Federal Register / Vol. 71, No. 127 / Monday, July 3, 2006 / Notices
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: August 11, 2006.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Additional study requests and
requests for cooperating agency status
may be filed electronically via the
Internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (http://
www.ferc.gov) under the ‘‘eFiling’’ link.
m. This application is not ready for
environmental analysis at this time.
n. The Cushaw Project consists of the
following features: (1) A 1,550-foot-long
and 27-foot-high reinforced concrete
dam extending diagonally across the
James River; (2) a 138-acre reservoir at
a surface elevation of 656 feet mean sea
level; (3) an integral powerhouse with
the dam containing five generating units
with a total installed capacity of 7,500
kilowatts; (4) a 2.3–kV cable connecting
the powerhouse to the Cushaw
substation; and (5) appurtenant
facilities. The project is operated in a
run-of-river mode, and the average
annual electrical generation is
approximately 16,971,000
kilowatthours.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
http://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at
http://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.

VerDate Aug<31>2005

17:12 Jun 30, 2006

Jkt 208001

For assistance, contact FERC Online
Support.
p. With this notice, we are initiating
consultation with the Virginia State
Historic Preservation Officer (SHPO), as
required by Section 106 of the National
Historic Preservation Act, and the
regulations of the Advisory Council on
Historic Preservation, 36 CFR 800.4.
q. Procedural schedule and final
amendments: The application will be
processed according to the following
Hydro Licensing Schedule. Revisions to
the schedule will be made as
appropriate. The Commission staff
proposes to issue one environmental
assessment rather than issue a draft and
final EA. Comments, terms and
conditions, recommendations,
prescriptions, and reply comments, if
any, will be addressed in an EA. Staff
intents to give at least 30 days for
entities to comment on the EA, and will
take into consideration all comments
received on the EA before final action is
taken on the license application.
Issue Deficiency or Acceptance Letter:
July 2006.
Issue Scoping Document 1 for
comments: August 2006.
Notice of application is ready for
environmental analysis: October 2006.
Notice of the availability of the EA:
February 2007.
Ready for Commission’s decision on
the application: June 2007.
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Magalie R. Salas,
Secretary.
[FR Doc. E6–10331 Filed 6–30–06; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
June 26, 2006.

Take notice that the Commission
received the following electric rate
filings.
Docket Numbers: ER91–569–033.
Applicants: Entergy Services Inc.
Description: Entergy Services, Inc on
behalf of Entergy Arkansas, Inc et al.
submits a non-material change in status
pursuant to requirements of Order 652.
Filed Date: 6/20/2006.
Accession Number: 20060623–0049.
Comment Date: 5 p.m. Eastern Time
on Tuesday, July 11, 2006.

PO 00000

Frm 00045

Fmt 4703

Sfmt 4703

37931

Docket Numbers: ER96–496–015;
ER99–14–012; ER99–4463–006.
Applicants: Northeast Utilities
Service Company.
Description: Northeast Utilities
submits certain notifications to the
Commission to reflect the acquisition by
Hess Corp of the competitive retail
businesses operated by Northeast
Utilities Enterprise, Inc’s subsidiaries.
Filed Date: 6/20/2006.
Accession Number: 20060623–0039.
Comment Date: 5 p.m. Eastern Time
on Tuesday, July 11, 2006.
Docket Numbers: ER97–2153–015;
ER02–556–007; ER00–2181–003.
Applicants: Amerada Hess
Corporation; Select Energy New York,
Inc.; Hess Energy, Inc.
Description: Select Energy New York,
Inc et al. submits a notice of nonmaterial change in status.
Filed Date: 6/20/2006.
Accession Number: 20060623–0045.
Comment Date: 5 p.m. Eastern Time
on Tuesday, July 11, 2006.
Docket Numbers: ER05–1089–003.
Applicants: Wisconsin Public Service
Corporation.
Description: Wisconsin Public Service
Corp submits a settlement payment
report in compliance with the
Commission’s 6/2/06 order.
Filed Date: 6/19/2006.
Accession Number: 20060619–5023.
Comment Date: 5 p.m. Eastern Time
on Monday, July 10, 2006.
Docket Numbers: ER05–1508–002.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc.
submits its Large Generator
Interconnection Agreement with Power
Partners Midwest, LLC and Interstate
Power and Light Company.
Filed Date: 6/21/2006.
Accession Number: 20060623–0056.
Comment Date: 5 p.m. Eastern Time
on Wednesday, July 12, 2006.
Docket Numbers: ER06–255–003.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc.
submits a Large Generator
Interconnection Agreement with
FirstEnergy Generation Corp and
American Transmission System, Inc.
Filed Date: 6/21/2006.
Accession Number: 20060623–0057.
Comment Date: 5 p.m. Eastern Time
on Wednesday, July 12, 2006.
Docket Numbers: ER06–714–001.
Applicants: Midwest Independent
Transmission System.
Description: Midwest Independent
Transmission System Operator, Inc

