a— i MST ION CPOE, I OTE LM AEE VON RS NCE AANA 2

SUPREME COURT OF THE UNITED STATES
OCTOBER TERM, 1942

No. 463

ALEX RANIERI, PETITIONER,

VS.

THE UNITED STATES

ON PETITION FOR A WRIT OF CERTIORARI TO THE COURT OF CLAIMS

INDEX.
Original Print
Record from Court of Claims..................cceeeccec5, 1 1
spec eien AEE Ee OT eT POT CT SEATED Die ain O 1 1
On MOUND | bain eink wrbkicnn vusesdteeke us cere: 11 8
Defendant's special answer and counterclaim. ......... 13 8
Exhibit “E”—Invitation for bids.................. 30 15

MNO hb 00d Beanies ccup angie ccecius diecwove, 61 23
Replication to answer and COURTOPCIBIM ...... 5 wccconne 77 26
Argument and submission of case..................... 83 30
segnpeane«hespcsgyary, adboca-hecenn ROLE Tere POPC EE 85 30
a itso gpeageny-dheca bas de EOE, ET OTT a per eae 92 38
Opinion of the court by Jones, J..............00.0005.. 93 38
RN. RS haan Knew enhiv dow hue vende wticcueuic: 99 42
Proceedings after judgment ....................00..., 101 43
Plaintiff’s application for transcript of record.......... 102 43
Parts of evidence agreed to de ee ee 103 43

Testimony of M. W. O’Mera...................... 104 43

Mervin Armatrong........00ccsccs.. 106 45

Gianway Mawnan, Je. ...6..5.0. 0006. 108 46

We NG ce Shc era bereh eu i. 110 48

bathe essay Beth, ES OPT TT ai 111 48

Be Bas OOO ev on
9

tice to proceed; that the contractor received his copy of the
contract and notice to proceed on October 30, 1931, thus
fixing January 22, 1933, as the date set by the terms of the
contract for completion; that on November 16, 1931, the
contractor technically complied with the requirement of
the contract by commencing work on Lot A, but thereafter
delayed actual commencement of construction on Lot A for
one hundred (100) days, on Lot B for two hundred and
twenty-seven (227) days, on Lot D for two hundred and
ninety-seven (297) days and on Lot ©, for three hundred
and thirty-five (335) days.

Ill

That from the commencement of the operations the con-
tractor violated the requirements of the contract specifica-
tions and violated the plan of operations which he himself
had submitted, and he otherwise departed from sound
methods of construction, all in wilful disregard of written
and verbal warnings of the resident inspectors for the
United States and of the written instructions of the con-
tracting officer; that specifically, among the unsound prac-
tices resorted to and the contract violations committed,
the contractor provided inadequate drainage; he excavated
[fol. 15] and engaged in multiple handling of wet material
during rains; he placed saturated material within the em-
bankment; he placed wet material on an undrained founda-
tion; he pocketed water between partial fills; he developed
puddling by repeatedly and unnecessarily handling material
prior to its placement in the levee; he caused damage to the
embankment by superimposing the weight of large machines
and operating them from on top of the fill; he constructed
partial fills with excessively steep side slopes thereby cre-
ating planes of cleavage or separation which caused base
slides ; he failed to remove and destroy cleavage planes when
cutting out slides and thereby caused additional slides in the
refill material after cut-outs; he overdug the borrow pits;
he damaged levee foundations by overdigging inspection
ditches; and he failed to start the embankment out full to
the slope stakes and carry it regularly up to the gross fill.

IV

That by reason of the contractor’s failure to begin work
only after long delays on each Lot, and because of his

——— AS SENAY SME IEDR TY EIR AG DS

—
10

violations of the contract and the specifications, and be-
cause of his failure to diligently prosecute the work and to
place sufficient men and equipment thereon so as to insure
its completion within the time specified, the contractor found
on December 12, 1932, that approximately 91% of the con-
tract time period had elapsed and that only approximately
[fol. 16] 48% of the material was in place, with much of
this material in a condition which was totally unfit and
unacceptable to the United States as levee material, in that
it was wet material which was sloughing or showed ten-
dencies to slough and was full of numerous slides and planes
of cleavage contrary to the requirements of the specifica-
tions. The contractor addressed the following letter to
the contracting officer under date of December 12, 1932:

Careful investigations and extensive explorations of the
conditions at the site have disclosed the fact that the sub-
surface and/or latent conditions differ materially from the
conditions as represented in the plans and specifications,
and you are hereby formally notified that I elect to rescind
my contract with full reservations of all my rights in the
premises.

However, if mutually satisfactory adjustments can be
made, I am willing to proceed with the work and to that
end I hold myself in readiness to discuss this matter with
you at any time within the next forty-eight hours. Kindly
acknowledge receipt of this letter, and oblige,

Yours very truly, Alex Ranieri.

That on December 14, 1932, the contractor received the
following from the contracting officer:

I have your letter dated December 12, 1932, delivered
to my office by your attorneys upon the date named, on the
[fol. 17] subject of your contract for the construction of
Chamberlain-Lobdell Levee, Lots A, B, C, and D, in which
you state that due to subsurface and/or latent conditions
discovered you have elected to rescind your contract, re-
serving in full all your rights under said contract. Your
letter does not disclose in what manner, form, or particular,
subsurface and/or latent conditions differ materially from
the drawings or those shown in the specifications, without
which information I am unable to take further steps as pro-
vided in the contract.

eR RSRRONET TC IEHE —

>

Your attention is also invited to the fact that irrevocable
powers of attorney granted by you to Manning William
O’Meara and the National Surety Company, each coupled
with an interest in said contract, seem to preclude indi-
vidual action by you in furtherance of your rights under
the contract. You are, therefore, requested to furnish such
information or proof as may be available to you as to what
changes in subsurface and/or latent conditions now exist
under the contract, and to obtain the signature of the above-
named agents and attorneys in fact in support of the evi-
dence so submitted.

In the meantime your right to rescind the contract is
denied and you are expected to proceed with the work called
for under the terms of the contract.

11

Vv

That on the 26th day of September 1932, the petitioner
had entered into a subcontract with Manning William
[fol. 18] O’Meara for the construction of that part of the
new Chamberlain-Lobdell Levee Iter R-831 which was em-
braced within stations 3378 to 3431 in Lot C, and stations
3431 to 3472 in Lot D; that this said subcontract was
amended and extended by addenda thereto on November 9,
1932; that also on November 9, 1932, the petitioner executed
a full and irrevocable power of attorney to the said Manning
William O’Meara covering the portions of the work which
had been sublet to him as set forth above: that the said
power of attorney recites that the said attorney has an
interest in said contract; that a copy of the power of at-
torney to Manning William O’Meara is attached hereto,
marked ‘‘Exhibit C’’ and is made a part hereof.

VI

That on the 26th day of November 1932, the petitioner
executed a full and irrevocable power of attorney to the
National Surety Company of 115 Broadway, New York,
covering all of the work of levee construction of Item R-831,
Chamberlain-Lobdell Levee, Lots A, B, C, and D, with the
exception of the portion of the work which had been pre-
viously sublet to Manning William O’Meara, as set forth in
paragraph V. above; that this said power of attorney re-
cites that the National Surety Company, attorney in fact,

PERRET MEDEA PICLENS EINE AES IN

—
12

as surety on the bond of Alex Ranieri, has an interest in
said contract; that a copy of this power of attorney to the
[fol.19] National Surety Company is attached hereto,
marked ‘‘Exhibit D’’ and is made a part hereof.

vil

That subsequent to December 12th, 1932, no work of any
sort was performed on any part of the project, Item R-831,
either by the petitioner, or Manning William O’Meara, or
the National Surety Company ; that on January 3, 1933, just
nineteen days prior to the expiration of the contract period
of 450 days allowed for the completion of the work, and with
less than forty-five per cent of the required earthwork in
place, the contracting officer advised the petitioner, and
Manning William O’Meara, and the National Surety Com-
pany that owing to the failure to prosecute the work with
such diligence as to insure its completion within the con-
tract period, the right to proceed with the work was thereby
terminated under the provisions of Article 9 of the contract;
that on the same day, January 3, 1933, the contracting
officer asked the National Surety Company, as surety, to
state whether or not it desired to complete the work in ac-
cordance with the terms of the contract; that the National
Surety Company did not so elect and on May 19, 1933, con-
sented to a re-advertisement of the contract by the United
States without prejudice.

Defendant denies all other allegations of the petition.
[fol. 20] CouUNTERCLAIM

Further answering and by way of counterclaim the de-
fendant alleges:

I

That the United States, acting through the United States
Engineer Office of the War Department in New Orleans,
Louisiana, on June 6, 1933, readvertised for bids for the
completion of the contract entered into on October 12,
1931, between the petitioner, Alex Ranieri, and the United
States, for the construction of the Chamberlain-Lobdell
Levee, Item R-831, Lots A, B, C, and D; that under the new
specifications, being number 33576, a copy of which is at-

Nyetuure tates eeess ee
EIR LEE oh ITM We OE FSGS ORES NORE VPS

_

13

tached hereto and made a part hereof, marked ‘Exhibit
K’’, no material departure was made from the original
specifications; that due to the earthwork already in place,
the amount estimated as being necessary to complete the
levee to original grade and section was given as approxi-
mately 1,612,000 cubie yards; that the time for placing the
same was set at 240 days; and necessarily, by reason of the
former unsatisfactory workmanship and materials in the
earthwork placed by the petitioner, Alex Ranieri, the new
specifications provided for the cutting out of the existing
slides for which no payment was to be made for cutting out
but only for satisfactorily completed levee; that the new
specifications also necessarily required the refilling of cer-
[fol. 21] tain overdug pits and berms because of the prior
negligent and improper work of the petitioner in overdig-
ging the same contrary to his original contract and specifica-
tions. In all other respects the specifications remained
the same,

II

That bids were opened on June 26, 1933, and the work was
awarded to Walter S. Hardwick and Ferdinand M. Horton,
the low bidder, and a contract was entered into by them with
the United States on July 10, 1933, for the construction of
the uncompleted portion of the Chamberlain-Lobdell Levee,
Lots A, B, C, and D, for a consideration of 18.60 cents per
cubic yard; that a copy of this contract is attached hereto
marked ‘Exhibit F’’, and is made a part hereof; that the
new contract is known as W-1096 eng 2871.

Ill

That all of the work was satisfactorily completed by
Messrs. W. S. Hardwick and F. M. Horton on July 1, 1934;
that the new contractor placed in the levee a total of 1,700,-
650 cubic yards of earth in order to bring the completed
structure to required grade and section; that the following
is a table showing the computation of the excess cost to the
United States brought about by the default of the peti-

a
14

[fol. 22] tioner, Alex Ranieri. and the necessity of reletting
and completing the levee as originally contracted for:

Cost of placing 1,700,650 cubic
yards at $.186 per cu. yd. under

contract W-1096-eng-2871 .... $316,320.90
Cost under contract W-1096-eng-
1929 at $.124 per cu. yd...... 210,880.60
EE Cs Soe rg ee $105,440.30
Cost of readvertising and reletting work.... 79.27
Cost of supervision and inspection after de-
fault and prior to completion............. 3,444.31
District and Division overhead after default
and prior to completion .................. 31.83
PMI ge ays ab 108,995.71

Amount due Alex Ranieri and not paid for at
time of default

Retained percentages (10%) on

II os ocean Sh eo wae $11,301.40
25% retained on partial fill....... 36,723.65
Due for 188,044 cubic yards in
place at $.1240 per cubic yard,
EE Oak ies ew ena 23,317.46
———__ $71,342.51
Balance due the United States........ 37,653.20

That by reason of the petitioner’s failure or refusal to
do any more work on his contract after December 12, 1932,
the defendant in readvertising and reletting the levee con-
struction necessary for the completion of the said work was
required to and did pay $108,995.71 more than the work
would have cost had the petitioner completed the construc-
tion of the levee as required by his contract of October 12,
1931; and that, against this sum of $108,995.71 there was,
however, due and owing to Alex Ranieri from the United
States under his contract, the sum of $71,342.51; that this
sum is made up of three items, viz: (a) ten percent retained
percentage on payments made to him, as provided for by
paragraph 7 of the specifications in his contract, and which
amounts to $11,301.40; (b) 25% retained by the United

Rae Re Sie a eet eee - ae ee Rea
2 RORY L Epes 4 sy
ann Ea Late SE EEE RGR a DEAE Pi Sena i : PAR ES oly bite meet ie fase Bat! +

15

[fols. 23-29] States on partial fills where the levee had not
been completed to grade and section, which sum amounts to
$36,723.65 and which is also provided for by paragraph 7
of the specifications in the contract; (c) the sum of $23,-
317.46 which was due for 188,044 cubic yards of material
in place but which was not paid for by the United States at
the rate of $.1240 per cubic yard.

V

That the difference between the said excess cost figure
$108,995.71 and the figure $71,342.51, which was due the
petitioner is the sum of $37,653.20, and the defendant has
suffered damage to this amount by reason of the acts and
defaults of the petitioner, and said sum of $37,653.20 with
interest thereon at the rate of 6% per annum from July 1,
1934, when final settlement was had with, and final payment
was made to, Messrs. W. S. Hardwick and F. M. Horton
for the completion of said work, is owing by the petitioner
to and is due the defendant under Article 9 of the original
contract of October 12, 1931.

Wherefore, the defendant prays that the petition filed
herein be dismissed, that the petitioner take nothing, and
that the defendant have judgment over and against the
petitioner for the sum of $37,653.20 with interest at 6% per
annum from July 1, 1934, until paid.

