Friday,
June 29, 2007

Part VI

Department of
Energy
Federal Energy Regulatory Commission

mstockstill on PROD1PC66 with RULES3

18 CFR Part 292
New PURPA Section 210(m) Regulations
Applicable to Small Power Production
and Cogeneration Facilities; Final Rule

VerDate Aug<31>2005

16:42 Jun 28, 2007

Jkt 211001

PO 00000

Frm 00001

Fmt 4717

Sfmt 4717

E:\FR\FM\29JNR3.SGM

29JNR3

35872

Federal Register / Vol. 72, No. 125 / Friday, June 29, 2007 / Rules and Regulations
Order on Rehearing and Clarification

DEPARTMENT OF ENERGY

I. Introduction

Federal Energy Regulatory
Commission
18 CFR Part 292
[Docket No. RM06–10–001; Order No. 688–
A]

New PURPA Section 210(m)
Regulations Applicable to Small Power
Production and Cogeneration Facilities
Issued June 22, 2007.
AGENCY: Federal Energy Regulatory

Commission, DOE.

mstockstill on PROD1PC66 with RULES3

ACTION: Final rule; order on rehearing.
SUMMARY: In this order on rehearing, the
Federal Energy Regulatory Commission
(Commission) denies rehearing on most
major issues decided in Order No. 688,
which amended its regulations
governing small power production and
cogeneration in response to section 1253
of the Energy Policy Act of 2005 (EPAct
2005), which added section 210(m) to
the Public Utility Regulatory Policies
Act of 1978 (PURPA). The Commission
also clarifies certain aspects of the rule
and adopts some additional filing
requirements.
DATES: Effective Date: The revisions to
our regulations in this order on
rehearing will become effective July 30,
2007.
FOR FURTHER INFORMATION CONTACT:
Susan G. Pollonais (Technical
Information), Office of Energy Markets
and Reliability, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426,
(202) 502–6011.
Marka Shaw (Technical Information),
Office of Energy Markets and Reliability,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426, (202) 502–8641.
Samuel Higginbottom (Legal
Information), Office of the General
Counsel, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426, (202) 502–8561.
Mason Emnett (Legal Information),
Office of the General Counsel, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
(202) 502–6540.
Eric Winterbauer (Legal Information),
Office of the General Counsel, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
(202) 502–8329.
SUPPLEMENTARY INFORMATION: Before
Commissioners: Joseph T. Kelliher,
Chairman; Suedeen G. Kelly, Marc
Spitzer, Philip D. Moeller, and Jon
Wellinghoff.

VerDate Aug<31>2005

17:48 Jun 28, 2007

Jkt 211001

1. On October 20, 2006, the Federal
Energy Regulatory Commission
(Commission) issued Order No. 688,1 in
which the Commission revised its
regulations governing the purchase
requirement for electric energy
produced by qualifying cogeneration
and small power production facilities
(QFs). This rulemaking proceeding was
initiated to implement section 210(m) of
the Public Utility Regulatory Policies
Act of 1978 (PURPA),2 which mandates
termination of the requirement that an
electric utility enter into a new contract
or obligation to purchase electric energy
from QFs 3 if the Commission finds that
the QF has nondiscriminatory access to
one of three categories of markets
defined in section 210(m)(1)(A), (B), or
(C) of PURPA, as amended.
2. As relevant here, section 210(m)
provides for the following:
(i) Termination of the requirement that an
electric utility enter into a new contract or
obligation to purchase electric energy from a
QF after certain specified findings are made
by the Commission;
(ii) Reinstatement of the purchase
requirement upon a showing that the
conditions for terminating the requirement
are no longer met;
(iii) Termination of the requirement that an
electric utility enter into new contracts to sell
electric energy to QFs after certain specified
findings are made by the Commission;
(iv) Reinstatement of the sale requirement
upon a showing that the conditions for
terminating the requirement are no longer
met; and,
(v) Preservation of existing contracts and
obligations to purchase electric energy or
capacity from, or to sell electric energy or
capacity to, a QF.

The Final Rule amended Part 292 of
the Commission’s regulations,
pertaining to electric utilities’ obligation
to purchase electric energy from or sell
electric energy to a QF, to address these
provisions of section 210(m) and also to
provide a process for applying for the
reinstatement of the requirements to
purchase electric energy from or to sell
electric energy to QFs upon a showing
that the conditions for the removal of
those requirements are no longer met.
1 New PURPA Section 210(m) Regulations

Applicable to Small Power Production and
Cogeneration Facilities, Order No. 688, 71 FR 64342
(Nov. 1, 2006), FERC Stats. & Regs. ¶ 31,233 (2006)
(Final Rule).
2 Section 210(m) was added to PURPA by section
1253 of the Energy Policy Act of 2005 (EPAct 2005).
See Pub. L. 109–58, 1253, 119 Stat. 594, 967 (2005).
3 The requirement that an electric utility enter
into a new contract or obligation to purchase
electric energy from QFs is referred to herein as
either the mandatory purchase obligation or, more
simply, the purchase requirement.

PO 00000

Frm 00002

Fmt 4701

Sfmt 4700

3. New § 292.309 of the Commission’s
regulations describes the findings that
the Commission must make to justify
relieving an electric utility’s obligation
to enter into new QF purchase contracts.
If the Commission finds that the QF has
nondiscriminatory access to one of three
types of wholesale markets described in
subparagraphs (A), (B), and (C) of
section 210(m)(1), the requirement that
the electric utility enter into new
contracts or obligations is terminated. In
the Final Rule, the Commission
concluded that the four existing ‘‘Day 2’’
markets 4 satisfy the requirements of
subparagraph (A). The Commission
found that the ‘‘Day 1’’ markets 5 satisfy
some, but not all, of the requirements of
subparagraph (B). Finally, the
Commission found that the markets
operated by the Electric Reliability
Council of Texas (ERCOT) satisfy the
requirements of subparagraph (C). All of
these markets are administered by
regional transmission organizations
(RTOs) or independent system operators
(ISOs).
4. With regard to analyzing whether a
QF has nondiscriminatory access to one
of these markets, the Commission
adopted three rebuttable presumptions.
First, the Final Rule concluded that the
existence of an open access
transmission tariff (OATT), or a
reciprocity tariff filed by a non-public
utility pursuant to the Commission’s
open access regulations,6 justified a
rebuttable presumption that QFs have
nondiscriminatory access to the markets
in the transmission provider’s service
territory. Second, the Commission
adopted a rebuttable presumption that
QFs located within one of the four
existing ‘‘Day 2’’ markets also have
nondiscriminatory access to those
markets. Third, the Commission
concluded that QFs with a net capacity
no greater than 20 MW may not have
nondiscriminatory access to any market,
notwithstanding the availability of
service under an OATT or their location
within a ‘‘Day 2’’ market. The
Commission therefore adopted a
rebuttable presumption that such small
4 The four existing ‘‘Day 2’’ markets are those
auction based day-ahead and real-time markets
operated by the Midwest Independent Transmission
System Operator Corp. (MISO), PJM
Interconnection, LLC (PJM), New York Independent
System Operator, Inc. (NYISO), and ISO New
England, Inc. (ISO–NE).
5 The existing ‘‘Day 1’’ markets are those real-time
markets operated by the California Independent
System Operator Corporation (CAISO) and the
Southwest Power Pool (SPP).
6 18 CFR 35.28(e). An OATT provides
interconnection as well as transmission services on
a nondiscriminatory basis.

E:\FR\FM\29JNR3.SGM

29JNR3

Federal Register / Vol. 72, No. 125 / Friday, June 29, 2007 / Rules and Regulations

mstockstill on PROD1PC66 with RULES3

QFs do not have nondiscriminatory
access to any market.
5. Requests for rehearing and/or
clarification of these rulings, and the
procedure implementing them, were
received from the American Forest and
Paper Association (American Forest &
Paper) and California Cogeneration
Council (CCC), Central Vermont Public
Service Corporation (Central Vermont),
Cogeneration Association of California
and the Energy Producers and Users
Coalition (Cogeneration Association of
California), the Council of Industrial
Boiler Owners (CIBO), Deere &
Company (Deere), Edison Electric
Institute (EEI), Oklahoma Gas and
Electric Company (OG&E), jointly from
the Electricity Consumers Resource
Council (ELCON), the American Iron
and Steel Institute, the American
Chemistry Council, and the Council of
Industrial Boiler Owners (Industrial
Parties), National Rural Electric
Cooperative Association, (NRECA),
Occidental Chemical Corporation
(Occidental), PacifiCorp, and Public
Interest Organizations (PIOs). Southern
California Edison (SCE) and PJM
Interconnection, Inc. (PJM) filed
answers to the requests for rehearing.
ELCON and Cogeneration Association of
California filed answers those answers.7
6. As discussed below, the
Commission generally denies the
requests for rehearing of the Final Rule.
The Commission continues to believe
that the Final Rule appropriately
implements section 210(m) by
identifying what type of markets satisfy
the requirements of sections
210(m)(1)(A), (B), and (C) and the
criteria that will be used to determine
whether a QF has nondiscriminatory
access to one of those markets. We
therefore do not disturb the basic
implementation structure established in
that order. We do, however, grant
clarification regarding certain specific
matters. The Commission addresses
each of these issues in turn.
7 Rule 713(d) of the Commission’s Rules of
Practice and Procedure, 18 CFR 383.713(d),
provides that the Commission will not permit
answers to requests for rehearing. We will,
accordingly, reject SCE and PJM’s answers to the
requests for rehearing. Rule 213(a)(2) of the
Commission’s Rules of Practice and Procedure, 18
CFR 385.213(a)(2), prohibits an answer to an answer
unless otherwise ordered by the decisional
authority. We are not persuaded to accept the
answers of ELCON and Cogeneration Association of
California and will, therefore, reject them. The
alternative motions to reject of ELCON and
Cogeneration Association of California are rejected
as moot.

VerDate Aug<31>2005

17:48 Jun 28, 2007

Jkt 211001

35873

II. Discussion

1. Section 210(m)(1)(A)

A. Three Types of Markets

9. Section 210(m)(1)(A) of PURPA
requires the Commission to terminate an
electric utility’s obligation to purchase
from a QF if the QF has
nondiscriminatory access to (i)
independently administered, auctionbased, day ahead and real time
wholesale markets for the sale of electric
energy; and (ii) wholesale markets for
long-term sales of capacity and electric
energy. In the Final Rule, the
Commission found that the four existing
‘‘Day 2’’ markets, MISO, PJM, ISO–NE
and NYISO, satisfy the first prong of
section 210(m)(1)(A) because the
markets administered by these RTO/
ISOs are, as required by the statute,
independently administered, auctionbased day ahead and real time
wholesale markets for electricity.9 The
Commission further found that the
existence of bilateral long-term contracts
for long-term sales of capacity and
energy in these markets satisfies the
second prong of section 210(m)(1)(A).
Since both of these requirements are
satisfied, the Commission concluded
that a showing of nondiscriminatory
access to any of these ‘‘Day 2’’ markets
would terminate the purchase
requirement.

7. Section 210(m)(1) identifies three
types of markets, nondiscriminatory
access to which will satisfy the findings
the Commission must make to terminate
an electric utility’s purchase
requirement. As the Commission
explained in the Final Rule, the
statutory language of sections
210(m)(1)(A), (B), and (C) requires us to
differentiate among distinct types of
markets when analyzing whether an
electric utility will be relieved of its
purchase obligation. The Commission
must terminate the mandatory purchase
obligation if we find that a QF has
nondiscriminatory access to:
(A) ‘‘independently administered, auctionbased day ahead and real time wholesale
markets for the sale of electric energy’’ and
‘‘wholesale markets for long-term sales of
capacity and electric energy’’;
(B) ‘‘transmission and interconnection
services that are provided by a Commissionapproved regional transmission entity and
administered pursuant to an open access
transmission tariff that affords
nondiscriminatory treatment to all
customers’’ and ‘‘competitive wholesale
markets that provide a meaningful
opportunity to sell capacity, including longterm and short-term sales, and electric
energy, including long-term, short-term and
real-time sales, to buyers other than the
utility to which the [QF] is interconnected’’; 8
or,
(C) ‘‘wholesale markets for the sale of
capacity and electric energy that are, at a
minimum, of comparable competitive quality
as markets described in subparagraphs (A)
and (B).’’

8. In the Final Rule, the Commission
considered the specific criteria set forth
in these statutory provisions and
concluded that certain markets in the
United States satisfied some or all of the
requirements of each. The Commission
rejected proposals to adopt a single
standard for relief, which in effect
would interpret sections 210(m)(1)(A),
(B), and (C) as collectively defining a
single type of market, access to which
would require termination of the
purchase requirement. The Commission
found that the most reasonable
interpretation of section 210(m)(1) is
that Congress, in separately describing
three different types of markets, was
requiring the Commission to
differentiate among each type of market
when determining whether to terminate
the purchase requirement.
8 In determining whether a meaningful
opportunity to sell exists, section 210(m)(1)(B)
directs the Commission to consider, among other
factors, evidence of transactions within the relevant
market.