E:\FR\FM\03JYN1.SGM

03JYN1

sroberts on PROD1PC70 with NOTICES

37932

Federal Register / Vol. 71, No. 127 / Monday, July 3, 2006 / Notices

submits its Large Generator
Interconnection Agreement with
FirstEnergy Nuclear Operating Company
and American Transmission System,
Inc.
Filed Date: 6/21/2006.
Accession Number: 20060623–0040.
Comment Date: 5 p.m. Eastern Time
on Wednesday, July 12, 2006.
Docket Numbers: ER06–836–001.
Applicants: Pacific Gas & Electric
Company.
Description: Pacific Gas and Electric
Co submits a supplement to its 4/4/06
filing of Supplemental Balancing
Account Revisions.
Filed Date: 6/22/2006.
Accession Number: 20060623–0085.
Comment Date: 5 p.m. Eastern Time
on Thursday, July 13, 2006.
Docket Numbers: ER06–1046–002.
Applicants: Western Kentucky Energy
Corp.; LG&E Energy Marketing Inc.;
Louisville Gas & Electric Company;
Kentucky Utilities Company.
Description: LG&E Energy Marketing,
Inc et al. submit updated information to
inform FERC of certain recent
developments in a proceeding pending
before the Kentucky Public Service
Commission etc.
Filed Date: 6/21/2006.
Accession Number: 20060623–0051.
Comment Date: 5 p.m. Eastern Time
on Wednesday, July 12, 2006.
Docket Numbers: ER06–1055–001.
Applicants: Newmont Nevada Energy
Investment, LLC.
Description: Newmont Nevada Energy
Investment LLC submits revised tariff
sheets to its Electric Tariff, Original
Volume 1.
Filed Date: 6/21/2006.
Accession Number: 20060623–0047.
Comment Date: 5 p.m. Eastern Time
on Wednesday, July 12, 2006.
Docket Numbers: ER06–1098–001.
Applicants: JJR Power LLC.
Description: JJR Power LLC submits
an amended Petition of Acceptance of
Initial Tariff, Waiver and Blanket
Authority.
Filed Date: 6/21/2006.
Accession Number: 20060623–0041.
Comment Date: 5 p.m. Eastern Time
on Wednesday, July 12, 2006.
Docket Numbers: ER06–1163–000.
Applicants: American Electric Power
Service Corporation.
Description: The American Electric
Power Service Corp, on behalf of Ohio
Power Co et al submits an
interconnection agreement with Duke
Energy.
Filed Date: 6/21/2006.
Accession Number: 20060623–0042.
Comment Date: 5 p.m. Eastern Time
on Wednesday, July 12, 2006.

