441 G St. N.W.
Washington, DC 20548

Comptroller General
of the United States
DOCUMENT FOR PUBLIC RELEASE

Decision
Matter of:

Ares Enterprise, LLC

File:

B-424548; B-424548.2; B-424548.3

Date:

September 3, 2026

The decision issued on the date below was subject to a
GAO Protective Order. No party requested redactions;
we are therefore releasing the decision in its entirety.

Daniel J. Strouse, Esq., Pablo Nichols, Esq., Samuel Van Kopp, Esq.,
Anna Dichter, Esq., and Leslie A. Weinstein, Esq., Cordatis LLP, for the protester.
Victoria A. Moore, for Vision Information Technology Consultants LLC, the intervenor.
Erika Whelan Retta, Esq., and Isabelle P. Cutting, Esq., Department of the Air Force,
the agency.
Paul N. Wengert, Esq., and Tania Calhoun, Esq., Office of the General Counsel, GAO,
participated in the preparation of the decision.
DIGEST
1. Protest that Federal Supply Schedule (FSS) order issued under blanket purchase
agreement (BPA) exceeded the scope of the BPA is sustained where the record shows
that the BPA described services in support of specific functions, but the order included
services that were broader than and materially different from the scope of the BPA.
2. Protest that order issued under BPA exceeded the scope of the recipient vendor’s
FSS is sustained where the agency failed to validly determine that the order was within
the scope of the vendor’s contract and its labor categories.
DECISION
Ares Enterprise, LLC, of Fairfax, Virginia, a small business, protests the issuance of a
Federal Supply Schedule (FSS) task order under the Enterprise Information Technology
as a Service (EITaaS) Wave 1 Blanket Purchase Agreement (BPA) to Vision
Information Technology Consultants LLC, of San Antonio, Texas, also a small business,
under a solicitation issued by the United States Space Force, 1 for information
technology services in support of the 61st Communications Squadron at Los Angeles
Although the contracting actions at issue were taken on behalf of the United States
Space Force, many of the personnel involved, were from the Department of the Air
Force, including counsel representing the agency. Unless material to the protest, we
generally use the term “agency” throughout to indicate the United States Space Force.
1

Air Force Base (LAAFB), in El Segundo, California. Ares argues that the Space Force
improperly placed the LAAFB order on a sole-source basis and that the order exceeds
the scope of Vision’s FSS contract and the EITaaS BPA. 2
We sustain the protest.
BACKGROUND
Ares has performed information technology support services at LAAFB as a
subcontractor to Trace Systems, Inc., which was the recipient of a task order issued on
March 1, 2025, under the Army’s Responsive Strategic Sourcing for Services indefinitedelivery, indefinite-quantity contract. Contracting Officer’s Statement (COS) at 4 n.1.
Although the term of that task order provided a base year and four option years, the
agency did not exercise the first option year; instead, it awarded a series of 1-month
bridge contracts to Trace, under which performance ended on May 31, 2026. Id.
The agency explains that the transition of work from Trace’s contract to the EITaaS BPA
follows a 2023 agency decision to transition all local information technology contracts
providing field services to the EITaaS BPA. COS at 3 (citing Agency Report (AR),
Tab 4, Memorandum from Air Force Deputy Chief Information Officer (June 9, 2023)
at 1).
In planning the procurement, the agency’s contracting officer’s technical representative
and the contracting officer reviewed the most recent update to the EITaaS BPA ordering
guide, a July 2025 briefing from CACI about the BPA, 3 the views of the BPA contracting
The agency explains that the EITaaS BPA was a single-award BPA valued at
$5.7 billion over a term of up to 10 years. The Air Force established the BPA on
August 30, 2022, with a contractor teaming arrangement (CTA) consisting of ten FSS
contractors: CACI NSS, LLC, as the lead contractor and nine small business team
members, including Vision, but not Ares. A CTA under the General Services
Administration's (GSA) FSS program is a written agreement between two or more
Schedule contractors to work together to meet an agency's requirements and to
maximize a vendor's competitiveness. See GSA, Partner with Other MAS Contractors
page, https://www.gsa.gov/sell-to-government/step-1-learn-about-governmentcontracting/how-to-access-contract-opportunities/help-with-mas-contracts-to-sell-togovernment/team-up-with-other-mas-contractors (last visited Aug. 26, 2026). Under
GSA’s policies regarding CTAs, each team member is deemed to have contractual
privity with the contracting agency. After establishing a single-award FSS BPA, an
agency may issue orders without holding further competition. See Federal Acquisition
Regulation (FAR) 8.405-3(c)(1).

2

Ares also contends that the July 2025 briefing reveals an impermissible organizational
conflict of interest (OCI) that makes issuing the order to any EITaaS CTA member
improper. Comments & 2nd Supp. Protest at 2-3. Ares argues that CACI, as a
contractor, had impaired objectivity in providing information to the agency regarding the
(continued...)

3

Page 2

B-424548 et al.

officer, and the views of a CACI official. Based on that review, they both determined
that the agency’s requirements were within the scope of the BPA. COS at 4-5; AR,
Tab 7, Scope Determination Documents at 2 (Contracting Officer’s Determination and
Findings (May 21, 2026)). During the process, the contracting officer’s technical
representative (COTR) questioned whether two subjects (knowledge management
functions and freedom of information/personally identifiable information/records
management functions) were within the scope of the EITaaS BPA and was advised by
both CACI and the BPA contracting officer that they were. Id. at 4 (Memorandum from
COTR to Contracting Officer).
The agency explains that CACI selected Vision to submit a quotation for the LAAFB
order because, under the EITaaS BPA procedures, “as CTA Lead, CACI receives
solicitations and distributes them to CTA members that, in its determination, can best
meet the stated requirements.” COS at 2. In that regard, the BPA ordering guide
provides a list of the CTA lead duties, which includes that CACI will “[d]istribute
solicitations to appropriate CTA Team Member(s) and consolidate [a] formal proposal
submission” and then will “[c]onsolidate and submit proposal responses including CTA
Team Members as applicable.” AR, Tab 5, EITaaS Ordering Guide (Mar. 8, 2024
revision) at 7.
On May 29, 2026, Space Force issued the order at issue (the LAAFB order) to Vision
under the EITaaS BPA to provide services for a 9-month base period, and two 1-year
options, plus a 6-month extension-of-services option under FAR 52.217-8. COS at 5;
Memorandum of Law (MOL) at 3. Ares then filed this protest.
DISCUSSION
Ares contends that the LAAFB order exceeds the scope of both the EITaaS BPA and
Vision’s FSS contract. The agency argues that the protest should be dismissed as
untimely and because Ares is not an interested party. We consider those arguments
before turning to the merits of the protest.

scope of the EITaaS BPA. Id. While, as noted, the COTR and contracting officer
reviewed the briefing, Ares’s arguments do not support the claim that, in doing so, the
agency regarded CACI to be providing unbiased analysis or advice from which an OCI
could arise. The agency recognized the obvious fact that the lead contractor on the
BPA, CACI, was describing the scope of its own BPA, and thus was not objective or
unbiased. Indeed, the emails regarding the briefing, and the briefing itself, are
prominently marked with CACI’s logo and their text shows them to be an effort to
promote use of the BPA, rather than convey an unbiased analysis. Accordingly, we
dismiss this argument as lacking the required factual and legal basis. 4 C.F.R.
§§ 21.1(c)(4), 21.5(f).
Page 3

B-424548 et al.