George C. Sweeney, Assistant Attorney General.
Edgar T. Fell, Attorney.

[fols. 30-32] Exutsir E ro CountercLam

[Do not write above this line]
Standard Government Form of Invitation for Bids
(Construction Contract)
Spec. No. 33.576

* * * * * * *

[fols. 33-36] 7. Payments.—(a) For work under straight
contracts.—Payments will be made on monthly estimates of
net yardage in place; provided that only 75 per cent of the

16

unit price will be allowed for material in fill not completed
to grade and section; and provided further that no estimate
on such incomplete fill will be made on less than 20 percent
of the material comprised in the specified section. This
limits estimates on any section to five. A percentage of 10
percent will be reserved from each payment until the work
is fully completed; except that the contracting officer, at
any time after 50 percent of the work in an item shown in
paragraph 39 hereof as constituting a unit of the contract
has been completed, if he finds that satisfactory progress
is being made, may make any of the remaining payments
in full upon work under said item that has been completed
to grade and section.

When all the requirements of the contract and these
specifications have been fully completed to the satisfaction
of the contracting officer the work will be accepted and final
payment made. (See paragraph 38.) Should two or more
items of work be awarded to one bidder, one contract will
be entered into, but payment of the retained percentages
will be made upon completion of each item of work as listed
in the form of bid.

* * * * * * *

[fol. 37] 9. Acceptance of work.—Continuous lengths of
levee of 500 linear feet or more will be accepted by the con-
tracting officer when fully and completely finished except
timber felling and the sodding or seeding. The intention of
this paragraph is that in case of damage or destruction
through no fault of the contractor of such lengths as have
been accepted such loss falls upon the United States and
not upon the contractor. Portions of levee upon which
payments have been made, but which have not been ac-
cepted as herein provided shall, if damaged or destroyed,
be repaired or replaced by the contractor at his own ex-
pense. Retained percentage upon accepted work will not
be paid to the contractor until the satisfactory comple-
tion and final acceptance as provided in paragraph 7.

[fol. 38] 13. Right of way and material—This agreement
is made with the understanding that the right of way and
earth for constructing the levee will be furnished without
cost to the contractor, except as provided in paragraph 22
(b). Days upon which work is prevented by failure to pro-

17

vide necessary right of way will not be counted against
the contractor as delay in completion of contract, nor in
computing the time stipulated in paragraph 2 hereof for
commencement of work; but no claim is to be made by
the contractor for damage or expense occasioned by delay
[fol. 39] or failure in securing right of way. In event of
failure to obtain right of way for all or any portion of
the line by the time construction has progressed thereto,
the contracting officer shall have the right to omit wor
on such line or portion of the line.

* * * ” * * *

[fols. 40-42] 19. Net cross section—Unless otherwise
specified in paragraph 39 hereof, levees shall be constructed
to the following net dimensions:

(a) Levees below Cape Girardeau, Mo., and Thebes, II.

Landside slope to
Section Crown Riverside contain seepage Governing
slope line of— material
Feet

Rae gee 10 lon3 1 on 6 75% or more buckshot.
| ER ORL OA 10 lon3\% 1 on 6% Loam.
| MBE ea ee Ger 12 lond5 lon8 75% or more of sand.

* * * * * * .

[fol.43] 22. (a) Embankment.—Unless otherwise specifi-
cally directed by the contracting officer in writing, the em-
bankment shall be started full out to the slope stakes and
be carried regularly up to the gross fill. In the ease of
wagons carrying 5 cubic yards or more and drawn by
not less than 10-ton tractors, the fill shall be deposited in
layers not exceeding 5 feet in thickness. In the cases of
lighter equipment such as scrapers or horse-drawn wagons,
the fill shall be deposited in layers not exceeding 3 feet
in thickness. Where the work is performed by machines,
the requirement of layer construction may be omitted and
the work carried continuously to gross fill. If portions
of the prepared right-of-way or uncompleted levee be
unduly compacted from any cause whatever, before de-
positing any material on such surfaces they must again
be thoroughly broken up as specified in paragraph 20.
[fols. 44-45] Clean earth, free from all foreign matter,
shall be used in constructing the embankment. No earth
which sloughs or which shows tendency to slough shall

a

18

be placed in the embankment, except when placed hy-
draulically under paragraph 22 (b). ,

(fol. 46] 24. Disposition of objectionable material.—
When the borrow pits, or the ground to be occupied by
the levee, contains soil which is unfit to be put into or
remain under the levee, the contractor will be required
to remove the same and dispose of it as directed by the
contracting officer. If such material removed from the
ground to be occupied by the levee or removed from the
[fols. 47-53] borrow pits furnished by the United States
is wasted, the contractor will be paid for it at the contract
price per cubic yard.

[fol. 54] 39. Description of work.—Drawings.—The work
shall conform to the drawings marked ‘‘L-8-2268 entitled
Item R 831, Chamberlin-Lobdell Levee’’, which form a
part of these specifications and which are filed in the
U. S. Engineer Office, Second New Orleans District, Foot
of Prytania Street, New Orleans, La.

[fol. 55] Atchafalaya Front Levee District ‘
Net
Item Stations Kind of Cubic _ height,
work yards fee-
R 831-A, Chamberlain-
Lobdell Levee........... 3273+04 to 3329+00 New 307,000 23-30

(a) Time.—Work shall be commenced in accordance with
paragraph 2 of these specifications and shall be completed
within 240 calendar days from date of receipt of notice
to proceed.

(b) Borrow pits——The material required for this work
shall be obtained from riverside borrow pits, and from
the existing controlling levee to extent indicated on draw-

ing.

(c) Cross-section—The soil conditions indicate that
a ‘*B’’ cross-section is required throughout.

(d) Slides.—Existing slides at the approximate locations
listed below shall be cut out below the sliding surface and
properly restored. The basis for payment will be at the
net quantity in the restoration placed above the actual
cut-out, as cross-sectioned upon completion of cut-out. No

19

payment will be made for cutting out but only for satis-
factorily completed levee in accordance with paragraph 7
hereof.

Approximate
quantity to be
Approximate stations restored, cu.
yds., net
ot Ok SR URER SS Bae epee apt engine SMe PT: 8,500
a cde ag EE Oy ree Dae om eens 7,000
sos shapieaprshaor tone ein Ades EEE CE NRT AR 35,000

(e) Special provisions—Construction above station 3288
shall not be undertaken until authorized in writing by the
contracting officer.

[fol.56] (f) Refill of overdug pits and berm.—Pit and
berm excavated in violation of specifications by the origi-
nal contractor shall be restored under this contract, Pay-
ment will be made on the basis of net quantity placed.
The following table shows the locations and approximate
quantities of overdug pit and berm:

Where violation Approximate,

Approximate stations exists cu. yds., net
3200+-00 to 3207+-75..................... Rerm 680
DIVO TOO 80 SOLO UO 6 i os eons dnccns Berm 340
3322+00 to 3324+00..................... Berm 10
3301 +25 to $8024-00... 2.00... ....05000., Pit 40
Net
Item Stations Kind of Cubic _ height,

work yards feet
R 831—B, Chamberlain-

Lobdell Levee. .......... 3329+00 to 3378+-00 New 239,000 24-30

(a) Time.—Work shall be commenced in accordance
with paragraph 2 of these specifications and shall be
completed within 240 calendar days from date of receipt
of notice to proceed.

(b) Borrow pits —The material required for this work
shall be obtained from riverside borrow pits.

(c) Cross section—The soil conditions indicate that a
‘B”’ cross section is required throughout.

(d) Slides.—Existing slides at the approximate loca-
tions listed below shall be cut out below the sliding surface
and properly restored. The basis for payment will be the
net quantity in the restoration placed above the actual
cut-out, as cross sectioned upon completion of cut-out. No
payment will be made for cutting out but only for satis-

Bay eet otse

ALEC" OPEL SE AES or MARE ANNE GPS LNT ELA MEE RIN MITRE be ILS EM PAIL EG EN DABS

20

[fol. 57] factorily completed levee in accordance with para-
graph 7 hereof.

Approximate

quantity to be
Approximate stations restored,

cu. yds., net
8388-+-75 to SBBH+25..... cece rere eee ee ener reer eenees 8,000
$3364-50 to SBBT475. nce cree cece nent neeneeeveneeens 6,000
SSAO4-B5 tO SOFT ID... ccc ccc cece gee ee ence eecenvenens 7,000
93424-75 to SB454+25. www cece eet e eet e eee rere seeee 19,000
DHG1 BD CO CHOP OB ck cuss csa gucci ener ssvavocedemueseren 8,000
8362+-75 to S8B4+00. ccc ccc cette rent eneeeeeeae enone 14,000

(ce) Refill of overdug berms.—Berm excavated in viola-
tion of specifications by the original contractor shall be
restored under this contract. Payment will be made on
the basis of the net quantity placed. The following table
shows the locations and approximate quantities of over-
dug berm:

Where violation Approximate,

Approximate stations exists cu. yds., Net
3362+-00 to 3378-+00. .. 0... eee eee eee Berm 400
Net
Item Stations Kind of Cubie _ height,
work yards feet

R 831-C, Chamberlain-
Lobdell Levee... iss. oe ess 3378+00 to 3431+00 New 537,000 25-29
(a) Time.—Work shall be commenced in accordance with
paragraph 2 of these specifications and shall be completed
within 240 calendar days from date of receipt of notice
to proceed.

(b) Borrow pits——The material required for this work
shall be obtained from riverside borrow pits.

(c) Cross-section—The soil conditions indicate that a
‘“B’? cross-section is required throughout.

(d) Slides.—Existing slides at the approximate locations
listed below shall be cut out below the sliding surface
(fol. 58] and properly restored. The basis for payment
will be the net quantity in the restoration placed above
the actual cut-out, as cross-sectioned upon completion of
cut-out. No payment will be made for cutting out but
only for satisfactorily completed levee in accordance with
paragraph 7 hereof.

Approximate
quantity to
Approximate stations be restored,
cu. yds., net
3381+00 to 3382+00. cic eer eee e eee nee ee teees 13,000

33824-70 to SBBA4-25 occ cece cere cere neeeeneceeceres 10,000

pana —
21

(ce) Refill of overdug berm.—Berm excavated in viola-
tion of specifications by the original contractor shall be
restored under this contract. Payment will be made on
the basis of the net quantity placed. The following table
shows the locations and approximate quantities of over-
dug berm:

Where violation Approximate

Approximate stations exists cu. yds., net
3391+-00 to 3898+-00..................... Berm 50
Net
Item Stations Kind of Cubic height,
work yards feet

R 831—-D, Chamberlain-
Lobdell Levee. .......... 3431+00 to 3493+20 New 529.000 21-26

(a) Time.—Work shall be commenced in accordance with
paragraph 2 of these specifications and shall be completed
within 240 calendar days from date of receipt of notice to
proceed.

(b) Borrow pits—The material required for this work
shall be obtained from riverside borrow pits, and from
[fol. 59] the existing levee to extent indicated on drawing.

(c) Cross-section—The soil conditions indicate that a
‘‘B’’ cross-section is required throughout.

(d) Slides.—Kxisting slides at the approximate locations
listed below shall be cut out below the sliding surface and
properly restored. The basis for payment will be the net
quantity in the restoration placed above the actual cut-out,
as cross-sectioned upon completion of cut-out. No payment
will be made for cutting out but only for satisfactorily
completed levee in accordance with paragraph 7 hereof.

Approximate
quantity to
Approximate stations be restored,
cu. yds., net
ania tb cedar bona omth kocech SAE 13,000

(e) Refill of overdug berm.—Berm excavated in viola-
tion of specifications by the original contractor shall be
restored under this contract. Payment will be made on
the basis of the net quantity placed. The following table
shows the locations and approximate quantities of over-
dug berm:

Where violation Approximate,

Approximate stations exists cu. yds., net
3463 +00 to 3476400... 2.0... 00. cece eee Berm 310
4—463

it ae oe
Bic:

22

(f) Special provisions.—Construction below _ station
3485-+-00 shall not, be undertaken until authorized in writ-
ing by the contracting officer. The right is reserved to
require the construction of a wing levee approximately
500 feet long, at the lower end of the work as indicated
on the drawing. The estimated quantity of this wing
[fol. 60] levee is approximately 35,000 cubie yards, which
is not included in the total estimated quantity shown in
the tabulation above. Material for this work shall be
obtained from river side borrow pits and from the exist-
ing levee to extent indicated on drawings. If constructed
payment for the wing levee will be made at the contract
price per cubic yard.

Estimates by United States——Bidders are advised that
the United States will prepare estimates of cost of con-
struction by the use of Government plant and hired labor
on each individual item and on combinations of items as
listed under ‘‘Combinations’’ in the bid form.

General provisions—The following general provisions
shall be applicable to all work under these specifications:

Measurements for payments.—Payment will be made on
the basis of the quantities placed under these specifica-
tions within prescribed gross dimensions, less the shrink-
age allowance called for by par. 27 hereof.

Yardage will be determined by place measurement.

Determination of settlement.—Claims for reimbursement
for additional yardage under the provisions of first sub-
paragraph of paragraph 28 hereof to be considered must
be substantiated by measurement of the vertical displace-
ment of the foundation made within 48 hours after com-
pletion of embankment at the site of the structure installed
to measure such foundation settlement.

U. S. Engineer Office, Second New Orleans District, Foot
of Prytania Street, New Orleans, La., June 6, 1933.

gamers
23
[fols. 61-62] Exuisir F ro Counrerciaim
Standard Government Form of Contract

(Construction)

Contract W 1096 eng.-2781. July 10, 1933.