VerDate Aug<31>2005

17:12 Jun 30, 2006

Jkt 208001

Docket Numbers: ER06–1164–000.
Applicants: New York State Electric &
Gas Corporation.
Description: New York State Electric
& Gas Corp submits a supplement to
Rate Schedule 200—Facilities
Agreement with New York Power
Authority.
Filed Date: 6/19/2006.
Accession Number: 20060623–0048.
Comment Date: 5 p.m. Eastern Time
on Monday, July 10, 2006.
Docket Numbers: ER06–1165–000.
Applicants: Southern Company
Services, Inc.
Description: Southern Company
Services, Inc on behalf Alabama Power
Co et al submits Revision 3 to the
Agreement for Network Integration
Transmission Service for Tennessee
Valley Authority.
Filed Date: 6/22/2006.
Accession Number: 20060623–0052.
Comment Date: 5 p.m. Eastern Time
on Thursday, July 13, 2006.
Docket Numbers: ER06–1166–000.
Applicants: Liberty Power Nevada
LLC.
Description: Liberty Power Nevada,
LLC submits its petition for acceptance
of initial rate schedule (FERC Electric
Rate Schedule No. 1), waivers and
blanket authority.
Filed Date: 6/22/2006.
Accession Number: 20060626–0163.
Comment Date: 5 p.m. Eastern Time
on Monday, July 3, 2006.
Docket Numbers: ER06–1167–000.
Applicants: Liberty Power New
Hampshire LLC.
Description: Liberty Power New
Hampshire, LLC submits a petition for
acceptance of its initial rate schedule
(FERC Electric Rate Schedule No. 1),
waivers and blanket authority.
Filed Date: 6/22/2006.
Accession Number: 20060626–0161.
Comment Date: 5 p.m. Eastern Time
on Monday, July 3, 2006.
Docket Numbers: ER06–1168–000.
Applicants: Liberty Power
Pennsylvania LLC.
Description: Liberty Power
Pennsylvania, LLC submits a petition of
its initial rate schedule (FERC Electric
Rate Schedule 1), waivers and blanket
authority.
Filed Date: 6/22/2006.
Accession Number: 20060626–0162.
Comment Date: 5 p.m. Eastern Time
on Monday, July 3, 2006.
Docket Numbers: ER06–1169–000.
Applicants: Moses Lake Generating
LLC.
Description: Moses Lake Generating,
LLC submits a notice of cancellation of
its market-based rate tariff, FERC
Electric Tariff, Original Volume No. 1.

PO 00000

Frm 00046

Fmt 4703

Sfmt 4703

Filed Date: 6/23/2006.
Accession Number: 20060626–0149.
Comment Date: 5 p.m. Eastern Time
on Friday, July 14, 2006.
Docket Numbers: ER06–1170–000.
Applicants: Liberty Power Ohio LLC.
Description: Liberty Power Ohio, LLC
submits a petition for acceptance of its
initial rate schedule (FERC Electric Rate
Schedule 1) waivers and blanket
authority.
Filed Date: 6/22/2006.
Accession Number: 20060626–0150.
Comment Date: 5 p.m. Eastern Time
on Monday, July 3, 2006.
Docket Numbers: ER06–1171–000.
Applicants: Southern California
Edison Company.
Description: Southern California
Edison Co submits an Interconnection
Facilities Study Agreement with the
Nevada Hydro Co Inc.
Filed Date: 6/23/2006.
Accession Number: 20060626–0158.
Comment Date: 5 p.m. Eastern Time
on Friday, July 14, 2006.
Docket Numbers: ER06–1172–000.
Applicants: Liberty Power California
LLP.
Description: Liberty Power California,
LLP submits a petition for acceptance of
its initial rate schedule (FERC Electric
Rate Schedule 1), waivers and blanket
authority.
Filed Date: 6/23/2006.
Accession Number: 20060626–0160.
Comment Date: 5 p.m. Eastern Time
on Wednesday, July 5, 2006.
Docket Numbers: ER06–1173–000.
Applicants: Liberty Power
Connecticut LLP.
Description: Liberty Power
Connecticut, LLP submits a petition for
acceptance of its initial rate schedule
(FERC Electric Tariff 1), waivers and
blanket authority.
Filed Date: 6/23/2006.
Accession Number: 20060626–0159.
Comment Date: 5 p.m. Eastern Time
on Wednesday, July 5, 2006.
Docket Numbers: ER06–1174–000.
Applicants: New York Independent
System Operator, Inc.
Description: New York Independent
System Operator, Inc submits revised
tariff to reinstate inadvertently delete
language needed to determine sanctions
for failure to meet ICAP Bidding
requirements.
Filed Date: 6/23/2006.
Accession Number: 20060626–0146.
Comment Date: 5 p.m. Eastern Time
on Friday, July 14, 2006.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of

E:\FR\FM\03JYN1.SGM

03JYN1

Federal Register / Vol. 71, No. 127 / Monday, July 3, 2006 / Notices
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at http://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–10328 Filed 6–30–06; 8:45 am]
sroberts on PROD1PC70 with NOTICES