Timeliness
Space Force argues that the protest is untimely because Trace had been told of the
agency’s intention to issue an order under the EITaaS BPA as early as March 1, but
Ares did not file its protest until June 3, well beyond the 10-day timeliness requirement
in our Bid Protest Regulations. Req. for Dismissal at 2-3 (citing 4 C.F.R. § 21.2(a)).
Ares acknowledges that by May 12 it had learned that Vision was working to recruit
incumbent employees based on an expectation that the agency would issue an order to
it under the EITaaS BPA, but also that the agency had delayed a decision to proceed
until May 29. Protest at 4. Ares contends that it “learned from recruiters, which had
begun reaching out to Ares employees on behalf of” Vision, that the agency “intended to
place work” from the contract on which Ares was then performing onto a different
contract vehicle. Opp. to Req. for Dismissal at 1-2. Ares explains that it learned on
May 29 that the agency had, or would imminently, issue an order to Vision, so the firm
filed an agency-level protest. Id. at 1-2. While the agency-level protest stated that Ares
did not believe an order had been issued (thus it was arguably premature), the agency
immediately denied Ares’s protest and then proceeded to issue the order to Vision on
May 29. COS at 6.
Contrary to the agency’s view, Ares was not required to file a defensive protest based
on secondhand information to challenge a contracting action that had not, in fact,
occurred at that time. See, e.g., Ervin & Assocs., Inc., B-278850, Mar. 23, 1998, at 7
(protest challenging task order as exceeding scope of underlying contract was not
untimely even though protester received rumors of the order more than 10 days before
the protest because “mere speculation or rumor provides no basis for questioning the
propriety of a procurement”). Ares filed this protest with our Office on June 3, which is
timely because it was filed within 10 days of the denial of the agency-level protest--and
within 10 days of the issuance of the LAAFB order. 4 C.F.R. § 21.2(a)(2), (3).
Interested Party
The agency also argues that Ares’s protest should be dismissed because the firm is not
an interested party because it was not one of the EITaaS BPA team members.
Ares contends that it is an interested party to challenge the LAAFB order because its
protest contends that the order is improper and beyond the scope of both the BPA and
Vision’s FSS contract. Ares also argues it could compete for the requirement if its
protest were to be sustained because Space Force would have to consider a
procurement that did not use the EITaaS BPA or Vision’s FSS contract, and thus, would
hold a competitive procurement under which Ares could compete.
Under the bid protest provisions of the Competition in Contracting Act, 31 U.S.C.
§§ 3551-3557, only an “interested party” may protest a federal procurement. That is, a
protester must be an actual or prospective bidder or offeror whose direct economic
interest would be affected by the award of a contract or the failure to award a contract.

Page 4

B-424548 et al.

Bid Protest Regulations, 4 C.F.R. § 21.0(a)(1). Determining whether a party is
interested involves consideration of a variety of factors, including the nature of issues
raised, the benefit or relief sought by the protester, and the party’s status in relation to
the procurement. RELM Wireless Corp., B-405358, Oct. 7, 2011, at 2.
Here, Ares is challenging whether the LAAFB order is within the scope of both Vision’s
BPA and its FSS contract and contending that if the protest is sustained then the
LAAFB order is invalid and a competitive procurement will be required, under which
Ares could compete. Protest at 11; Opp. to Req. for Dismissal at 5. Based on the
issues raised and the relief sought, Ares is an interested party to pursue this protest.
See Sigmatech, Inc., B-296401, Aug. 10, 2005, at 4 n.5 (protester that did not hold FSS
contract was an interested party to challenge the propriety of agency’s actions
establishing an FSS BPA and placing orders under it).
Accordingly, we proceed with consideration of Ares’s challenges to the scope of the
order, first with respect to the scope of the EITaaS BPA, and then with respect to the
scope of Vision’s FSS contract.
Comparison of Scope of LAAFB Order to Scope of EITaaS BPA
Ares argues that the LAAFB order issued to Vision exceeds the scope of the EITaaS
BPA’s performance work statement (PWS). In particular, Ares argues that the order
includes operation and maintenance of networks and systems, and mission-specific,
system-specific engineering and development work, most of which is beyond the scope
of the EITaaS BPA. In contrast, the firm argues, the scope of the EITaaS BPA is
principally enterprise help desk services and end user device support. Protest at 7. As
a result, the firm contends, the scope of the BPA does not include much of the scope of
the order, including operations and maintenance of systems and infrastructure,
cybersecurity and information security, information technology planning and
management, electronic information systems support, short-term projects, and support
for records management, among other things. Supp. Protest at 5-6; Protest at 8. 4
The agency argues that it made a reasonable assessment that the services were within
the scope of the EITaaS BPA, and that Ares’s arguments are faulty both because it
interprets the scope of the BPA too narrowly and depicts the scope of Vision’s order too
broadly. Correctly understood, the agency contends that the order issued to Vision is
within the broad scope of the EITaaS BPA. MOL at 5-6. The contracting officer argues
Ares raised additional arguments in its first supplemental protest, challenging several
tasks in eight LAAFB task areas (2.8 and 2.11 through 2.17) that the firm argued were
partially beyond the scope of the EITaaS BPA. Supp. Protest at 7-8. For each task
area, the agency responded with an explanation of the basis for its judgment that each
task area was within the scope of the BPA. E.g., COS at 6-7, 19-24. In its comments,
Ares made only a general assertion (in a brief footnote) that those challenges were
valid. In doing so, it did not meaningfully challenge the agency’s arguments in support
of those task areas. We deem those challenges abandoned and do not address them.
4

Page 5

B-424548 et al.

