# wwhite on PROD1PC65 with NOTICES

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/agency%3Aferc%3A60e3d5d2ef4022f8

## Record

- **Collection:** Agency decision
- **Document type:** Agency decision

## Text

wwhite on PROD1PC65 with NOTICES

Federal Register / Vol. 71, No. 37 / Friday, February 24, 2006 / Notices

including the use of eminent domain
and how to participate in the
Commission’s proceedings.

Commodities, Inc., submit notification
of change in status.
Filed Date: 2/8/2006.
Accession Number: 20060208–5047.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 1, 2006.

DEPARTMENT OF ENERGY

Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at http://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.

Southern Star Central Gas Pipeline,
Inc.; Notice of Intent To Prepare an
Environmental Assessment for the
Proposed West Colony Expansion of
the Colony Storage Field and Request
for Comments on Environmental
Issues

Magalie R. Salas,
Secretary.
[FR Doc. E6–2628 Filed 2–23–06; 8:45 am]
BILLING CODE 6717–01–P

VerDate Aug<31>2005

18:03 Feb 23, 2006

Jkt 208001

Federal Energy Regulatory
Commission

Summary of the Proposed Project

[Docket No. CP06–49–000]

February 14, 2006.

The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Colony Storage Field involving
construction and operation of facilities
by Southern Star Central Gas Pipeline,
Inc. (Southern Star) in Anderson and
Allen County, Kansas.
This notice announces the opening of
the scoping period that will be used to
gather environmental input from the
public and interested agencies on the
project. Your input will help the
Commission staff determine which
issues need to be evaluated in the EA.
Please note that the scoping period will
close on March 16, 2006.
This notice is being sent to affected
landowners; federal, state, and local
government representatives and
agencies; environmental and public
interest groups; Native American tribes;
other interested parties in this
proceeding; and local libraries and
newspapers. We encourage government
representatives to notify their
constituents of this planned project and
encourage them to comment on their
areas of concern.
If you are a landowner receiving this
notice, you may be contacted by a
pipeline company representative about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The pipeline
company would seek to negotiate a
mutually acceptable agreement.
However, if the project is approved by
the Commission, that approval conveys
with it the right of eminent domain.
Therefore, if easement negotiations fail
to produce an agreement, the pipeline
company could initiate condemnation
proceedings in accordance with state
law.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ is available for viewing on
the FERC Web site (http://
www.ferc.gov). This fact sheet addresses
a number of typically asked questions,

PO 00000

Frm 00025

Fmt 4703

Sfmt 4703

9537

Southern Star proposes to increase the
certificated storage boundary and buffer
zone of the Colony Storage Field by
approximately 1,960 acres. The
additional acreage is necessary to
protect the field’s integrity by recapturing gas that has migrated outside
the currently identified storage
boundary. This added acreage is located
at the southwestern boundary of the
storage field in an area known as the
West Colony Field in Anderson County,
reaching into Allen County, Kansas. The
existing storage field consists of about
4,900 acres and operates up to a
maximum storage capacity of 12.7
billion cubic feet (Bcf) of natural gas. No
increase in storage capacity of field
deliverability is proposed as part of this
action. The location of the project
facilities is shown in appendix 1.1
The purpose of this project is to
expand the field geographically and
geologically to collect gas that has
moved beyond the existing certificated
field boundary. A gas collection system
will be installed for collecting and
recycling gas back into the presently
certificated reservoir.
Southern Star proposes to:
• Install and operate a 180horsepower natural gas-driven
compressor in Anderson County,
Kansas;
• Construct a 0.2-mile lateral line
connecting the new compressor to an
existing well;
• Construct a 2.6-mile connection
line from the new compressor to an
existing injection/withdrawal well; and
• Install two measurement settings, a
filter separator, and an associated waste
tank.
Storage rights and wells on
approximately 680 acres have already
been acquired by Southern Star, and
approximately 1,280 additional acres
are proposed for acquisition. Within the
acreage already acquired, there are
fourteen open wells which are used for
pressure relief, observation, or salt water
disposal. Within the acreage proposed
for acquisition, there are eight active oil
wells and five temporarily abandoned
wells. Pending acquisition of the
1 The appendices referenced in this notice are not
being printed in the Federal Register. Copies are
available on the Commission’s Web site (excluding
maps) at the ‘‘eLibrary’’ link or from the
Commission’s Public Reference Room or call (202)
502–8371. For instructions on connecting to
eLibrary refer to the end of this notice. Copies of
the appendices were sent to all those receiving this
notice in the mail.

