13380

Federal Register / Vol. 71, No. 50 / Wednesday, March 15, 2006 / Notices

Environmental Mailing List
If you do not want to send comments
at this time, but still want to remain on
our mailing list, please return the
attached Mailing List Retention Form
(Appendix 3). If you do not return the
form, you will be taken off the mailing
list.
Additional Information
Additional information about the
Project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (http://www.ferc.gov)
using the eLibrary link. Click on the
eLibrary link, click on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at 1–866–208–3676, or for
TTY, contact 1–202–502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to http://
www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at http://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Magalie R. Salas,
Secretary.
[FR Doc. E6–3661 Filed 3–14–06; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission

sroberts on PROD1PC70 with NOTICES

[Docket No. CP06–58–000]

Southern Natural Gas Company;
Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Southern Natural Gas
Company’s 2006 Abandonment and
Replacement Project Request for
Comments on Environmental Issues
March 8, 2006.

The staff of the Federal Energy
Regulatory Commission (FERC or

VerDate Aug<31>2005

17:27 Mar 14, 2006

Jkt 208001

Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
Southern Natural Gas Company’s
(Southern) application for its 2006
Abandonment and Replacement Project.
Southern proposes to abandon, replace
and modify facilities associated with its
22-inch North Main Loop Line and
abandon its Pell City Compressor
Station Unit No. 3 as part of an
extensive pipeline integrity program.
Pipeline changes would occur on
Southern’s existing system in
Tuscaloosa County, Alabama.
Abandonment of a compressor station
would occur in St. Clair County,
Alabama.
This notice announces the opening of
the scoping period that will be used to
gather environmental input from the
public and interested agencies on the
project. Scoping comments are
requested by April 10, 2006.
With this notice, the staff of the FERC
is asking other Federal, State, local and
tribal agencies with jurisdiction and/or
special expertise with respect to
environmental issues to cooperate with
us in the preparation of the EA. These
agencies may choose to participate once
they have evaluated Southern’s proposal
relative to their responsibilities.
Agencies that would like to request
cooperating status should follow the
instructions for filing comments
described in Appendix 1.
This notice is being sent to potentially
affected landowners; Federal, state, and
local government agencies; elected
officials; environmental and public
interest groups; Native American Tribes,
other interested parties; local libraries
and newspapers. State and local
government representatives are asked to
notify their constituents of this planned
project and encourage them to comment
on their areas of concern.
If you are a landowner receiving this
notice, you may be contacted by a
pipeline company representative about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The pipeline
company would seek to negotiate a
mutually acceptable agreement.
However, if the project is approved by
the Commission, that approval conveys
with it the right of eminent domain.
Therefore, if easement negotiations fail
to produce an agreement, the pipeline
company could initiate condemnation
proceedings in accordance with state
law.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ is available for viewing on
the FERC Web site (http://

PO 00000

Frm 00049

Fmt 4703

Sfmt 4703

www.ferc.gov). This fact sheet addresses
a number of typically asked questions,
including the use of eminent domain
and how to participate in the
Commission’s proceedings. It is
available for viewing on the FERC
Internet Web site (http://www.ferc.gov).
Background
Pipeline Abandonment, Replacement
and Modification
Southern’s 22-inch McConnells North
Main Loop Line, which is part of its
North Main Line System in Tuscaloosa
County, Alabama, was commissioned in
1946 and is proposed for retirement as
part of the application. Because of a
reduction in contracted capacity in this
area due to capacity turnback and
capacity shift, this section of the line is
no longer needed. However, to continue
to provide reliable and safe gas supplies
to the western Alabama region,
Southern proposes to replace a section
of the abandoned 22-inch McConnells
North Main loop Line by extending the
existing 24-inch 2nd North Main Loop
Line.
Compressor Station Abandonment
The Pell City Compressor Station was
built in 1989 to deliver firm contract
volumes on the Gadsden Lateral Line.
Since the Gadsden Lateral Line has not
been operating at full contract capacity,
the Pell City Unit No. 3 has not been
required to deliver peak day demand on
the Gadsden Lateral Line. Recent
capacity turnback on the Gadsden
Lateral Line makes it possible to
abandon the Pell City Unit No. 3 since
it is no longer required to meet firm
peak day requirements.
Summary of the Proposed Project
Tuscaloosa, Alabama
• Abandon in place 4.55 miles of the
McConnells 22-inch North Main Loop
Segment from Milepost 260.74 to
Milepost 265.29. This portion of the
McConnells North Main Loop Segment
would be pigged, filled with nitrogen,
and capped before being abandoned in
place.
• Abandon and remove 6.36 miles
from Milepost 265.29 to Milepost
271.65. Southern proposes to remove all
pipeline and associated piping
assemblies along this 6.36 mile route,
with the exception of the North River
crossing at Milepost 269.45 and any
uncased road crossings. The uncased
road crossing would be cut and capped
on each side of the road crossing and
filled with grout for abandonment in
place. The cased road crossings that are
left void would also be filled with grout
and abandoned in place.