that most of the challenged work is within the scope of EITaaS BPA task areas 7.1,
Enterprise Services; 7.2, End User Device; and 7.3, Protect. COS at 6-7. For the
remainder of the challenged work, the contracting officer argues that individual tasks
would be covered by EITaaS BPA task area 9 (engineering services) for electronic
information support systems, task area 11 (transition services) for short-term projects
and support of the contract writing system, and task area 14 (configuration
management) for intelligence and threat support services. Id. at 7.
The Competition in Contracting Act generally requires “full and open competition” in
government procurements, to be obtained through competitive procedures. 10 U.S.C.
§ 3201(a)(1); see also 41 U.S.C. § 3301. Where an agency uses the FSS program, it
satisfies the requirement to obtain full and open competition, so long as the agency
complies with the applicable procedures for its use. 10 U.S.C. § 3012(3). Among
these, when an agency uses the FSS, it must order products and services that are
available from the relevant contractor’s FSS contract(s) and may not order non-FSS
items (known as “open market” items). 5 RELX Inc., B-421597.2, B-421597.3,
Nov. 17, 2023, at 5.
Where a protester challenges a task order as exceeding the scope of the contract or
agreement under which the order is issued, our Office will review the record to
determine “whether there is a material difference between the . . . order and the
underlying BPA.” Vetterra, LLC, B-417991 et al., Dec. 20, 2019, at 6. The effort to
assess whether differences are material is based on “reviewing the BPA as awarded”
and “the terms of the delivery order.” Tempus Nova, Inc., B-412821, June 14, 2016,
at 4. Our “overall inquiry is whether the order is of a nature which potential offerors [that
would have competed for establishment of the BPA] reasonably would have
anticipated.” Vetterra, LLC, supra at 6.
The EITaaS BPA included a PWS that described the intended purpose of the EITaaS
BPA as a vehicle to provide “wave 1” of a set of services to:
transform End User Device services . . . . Services may also be required
to develop new systems, consolidate and/or integrate systems, develop
interfaces with other systems/services, and expand the existing systems
to also support other [agency] mission areas.
AR, Tab 3, EITaaS BPA attach. 3, PWS at 5.
The PWS further described the wave 1 services as providing “a robust Enterprise IT
Service Management (EITSM) platform, modernized End User Devices, Device

We recognize an exception for the inclusion of items for which the total value does not
exceed the micro-purchase threshold, the level at which competition requirements do
not generally apply. See Maybank Indus., LLC, B-403327; B-403327.2, Oct. 21, 2010,
at 4. No party here contends that this exception would apply to the order.

5

Page 6

B-424548 et al.

Software, Device Management, and responsive and efficient Enterprise and Local Help
Desk Services.” Id. at 8.
The PWS states that it “establishes the full scope of Wave 1,” which was depicted in an
accompanying graphic and organized in a bulleted list, as follows:
•
•

•

Enterprise Services
• Service Desk and ITSM [information technology service management]
End User Devices and Management
• Computing Devices
• Print
• Voice Devices
• Bring Your Own Approved Device (BYOAD)
Protect
• End User Device and Data Protection

Id. at 8-9.
The PWS provided narrative explanations of each task area (many of which were
broken into further subdivisions) starting at section 7 of the document. The protest
issues mainly arise with respect to the scope of task areas 7.1, 7.2, 7.3, 9, 11, and 14,
which we summarize below as necessary background.
EITaaS task area 7.1 was labeled “enterprise services,” under which subtask 7.1.1,
labeled “service desk and ITSM [information technology service management],”
provided for the vendor to provide a “common set of productivity and collaborative
services to support and bring value to” the agency’s over 800,000 users, “agnostic of
device, worldwide location, or time.” Id. at 9. To do so, the vendor would “manage all
Wave 1 services and operate, maintain, and deploy processes and tools that conform to
commercial best practices” by establishing an ITSM office. The functions of the ITSM
office were listed as including areas such as planning and management of enterprise
information technology and organizational change management “for Wave 1 service
areas.” Id. at 9-10.
For example, under subtask 7.1.1.1, labeled “service desk,” the vendor would provide a
single point of 24/7/365 IT service support “for all service issues (including end point
devices)” Id. at 10. Subtask 7.1.1.2, labeled “field services,” required services that
were distinguished from the service desk by field services constituting “Tier 2
services,” 6 in the form of “[o]n-site local field support providing touch labor and walk-in
service.” Id. at 10-11. Subtask 7.1.1.3 provided for the vendor to institute a single,
The tiers were summarized in the PWS, ranging from tier 0 (virtual self-service/user
empowerment), tier 1 (staffed call center support), tier 2 (on-site local field support and
walk-in service), tier 3 (on-call access to subject matter experts), and tier 4 (support by
original equipment manufacturer). AR, Tab 3, EITaaS BPA PWA at 10.
6

Page 7

B-424548 et al.

enterprise-wise solution for managing both classified and unclassified service requests,
incidents, releases, problems, events, assets, configuration, knowledge, service levels,
and similar needs, which the PWS contrasted with the agency’s existing solutions,
under which cyber weapons, programs, and user groups were managed separately. Id.
at 11. Other enterprise services subtasks included providing rapid or automated
incident response, and an information technology storefront. Id. at 12.
Task 7.2, “End User Device” covers services for “the fielding and management of . . .
enterprise end user device solutions, such as computing, mobile, print, and voice
solutions.” Id. at 13. The subtasks included developing a new secure device
configuration baseline, provisioning and managing “government-issued laptops, mobile
devices and smart devices,” and providing a storefront for agency commands to procure
pre-configured devices. Id. 14. Other subtasks related to providing and managing
printing capabilities, document scanning, copying, and faxing for classified and
unclassified materials, as well as non-mobile voice communication devices for both
classified and unclassified communications, and bring-your-own-approved-device
support to allow access to agency resources through a user’s personal device. Id.
at 16-17.
Task 7.3, “Protect,” would include subtasks for services such as end user device and
data protection and malware prevention, automated endpoint management, automated
patching of devices, development of a vulnerability management solution, providing an
automated threat detection and remediation solution, and applying encryption methods
to protect data at rest on a device and during transmission. Id. at 19-24.
PWS task 9, engineering services, states that the vendor will provide engineering
services “to perform support tasks not already defined” among the BPA tasks and
contract line items. Id. at 26. The PWS stated that the specific requirements of such
engineering tasks would be defined in individual task orders, but gave as three
illustrations services to provide a “proof-of-concept” (described as a non-operational
representation of a desired capability), a “prototype” (described as an incomplete project
or product for testing purposes), or a “pilot” (described as a final product distributed only
to limited users). Id. at 26-27. The PWS further stated that engineering services could
also be used “to complete other tasks that would be defined by the Government at the
BPA Order level, consistent with the allowable scope of the BPA.” Id. at 27.
PWS task 11, transition services, stated the importance of transition services to move
from legacy solutions to the contractor’s solution and noted the need for transition
services to include ensuring an “effective transition-in and transition-out of other
contractor and Government support,” while providing continued system operations, and
preventing interruption or disruption of services. Id. at 27.
Finally, task 14, configuration management, consists of just three sentences, which
direct the vendor to “uphold all [c]onfiguration [m]anagement disciplines,” to develop,
implement and maintain configuration management processes across all aspects of the
BPA, and to submit a configuration management plan. Id. at 28.

