Federal Register / Vol. 71, No. 175 / Monday, September 11, 2006 / Notices
Big Creek, Strong River, Leaf River,
West Tallahala Creek, Shubuta Creek,
Tallahalla Creek, Chickasaway River,
and Bucatunna Creek.
—Potential impacts on waterbodies
greater than 100 feet in width
including the Strong River.
—Impacts on wetlands.
Vegetation and Wildlife:
—Impacts on vegetation.
—Impacts on wildlife, wildlife habitat,
and fisheries.
—Potential impacts on federally and
state-listed threatened and
endangered species.
Cultural Resources:
—Impacts on archaeological sites and
other historic properties.
Land Use, Recreation, and Visual
Resources:
—Potential impacts to existing land
uses, including residences, suburban
housing developments, cemeteries,
agricultural lands, orchards, and
managed forested lands.
—Visual effects of the proposed
Harrisville Compressor Station and
M&R Stations on surrounding areas.
Socioeconomics:
—Potential impacts and benefits of
construction workforce on local
housing, infrastructure, public
services and economy.
Air and Noise Quality:
—Effects on air and noise quality from
construction and operation of the
Harrisville Compressor Station.
Reliability and Safety:
—Public safety and potential hazards
associated with the transport of
natural gas.
Alternatives:
—Assessment of route variations and
route alignments to reduce or avoid
environmental impacts.
Cumulative Impacts:
—Assessment of the effect of the
proposed project when combined
with other past, present, or reasonably
foreseeable future actions in the
project area.

rwilkins on PROD1PC61 with NOTICES

Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the
proposed project. By becoming a
commentor, your concerns will be
addressed in the EIS and considered by
the Commission. Your comments
should focus on the potential
environmental effects, reasonable
alternatives (including alternative
facility sites and pipeline routes), and
measures to avoid or lessen
environmental impact. The more

VerDate Aug<31>2005

18:03 Sep 08, 2006

Jkt 208001

specific your comments, the more useful
they will be. To ensure that your
comments are timely and properly
recorded, please carefully follow these
instructions:
• Send an original and two copies of
your letter to: Magalie R. Salas,
Secretary, Federal Energy Regulatory
Commission, 888 First St., NE., Room
1A, Washington, DC 20426.
• Label one copy of your comments
for the attention of Gas Branch 2, DG2E.
• Reference Docket No. PF06–031–
000 on the original and both copies.
• Mail your comments so that they
will be received in Washington, DC on
or before October 5, 2006.
The Commission strongly encourages
electronic filing of any comments in
response to this Notice of Intent. For
information on electronically filing
comments, please see the instructions
on the Commission’s Web site at
http://www.ferc.gov under the ‘‘eFiling’’ link and the link to the User’s
Guide, as well as information in 18 CFR
385.2001(a)(1)(iii). Before you can
submit comments you will need to
create a free account, which can be
created on-line.
Once Gulf South formally files its
application with the Commission, you
may want to become an official party to
the proceeding known as an
‘‘intervenor.’’ Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in a
Commission proceeding by filing a
request to intervene. Instructions for
becoming an intervenor are included in
the User’s Guide under the ‘‘e-filing’’
link on the Commission’s Web site.
Please note that you may not request
intervenor status at this time. You must
wait until a formal application is filed
with the Commission.
Environmental Mailing List
An effort is being made to send this
notice to all individuals, organizations,
and government entities interested in
and/or potentially affected by the
proposed project. This includes all
landowners who are potential right-ofway grantors, whose property may be
used temporarily for project purposes,
or who own homes within distances
defined in the Commission’s regulations
of certain aboveground facilities.
If you received this notice, you are on
the environmental mailing list for this
project. If you do not want to send
comments at this time, but still want to
remain on our mailing list, please return
the Information Request (Appendix 2). If
you do not return the Information

PO 00000

Frm 00082

Fmt 4703

Sfmt 4703

53443

Request, you will be removed from the
Commission’s environmental mailing
list.
Availability of Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC (3372) or on the
FERC Internet Web site (http://
www.ferc.gov) using the ‘‘eLibrary link.’’
Click on the eLibrary link, select
‘‘General Search’’ and enter the project
docket number excluding the last three
digits (i.e., PF06–036) in the ‘‘Docket
Number’’ field. Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or TTY, contact
(202) 502–8659. The eLibrary link on
the FERC Internet Web site also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
In addition, the FERC now offers a
free service called eSubscription that
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. To register for this service,
go to http://www.ferc.gov/
esubscribenow.htm.
Public meetings or site visits will be
posted on the Commission’s calendar
located at http://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Finally, Gulf South has established an
Internet Web site for this project:
http://www.gulfsouthpl.com/. You can
also request additional information
directly from Gulf South at 1–877/972–
8533 or Stephens, Kyle (Gulf South)
kyle.stephens@gulfsouthpl.com.
Magalie R. Salas,
Secretary.
[FR Doc. E6–14968 Filed 9–8–06; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing and Soliciting Motions To
Intervene, Protests, and Comments
August 30, 2006.

Take notice that the following
hydroelectric application has been filed

E:\FR\FM\11SEN1.SGM

11SEN1

rwilkins on PROD1PC61 with NOTICES

53444

Federal Register / Vol. 71, No. 175 / Monday, September 11, 2006 / Notices

with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 12722–000.
c. Date filed: July 31, 2006.
d. Applicant: UEK Corporation.
e. Name of Project: Piscataqua Tidal
Energy Hydroelectric Project.
f. Location: The project would be
located in the Piscataqua River, in
Rockingham County, New Hampshire.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contacts: Mr. Philippe
Vauthier, UEK Corporation, Box 3124
Annapolis, Maryland 21403, phone:
(410) 267–6507.
i. FERC Contact: Chris Yeakel, (202)
502–8132.
j. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Description of Project: The
proposed project would consist of: (1)
Up to 120 Bi-Directional Hydro Turbine
Assembly for Tidal Deployment units
consisting of, (2) two horizontal axis
turbines 17 feet in diameter, 32 feetwide, and 20 feet-long, (3) integrated
generators with a capacity of 336.8 kW
each, (4) biological protection screens
and deterrent systems, (5) anchoring
systems, (6) mooring lines, and (7)
interconnection transmission lines. The
project is estimated to have an annual
generation of 221.79 gigawatt-hours peryear, which would be sold to a local
utility
l. Locations of Applications: A copy of
the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room, located at 888 First Street, NE.,
Room 2A, Washington, DC 20426, or by
calling (202) 502–8371. This filing may
also be viewed on the Commission’s
Web site at http://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and

VerDate Aug<31>2005

18:03 Sep 08, 2006

Jkt 208001

reproduction at the address in item h
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Competing Preliminary Permit:
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30(b) and 4.36.
o. Competing Development
Application: Any qualified development
applicant desiring to file a competing
development application must submit to
the Commission, on or before a
specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30(b) and 4.36.
p. Notice of Intent: A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
q. Proposed Scope of Studies under
Permit: A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
r. Comments, Protests, or Motions to
Intervene: Anyone may submit

PO 00000

Frm 00083

Fmt 4703

Sfmt 4703

comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under ‘‘efiling’’ link. The Commission strongly
encourages electronic filing.
s. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’,
‘‘COMPETING APPLICATION’’ or
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. Any of the above-named
documents must be filed by providing
the original and the number of copies
provided by the Commission’s
regulations to: The Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
A copy of any motion to intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
t. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E6–14952 Filed 9–8–06; 8:45 am]
BILLING CODE 6717–01–P