PO 00000

Frm 00003

Fmt 4701

Sfmt 4700

Requests for Rehearing
10. No petitioner challenges the
Commission’s determination that the
existing ‘‘Day 2’’ RTO/ISO markets
satisfy the requirements of the first
prong of section 210(m)(1)(A), i.e., that
they are independently administered,
auction-based day ahead and real time
wholesale electricity markets. Requests
for rehearing instead focus on the
second prong, regarding whether a
wholesale market for long-term sales of
capacity and electric energy also exists
in these regions. PIOs argue that the
mere existence of some bilateral longterm contracts does not demonstrate the
existence of a competitive wholesale
market for long-term sales or actual
‘‘meaningful opportunities’’ for QFs to
sell energy or capacity long-term to
multiple buyers. PIOs therefore contend
that the Commission erred in finding
that the ‘‘Day 2’’ markets satisfy the
requirements of section 210(m)(1)(A).
Cogeneration Association of California
agrees that the existence of a ‘‘Day 2’’
9 The Commission stated that any future
determinations of whether a new ‘‘Day 2’’ market
satisfies the requirements of section 210(m)(1)(A)
would be considered on a case-by-case basis, either
in response to an application for termination of the
mandatory purchase obligation or a petition for
declaratory order.

E:\FR\FM\29JNR3.SGM

29JNR3

mstockstill on PROD1PC66 with RULES3

35874

Federal Register / Vol. 72, No. 125 / Friday, June 29, 2007 / Rules and Regulations

market does not equate to a long-term
market, arguing that access to a longterm market is essential to provide the
assurance of long-term revenue
necessary to provide incentives for
construction of new resources.
11. American Forest & Paper and CCC
argue that there has never been a time
in the history of the power industry
when some bilateral contracts did not
exist. They contend that there is no
evidentiary basis that shows such
contracts are available to QFs on a
nondiscriminatory basis or that there is
a market for such contracts. They argue
that the word ‘‘market’’ presumes more
than an occasional, isolated transaction.
American Forest & Paper and CCC argue
that in the Final Rule the Commission
not only fails to explain why the
existence of bilateral contracts
constitutes a meaningful competitive
market, but also fails to establish any
standard for what constitutes a ‘‘long
term sale,’’ examine any of the bilateral
contracts it believes exist to determine
if they meet any such standard, or
consider whether bilateral contracts are
in fact available to QFs in any
meaningful sense.
12. Cogeneration Association of
California adds that the insufficiency of
the bilateral markets is also
demonstrated by the lack of meaningful
participation in utility requests for
offers. Cogeneration Association of
California argues that the current
practice of bilateral contracting is not
indicative of a competitive market, nor
is it proof that QFs have a meaningful
opportunity to participate in whatever
markets are there. It argues that there is
significant discrimination against QFs
when they attempt to enter into bilateral
contracts.
13. American Forest & Paper and CCC
also argue that the Final Rule errs as a
matter of law by determining generically
that ‘‘Day 2’’ markets satisfy section
210(m)(1)(A) rather than requiring
utilities to demonstrate, on a case-bycase basis, the factual basis upon which
relief is requested, which they argue is
required by section 210(m)(3). American
Forest & Paper and CCC contend that
the Commission simply presumed
adequate wholesale markets existed in
the ‘‘Day 2’’ markets, rendering the
language of section 210(m)(1)(A)(ii) of
the statute a nullity by not requiring
applicants to set forth the factual basis
on which relief is requested. American
Forest & Paper and CCC complain that
QFs have been denied the opportunity
to challenge the specific findings after
sufficient notice of the factual claims
being made.
14. American Forest & Paper and CCC
cite Alliant Energy Corporate Services

VerDate Aug<31>2005

16:42 Jun 28, 2007

Jkt 211001

Inc.10 as support for its belief that
section 210(m)(3) requires notice to each
affected QF prior to the Commission
making a determination under section
210(m)(1). American Forest & Paper and
CCC compare the Commission’s generic
treatment of ‘‘Day 2’’ markets with its
case-by-case procedures for the
reinstatement of the obligation, despite
the almost identical statutory language
in sections 210(m)(3) and 210(m)(4).
American Forest & Paper argues that
‘‘regulations cannot alter the statutory
scheme,’’ 11 stating that the procedural
requirements have been inappropriately
interpreted away in the Final Rule.
15. In American Forest & Paper and
CCC’s view, Congressional intent to
encourage QF development supports
interpreting section 210(m)(1)(A)(ii) as
requiring the Commission to find, based
on specific evidence, that there is a
meaningfully competitive market prior
to terminating the mandatory purchase
obligation. American Forest & Paper and
CCC note, for example, that EPAct 2005
did not repeal PURPA and provided for
termination of the purchase requirement
only if a very particular demonstration
is made.
16. Industrial Parties similarly argue
that the Commission erred in
categorically finding that ‘‘Day 2’’
markets provide QFs with access to
long-term wholesale markets. Industrial
Parties contend that the Commission
has ignored evidence that establishes
that these markets are in their infancy.
While acknowledging that suppliers
will offer QFs a bilateral contract in the
organized markets, Industrial Parties
argue that the rates and terms and
conditions of such contracts typically
are not truly long-term and are
discriminatory. Industrial Parties state
that the long-term markets that exist are
predominantly for resale—generators
selling to load serving entities that in
many cases have divested generation—
and that these contracts are typically for
a period of 6 to 18 months.
17. Industrial Parties also argue that
the Commission incorrectly assumed
that access to short-term ‘‘Day 2’’
markets is equivalent to a finding of
access to long-term markets under
section 210(m)(1)(A)(ii). Industrial
Parties contend that the Commission
must address the definition of ‘‘longterm,’’ arguing that the Commission
appears to view a market in excess of
one year as long-term. Industrial Parties
contend that a long-term market is a
10 113 FERC ¶ 61,024 (2005).
11 American Forest & Paper Request for Rehearing
at 13 (citing P. Gioso & Sons, Inc. v. Occupational
Safety and Health Review Commission, 115 F.3d
100, 105 (1st Cir. 1997)).

PO 00000

Frm 00004

Fmt 4701

Sfmt 4700

market of several years’ duration or at
least the timeframe for planning a new
generator, which they state is three to
five years for a gas-fired combined cycle
unit. Industrial Parties ask that the
Commission require utility applicants to
present information on the short- and
long-term capacity obligations of loadserving entities in the relevant markets,
their practices for meeting such
obligations, and any barriers to entry
into such markets.
18. Finally, American Forest & Paper
and CCC argue that the Commission’s
interpretation of section 210(m)(1)(A)(ii)
violates rules of statutory construction.
Because subparagraph (C) specifically
refers to markets for the sale of capacity
under both subparagraphs (A) and (B),
defining a third type of market that is
‘‘similar’’ to subparagraphs (A) and (B),
American Forest & Paper and CCC argue
it is nonsensical to conclude that the
markets for capacity referenced in
subparagraphs (A)(ii) and (B)(ii) are not
similar as between themselves.
American Forest & Paper and CCC
therefore argue that the Commission
erred by not interpreting subparagraph
(A)(ii) as imposing qualitative
requirements comparable to those
imposed under subparagraph (B)(ii). In
American Forest & Paper and CCC’s
view, otherwise the inclusion of a
requirement that the Commission
review specific ‘‘evidence of
transactions’’ in subparagraph (B)(ii)
would require the Commission to ignore
evidence of transactions when applying
subparagraph (A)(ii), which the
Commission did not do in the Final
Rule.
Commission Determination
19. The Commission denies rehearing
of the determination that the four
existing ‘‘Day 2’’ markets (MISO, PJM,
NYISO, and ISO–NE) satisfy the
requirements of the second prong of
section 210(m)(1)(A). Petitioners on
rehearing essentially argue that the
Commission should have imposed a
standard higher than what the statutory
language literally requires, i.e.,
nondiscriminatory access to ‘‘wholesale
markets for long-term sales of capacity
and electric energy.’’ The Commission
declined to do so in the Final Rule and
we affirm that determination here.
20. The Commission did not simply
assume the existence of long-term
markets in the ‘‘Day 2’’ markets, as some
petitioners argue. Rather, the
Commission found that the existence of
bilateral long-term contracts for longterm sales of capacity and energy is a
sufficient indication of a market. The
Commission continued that it is
reasonable to conclude that the

E:\FR\FM\29JNR3.SGM

29JNR3

mstockstill on PROD1PC66 with RULES3

Federal Register / Vol. 72, No. 125 / Friday, June 29, 2007 / Rules and Regulations
subparagraph (A)(ii) requirement for
long-term markets is met because
bilateral long-term contracts are
available to participants in the
footprints of the MISO, PJM, ISO–NE,
and NYISO. The Commission noted that
long-term contracts were to be expected
in these markets because of the nature
of these markets. In this regard, the
transmission access offered by RTOs
allows suppliers (including QFs) the
opportunity to enter into long-term
bilateral contracts. RTOs have no
incentive to favor one set of suppliers
over others in providing transmission
access. By eliminating pancaked rates,
eliminating problems with internal loop
flows, and improving the reliability of
transmission operations over a broad
multi-utility region, an RTO offers
regional transmission service which
facilitates longer-term contracting
practices. This is because an RTO’s
footprint encompasses many different
wholesale buyers, providing significant
opportunity for a seller to reach many
potential wholesale buyers.
21. In addition, organized markets
operated by an RTO facilitate long-term
bilateral contracts between sellers
(including QFs) and wholesale buyers
by reducing the costs to sellers of
making long-term bilateral supply
commitments. In the event a seller is
unable to produce the energy required
under a bilateral contract (for example,
because of an outage), the seller can
easily acquire replacement energy from
the organized market at a transparent
and competitive price. Even when the
seller is physically capable of producing
its contractually-required energy, the
seller can acquire the energy from the
RTO’s market whenever it is cheaper to
do so. Both of these factors reduce the
cost to a seller of entering into a longterm bilateral contract.12
22. With respect to bilateral long-term
markets in these RTO/ISOs, the
Commission noted that no commenters
argued that long-term contracts do not
exist in these markets or that QFs are
precluded from entering into them with
willing buyers.13 The Commission also
pointed out that electronic quarterly
report (EQR) filings indicate that there
are in fact contracts for long-term sales
of capacity and energy in each of the
‘‘Day 2’’ markets. The Commission
concluded that the existence of these
long-term contracts is a sufficient
indication that long-term wholesale
markets exist in those regions. It is
telling that no petitioner on rehearing
challenges (indeed, several petitioners
concede) that long-term contracts exist

14 The New Oxford English Dictionary Vol. 1 A–
M (1993 ed.).
15 Webster’s New Collegiate Dictionary (1979 ed.).

12 Final Rule at P 120.
13 Final Rule at P 117–20.

VerDate Aug<31>2005

16:42 Jun 28, 2007

in the ‘‘Day 2’’ markets. Instead,
petitioners argue that existence of such
contracts does not necessarily indicate
that an adequate market for long-term
energy and capacity exists. Yet the very
fact that buyers and sellers of long-term
energy and capacity have found each
other, evidenced by the contracts they
have entered into, demonstrates that a
market for such products does in fact
exist, which is all that the statute
requires.
23. The thrust of many of the
arguments on rehearing is that the
Commission should have considered
whether these long-term markets were
competitive or as robust as QFs would
like. That is not the standard set forth
by Congress in section 210(m)(1)(A)(ii),
which requires only that a long-term
market is present, not that it be
competitive or that it meet the
subjective preferences of all QFs. As the
Commission noted in the Final Rule,
Congress knew how to impose a more
specific level of review regarding the
quality of the relevant long-term market
since, in contrast to the language it used
in section 210(m)(1)(A)(ii), it expressly
used prescriptive language in section
210(m)(1)(B)(ii).
24. Section 210(m)(1)(A)(ii) requires
only that we find access to ‘‘wholesale
markets for long-term sales of capacity
and electric energy.’’ The term ‘‘market’’
is not defined with respect to any
particular number of purchasers or
sellers or the quality of the contracts
available. One definition is ‘‘the action
or business of buying and selling; an
instance of this, a commercial
transaction; a (good or bad) bargain.’’ 14
Another definition is ‘‘a meeting
together of people for the purpose of
trade by private purchase and sales and
usually not by auction.’’ 15 These
standard definitions support the
Commission’s finding that the ability of
QF sellers to reach purchasers and the
existence of long-term contracts for
capacity and energy are sufficient to
determine that ‘‘markets’’ exist for
purposes of section 210(m)(1)(A)(ii). In
contrast to section 210(m)(1)(A)(ii),
section 210(m)(1)(B)(ii) requires us to
find access to ‘‘competitive wholesale
markets that provide a meaningful
opportunity to sell capacity, including
long-term and short-term sales, and
electric energy, including long-term,
short term and real-time sales.’’ Under
this statutory directive, the Commission
must not only find that markets exist,
but it must assess the quality of the
markets and find that they are