Page 8

B-424548 et al.

Ares challenges numerous provisions of the LAAFB order, each of which we address
below.
LAAFB order PWS 2.4 -- Task Four: Network and System Operations &
Maintenance
Ares argues that the LAAFB order improperly requires Vision to provide operation and
maintenance of an extensive list of systems, networks, and infrastructure--albeit
excluding those within scope of a separate contract held by CACI. Supp. Protest at 5;
AR, Tab 8, LAAFB Order PWS at 21. Notwithstanding that exclusion, Ares argues that
the order’s requirements improperly require Vision to provide support services to
“operate and maintain equipment and systems in a serviceable condition or to restore it
to a serviceable condition to include identifying required parts to the Government,
inspection, periodic testing, adjustment, and repair” for networks and systems identified
in an accompanying appendix. Comments & Supp. Protest at 10-11. The firm’s
responsibilities are to include “check[ing] each network and system that is controlled by
the [61st Communications Squadron] every business day morning and provid[ing] a
status report.” Id. The covered systems and networks depicted include a Wi-Fi
network, external web servers, wide area networks, storage area networks, virtual
desktops for non-classified and classified networks, backup power systems, and
database, file, print, application, and web servers. Id. at 10 (citing AR, Tab 8, LAAFB
Order PWS at 84 (PWS app. B, “Scope of Control” diagram)).
The contracting officer contends that PWS 2.4 of the LAAFB order is properly within the
scope of EITaaS PWS 7.2 and 7.3. COS at 6, 8-10. 7 The agency contends that the
scope of the EITaaS BPA “does not exclude any specific device or include a
comprehensive list of IT components,” and therefore the order properly required Vision
to provide services to operate and maintain anything that could be classified as
“endpoints.” The agency reasons that the task thereby included support of the entire
range of agency infrastructure. Id. at 9.
Our review of the record does not support the contracting officer’s determination of the
scope of the EITaaS BPA. EITaaS PWS tasks in paragraphs 7.2 and 7.3 provide for
We recognize that the agency contends in its memorandum of law that “the LAAFB
[order] does not call for network operations, infrastructure support, or software and
application development.” MOL at 3. The language of the order PWS contrasts with
this claim, however. For example, the name of task four is “Network and System
Operations & Maintenance,” and provides that Vision “shall be responsible for
operations and maintenance of all systems and infrastructure within the control of the
[61st Communications Squadron] that have not been consolidated” under other
contracts. The PWS then refers to the scope of control diagram and specifies that
operations and maintenance support is to include the vendor’s efforts “to operate and
maintain equipment and systems . . . to include identifying required parts to the
Government, inspection, periodic testing, adjustment, and repair.” AR, Tab 8, LAAFB
Order PWS at 21.

7

Page 9

B-424548 et al.

end user device support. End user devices are treated in EITaaS as falling into the
categories of computing devices (subtask 7.2.1), printers (7.2.2), voice devices (7.2.3),
and bring-your-own-approved-device items (7.2.4). AR, Tab 3, EITaaS BPA attach. 3,
PWS at 13-18. The EITaaS tasks under PWS 7.2 do not describe the operation and
maintenance of underlying networks, systems, or enterprise infrastructure such as
servers and storage area networks.
With regard to EITaaS PWS 7.3, our review shows that its scope again covers end user
devices and protection of data in transit and at rest “on the user’s devices (i.e., desktop,
laptop, tablet, mobile phone, etc.),” along with services that allow such a device to be
wiped or disabled remotely. Id. at 19. Even though EITaaS PWS 7.3 includes a
subtask addressing “endpoint management,” that subtask involves the monitoring of
and assessment of “all end user devices to include [bring-your-own-approved-device] as
well as mobile and stateless devices,” but does not provide a basis to include broader
responsibility network operations and maintenance. Id. at 20. To the contrary, PWS 7.3
expressly distinguishes its scope from broader network and system cybersecurity
scope, stating that “Wave 1 will focus on the End User Device and Data Protection
capability[,] with other service areas being provided in future waves.” Id. at 19
(emphasis added). The contracting officer’s reading of the EITaaS PWS as including
aspects of the LAAFB networks and systems such as servers and storage area
networks is not consistent with the language of that subtask, which addresses support
of end user devices and is, therefore, unreasonable. Consequently, our review shows
that LAAFB PWS 2.4 is not within the scope of the EITaaS BPA.
LAAFB order PWS 2.5 -- Task Five: Cybersecurity
Next Ares challenges the scope of PWS 2.5 of the LAAFB order. That task requires
Vision to provide continuous security, operational availability, and reliability of IT
systems and equipment supporting the LAAFB mission, including assessment and
authorization, responding to negligent classified information releases, training of support
staff cybersecurity liaison, ports/protocols/services management, and numerous other
subtasks. Ares contends none of these services are within the scope of the EITaaS
BPA. Comments & 2nd Supp. Protest at 16-19.
The contracting officer explains that the agency is responsible for cybersecurity
governance, while the services actually included in the LAAFB order are within the
scope of EITaaS PWS 7.3. The contracting officer explains that PWS 2.5 of the LAAFB
order provides that Vision will “augment[] the Government Base Cybersecurity Office
(BCO) by providing Risk Management Framework (2.5.1) support, Computer Security
(2.5.2), support[] the government’s TEMPEST Program (2.5.3), participat[e] in the
government’s Information Assurance Program (IAP) [(]2.5.4[)], and support[] the base
Communications Security (COMSEC) program (2.5.5).” COS at 11. Those
requirements are within the scope of the EITaaS BPA, the contracting officer explains,
because they “fall within the Protection [sic, Protect] portfolio of the EITaaS Wave 1
BPA at PWS . . . [regarding] security configuration management, vulnerability
management, protected transit, and data protection” of EITaaS PWS 7.3. Id. at 11.

Page 10

B-424548 et al.