Department: War (Engineer Department at Large) U.S.
Engineer Office, Second New Orleans District.

Contractor: W. S. Hardwick and F. M. Horton.

Contract for Chamberlaim-Lobdell Levee: Amount
RNA EAM C8" AS ee aN grate) te $57,102.00
et I a Cee en 44,454.00
RTI oe ey i Gera we 99,882.00
SI Oe ot nS ea a .. 98,394.00

POOR On Eh 299,832.00

Place: Atchafalaya Front Levee District.

Contract for Construction

[fol. 63] Articie 3. Changes.—The contracting officer may
at any time, by a written order, and without notice to the
sureties, make changes in the drawings and (or) specifica-
tions of this contract and within the general scope thereof.
If such changes cause an increase or decrease in the amount
due under this contract, or in the time required for its per-
formance, an equitable adjustment shall be made and the
contract shall be modified in writing accordingly. No
change involving an estimated increase or decrease of more
than Five Hundred Dollars shall be ordered unless ap-
proved in writing by the head of the department or his duly
authorized representative. Any claim for adjustment un-
der this article must be asserted within ten days from the
date the change is ordered, unless the contracting officer
shall for proper cause extend such time, and if the parties
cannot agree upon the adjustment the dispute shall be de-
termined as provided in Article 15 hereof. But nothing
provided in this article shall excuse the contractor from
proceeding with the prosecution of the work so changed.

ArticLe 4. Changed Conditions.—Should the contractor
encounter, or the Government discover, during the progress

a
24

of the work, subsurface and (or) latent conditions at the
[fols. 64-65] site materially differing from those shown on
the drawings or indicated in the specifications, the atten-
tion of the contracting officer shall be called immediately to
such conditions before they are disturbed. The contracting
officer shall thereupon promptly investigate the conditions,
and if he finds that they materially differ from those shown
on the drawings or indicated in the specifications, he shall
at once, with the written approval of the head of the de-
partment or his representative, make such changes in the
drawings and (or) specifications as he may find necessary,
and any increase or decrease of cost and (or) difference in
time resulting from such changes shall be adjusted as pro-
vided in Article 3 of this contract.

* * * * * * *

{fol.66] Arricte 7.—Materials and Workmanship.—Un-
less otherwise specifically provided for in the specifications,
all workmanship, equipment, materials, and articles incor-
porated in the work covered by this contract are to be of the
best grade of their respective kind for the purpose.

[fol. 67] Articte 9. Delays—Damages.—lf the contractor
refuses or fails to prosecute the work, or any separable part
thereof, with such diligence as will insure its completion
within the time specified in Article 1, or any extension
thereof, or fails to complete said work within such time, the
Government may, by written notice to the contractor, termi-
nate his right to proceed with the work or such part of the
work as to which there has been delay. In such event, the
Government may take over the work and prosecute the same
to completion by contract or otherwise, and the contractor
and his sureties shall be liable to the Government for any
excess cost occasioned the Government thereby. If the con-
tractor’s right to proceed is so terminated, the Government
may take possession of and utilize in completing the work
such materials, appliances, and plant as may be on the site
of the work and necessary therefor. If the Government
does not terminate the right of the contractor to proceed,
the contractor shall continue the work, in which event the
actual damages for the delay will be impossible to deter-
mine and in lieu thereof the contractor shall pay to the

20

Government as fixed, agreed, and liquidated, damages for
each calendar day of delay until the work is completed or
[fols. 68-69] accepted, the amount as set forth in the specifi-
cations or accompanying papers and the contractor and his
sureties shall be liable for the amount thereof: Provided,
That the right of the contractor to proceed shall not be ter-
minated or the contractor charged with liquidated damages
because of any delays in the completion of the work due to
unfor-seeable causes beyond the control and without the
fault or negligence of the eentractor, including, but not re-
stricted to, acts of God, or of the public enemy, acts of the
Government, fires, floods, epidemics, quarantine restric-
tions, strikes, freight embargoes, and unusually severe
weather or delays of subcontractors due to such causes:
Provided further, That the contractor shall within ten days
from the beginning of any such delay notify the contracting
officer in writing of the causes of delay, who shall ascertain
the facts and the extent of the delay, and his findings of
facts thereon shall be final and conclusive on the parties
hereto, subject only to appeal, within thirty days, by the
contractor to the head of the department concerned, whose
decision on such appeal as to the facts of delay shall be
final and conclusive on the parties hereto.

* * * * * * *

(fol. 70] Arricie 15. Disputes.—Except as otherwise spe-
cifically provided in this contract, all disputes concerning
questions of fact arising under this contract shall be decided
by the contracting officer or his duly authorized representa-
tive, subject to written appeal by the contractor within
thirty days to the head of the department concerned, whose
decision shall be final and conclusive upon the parties
thereto as to such questions of fact. In the meantime the
contractor shall diligently proceed with the work as
directed.

ARTICLE 16. Payments to contractors.—(a) Unless other-
wise provided in the specifications, partial payments will be
made as the work progresses at the end of each calendar
month, or as soon thereafter as practicable, on estimates
made and approved by the contracting officer. In preparing
estimates the material delivered or the site and preparatory
[fols. 71-76] work done may be taken into consideration.

(6) In making such partial payments there shall be
retained 10 percent on the estimated amount until final

)
a
——
SEN

26

completion and acceptance of all work covered by the con-
tract: Provided, however, That the contracting officer, at
any time after 50 percent of the work has been completed,
if he finds that satisfactory progress is being made, may
make any of the remaining partial payments in full: And
provided further, That on completion and acceptance of
each separate building, vessel, public work, or other division
of the contract, on which the price is stated separately in
the contract, payment may be made in full, including re-
tained percentages thereon, less authorized deductions.

(c) All material and work covered by partial payments
made shall thereupon become the sole property of the Gov-
ernment, but this provision shall not be construed as re-
lieving the contractor from the sole responsibility for the
care and protection of materials and work upon which pay-
ments have been made or the restoration of any damaged
work, or as a waiver of the right of the Government to re-
quire the fulfillment of all the terms of the contract.

* * * * * * *

[fol. 77] IV. RepiicatTion TO ANSWER AND COUNTERCLAIM—
Filed August 23, 1939

The Claimant, for answer to the counterclaim of the De-
fendant, hereby makes the following reply, viz.—

1.) Claimant alleges that he did not unreasonably delay
in commencing the work under contract described in the
petition herein, and alleges that all of the time previous to
his commencing said work was necessarily and profitably
employed by him in making such preparation for said work
that when actual construction began it would be expedited
by the time so taken in proper preparation.

2.) Claimant denies that in doing the construction work
under said contract he violated either the requirements of
the contract specifications or the plan of operations, or
departed from sound construction methods; and claimant
specifically denies that he resorted to any of what are
denominated unsound practices or committed any of what
(fol. 78] are called contract violations enumerated in the
subdivision of Defendant’s special answer and counter-
claim numbered III, and alleges that he did all his work

ww
27

under said contract in a proper and sound construction
way.

3.) Claimant denies that by reason of his failure to begin
work only after long delay and because of his violation of
the contract in the specifications, and his failure to dili-
gently prosecute the work, and to place sufficient men and
equipment failed to insure its completion within the time
specified, or by reason of any of such alleged happenings
(all of which allegations claimant alleges to be untrue), on
December 12, 1932, only 48% of the material was in place,
with much of it unfit and unacceptable as levee material,
because it was wet material sloughing or showed tendencies
to slough, and full of slides and planes of cleavage, con-
trary to the specification requirements; and, on the con-
trary, claimant alleges that the fact that but 48% of the
material was in place at said date was due wholly to the
fact that the material to be exeavated and placed was not
loam, as represented in the specifications, but an admixture
of clay, organic matter, sand and silt, all heavily impreg-
nated with water, and with the stumps of cypress swamp
scattered throughout the area thickly enough to seriously
interfere with the work, and interspersed with under-
ground water, seeping through it at frequent intervals, and
the site of a crevass- as more particularly described in the
petition, which, while differing as stated from what it was
represented in the specifications to be, made it far more diffi-
cult to excavate and place, and the circumstance that the
United States officials in charge required the work to be
done as if the material had been loam instead of the kind de-
[fol. 79] scribed, which was unsuited to and improper for
the kind of material actually found, which two cireum-
stances together rendered it impossible to complete the
construction within the time specified in the contract, or to
do more than was done at the date mentioned.

This claimant denies that much, or any, except a neglible
amount, of the material which had been placed was unfit,
and alleges that it was proper material and in proper con-
dition, and should have been acceptable to and accepted by
the United States.

4.) Claimant admits that he sent, December 12, 1932, the
notice (denominated a letter in the answer and counter-
claim), set out under No. IV of said answer and counter-
claim, and that he received, December 14, 1932, the com-

sa

28

munication set out in subdivision IV from the contracting
officer.

Claimant further alleges that it was unnecessary to dis-
close in his said notice in what manner, form, or particular,
subsurface and/or latent conditions differ materially from
the drawings or those shown in the specifications, as it was
wholly known to the contracting officer and to the United
States previous to the letting of the contract herein that the
material to be excavated and placed was not loam, as stated
and shown in the specifications, but was of the character
and kind hereinabove, and in the petition particularly de-
scribed; and the nature of said material was disclosed from
day to day as the work proceeded, from the time that claim-
ant undertook the same, when the contracting officer by
frequent if not daily inspection had become, and was thor-
oughly familiar with the differences in the material between
[fol. 80] the description in the specifications and the ma-
terial actually being excavated and placed.

6.) Claimant further alleges that the powers of attorney
described in the answer and counterclaim to Manning Wil-
liam O’Meara and the National Surety Company did not
give or purport to give said attorneys in fact or either of
them the exclusive right to act for claimant in respect to
the construction contract, or deprive, or attempt or pur-
port to deprive claimant of the right to act with respect
thereto in all matters, and, particularly, in matters between
this claimant and defendant, and claimant, therefore, al-
leges that it was not necessary to have either of said attor-
neys in fact join in claimant’s notice that he rescinded the
construction contract.

7.) Claimant further alleges that defendant never gave
him notice of its readvertising for bids for the completion
of the construction work described in said contract, and
that claimant is not, and did not become bound by said re-
advertising for bids, or by the attempted reletting of the
contract, or the result or any of them of the work done there-
under.

And claimant alleges that by such failure to notify claim-
ant of such readvertising for bids, defendant recognized
claimant’s notice of rescision, and his rescision thereby
was made valid and said failure validated the same.

8.) Claimant further alleges that by virtue of the de-
fendant having misrepresented the nature of the soil to

29

be excavated and placed as loam when it was not of that
kind, but was of the nature and kind hereinabove and in
the petition particularly described, and was, therefore, far
more difficult and far more expensive to handle, and con-
sumed a much longer time both to excavate and place, and
[fol. 81] through defendant’s insisting and requiring that
said excavating and placing and the construction work should
be done in a manner suited to loam, and unsuitable and ex-
tremely difficult with the soil that was in fact found, claim-
ant had the right to rescind said contract and became en-
titled to payment for the damages which he suffered through
such misrepresentation, and said requirement to do said
work in the manner above described, and for the work which
he did in accordance with the contract and as specified in
the petition herein, and that he is not liable for the in-
creased cost of any part thereof paid by defendant in
completing said construction work; and claimant alleges
that said attempted reletting was made at a time when the
prices of sich construction work were much lower than
when the contract described in the petition was made, and
that, taking this into consideration, the fair value of the
construction work at the time the contract was let, and the
prices which would have been bid had the real nature and
kind of the material to be excavated and placed been made
known, instead of being misrepresented as loam, would
have been more than the $.186 paid to the new contractor,
instead of $.124, the price at which claimant was induced to
bid through said misrepresentation as to the nature of the
soil to be excavated and placed.
That claimant was obliged to and did do all of the pre-
| liminary work necessary to the beginning construction,
which included many details and took a very considerable
time, all of which was done at large cost. That the new
bidder had none of this preliminary work to do, but had
solely the cost of excavating and placing the remaining
[fol. 82] cubic yards to complete construction, without any
of this preliminary expense or delay. That taking into ac-
count the time claimant was obliged to give to preliminary
Work (aside from claimant’s being required by the con-
tracting officer to do the work in a manner unsuitable to the
material encountered, and, therefore, unnecessarily diffi-
cult and expensive, and taking much longer), claimant did
not take as much time per cubie yard in excavating and
placing the material as was taken by the new bidder,

—F

Wherefore, claimant prays judgment, in accordance with
the part of the petition, for $258,880.49, together with in-
terest from December 14, 1932, the date when the contract
described in the petition was rescinded, and for such other,
further, or different judgment or relief as may be just and
equitable in the premises, and for the dismissal of said
counterclaim.

Dated this 13th day of August, 1935.

S. Wallace Dempsey, Attorney for Claimant, 721-
723 Investment Building, Washington, D. C.

[fols. 83-84] Duly sworn to by Alex Ranieri. Jurat omit-
ted in printing.

V. ARGUMENT AND SUBMISSION OF CASE

On October 8, 1941, the ease was argued and submitted on
merits by Mr. S. Wallace Dempsey for plaintiff, and by Mr.
W. A. Stern, IT, for defendant.

