# Federal Register / Vol. 71, No. 124 / Wednesday, June 28, 2006 / Notices

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/agency%3Aferc%3A1eeb91fc266425b1

## Record

- **Collection:** Agency decision
- **Document type:** Agency decision

## Text

36766

Federal Register / Vol. 71, No. 124 / Wednesday, June 28, 2006 / Notices

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER06–738–000; ER06–738–
001; ER06–739–000; ER06–739–001]

Cogen Technologies Liden Venture,
L.P.; East Coast Power Liden Holding,
L.L.C.; Notice of Issuance of Order

jlentini on PROD1PC65 with NOTICES

June 22, 2006.

Cogen Technologies Liden Venture,
L.P. and East Coast Power Liden
Holding, L.L.C. (collectively, the Liden
Group) filed applications for marketbased rate authority, with
accompanying rate schedules. The
proposed market-based rate schedules
provide for the sale of energy, capacity
and ancillary services at market-based
rates. The Liden Group also requested
waivers of various Commission
regulations. In particular, the Liden
Group requested that the Commission
grant blanket approval under 18 CFR
part 34 of all future issuances of
securities and assumptions of liability
by the Liden Group.
On June 21, 2006, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development—West, granted the
requests for blanket approval under part
34. The Director’s order also stated that
the Commission would publish a
separate notice in the Federal Register
establishing a period of time for the
filing of protests. Accordingly, any
person desiring to be heard or to protest
the blanket approvals of issuances of
securities or assumptions of liability by
the Liden Group should file a motion to
intervene or protest with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing motions to intervene
or protest is July 21, 2006.
Absent a request to be heard in
opposition by the deadline above, the
Liden Group is authorized to issue
securities and assume obligations or
liabilities as a guarantor, indorser,
surety, or otherwise in respect of any
security of another person; provided
that such issuance or assumption is for
some lawful object within the corporate
purposes of the Liden Group,
compatible with the public interest, and
is reasonably necessary or appropriate
for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be

VerDate Aug<31>2005

18:33 Jun 27, 2006

Jkt 208001

adversely affected by continued
approvals of the Liden Group’s
issuances of securities or assumptions of
liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at http://
www.ferc.gov, using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E6–10163 Filed 6–27–06; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP06–386–000]

Dominion Transmission, Inc.; Notice of
Request Under Blanket Authorization
June 20, 2006.

Take notice that on June 13, 2006,
Dominion Transmission, Inc. (DTI), 120
Tredegar Street, Riverside Building,
Richmond, Virginia 23219, filed in
Docket No. CP06–386–000 a request
pursuant to sections 157.205(b) and
157.208(f)(2) of the Commission’s
Regulations under the Natural Gas Act
(18 CFR 157.205 and 157.208) for
authorization to increase the maximum
allowable operating pressure (MAOP) of
LN 257–S at the Sharon Storage
Complex located in Potter County,
Pennsylvania, under the authorization
issued in Docket No. CP82–537–000
pursuant to section 7 of the Natural Gas
Act, all as more fully described in the
request.
This filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at http://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY,
contact (202) 502–8659.

PO 00000

Frm 00014

Fmt 4703

Sfmt 4703

Any questions concerning this request
may be directed to Matthew R. Bley,
Manager, Gas Transmission Certificates,
Dominion Transmission, Inc., 120
Tredegar Street, Richmond, Virginia
23219, at (804) 819–2877 or Fax (804)
819–2064 or
Matthew_R_Bley@dom.com.
DTI states that because no
compression facilities are available at
the Sharon Storage Complex (Sharon),
Sharon’s pool pressure and inventory
levels rely on pipeline pressures
available from DTI’s State Line and
Quinlan Compressor Stations (Quinlan).
DTI asserts that since TL527, which
connects Quinlan and Sharon has an
MAOP of 1,250 psig, it is necessary to
uprate the MAOP of LN 257–S from
1,100 psig to 1,250 psig in order to
achieve an equilibrium in pressure
between Quinlan and Sharon. DTI
maintains that the proposed MAOP
increase is needed in order to provide
greater operating flexibility and to allow
for the continued and effective
operation of Sharon. DTI contends that
LN 257–S was tested to 2,200 psig when
it was replaced in 1994.
Any person or the Commission’s Staff
may, within 45 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to section
157.205 of the Commission’s
Regulations under the Natural Gas Act
(NGA) (18 CFR 157.205) a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-filing’’ link. The Commission
strongly encourages electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E6–10155 Filed 6–27–06; 8:45 am]
BILLING CODE 6717–01–P

E:\FR\FM\28JNN1.SGM

28JNN1

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/agency%3Aferc%3A1eeb91fc266425b1. Public record. Not legal advice.