Jkt 211001

PO 00000

Frm 00005

Fmt 4701

Sfmt 4700

35875

‘‘competitive.’’ Congress chose not to
require a finding of ‘‘competitive’’ longterm markets as a condition of invoking
section 210(m)(1)(A)(ii) and we have
given reasonable meaning to this
difference in language.16
25. Congress’s decision to establish
different standards in subparagraphs (A)
and (B) makes sense in light of the
ultimate question of whether a QF has
nondiscriminatory access to potential
purchasers other than the host utility,
sufficient to justify terminating the
purchase requirement, which is the
overarching theme of section 210(m)(1).
In the ‘‘Day 2’’ markets, which were in
existence when EPAct 2005 was enacted
and of which Congress was aware when
it was considering PURPA reform,
energy sold under bilateral long-term
contracts as well as in the competitive
day-ahead and real-time energy markets
is simply scheduled as a delivery to the
RTO and ISO grid. These market
conditions make it possible for parties
to enter into long-term contracts with
confidence that electric energy sold
pursuant to these contracts will be
delivered. It is reasonable to conclude,
therefore, that Congress considered the
criteria specified for long-term contracts
in section 210(m)(1)(B) unnecessary for
section 210(m)(1)(A). This explains the
distinctions embedded in the standards
set forth in sections 210(m)(1)(A) and
210(m)(1)(B).
26. It is true, as petitioners point out,
that in some ‘‘Day 2’’ markets there is
no formalized market for long-term sales
of energy and capacity. It may also be
true that such long-term markets are
nascent and that the sales that do occur
are predominantly to load serving
entities for resale. All that is required by
section 210(m)(1)(A)(ii), however, is that
there be a market, not that it has
particular market attributes desired by
petitioners. Petitioners have offered no
reasonable alternative to our
interpretation of section 210(m)(1).
27. Petitioners are correct to point out
that the Commission did not expressly
define what length of contract it
considered ‘‘long-term’’ within the
meaning of section 210(m)(1)(A)(ii). The
Commission explained, however, that it
was relying on EQR data to find that
long-term contracts existed in the ‘‘Day
2’’ markets. Long-term contracts are
defined for EQR purposes as having a
16 Some petitioners argue that the Commission’s
reliance on EQR reports to find the existence of a
long-term market in ‘‘Day 2’’ regions is contradicted
by Congress’ reference to ‘‘evidence of transactions’’
in section 210(m)(1)(B), but not in section
210(m)(1)(A). The requirement in subparagraph (B)
for evidence of transactions does not bar the use of
such evidence in subparagraph (A), but merely
indicates that such evidence is not required under
subparagraph (A).

E:\FR\FM\29JNR3.SGM

29JNR3

35876

Federal Register / Vol. 72, No. 125 / Friday, June 29, 2007 / Rules and Regulations

mstockstill on PROD1PC66 with RULES3

term of one year or more and, thus, the
Commission’s findings regarding longterm contracts in the Final Rule
incorporated that definition. While
some petitioners argue that a longerterm should have been used, we
continue to believe that contracts of a
year or more are sufficiently long-term
to meet the statutory requirement that
there be ‘‘wholesale markets for longterm sales of capacity and energy’’
within the meaning of section
210(m)(1)(A)(ii).17
28. We note that the Commission has
initiated a proceeding to explore ways
to improve the operation of wholesale
organized electric markets administered
by RTOs and ISOs, including actions the
Commission might take to further
improve opportunities for long-term
contracting in RTO and ISO regions.18
While we disagree with petitioners who
argue that QFs above 20 MW do not
have access to long-term contracting
opportunities in organized markets, or
that section 210(m)(1)(A) requires us to
find ‘‘competitive’’ or ‘‘robust’’
contracting opportunities, we are taking
steps to facilitate additional
opportunities for long-term contracting.
29. The Commission also rejects
arguments that it may not make generic
findings in this rulemaking as to the
‘‘Day 2’’ markets satisfying the
requirements of section 210(m)(1)(A).
The Commission has broad discretion to
adopt generic policy or make generic
findings through the rulemaking process
rather than case-by-case adjudications.19
Establishing generic findings in this
rulemaking provides all parties,
including electric utilities and QFs
alike, a reasonable chance to be heard
on common issues that arise in various
17 Although the statute contrasts real-time, dayahead, and long-term wholesale sales, it provides
no definition of those categories of transactions.
Nevertheless, the terms real-time and day-ahead
markets were well known with respect to ISOs and
RTOs at the time EPAct 2005 was enacted and
definitions of these markets were well understood,
i.e., Congress knew the meaning the terms as used
with respect to ISOs and RTOs existing at the time
of enactment of EPAct 2005. Additionally, the
Commission at the time of enactment of EPAct 2005
had for years defined long-term contracts under the
OATT as one year or longer. Similarly, the
Commission has treated power sales with a contract
term of greater than one year to be ‘‘long-term’’ for
reporting purposes. See, e.g., Revised Public Utility
Filing Requirements, Order No. 2001, 67 FR 31043,
FERC Stats. & Regs. ¶ 31,127 (2002), Order No.
2001–A, 100 FERC ¶ 61,074, reconsideration and
clarification denied, Order No. 2001–B, 100 FERC
¶ 61,342 (2002). We thus believe it is reasonable to
use the convention of treating contracts of a year
or more as ‘‘long-term’’ consistent with our
longstanding practice.
18 Wholesale Competition in Regions with
Organized Electric Markets, 119 FERC ¶ 61,306.
19 Securities and Exchange Comm’n v. Chenery,
332 U.S. 194, 202–03, reh’g denied, 332 U.S. 747
(1947).

VerDate Aug<31>2005

16:42 Jun 28, 2007

Jkt 211001

market structures and involving classes
of QFs. Indeed, no party has sought
rehearing of the Commission’s
conclusion that the ‘‘Day 2’’ markets
satisfy the first prong of section
210(m)(1)(A). It is just as appropriate for
the Commission to find generically, in
this rulemaking, that long-term markets
exist in the ‘‘Day 2’’ RTO/ISOs as it is
to find that those RTO/ISOs operate
independently administered, auctionbased day ahead and real time
wholesale markets within the meaning
of section 210(m)(1)(A)(i).
30. These generic findings do not
violate the requirements of section
210(m)(3), as some petitioners argue.
Under section 210(m)(1), the
Commission must terminate the
purchase requirement if it makes certain
findings regarding nondiscriminatory
access to specified markets. That
provision of the statute does not specify
the particular procedural mechanism
the Commission must use in making
those findings and, thus, the
Commission has discretion to act
through a rulemaking, case-by-case
determinations, or some combination
thereof. Section 210(m)(3) does not, as
the petitioners appear to assume,
require the Commission to await an
application from an electric utility in
order to make any of the particular
findings specified in section 210(m)(1).
While the Commission made certain
generic findings in the Final Rule, it
also required electric utilities (including
those in the ‘‘Day 2’’ markets) that seek
relief from the obligation to enter into
new contracts or obligations with QFs to
file an application pursuant to
regulations implementing section
210(m)(3).20 Thus, the Commission has
incorporated the application process
into its implementing regulations,
combining the application procedures
with generic findings and rebuttable
presumptions to streamline the
Commission’s review. The resulting
structure is fully consistent with the
requirements of both sections 210(m)(1)
and 210(m)(3).21
2. Section 210(m)(1)(B)
31. Section 210(m)(1)(B) requires
termination of the purchase obligation if
a QF has nondiscriminatory access to (i)
transmission and interconnection
services provided by a Commission20 Final Rule at P 102.
21 The comparative structures of sections
210(m)(3) and 210(m)(4) do not support a different
outcome. Section 210(m)(4) specifies the procedural
requirements for reinstating the purchase
requirement after the Commission has entered an
order terminating that requirement and, thus, does
not govern the Commission’s initial procedures for
acting to terminate the requirement.

PO 00000

Frm 00006

Fmt 4701

Sfmt 4700

approved regional transmission entity
pursuant to an open access tariff and (ii)
competitive wholesale markets
providing a meaningful opportunity to
sell long-term and short-term capacity
and electricity to buyers other than the
interconnecting electric utility. The
Commission concluded in the Final
Rule that the CAISO and SPP are
regional transmission entities within the
meaning of the first prong of section
210(m)(1)(B), but made no findings as to
the second prong for any market,
including those operated by CAISO and
SPP. The Commission also stated that
any future determinations of what
transmission providers qualify as a
regional transmission entity within the
meaning of the first prong will be made
on a case-by-case basis. The
Commission provided examples of
factors it may consider in making that
determination, such as sufficient
regional scope or configuration of the
multiple discrete transmission systems
the regional transmission entity
controls.
Requests for Rehearing
32. Occidental argues that the
Commission erred in reserving the
discretion to deem an entity a
‘‘Commission-approved regional
transmission entity’’ in the context of a
section 210(m) proceeding. Because
section 210(m)(1)(B)(i) refers to a
‘‘Commission-approved’’ entity,
Occidental argues that a transmission
provider must have been deemed by the
Commission to be a ‘‘regional
transmission entity’’ prior to the filing
of an application for relief from the
purchase requirement.
33. PacifiCorp argues that evidence of
robust bilateral markets or actual sales
by a QF to wholesale non-PURPA
purchasers should be considered when
the Commission determines whether
QFs have the requisite ‘‘meaningful
opportunity’’ to sell capacity and energy
to other buyers within the meaning of
section 210(m)(1)(B)(ii). PacifiCorp
offers factual examples of QF plans to
participate in wholesale markets,
depending on market prices, although it
acknowledges that the examples it used
are extreme and did not materialize.
PacifiCorp asks the Commission to
establish a rebuttable presumption that
evidence of a robust bilateral market
featuring liquid trading points, or actual
sales by QFs, should be adopted for
purposes of implementing section
210(m)(1)(B)(ii). Alternatively,
PacifiCorp asks the Commission to
provide further guidance as to how the
standards of that section will be
applied.

E:\FR\FM\29JNR3.SGM

29JNR3

Federal Register / Vol. 72, No. 125 / Friday, June 29, 2007 / Rules and Regulations

mstockstill on PROD1PC66 with RULES3

34. With regard to the SPP market,
OG&E argues that the Commission erred
in declining to find that utilities
operating in SPP also satisfy the second
prong of section 210(m)(1)(B) or to
provide guidance with respect to the
information required for utilities to
make such a showing. OG&E argues that
its comments on the NOPR adequately
demonstrated that QFs have
nondiscriminatory access to competitive
markets within SPP. If the evidence it
submitted was insufficient, OG&E
claims the Commission erred by failing
to provide guidance as to what type of
information would satisfy the
Commission’s requirements. OG&E
contends that such guidance would
reduce the costs and burdens associated
with preparing an application under
section 210(m).
35. With regard to the CAISO market,
Cogeneration Association of California
argues that the lack of new construction
in California, despite a clear supply
shortage, is evidence that competitive
long-term markets do not exist in that
region. Cogeneration Association of
California also argues that competitive
markets must have price transparency,
including both pricing terms and nonprice terms, contending that there is
virtually no disclosure to any market
participant of prices secured or
approved for capacity or energy
purchased by utilities. Industrial Parties
point to other characteristics of the
California market that, in their view,
would preclude a finding of access to
sufficiently competitive markets, such
as exit fees, the lack of direct access,
and the dominance of utility generation
in an otherwise thinly traded market.
Commission Determination
36. We disagree with Occidental’s
assertion that a transmission entity must
have been deemed by the Commission
to be a ‘‘regional transmission entity’’
prior to the filing of an application for
relief from the purchase requirement. As
we explained in the Final Rule, section
210 does not define regional
transmission entity and, therefore, the
Commission has discretion in
interpreting that term. At the time of
enactment of section 210(m), Congress
was aware of the existence of
Commission-approved RTOs and ISOs
with varying degrees of regional scope
(some spanning many states and some
covering only large individual states), as
well as the continuing voluntary
development of various types of
transmission organizations.22 It is
22 Indeed Congress, in EPAct 2005 incorporated
into the Federal Power Act (FPA) definitions of
RTO and ISO, with the RTO definition specifically

VerDate Aug<31>2005

16:42 Jun 28, 2007

Jkt 211001

reasonable to conclude that Congress, by
using the generic term ‘‘regional
transmission entity’’ in section
210(m)(1)(B)(i), intended to leave it to
the Commission’s discretion to
determine on a case-be-case basis
whether or not an entity is regional
within the meaning of the statute.23
37. We also deny rehearing of the
decision not to find in the context of
this rulemaking that the SPP market
satisfies the second prong of section
210(m)(1)(B). While OG&E claims to
have provided in its initial comments
evidence demonstrating the quality of
the SPP market,24 what OG&E provided
was little more than cursory comments
and a description of bidding procedures
that are being adopted in Oklahoma.
Section 210(m)(1)(B)(ii) requires a
showing of ‘‘competitive wholesale
markets that provide a meaningful
opportunity to sell capacity, including
long-term and short-term sales, and
electric energy, including long-term,
short-term and real-time sales, to buyers
other than the utility to which the
qualifying facility is interconnected.’’
This provision also provides that ‘‘[i]n
determining whether a meaningful
opportunity to sell exists the
Commission shall consider, among
other factors, evidence of transactions
within the relevant market.’’ We do not
find OG&E’s cursory submission
sufficient to meet the statutory
requirements. Moreover OG&E did not
include any evidence of transactions in
the SPP market. There was, and
continues to be, an insufficient record in
this proceeding to find that the SPP
market satisfies the second prong of
section 210(m)(1)(B).
38. With regard to OG&E’s and
PacifiCorp’s requests for further
guidance, we believe that the statutory
language requiring that a QF have a
meaningful opportunity to sell capacity
and energy to buyers other than the
interconnected utility means an actual,
and not just theoretical, opportunity.
recognizing that such an entity must be of sufficient
‘‘regional’’ scope, whereas the ISO definition does
not contain a sufficient regional scope element.
Pub. L. 109–58, 1291, 119 Stat. 594, 984 (2005)
(codified at 16 U.S.C. 796(27), (28)). Cf. Pub. L. 109–
58, 1286, 119 Stat. 594, 981 (2005) (adding section
206(a)(2) to the FPA, allowing Commission to order
refunds for certain sales in ‘‘organized’’ markets).
23 Congress in section 210(m) did not use the term
‘‘regional transmission organization’’ and thus
presumably did not intend to limit a ‘‘regional
transmission entity’’ to the regional scope
requirements of Order No. 2000. Regional
Transmission Organizations, Order No. 2000, 65 FR
809 (Jan. 6, 2000), FERC Stats. & Regs. ¶ 31,089
(1999), order on reh’g, Order No. 2000–A, 65 FR
12088 (Mar. 8, 2000), FERC Stats. & Regs. ¶ 31,092
(2000), dismissed sub nom. Pub. Util. Dist. No. 1 of
Snohomish County, Washington v. FERC, 272 F.3d
607 (D.C. Cir. 2001).
24 OG&E Comments at 4–6.