Our review of the record in this regard does not support the contracting officer’s
determination of the scope of the EITaaS BPA with respect to the cybersecurity task.
As discussed above, the scope of EITaaS PWS 7.3 specifically relates to security
involving end user devices (such as the requirements to ensure end user devices are
configured and run properly within agency networks, services to scan end user devices,
and services to support monitoring and assessment of end user device compliance).
The EITaaS BPA tasks in PWS 7.3 that the agency cites do not provide for the broader
cybersecurity-related services included in LAAFB PWS 2.5, which are not related to end
user devices. As noted previously, the scope of EITaaS PWS 7.3 expressly notes that
its scope addresses “End User Device and Data Protection capability” and that other
service areas are to be addressed in subsequent BPA waves. AR, Tab 3, EITaaS BPA
attach. 3, PWS at 19. In short, our review shows that LAAFB PWS 2.5 is not within the
scope of the EITaaS BPA.
LAAFB order PWS 2.6 -- Task Six: Information Technology Planning and Support
Services
Under task six, the LAAFB PWS specifies that Vision will provide technical expertise
regarding multiple areas that include information technology requirements analysis,
managing projects, installation records management, developing a “road map for future
[information technology] requirements,” and providing technical solutions. AR, Tab 8,
LAAFB PWS at 33. Ares argues that task six requires Vision to provide the agency with
“base-level communications, program management and governance” rather than wave
1 end user device support. Ares acknowledges that the EITaaS BPA describes service
desk and information technology service management functions that involve incident
response, management of service requests, incidents, releases, problems, events,
assets, configuration, knowledge, and service levels. Comments at 19 (citing AR,
Tab 3, EITaaS BPA PWS at 11). Nevertheless, Ares argues that the EITaaS BPA PWS
does not contemplate that the BPA would include providing information technology
requirements analysis or technical solution development. Comments at 19.
The agency again argues that Ares mischaracterizes the scope of the LAAFB order.
Contrary to the protester’s depiction, the contracting officer explains that under task six,
the agency retains “overall responsibility base-level communication planning.” COS
at 12. Task six, the agency explains, requires Vision to “augment” the agency’s work by
validating new information technology requirements and developing technical solutions,
managing and maintaining information system installation records, performing quality
assurance functions, and planning and overseeing installations/modification of systems
within the vendor’s control. COS at 12 (citing AR, Tab 8, LSSFB Order PWS at 33-35).
The agency contends that the scope of task six is consistent with the EITaaS BPA tasks
for enterprise services in PWS 7.1 and protection in PWS 7.3. In particular, the
contracting officer argues that EITaaS PWS 7.1.1 provides for the vendor to provide a
service desk and an information technology service management office. Then, within
that requirement, 7.1.1.2 provides for the service desk to function as “the single point” of
information technology support, and to “manage the full lifecycle of all incidents,

Page 11

B-424548 et al.

problems, and service requests[,] including fulfillment, verification, and closure as well
as interact/cooperate with existing help desks and service providers.” COS at 13
(quoting AR, Tab 3, EITaaS BPA PWS at 10). Further, the agency explains, the
remaining elements of task six, under which Vision will provide both communications
records management and quality assurance, are within the scope of EITaaS BPA
PWS 7.3.1.10. Id. at 13-14.
Our review of the record shows that the LAAFB order identifies the general scope of
task six as covering information technology requirements analysis, managing projects,
providing installation records management, developing a roadmap for future information
technology requirements, and providing technical solutions. AR, Tab 8, LAAFB Order
PWS at 33. The subtasks under task six then provide that Vision would be appointed
as the Cyberspace Infrastructure Planning System (CIPS) 8 monitor for the purposes of
having Vision “oversee all new [information technology] requirement requests for
LAAFB.” Id. In that role, the order goes on to specify that Vision will, for example,
develop technical solutions with stakeholders, manage and maintain communications
and information systems installation records, act as the quality assurance monitor for
equipment, technical order management, corrosion prevention and control, and
electrostatic discharge standards, and will review contracting statements of work and
performance work statements “to ensure standard processes are followed.” Id. at 34.
The EITaaS BPA PWS does not provide a basis for the inclusion of the LAAFB order
task six requirements. The scope of the enterprise services in the BPA, and particularly
the service desk support under PWS 7.1, are described in terms of a service desk and
an information technology service management office to respond to incidents, problems,
and service requests. 9 Significantly, EITaaS BPA PWS 7.3.1.10 is organized under
PWS 7.3.1, which establishes the scope of the subsidiary task elements as being
connected to end user devices and associated data protection. BPA PWS 7.3.1.10
follows after requirements addressing the needs for the vendor’s system to provide for
protection of specific files and directories from modification, such as attempts to modify
or terminate antivirus protections (PWS 7.3.1.7); protection of data at rest through
encryption (PWS 7.3.1.8); and ensuring a capability to isolate an individual application
from the operating system when necessary (PWS 7.3.1.9). AR, Tab 3, EITaaS BPA
CIPS is an official system of records used by Air Force communications squadrons to
manage infrastructure-related information technology documentation. It enables the
agency’s planning and management of base infrastructure using functions that include
requirement tracking, work order management, outside plant wiring diagrams, inside
plant records, and work plans. See, e.g., Air Force Materiel Command, CIPS
Implementation for Gunter Business and Enterprise Systems, Dec. 5, 2023,
https://www.afmc.af.mil/News/Article-Display/Article/3606965/cips-implementation-forgunter-business-and-enterprise-systems/ (last visited Aug. 26, 2026).

8

In so noting, we also recognize that PWS 7.1 has a distinctly broader scope that,
unlike PWS 7.2 and 7.3 discussed above, does not focus specifically on services in
support of end user devices.
9

Page 12

B-424548 et al.

PWS at 23-24. Understood in that context, PWS 7.3.1.10 provides for the vendor’s
solution to “ensure confidentiality, integrity, and availability of information” both when
moving across the agency’s networks and resting within systems, by use of approved
encryption. The language of the EITaaS BPA PWS does not support the agency’s
much broader construction of the BPA PWS tasks and, specifically, does not provide a
basis for LAAFB order requirements for Vision to analyze new information technology
requirements, or to develop appropriate technical solutions. Neither does the scope of
the BPA anticipate providing services to manage and maintain information system
installation records, performing quality assurance functions for equipment, ensuring
compliance with corrosion prevention and control standards and electrostatic discharge
limits, or reviewing contracting statements of work and performance work statements.
Therefore, task six of the LAAFB Order improperly exceeds the scope of the EITaaS
BPA.
LAAFB order PWS 2.7 -- Task Seven: Knowledge Management
Ares next challenges the inclusion of the knowledge management task in the LAAFB
order. The order PWS provides that Vision will serve as the alternate base records
manager, and as both the primary and alternate unit records managers for the 61st
Communications Squadron. AR, Tab 8, LAAFB Order PWS at 37. The contractor is
required to visit each of 44 unit-level records managers, train all records professionals
within 3 months of appointment, develop publications, and monitor processing and
reviews of publications and forms under applicable policies. Id. Under the Privacy Act
functions, the contractor is tasked with being appointed as the unit privacy monitor for
the 61st Communications Squadron, and with analyzing and processing breaches of
personally identifiable information protections and related complaints and then
determining the appropriate disposition. Id. The task also included advising on and
preparing responses to Freedom of Information Act requests under government
supervision, and assisting in developing, managing, and maintaining unit Sharepoint
sites, including annual training for the knowledge managers. Id. at 38. Ares argues that
the scope of the EITaaS BPA has no significant relationship to the scope of LAAFB
order PWS 2.7. Comments & 2nd Supp. Protest at 21.
The agency argues that Ares overstates the scope of the records management task and
ignores that the agency retains overall responsibility for knowledge management. COS
at 14. The contracting officer explains that after reviewing the issue, the agency
correctly determined that the knowledge management task was within EITaaS PWS
7.1.1.3, labeled information technology service management, and PWS 7.3.1.11,
labeled data protection. Id. at 15.
We do not agree that the scope of knowledge management task seven is within the
scope of the EITaaS BPA PWS, based on our review of the record here. First, BPA
PWS 7.3.1.11 provides simply for the vendor to ensure that information on user devices
will be retained until the device was decommissioned or the information was removed
by designated agency officials, and to hold the corresponding records as provided in
data retention policies. AR, Tab 3, EITaaS BPA attach. 3, PWS at 24.
Paragraph 7.3.1.11 does not address providing broader knowledge management
Page 13