[fol. 85] VI. Special Findings of Fact, Conclusion of Law
and Opinion of the Court by Jones, J.—
Filed February 2, 1942
Mr. S. Wallace Dempsey for the plaintiff. Mr. Bruce
Fuller was on the briefs.
Mr. W. A. Stern, II, with whom was Mr. Assistant
Attorney General Francis M. Shea, for the defendant.
This case having been heard by the Court of Claims,
the court, upon the report of a commissioner and the evi-
dence, makes the following

SpeciaL Frypincs or Fact

1. Plaintiff and defendant entered into a contract Octo-
ber 12, 1931, numbered W 1096 eng. 1929, whereby, for a
consideration of 12.40 cents per cubie yard, place measure-
ment, the plaintiff agreed to ‘‘furnish all labor and mate-
rials, and perform all work required for the construction
of Item R 831, Chamberlain-Lobdell Levee, Lots A, B, C,
& D, containing approximately two million nine hundred
fifty thousand (2,950,000) yards, situated in the Atchafa-
laya Front Levee District,’’ in accordance with specifica-
tions, schedules, and drawings, all made a part of the
contract and designated ‘‘Engineer Department, U. S.

31

Army, Standard Specifications for Levee Work, No. 32.38,
dated August 25, 1931, and drawing entitled Item R 831,
Chamberlain-Lobdell Levee, File No. L-8-2268.’’

Under the contract the work on each of the four lots

was to commence within 20 calendar days after the respec-
tive dates of receipt of notice to proceed thereon and be
completed within 450 calendar days from the date of
receipt of such notice.
[fol. 86] About 2,000 linear feet out of 20,000 feet of an
old levee were made available by the contract for the new
levee construction and the remainder of the material was
to be obtained from riverside borrow pits.

The specifications stated that the soil conditions indi-
cated a B Section was required throughout.

Paragraph 19 of the specifications described a B Section
as having a crown of 10 feet, a riverside slope of 1 on
3%, the landside slope as containing a seepage line of 1
on 61%, and the governing material as loam.

Copy of the contract, the specifications and drawing is
in evidence and made part hereof by reference.

The plaintiff had had no experience in building levees.

Prior to bidding, representatives of the plaintiff visited
and inspected the site of the proposed levee.

2. The levee to be constructed extended from station
3273-+-04 to station 3493+20, a distance of about 22,000
feet. Borings had been taken over the site of the pro-
posed levee at intervals of 1,000 feet, each to a depth of
about 25 feet, and a chart of these borings appeared on
the sasilaas map. Plaintiff had been furnished the con-
tract map and specifications before submitting his bid.
This chart classified the earth disclosed by the borings as
sandy loam, sandy clay, sand and loam, clay, loam, sand
and silt, clay and silt, brown clay, soft brown clay and
sand, soft blue clay, hard blue clay, and lastly soft brown
clay, and indicated the several depths and locations at
which these various classes had been found in the hole
bored.

The average depth of loam or sandy loam disclosed by
these borings was about 6 feet, the maximum depth was 16
feet and the minimum depth 1 foot, a mean depth of 8%
feet.

There was sufficient satisfactory material in the borrow
pits and in the available sections of the old levee from
which to construct a B Section, and the new levee was

PERE PSR, 0

32

eventually successfully constructed from such sources with
a B Section.

There is no evidence that the borings were inaccurately
charted.

3. On October 30, 1931, the plaintiff received notice to
proceed with the work. This fixed the date for completion
[fol. 87] as on or before January 22, 1933. He commenced
in contract time with preparatory work such as clearing,
grubbing, and plowing, which required about one week’s
time.

Plaintiff began the placing of material in the levee on
Lot A February 10, 1932; on Lot B June 14, 1932; on
Lot D August 23, 1932; and on Lot C September 30, 1932,
103, 228, 298, and 366 days, respectively, after receipt of
notice to proceed.

4. Plaintiff sublet a part of the work as of September 19,
1932, to Robinson & Young, a co-partnership, being certain
work on Lots C and D, and as of September 26, 1932, to
M. W. O’Meara, being certain other work on Lots C and D.

5. In the course of the work the Government inspectors
on the job served current notices upon the plaintiff warning
him of departures he was making from contract require-
ments. The instances of such violations, as communicated
to plaintiff from time to time, were as follows:

Number of instances
Borrow pits:

| ee | ee an Wee ee eet: 23
Embankment:
Not started full out to slope stakes (Par. 22-a).._.. 16
Water impounded between partial fills (Par. 33).. 24
Woe MURMOTO TOR: DERE ooo eee: 40
Material showing tendency to slough (Par. 22-a)... 67
Grade deficient (Construction notes) .......... 3
Surface of incomplete levee not thoroughly broken
and turned to depth of 6 inches (Par. 22-a)..... 2
Foundation:
Not properly prepared (Par. 20)................. 6
Mee AIR ge oes 41
We meer OW MEME TEU. Bee. oes eek hs wae 4
Inspection ditch excessive in width and depth (Par.
Py heehee AN eee ee it eich aie eae 5

33

Of the total instances as to which warnings were issued
102 related to Lot A, 46 to Lot B, 32 to Lot C, and 51 to
Lot D.

Included in these notices was one dated March 1, 1932,
warning that material placed in the embankment showed a
tendency to slough. The plaintiff took exception to this
criticism March 7, 1932, in the following letter to the con-
tracting officer:

As you know we are having our first experience on build-
ing levees. We proposed when we came into this business
(fol. 88] to do our work just as well as possible and live
up to all reasonable requirements of the inspector and
engineer in charge.

On the morning of March 1, the inspector Mr. Laforber
gave us a ticket for placing wet dirt in the levee. We
wish to say that the dirt placed in the levee was not wet.
This dirt had been dug several weeks ago and drainage
had been maintained ever since. In fact the dirt was so
dry that one could walk on it without soiling anything but
the soles of his shoes.

We would like to call your attention to the fact that we
are dropping from ten to twelve yards at a time and this
may cause a slight settlement of the dirt already dry upon
which it falls. But that does not justify any reasonable
man of intimating or writing something which is false.

There is no proof that the plaintiff at any time other-
wise contested the inaccuracy of these notices.

During the progress of the work the contracting officer,
finding that the plaintiff was violating various provisions
of the specifications in the construction of the levee, or
engaging in harmful practices, communicated such findings
to the plaintiff, directed him to correct the conditions com-
plained of, and warned him that he would be held respon-
sible for resulting damage to the levee, The subject matter
of the contracting officer’s notifications and their dates
are as follows:

Feb. 16, 1932: Water on berm.

Mar. 2, 1932: Water impounded between partial fills.

Apr. 15, 1932: Enbankment not started full out to slope
stakes.

June 18, 1932: Excessive gross gerade.

June 20, 1932: Embankment not started full out to
slope stakes.

EEN AS POR DS TLD IND LN IIS

34

July 20, 1932: Machine working on incomplete embank-
ment.

Oct. 8, 1932: Slide due to wet material.

Oct. 18, 1932: Slide due to wet material.

Oct. 28, 1932: Overdug borrow pits.

Nov. 26, 1932: Slide due to sloughing material.

Nov. 29, 1932: Slide due to wet material and method of
construction.

Dee. 12, 1932: (1) Slide due to wet material and method
of construction.

Dee. 12, 1932: (2) Slide due to wet material and method
of construction.

Dee. 14, 1932: Placing material with tendency to slough.

On September 15, 1932, the contracting officer notified
the plaintiff in writing that the progress of the work was
unsatisfactory and demanded the use of additional equip-
[fol. 89] ment, and again communicated with plaintiff Octo-
ber 14, 1932, by letter as follows:

A review of the progress of construction on Chamberlain-
Lobdell Levee discloses that none of the embankment in
Lots A and B has been completed to the grade and section
required under the contract. All of the equipment on Lot
A between the dates of August 10, 1932, and October 1, 1932,
has been engaged in cutting out the numerous slides which
occurred in the partially completed embankment. During
the thirty-day period prior to August 10, 1932, there was
placed, in the embankment comprising Lot ‘‘A’’, slightly
less than 9,500 eubie yards of material.

Work on Lot ‘‘B’’ began about April 25, 1932. Numerous
difficulties with your equipment due to breakdowns, and
many days of delay due to lack of proper drainage, arose
during the course of construction, and slides, dues to your
faulty methods of construction, have developed which fur-
ther delay completion. Up to October 1, 1932, none of the
embankment was completed to the grade and section re-
quired under the contract. The lot is only 50% completed
and 75% of the time allowed for its completion has already
elapsed.

Due to unsound construction methods adopted by your-
selves, the embankment as presently installed in Lots ‘‘A”’
and ‘*B’’ is not considered entirely satisfactory for com-
pletion. The unsound construction methods referred to
included operations which provided for handling and re-

35

handling of material several times before its final place-
ment; construction of partial fills on slopes steeper than
provided for in the contract specifications: introduction of
pockets and valleys into the work between partial fills, which
provided excellent basins for collecting and impounding
rainfall and moisture seepage from the fills; construction of
embankment to heights in excess of gross gerade thereby
providing conditions conducive to (1) slides, beeause slopes
are necessarily steeper than provided for in the contract
specifications, and (2) foundation failures due to the excess
weight imposed by the added load; installation of a drag-
line machine atop partially completed embankment, pro-
ducing excessive vibration and also adding excess weight to
be borne by the foundation area; lack of proper drainage
for the successful execution of the work; overdigging of
borrow pits and excavation of inspection diteh to dimen-
[fol. 90] sions greater than specified, all of which are in the
nature of violations of contract specifications or contrary to
sound construction practice.

It is the opinion of this office that additional difficulties
will probably ensue when completion of the presently in-
stalled partial fill is attempted. The doubtful nature of the
work already done by you prohibits additional partial pay-
ments on work to be done on Lots ‘A’? and ‘‘B’’, You are
therefore advised that no further partial payments will be
made for incompleted embankment in these two items. Pay-
ment for completed embankment will be made as provided
for in paragraph 9 of the contract specifications.

I am in receipt of your letter dated September 24, 1932,
in which you list certain equipment which was proposed to
be placed in operation on your work at onee. This list in-
cluded one Monighan 6 W Dragline, and three small drag-
lines to be used in conjunction with tractor and wagon haul-
ing units. It is noted that the small draglines and the
tractor and wagon units were placed in operation on Lot
“C’? between the dates September 26 and September 29,
1932. However, the Monighan 6 W dragline has not vet
been placed in operation.

Again, on October 2, 1932, you wrote to this office, through
Mr. Edgar S. Maupin, Area Engineer, stating that a Monig-
han 6 W dragline machine would be on the site of the work
immediately. This machine has not yet been placed in
operation, nor is it yet on the site of the work.

a
36

It is desired to inform you that in order to complete
Lot ‘‘A’’ within the time fixed for completion, it will be
necessary to install additional equipment capable of
handling at least 2,000 cubic yards per day. The equip-
ment presently engaged on this lot is estimated to have a
capacity of approximately 3,000 cubic yards per day. As
there remains only about 70 effective working days of the
100 remaining calendar days in which to place the remain-
ing 315,000 cubie yards in this lot, the necessity for requir-
ing additional plant is apparent. It is desired to have this
additional plant on the site of operation and in working con-
dition without undue loss of time. You are requested to
inform me concerning plans for installation of this addi-
tional equipment as soon as practicable after receipt of
this letter.

At no time did the plaintiff appeal to the Secretary of
War from any decision of the contracting officer.

[fol. 91] 6. The plaintiff, on or about December 12, 1982,
ceased work on the project, and on that date sent the follow-
ing communication to the contracting officer :

Careful investigations and extensive explorations of
the conditions at the site have disclosed the fact that the
subsurface and/or latent conditions differ materially from
the conditions as represented in the plans and specifica-
tions, and you are hereby formally notified that I elect to
rescind my contract with full reservations of all my rights
in the premises.

However, if mutually satisfactory adjustments can be
made, I am willing to proceed with the work and to that end
I hold myself in readiness to discuss this matter with you
at any time within the next forty-eight hours.

Kindly acknowledge receipt of this letter, and oblige,

The contracting officer replied December 14, 1932, deny-
ine the right of plaintiff to rescind the contract, and de-
manding resumption of operations. Operations were not
resumed. The contracting officer on January 3, 1933, trans-
mitted the following letter to the plaintiff:

Reference is made to Contract W1096eng-1929, entered
into by you on October 12, 1931, for furnishing all labor
and materials and performing all work required for the
construction of Item R 831, Chamberlain-Lobdell Levee,

rai ae rage ee

i 7
37

Lots A, B, C, and D in the Atchafalaya Front Levee Dis-
trict, containing approximately two million nine hundred
fifty thousand (2,950,000) eubie yards.

Article 1 of said contract provides that the work shall be
completed within the time fixed for completion in paragraph
39 of the specifications made a part of the contract. Para-
graph 39 of the specifications provides as follows:

“Time: Work shall be commenced in accordance with
paragraph 2 of these specifications and shall be completed
within 450 calendar days from date of receipt of notice to
proceed,’’

Notice to proceed under the contract was received by you
on October 30, 1931, thus fixing the date for completion as
January 22, 1933. To present date 430 calendar days have
elapsed since the beginning of the contract period and less
than forty-five percent of the required earthwork has been
construeted. Due to your failure to prosecute the work with
such diligence as to insure its completion within the con-
[fol. 92] tract period, your right to proceed with the work
is hereby terminated under the provisions of Article 9 of
the contract.

On December 12, 1932, the plaintiff had done about 45
percent of the required work, and had exhausted about 91
percent of the contract time.

7. There is an absence of proof that defendant’s officers
at any time misrepresented conditions to the plaintiff, either
orally or in writing, or in particular through the plans or
specifications.