PO 00000

Frm 00007

Fmt 4701

Sfmt 4700

35877

Concrete evidence of transactions would
further that finding, as the statutory
language implies. To the extent such
evidence is not available, we would
expect at a minimum a petitioning
electric utility to explain any lack of
evidence of transactions and to provide
a reasoned explanation of how the
Commission could find that a
meaningful opportunity to sell to buyers
other than the interconnected utility
exists in the absence of a history of
transactions.25 PacifiCorp’s evidence of
QF proposals that never reached fruition
does not provide an adequate basis for
the Commission to make any
presumptions regarding whether
particular markets satisfy the
requirements of section 210(m)(1)(B)(ii).
We continue to believe that it is best to
address on a case-by-case basis whether
non-RTO/ISOs and RTO/ISOs that do
not have both auction-based real-time
and day-ahead markets satisfy those
statutory requirements.26
39. The claims of Cogeneration
Association of California and the
Industrial Parties regarding the lack of a
sufficiently competitive market in
California can be addressed in any
individual cases concerning California.
We note that the CAISO has been found
only to satisfy section 210(m)(1)(B)(i)
and that a separate finding of
‘‘competitive wholesale markets’’ is
required under section 210(m)(1)(B)(ii).
Thus, if a California utility makes a
filing pursuant to section 210(m)(3) and
§ 292.310 of the Commission’s
regulations, and claims that it satisfies
the section 210(m)(1)(B) criteria for
relief from the purchase obligation, the
issue of whether ‘‘competitive
wholesale markets’’ exist will be an
issue in that proceeding and the burden
will be on the applicant to make the
required demonstration.27
3. A Single Standard of Relief
40. As explained above, the
Commission concluded in the Final
Rule that the most reasonable
interpretation of section 210(m)(1) is
that Congress, in setting forth three
discrete tests for three different types of
markets, was directing the Commission
to differentiate among three different
25 The Commission is aware that certain types of
evidence of transactions may contain information
that an electric utility considers to be confidential.
If information is considered confidential by the
electric utility, procedures exist to maintain its
confidentiality.
26 Final Rule at P 145.
27 The Commission also left open the option of
California utilities seeking a determination that the
California market satisfies section 210(m)(1)(A) by
filing requests for declaratory orders, after there is
a functioning ‘‘Day 2’’ RTO/ISO in California. Final
Rule at P 157.

E:\FR\FM\29JNR3.SGM

29JNR3

35878

Federal Register / Vol. 72, No. 125 / Friday, June 29, 2007 / Rules and Regulations

markets, access to which would require
termination of the purchase requirement
provided such access is available on a
nondiscriminatory basis. A number of
petitioners had advocated a different
interpretation of section 210(m)(1),
arguing that subparagraphs (A), (B), and
(C), when read together, establish a
single standard for relief from the
purchase requirement. In their view,
these separate provisions together
require electric utilities to demonstrate
that a QF would remain economically
viable or would otherwise have access
to the technical equivalent of the
purchase requirement in order to
terminate the purchase requirement.
The Commission rejected that view by
interpreting section 210(m)(1) as
establishing different standards for each
of the three types of markets identified
in subparagraphs (A), (B), and (C).

mstockstill on PROD1PC66 with RULES3

Requests for Rehearing
41. American Forest & Paper and CCC
again challenge the Commission’s
determination that the three standards
of relief described in section 210(m)(1)
were intended to be different in terms
of the organization and competitiveness
of the relevant market or the evidentiary
showings required for each. They argue
that EPAct 2005 did not repeal PURPA
or the Commission’s obligation to
encourage QF development and,
therefore, the Commission’s
interpretation of section 210(m)(1) is
unreasonable. American Forest & Paper
and CCC suggest that section
210(m)(1)(C) clearly requires markets
under subparagraphs (A), (B) and (C) to
be of similar competitive quality since
markets that satisfy subparagraph (C)
must be ‘‘similar’’ to those described in
subparagraphs (A) and (B). American
Forest & Paper and CCC conclude that
the Commission has adopted an
unreasonable statutory construction by
interpreting section 210(m)(1) as
referring to three distinct types of
markets.
Commission Determination
42. The Commission denies requests
for rehearing of the determination not to
adopt a single test to evaluate whether
the requirements of section 210(m)(1)
are met. We continue to believe, as we
found in the Final Rule, that the most
reasonable interpretation of section
210(m)(1) is that Congress, in setting
forth discrete tests for three different
types of markets, was requiring the
Commission to differentiate among
these markets and the differing
circumstances they present in
determining whether a utility is relieved
of the purchase requirement. As
discussed above, this interpretation is

VerDate Aug<31>2005

16:42 Jun 28, 2007

Jkt 211001

supported by the different language
Congress used in subparagraphs (A) and
(B) and the consequent need to make
meaningful distinctions in the explicit
statutory language Congress used.
Otherwise, subparagraphs (A) and (B)
presumably would have been collapsed
by Congress into one test.
43. We agree the reference in section
210(m)(1)(C) to markets that are of
‘‘comparable competitive quality as
markets described in subparagraphs (A)
and (B)’’ indicates Congress’ belief that
those two types of markets share a
certain set of competitive qualities. It
does not follow, however, that the
Commission should disregard the
specific statutory tests in each of those
subparagraphs when applying section
210(m)(1). The structure of section
210(m)(1), which separately describes
different types of markets, makes clear
that Congress was establishing a
particular set of tests for the
Commission to apply. In the Final Rule,
the Commission adopted the most
reasonable interpretation of
subparagraph (C)—that Congress
believed the two types of markets
identified in subparagraphs (A) and (B),
while distinct between themselves,
contain certain competitive qualities
that justify termination of the purchase
requirement for any QF with
nondiscriminatory access to those
markets. Subparagraph (C) directs the
Commission to consider these
competitive qualities when analyzing
whether there are other markets that,
while not meeting the specific
requirements of subparagraphs (A) and
(B), are sufficiently competitive to
justify termination of the purchase
requirement.
44. The fact that the markets
identified in subparagraphs (A) and (B)
contain certain competitive qualities
does not mean that they are the same
type of market, or that a single test must
be adopted for determining whether a
particular market satisfies the
requirements of a particular
subparagraph. Such an interpretation
would undermine Congress’s decision
to separately identify the two types of
markets that it believes are sufficiently
competitive to justify termination of the
purchase requirement. It would also
conflict with the particular
determinations to be made under each
of the subparagraphs. Subparagraph (A)
explicitly refers to both ‘‘day ahead and
real time’’ (i.e., ‘‘Day 2’’) organized
markets. RTO/ISO day-ahead and real
time markets are operated pursuant to
Commission tariffs containing market
rules and market mitigation aimed at
preventing exercises of market power. It
is reasonable to conclude that Congress

PO 00000

Frm 00008

Fmt 4701

Sfmt 4700

assumed these markets to be sufficiently
competitive, in combination with
markets for long-term contracts, to
justify termination of the mandatory
purchase obligation.
45. As we noted in the Final Rule,
‘‘Day 2’’ markets are generally
recognized as providing greater
opportunities for QFs and other
independent generators to make sales to
a large number of buyers than other
markets because the existence of dayahead and real-time energy markets
allows all competing generators to
submit bids to participate on a
nondiscriminatory basis in a market
from which many buyers over a large
area make purchases. While the ‘‘Day 1’’
markets also provide opportunities for
independent generators to compete, the
markets are more limited. It is therefore
not surprising that the factual showing
required under section 210(m)(1)(B) is
more difficult relative to section
210(m)(1)(A), which enjoys the benefit
of the ‘‘Day 2’’ market structures. These
different standards support, rather than
undermine, the Commission’s
interpretation that subparagraphs (A)
and (B) separately identify the particular
markets that Congress has deemed
sufficiently competitive to justify
termination of the purchase
requirement.
46. The Commission’s task under
section 210(m)(1)(C) is, therefore, to
determine the set of competitive
qualities that are shared by markets
satisfying the requirements of
subparagraphs (A) and (B). Recognizing
this task, the Commission declined in
the Final Rule to adopt any bright line
tests when applying subparagraph (C).
Simply put, the common objective of
subparagraphs (A) and (B), and therefore
subparagraph (C), is the identification of
a wholesale marketplace where QFs
have alternatives to their local utility to
sell their electric energy. We believe the
three-tiered structure of section
210(m)(1) indicates a finding by
Congress that two particular market
designs provide those alternatives,
while directing the Commission to
consider whether other market designs
might as well.
47. Congress could have stated a
broad, general finding to be made by the
Commission such as ‘‘workably
competitive markets.’’ Instead, Congress
tailored subparagraphs (A) and (B) to
establish criteria specific to each market
design that, in its view, provide
sufficient sales alternatives for QFs.
Under these circumstances, we believe
it appropriate to use the market designs
identified in subparagraphs (A) and (B)
as guides when analyzing whether an
alternative market design satisfies the

E:\FR\FM\29JNR3.SGM

29JNR3

Federal Register / Vol. 72, No. 125 / Friday, June 29, 2007 / Rules and Regulations

mstockstill on PROD1PC66 with RULES3

requirements of subparagraph (C). For
example, the Commission found in the
Final Rule that the markets in ERCOT
satisfy the statutory requirements of
subparagraph (C) because they are of
comparable quality to those described in
subparagraph (A). We continue to
believe that finding is appropriate and
note that no petitioner challenges it on
rehearing.
48. Finally, while it is true that EPAct
2005 did not repeal PURPA or the
Commission’s obligation to encourage
QF development, enactment of section
210(m) of PURPA clearly changed the
rights of QFs under PURPA. The
Commission has no discretion other
than to terminate the purchase
requirement if it finds that a QF has
nondiscriminatory access to any of the
markets described in section
210(m)(1)(A), (B) or (C). It would be
inappropriate for the Commission to
ignore this mandate by implementing
section 210(m)(1) in a way that
undermines the specific standards of
relief Congress chose to establish in the
statute.
B. Nondiscriminatory Access to a
Market
49. The Commission also must
determine that a QF has
nondiscriminatory access to a PURPA
section 210(m)(1) market in order to
terminate the purchase requirement. In
the Final Rule, the Commission adopted
several presumptions to be used in
determining whether access to a
particular market is available on a
nondiscriminatory basis in order to
streamline processing of applications for
termination of the purchase
requirement.
50. First, the Final Rule found that a
QF’s eligibility for service under an
OATT, or a reciprocity tariff filed by a
non-public utility, creates a rebuttable
presumption that the QF has
nondiscriminatory access to the relevant
market. Second, the Commission
adopted a rebuttable presumption that
QFs interconnected with electric utility
members of a ‘‘Day 2’’ RTO/ISO have
nondiscriminatory access to the ‘‘Day 2’’
market. Finally, regardless of available
transfer capability (ATC) under an
OATT or location within a ‘‘Day 2’’
market, the Final Rule establishes an
additional rebuttable presumption that
QFs with a net capacity no greater than
20 MW do not have nondiscriminatory
access to wholesale markets.
51. These rebuttable presumptions
were designed to work together to
facilitate prompt Commission review of
requests to terminate the purchase
requirement within the 90-day time
frame mandated in the statute. Various

VerDate Aug<31>2005

16:42 Jun 28, 2007

Jkt 211001

petitioners challenge the adoption of
these presumptions on rehearing, which
we address below.
1. The OATT
52. The Commission first established
a rebuttable presumption that a QF has
nondiscriminatory access to a market if
it is eligible for service under a
Commission-approved OATT, or
Commission-filed reciprocity tariff, and
Commission-approved interconnection
rules.28 If the Commission determines
that a particular market meets the
criteria of section 210(m)(1)(A), (B), or
(C), and a QF in that market is eligible
for service under an OATT or
reciprocity tariff, a QF may seek to rebut
the presumption of access to the market
by providing specific and credible
evidence that the QF does not have
nondiscriminatory access due to
operational characteristics or
transmission constraints. If the QF is
unable to make this demonstration, the
purchase requirement will be
terminated.
53. In the Final Rule, the Commission
determined that only issues other than
issues related to the provision of open
access transmission under the OATT
would be considered when analyzing
whether the presumption of
nondiscriminatory access to markets has
been rebutted. The Commission rejected
requests to allow a QF to litigate open
access implementation issues in the
context of these 90-day applications,
concluding that complaint proceedings
are the appropriate forum for such
disputes. The Commission also rejected
arguments that it is unreasonable to rely
on a presumption that a Commissionapproved OATT provides
nondiscriminatory access to markets in
light of the then-pending NOPR in the
OATT reform rulemaking, Docket Nos.
RM05–17, et al., in which reforms to the
pro forma OATT had been proposed.
Requests for Rehearing
54. Occidental challenges the
Commission’s reliance on an OATT to
create a rebuttable presumption that
QFs have nondiscriminatory access to
the relevant wholesale markets.
Occidental argues that the
Commission’s actions in the OATT
reform rulemaking have demonstrated
that, notwithstanding the existence of
an OATT, there remain continuing
opportunities for undue discrimination
by transmission entities. Occidental
contends that the Commission’s
statement in the Final Rule that it had
28 Transmission providers are required to provide
interconnection as well as transmission services on
a nondiscriminatory basis under their OATTs.

