# Federal Register / Vol. 73, No. 5 / Tuesday, January 8, 2008 / Notices

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/agency%3Aferc%3A70e8774aeb637e9c

## Record

- **Collection:** Agency decision
- **Document type:** Agency decision

## Text

1334

Federal Register / Vol. 73, No. 5 / Tuesday, January 8, 2008 / Notices

information, contact Timothy Konnert at
(202) 502–6359.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–44 Filed 1–7–08; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP07–207–000]

Colorado Interstate Gas Company;
Notice of Availability of the Final
Environmental Impact Statement for
the Proposed High Plains Expansion
Project

pwalker on PROD1PC71 with NOTICES

December 28, 2007.

The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared this Final
Environmental Impact Statement (EIS)
for the natural gas pipeline facilities
proposed by Colorado Interstate Gas
Company (CIG) under the abovereferenced docket. CIG’s High Plains
Expansion Project (Project) would be
located in Weld, Morgan, and Adams
Counties, Colorado.
The Final EIS was prepared to satisfy
the requirements of the National
Environmental Policy Act. The FERC
staff concludes that the proposed
Project, with the appropriate mitigation
measures as recommended, would have
limited adverse environmental impact.
The purpose of the Project is to
expand CIG’s existing pipeline system
along Colorado’s Front Range in order to
provide additional transportation
services to this rapidly growing market.
CIG is proposing to construct about
163.7 miles of 24-inch and 30-inchdiameter pipeline in four separate
pipeline segments and associated
ancillary facilities.
The Final EIS addresses the potential
environmental impacts resulting from
the construction and operation of the
following facilities:
• Line 250A: 64.5 miles of 30-inchdiameter pipeline and 20.3 miles of 24inch-diameter pipeline that would
extend from CIG’s existing Cheyenne
Compressor Station to an interconnect
point on the proposed Line 251A in
northeast Adams County;
• Line 251A: 57.9 miles of 24-inchdiameter pipeline between CIG’s
existing Watkins and Fort Morgan
Compressor Stations;
• Line 252A: 14.9 miles of 30-inchdiameter pipeline extending westward
from a point on the proposed Line 250A
about one mile north of the existing

VerDate Aug<31>2005

17:32 Jan 07, 2008

Jkt 214001

Hudson Power Plant in the Town of
Hudson, Colorado, to a new
interconnect with Public Service
Company of Colorado’s existing TriTown facilities in Weld County,
Colorado;
• Line 253A: 6.1 miles of 24-inchdiameter pipeline extending westward
from the Watkins Compressor Station to
CIG’s existing East Denver measurement
facility in Adams County, Colorado;
• Ten new meter stations and 19 new
block valves; and
• Twelve pig launcher/receivers.
The entire project would be capable of
transporting about 899,000 decatherms
of gas per day. CIG proposes to begin
construction in January 2008. It would
put each pipeline segment into service
as it is completed, and the entire Project
would be in service by October 2008.
The Final EIS has been placed in the
public files of the FERC and is available
for public inspection at: Federal Energy
Regulatory Commission, Public
Reference Room, 888 First Street NE.,
Room 2A, Washington, DC 20426, (202)
502–8371.
A limited number of copies of the
Final EIS are available from the Public
Reference Room identified above. In
addition, CD copies of the Final EIS
have been mailed to affected
landowners; various federal, state, and
local government agencies; elected
officials; environmental and public
interest groups; Native American tribes;
local libraries and newspapers;
intervenors; and other individuals that
expressed an interest in the proposed
Project. Hard-copies of the Final EIS
have also been mailed to those who
requested that format during the scoping
and comment periods for the proposed
Project.
Additional information about the
proposed Project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (http://www.ferc.gov).
To access information via the FERC
Web site click on the ‘‘eLibrary’’ link
then click on ‘‘General Search’’ and
enter the docket number excluding the
last three digits in the Docket Number
field. Be sure you have selected an
appropriate date range. The ‘‘eLibrary’’
link provides access to the texts of
formal documents issued by the
Commission, such as orders, notices,
and rulemakings. For assistance with
‘‘eLibrary’’, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at 1–866–208–3676, or for
TTY, contact (202) 502–8659.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in

PO 00000

Frm 00021

Fmt 4703

Sfmt 4703

specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
these documents. To learn more about
eSubscription and to sign-up for this
service please go to http://www.ferc.gov/
esubscribenow.htm.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–68 Filed 1–7–08; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP08–38–000]

East Tennessee Natural Gas, LLC;
Notice of Request Under Blanket
Authorization
December 21, 2007.

Take notice that on December 18,
2007, East Tennessee Natural Gas, LLC
(East Tennessee), P.O. Box 1642,
Houston, Texas 77251–1642, filed in
Docket No. CP08–38–000 a prior notice
request pursuant to sections 157.205
and 157.210 of the Commission’s
regulations under the Natural Gas Act
(NGA) and East Tennessee’s blanket
certificate issued in Docket No. CP82–
412, for authorization to acquire
approximately 72 miles of transmission
pipeline. East Tennessee proposes to
acquire approximately 72 miles of
Spectra Energy Virginia Pipeline
Company’s 8-inch line, in Smyth and
Washington Counties, Virginia, all as
more fully set forth in the application,
which is on file with the Commission
and open to public inspection. The
filing may also be viewed on the Web
at http://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TTY, (202)
502–8659.
Any questions regarding the
application should be directed to Garth
Johnson, General Manager, Certificates
& Reporting, East Tennessee Natural
Gas, LLC, P.O. Box 1642, Houston,
Texas 77251–1642 at (713) 627–5415.
Any person or the Commission’s Staff
may, within 60 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to section

E:\FR\FM\08JAN1.SGM

08JAN1

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/agency%3Aferc%3A70e8774aeb637e9c. Public record. Not legal advice.