Plaintiff could have satisfactorily completed the work
with the material available and in the agreed time. His
failure to do so was due to his own fault and negligence, to
delay on his part in getting started in the actual handling
of levee material, to his violation of the terms of the con-
tract, and unsound practices in the handling of material.
These unsound practices and contract violations related
mainly to the handling and disposition of material when
wet and tending to slough or slide, and the impounding of
water in partial fills.

8. The work remaining to be done was relet by due ad-
vertisement and bid to other contractors, who suecessfully
completed plaintiff’s work. The actual cost to the defend-
ant of the work remaining to be done, including administra-

38

tive costs and correction of plaintiff’s work, such as cutting
out and replacing slides, was $319,876.31, which was a fair
and reasonable amount.

Had the plaintiff completed the work remaining to be
done, the cost thereof to the defendant would have been
$210,880.60.

The excess in cost is $108,995.71. At the time of plain-
tiff’s default he had earned, in addition to moneys already
paid him, $71,342.51, which he has never received.

The net excess cost to the United States of completing
plaintiff’s contract, on account of his failure to complete the
contract, is $37,653.20.

ConcLusion oF Law

Upon the foregoing special findings of fact, which are
made a part of the judgment herein, the court concludes, as
a matter of law, that the plaintiff is not entitled to recover,
[fol. 93] and the petition is therefore dismissed. The court
further concludes that defendant is entitled to recover on
its counterclaim $37,653.20.

It is therefore adjudged and ordered that the defendant
recover of and from the plaintiff the sum of thirty-seven
thousand six hundred fifty-three dollars and twenty cents
($37,653.20). Judgment is also rendered against the plain-
tiff for the cost of printing the record herein, the amount
thereof to be entered by the clerk and collected by him ac-
cording to law.

OPINION

Jones, Judge, delivered the opinion of the court:

On October 12, 1931, plaintiff contracted with the defend-
ant to construct certain levees on the lower Mississippi
River containing approximately 2,950,000 eubie yards of
earth. The particular project was known as Item R 831,
Chamberlain-Lobdell Levee, Lots A, B, C, and D. The con-
sideration was to be 12.40 cents per cubic yard. The work
was to begin on each of the four lots within 20 calendar
days after receipt of notice to proceed. Completion was to
be within 450 calendar days from the date of such notice.

According to the contract and specifications the material
for building such levees was to be obtained from an old
levee and borrow pits located on the right-of-way. The
type of material to be selected from these sources was set
out in the specifications.

39

On October 30, 1931, plaintiff received notice to proceed,
and the date for completion was therefore fixed as not later
than January 22, 1933.

Plaintiff was hopelessly inexperienced in the building of
levees. Most of his construction experience had been in the
city of Chicago and he had never done any levee construc-
tion work.

A machinery salesman by the name of Maxson talked
with Mr. Ranieri and went down to visit the area where the
levee was to be constructed. He was accompanied by a Mr.
Dee, who was a representative of the plaintiff, and also by
a Mr. Derock. Maxson made some estimates and plans of
operation, and together with Derock furnished Dee some
[fol. 94] figures. Upon these figures Dee made some ealeu-
lations. All three looked over the site. The plaintiff used
this information, plan of operations, and the calculations in
making his bid. Maxson then sold him such new and
second-hand machinery as was thought to be necessary in
order for plaintiff to do the essential construction work.

Plaintiff’s unfamiliarity with both this section of the
country and the character of work he had contracted to do
soon became evident. While he commenced within a week
with some preparatory work such as clearing, grubbing, and
plowing which required about two weeks’ time, he did not
begin placing the material in the levee on Lot A until about
103 days after receipt of notice to proceed; on Lot B, 228
days after such receipt; on Lot D, 298 days after receipt of
notice, and on Lot C, 336 days after such receipt.

Plaintiff ran into many difficulties in handling the soil
from the borrow pits, encountering cypress stumps and
other organie matter, which caused damage to his machin-
ery. He also had difficulty with sloughs and slides. There
was also much rainfall. These conditions, however, were
not shown to be unusual in that section.

Many times during the course of the work the Govern-
ment inspectors served notices upon plaintiff warning him
of departures he was making from contract requirements.
Such notices were given in 231 instances, as set out in
Finding 5.

On December 12, 1932, plaintiff ceased work on the proj-
ect, complaining that subsurface and latent conditions dif-
fered materially from the conditions as represented in the
plans and specifications, and gave formal notice that he
elected to rescind the contract, indicating, however, that if

he ea

40

adjustments could be made he would be willing to proceed.
The contracting officer replied on December 14, 1932, deny-
ing the right of the plaintiff to rescind the contract and de-
manding the resumption of operations. Operations, how-
ever, were not resumed, and on January 3, 1933, the con-
tracting officer sent plaintiff a letter stating that 430 of the
450 calendar days allowed for the completion of the contract
had elapsed, and that less than 45% of the required earth-
work had been constructed, and notifying him that his right
to proceed with the work had been terminated. The defend-
[fol. 45] ant chose to relet the work to be done and it was
let to other contractors who completed the construction of
the levee.

The excess cost of completing the work over the amount
specified in the original contract, after allowing credit for
sums which plaintiff had earned in addition to the money
which had been paid him prior to default was $37,653.20.

Plaintiff sues for various items set out in his petition
aggregating a total of $258,880.49, which he asserts he is
entitled to recover.

Defendant pleads that plaintiff is not entitled to recover
any sum, and that defendant is entitled to judgment on its
counterclaim in the sum of $37,653.20.

Plaintiff bases his claim in the main on the alleged failure
of the defendant to furnish the plaintiff the type of soil
in the borrow pits which was suitable for the building of
such a levee, and upon its failure to disclose to him the na-
ture of the soil, the type of outside material, including
cypress stumps, found in some of the borrow pits, as well
as the excess moisture found in the soil.

Plaintiff’s first point is that defendant agreed to furnish
plaintiff, without cost, clean earth, free from foreign mate-
rial, which would not slough or show a tendency to slough.
He cites Sections 13 and 22 (a) of the specifications. His
reliance on these two provisions discloses that plaintiff
wholly misinterpreted their meaning. Section 13 does pro-
vide that the defendant will furnish the right-of-way and
earth for constructing the levee, but 22 (a) clearly places
the obligation upon the contractor to select from the borrow
pits the type of earth suited for the levees and as ealled for
in the specifications. The plaintiff makes the same charac-
ter of mistake in interpreting Section 19 of the specifica-
tions. He construes this section as a warranty on the part
of the defendant that the material contained in the borrow

Pe heat iol 4%

SPENT MASUR PAI AERA VARESE MOST VON STIS OF ONE TRE TE

41

pits was loam, whereas the specifications merely require
that a B Section be constructed of loam, which of course was
to be selected by the plaintiff from the material in the
borrow pits.

The evidence shows that there was sufficient material for

this purpose, which conclusion is further strengthened by
the fact that the later contractor completed the work in a
satisfactory manner with materials drawn from these same
borrow pits.
[fol. 96] Plaintiff’s second point that none of the material
in the borrow pits was suited to the construction of a B
Section levee is not borne out by the facts as disclosed by
the evidence, Plaintiff actually built some of the embank-
ment not only to the prescribed grade but higher than the
grade specified.

Plaintiff also emphasizes the fact that insufficient borings
were taken and that these do not properly disclose the char-
acter of the soil which was actually found when the work
began. Nowhere, however, does plaintiff contend that the
charts of the borings show anything different from the true
facts as disclosed by such borings. Only one boring was
made for each thousand feet. There was no obligation on
the part of the defendant to make any borings. However,
there was an obligation on its part, if it did make borings, to
fully disclose such facts as were found. This it did.

The chart classified the earth as disclosed by the borings
as sandy loam, sandy clay, sand and loam, clay, loam, sand
and silt, clay and silt, brown clay, soft brown clay and sand,
soft blue clay, hard blue clay, and soft brown clay. The
borrow pits contained sufficient of the type of material
called for in the specifications for plaintiff to have con-
structed the levee in accordance with the contract.

The evidence rather clearly shows that the conditions
found could not be called unusual. Any sort of investiga-
tion by the plaintiff, as disclosed by the various witnesses
who testified, would have shown him that he would probably
encounter wet soil; that it is not unusual to encounter cy-
press stumps; that water and such stumps are frequently
found in that section, especially where there is an extra
heavy growth of sugar cane, as in the instant case. The
evidence further shows that defendant made no misrepre-
sentation; that it withheld no information; that it aceu-
rately reported the borings, and that therefore the plaintiff

OI DDG ET ONE mm

ae

42

was not misled in any way by representations of the Gov-
ernment.’

Looking over the entire record it appears to be a clear
case of a man’s undertaking a large and responsible con-
tract for a type of construction for which he was not
equipped either by training or experience, in a section of
[fols. 97-98] the country where soil and water conditions
were entirely different from those to which he had been
accustomed, and where the methods of work required and
conditions likely to be encountered were wholly unfamiliar
to him.

It is unfortunate, but the plaintiff duly signed the con-
tract, which was awarded on his own bid, and voluntarily
undertook its obligations. In view of the facts and cireum-
stances as disclosed by the record we know of no way that
he may avoid the legal consequences of his act.

Plaintiff is not entitled to recover against the defendant,
and defendant is entitled to recover a judgment against the
plaintiff on its counterclaim in the sum of $37,653.20.

It is so ordered.

Mapven, Judge; Lirrteron, Judge; and Wuatey, Chief
Justice, concur.

Wuiraker, Judge, took no part in the decision of this
case.

[fols. 99-100] VII. JupDGMENT OF THE Court—February 2,
1942

Upon the special findings of fact, which are made a part
of the judgment herein, the court concludes, as a matter of
law, that the plaintiff is not entitled to recover, and the
court further concludes that the defendant is entitled to
recover on its counterclaim.

It is Therefore Adjudged and Ordered that the plain-
tiff’s petition be and the same is hereby dismissed, and
that the defendant recover of and from the plaintiff the
sum of thirty-seven thousand six hundred fifty-three dol-
lars and twenty cents, ($37,653.20).

1 Trimount Dredging Co. v. United States, 80 C. Cls. 559;
James Stewart & Co., Inc., v. United States, 94 C. Cls. 95.

43
[fol.101] VIII. Proceeptnes Arrer J UDGMENT

On April 2, 1942, the plaintiff filed a motion for a new
trial.
On June 1, 1942, the court entered the following order
on said motion:
Order

It is Ordered this 1st day of June, 1942, that the plaintiff’s
motion for a new trial be and the same is hereby overruled.

On July 8, 1942, the plaintiff filed a motion for an exten-
sion of time to September 15, 1942, within which to file a
request for other parts of the record under Rule 99 (b)
and said motion was allowed by the court on July 13, 1942.

?

[fol. 102] Praintirr’s Appiication For Rercorp—Filed
September 15, 1942

On September 15, 1942, plaintiff filed a request for record
in re certiorari under rule 99 (b), together with other parts
of the evidence agreed to by parties as material to errors
assigned and petition for writ of certiorari.

[fol. 103] IX. Parts of Evidence Agreed to by Parties on
Petition for Certiorari

Parts of the evidence agreed to by the parties as ma-
terial to the errors assigned are as follows:

[fol. 104] M. W. O’Mera, (Plaintiff’s Witness; Tr. 1):

I have been engaged in drainage irrigation and levee con-
struction, investigating different types of soil and handling
it, for 29 years (Tr. 2, qq. 1; 4, 7, 8; Tr. 3, q. 16; Tr. 4, qq.
18, 19, 20-23). I was on the job as a subcontractor during
September, October and November 1932 (Tr. 7).

I found a little bit of loam on the top. I found clay
slough, washing material, places where you found rotten
debris probably in there for centuries, a mixture of every-
thing. This soil was very, very wet. You could see the

SCOR REY PAY TTD. SN ENT ATR NCL PORE OBA GOBBI AP RE MY EET -
. seen PE TEEN AS Me ARE SO AL EL POY ERE PIR

44

seepage. The soil had a tendency to retain water, except
when you got it under pressure (Tr. 10, 11).

It was the first time in my life I ever encountered soil
like it. A levee can be built with that soil, but it takes a
long time (Tr. 12).

The slope was B-section, six and a half to one, the river
side was three and a half. The levee could not be built up
to gerade on that slope (Tr. 13).

I encountered foreign matter in the borrow pits, a great
many cypress stumps (Tr. 14). Tt was impossible to re-
move them. You had to dig around blindly and break your
equipment. We broke two-inch cables (Tr. 15, 16). Those
eypress stumps interfered with the quantity of dirt we were
to remove from the borrow pit, resulting in leaving 10%
of the borrow pit area, and caused me to go out farther. It
meant rehandling dirt (Tr. 15, 16). I went out 70 feet
farther when I encountered those stumps than provided
originally in our plans (Tr. 17).

We were delayed because of cypress stumps 30 to 40%.
The soil in the borrow pits was charged with water, inter-
fering with my work. The water would run out of the soil I
took from the borrow pits when it was placed into the levee
(Tr. 20, 21). The loss from water in the buckets was ten
to 15%.

The Government objected to my placing sloughing ma-
terial in the embankment. There was no other material to
(fol. 105] be had. I said ‘‘if this material is slough I ean’t
put it in here’’. He said go ahead, but don’t shut down
(Tr. 24).

In order to get the moisture out of the soil, we threw it
up in piles, and let it set a week or ten days. Then we would
eo back and throw it over (Tr. 27). I did not operate and
place soil on the levee at any time during rains. The in-
spector shuts you down immediately (Tr. 29).