B-424548 et al.

support. Neither does PWS 7.1.1.3 support the agency’s position. It describes the
agency’s goal of a single, enterprise-wide ITSM solution that would allow the agency to
“provide end-to-end management of service requests, incidents[,] releases, problems,
events, assets, configuration, knowledge, service levels, etc.” Id. at 11. The PWS
describes the solution in terms of implementation through appropriately secure cloud
instances and “support[ing] cyber weapon systems, programs of record, and users as
opposed to the current configuration where the [the agency] pays for multiple ticketing
systems.” Id. at 12. In short, the EITaaS subtask has no similarity to the requirements
of LAAFB task seven, which provides for Vision to provide support for much broader
knowledge management functions (regardless of the fact that the agency itself retains
overall responsibility). Therefore LAAFB PWS 2.7 is also not within the scope of the
EITaaS BPA.
LAAFB order PWS 2.9 & 2.10 -- Task Nine: Electronic Information Systems
Support and Task Ten: Short-Term Projects
Ares challenges the inclusion of tasks nine and ten 10 in the LAAFB order, arguing that
the tasks require Vision to provide “operation, maintenance, enhancement, and
development of enterprise applications, databases, SharePoint environments, Power
Apps, scheduling systems, and other business applications… [and] includes software
engineering functions such as coding, integration testing, version control, and
development activities,” among other things. Supp. Protest at 5. Ares characterizes the
elements of task nine first as requiring operations and maintenance, which it argues
also exceeds the scope of the EITaaS BPA PWS under task nine for the same reasons
that Ares argued regarding task four, discussed above. Comments & 2d Supp. Protest
at 23. Regarding task ten, Ares argues that the LAAFB order provides for Vision to
support short-term projects that amounts to “developing and implementing new
requirements,” which the firm contends are also beyond the scope of the EITaaS BPA
PWS. Id. at 24.
The firm notes that the LAAFB order PWS describes task nine as including process
engineering, for which the PWS identifies three types: 1) maintenance, under which the
vendor modifies an existing software product to correct faults, to improve functionality,
or to adapt it to an environment; 2) enhancement, under which the vendor improves an
existing software product to meet a new requirement, including associated testing; and
3) development, under which the vendor programs, documents, tests software; that is,
to create a new software program. Comments & 2d Supp. Protest at 22 (citing AR,
Tab 8, LAAFB Order PWS at 41). Ares argues that the order thus requires more than
We address LAAFB order PWS tasks nine and ten together. The LAAFB order PWS
states that task nine involves “maintain[ing] and enhanc[ing] existing processes
identified in Appendix I” and then provides definitions of not just the terms maintenance
and enhancement, but also development. Task nine then states that “for development
of business processes, refer to [task ten] Short Term Projects paragraph 2.10.” AR,
Tab 8, LAAFB order PWS at 41. This connection between the tasks that the LSSFB
order PWS establishes simplifies our consideration of both tasks.

10

Page 14

B-424548 et al.

simply maintaining or enhancing the existing applications and business processes and,
at a minimum, provides for Vision to develop and implement new applications to
respond to new requirements. Ares notes that at least two such development
requirements are identified in appendix I to the PWS as requiring development: a CIPS
requirements tracker and a video teleconference/conference center service request
application. Id. at 23 (citing AR, Tab 8, LAAFB Order PWS at 102 (app. I, “Space
Systems Command Enterprise Information Systems Processes” table). The firm notes
that the order also states that short-term projects under task ten could include
“integrating tools,” “migrating the existing LAAFB network environment to another
mandated environment,” and “developing/implementing new business processes to
improve information management.” Id. at 24 (quoting AR, Tab 8, LAAFB Order PWS at
44). Ares argues that the requirement for Vision to develop applications and new
business processes under tasks nine and ten are not contemplated by the EITaaS BPA
PWS. Comments & 2d Supp. Protest at 23-25.
The contracting officer argues that the requirements under task nine fall within the
scope of engineering services under EITaaS BPA PWS 9, while the requirements of
task ten are within the scope of transition services under BPA PWS 11. COS
at 7, 16-17. The contracting officer contends that the requirements of the LAAFB order
do not include “development of new business processes, applications, or major
modifications of existing processes/applications.” COS at 16. Instead, the order
provides for Vision to manage and maintain an existing platform and to maintain and
enhance “existing applications and business processes” consistent with best practices.
Id. The actual requirements of the order are within the scope of EITaaS BPA PWS
enterprise services for the same reasons as explained regarding task six above, the
contracting officer contends, or at most are covered as supporting engineering services
described in EITaaS BPA PWS 9. Id.
In most respects Ares fails to show that LAAFB order PWS tasks nine and ten exceed
the scope of the EITaaS BPA PWS. As noted above, BPA PWS 7.1 includes enterprise
services that expressly include planning and management of enterprise information
technology, and Ares does not show that the order requirements for operating,
maintaining, and enhancing the agency’s existing platform, existing applications, and
business processes would exceed the scope of the BPA. However, the order PWS also
identifies “development” as one of the three elements of process engineering, it then
connects “development of business processes” to task 10, and it refers to the table in
appendix I that identifies a need for development of a CIPS requirements tracker and a
video teleconference/conference center service request application. AR, Tab 8, LAAFB
Order PWS at 41-42, 102 (PWS app. I, “Space Systems Command Enterprise
Information Systems Processes” table, lines 25, 30, 34). Whether arising under task
nine or ten of the LAAFB order, the EITaaS BPA PWS does not anticipate for services
in support of application development, which the order defines as “computer
programming, documenting, testing, and bug fixing involved in creating applications and
frameworks,” with the purpose of creating “a new software program” or a new version of
existing software reflecting “major changes.” AR Tab 8, LAAFB Order PWS at 42.