E:\FR\FM\24FEN1.SGM

24FEN1

9538

Federal Register / Vol. 71, No. 37 / Friday, February 24, 2006 / Notices

additional acreage, Southern Star plans
to either plug these wells or convert
some to observation wells.
Land Requirements for Construction
Construction of the proposed facilities
would require about 5.6 acres of land.
Of this acreage, 4.7 acres would be
temporarily impacted and 0.9 acres
would be permanently affected. An
additional 0.5 acres of permanently
affected land may or may not be
required to convert two existing wells to
pressure relief.

wwhite on PROD1PC65 with NOTICES

The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping’’. The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
Notice of Intent, the Commission staff
requests public comments on the scope
of the issues to address in the EA. All
comments received will be considered
during the preparation of the EA. State
and local government representatives
are encouraged to notify their
constituents of this proposed action and
encourage them to comment on their
areas of concern.
In the EA, we 2 will discuss impacts
that could occur as a result of the
construction and operation of the
proposed project. We will also evaluate
possible alternatives to the proposed
project or portions of the project, and
make recommendations on how to
lessen or avoid impacts on the various
resource areas. This EA will be used by
the Commission in its decision-making
process to determine whether the
project is in the public convenience and
necessity.
Our independent analysis of the
issues will be presented in the EA. The
EA will also include possible
alternatives to the proposed project or
portions of the project, and our
recommendations on how to lessen or
avoid impacts on the various resource
areas of concern. Depending on the
comments received during the scoping
process, the EA may be published and
mailed to federal, state, and local
government agencies; public interest
groups; Native American tribes;
2 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the
environmental staff of the Office of Energy Projects
(OEP).

VerDate Aug<31>2005

18:03 Feb 23, 2006

Jkt 208001

interested individuals; affected
landowners, newspapers, libraries, and
the Commission’s official service list for
this proceeding. A 30-day comment
period will be allotted for review if the
EA is published. We will consider all
comments submitted in any
Commission Order that is issued for the
project.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
By becoming a commentor, your
concerns will be addressed in the EA
and considered by the Commission.
Your comments should focus on the
potential environmental effects of the
proposal, reasonable alternatives to the
proposal (including alternative locations
and routes), and measures to avoid or
lessen environmental impact. The more
specific your comments, the more useful
they will be. Please carefully follow
these instructions to ensure that your
comments are received in time and
properly recorded:
• Send an original and two copies of
your letter to: Magalie R. Salas,
Secretary, Federal Energy Regulatory
Commission, 888 First St., NE., Room
1A, Washington, DC 20426.
• Label one copy of the comments for
the attention of Gas Branch 1.
• Reference Docket No. CP06–49–
000.
• Mail your comments so that they
will be received in Washington, DC on
or before March 13, 2006.
Please note that the Commission
encourages electronic filing of
comments. See 18 Code of Federal
Regulations (CFR) 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Internet Web site at
http://www.ferc.gov under the ‘‘eFiling’’
link and the link to the User’s Guide.
Prepare your submission in the same
manner as you would if filing on paper
and save it to a file on your hard drive.
Before you can file comments you will
need to create an account by clicking on
‘‘Login to File’’ and then ‘‘New User
Account.’’ You will be asked to select
the type of filing you are making. This
filing is considered a ‘‘Comment on
Filing.’’
The determination of whether to
distribute the EA for public comment
will be based on the response to this
notice. If you are interested in receiving
it, please return the Information Request
(appendix 3). An effort is being made to
send this notice to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the proposed project. This includes
all landowners who are potential right-