In all my experience I never encountered any soil as bad
as this (Tr. 30, 31).

I did not pocket water between partial fills, only for such
time as was required to get it out. The water was taken
off (Tr. 32).

A fair and reasonable charge for building this levee was
18 to 20 cents per eubie yard (Tr. 34).

Before I made my bid to Ranieri, I examined the site,
plans and borings, which on the face of it looked like a
mighty good job (Tr. 54).

WILLE

ae metus

45

No one realized that there were hidden cypress there
because the soil did not show it (Tr. 56).

When I dug my inspection ditch, it would fill full of water
if you did not keep it pumped. I made protest verbally to
this engineer in charge, Mr. Thompson (Tr. 79). I told him
that the material was so wet it would not go to grade (Tr.
80).

From the specifications a B-section is supposed to be loam,
a high class material (Tr. 96).

_—_—_

[fol. 106] Mervin Armstrong, (Plaintiff’s Witness, Tr.

342).

I am an engineer. I am employed by the Page Engi-
neering Co. which sold equipment to Ranieri. I was em-
ployed with excavating contractors for nearly 25 years
(Tr. 343.) I have been on more than 200 levee jobs, and
constructed them. (Tr. 363.) It was in connection with
the Page Engineering Co. that I had occasion to inspect
the cite of Ranieri’s work. I went to the job January
19, 1932, (Tr. 344), and the second time in July 1932,
(Tr. 347). I was there from January 19th to February
4, 1932; the next trip was July 9th, and I was there inter-
mittently until the 25th. I was back there on August 3rd.
(Tr. 397.)

I examined samples of the soil taken from one place
for the water content. The moisture content of the hard
blue clay was 37 and % per cent., another test showed
31 per cent, and the sandy top soil was 28 per cent. (Tr.
349-352.) I got samples of the materials, weighed them,
put them in the oven, a small stove, where they prepared
their meals, slowly let it dry and weighed it again.

The water was not permitted to remain in any place
for a long period of time, that was the reason adequate
provision was made for drainage, to get it away. (Tr. 352.)

There were eypress stumps in the borrow pits. (Tr. 353.)
Sometimes they were too thick for a bueket to pull be-
tween them. They interfered with the efficiency of the
dragline equipment, and retarded the progress. It was
necessary to go farther out for material. (Tr. 354.)

I would roughly estimate that eighty per cent of the
material was composed of sedimentary material, silty

46

clays and silty sands. Such material as that could not be
built in the time allowed, 450 days. (Tr. 367.)

The inspection ditches were always being pumped out.
They were wet as ‘‘the devil’, and full of water. (Tr. 368.)

Ranieri pumped out the pocket water between the fills.
I did not observe any pocket water on the levee for any
[fol. 107] period of time. (Tr. 368, 369.)

I saw the sheet of borings. Hard blue clay as I under-
stand it didn’t exist. (Tr. 374.) This clay on this job
was full of vegetable matter, had a stink to it. (Tr. 375.)

In my opinion, it was impossible to get the water out
of the ground to reduce the water content so he could work
and stand on it. (Tr. 380.)

If Ranieri had been ready to proceed at once and if
working conditions had been good, the levee construction
could have been completed within 450 days. Under the
conditions as existed, it was not possible to complete that
levee in four hundred and fifty days. (Tr. 405, 406.)

The Government placed back limits on the pits in some
places due to the fact that the rule was we could not ap-
proach the old controlling levee within a certain limit.

(Tr. 393.)

[fol. 108] Grenway Maxon, Jr. (Plaintiff’s Witness, Tr.
100).

Lama mechanical engineer, graduate of the University of
Wisconsin, and not a construction engineer. I designed
contractor’s equipment for ten years. From my association
with excavating contractors and from my experience in ap-
pearing on jobs since 1926, T am able to judge the various
types of earth excavated by contractors. (Tr. 100, 101).
Ranieri had never done any levee construction work on the
Mississippi River, nor had I. I do not know who in his or-
eanization had had such experience. Iwas at the site a good
part of the time from the last of November 1931 to June 15,
1932, and occasionally for another few months. (Tr. 148).

Before work was started, I prepared and submitted plain-
tiff’s plan of operation, and the machinery to be used, which
the Government accepted. (Tr. 117, q. 27; Tr. 120). The
machinery to be used was one Page Class 222 with a 90 foot
boom and 4 yard bucket; a 430 Page with a 70 foot boom
and 8 yard bucket; (Tr. 102, 103); and a P, & H, machine,

ac

47

(Tr. 104). With this equipment Ranieri could have started
at one end and come through to the other end of all four
items, and completed the whole of it within 450 days, if
the soil had been as we expected. (Tr. 187, q. 66).

The cypress stumps in the borrow pits interfered with
the amount of dirt that could be had from those borrow pits,
making it necessary to go further out to get material. It
meant practically an entire different plan had to be used,
by hauling part of it and rehandling the dirt twice with the
hig machines. I would say it would double the cost. It
definitely impeded the progress of the work. I did not con-
template any of those conditions at the time I submitted the
plan to the Government (Tr. 140, qq. 195-200; Tr. 1438-145,
qq. 210-214).

Irom my experience with these levees, it would not be
possible to complete a levee of the size undertaken by
Ranieri with that type of material, and bring it up to
grade in a period of 450 days. (q.175). This is an opinion
[fol. 109] based on observation, as I had never done any
levee construction work. (Tr, 212-213).

Just as soon as the borrow pits were opened up, they
brought forth a terrible stench. (Tr. 136, 137). In some
places the water practically cascaded underneath the loam
which was 3 or 4 feet thick in places. (Tr. 134, q. 170).

This soil was not the type of soil that should have gone
into the levee. There was no material close to hand other
than the material provided for in the borrow pits with which
to build the levee. (Tr. 169, qq. 302, 303).

By the method used, they insisted upon bringing the dirt
all the way back. (Tr. 143). Ranieri attempted to fulfill
a requirement which was very difficult to understand. He
first placed the material which they rehandled into the
landside toe and dressed it completely. Then he came with
the big machines and placed the riverside toe, and then had
to level that all off. In other words, he could not put a pile
here, and a pile there to make drainage for the water. They
required him to level that right straight off on top. (Tr.
145).

As to pocket water, I saw one or two little ponds which
he got them right out, they were not permitted to remain
for any length of time. (Tr. 145). Ranieri provided ade-
quate drainage. When you drop a bucket the dirt stands
8to 10 feet high. (Tr.197). At all times there were pumps,

48

(Tr. 141, 142, qq. 202, 206). Everything possible was done
to drain the site. (Id.; Tr. 196, 197).

About a week or ten days before rescission, financial aid
was badly needed as we had a payroll of seven or eight
thousand dollars staring us in the face, and it would be
only folly to continue on not knowing where we were going
to get money to pay any more expenses that might be
incurred. (Tr. 331).

(fol. 110] Vieror Fasrts, (Plaintiff's Witness; Tr. 218).

I have been a sewer foreman for 18 years. I have handled
various types of earth, many kinds. Tam able to distinguish
between them, to tell the difference. I was foreman of a
shift on this job, from November 14, 1931. (Tr. 218, 219).
The Superintendents were Derock, Ed. White and Joe
White, and after that Mr. McWilliams. (Tr. 248).

There were eypress stumps in the borrow pits. They
were close together, and we could not get the buckets in be-
tween them. (Tr. 224). They slowed the machines down 29
to 30%. We ran short of dirt due to the cypress stumps,
and had to go out further to get some more dirt. (Tr. 225).
In going out further for dirt, in the borrow pit, it was neces-
sary to handle the dirt in wagons sometimes 3 times. (Tr.
229).

The minute it quit raining, we would pump it out and
drain. We did not leave the water on the levee for any
length of time. (Tr. 280). The minute we knew that the
borrow pit was dug too deep, we refilled it the same day.

(Tr. 235).

[fol. 111] Wiis M. Der, (Plaintiff’s Witness; Tr. 953).

I kept the books and records for Ranieri. »

| canis
SUPREME COURT OF THE UNITED \STATES

OCTOBER TERM, 1942

—————____ __ __. Pa

No. 463

ALEX RANIERI,
Petitioner,

THE UNITED STATES.

PETITION FOR A WRIT OF CERTIORARI TO THE
COURT OF CLAIMS.

S. Wauiace Dempsey,
Counsel for Petitioner.

Bruce Fuuuer,
Of Counsel.

MP RPA

MALARIA SERIALS AVE EDA ALTA EI EOL

INDEX.
Sussecr Inpex.
Page
a Galen Gas eee eT NT ee ee 1
SN US aeniecis oo vy kaldeed doe enee van 1
SIAR Adee ee eens ede ee 2
| SS enn in mana ea 2
oe ei, LT ENO EA ERA FG Tied arene aT 2
I St i ee ee a 3
Specification of errors to be urged............... 6
Reasons for granting the writ................... 10
IIR accS ae ies Vises oh perc ok oak 20
TABLE OF Cases CITED.

American P. & Mfg. Co. v. U. S., 300 U. S. 475, 480... 11
Anvil Mining Co. v. Humble, 153 U. 8. 540, 552....... 18
Chippewa Indians v. U. S., 305 U. S. 479, 481........ 11
Cree YO. te re es so Sh eee eb kk. 14

Connery Coal Etc. Co. v. Comr. Int. Rev., 84 F. (2d)

Ey SA ed ok eee ake Fea ac a Ee valet oe 15
Cotten Go. v.20. &, OT Ch. Ces Gb ick oe icc ccna 16
Dermott v. Jones, 23 How. 220, 235.................. 16
Guerini Stone Co. v. P. J. Carlin Constr. Co., 248 U. S.

NS eons Retna ca wee SPE Seeks ee Legs 17
Ralorweek +. O..8., MES U.S, BBs ov ccc eens 14
Luckenback 8. S. Co. v. U. S., 272 U.S. 533, 539..... 10
McPherson v. San Joaquin Co., 124 Cal. xvii, 56 P. 802. 14
Norrington v. Wright, 115 U.S. 188................. 14
Ohio & M. R. Co. v. McCarthy, 96 U. S. 258.......... 15,17
Philadelphia etc. R. R. Co. v. Howard, 13 How. 307... 14, 18
a Bk ee OS | Rete ea renee 10
Seminole Nation v. U. S., 86 L. Ed. 980, 988, 992, 993. . 10
U. S. v. Esnault-Pelterie, 299 U.S. 201.............. 10
U.S. v. Esnault-Pelterie, 303 U. 8. 26, 31............ 10
U.S. v. Atlantic Dredging Co., 253 U.S. 1,12........ 15
Universal Battery Co. v. U. S., 281 U. 8. 580.......... 10
Wood v. Ft. Wayne, 119 U. S. 312, 322............... 16

Texts Cirep.
Am. Jur., Vol. 12, 2440, ps. 1021, 1022............... 17
Elliott on Contracts, Vol. 3, 32044 ................... 18
Page on Contracts, Vol. 5, 22958, ps. 5222, 5223; 22960,

Sk, ty IS ca. Gu sa kh a sin oben eae ee cs 14,18
Williston on Contracts, Vol. 3, 2657, ps. 1940, 1941 .... 18

—2741

eee: ¥

SUPREME COURT OF THE UNITED STATES
OCTOBER TERM, 1942

No. 463

ALEX RANIERI,
Petitioner,
vs.

THE UNITED STATES.

PETITION FOR A WRIT OF CERTIORARI TO THE
COURT OF CLAIMS.

The petitioner, Alex Ranieri, prays that a writ of certio-
rari issue to review the judgment of the Court of Claims in
the above entitled case.

Opinion Below.

The opinion of the Court of Claims is not yet officially
reported.

Jurisdiction.

The judgment of the Court of Claims was entered Feb-
ruary 2, 1942. A motion for a new trial was overruled on
June 1, 1942 (R. 43). The time to file a petition for a writ
of certiorari was extended by the Supreme Court of the
United States to October 29, 1942. The jurisdiction of this

lm

2

Court is invoked under Section 3(b) of the Act of February
13, 1925, ec. 229, § 3, 43 Stat. 939, as amended by the Act of
May 22, 1939, infra, pages 2, 3.

Questions Presented.

(1) Whether the Court erred in failing and refusing
to make material findings on material issues, and in making
findings not supported by the evidence as described in Peti-
tioner’s Specification of Errors.

(2) How the Act of May 22, 1939, c. 140, 53 Stat. 752, is
to be interpreted, particularly as to the meaning of the
words ‘‘it shall be competent,’’ and general as to the scope
of the Act and the intent of Congress, and as determining
the rights of the petitioner to a review and determination
thereunder.

(3) Whether the Court erred in dismissing the petition,
and awarding respondent judgment on its counterclaim.

Statute Involved.

(b) In any case in the Court of Claims, including
these begun under section 287 of this title, it shall be
competent for the Supreme Court, upon the petition of
either party, whether Government or claimant, to re-
quire, by certiorari, that the cause be certified to it
for review and determination of all errors assigned,
with the same power and authority, and with like effect,
as if the cause had been brought there by appeal. In
such event the Court of Claims shall include in the
papers certified by it the findings of fact, the con-
clusions of law, and the judgment or decree, as well as
such other parts of the record as are material to the
errors assigned, to be settled by the Court.

The Court of Claims shall promulgate rules to gov-
ern the preparation of such record in accordance with
the provisions of this section.

3

In such cases the Supreme Court shall have authority
to review, in addition to other questions of law, errors
assigned to the effect that there is a lack of substantial
evidence to sustain a finding of fact; that an ultimate
finding or findings are not sustained by the findings of
evidentiary or primary facts; or that there is a failure
to make any finding of fact on a material issue. As
amended May 22, 1939, ec. 140, 53 Stat. 752.