Page 15

B-424548 et al.

Neither does the EITaaS BPA PWS 9, engineering services, or PWS 11, transition
services, provide for the application development requirements to be included in the
LAAFB order as the agency argues. The EITaaS BPA PWS provides little express
limitation on engineering services, yet also states that engineering services include
three specific limited development steps of establishing a proof of concept, performing
prototyping, and deploying a pilot to limited users. While general language in BPA PWS
9 also describes engineering services as “providing support tasks not otherwise
defined” elsewhere in the PWS, we will not read such broad language as providing a
general exception to the scope of the BPA. See DynCorp Int’l LLC, B-402349,
Mar. 15, 2010, at 9 (sustaining protest that orders exceeded scope of contracts under
which they were issued; general statements in the contracts did not serve to expand
their scope beyond that anticipated during the competition). Regarding transition
services under BPA PWS 11, we likewise find no support for the contracting officer’s
contention that the BPA provision discussing the vendor’s role in transition from legacy
systems to the BPA vendors’ solution anticipates the vendor would develop new
applications or business processes under the label of a short-term project. 11 We
therefore sustain the protest with respect to the inclusion of development requirements
in the LAAFB order.
LAAFB order PWS 2.18 -- Task Eighteen: ConWrite Support
Ares contends that task 18 requires Vision to provide functional administration for
multiple contracting and procurement databases. Supp. Protest at 6. The firm
contends that such specialized support services are not within the scope of the EITaaS
BPA. Id.
The agency explained that the scope of task 18 involves contracting support software
(ConWrite). Vision’s work under the LAAFB order “entails patching and user access
The contracting officer contends that under the existing LAAFB order, Vision will only
perform planning for short-term projects scope under task ten. If the agency approves
of Vision’s plan, the contracting officer would implement the project by modifying the
LAAFB order. Although recognizing that the modification “would have to fall within the
scope of the LAAFB [order] and underlying EITaaS Wave 1 BPA PWS,” the contracting
officer contends the BPA “provides significant breadth for short term projects.” COS
at 18. We disagree because the scope of transition services in EITaaS BPA PWS 11 is
not so broad. Instead, the PWS provides for transformation of “end user services” from
legacy systems to the vendor’s solution. AR, Tab 3, EITaaS BPA PWS at 27. Contrary
to the contracting officer’s reading, the use of the term “end user services” (or EUS) is a
reference to the PWS background, where EUS was one of three lines of effort
established in 2018 through other transaction agreements. Id. at 5. The PWS further
explains that one of the six goals of the EITaaS BPA is to provide a transition,
specifically by “[c]eas[ing] the EUS [risk reduction effort] and transition[ing] eight bases
to Wave 1 Enterprise Services.” Id. at 7. The scope of transition services in BPA
PWS 11 is thus specifically related to EUS transition, not the broad scope depicted by
the contracting officer.
11

Page 16

B-424548 et al.

management of existing databases,” and asserts that the work constitutes ordinary
operations and maintenance. The agency also argues that task 18 properly includes
Vision supporting a potential future transition to a new centrally managed web-based
solution (CON-IT). COS at 18. The agency explains that it viewed this task as being
covered mainly under the enterprise services scope of the EITaaS BPA PWS. Id. at 19.
In its comments responding to the agency report, Ares briefly references its earlier
arguments regarding the scope of transition services, and states that the same
principles show that task 18 is beyond the scope of the EITaaS BPA. Comments & 2d
Supp. Protest at 25. These brief assertions fail to materially contest the substance of
the agency’s explanation supporting the inclusion of task 18. Accordingly, we deny the
Ares challenge to the inclusion of task 18 in the LAAFB order.
LAAFB order PWS 2.19 – Task Nineteen: Space Systems Command
Intelligence & Threat Analysis Support
Ares also argues that LAAFB order task 19 exceeds the scope of the EITaaS BPA PWS
because the scope of task 19 is “mission-network operations and cybersecurity
management services” that are not contemplated by the EITaaS BPA PWS. Supp.
Protest at 6. Ares contends that task 19 states that Vision will be appointed to hold
multiple significant roles for LAAFB -- specifically the Information Systems Security
Manager, the Information Systems Security Officer, and the System Administrator -- all
for the Air Force sensitive compartmented information network at LAAFB. Comments &
Supp. Protest at 25. Ares argues that the order PWS describes those roles as,
respectively, a lead governance role responsible for overseeing cybersecurity
compliance for LAAFB, a day-to-day manager of security functions, and the
administrative role charged with oversight of all tasks associated with ensuring the
sensitive compartmented information network at LAAFB is operational, accessible, and
complies with agency enterprise architecture. Id. These responsibilities are outside the
scope of the EITaaS BPA PWS, the firm argues. Id. at 26.
In response, the contracting officer asserts that the requirements in task 19 “fall
squarely” in the scope of the EITaaS BPA PWS requirements regarding cybersecurity
support under six elements of BPA PWS 7.3.1 and PWS 14 configuration management.
COS at 19.
Our review of the record does not support the contracting officer’s assertions that the
scope of task 19 is contemplated by the EITaaS BPA PWS. As discussed above with
respect to task 4, EITaaS BPA PWS 7.3.1, which is entitled “End User Device and Data
Protection,” provides for the vendor to ensure end user device protection. Under that
heading, the BPA PWS requirements that the contracting officer argues are relevant
include, for example, having the vendor’s system support monitoring and assessment of
end user devices, implementing and enabling the agency’s zero-trust architecture along
with the ability to isolate non-compliant endpoints, and automated threat detection and
remediation across end user devices, and protection of data in transit and at rest. See
AR, Tab 3, EITaaS BPA PWS at 19-24. As we concluded, above, with regard to LAAFB
order task 4, the scope of tasks under EITaaS BPA PWS 7.3.1 does not include the
Page 17

B-424548 et al.

