manufacturing large
sealed sources for isotopic power and radiation applications,

General Rleetric Hanford Atomie Prod.
Operation

Shift supervision responsibilities for operations in chemical separation plants, the
plutonium fabrication facility and the UO, conversion facility. Staff responsi-
bility also for operator safety training, production planning and scheduling, nu-
clear materials management, and plant maintenance. From 1952 to 1955 senior
process engineer with responsibilities for assisting with supervisor and operator
training, preoperational testing, and the startup of the Redox plant, the TBP
plant, and the Purex plant. In 1955, appointed Group Leader of the Process and
engineering Unit, with responsibilities for providing process engineering services
to ensure the overall performance and safety of the Purex plant at Hanford. Pro-
noted to Mngineering Analyst, with responsibilities for technical evaluation and
economic analysis of proposed new eapital projeets, and directly assisted the
Manager of the Facilities Engineering Operation, Chemical Processing Depart-
Inent, With management studies directed toward improving the effectiveness of
the design, engineering and project management components reporting to him.

vIL

NELSON R. LEIST
National Lead Company of Ohio
P. O. Box 39158
Cineinnati, Ohio 45239
Telephone 513 738-1151
EDUCATION
Chem. Eng. Degree Chemical Engineering University of Cincinnati 1954
Juris Doctor Degree = Law Chase College 1961
EXPERLENCE
1966 to date Supervisor Production Technology-
Chemical Group
National Lead Co. of Ohio
Responsible for the development of process improvements and new processes for
the conversion of uranium concentrates into cascade feed materials. Duties in-
clude work associated with processes and procedures necessary for environmental
protection. Specifically in the field of water and air contamination by chemical
pollutants and radionuclides from the refining processes.

1961 to 1966 Section Leader Chemical Departinent
National Lead Co. of Ohio

Supervision of a section responsible for the devlopment of new processes and
procedures associated with the liquid-liquid extraction of uraniwn and thorium.

GT

1956-1961 Technologist Chemical Department
National Lead Co, of Ohio

Pilot Plant and production testing of liquid-liquid extraction processes.

temeeeeeeneeeeeen e |

PUBLICATIONS

J. F. Blom, R. 1 Eierhorst, C. W. Huntington, J. 1. Krekeler, N. R. Leist, J. R.
Nelli, and M. D. Snyder, “Refining of Thorium-containing Uranium Concentrates
by Extraction with Tributyl Phosphate,” USAEC Report, NLCO-692, August 29,
1957

N. R. Leist, “Evaluation of a Coalescer-De-Entrainer Unit,” USAKC Report,
NLCO-725 (p. 29-34), April 18, 1958

C. T. Hieks, N. R. Leist, and J. R. Nelli, “Laboratory and Pilot Plant Evaluation
of Stanrock Uranium Concentrate,” USAEC Report, NUCO-762, October 10, 1958

N. R. Leist and J. R. Nelli, “Raffinate Mirer-Settler for the Primary Extraction
Columns,” USAEC Report, NLCO-S805 (p. 15-21), April 29, 1960

J. WH. Krekeler and N. R. Leist, “Removal of Foreiqn Materials from the Refinery
TBP Solvent,” USAEC Report, NLCO-S8S82, June 25, 1965

R. C. Kispert and N. R. Leist, “Computerized Control of Nuclear Materials for
Uranium Residue Reprocessing,” USAEC Report, NLCO-1017, May 3, 1968

J. HH. Cavendish, R. C. Kispert, N. R. Leist and G. P. Miller, “Cry. tallization Char-
acteristics of Acid Uranyl Nitrate Solutions,” Nuelear Applications, 5:224, 1968
N. R. Leist, “The Beneficiation and Refining of Uranium Concentrates,” USAEC
Report, NLCO-1067, April 23, 1970

R. C. Kispert, N. R. Leist, and A. FL Pennak, “Reduction of Nitrogen Oxides in
Vent Gases by Scrubbing,” USAKC Report, NLCO-1094, October 20, 1972