(Amendment to Act of Feb. 13, 1925, e. 229, ¢ 3, 43
Stat. 939, 28 USCA § 288).

Statement.

Petitioner contracted with respondent in October, 1931,
to build a levee containing about 2,950,000 eubic yards on
the Mississippi River for 12.4 cents per eubie yard.’ Re-
spondent agreed to furnish petitioner without cost the
material for building the levee, from designated borrow
pits,” ‘‘of the best grade’’ ‘‘clean earth, free from all
foreign matter, which would not slough or show a tendency
to slough’’,* with the governing material loam for building
a B-section levee of an average height of 31.5 feet.®

All the earth furnished was very wet and sloughy and
practically no loam, filled with foreign matter and large
cypress stumps, 3 feet below the surface to 27 feet, and 3
to 8 feet in diameter, and not any of it the kind respondent
agreed to furnish. It was not part bad and the remainder
good, but was all bad. There is no limitation of the bad con-
dition to part only in the evidence, but all the descriptions
of its condition as bad were unlimited, and general and

"Cts. Spee. Find. of Faet No. 1 (R. 30),
*R. 16; See. 13 of Specifications; R. 46, 53.
*R. 24; Art. 7 of Contract.
*R. 17; See. 22-a of Specifications.
° Cts. Find. No. 1; R. 31; R. 52.

2m

Nr

4

applied to the whole. There was no earth such as respond-
ent agreed to furnish which petitioner could ‘*select’’ or
pick out.®

A boring’s chart was presented to petitioner which de-
scribed the soil by its various names, but stated nothing as
to the condition of the soil except that only 10%, on two of
the four lots, was soft clay, and failed to show that the soil

6 (a) The soil was not in as good condition as it should have been,
NEW, Deft’s. officer in charge, R. 53; it did not readily give up its
moisture content, Id., R. 53; it contained hidden eypress stumps and
foreign matter, Id., R. 53, and there was no other material available,
Id., R. 52, 53.

(b) Respondent had 142 written weekly Reports of each day’s work
made by its Inspector, 100 of which showed that the soil was wet, very
wet, 14 that it was moist, and none of it dry; that the machines were
idle most of the time on account of the bad condition of the soil for
160 days, and idle parts of practically every day; that there was no good
material or of the type required; that the material was too wet; there
was seepage; pumps had to be operated continuously, and that there was
practically no loam (Deft’s. Ex. 52 A-D).

(e) Respondent's answer alleges—“That much of this material
(in the levee after handling and drying) “was totally unfit,
wet, * * * sloughing, * * * showed tendencies to slough, and
was full of numerous slides and planes of cleavage” (R. 10).

® es oo”

(d) Respondent stated in 107 notices it gave petitioner that the
material was wet and sloughy. Respondent stated in 8 letters that the
material was wet, and showed a tendency to slough. No notice claimed
that there was any better material which petitioner could have selected
or picked out (Cts. Find. No. 4, R. 32).

(e) After the work started there were slides and additional borings
were taken to see whether the levee of the height deseribed could be
constructed with the available material (VEW, R. 52).

(f) “Plaintiff ran into many diffieulties in handling the soil in the
borrow pits, encountering cypress stumps and other organic matter
which caused damage to his machinery” (Cts. Opinion, R. 39), and
respondent knew these conditions before the contract was let (R. 53).

(g) The material here was the worst encountered in 29 years of levee
building, O’Mera, R. 43-45; it was a dangerous piece of work on
account of the soft material, McWilliams, R. 50; the material was
sloughy, and there was no other material, O’Mera, R. 43-45; the water
content averaged 35%, Armstrong, R. 45, Dee, R. 40, eypress stumps
in the borrow pits were 27 feet deep, 3 feet below the surface, and 3 to 8
feet in diameter, HEUSMANN (R. 55-56).

td

Res

BIOSIS Ca CM EI RE DIOL LOD Og Til ERP LI POE DIO RE 6 INE LEME NIN PR INGE EE PERN OTTER 6 ETERS RIOR Te
gic

5

was wet and filled with foreign matter and cypress stumps.’
The borings were made only at 1000 feet intervals and only
over 73% of the site representing but one five-millionth of
one per cent of the borrow pit area.*

Respondent approved previous to the work petitioner’s
plan of operation and his machinery.®

Petitioner was delayed constantly by the wet, sloughy
material, and lost most of the time of 160 days and parts
of every day,’® and had 30 to 40% loss of time due to the
eypress stumps which broke his cables and equipment,"
and foreed him to go further out to obtain material,’ and to
obtain extra machinery.” He protested about these condi-
tions being different from what respondent represented,
and its refusal to pay him a large sum due him for work."

On December 12, 1932, there was due petitioner $71,-
342.51 even at the contract price, of which respondent ad-
mits it had no right to retain $23,317.16, but which it re-
fused to pay petitioner who was in dire need of it.®> He
then notified respondent that he elected to rescind his con-
tract due to said conditions, but that he would proceed if
mutually satisfactory adjustments were made. Respond-
ent, December 14, 1932, refused to make any adjustment,
and notified petitioner to proceed with the work under the
terms of the contract. Thereupon petitioner discontinued
work.”®

7 Deft’s. Ex. 16; Note 6 above.

8 HEUSMANN, R. 55.

® Maron, R. 46.

1 Deft’s. Ex. 52 A-D; Note 6-b above.

1! O’Mera, R. 44.

12 Dee, R. 49; NEW, R. 54; O’Mera, R. 44.
Defts. Ex. 52 A-D; Cts. Find. No. 5, R. 36.
Dee, R. 48-49; O’Mera, R. 45; Note 15, infra.
™R. 14; Cts. Find. No. 8, R. 38.

16 Cts. Find. No. 6, R. 36.

a 4%

6

The fair and reasonable value of petitioner’s work in
placing 1,550,822 cubic yards in the levee,” at 20 cents per
cubic yard,'* and for other work performed by him is™®
$393,700.22, less the $80,640.05 paid *® leaving $313,060.17
due him.

The Court found that there was sufficient satisfactory
material to build the levee, dismissed the petition and
gave respondent judgment on its counterclaim.”

Specification of Errors to Be Urged.

Petitioner urges that the Court of Claims erred in failing
and refusing to make the following Special Findings of
Fact requested by petitioner, viz:—

I.

(1) Respondent by the contract agreed that the (a)
‘‘earth for constructing the levee will be furnished without
cost to the contractor’’ by defendant, and (b) that it should
be ‘‘clean earth, free from all foreign matter’’, ‘which

17 Deft’s. Ex. 52 A-D; on Mareh 5, 1933, Ex. 52-A; March 5, 1933,
Ex. 52-B; March 10, 1933, Ex. 52-C; Feb. 20, 1933, Ex. 52-D.

18 The Government’s estimate as to value of work was 16 cents per
eubie yard, plus 25% profit, making it 20 cents per eubie yard, or $609,175
for the total yardage, NEW, R. 54; FINN, R. 56. The other witnesses
testified also that 20 cents was the fair value per eubie yard; Dee, R. 48;
McWilliams, R. 51.

19 Subsidence was 132,930 cubie yards, NEW, R. 54; 49-390 eubie
yards slides cut and replaced, Deft’s. Ex. 52 A-D, and 18; 12% or
186,098 eubie yards lost by being displaced by water in excavating, O’Mera,
R. 44.

20 Dee, R. 49.

*1 Finding 2, R. 31, 38.

Respondent did not claim in the Court below, and the Court did
not make a finding of fact, that there was sufficient material of the type
required by the contract and specifications to build the levee, but claimed
that it was petitioner’s duty to remove the foreign matter, such as eypress
stumps from the soil, and to dry out the wet, sloughy soil before placing
it into the levee (Deft’s. Brief, p. 167, in Ct. Clms.).

a ee eo et Prk NEL NT RRL ERR TORTIE IEG FY ON CES RE RL! POMS ELSE, pw. we.
aaa t ae
,

7

would not slough or show a tendency to do so’ and ‘‘be of
the best grade’’, but respondent failed to furnish peti-
tioner any earth of the kind stipulated and provided only
very wet and sloughy earth, subject to slides, thickly per-
vaded with cypress stumps, reaching from 3 feet to 27 feet
below the surface.

(2) Respondent presented to petitioner a borings chart,
and represented thereby that it had made adequate borings,
and that the only imperfection in the soil was about 10%
soft clay, and respondent failed to show and concealed the
bad condition of the soil, and that there were cypress
stumps and foreign matter in the borrow pits, although it
knew (but petitioner did not), that the borings were wholly
inadequate and that the soil was in an unfit and bad con-
dition, and as to the cypress stumps and foreign matter.
Respondent approved petitioner’s machinery as sufficient,
although it was inadequate under conditions of which it
knew.

(3) Petitioner relied upon respondent’s said agreement
to furnish soil of the kind stipulated, and on its said rep-
resentations as to the borings and the conditions of the
soil, and was misled thereby and by its concealing the ex-
istence of the cypress stumps and foreign matter, and the
bad condition of the soil, and was induced thereby to bid
12.40 cents per cubic yard on constructing the levee when
it was worth 20 cents per yard.

(4) The cypress stumps so obstructed the work and made
it so difficult to secure soil that petitioner was forced to
go further for earth than the contract provided, which
necessitated much additional machinery, and a greatly in-
creased cost for moving the dirt, but defendant insisted that
plaintiff should still move the material at the contract
price.

F .
Be e

peees a, athens SEEN ieee acs Tease ———

8

(5) Petitioner protested repeatedly to respondent its
failur: to furnish earth such as it agreed to supply, and its
misrepresentations and concealments as to the condition of
the soil, and requested adjustments, but struggled on until
he had placed 1,550,822 cubic yards, which respondent
Accepted, and which became a part of the completed levee,
when, as his protests and requests were ignored, and be-
cause respondent refused to pay him money due him, he
rescinded the contract.

(6) Respondent objected to rescission, but only on the
grounds,—(1) that the rescission notice did not state how
sub-surface conditions differed from the drawings, or those
shown in the specifications, of which difference respondent
was fully aware; (2) that petitioner should furnish proof
as to how sub-surface conditions differed from the draw-
ings or specifications, signed by two outside persons, neither
of whom had any interest in rescission; and (3) that peti-
tioner was expected to proceed with the work under the
terms of the contract.

(7) The reasonable value of the work petitioner per-
formed in moving and placing earth was 20 cents per cubic
yard, and the work performed and its value in items were
as follows, viz:

For placing 1,550,822 cubic yards of material in the levee
$310,144.50.

For 132,930 cubic yards lost through subsidence $26,-
580.00.

For 49,390 cubic yards of slides which respondent re-
quired petitioner to cut and replace $19,758.00.

For a 12% loss through excavating and placing 186,098
cubic yards of water in the soil $37,219.72.

— a ary GAR TORT WN HSA TAPES APO OE AOI i IEE ER LOSES ENTS SE ETD ALI
ae

The total amount earned by petitioner was $393,700.22.
Petitioner was paid $80,640.05.
The balance now due petitioner is $313,060.17.

II.

The Court erred in making the following Special Find-
ings of Fact, and Conclusions of Law:

(1) There was sufficient satisfactory material in the
borrow pits and in the available sections of the old levee
from which to construct a B Section, and the new levee was
eventually successfully constructed from such sources with
a B Section.

(2) About 2,000 linear feet out of 20,000 feet of an old
levee were made available by the contract for the new levee
construction and the remainder of the material was to be
obtained from riverside borrow pits.

(3) There is no evidence that the borings were inaccu-
rately charted.

(4) There is an absence of proof that respondent’s of-
ficers at any time misrepresented conditions to the peti-
tioner, either orally or in writing, or in particular through
the plans or specifications.

(5) Petitioner could have satisfactorily completed the
work with the material available and in the agreed time.
His failure to do so was due to his own fault and negligence,
to delay on his part in getting started in the actual handling
of levee material, to his violation of the terms of the con-
tract, and unsound practices in the handling of material.
These unsound practices and contract violations related
mainly to the handling and disposition of material when wet
and tending to slough or slide, and the impounding of water
in partial fills.

10

(6) In holding as a Conclusion of Law that petitioner is
not entitled to recover against the respondent, and that
respondent was entitled to a judgment on its counterclaim
for $37,653.20.

Reasons for Granting the Writ.

The Court in failing and refusing to make the material
findings on material issues described in the specifications of
errors (hereinafter called S. E.), and in making the errone-
ous findings, also material and on material issues enumer-
ated in said Specifications, violated the Rules of this Court
(U. S. v. Esnault-Pelterie, 303 U. S. 26), and the Act of
May 22, 1939, c. 140, 53 Stat. 752, supra, and the case should
be remanded for additional and corrected findings (Ripley
v. U. §., 222 U.S. 144; Universal Battery Co. v. U. S., 281
U. S. 580; Luckenback S. S. Co. v. U. S., 272 U. S. 533, 539;
U. S. v. Esnault-Pelterie, 299 U. S. 201; Seminole Nation
v. U. S., 86 L. Ed. 980, 988, 992, 993), or the judgment should
be reversed and judgment for petitioner as claimed be
directed because ‘‘the subordinate or circumstantial find-
ings made by the Court below necessarily override its ulti-
mate findings of fact and show that the judgment in point
of law is not sustainable’ (U. S. v. Esnault-Pelterie, 303
U. S. 26, 31) and is in conflict with the decisions of this
Court as stated under C mfra, pp. 14-17.