PO 00000

Frm 00026

Fmt 4703

Sfmt 4703

of-way grantors, whose property may be
used temporarily for project purposes,
or who own homes within distances
defined in the Commission’s regulations
of certain aboveground facilities.
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an official party to the
proceeding, or ‘‘intervenor’’. To become
an intervenor you must file a motion to
intervene according to Rule 214 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214). Intervenors
have the right to seek rehearing of the
Commission’s decision. Motions to
Intervene should be electronically
submitted using the Commission’s
eFiling system at http://www.ferc.gov.
Persons without Internet access should
send an original and 14 copies of their
motion to the Secretary of the
Commission at the address indicated
previously. Persons filing Motions to
Intervene on or before the comment
deadline indicated above must send a
copy of the motion to the Applicant. All
filings, including late interventions,
submitted after the comment deadline
must be served on the Applicant and all
other intervenors identified on the
Commission’s service list for this
proceeding. Persons on the service list
with email addresses may be served
electronically; others must be served a
hard copy of the filing. Please refer to
appendix 2 if you would like more
information on how to intervene in
Commission proceedings.
Affected landowners and parties with
environmental concerns may be granted
intervenor status upon showing good
cause by stating that they have a clear
and direct interest in this proceeding
which would not be adequately
represented by any other parties. You do
not need intervenor status to have your
environmental comments considered.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs
at 1–866–208 FERC (3372) or on the
FERC Internet Web site (http://
www.ferc.gov). Using the ‘‘eLibrary’’
link, select ‘‘General Search’’ from the
eLibrary menu, enter the selected date
range and ‘‘Docket Number’’ (i.e., PF06–
49–000), and follow the instructions.
For assistance with access to eLibrary,
the helpline can be reached at 1–866–
208–3676, TTY (202) 502–8659, or at
FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC Internet Web
site also provides access to the texts of
formal documents issued by the

E:\FR\FM\24FEN1.SGM

24FEN1

Federal Register / Vol. 71, No. 37 / Friday, February 24, 2006 / Notices
Commission, such as orders, notices,
and rule makings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to http://
www.ferc.gov/esubscribenow.htm.
Magalie R. Salas,
Secretary.
[FR Doc. E6–2622 Filed 2–23–06; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM98–1–000]

Records Governing Off-the-Record
Communications; Public Notice
February 14, 2006.

This constitutes notice, in accordance
with 18 CFR 385.2201(b), of the receipt
of prohibited and exempt off-the-record
communications.

Order No. 607 (64 FR 51222,
September 22, 1999) requires
Commission decisional employees, who
make or receive a prohibited or exempt
off-the-record communication relevant
to the merits of a contested proceeding,
to deliver to the Secretary of the
Commission, a copy of the
communication, if written, or a
summary of the substance of any oral
communication.
Prohibited communications are
included in a public, non-decisional file
associated with, but not a part of, the
decisional record of the proceeding.
Unless the Commission determines that
the prohibited communication and any
responses thereto should become a part
of the decisional record, the prohibited
off-the-record communication will not
be considered by the Commission in
reaching its decision. Parties to a
proceeding may seek the opportunity to
respond to any facts or contentions
made in a prohibited off-the-record
communication, and may request that
the Commission place the prohibited
communication and responses thereto
in the decisional record. The
Commission will grant such a request
only when it determines that fairness so
requires. Any person identified below as
having made a prohibited off-the-record

Docket No.

communication shall serve the
document on all parties listed on the
official service list for the applicable
proceeding in accordance with Rule
2010, 18 CFR 385.2010.
Exempt off-the-record
communications are included in the
decisional record of the proceeding,
unless the communication was with a
cooperating agency as described by 40
CFR 1501.6, made under 18 CFR
385.2201(e)(1)(v).
The following is a list of off-therecord communications recently
received by the Secretary of the
Commission. The communications
listed are grouped by docket numbers in
ascending order. These filings are
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
http://www.ferc.gov using the eLibrary
link. Enter the docket number,
excluding the last three digits, in the
docket number field to access the
document. For assistance, please contact
FERC, Online Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or for TTY,
contact (202) 502–8659.
Exempt
Date received

Presenter or requester

2–7–06

Hon. Barbara A. Mikulski.