9TL

ROBERT G. JORDAN
Union Carbide Corporation — Nuclear Division
P. O. Box Y
Oak Ridge, Tennessee 37830
Telephone : 615 483-8611, Ext. 3-5164

EDUCATION
B.S. Chemistry-Physies — Ohio State University 1942
EXPERIENCE
1972 to date Manager of Safety and Environmental Union Carbide Corporation

Protection Nuclear Division
1963 to 1972 Plant Superintendent UCC-ND

Oak Ridge Gaseous Diffusion Plant Ss)
1961 to 1963 Plant Superintendent UCC-ND =

Oak Ridge Y-12 Plant
1954 to 1961 Plant Superintendent UCC-ND

Paducah Gaseous Diffusion Plant
1951 to 1954 Operations Superintendent UCC-ND

Padueah Gaseous Diffusion Plant
1947 to 1951 Process Engineering Department Head UCC-ND

Oak Ridge Gaseous Diffusion Plant
19438 to 1947 Process Engineer — SAM Laboratories UCC-ND

and Oak Ridge Gaseous Diffusion Plant
1942 to 1943 Iingineer Sanderson & Porter

EE

EDUCATION
1S.

MEN PERIENCE

1971 to present
IMT -1971

1965-1967

1956-1963

LOD 1956

192-1953

bol-1O52

1948-1951

VIRGIL S. EMLER
P.O} Box GS
Piketon, Ohio 45661
Telephone: (614) 289-2331

Met. Engr. Carnegie-Mellon Univ. 1950
Supervisor, Environmental Control Goodvear Atomie Corp.
Corporate responsibility for environmental control and pollution abatement.
Supervisor, Special Projects Goodyear Atomie Corp.
Coordination and evaluation of development laboratory projects.

Supervisor, Chemistry Dept. Cioodvear Atomie Corp,

Developmental chemistry for gaseous diffusion process,

IR Spectroscopy, speetrography, and cleetron microprobe labs.
Supervisor, Metallurgy Dept. Goodvear Atomie Corp.
Developmental metallurgy for diffusion plants.

Mailure-analysis lab.

Metallurgist Gioodvear Atomie Corp.
failure analysis.
Metallurgist North Ameriean Aviation

(North Ameriean-Rockwell)
Teehnical assistanee to vendor foundries.

Metallurgist Battelle Memorial Institute
Alloy development.
Metallographer, Metallurgist Vanadium Corp. of America

Metallography, heat-treatment studies.

KMdueational and Professional Qualifications

‘ROBERT F. BARKER
Chief, Product Standards Branch
U.S.ALE.C.

My name is Robert F. Barker. | am Chief of the Product Standards Branch of the Directorate
of Regulatory Standards of the U. S. Atomie Energy Commission, 7920 Norfolk Avenue, Bethesda,
Maryland. Since assuming this position in January 1961, | have been responsible for the formula-
tion of poliey and development of regulatory safety standards, criteria, rules and regulations for the
transportation of byproduct, souree and special nuclear material in the Commission's licensing
program. During the past 11 months, | have been responsible for preparation of the sections on
transportation in about 50 environmental statements for individual nuclear power plants.

I received a Bachelor of Science in Eleetrieal Engineering from Ohio University in 1949. I did
graduate work toward a Master of Science degree in radiological physics on an AEC fellowship at
the University of Rochester in 1949-50, which | received in 1953.

61

| was employed by the University of California at the Los Alamos Seientifie Laboratory from
1950 until 1955. As assistant Leader of the General Monitoring Section, | was responsible for the
monitoring operations at nuclear weapons tests, around the test reactors and for shipments coming
to or leaving the Laboratory. While in that position, | compiled and edited the first General Moni-
toring Handbook.

In 1955, | joined the AEC as assistant Chief of the Radiation Safety Braneh of the Lsotopes
Division and, except for the vears 1959 and 1960, | have been with the Commission sinee that time.
During 1959 and 1960, T was employed on the Staff of the International Atomic Energy Ageney as a
Senior Health Physicist in the Division of Health, Safety, and Waste Disposal. As part of my duties
for the LAK.A, | was the Secretary to the Panel of Experts called together by the Ageney to establish
International Standards for the Safe Transportation of Radioactive Materials.

ni

In subsequent meetings of Panels of Experts on Transportation of Radioactive Materials
organized by the LAFA, in 1962, 1964, 1970 and 1971, | represented the AEC as participant or ad-
visor to the designated participant.

lama Health Physicist certified by the American Board of Health Physies.