E:\FR\FM\15MRN1.SGM

15MRN1

Federal Register / Vol. 71, No. 50 / Wednesday, March 15, 2006 / Notices
• Install a new anchor block and
blowoff/crossover assembly at Milepost
271.65, and, if necessary, continue
maintenance by installing sleeves on
coupled joints from Milepost 271.65 to
Milepost 271.73.
• Extend its 24-inch 2nd North Main
Loop Line by constructing, installing
and operating 6.1 miles of 24-inch
pipeline from Milepost 142.6 to
Milepost 148.7 (Tuscaloosa County,
Alabama). This segment of the 24-inch
2nd North Main Loop Line is parallel to
Milepost 265.3 to Milepost 271.6 of the
22-inch North Main Loop Line, which is
proposed to be abandoned above.
Installation of the proposed 2nd North
Main Loop Segment would be within
the same location and same ditch line
as Southern’s 22-inch North Main Loop
Line after the abandonment and removal
of the 6.36 miles described above.
• Connect the proposed 2nd North
Main Loop Segment to the existing 24inch 2nd North Main Loop Line by
removing the existing weld cap and
making a tie-in at Milepost 142.56. It
would also be necessary to install a new
blowoff/crossover assembly at Milepost
148.93, which would be connected to
the crossover assembly installed at
Milepost 271.65 on the 22-inch North
Main Loop Line as detailed above.
St. Clair County, Alabama
• Abandon in place its Pell City
Compressor Station Unit No. 3 (St. Clair
County, Alabama) at Milepost 352.8 on
Southern’s North Main and North Main
Loop Lines. All existing gas piping
systems would be disconnected
including fuel gas and blind flanges
would be installed at these points.
Additionally, electric power would be
disconnected from the unit such that all
control systems would be inoperable.
The unit would then be purged with
nitrogen and prepared for long term
storage in place.
The location of the project facilities is
shown in Appendix 2.1

sroberts on PROD1PC70 with NOTICES

Land Requirements
Abandonment, replacement and
modification of the proposed facilities
would require the temporary
disturbance of about 105.24 acres of
land, the majority of which is within
Southern’s existing 100-foot right-ofway. Additional extra work spaces of
1 The appendices referenced in this notice are not
being printed in the Federal Register. Copies of all
appendices, other than appendix 1 (maps), are
available on the Commission’s Web site at the
‘‘eLibrary’’ link or from the Commissions Public
Reference Room, 888 First Street, NE., Washington,
DC 20426, or call (202) 502–8371. For instructions
on connecting to eLibrary refer to the last page of
this notice. Copies of the appendices were sent to
all those receiving this notice in the mail.

