Federal Register / Vol. 71, No. 234 / Wednesday, December 6, 2006 / Proposed Rules
Closing Remarks:
4:15 p.m.–4:30 p.m.
The Commissioners and staff may ask
questions at the conclusion of
presentations. All interested persons
may file written comments following
the technical conference on or before
January 26, 2007.
[FR Doc. E6–20609 Filed 12–5–06; 8:45 am]

Mandatory Reliability Standards for the
Bulk-Power System, Docket No. RM06–16–
000.
Facilities Design, Connections and
Maintenance Reliability Standards, Docket
No. RM07–3–000.

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
18 CFR Part 40
[Docket No. RM06–16–000]

Mandatory Reliability Standards for the
Bulk-Power System
November 27, 2006.
AGENCY: Federal Energy Regulatory

Commission, DOE.
ACTION: Notice granting in part motions

PWALKER on PRODPC60 with PROPOSALS

for extension of time to file comments
and announcing rulemaking proceeding.
SUMMARY: On October 20, 2006, the
Commission issued a Notice of
Proposed Rulemaking on mandatory
reliability standards for the Bulk-Power
System. 71 FR 64770 (November 3,
2006). The Commission is extending the
date to file comments on the proposed
rule at the request of Edison Electric
Institute and the ISO/RTO Council and
is establishing a comment period for
twenty revised proposed Reliability
Standards that were filed in this docket
on behalf of the North American Electric
Reliability Council (NERC). The
Commission is also opening a new
rulemaking proceeding for three new
proposed Reliability Standards that
were filed by NERC.
DATES: Comments on the NOPR are due
January 3, 2007. Comments on NERC’s
twenty revised proposed Reliability
Standards are due January 3, 2007.
ADDRESSES: You may submit comments,
identified by Docket No. RM06–16–000,
by one of the following methods:
• Agency Web site: http://ferc.gov.
Follow the instructions for submitting
comments via the eFiling link found in
the Comment Procedures section of the
Preamble.
• Mail: Commenters unable to file
comments electronically must mail or
hand deliver an original and 14 copies
of their comments to: Federal Energy
Regulatory Commission, Office of the
Secretary, 888 First Street, NE.,
Washington, DC 20426. Refer to the
Comment Procedures section of the

VerDate Aug<31>2005

16:05 Dec 05, 2006

preamble for additional information on
how to file paper comments.
FOR FURTHER INFORMATION CONTACT:
Jonathan First (Legal Information),
Office of the General Counsel, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
(202) 502–8529.
SUPPLEMENTARY INFORMATION:

Jkt 211001

On October 20, 2006, in Docket No.
RM06–16–000, the Commission issued a
Notice of Proposed Rulemaking (NOPR)
on Mandatory Reliability Standards for
the Bulk-Power System.1 Comments on
the NOPR are due 60 days after
publication in the Federal Register, or
January 2, 2007. On November 17, 2006
and November 22, 2006, Edison Electric
Institute (EEI) and the ISO/RTO
Council, respectively, requested a seven
day extension to file comments.
On November 15, 2006, the North
American Electric Reliability Council,
on behalf of its affiliate, the North
American Electric Reliability
Corporation (NERC Corporation, and
collectively NERC), filed 20 revised
proposed Reliability Standards and
three new proposed Reliability
Standards for Commission approval.
The Commission certified NERC
Corporation as the Electric Reliability
Organization (ERO) pursuant to section
215 of the Federal Power Act in an order
issued July 20, 2006 in Docket No.
RR06–1–000.
NERC requested that the 20 revised
proposed Reliability Standards be
included as part of the NOPR issued by
the Commission in Docket No. RM06–
16–000. Because of their close
relationship with Reliability Standards
dealt with in the October 20, 2006
NOPR, the Commission will address
these 20 Reliability Standards as part of
that proceeding. The 20 revised
proposed Reliability Standards are:
CIP–001–1—Sabotage Reporting
COM–001–1—Telecommunications
COM–002–2—Communications and
Coordination
EOP–002–2—Capacity and Energy
Emergencies
EOP–003–1—Load Shedding Plans
EOP–004–1—Disturbance Reporting
EOP–006–1—Reliability Coordination—
System Restoration
INT–001–2—Interchange Information
INT–003–2—Interchange Transaction
Information

IRO–001–1—Reliability Coordination—
Responsibilities and Authorities
IRO–002–1—Reliability Coordination—
Facilities
IRO–003–2—Reliability Coordination—WideArea View
IRO–005–2—Reliability Coordination—
Current-Day Operations
PER–004–1—Reliability Coordination—
Staffing
PRC–001–1—System Protection Coordination
TOP–001–1—Reliability Responsibilities and
Authorities
TOP–002–2—Normal Operations Planning
TOP–004–1—Transmission Operations
TOP–006–1—Monitoring System Conditions
TOP–008–1—Response to Transmission
Limit Violations

Comments on these 20 revised
proposed Reliability Standards should
be submitted by January 3, 2007, in
Docket No. RM06–16–000. In addition,
the deadline for filing comments on the
NOPR is extended to January 3, 2007.
Accordingly, the requests for extension
of time filed by EEI and the ISO/RTO
Council are granted to the limited extent
set forth here.
The Commission is also opening a
new Docket No. RM07–3–000 for
processing the three new proposed
Reliability Standards. No preliminary
comments are being sought at this time.
A proposed rulemaking will be issued
later, and we will allow comments then.
The three proposed new Reliability
Standards included in this docket are:
FAC–010–1—System Operating Limits
Methodology for the Planning
FAC–011–1—System Operating Limits
Methodology for the Operations Horizon
FAC–014–1—Establish and Communicate
System Operating Limits

This filing is accessible on-line at
http://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–20608 Filed 12–5–06; 8:45 am]
BILLING CODE 6717–01–P

1 Mandatory Reliability Standards for the BulkPower System, 117 FERC ¶ 61,084 (2006), 71 FR
64770 (November 3, 2006).

PO 00000

Frm 00013

Fmt 4702

Sfmt 4702

70695

E:\FR\FM\06DEP1.SGM

06DEP1

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/agency%3Aferc%3Ab070b7e614ec28a7. Public record. Not legal advice.