Lama member of the Health Physies Society, the American Society for Quality Control and the
Society for Non-Destructive Testing.

Il am author of the Chapter on “Radiation Protection” in the Handbook on Non-Destructive
Testing, an A.S.T.M. publication, co-author of a Chapter in the “Safe Transport of Radioactive
Materials” edited by Roy Gibson and have written several technical papers on safety in transpor-
tation.

OGL

IRM Oe Tye [ins Lakeman dh saab - : ro aa

JOE DYKSTRA
P. O. Box P
Oak Ridge, Tennessee 37830
Telephone 615 483-8611, Ext. 3-3306

EDUCATION

A.B. Chemistry Grinnell College 1943
EXPERIENCE

1943-1945 Hooker Chemical Company, Niagara Falls

Manhattan Distriet — Fluorine and Fluroearbon
Development and Production.

1945 to date Union Carbide Nuclear Division — Oak Ridge
Gaseous Diffusion Plant.

Tel

Operations Division Supervisory assignments in gaseous diffusion cascade operq-
tions, equipment decontamination, uranium recovery, fluorine production. Oxide
to UF's production, utilities production and distribution such as steam, air, potable
and recirculating cooling water and diffusion plant environmental control.

Currently, Chemica! Operations Department Superintendent responsible for re-
ceipt and shipment of toll enrichinent feed and product and diffusion plant equip-
ment decontamination and uranium recovery.

PUBLICATIONS
AFC publications on Fluorine Production and Uranium Recovery.

EDUCATION
B.S.

Graduate Study
EXPERIENCE
1972 to date

1957 to 1972

IRVIN G. SPEAS
Union Carbide Corporation — Nuclear Division
P.O. Box Y
Oak Ridge, Tennessee 37830
Telephone: 615 483-8611, Ext. 3-5164

Mechanical Engineering — Duke University 1949
Math & Mech. Eng. Courses University of Tennessee 1955-58
Mngineering Consultant Union Carbide Corporation

Nuclear Division

Office of Safety and Environmental
Protection

Oak Ridge, Tennessee

This office is responsible for the coordination of the safety and environmental pro-
grams at the Oak Ridge National Laboratory, Oak Ridge Gaseous Diffusion Plant,
Padueah Gaseous Diffusion Plant, and the Oak Ridge Y-12 Plant.

Department Superintendent Union Carbide Corporation

Nuclear Division

Design Engineering

Oak Ridge Y-12 Plant
Responsible for engineering studies of plant facility requirements, design of
special process equipment, plant budget justification documents, design of process
and utility piping systems, and environmental pollution abatement studies and

designs.

Per |] Cees ke eae I A, 0 gd FEE Ci tS

1949 to 1957 Design Engineer Union Carbide Corporation
Nuclear Division
Design Engineering
Oak Ridge Y-12 Plant

Design of process and utility systems and associated pumps, compressors, heat

exchangers, stills, and cooling towers. I
ENVIRONMENTAL POLLUTION CONTROL ASSIGNMENTS
1967 to 1972 Y-12 Plant representative on the AEC-ORO Environmental Pollution Task Force.

This group is responsible for the environmental programs at the AEC facilities in
Oak Ridge, Tennessee; Padueah, Kentucky; Cineinnati, Ohio; and Portsmouth,

Ohio.
1970 to 1972 Y-12 Plant representative on the Union Carbide Corporation — Nuclear Division 3
Four-Plant Environmental Committee. This committee was responsible for

apprising management of the extent and possible impact of the Division’s opera-
tions upon the environment.

TECHNICAL PAPERS PRESENTED
“Survey of Municipal Refuse Incinerator Design Practices”, presented before the
AEC-ORO Environmental Pollution Task Foree, July 13, 1967.