governance, day-to-day network operations, and system administration roles in task 19.
Neither does the scope of EITaaS BPA PWS 14, configuration management, support
the agency’s position. As noted above, the scope of the configuration management
task area in the BPA PWS is a brief and general instruction for the vendor to ensure that
configuration management practices are followed by itself and all subcontractors
“across all aspects of the BPA,” and has no relationship to intelligence and threat
analysis support. Accordingly, the record shows that LAAFB task 19 exceeds the scope
of the EITaaS BPA PWS.
For the reasons discussed above, the LAAFB order exceeds the scope of the EITaaS
BPA with regard to task areas 4, 5, 6, 7, 19, and development requirements under tasks
9 and 10. The record demonstrates material differences between the requirements of
the LAAFB order and the EITaaS BPA. See Vetterra, LLC, B-417991 et al.,
Dec. 20, 2019, at 6. Therefore, the agency’s placement of the order under the BPA was
improper. We sustain the protest on that basis.
Comparison of Scope of LAAFB Order to Scope of Vision FSS Contract
Apart from whether the LAAFB order was within the scope of the EITaaS BPA, Ares
contends that the order is improper because it is outside the scope of Vision’s FSS
contract. Specifically, the protester argues that of the 40 labor categories on Vision’s
FSS contract, none provide labor categories necessary to perform many of the services
under the order. Protest at 9. The protester also contends that the agency explained
that it regarded the existence of the CTA led by CACI as making it unnecessary to
review the labor categories on Vision’s FSS contract specifically, in order to compare
them to the labor categories required under the LAAFB order. Rather, the agency
considered that by issuing the order to Vision, the existence of the CTA would make the
more extensive labor categories on the CTA members’ contracts (including CACI’s)
available. Supp. Protest at 8. Ares argues that this position is legally and factually
incorrect; that is, only one order was issued, which was to Vision and therefore was
under Vision’s FSS contract, and nothing indicates that CACI also received any portion
of the LAAFB order. Id. Further, in response to the agency’s proffer of a table listing 32
unique roles required by the LAAFB order, the labor categories in the EITaaS that could
fill those roles and, the FSS labor categories that would fulfill the skill and seniority
requirements of those EITaaS labor categories, Ares argues that none of the FSS labor
categories listed by the agency can be found on Vision’s FSS contract, although there
are similarities. 12 Comments & 2nd Supp. Protest at 4-7.
The agency argues that the LAAFB order is within the scope of Vision’s FSS contract
because a review shows a number of Vision’s labor categories that could meet the
requirements of the order. COS at 25. Additionally, the contracting officer maintains
Ares acknowledges that some of Vision’s labor categories are similar to those
identified by the agency, but points out that at no point has the agency attempted to
map the required labor categories to those on Vision’s FSS contract (or required Vision
to do so). Comments & 2nd Supp. Protest at 7.
12

Page 18

B-424548 et al.

that the EITaaS Wave 1 Ordering Guide permits the use of any CTA member’s labor
categories, not just the firm receiving the order, when it states that “prices for all labor
categories must be on CACI and/or CTA members[’] Schedule contract.” Id. As a
result, the agency contends there is no credible basis on which to argue that Vision
lacks the requisite labor categories to perform the LAAFB order. Id. at 26.
For its part, Vision argues that the factual premise of Ares’s argument is incorrect
because “Ares presumes that the [g]overnment is ordering from the labor categories on
Vision IT’s GSA Schedule.” Intervenor’s Comments at 7. Vision contends that Ares
lacks evidence that the agency failed to determine that the “function of [a] job category
listed in the [s]olicitation [wa]s sufficiently close to the service offered in the vendor’s
FSS contract,” and that an ordering agency is not required to determine that a vendor’s
FSS has the same “job titles and qualifications.” Id. (citing HomeSource Real Estate
Asset Servs., Inc. v. United States, 94 Fed. Cl. 466, 486–87 (2010)).
FSS delivery orders that are outside the scope of the underlying FSS or BPA are
subject to the general requirement for full and open competition. See Onix Networking
Corp., B-411841, Nov. 9, 2015, at 6-7. In determining whether a delivery order is
outside the scope of the underlying FSS contract, our Office considers whether there is
a material difference between the delivery order and the underlying BPA. Id. Where an
agency orders from an existing FSS, all items quoted and ordered are required to be on
the vendor’s schedule contract as a precondition to receiving an order. Science
Applications Int’l Corp., B-401773, Nov. 10, 2009, at 2.
Our review of the record shows that the agency lacks a factual basis for its conclusion
that the LAAFB order is within the scope of Vision’s FSS contract. While the agency
offers that it is possible that several of Vision’s labor categories could meet the
requirements, the agency and Vision both contend that an order issued to a CTA
member need not fall within the scope of that firm’s FSS contract, so long as it might fall
within the scope of another CTA member’s FSS contract. We disagree that existence of
a CTA relieves an agency of the requirement to order only those services that are within
the scope of the order recipient/CTA member’s FSS contract. That basic legal principle
is unchanged. As explained above, under a CTA, each team member is a prime
contractor and in privity of contract with the government with respect to its underlying
FSS contract. A CTA simply allows the agency to place orders with more than one CTA
member for a single requirement, but the agency indicates the LAAFB order was placed
with Vision.
Neither the agency nor Vision points to any basis in law or regulation to support the idea
that the rules requiring FSS contractors to operate within the scope of their FSS
contracts can effectively be ignored after the formation of a CTA. The agency merely
references the EITaaS Wave 1 ordering guide for the unremarkable notion that all labor
categories must be on CACI’s or a CTA member’s FSS contract. The agency, however,
does not indicate where the ordering guide says that a CTA member can perform labor

Page 19

B-424548 et al.

categories that are not on its own FSS contract. 13 Absent such support, we are
unwilling to adopt such a proposition because the conclusion is at odds with the very
notion that each team member is a prime contractor that has privity of contract with the
government. Since each team member is a prime contractor, it is axiomatic that the
terms of each contract must be the basis of that relationship, which necessarily includes
the requirement for the FSS contractor to operate within the scope of its contract. Here,
the agency has not shown that the LAAFB order is within the scope of Vision’s FSS
contract and, on the contrary, indicates that neither the agency nor Vision believed that
it had to do so, or in fact did so. Accordingly, we also sustain the protest on this basis.
RECOMMENDATION
During the protest, the agency notified our Office that the head of the contracting activity
had authorized continued performance under the LAAFB order as being in the
government’s best interests, as provided in 31 U.S.C. § 3554(b)(2). Under those
circumstances, we are to recommend relief “without regard to any cost or disruption
from terminating, recompeting, or reawarding the contract.” We therefore recommend
that the agency terminate the LAAFB order issued to Vision and issue a new solicitation
to meet its requirements consistent with the rules for full and open competition. We also
recommend that the agency reimburse Ares its costs of filing and pursuing the protest,
including reasonable attorneys’ fees. 4 C.F.R. § 21.8(d)(1). In accordance with
4 C.F.R. § 21.8(f)(1), the protester's certified claim for such costs, detailing the time
expended and costs incurred, must be submitted directly to the agency within 60 days
after receipt of this decision.
The protest is sustained.
Edda Emmanuelli Perez
General Counsel

In so noting, we express no view whether, if such language were to be added to the
ordering guide, it would control.
13

Page 20

B-424548 et al.

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/agency%3Agao%3Ac498022827f9bbec. Public record. Not legal advice.