PO 00000

Frm 00009

Fmt 4701

Sfmt 4700

35879

not found actual discrimination in the
OATT reform rulemaking is inconsistent
with findings in the OATT reform
NOPR that deficiencies in the OATT
needed to be addressed. In Occidental’s
view, the Commission’s determination
in the OATT reform NOPR that there are
remaining opportunities for undue
discrimination bear directly on the
finding that the Commission must make
under section 210(m) that a utility is
administering its OATT in a
nondiscriminatory manner.
55. Occidental argues that the
Commission’s determination that only
issues not related to the provision of
open access transmission under the
OATT may be raised to rebut the
presumption of nondiscriminatory
access is inconsistent with the statutory
language of section 210(m) and is a
violation of due process. Industrial
Parties assert that the Commission must
consider evidence of discrimination
when analyzing whether the
presumption has been rebutted. Failure
to do so would, in their view, violate the
Commission’s statutory obligation to
eradicate discrimination.
56. Occidental further argues that the
Commission should clarify that QFs
under section 210(m)(1)(B) and (C) have
the same opportunity to rebut the
presumption of nondiscriminatory
access as QFs under section
210(m)(1)(A). Occidental notes that the
Commission lists several factors in the
Final Rule as a possible rebuttal to a
finding of nondiscriminatory access to
the markets set forth in subparagraph
(A), but that it is not clear if the factors
are also relevant to the question of
whether the purchase obligation should
be terminated under subparagraphs (B)
and (C). If the Commission does not
grant clarification, Occidental requests
rehearing on this issue.
57. Cogeneration Association of
California argues that existence of an
OATT is insufficient to guarantee
nondiscriminatory access since it may
not provide physical transmission
rights. Because QFs generate electricity
as a necessary by-product of their
service to their thermal hosts,
Cogeneration Association of California
contends that a cogenerator must have
a physical location to deliver the
electricity. Cogeneration Association of
California argues that this requires
physical transmission rights that
recognize the operating requirements of
cogeneration operations. In its view, the
lack of physical delivery rights places a
cogeneration QF in the untenable
situation of either ceasing operation or
violating ISO tariff and scheduling
protocols, thereby incurring penalties or
sanctions. Cogeneration Association of

E:\FR\FM\29JNR3.SGM

29JNR3

mstockstill on PROD1PC66 with RULES3

35880

Federal Register / Vol. 72, No. 125 / Friday, June 29, 2007 / Rules and Regulations

California goes on to illustrate its
concern using the California market
redesign effort as an example. Because
the congestion revenue rights are
allocated first to load-serving entities,
and the remainder are auctioned to
other market participants, Cogeneration
Association of California fears that
existing QFs would be unable to hedge
congestion and that new projects would
be unable to obtain long-term rights
necessary to support long-term contacts,
a prerequisite for financing.
58. Occidental adds that, if the
Commission does not reject the OATT
presumption on rehearing, it should
require applicants to submit at a
minimum additional information such
as clear and specific definitions and
descriptions of each real-time, shortand long-term market the utility claims
in its section 210(m) application that the
QF is able to access on a
nondiscriminatory basis.
59. Multiple petitioners argue that the
Commission erred by establishing any
form of rebuttable presumption.
Industrial Parties contend that the
Administrative Procedure Act requires
that the applicant for relief—in this case
an electric utility—has the burden of
proof.29 Industrial Parties argue that an
agency may not use a presumption to
shift the burden of proof if the result is
not in keeping with the statutory
purpose and, in their view, it runs
counter to section 210(m) to impose on
QFs the burden to prove a lack of
nondiscriminatory access to markets
since the relevant information
concerning transmission and access to
markets is most likely in the possession
of the utility rather than the QF.
60. PIOs argues that creating
rebuttable presumptions that electric
utilities meet section 210(m)
requirements is contrary to the plain
language of section 210(m)(3). PIOs
argues that, when a utility seeks relief
from the mandatory purchase
obligation, the Commission is required
by section 210(m)(3) to consider
evidence of the assertion that the
required access and markets are actually
available to QFs in the utility’s service
territory, including a utility in an RTO.
In PIOs’ view, the Commission is not
authorized to permit utilities to escape
the obligation to set forth facts that
demonstrate that the conditions
provided in section 210(m)(1)(A), (B) or
(C) have been met for the QFs in its
territory.

61. American Forest & Paper and CCC
agree, citing NICOR Exploration Co. v.
FERC 30 for the proposition that the
Commission incorrectly shifts the
burden of proof away from electric
utilities through adoption of rebuttable
presumptions. American Forest & Paper
and CCC state that NICOR found that
the Commission erred by shifting the
burden for a natural gas producer to
prove that an area rate clause authorized
incentive based rates.31 American Forest
& Paper and CCC argue that that
situation is directly analogous to the
issue in this proceeding, where the
Commission has relieved electric
utilities of proving that QFs have nondiscriminatory access to wholesale
markets and, instead, forced QFs to
prove the absence of such access.

29 Industrial Parties Request for Rehearing at 7
(citing Hi-Tech Furnace Sys. v. FCC, 224 F. 3d 781
(D.C. Cir. 2000); Pub. Serv. Comm’n of New York
v. FERC, 866 F.2d 487 (D.C. Cir. 1989)).

30 NICOR Exploration Co. v. FERC, 50 F.3d 1341
(5th Cir. 1995) (NICOR).
31 American Forest & Paper and CCC Request for
Rehearing at 25.

VerDate Aug<31>2005

16:42 Jun 28, 2007

Jkt 211001

Commission Determination
62. The Commission denies rehearing
of the adoption of a rebuttable
presumption that eligibility for service
under a Commission-approved OATT,
or Commission-filed reciprocity tariff,
provides nondiscriminatory access to
the market. We first address arguments
against the use of any form of rebuttable
presumption and then turn to arguments
against relying on the OATT in
particular.
63. The Commission denies rehearing
regarding the use of rebuttable
presumptions in processing requests to
terminate the purchase requirement. As
discussed in paragraph 30 above, under
the plain language of section 210(m)(1),
it is the Commission’s responsibility to
find that there is nondiscriminatory
access to certain specified markets prior
to terminating the purchase
requirement. The use of rebuttable
presumptions serves to identify, in
advance, the Commission’s preliminary
analysis, subject to future evidentiary
submissions, thereby streamlining the
application review process. The
Commission believes this will facilitate
prompt processing of applications under
section 210(m), which is required by
section 210(m)(3), and ultimately
benefit QFs and electric utilities alike by
providing advance notice of how the
Commission will consider certain
issues. Abandoning the use of rebuttable
presumptions, as some petitioners
advocate, would unduly complicate the
application process and impair the
Commission’s ability to act within the
90-day timeframe required by section
210(m)(3). Moreover, these rebuttable
presumptions were not created in a

PO 00000

Frm 00010

Fmt 4701

Sfmt 4700

vacuum. They are based on the
Commission’s experience in
implementing non-discriminatory open
access transmission over the past 11
years, its experience with QF issues
(including interconnection issues) over
the past 29 years, and its experience
with RTO/ISO markets over almost 10
years.
64. The cases cited by petitioners,
which taken together stand for the
proposition that the proponent of a rate
change bears the burden of proving that
change satisfies the relevant statutory or
regulatory requirements, are therefore
inapposite.32 The rebuttable
presumptions do not relieve the
Commission of its ultimate
responsibility to make findings under
section 210(m)(1) prior to relieving an
electric utility of the purchase
requirement. Instead, they simply
provide advance notice of how the
Commission will carry out that
responsibility.
65. The rebuttable presumptions are
also consistent with the requirements of
section 210(m)(3), which establishes the
procedures to be followed when an
electric utility requests that the
Commission make the finding of
nondiscriminatory access to a market
identified in section 210(m)(1)(A), (B),
or (C). As required in section 210(m)(3),
the regulations promulgated in the Final
Rule clearly require a petitioning
electric utility to state the factual basis
on which it relies and describe why the
conditions set forth in subparagraphs
(A), (B), or (C) are met.33 That factual
basis could include the factual
determinations made in the Final Rule
regarding certain markets satisfying the
criteria of those subparagraphs, the
presumptions adopted in the Final Rule
regarding nondiscriminatory access, or
any other factor the electric utility
considers relevant to the determination
the Commission must make under
section 210(m)(1). There is no conflict
between the use of rebuttable
presumptions and the procedural
requirements of section 210(m)(3).
66. We reiterate that the rebuttable
presumptions adopted in the Final
Rule—some of which are presumptions
in favor of the electric utility and some
of which are in favor of the QF—are not
final determinations. Each of these
presumptions is expressly rebuttable.
Electric utilities and QFs alike will have
the opportunity to present case-specific
evidence in support of or against
32 See Hi-Tech Furnace Sys. v. FCC, 224 F.3d 781
(D.C. Cir. 2000); Pub. Serv. Comm’n of New York
v. FERC, 866 F.2d 487 (D.C. Cir. 1989); NICOR
Exploration Co. v. FERC, 50 F.3d 1341 (5th Cir.
1995).
33 See 18 CFR 292.310.

E:\FR\FM\29JNR3.SGM

29JNR3

mstockstill on PROD1PC66 with RULES3

Federal Register / Vol. 72, No. 125 / Friday, June 29, 2007 / Rules and Regulations
application of the presumption on
review of a request to terminate the
purchase requirement. For example,
regarding the OATT presumption in
particular, there may be circumstances
unique to a particular QF that interfere
with that QF’s nondiscriminatory access
notwithstanding its eligibility for
service under an OATT. The QF might
have operational characteristics that
effectively prevent its participation in a
market. The QF might lack access to a
mechanism to schedule transmission
service or make advance sales on a
consistent basis. Each QF will be in the
best position to have knowledge of the
particular circumstances that interfere
with its ability to access the market
through the OATT and, thus, requiring
the QF to submit evidence of its lack of
nondiscriminatory access is entirely
reasonable. The Commission clarifies
that the ability to rebut the presumption
of nondiscriminatory access applies
regardless of the market in which the
QF is located.
67. The Commission was nonetheless
sensitive to the QFs’ potential need for
information relevant to rebutting the
presumption of nondiscriminatory
access. The Commission therefore
required petitioning electric utilities to
submit information regarding
transmission constraints, levels of
congestion, and interconnections in
order to give potentially affected QFs
data that may be relevant to rebutting
the presumption that they have access
to the market. With these informational
safeguards in place, we believe that
reliance on a rebuttable presumption
regarding nondiscriminatory access to
the market is reasonable.
68. We also reject arguments on
rehearing that the Commission failed to
justify reliance on the OATT in
particular when formulating its
rebuttable presumptions. Since issuance
of the Final Rule, the Commission has
issued Order No. 890, adopting reforms
to the OATT to ensure that transmission
customers continue to have
nondiscriminatory access to
transmission service.34 The
Commission’s findings in Order No. 890
do not, however, conflict with the
rebuttable presumption adopted in this
proceeding, as petitioners claim. The
Commission did not find in Order No.
890 that any transmission provider
actually discriminated against a
particular customer and, instead, found
that there remained opportunities for
such discrimination that needed to be
34 Preventing Undue Discrimination and
Preference in Transmission Service, Order No. 890,
72 FR 12266 (Mar. 15, 2007), FERC Stats. & Regs.
¶ 31,241 at P 443 (2007).