“Electrostatic Precipitators Versus Mechanical Collectors For Steam Plant Stack
Emission Control”, presented before the AEC-ORO Environmental Pollution Task
Force, January 17, 1969.

“Environmental Pollution Control (Liquid, Gaseous, and Solid Wastes)”, pre-
sented before the AEC National Plant Facilities Managers Meeting; Oak Ridge,
Tennessee; March 14, 1969.

“Environmental Pollution Control at the Oak Ridge Y-12 Plant”, presented before
the Southeastern Industrial Health Conference; Gatlinburg, Tennessee ; October
1, 1970.

“Experience with the Oak Ridge Centralized Sanitary Landfill”, presented before
the AEC Pollution Control Conference ; Oak Ridge, Tennessee ; October 26, 1972.

MILITARY STATUS
1944 to 1946 Veteran U.S. Army Signal Corps

TECHNICAL SOCIETIES
Registered Professional Engineer, State of Tennessee

Member of Tennessee Society of Professional Engineers and the National Society
of Professional Engineers

PERSONAL
U.S. Citizen Born July 12, 1925
Married Two Children
Height — 5’9” Weight — 155 pounds

Excellent Health No Physical Defects

VoL

EDUCATION
BA

EXPERIENCE
1962 to present

1956 to 1962

. . T+ : Er 2 wre

WILLIAM H. RAY
USAEC, Bethesda, Maryland ~

Physies State University of Iowa 1938

Senior Health Physicist Fuels & Materials Div.
Regulatory, USAEC

Evaluation of the radiological safety provisions of irradiated fuel and radio-
isotope processing plants. Work has included the preparation of environmental
statements, safety evaluations to justify the issuance of materials licenses for:
laboratories utilizing hot cells, tests and usage of devices employing large quan-
tities of radioisotopes as a heat source, and containers for the shipment of irra-
diated nuclear fuel and/or large quantities of radioisotopes.

Health Physicist General Atomic

Organized and administered a health and safety program for the newly founded
General Atomics Division of General Dynamics. Developed instruments as they
became needed for special radiological safety applications, e.g., a stack gas beta
activity monitor, a low background laboratory counter to simultaneously measure
alpha and beta activity, and a variety of radiation alarms, some adapated to dealing
with pulses from accelerators and thermonuclear experiments. Responsibilities
included nuclear safety surveillance and material accountability, design of ventila-
tion systems to control airborne radioactive particulates, operation of the radio-
active waste collection and packaging service, and promulgation of radiological
and industrial safety throughout the laboratory. Served as a member of the iso-

Col

aera ener eee

tope committee of a local hospital staff comprised the Radiological Assistance
Team for San Diego county.

1955 to 1956 Training Officer U.S. Publie Health

Condueted Radiological Safety courses for State Health Departments throughout
the U.S. Helped to establish the fallout monitoring network, and worked with the
Federal Civil Defense Agency in the initiation of a radiological safety training
program, whieh included the forecasting of fallout patterns.

1954 to 1955 Maintenance Engineer Black Hawk Broadcasting

Installed, maintained and operated two television stations, and maintained two
AM broadeast stations. Ran RCC proof of performance. Designed and built
equipment to convert to color transmission.

1950 to 1952 Research Associate (iraduate School of Public Health S
Univ. of Pittsburgh

Taught Radiological Physies and Health Physies, and provided health physics
surveillance throughout the University of Pittsburgh and Carnegie Institute of
Technology. Initiated a reasearch program to investigate the consequences of
inhaling insoluble radioactive particulates. Served as a consultant to Westing-
house Kleetrie Corporation's Atomic Power Division, and participated in Los
Alamos Scientific Laboratory fallout studies in Nevada during two bomb test
series,
1953 te 1954 engineer dgerton, Germeshauser & Grier

Responsible for the radiological safety program of EG&G, Ine. in addition to pri-
mary duties involving nuclear explosion diagnostic. During this period, developed
and field tested a radiation measuring and telemetry system.