(A) The Court below found as evidentiary facets (R. 32-33,
39, 41) that the soil was wet, sloughy, contained cypress
stumps and foreign matter (hereinafter called ‘‘ Prohibited
Soil’’), although the contract and specifications required
respondent to furnish free of cost to petitioner ‘‘soil of the
best grade, free from all foreign matter, which would not
slough or show a tendency to slough’’, with the governing
material loam for building a B-section levee (R. 16, 17, 24;
Notes 2-4 supra, p. 3). (Hereafter called Contract Soil).

er Rete eee Se ee

ll

In conflict with its evidentiary findings, and the substan-
tial evidence, the court made the ultimate finding, not in
issue, that there was sufficient satisfactory material in the
borrow pits and in the available sections of the old levee
to construct a B-section levee, and that the new levee was
eventually constructed from such sources with a B-section
(R. 31-32), and refused to make petitioner’s requested find-
ing on the material issue that there was no Contract Soil

furnished (S. E. 1).

(1) The Court’s evidentiary findings made in its findings
of fact, and in its opinion (which as the meaning is am-
biguous may be resorted to in determining what it meant
by ‘“‘satisfactory material’, American P. & Mfg. Co. v.
U. S., 300 U. 8. 475, 480; Chippewa Indians v. U. S., 305
U. S. 479, 481), clearly show that the ‘‘satisfactory mate-
rial’? was prohibited soil, as follows:

(a) Respondent served 40 notices on petitioner that the
material furnished petitioner was wet, and 67 like notices
that it showed a tendency to slough (R. 33); that it notified
petitioner in writing on eight occasions that the soil was
wet, showed a tendency to slough and did slough (R. 33-34).
No claim was made by respondent then or thereafter that
there was any other material available.

(b) That petitioner ‘‘ran into many difficulties in han-
dling soil from the borrow pits, encountering cypress
stumps and other organic matter, which caused damage to
his machinery’’, and that ‘‘he had difficulties with sloughs
and slides’? (R. 39).

(c) That an investigation would have shown that ‘‘wet
soil probably would be encountered’’; ‘‘that it was not un-
usual to encounter cypress stumps; that water and such
stumps are frequently found in that section’? (R. 41);

Sete ae, ee eet Set

(Clearly Prohibited Soil, and not shown on respondent’s
borings chart).

12

(d) That respondent agreed to furnish sufficient Contract
Soil to build a B-section levee (R. 41), but all the 168 In-
spection Reports (Deft’s. Ex. 52 A-D) but 2 show that there
was no loam, (the soil required for this steep B-section).

(2) The undisputed evidence also shows that the only
material was sloughing wet material containing numerous
large cypress stumps and organic matter,—Prohibited Soil,
which petitioner protested but was required to use by re-
spondent (R. 43-44; Note 6, supra, p. 4), and,—

(a) Contrary to the Court’s finding that ‘‘2000 linear
feet out of the 20,000 feet of the old levee were made avail-
able by the contract for the new levee’? (R. 31), such was
not provided for by the contract, map or drawings, and
petitioner was required to obtain his ‘‘material solely from
the riverside borrow pits’’ (New, Deft’s. officer in charge,
R. 52-53), and was prevented from approaching and obtain-
ing soil within a certain limit of the old levee (R. 46).

(3) The new contractors were paid once and a half peti-
tioner’s price, and took once and half the time stipulated
(R. 51, 56); which proves that the soil was not ‘‘satis-
factory’’, and that the levee was not completed in a satis-
factory manner.

The material issue (on which petitioner requested find-
ings, S. KE. 1) was whether there was sufficient Contract
Soil, and if not, whether petitioner suffered damages, and
not whether there was ‘‘satisfactory material,’’ or whether
it was physically possible to construct the levee as it was
constructed in once and a half the time stipulated, and at
once and a half petitioner’s contract price.

TN RN ERG ON SPORT ETA ORE LOMO PW, CYT ane

aaa

13

The relation of the parties is substantially that of seller,
respondent, and of buyer, petitioner, and the cases hold the
word ‘‘satisfactory’’ means so to the buyer. That the soil
was not ‘‘satisfactory’’ to petitioner is shown by his notice
of rescission (Finding by the Court), made because the
soil was different from what it was represented,—because
he was dissatisfied with it (R. 36).

(B) The Court erred in refusing to make petitioner’s re-
quested findings (S. KE. 2, 3, 4), that the borings chart mis-
represented and concealed the true conditions of the soil,
damaging petitioner, and in making the erroneous ultimate
findings,—(1) that there was no evidence that the borings
were inaccurately chartered (R. 32); and (2) that there
was no proof that respondent’s officers at any time misrep-
resented conditions to the petitioner, either orally or in
writing, or in particular through the plans or specifica-
tions (R. 37).

These erroneous findings are overridden by the evi-
dentiary findings, as well as by undisputed evidence, that
the soil was wet, showed a tendency to slough, and contained
cypress stumps and foreign matter, none of which was
shown on the chart (‘‘A’’ above; Deft’s. Ex. 16).

(a) The borings were inadequate, made at 1000 foot
intervals over only 73% of the levee, and amounting to only
one five millionth of one per cent of the pit area. After
work was started, slides made new borings necessary at 200
to 400 feet intervals, and soil analysis and stability compu-
tations to see whether the levee could be constructed with
the material (Notes 8, 6-e, supra, ms. 63.

(b) The chart represented that only about 10% of the
soil was soft clay, but the undisputed evidence shows that
all of the soil was wet. (See ‘*A’’, supra.)

|

14

(C) Petitioner’s requested findings, and the erroneous
findings made by the Court were on material issues for the
following reasons:

(1) As respondent agreed to furnish the ‘‘Contract
Soil’? (R. 16, 17, 24), it was a condition precedent which
should have been but was not exactly performed (5 Page
on Contracts, § 2958, ps. 5222, 5223; 3 Williston § 657, ps.
1940, 1941; Philadelphia Ete. R. R. Co. v. Howard, 13 How.
307; Norrington v. Wright, 115 U.S. 188; MePherson v. San
Joaquin Co., 124 Cal. xvii, 56 P. 802). Respondent’s breach
of said covenant entitles petitioner to recover his damages.
(Id.; Christie v. U. S., 937 U. S. 234; Hollerbach v. U. S.,
233 U. S. 165).

(2) Failure to show cypress stumps in the borings chart
entitled petitioner to recover his damages. In Christie v.
U. S., supra, the contractors recovered damages because
the borings did not show sunken logs although the con-
tractors ‘‘admitted that they had reason to and did expect
to eneounter some logs’’. Here respondent, by its ex-
periences in building levees in the locality, expected hidden
stumps (R. 53), while petitioner with no experience could
not anticipate them (R. 31).

Failure to state that the material was wet, and pervaded
with foreign matter were material concealments : In Chris-
tie v. U. S., supra, describing material as sand and gravel
without stating that they were cemented together was held
a material concealment.

(3) The representation in the boring chart that only 10%
was soft clay (Note 7, supra, p. 5) was a misrepresentation
and concealment, as it was all wet, entitling petitioner to
recover. (Christie v. U. S., supra; Hollerbach v. U. S.,,
supra.)

"a

15

(4) The insufficient borings, representing only one five-
millionth of one per cent (‘‘B’’) above), was a deception,
entitling petitioner to rescind the contract. (U.S. v. At-
lantic Dredging Co., 253 U.S. 1, 12).

(5) The insufficient borings chart was accentuated by
approval of petitioner’s plant (R. 46), ‘‘which was assur-
ance that the chart was correct, and justification of reliance
on it’? (Id.).

(6) Petitioner had the right to rely upon respondent’s
agreement ((1) above), and that the boring chart did not
show stumps, organie matter, or wet soil, without mak-
ing an investigation. (Hollerbach v. U. S., supra; Christie
v. U. S., supra.)

(7) The Court in its opinion (R. 41) in attempting to
bolster its finding that the soil was ‘‘satisfactory’’ errone-
ously held that it was petitioner’s duty to select the Con-
tract Soil, and that there was sufficient soil of that type to
build the levee. This statement is contrary to all the evi-
dence, as there was no Contract Soil as shown under A
above.

Moreover, even if the findings quoted showed that there
was soil of the type promised mixed with the eypress
stumps, organic matter, and wet and sloughy soil, petitioner
was not bound to select it from this mass. (Norrington v.
Wright, supra.)

(8) Respondent contended by its answer and throughout
the work by serving 107 notices that the soil was unfit, and
that petitioner was required to make it fit (Note 6, supra,
p. 4), and is estopped thereby from changing and claiming
that this bad soil was ‘‘satisfactory’’. (Ohio & M. R. Co. v.
McCarthy, 96 U. S. 258; Connery Coal Etc. Co. v. Comr.
Int. Rev., 84 F. (2d) 485, 487).

16

(9) Refusal to find that petitioner relied on respondent’s
agreement to furnish Contract Soil and its representations
as to the borings and the condition of the soil, and was mis-
led thereby and by its concealing the existence of the cypress
stumps and the bad condition of the soil (R. 39), and was
induced thereby to bid 12.40 cents per cubie yard for work
worth 20 cents per yard (Note 18, supra, p. 6), was refusal
of a material finding on a material issue, established by
the evidence. (Hollerbach v. U. S., supra; Christie v. U.S.,
supra.

(10) Refusal to find that cypress stumps so obstructed
the work and damaged the machinery (so stated in the
Court’s opinion, R. 39), and made it so difficult to secure
earth that petitioner was forced to go farther out than the
contract contemplated (R. 44, 49, 54), necessitating ad-
ditional machinery (R. 36), and increasing the cost, but
that respondent insisted that petitioner should still work
at the contract price (R. 36), was a refusal of a material
finding on a material issue, the evidence as to which was
undisputed, entitling petitioner to abandon the work and
recover. (Cotton Co. v. U. S., 87 Ct. Cls. 563; Wood v. Ft.
Wayne, 119 U. §. 312, 322.)

(11) Refusal to find that petitioner protested respond-
ent’s failure to furnish the earth it promised, and its mis-
representations and concealments of the condition of the
soil, and requested adjustments, and that petitioner placed
1,550,822 cubie yards which respondent accepted and it be-
came part of the completed levee, but that respondent ig-
nored petitioner’s protests and requests, and refused to pay
money due him, because of which he rescinded the contract
(Notes 2-18, supra, ps. 3-6), was refusal of a material finding
on a material issue, established by undisputed evidence, en-
titling petitioner to recover. (Dermott v. Jones, 28 How.

17

220, 235; Guerini Stone Co. v. P. J. Carlin Constr. Co., 248
U.S. 334, 344; 12 Am. Jur. § 440, ps. 1021, 1022.)

(12) Refusal to find that respondent objected to rescis-
sion but only on the ground that the notice did not state how
the subsurface conditions differed from the drawings or
specifications (R. 10-11), which difference it knew (Deft’s.
Ex. 52 A-D), and that petitioner should furnish proof as
to this by two persons not interested in rescission, was re-
fusal of a material finding on a material issue, established
by undisputed evidence.

Respondent is confined to the objections it made, which
were invalid. Rescission became effective through the ob-
jections being invalid. (Ohio & M. R. Co. v. McCarthy, 96
U. S. 258.)

(13) The failure and refusal to find that the fair value
of the work performed by petitioner and described in the
Specification of Errors Numbered 7 was__._. $393,700.22
on which he has been paid only.............. $80,640.05
and that there is still due him... sssisiswsisis $313,060.17
was refusal to find a material finding on a material issue
established by undisputed evidence. (S. E. No. 7; Notes
17-20, supra, p. 6.)

(D) As respondent is in default for performance of a
precedent condition to furnish the Contract Soil, it was
not entitled to recover on its counterclaim, and its claim
that petitioner did not perform the work in a workmanlike
manner or in accordance with the contract provisions is no
defense.

(1) Respondent agreed to furnish the material and in-
serted a provision in the coutract drawn by it that it must
be clean earth, free from all foreign matter, which would
not slough or tend to do so, and be of the best grade (R. 16,

18

17, 24). On these facts, respondent became bound to fur-
nish the material of the kind and in the condition it required
it to be used. (Philadelphia, etc., R. R. Co. v. Howard, 13
How. 307.)

(2) The obligation to furnish such soil was a condition
precedent (Id.; 5 Page on Contracts, § 2958 ; 3 Elliott § 2044;
Norrington v. Wright, supra), which respondent was re-
quired to perform exactly. (Norrington v. Wright, supra;
Anvil Mining Co. v. Humble, 153 U. 8. 540, 552; 3 Williston,
§ 675.)

(3) Respondent did not furnish material of the kind and
in the condition it required it to be used. The court below
finds that the material was wet and showed a tendency to
slough; that there were slides due to wet material, and other
slides due partly to wet material (Findings of Fact, R. 32,
39); that petitioner ‘‘ran into many difficulties in handling
the soil from the borrow pits’’, ‘‘with sloughs and slides and
in encountering cypress stumps and other organic matter,
which damaged his machinery’’. (Opinion, R. 39).

The evidence shows, without dispute, that the soil was all
unfit, and showed a tendency to slough (Note 6, supra). So,
respondent failed not alone to perform its precedent con-
dition exactly, but it failed altogether, and therefore it
cannot recover damages against petitioner. There was no
loam, the soil required for this steep B-section (Inspector’s
Reports).

‘The party who is in default for performance of a prece-
dent covenant cannot recover damages from the adversary
party for his default in performance of subsequent cove-
nants.’’ (5 Page on Contracts, § 2960, ps. 5

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---