VerDate Aug<31>2005

16:42 Jun 28, 2007

Jkt 211001

remedied.35 The fact that opportunities
remained for discrimination in the
provision of transmission service
(which, we add, we have now
addressed) would conflict with an
irrebuttable presumption of
nondiscriminatory access, not a
rebuttable presumption. The rebuttable
nature of the presumption
acknowledges that a QF may not
actually have nondiscriminatory access
and leaves that determination for caseby-case review by the Commission.
69. At the same time, the underlying
structure of the OATT, even before the
reforms adopted in Order No. 890 are
implemented, and certainly after,
counsels in favor of the rebuttable
presumption that eligibility for service
under an OATT provides
nondiscriminatory access to markets.
Under the OATT, transmission
providers must make transmission
capacity available to all customers on a
nondiscriminatory basis, thereby
ensuring a level playing field for all
market participants attempting to access
supplies. That requirement by definition
satisfies the nondiscriminatory access
criteria of section 210(m). To the extent
a QF believes that it in fact is not
receiving nondiscriminatory access to
the market, however, it can make that
demonstration in response to an electric
utility’s application to terminate the
purchase requirement.
70. In response to arguments by
Cogeneration Association of California
that the existence of an OATT is
insufficient to guarantee
nondiscriminatory access because it
may not provide physical rights, we
note that in organized markets which
offer financial transmission rights, these
financial rights are in addition to, not in
place of, physical rights. In essence, the
Cogeneration Association of California
is arguing that the Commission should
provide a QF with transmission services
superior to those available to other
generators in the organized markets.
However, section 210(m)(1) requires
that a QF have nondiscriminatory access
to one of the markets specified in
section 210(m)(1)(A), (B), or (C); it does
not guarantee a QF preferential access to
transmission service. To the extent that
Cogeneration Association of California
also argues that a QF that has
contractual obligations to thermal hosts
does not have the flexibility to
participate in markets where the access
is provided by financial, rather than
physical, transmission rights, the
Commission in its regulations has
provided each QF the opportunity to
argue that its operational characteristics
35 Id. at P 42.

PO 00000

Frm 00011

Fmt 4701

Sfmt 4700

35881

prevent the qualifying facility’s
participation in a market. Thus any QF
that believes it does not have
nondiscriminatory access to the market
(regardless of whether access is
provided by physical or financial rights)
has the right to rebut the OATT
presumption of access in response to an
electric utility filing seeking termination
of the mandatory purchase obligation.
71. The Commission also declines to
adopt Occidental’s recommendation to
require additional information from
electric utilities relying on the OATT
presumption. The filing requirements of
§ 292.310 of the Commission’s
regulations, as modified below, are
sufficient to provide the Commission
with the information necessary to
promptly process applications for
termination of the purchase
requirement.
72. Finally, the Commission grants
clarification of its determination in the
Final Rule that only issues other than
issues related to the provision of open
access transmission under the OATT
will be considered when analyzing
whether the presumption of
nondiscriminatory access to markets has
been rebutted. The Commission
continues to believe that complaint
proceedings are the appropriate forum
for such disputes. However, where there
are pending complaints raising credible
issues concerning a transmission
provider’s implementation or
administration of its OATT, the
Commission will also consider that fact,
as appropriate, when evaluating
whether a QF does in fact have
nondiscriminatory access to the market.
2. ‘‘Day 2’’ Markets
73. The Final Rule provided for a
second rebuttable presumption specific
to QFs operating in a ‘‘Day 2’’ market.
Because members of the ‘‘Day 2’’ RTO/
ISOs have turned over the operation of
their transmission facilities to an
independent entity that has no stake in
the marketplace and that ensures all
users of the transmission system are
treated on a nondiscriminatory basis
and are provided access to their
markets, the Commission established a
rebuttable presumption that QFs
interconnected with electric utility
members of a ‘‘Day 2’’ RTO/ISO have
nondiscriminatory access to that ‘‘Day
2’’ market. Since the Commission found
that the existing ‘‘Day 2’’ markets
satisfied the requirements of section
210(m)(1)(A), this creates a rebuttable
presumption that electric utility
members of the existing ‘‘Day 2’’ RTO/
ISOs are relieved of the purchase
requirement.

E:\FR\FM\29JNR3.SGM

29JNR3

35882

Federal Register / Vol. 72, No. 125 / Friday, June 29, 2007 / Rules and Regulations

mstockstill on PROD1PC66 with RULES3

74. The Commission declined to
apply this presumption of
nondiscriminatory access to entities that
are not members of the ‘‘Day 2’’ RTO/
ISOs. In order for such entities to obtain
relief of the purchase requirement, the
Commission stated that they must file
an application pursuant to either section
210(m)(1)(B) or (C), to be reviewed on a
case-by-case basis by the Commission.
Requests for Rehearing
75. Industrial Parties argue that the
Commission does not have sufficient
experience to impose a presumption of
access in the ‘‘Day 2’’ markets. In their
view, these markets are nascent and the
Commission does not have the ability to
determine whether QFs have sufficient
access to competitive alternatives to
justify relieving electric utilities within
those markets of the mandatory
purchase obligation.
76. NRECA, on the other hand, argues
that it is arbitrary and capricious to
deny to non-member utilities within or
adjacent to the footprint of a ‘‘Day 2’’
RTO/ISO the same presumption
accorded to RTO/ISO members. NRECA
contends that there is no basis for
denying non-RTO member utilities
adjacent to an RTO the same
presumption where the non-RTO
member utilities have a Commissionapproved OATT or reciprocity tariff.
NRECA also argues that the Final Rule
appears inconsistent as to which
standard a non-RTO member within a
‘‘Day 2’’ RTO footprint must satisfy in
order to obtain a waiver from the
purchase requirement. Although the
Final Rule provides that non-RTO
members, if they are located within or
adjacent to the footprint of a ‘‘Day 2’’
RTO, must satisfy the section
210(m)(1)(B) or (C) standards in order to
remove the purchase obligation, NRECA
notes that the Final Rule also states that
any electric utility may file an
application for relief from the purchase
requirement by showing
nondiscriminatory access to any of the
section 210(m)(1)(A), (B) or (C)
markets.36
77. NRECA also argues the Final Rule
effectively allows QFs interconnected to
an RTO member that has had its
purchase requirement terminated to
have the option of participating in that
RTO market or requesting wheeling
service to whichever non-member
utility within or adjacent to the RTO’s
footprint has the highest avoided cost.
NRECA expresses concern that the QF
in this circumstance could seek to
consummate a mandatory purchase
36 NRECA Request for Rehearing at 8 (citing Final
Rule at P 125, 151).

VerDate Aug<31>2005

16:42 Jun 28, 2007

Jkt 211001

agreement with a distant utility,
notwithstanding termination of the
purchase obligation for its
interconnected utility. NRECA therefore
asks the Commission to address this
unintended consequence on rehearing.
78. Even if Congress assumed that
QFs in RTO regions have access to
nondiscriminatory transmission
services, as well as meaningful
opportunities to sell long-term capacity/
energy in competitive markets, PIOs
argues that it does not follow that
Congress intended to permit utilities in
those regions to bypass section
210(m)(3) requirements or to authorize
the Commission not to consider
evidence of actual QF access to required
services and markets when utilities in
those regions seek to end their PURPA
obligations.
Commission Determination
79. The Commission denies rehearing
of its decision to adopt a rebuttable
presumption that QFs interconnected
with electric utility members of a ‘‘Day
2’’ market have nondiscriminatory
access to that ‘‘Day 2’’ market.
Arguments that the ‘‘Day 2’’ markets do
not provide QFs sufficient competitive
alternatives are rejected above.37 The
Commission has sufficient experience
with the four ‘‘Day 2’’ markets to
determine that QFs have
nondiscriminatory access to those
markets. Industrial Cogenerators offers
no reason to depart from the statutory
language and impose a more rigorous
standard.
80. The Commission also denies
rehearing of its decision to limit
application of the ‘‘Day 2’’ presumption
only to member utilities of the
particular ‘‘Day 2’’ RTO/ISO. Member
utilities have turned over control of
their transmission to the regional
organization. As a result, QFs
interconnected with a member utility
may offer their energy into the RTO/ISO
day ahead and real time energy markets
without any additional concerns about
securing transmission capacity. These
QFs face few, if any, barriers to be able
to sell energy and capacity to any
willing purchaser within the RTO/ISO
region, subject to the purchaser’s
willingness to pay any relevant
congestion charges.
81. In contrast, non-member utilities
have retained control over their
transmission facilities and, thus, control
the only access interconnected QFs have
to the market. While an OATT or
reciprocity tariff will provide a QF
interconnected with a non-member
utility with access to the market within
37 See supra P 19–30, 41–48.

PO 00000

Frm 00012

Fmt 4701

Sfmt 4700

that particular utility’s subregion, the
QF must compete with the non-member
utility to secure transmission service in
order to access the nearby regional
market. Issues may arise concerning
ATC and a range of other open access,
commercial, and coordination (with the
RTO or ISO) matters that are more
appropriately examined on a casespecific basis.38 Accordingly, it is
reasonable for the Commission to limit
application of the rebuttable
presumption that the four RTO/ISOs
meet the statutory standards under
PURPA 210(m)(1)(A) only to member
utilities of those regional organizations.
Non-member utilities remain free,
though, to seek termination of the
obligation to purchase from QFs in
individual cases.
82. NRECA is correct that any electric
utility may file an application for relief
of the purchase obligation under any
subparagraph of section 210(m)(1). We
clarify that the Commission’s
conclusion not to apply a presumption
of nondiscriminatory access to nonmember utilities of a ‘‘Day 2’’ RTO/ISOs
does not preclude such utilities from
seeking to satisfy the requirements of
subparagraphs (A), (B), or (C), as the
regulations in Part 292 of the
Commission’s regulations expressly
provide.
83. In response to NRECA’s concern
that a QF interconnected with a member
utility of a ‘‘Day 2’’ market will seek
PURPA contracts with adjacent utilities,
using QF wheeling rights, we do not
interpret section 210(m) to permit this.
Section 210(m)(1) provides that ‘‘no
electric utility’’ shall be subject to the
purchase requirement if the
Commission finds that the QF has
nondiscriminatory access to one of the
specified markets. Thus, once the
Commission makes a finding that a
particular QF has nondiscriminatory
access to one of the specified markets,
no electric utility shall be required to
enter into a new contract or obligation
with that QF. The QF would therefore
no longer be able to impose the
purchase requirement on any electric
utility. If a QF that has been found to
have nondiscriminatory access to one of
the specified markets pursuant to the
request of a particular electric utility
seeks to enforce the purchase obligation
against another electric utility, the
38 For example, QFs interconnected with member
utilities would not experience rate pancaking for
transmission service to access the market,
additional risks and costs of possible curtailment
outside of the locational marginal price (LMP)
managed market, or increased scheduling burdens
associated with taking service over an intervening
transmission system under the OATT (in
comparison to directly scheduling energy deliveries
in the day-ahead and real-time LMP markets).

E:\FR\FM\29JNR3.SGM

29JNR3

Federal Register / Vol. 72, No. 125 / Friday, June 29, 2007 / Rules and Regulations
second electric utility may file an
application to terminate its purchase
obligation with respect to that QF, and
the Commission would consider its
findings in the first proceeding to be
determinative, absent a showing by the
QF that circumstances, either
nondiscriminatory access or the state of
the markets, have changed.

mstockstill on PROD1PC66 with RULES3

3. Small Size
84. Notwithstanding the presumption
of nondiscriminatory access afforded by
the OATT or the structure of the ‘‘Day
2’’ markets, the Commission concluded
in the Final Rule that certain QFs may
nonetheless have difficulty accessing
the market due to their small size. The
Commission, therefore, adopted an
additional rebuttable presumption that
small QFs do not have
nondiscriminatory access to the market,
regardless of whether the QF is an
eligible customer under an OATT or
interconnected with a member utility of
a ‘‘Day 2’’ RTO/ISO. Although the
Commission did not specify in the Final
Rule what evidence would be sufficient
to rebut this presumption, it did note
that relevant evidence could include the
extent to which the small QF has been
participating in the market or is owned
by, or is an affiliate of, an entity that has
been participating in the relevant
market. The Commission also found that
a reasonable and administratively
workable definition of ‘‘small’’ is 20
MW net capacity or smaller.
Requests for Rehearing
85. On rehearing, petitioners raise
several issues regarding the rebuttable
presumption for small QFs. Some
utilities argue that there should be no
special treatment of small QFs and that
the rebuttable presumption is an
impermissible waiver of section 210(m).
Some QFs, however, argue that small
QFs should be completely exempt from
termination of the mandatory purchase
obligation. Various petitioners argue
that the Commission should set the
threshold for ‘‘small’’ lower or higher.
86. Central Vermont argues that
making exceptions for certain QFs
because of their small size goes against
the plain language of the statute,
contending that the statute says nothing
about allowing the Commission to
consider whether it is practical or
economical for the QF to reach the
wholesale market in question. Central
Vermont argues that the Commission’s
findings with respect to QFs
interconnected with member utilities of
the ‘‘Day 2’’ RTO/ISO should apply
equally to all QFs regardless of size.
NRECA similarly argues that Congress
did not establish exceptions for size,

VerDate Aug<31>2005

16:42 Jun 28, 2007

Jkt 211001

characterizing the Commission’s
standards for overcoming this
presumption as insurmountable and,
therefore, arbitrary and capricious.
87. Deere argues, however, that the
purchase requirement for small QFs
should be retained in full in any market
in which that obligation is otherwise
lifted for large generators. Otherwise,
Deere contends, the rebuttable
presumption will be an invitation for
expensive litigation. Deere argues that
the Commission should treat small QFs
in a manner that prevents the costs of
defending the rebuttable presumption
from becoming a discouragement to the
development of small renewable
projects.
88. CIBO argues that the Commission
should expand the size presumption to
apply to QFs with a net capacity of 80
MW or less. CIBO contends such
treatment would be consistent with the
Commission’s obligation under EPAct
2005 to issue a rule that ensures
continuing progress in the development
of efficient electric energy generating
technology. CIBO argues that Congress
defined ‘‘small’’ in PURPA as 80 MW
for small biomass, waste, renewable
resources and geothermal resource
power generation and, therefore, the
Commission’s defining of small QFs at
20 MW contravenes Congress’s
longstanding support of QFs, creates
obstacles for some but not all small QFs
and upsets capital investment. CIBO
argues that the Commission makes no
attempt to explain how 20 MW QFs
differ from 80 MW QFs and that any
differentiation for purposes of unequal
statutory treatment must have a rational
basis.
89. CIBO further argues that the
orders cited by the Commission in favor
of a 20 MW threshold, such as Order
No. 671 39 and Order No. 2006,40 do not
address the operational limits or
difficulties that larger QFs have in
accessing ‘‘Day 2’’ markets, such as
widely fluctuating steam-host demand,
siting issues and transmission versus
distribution interconnection access
issues. Without guaranteed access to
markets, CIBO contends that many QFs
in the 20–80 MW range will simply stop
39 Revised Regulations Governing Small Power
Production and Cogeneration Facilities, Order No.
671, 71 FR 7852 (Feb. 15, 2006), FERC Stats. & Regs.
¶ 31,203 (2006), order on reh’g, Order No. 671–A,
71 FR 30585 (May 30, 2006), FERC Stats. & Regs.
¶ 31,219 (2006).
40 Standardization of Small Generator
Interconnection Agreements and Procedures, Order
No. 2006, 70 FR 34189 (June 13, 2005), FERC Stats.
& Regs. ¶ 31,180 (2005), order on reh’g, Order No.
2006–A, 70 FR 71760 (Nov. 30, 2005), FERC Stats.
& Regs. ¶ 31,196 (2005).