VerDate Aug<31>2005

17:27 Mar 14, 2006

Jkt 208001

10.32 acres) would be required at road
and waterbody crossings.
Following construction, permanent
land acquisition of 0.16 acres would be
maintained as part of the right-of-way
for the maintenance of the 24-inch 2nd
North Main Loop Line Replacement
section. The remaining acreage required
during construction would be restored
and allowed to revert to its former land
uses.
The EA Process
We 2 are preparing this EA to comply
with the National Environmental Policy
Act (NEPA) which requires the
Commission to take into account the
environmental impacts that could result
from an action whenever it considers
the issuance of a Certificate of Public
Convenience and Necessity. NEPA also
requires us to discover and address
concerns the public may have about
proposals. This process is referred to as
‘‘scoping.’’ The main goal of the scoping
process is to focus the analysis in the
EA on the important environmental
issues. By this Notice of Intent, the
Commission staff requests public
comments on the scope of the issues to
address in the EA. All comments
received are considered during the
preparation of the EA. By this notice, we
are also asking Federal, state, and local
agencies with jurisdiction and/or
special expertise with respect to
environmental issues to formally
cooperate with us in the preparation of
the EA. Agencies that would like to
request cooperating status should follow
the instructions for filing comments
below.
Our independent analysis of the
issues will be in the EA. Depending on
the comments received during the
scoping process, the EA may be
published and mailed to Federal, state,
and local agencies, public interest
groups, interested individuals, affected
landowners, newspapers, libraries, and
the Commissions official service list for
this proceeding. A comment period will
be allotted for review if the EA is
published. We will consider all
comments on the EA before we make
our recommendations to the
Commission.
Currently Identified Environmental
Issues
In the EA, we will discuss impacts
that could occur as a result of the
construction and operation of the
project. We will also evaluate
2 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the
environmental staff of the Office of Energy Projects
(OEP).

PO 00000

Frm 00050

Fmt 4703

Sfmt 4703

13381

reasonable alternatives to the proposed
project or portions of the project.
We have already identified several
issues that we think deserve attention
based on a preliminary review of the
proposed facilities and the
environmental information provided by
Southern. This preliminary list of issues
may be changed based on your
comments and our analysis.
Project-related impact on:
• 7 residences/structures within 50
feet of the construction workspace.
• 1 active private well within 32 feet
of the construction workspace.
• 2.6 acres of upland forest.
• Four federally-listed threatened and
endangered species potentially in the
project area.
• 9 emergent wetland crossings 3.5
acres.
• 23 water body crossings.
• Road crossings.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
By becoming a commentor, your
concerns will be addressed in the EA
and considered by the Commission. You
should focus on the potential
environmental effects of the proposal,
alternatives to the proposal (including
alternative locations and routes), and
measures to avoid or lessen
environmental impact. The more
specific your comments, the more useful
they will be. Please carefully follow
these instructions to ensure that your
comments are received in time and
properly recorded:
• Send an original and two copies of
your letter to: Magalie R. Salas,
Secretary, Federal Energy Regulatory
Commission, 888 First St., NE., Room
1A, Washington, DC 20426.
• Label one copy of the comments for
the attention of Gas Branch 3.
• Reference Docket Number CP06–
58–000.
• Mail your comments so that they
will be received in Washington, DC on
or before April 10, 2006.
Please note that the Commission
encourages electronic filing of
comments. See 18 Code of Federal
Regulations (CFR) 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site at http://
www.ferc.gov under the ‘‘e-Filing’’ link
and the link to the User’s Guide. Prepare
your submission in the same manner as
you would if filing on paper and save
it to a file on your hard drive. Before
you can file comments you will need to
create an account by clicking on ‘‘Login
to File’’ and then ‘‘New User Account.’’
You will be asked to select the type of