1944 to 1950

1941 to 1944

1938 to 1941

Section Chief Oak Ridge National Lab

Responsible for: all plant and environmental surveys, personnel monitoring, and
instrument calibration. Played a primary role in establishing the objectives,
developing the techniques, and evolving the basie principles of the health physics
profession. Instituted radiological safety programs at the University of Chicago
Metallurgical Laboratory, at Mound Laboratory, and at the San Francisco Navl
Shipyard (which evolved into the U.S. Naval Radiological Defense Laboratory).
Served as a consultant to AEC regarding radiological safety practices at uranium
refineries, and made a field study of the residual activity and the particulate
problem at Eniwetok, following the first test series at that atoll.

Crystal Physicist Collins Radio Co.

Developed new quartz oscillator control cuts, manufactured techniques and quality
control procedures. Custom finished erystals and trained finishers.

Heating & Air Conditioning Engineer = Cheeker Electrie Supply, Ine.

Surveyed domestic and commercial buildings to determine heating and cooling
needs. Designed heating and air conditioning systems, including duct work de-
tails. Supervised installations and responsible for atta‘ning warranty performance.

PUBLICATIONS

“Letter to the Editor.” (Concerning evidence of log-normal distribution of air
sampling data and of personne! cumulative radiation exposure.) Health Physics,
Vol. 9, p. 242, 1963.

“Stack Gas Beta Monitor,” American Industrial Hygiene Association Journal,
Vol. 23, pp. 496-502, 1962.

lol

es |

CEE

“Radiation Alarm Pedestal,” American Industrial Hygiene Association Journal,
Vol. 22, pp. 494-496, 1961.

“Protection of Livestock from Radioactive Fallout,” Bremer County Independent,
Waverly, lowa, November 7, 1956.

AKRCU-565 “The Design of Radiochemical Laboratories.”

ABRCD-2357 “Change and Eng. in Use.”

MDDC-1502 “The Clinton Walkie Talkie and Scale of Two.”

MDDC-40 “Health Physies Building Surveying at Clinton Laboratory.”
Radiological Safety Manuals:

“A Manual of Radiological Safety Practices,” The Donald N. Sharp Memorial
Hospital, San Diego, California, 1959.
GiA-417 “Radiological Safety at General Atomic,” 1958,

“Health Physies Primer,” Edgerton Germeshausen and Grier, Inc., Las Vegas,
Nevada, 1953.

86

RALPILG. PAGE
USAEC, Bethesda, Md.
EDUCATION
B.A. Chemistry and Math Augustana College 1949-50
Rock Island, Ill. 1951-54

AEC Radiological Physics Fellowship — University of Washington 1954-55
Seattle, Wash.

Nuclear Engineering University of Tennessee Night School
University of Maryland 1957-60
Management Federal Executive Inst. 8 weeks
Charlottesville, Va. 1969
EXPERIENCE a
1972 to present Chief, Materials & Plant U.S. Atomie Energy Commission 3
Protection Branch Directorate of Licensing

Washington, D.C.

Reviews applicant's materials security and plant protection procedures and issues
license amendinents, exemptions, and special conditions; assists in development of
regulatory materials and plant protection policies and implementing regulations;
evaluates effectiveness of applicable materials and plant protection requirements
on a continuing basis.

1967 to 1972 Assistant Director for Licensing U.S. Atomie Energy Commission
and Regulations Division of Nuclear Materials
Safeguards

Washington, D.C.
Same as in present position.

eileen

a nn en ee

1962 to 1967 Chief, Enforcement Branch U.S. Atomie Energy Commission
Division of Licensing and Regulation
Washington, D.C.

Reviewed compliance inspection reports and initiated enforcement actions in cases
where licensees were found out of compliance with applicable regulatory require-
ments.

1955-1962 Health Physicist U.S. Atomie Energy Commission
Oak Ridge, Tennessee and
Washington, D.C.

Reviewed adequacy of radiation safety programs proposed and implemented by
licensees for protecting the publie against radiation hazards.

PUBLICATIONS
“Physieal Protection of Special Nuclear Material in Transit”, Conf. Transporta-
tion of Radioactive Material, University of Virginia, Charlottesville, October
1969 by Page, R. G.