PO 00000

Frm 00013

Fmt 4701

Sfmt 4700

35883

cogenerating and new industrial
cogeneration will not be developed.
90. Finally, CIBO argues that
increasing the threshold to 80 MW adds
a very small number of QFs and would
add little to the amount of capacity
compared to total nationwide capacity.
In CIBO’s view, the Final Rule already
requires utilities to purchase power
from QFs that are less than 20 MW and,
thus, there would not be any material
increase in administrative burden for
electric utilities to use an 80 MW
threshold.
91. Industrial Parties argue that the
Commission should expand the small
size presumption to include any QF that
is unable to sell power in 50 MW
blocks, regardless of the particular
capacity of the facility. Industrial Parties
contend that certain over the counter
bilateral contracts stipulate a minimum
lot increment of 50 MW, which can be
a problem for larger QFs (i.e., above the
20 MW threshold) because their
intermittent production of surplus
power cannot always or easily be
packaged in 50 MW x 16 hour
increments. Industrial Parties state that
QFs that cannot sell 50 MW blocks have
only very limited access to financial
markets, at disadvantageous terms.
92. NRECA argues that the
Commission’s 20 MW threshold is too
generous. NRECA states there is
evidence in the record that RTOs are
capable of transacting with generators
with capacities as small as one or two
MW depending on the RTO. NRECA
contends that no party has
demonstrated that the existing RTO
processes for utilities between one and
20 MW are ineffective, unduly
complicated or overly burdensome.
NRECA also suggests that the
Commission’s earlier decision to
simplify interconnection for generators
with capacities of less than 20 MW is
unrelated to the question of whether
QFs have access to markets or, if related,
demonstrates that they have such
access.
93. With regard to how the
Commission measures the size of a QF
for purposes of applying the rebuttable
presumption, the Cogeneration
Association of California requests the
Commission to clarify it is by reference
to capacity delivered to the grid. The
Cogeneration Association of California
state that cogenerators often supply
electricity to on-site load and only
supply a portion of their maximum
electrical output to the grid. In its view,
electricity used to supply on-site load
should not be counted for purposes of
applying the size presumption.

E:\FR\FM\29JNR3.SGM

29JNR3

35884

Federal Register / Vol. 72, No. 125 / Friday, June 29, 2007 / Rules and Regulations

mstockstill on PROD1PC66 with RULES3

Commission Determination
94. The Commission denies the
requests for rehearing regarding the
rebuttable presumption that small QFs
do not have nondiscriminatory access to
the market. We continue to believe it is
appropriate to adopt a rebuttable
presumption that certain QFs do not
have nondiscriminatory access to
markets because of their small size. The
purchase requirement will therefore
remain in effect, in all markets, for all
QFs with a net capacity of 20 MW or
smaller, although electric utilities will
have the opportunity to rebut the
presumption by showing that a small
QF does in fact have nondiscriminatory
access to the relevant market.
95. We share CIBO’s goal of
continuing progress in the development
of efficient electric generating
technology, but disagree with CIBO and
other petitioners that we have
unreasonably differentiated ‘‘small’’
from ‘‘large’’ QFs. There is no perfect
bright line that can be drawn and we
have reasonably exercised our
discretion in adopting a 20 MW or
below demarcation for purposes of
determining which QFs are unlikely to
have nondiscriminatory access to
markets. Moreover, any QF above 20
MW is permitted to demonstrate an
inability to access the markets, and any
electric utility is permitted to
demonstrate that a QF 20 MW or smaller
is able to access the markets. The
Commission’s development of
rebuttable presumptions is based on its
experience with QFs, transmission
interconnections and related market
issues, and is designed to provide a
reasoned and fair approach for
processing applications within the 90day time frame dictated by the statute.
96. While the Final Rule does not
make a generic finding that QFs
interconnected at a distribution level
lack nondiscriminatory access to
markets, we believe that it is reasonable
to conclude that some, perhaps most,
small QFs at or below the 20 MW level
can be distinguished from larger QFs by
the type of delivery facilities to which
they typically interconnect. Most QFs
larger than 20 MW are interconnected to
higher voltage lines, typically
considered to be transmission lines,
while smaller QFs tend to be
interconnected to lower voltage radial
lines, frequently considered to be
distribution.41 Many lower voltage
41 See, e.g., Standardization of Small Generator
Interconnection Agreements and Procedures, Order
No. 2006–A, 70 FR 71760 (Nov. 30, 2005), FERC
Stats. & Regs. 31,196 at P 105 (2005), (‘‘We expect
the vast majority of small generator
interconnections will be with state interconnection

VerDate Aug<31>2005

16:42 Jun 28, 2007

Jkt 211001

facilities are radial systems designed to
carry power from the high-voltage grid
downstream to loads, and there may be
technical enhancements required to
move power injected into such facilities
upstream to the transmission grid to
access the broader wholesale market.
Smaller QFs are also more likely to have
to overcome other obstacles, such as
jurisdictional differences, pancaked
delivery rates, and perhaps additional
administrative procedures, to obtain
access to distant buyers.42 Taken
together, these factors support a
rebuttable presumption that smaller QFs
have substantially less ability to access
wholesale markets than do larger QFs.
97. Although there is no unique and
distinct megawatt size that uniquely
determines if a generator is small, in
other contexts the Commission has used
20 MW, based on similar considerations
to those presented here, to determine
the applicability of its rules and
policies. Indicative of this is the
Commission’s reliance in the Final Rule
on its findings in Order No. 671, where
the Commission retained exemptions for
QFs that are 20 MW or smaller from
sections 205 and 206 of the FPA, and
Order Nos. 2006 and 2006–A, where the
Commission recognized that generators
20 MW or smaller should have different
standards for interconnection than large
generators. We continue to believe that
20 MW is the appropriate level at which
to apply this rebuttable presumption.
98. We disagree with CIBO that the
Commission’s small QF threshold of 20
MW contradicts Congress’s 80 MW
definition of small power producers in
PURPA section 210(a).43 The 80 MW
threshold in section 210(a) of PURPA
defines the qualification of small power
producers eligible for the rights,
privileges and protections of QFs. The
use of 20 MW in the Commission’s
implementation of section 210(m) of
PURPA serves a fundamentally different
purpose. The Commission is
distinguishing between small and large
facilities to reflect the ability of
particular QFs to access markets.
Categorically applying the presumption
to all small power production facilities,
through adoption of a 80 MW threshold,
would not appropriately take into
programs.’’); Id. at P 102 (‘‘a QF selling at retail is
not eligible to interconnect under either Order No.
2003 or Order No. 2006. Under the Public Utility
Regulatory Policies Act of 1978, such
interconnections are governed by state law.’’)
(citations omitted).
42 See, e.g., Standardization of Small Generator
Interconnection Agreements and Procedures, Notice
of Proposed Rulemaking, 68 FR 49974 (Aug. 19,
2003), FERC Stats. & Regs. ¶ 32,572 (2003) at P 23–
25.
43 16 U.S.C. 796(17)(A)(ii).

PO 00000

Frm 00014

Fmt 4701

Sfmt 4700

account the different considerations that
affect a QF’s ability to access markets.
99. We also disagree that use of a 20
MW threshold defeats Congressional
intent to foster small power production.
The purchase requirement remains in
place for small power producers that do
not have nondiscriminatory access to
one of the markets identified in section
210(m)(1)(A), (B), or (C). The purchase
requirement can be terminated only if
the Commission finds
nondiscriminatory access to such
markets, which in turn means the small
power producers will have the ability to
sell their energy and capacity into the
wholesale marketplace.
100. We reject the request that the
Commission expand the small size
presumption to include any QF that is
unable to sell power in 50 MW blocks,
regardless of the particular capacity of
the facility. While it may be true that
certain over-the-counter bilateral
contracts stipulate a minimum lot
increment of 50 MW, and while also it
may be true that such a contractual
requirement may be a problem for some
QFs that are larger than 20 MW because
of their intermittent production of
surplus power, the Commission has
provided these larger QFs the
opportunity to rebut the presumption of
access to the ‘‘Day 2’’ market by
showing, among other things,
operational characteristics that
effectively prevent the QF’s
participation in a market or that the QF
has no access to a mechanism to
schedule transmission service or make
sales in advance on a consistent basis
because of variability of the QF’s
electric energy production or because of
market rules that prevent the QF from
scheduling transmission service or
participating in organized markets.44
The effect of needing to sell in 50 MW
blocks may therefore be presented to the
Commission in the context of a
particular request to terminate the
purchase requirement. Expansion of the
small size rebuttable presumption to
reflect this concern, which may not be
relevant in all cases, is thus neither
necessary nor appropriate.
101. The Commission rejects requests
to apply the small size presumption
only to much smaller QFs, such as those
with a net capacity of one or two MW.
We set the rebuttable presumption at an
appropriate level, reflecting our
understanding of the general nature of
QFs’ interconnection practices and the
relative capabilities of small entities.
However, we again stress that the
presumption is rebuttable. Electric
utilities are free to argue that smaller
44 Final Rule at P 82–84; 18 CFR 292.309(e)(1).

E:\FR\FM\29JNR3.SGM

29JNR3

mstockstill on PROD1PC66 with RULES3

Federal Register / Vol. 72, No. 125 / Friday, June 29, 2007 / Rules and Regulations
entities have nondiscriminatory access
to qualifying markets. We believe that
the best place to consider such
arguments is in the individual cases that
electric utilities bring to the
Commission.
102. Petitioners arguing that the
Commission has inappropriately waived
the effects of section 210(m) for small
QFs mischaracterize the Final Rule. The
Commission made clear in the Final
Rule that no class of QFs had been
shown to uniformly lack
nondiscriminatory access based on a
single factor and, as such, no
justification existed for exempting any
category of QFs from any future orders
which may terminate a utility’s
purchase requirement. The Commission
did, however, create a rebuttable
presumption that small QFs may not
have nondiscriminatory access to
markets because of their small size. As
we explain above, the use of such
rebuttable presumptions is fully
consistent with the Commission’s
obligation under section 210(m) and the
Commission’s need to identify ways to
expedite processing of applications.
103. To be clear, the use of a
rebuttable presumption does not
prevent a utility from seeking to
terminate the obligation to purchase
power from small QFs, as would be the
case if the Commission implemented a
waiver. Instead, the use of the rebuttable
presumption simply leaves the burden
on the utility to show that these smaller
entities indeed have nondiscriminatory
access. This approach recognizes that,
more often than not, a small QF will
have greater difficulty obtaining
nondiscriminatory access to markets
due to the tendency for small QFs to be
interconnected to lower voltage radial
lines, and the consequent need to
overcome other potential obstacles to
nondiscriminatory access, such as local
distribution access rules that are not
within the Commission’s jurisdiction,
pancaked delivery rates and additional
administrative burdens to obtain access
to buyers other than the interconnected
utility. It is therefore appropriate in the
first instance to place on the electric
utility the burden of demonstrating that
a small QF does in fact have
nondiscriminatory access to the types of
markets identified in sections
210(m)(1)(A), (B) or (C). Similarly, the
rebuttable presumption that QFs above
20 MWs do have nondiscriminatory
access to markets does not prevent a QF
from providing evidence to the contrary.
104. With regard to the request to
clarify how the 20 MW threshold will be
measured, the Commission explained in
the Final Rule that a QF is required to
state its size in terms of ‘‘net capacity’’