1. CP06–26–000, CP05–130–000, et al. ...........................................................................................

Magalie R. Salas,
Secretary.
[FR Doc. E6–2620 Filed 2–23–06; 8:45 am]
BILLING CODE 6717–01–P

ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OECA–2005–0028; FRL–8036–5]

Agency Information Collection
Activities; Submission for OMB Review
and Approval; Comment Request;
NSPS for Lime Manufacturing
(Renewal), ICR Number 1167.08, OMB
Control Number 2060–0063
AGENCY: Environmental Protection

Agency (EPA).

wwhite on PROD1PC65 with NOTICES

ACTION: Notice.
SUMMARY: In compliance with the
Paperwork Reduction Act, this
document announces that an
Information Collection Request (ICR)
has been forwarded to the Office of
Management and Budget (OMB) for
review and approval. This is a request
to renew an existing approved

VerDate Aug<31>2005

18:03 Feb 23, 2006

Jkt 208001

collection. This ICR is scheduled to
expire on April 30, 2006. Under OMB
regulations, the Agency may continue to
conduct or sponsor the collection of
information while this submission is
pending at OMB. This ICR describes the
nature of the information collection and
its estimated burden and cost.
DATES: Additional comments may be
submitted on or before March 27, 2006.
ADDRESSES: Submit your comments,
referencing docket ID number EPA–HQ–
OECA–2005–0028, to (1) EPA online
using http://www.regulations.gov (our
preferred method), by e-mail to
docket.oeca@epa.gov, or by mail to: EPA
Docket Center (EPA/DC), Environmental
Protection Agency, Enforcement and
Compliance Docket and Information
Center, Mail Code 2201T, 1200
Pennsylvania Avenue, NW.,
Washington, DC 20460, and (2) OMB at:
Office of Information and Regulatory
Affairs, Office of Management and
Budget (OMB), Attention: Desk Officer
for EPA, 725 17th Street, NW.,
Washington, DC 20503.
FOR FURTHER INFORMATION CONTACT:
Learia Williams, Compliance

PO 00000

Frm 00027

Fmt 4703

Sfmt 4703

9539

Assessment and Media Programs
Division, Office of Compliance, (Mail
Code 2223A), Environmental Protection
Agency, 1200 Pennsylvania Avenue,
NW., Washington, DC 20460; telephone
number: (202) 564–4113; fax number:
(202) 564–0050; e-mail address:
williams.learia@epa.gov.
SUPPLEMENTARY INFORMATION: EPA has

submitted the following ICR to OMB for
review and approval according to the
procedures prescribed in 5 CFR 1320.12.
On May 6, 2005 (70 FR 24020), EPA
sought comments on this ICR pursuant
to 5 CFR 1320.8(d). EPA received no
comments.
EPA has established a public docket
for this ICR under Docket ID Number
EPA–HQ–OECA–2005–0028, which is
available for public viewing at the
Enforcement and Compliance Docket
and Information Center in the EPA
Docket Center (EPA/DC), EPA West,
Room B102, 1301 Constitution Avenue,
NW., Washington, DC. The EPA Docket
Center Public Reading Room is open
from 8:30 a.m. to 4:30 p.m., Monday
through Friday, excluding legal
holidays. The telephone number for the

E:\FR\FM\24FEN1.SGM

24FEN1

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/agency%3Aferc%3A60e3d5d2ef4022f8. Public record. Not legal advice.