“The Division of Nuclear Materials Safeguards — The Second Year”, 11th Annual
Meeting of Institute of Nuclear Materials Management, Gatlinburg, May 1970 by
IYAmico, V. J., and Page, R. G.

0&2

“U.S. Safeguards Experience in Regulation and Inspection of the Private Nuclear
Industry”, Symposium on Safeguards Techniques, Karlsruhe, West Germany,
July, 1972 by Wischow, R. P., D’Amico, V. J. Page, R. G., and Ong, L. D. Y.

NATHAN BASSIN
USAEC, Bethesda, Md.
Telephone 301-973-7463

EDUCATION
B.A. Chemistry Suffolk University 1951
Chemistry Boston College 1956
EXPERIENCE
1958 to date Senior Reviewer Materials Branch
; Directorate of Licensing, USAEC
Evaluation of applications for use of byproduct material. Review of applications
for all areas of radioisotope use including review of applications for disposal of
radioactive waste by land burial and burial at sea,
1958-1959 Reviewer Materials Branch
USAEC
Division of Licensing and Regulation
Evaluation of applications for use of byproduct material.
1958 Physical Scientist Canoga Park Area Office
USAEC
Administration of contract of prime AKC-contractor, Review of health physies
and materials management programs of contractor.

Tél

1955-1958 Reviewer Isotopes Branch
Oak Ridge Operations Office
USAEC
Review of applications for use of byproduct material.
1952-1954 Chemist Tracerlab, Ine.

Boston, Mass.
Worked on classified Air Force project.

ane

Ren eieerenenmnrremerenermes ae neem:

JACK EF, ROTHFLEISCH
USAEC, Bethesda, Md.

EDUCATION
B.Ch.E. Chemical Engineering College of the City of N.Y. 1940
Industrial Management University of Tennessee 1956-60
EXPERIENCE
1972 to present Senior Materials U.S. Atomic Energy Commission
Licensing Engineer Washington, D.C.
Process license applications for uranium milling and uranium hexafluoride pro-
duction facilities including preparing detailed statements of environmental im-
pact of proposed or existing installations.
1968 to 1972 Technical Superintendent Union Carbide Corp. e3
Vanadium Mine and Mill
Hot Springs, Arkansas
Supervised Technical Department Operations. Prepared budget. Established
mill operating conditions for optimum recovery of vanadium from ore. Directed
studies for solution of process problems, process improvement, and process de-
velopment. Set up and directed air, water, and noise pollution control programs.
1962 to 1968 Senior Development Engineer Union Carbide Corp.
Electronics Division
Parma, Ohio
Development and optimization of systems for production of pure hydrogen for
use in fuel cells. Studies included catalytic steam reforming processes, thermal
eracking of hydrocarbons, dissociation of ammonia, and hydrazine and hydrolysis
N |

of metal hydrides. Vlanned and direeted experimental work, correlated test data,
prepared reports, and technical proposals for government contracts.

1960 to 1962 Chief Metallurgist Union Carbide Corp.
Uranium Mill
Rifle, Colorado
Planned and supervised process studies directed toward improved quality and

reduced costs in the production of uranium and vanadium compounds from carno-
tite ore. Responsibilities included supervision of air and water pollution control

programs.
1952 to 1960 Senior Chemical Engineer Union Carbide Nuclear Co.
Gaseous Diffusion Plant
Oak Ridge, Tennessee

vel

Headed section engaged in engineering development studies directed toward im-
proving various processes associated with the separation of uranium isotopes by
gaseous diffusion. Process studies ineluded fluorine generation, feed plant opera-
tions, byproduct recovery, barrier manufacture.

1951 to 1952 Lieutenant, USNR United States Navy
Communications Officer USS Eldorado (AGC-11)
1946 to 1950 Chemical Engineer IIT Tennessee Valley Authority

Chemical Engineering Department
Wilson Dam, Alabama

Pilot and production seale studies in support of production of phosphatic fertil-
izers, ammonia, nitric acid and ammonium nitrate. Included studies on control of
stack emissions from phosphate and nitric acid plants.