VerDate Aug<31>2005

16:42 Jun 28, 2007

Jkt 211001

when certifying its status as a QF.45 Net
capacity is the maximum amount of
power that the facility is able to produce
(gross capacity) less any auxiliary load
for devices that are necessary and
integral to the power production process
(station power). Any power consumed
by on-site load at the location of the QF
for purposes unrelated to the power
production process should not be
subtracted from gross capacity for
purposes of reporting net capacity.
Whether the facility is a Commissioncertified facility or a self-certified
facility, both are certified at net
capacity. Therefore, a QF’s Commissioncertified (or self-certified) net capacity
would determine whether the QF
qualifies for the ‘‘small size’’ rebuttable
presumption.
C. Filing Requirements
105. In the Final Rule, the
Commission found that a utility electing
to file for relief from the purchase
requirement must submit an application
with the Commission providing certain
information, including transmission
constraints within its service territory in
order to give potentially affected QFs
information that may be useful in
rebutting the presumption that they
have access to all aspects of the
applicable ‘‘Day 2’’ markets.46 The filing
requirements are contained in new
§ 292.310(d) of the Commission’s
regulations.
Requests for Rehearing
106. Industrial Parties contend that
the Commission is not sufficiently
prescriptive as to the level of detail on
transmission availability that utilities
should provide in their applications.
Industrial Parties argue that the
Commission should require the same
information on transmission access as in
UniSource Energy Corporation.47
Industrial Parties also argue that to
enable effective input by QFs and other
interested parties, any information
provided to support an electric utility’s
application to terminate its purchase
obligation must be provided to all
affected QFs at the time of filing.
Industrial Parties continue that if a QF
later seeks to reinstate the purchase
obligation, the electric utility needs to
provide current data, and not rely on the
45 Final Rule at P 72, n.41.
46 Final Rule at P 102.
47 UniSource Energy Corporation, 109 FERC
¶ 61,047 (2004) (UniSource) (reviewing a market
monitoring plan submitted in support of a request
for Commission authorization of the disposition of
jurisdictional facilities for purposes of identifying
anticompetitive conduct).

PO 00000

Frm 00015

Fmt 4701

Sfmt 4700

35885

data it used to justify termination of the
purchase obligation.
107. EEI, however, believes the filing
requirements in § 292.310(d)(3) of the
Commission’s regulations are unduly
broad and potentially burdensome. EEI
urges the Commission to exempt
utilities operating within the footprint
of Commission-approved RTO/ISOs that
have financial, rather than physical,
transmission rights models and ERCOT
(which likewise operates under a
financial transmission rights model)
from the information submission
requirements in § 292.310(d)(3). Since a
QF has the right to interconnect to
transmission within an RTO/ISO that
operates under a financial transmission
rights model, EEI contends that the QF
has access to that market regardless of
whether a physical path exists for
electric sales. As a result, EEI argues
that interconnection and other
transmission constraint and congestion
studies are of little relevance in
determining whether a QF has
nondiscriminatory access to
transmission in any market with a
financial rights transmission model.
108. EEI argues that even in markets
without financial transmission rights,
all new QFs have nondiscriminatory
access if they are willing to fund on an
up-front basis the transmission upgrades
necessary to receive network resource
status, i.e., if they are willing to comply
with Order Nos. 2003 and 2006. Despite
the fact that any upgrade costs for firm
transmission service are typically rolled
into rates, EEI contends that the
Commission’s transmission pricing
policy could require that existing QFs
bear the incremental cost of upgrades if
firm transmission service is not
available and the costs of the upgrades
exceed the rolled-in rate. As a result,
EEI argues that the only grounds for
rebuttal of the presumption of
nondiscriminatory access when OATT
service is available should be related to
unique operational characteristics of the
specific QF or in the rare circumstance
in which there is not a sufficient
opportunity to relieve a transmission
constraint because of unique factors,
such as the inability to secure regulatory
approval for upgrades or otherwise to
remedy physical system limitations. EEI
therefore asks the Commission to limit
the informational filing requirements to
those particular circumstances.
109. In addition, EEI requests the
Commission to clarify what is intended
by ‘‘[r]elevant system impact studies for
the generation interconnections, already
completed’’ for both non-RTO/ISO and
RTO/ISO regions. EEI states that it is
unclear what studies, and what time
frames, are contemplated by this

E:\FR\FM\29JNR3.SGM

29JNR3

35886

Federal Register / Vol. 72, No. 125 / Friday, June 29, 2007 / Rules and Regulations

mstockstill on PROD1PC66 with RULES3

requirement and whether this language
is intended to refer to the
interconnection studies for existing QFs
or for all generator interconnections. EEI
requests clarification that ‘‘relevant’’
studies will be limited to studies that
are the most recent regarding the QF’s
impact on the system or the most recent
generic studies of the applicable control
area. EEI states that, for the last several
decades, interconnection studies for
QFs not selling to the market have been
performed under state oversight. EEI
requests that the Commission clarify
whether the equivalent of system impact
studies performed for QFs pursuant to
state regulation should be provided.
110. Lastly, if the Commission
chooses to maintain the requirements in
§ 292.310(d)(3) of the Commission’s
regulations, EEI requests that the
requirements identified in paragraph
(iii) of § 292.310(d)(3), regarding system
impact studies for generator
interconnections, be clarified to require
all Commission-approved RTO/ISOs to
identify and make available to their
member transmission owners
confidential and public versions of each
interconnection study it performs for
submission to the Commission. They
argue that it is not clear how electric
utilities that have transferred
operational control of their transmission
to RTO/ISOs could fulfill the
requirement to provide ‘‘relevant system
impact studies’’ without imposing
certain requirements on the RTO/ISO.
EEI urges the Commission to clarify that
submitting studies conducted by the
RTO/ISO will be sufficient to meet the
informational requirements.
Commission Determination
111. In order to ensure that a
potentially affected QF has an adequate
opportunity to evaluate potential
obstacles to nondiscriminatory access,
despite the existence of an OATT or the
QF’s location in a ‘‘Day 2’’ market, the
Commission will maintain the
requirement for applicants to submit
transmission-related information
relevant to a QF’s evaluation of this
question. Information about the
applicant’s long-term transmission plan,
the location of transmission constraints,
levels of congestion, system impact
studies, and links to applicant’s Open
Access Same Time Information System
(OASIS) for ATC information will allow
a potentially affected QF to detect
whether it might be located on a portion
of a utility’s system where limited
transfer capability may constrain its
ability to transfer power into the
wholesale market. In response to
Industrial Parties’ concerns that QFs be
provided any information used to

VerDate Aug<31>2005

16:42 Jun 28, 2007

Jkt 211001

support an electric utility’s application,
our rules currently provide that an
electric utility must identify with names
and addresses all potentially affected
QFs.48 Electric utilities serve potentially
affected QFs with a copy of the
application. In addition, the
Commission by letter provides notice of
the application to the potentially
affected QFs and explains comment
procedures and how the QFs can access
the electric utility’s filings.49 An
interested potentially affected QF
should intervene in the proceeding and
would then receive any subsequent
information provided by an electric
utility.
112. We disagree with EEI that the
filing requirements are unduly broad or
burdensome. It is reasonable to place
those obligations on the petitioning
electric utility, the party requesting the
Commission to make the findings
required by section 210(m)(1) of
PURPA. These filing requirements will
facilitate timely processing of the
application by the Commission, while
also providing QFs with the information
necessary for their own evaluation of
nondiscriminatory access to wholesale
markets. We find that EEI’s claim of
burden is overstated, since we do not
require anything which has not already
been developed. It is our experience that
most of this documentation is in
electronic format and available through
online resources.50 We clarify,
moreover, that an applicant can provide
a hyperlink to the relevant studies, if
available, rather than submitting
complete studies and reports.51 We
therefore believe that the burden on a
utility of providing existing information
is minimal and that the benefits to the
QFs and the Commission of providing
this information readily in one filing
48 18 CFR 292.310.
49 In the unlikely event a potentially affected QF
is intentionally or unintentionally omitted by the
electric utility and not served notice of an
application, the Commission will take remedial
steps as appropriate.
50 We note that the following public and nonpublic sources contain transmission information:
RTO websites for links to publicly available
regional transmission plans; OASIS websites for
system impact studies including various
transmission service requests, available through
confidentiality agreements; OASIS websites for
posted ATC values, available through an OASIS
certificate; and, FERC Form 715 for the Annual
Transmission Planning and Evaluation Report
submitted to the Commission, available on the
FERC website through the Critical Energy
Infrastructure Information (CEII) process.
51 The filing should identify the relevance of the
material in the hyperlink. And to the extent that the
filing discusses particular portions of such studies
and reports, the electric utility should clearly
identify those portions by page, paragraph, or
similar reference.

PO 00000

Frm 00016

Fmt 4701

Sfmt 4700

will outweigh any such minimal
burdens.
113. We deny EEI’s request to exempt
utilities operating within the footprint
of a Commission-approved RTO/ISOs
from submitting the information to the
extent it is otherwise available from or
provided by the RTO or ISO. The fact
that electric utilities in RTO/ISO regions
may be able to access information
required in those filings on an equal
basis as other parties, i.e., through the
RTO/ISO website or databases, does not
eliminate the Commission’s underlying
need for the information to process the
application in a timely manner.
Furthermore, we emphasize that
§ 202.310(d)(3) of the Commission’s
regulations requires the submission of
non-publicly available information to
the extent it is the only relevant
available resource responsive to this
requirement. Any need to maintain
confidentiality can be addressed in the
context of the particular application.
114. We also disagree that the
information required in § 292.310(d)(3)
is not necessary in RTO/ISO markets
with financial transmission rights
models. This information is relevant
even in the context of financial RTO
markets as it will help potentially
affected QFs understand the
transmission market circumstances they
would face if the Commission approves
the utility’s application. The filing
requirements will, in this regard,
therefore not be changed for any electric
utility seeking termination of the
purchase requirement.
115. As to the argument that
transmission-related information is
unnecessary since new QFs have
nondiscriminatory access if they fund
transmission upgrades necessary to
receive network resource status, we
disagree. Information about
transmission system constraints will
allow a potentially affected QF to
evaluate the impact of a utility’s request
on the QF. Transmission constraints
also provide valuable information about
the scope and geographic reach of the
market a potentially affected QF may
reach as an alternative to selling to the
local utility.
116. With regard to EEI’s request to
explain the phrase ‘‘[r]elevant system
impact studies for the generation
interconnections, already completed,’’
we clarify that the studies we consider
relevant are the most recent system
impact studies, already completed, that
analyze the generation interconnection
to the applicant’s transmission
substation that is ‘‘electrically close’’ to

E:\FR\FM\29JNR3.SGM

29JNR3

Federal Register / Vol. 72, No. 125 / Friday, June 29, 2007 / Rules and Regulations

mstockstill on PROD1PC66 with RULES3

the QF’s substation.52 With respect to
EEI’s question whether the equivalent of
system impact studies performed for
QFs pursuant to state regulation should
be provided, we clarify that these
studies must be submitted if they
provide responsive information relevant
to the filing requirements.
117. We also clarify, as requested by
EEI, that submitting studies conducted
by an RTO/ISO will be sufficient to
meet the informational requirements,
provided the submission is complete,
i.e., the applicant submits every study
required (or hyperlinks to the relevant
studies) and all related information
listed in § 292.310(d). However, we
deny EEI’s request that the Commission
require RTO/ISOs to identify and make
available confidential and public
versions of each interconnection study
it performs. We believe this request is
unnecessary. It is our understanding
that the current practice within the
RTO/ISOs is that the electric utility
receives the confidential version of the
study from the RTO/ISO, and likely has
participated at least in an advisory role
in the performance of the study.
Therefore, we expect that these studies
would already be in the applicant’s
possession or could be made available
to them without placing any extra
requirements or burdens on the RTO/
ISOs. It is the utility who is filing an
application seeking relief from the
purchase requirement and, therefore, we
believe it is their responsibility to gather
and submit the information to the
Commission. Additionally, while the
publicly available reports are available
through the OASIS websites, an
applicant still needs to identify those
studies that are relevant, and provide
them (either physically or by hyperlink)
with the filing.53
118. In response to the Industrial
Parties’ argument that the Commission
is not sufficiently prescriptive as to the
level of detail regarding transmission
availability required under the
Commission’s regulations, we deny
rehearing in part. As a general matter,
we believe the information identified in
§ 292.310(d)(3) is sufficient to give
potentially affected QFs information
relevant to evaluate whether there is
adequate transmission available for new
selling arrangements, subsequent to
termination of the utility’s purchase
52 By ‘‘electrically close’’ we mean any
interconnection to the same substation where the
QF is connected or to any adjacent substation or
interconnection point where power injection to the
transmission system has the same or similar impact
on the transmission facilities’ loadings, as the QF’s
power injection.
53 See supra note 51.

VerDate Aug<31>2005

16:42 Jun 28, 2007

Jkt 211001

requirement.54 In addition, the
information on processes to be followed
to access the markets, identified in
§ 292.310(d)(4) and (5), is sufficient to
give affected QFs information relevant
to evaluating nondiscriminatory access
to the markets described in section
210(m)(1) of PURPA. The relevant