BILLING CODE 6717–01–P

VerDate Aug<31>2005

17:12 Jun 30, 2006

Jkt 208001

ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6676–8]

Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167. An explanation of the
ratings assigned to draft environmental
impact statements (EISs) was published
in FR dated April 7, 2006 (71 FR 17845).
Draft EISs
EIS No. 20050540, ERP No. D–FAA–
C51029–00, New York/New Jersey/
Philadelphia Metropolitan Area
Airspace Redesign Project, To
Increase the Efficiency and Reliability
of the Airspace Structure and Air
Traffic Control System, NY, NJ and
PA.
Summary: EPA expressed
environmental concern about
cumulative impacts. EPA also requested
information on outreach to
environmental justice communities
impacted by noise and mitigation/
minimization of noise exposure to those
communities. Rating EC2.
EIS No. 20060154, ERP No. D–NPS–
E65081–FL, Castillo de San Marcos
National Monument, General
Management Plan, Implementation,
City of St. Augustine, St. Johns
County, FL.
Summary: EPA does not object to the
proposed action. Rating LO.
EIS No. 20060170, ERP No. D–COE–
K39097–AZ, Rio Salado Oeste Project,
Ecosystem Restoration along the Salt
River, City of Phoenix, Maricopa
County, AZ.
Summary: EPA supports the
restoration project and requested more
information regarding adaptive
management plans. Rating LO.
EIS No. 20060050, ERP No. DR–COE–
E34031–FL, Central and Southern
Florida Project, Revised Draft
Integrated Project Implementation
Report, Comprehensive Restoration
Plan, Implementation, Everglades
Agricultural Area Storage Reservoirs,
Palm Beach County, FL.
Summary: While EPA fully supports
the construction and operation of the
proposed project, it expressed
environmental concerns about potential

PO 00000

Frm 00047

Fmt 4703

Sfmt 4703

37933

water quality impacts, and requested
that additional water quality
information be included in the Final
EIS. Rating EC1.
Final EISs
EIS No. 20060156, ERP No. F–COE–
J39034–MT, Upper Columbia
Alternative Flood Control and Fish
Operations, Implementation, Libby
and Hungry Horse Dams, Columbia
River Basin, MT.
Summary: EPA supports the basic
goal of operating Libby and Hungry
Horse Dams to simulate a more natural
hydro graph for aquatic ecosystem
benefits. EPA also supports the Flow
Implementation Protocol being
developed by the Corps and other
stakeholders. However, EPA expressed
environmental concerns about the
potential for the new Libby Dam to
result in increased total dissolved gas
levels in the Kootenai River that would
exceed the state of Montana’s Water
Quality Standards.
EIS No. 20060157, ERP No. F–IBR–
K39076–00, Navajo Reservoir
Operations, Proposed Operational
Changes to Navajo Dam and
Reservoir, Endangered Species Act
(ESA), Related Flow
Recommendations, Navajo Unit-San
Juan River, NM, CO and UT.
Summary: EPA supports the
modification of operation of Navajo
Dam to meet flow recommendations for
the sucker and pikeminnow, and
requested additional commitments to
mitigation and monitoring for water
quality impacts.
EIS No. 20060196, ERP No. F–COE–
E34031–FL, South Florida Water
Management District (SFWMD),
Proposes Construction and Operation
Everglades Agricultural Area
Reservoir A–1 Project, Lake
Okeechobee, Palm Beach County, FL.
Summary: EPA continues to support
this element of the original selected
alternative as having reasonable and
feasible objectives while providing
sufficient environmental restoration
benefits; therefore, EPA does not object
to the proposed action.
EIS No. 20060225, ERP No. F–BLM–
K65293–NV, Sheep Complex, Big
Springs and Owyhee Grazing
Allotments Sensitive Bird Species
Project, Determine Impacts of
Livestock Grazing, Elko County, NV.
Summary: Modifications to the
selected alternative, such as using
phased grazing levels and the
implementation of monitoring and
adaptive management measures that
rely on ecosystem goals have addressed

E:\FR\FM\03JYN1.SGM

03JYN1

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/agency%3Aferc%3A53a4eafc5dec2b81. Public record. Not legal advice.