SEO

enema seteaen cea meee mene ar camara ener nei niet ins

1948 to 1946 Ensign, Lieutenant (JG) USNR United States Navy
Communications, Executive, Commanding Officer, USS LST 544.

1941 to 1943 Junior Chemical Engineer Tennessee Valley Authority
Chemical Engineering Department
Wilson Dam, Alabama

Manufacture of water gas conversion and ammonia synthesis catalysts. Ammonia
plant start-up.

1941 Rodman - Chainman Civil Aeronauties Administration
New York, New York
Airport layout and design
PUBLICATIONS
“Hydrogen from Methanol for Fuel Cells” SAE, 1964.

“Miniature Hydrogen Generators” Power Sources Conference, 20th Annual Pro-
ceedings, 1966.

FEL

EDUCATION
1952-1956

1961-1962

EXPERIENCE

June 1956-
May 1959

May 1959-
May 1961

Sept. 1962-
Dee. 1966

JAMES C. MALARO, JR.
4700 Broad Brook Dr.

Bethesda, Md. 20014

Telephone: 973-7718 (Work)
530-5472 (Home )

College : Yale University
Major: Chemical Engineering
Degree: BB.

Date of Graduation: June 1956

One year of graduate study at the University of California (Berkeley) under a
U.S. Atomic Energy Commission special fellowship in Health Physies.

Process Engineer U.S. Rubber Company, (Naugatuck Chemical Division, Nauga-
tuck, Conn.)

In military service — served for nineteen months as Health Physicist for the U.S.
Army Radioactive Material Disposal Facility (Edgewood, Md.).

Health Physicist U.S. Naval Research Laboratory.

cel

pein saeeaaeaeaanee iammareains items dp

Dec. 1966- U.S. Atomie Energy Commission :
Present

1. Senior Reviewer, Isotopes Branch, Division of Materials Licensing (Dee.

1966-May 1970).

to

Assistant Chief, Materials Branch, Division of Materials Licensing (May
1970 — March 1972).

3. Chief, Materials Branch, Directorate of Licensing (March 1972 — present).
PROFESSION SOCIETIES
Member of Health Physies Society (President, Baltimore — Washington Chap-
ter) and American Nuclear Society.

Certified by the American Board of Health Physies.

9€2

EDUCATION
B.S.

EXPERIENCE
1972 to date

1963 to 1972

1960 to 1963

CHARLES Fk. MACDONALD
Directorate of Licensing
U.S. Atomie Energy Commission
Washington, D.C. 20545

U.S. Merchant Marine Academy 1956

Chief, Transportation Branch

Directorate of Licensing

U.S. Atomie Energy Commission

Supervises the review and processing of all types of license applications for and
communications concerning the transportation and packaging or radioactive
material.

Materials Licensing Engineer

U.S. Atomie Energy Commission

Review and process for final action applications for and communications coneern-
ing licenses for receipt, possession, use and transfer of special nuclear material
and source material with particular emphasis on those applications for packaging
of radioactive material for transport.

Supervisor, Health Physics, Combustion Engineering, Ine., Naval Reactors Divi-
sion.

Established procedures covering personnel monitoring, waste disposal, environ-
mental monitoring, building and area surveys for operation of the SIC prototype.

Se ae ee ae

1958 to 1960 Radiological Safety, Combustion Engineering, Inc., Naval Reactors Division.
Assisted in establishing procedures for the group.
1958 to 1958 Engineer, Combustion Engineering, Inc., Nuclear Division.
Mechanical design of a PWR. ;
1956 to 1958 U.S. Navy
PUBLICATIONS

Implementation of the NEW AEC Transport Regulations 10 CFR 71, co-author,
1968.

SEL

EDUCATION
B.A.
EXPERIENCE
1972 to present

1965 to 1972

1963 to 1965

LELAND C. ROUSE
USAEC, Bethesda, Md.

301/973-7457
Physical Sciences, Education Nebr. State College at Wayne 1951
Chief, Technical Support Branch Fuels and Materials

Directorate of Licensing

Responsible for administration and techn

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40385003_1455%3A02. Public record. Not legal advice.