E:\FR\FM\15MRN1.SGM

15MRN1

13382

Federal Register / Vol. 71, No. 50 / Wednesday, March 15, 2006 / Notices

filing you are making. This filing is
considered a ‘‘Comment on Filing.’’
The determination of whether to
distribute the EA for public comment
will be based on the response to this
notice. If you are interested in receiving
it, please return the Information
Requested (Appendix 3). An effort is
being made to send this notice to all
individuals affected by the proposed
project. This includes all landowners
who are potential right-of-way grantors,
whose property may be used
temporarily for project purposes, or who
own homes within distances defined in
the Commission’s regulations of certain
aboveground facilities.
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an official party to the
proceeding known as an ‘‘intervenor’’.
To become an intervenor you must file
a motion to intervene according to Rule
214 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.214). Intervenors have the right to
seek rehearing of the Commission’s
decision. Motions to Intervene should
be electtronically submitted using the
Commission’s eFiling system at http://
www.ferc.gov. Persons without Internet
access should send an original and 14
copies of their motion to the Secretary
of the Commission at the address
indicated previously. Persons filing
Motions to Intervene on or before the
comment deadline indicated above must
send a copy of the motion to the
Applicant. All filings, including late
interventions, submitted after the
comment deadline must be served on
the Applicant and all other intervenors
identified on the Commission’s service
list for this proceeding. Persons on the
service list with email addresses may be
served electronically; others must be
served a hard copy of the filing.
Affected landowners and parties with
environmental concerns may be granted
intervenor status upon showing good
cause by stating that they have a clear
and direct interest in this proceeding
which would not be adequately
represented by any other parties. You do
not need intervenor status to have your
environmental comments considered.

sroberts on PROD1PC70 with NOTICES

Environmental Mailing List
If you wish to remain on our
environmental mailing list, please
return the Information Request Form

VerDate Aug<31>2005

17:27 Mar 14, 2006

Jkt 208001

included in Appendix 3. If you do not
return this form, you will be removed
from our mailing list.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (http://www.ferc.gov)
using the eLibrary link. Click on the
eLibrary link, click on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TYY,
contact (202) 502–8659. The eLibrary
link also provides access to the texts of
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to http://
www.ferc.gov/esubscribenow.htm.
Magalie R. Salas,
Secretary.
[FR Doc. E6–3669 Filed 3–14–06; 8:45 am]
BILLING CODE 6717–01–P

Transmission Company’s prior-period
adjustments to its gas compressor fuel
and lost and unaccounted for balances,
as discussed in the February 15, 2006
order.1
FERC conferences are accessible
under section 508 of the Rehabilitation
Act of 1973. For accessibility
accommodations please send an e-mail
to accessibility@ferc.gov or call toll free
(866) 208–3372 (voice) or 202–502–8659
(TTY), or send a fax to 202–208–2106
with the required accommodations.
All interested persons are permitted
to attend. For further information please
contact Abraham Silverman at (202)
502–6444 or e-mail
abraham.silverman@ferc.gov.
Magalie R. Salas,
Secretary.
[FR Doc. E6–3664 Filed 3–14–06; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Meetings; Sunshine Act
March 9, 2006.

The following notice of meeting is
published pursuant to section 3(a) of the
government in the Sunshine Act (Pub.
L. No. 94–409), 5 U.S.C 552b:
AGENCY HOLDING MEETING: Federal

Energy Regulatory Commission.
DATE AND TIME: March 16, 2006, 10 a.m.
PLACE: Room 2C, 888 First Street NE.,

Washington DC 20426.

DEPARTMENT OF ENERGY

STATUS: Open.

Federal Energy Regulatory
Commission

MATTERS TO BE CONSIDERED: Agenda.

*Note—Items listed on the agenda
may be deleted without further notice.

[Docket No. RP06–151–000]

Kern River Gas Transmission
Company; Notice of Technical
Conference
March 8, 2006.

Take notice that the Commission will
convene a technical conference on
Tuesday, March 21, 2006, at 9:30 a.m.
(EST), in a room to be designated at the
offices of the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington DC 20426.
The technical conference will deal
with issues related to Kern River Gas

PO 00000

Frm 00051

Fmt 4703

Sfmt 4703

CONTACT PERSON FOR MORE INFORMATION:

Magalie R. Salas, Secretary, Telephone
(202) 502–8400. For a recorded listing
item stricken from or added to the
meeting, call (202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all papers
relevant to the items on the agenda;
however, all public documents may be
examined in the Public Reference Room.
1 Kern River Gas Transmission Co., 114 FERC
¶61,162 (2006).

E:\FR\FM\15MRN1.SGM

15MRN1

---