19496

Federal Register / Vol. 71, No. 72 / Friday, April 14, 2006 / Notices

formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
that allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries, and direct links
to the documents. To register for this
service, go to http://www.ferc.gov/
esubscribenow.htm.
Information concerning the
involvement of the COE is available
from Jon Soderberg at 202–761–7763.

Wednesday, April 26, 2006, 7 p.m.
Holiday Inn Hotel & Suites, 838
Westwood Blvd., Price, UT 84501. (435)
637–8880.
This notice is being sent to affected
landowners; Federal, State, and local
government representatives and
agencies; environmental and public
interest groups; Native American tribes;
other interested parties in this
proceeding; and local libraries and
newspapers. We encourage government
representatives to notify their
constituents of this planned project and
encourage them to comment on their
areas of concern.

Magalie R. Salas,
Secretary.
[FR Doc. E6–5561 Filed 4–13–06; 8:45 am]

Questar proposes to increase the
capacity of its southern transmission
system by approximately 170,000
dekatherms per day. More specifically,
Questar seeks authority to:
• Construct approximately 53 miles
of 24-inch-diameter pipeline and
ancillary facilities to loop Questar’s
existing Main Line (ML) No. 40 by
extending its ML 104 from its
easternmost terminus at Soldier Creek
in Carbon County to the Green River
Block Valve in Uintah County;
• Construct approximately 5 miles of
24-inch-diameter pipeline to loop its
ML 104 between its existing Oak
Springs Compressor Station (Oak
Springs) and Fausett Junction in Carbon
County; and
• Restage/reconfigure Oak Springs
and Questar’s existing Blind Canyon
Compressor Station (Blind Canyon) and
modify other existing facilities,
including yard and station piping,
cooling equipment, valves and
launcher/receiver facilities at Oak
Spring, Blind Canyon, and Questar’s
Thistle Creek Compressor Station in
Utah County.
• Seek the modification of metering
and gas separation facilities by Kern
River Gas Transmission Company (Kern
River) at its interconnect with the ML
104 Pipeline near Goshen, Utah, which
serves as a receipt point for volumes
delivered by Questar to Kern River at
this location.
Location maps depicting Questar’s
proposed facilities and alternate routes
are provided in Appendix 1.2

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF06–18–000]

Questar Pipeline Company; Notice of
Intent To Prepare an Environmental
Assessment for the Proposed
Southern System Expansion Project II,
Request for Comments on
Environmental Issues and Notice of
Scoping Meeting

wwhite on PROD1PC65 with NOTICES

April 7, 2006.

The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
Questar Pipeline Company’s (Questar)
planned Southern System Expansion
Project II located in Utah, Carbon,
Duchesne, and Uintah Counties, Utah.
This notice announces the opening of
the scoping process we 1 will use to
gather input from the public and
interested agencies on the project. Your
input will help the Commission staff
determine which issues need to be
evaluated in the EA. Please note that the
scoping period will close on May 12,
2006.
Comments may be submitted in
written form or presented verbally at the
public meeting detailed below. Further
details on how to submit written
comments are provided in the public
participation section of this notice. In
lieu of sending written comments, you
are invited to attend the public scoping
meeting that is scheduled as follows:
1 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the Office of Energy Projects.

VerDate Aug<31>2005

16:37 Apr 13, 2006

Jkt 208001

Summary of the Proposed Project

2 The appendices referenced in this notice are not
being printed in the Federal Register. Copies are
available on the Commission’s Web site (excluding
maps) at the ‘‘eLibrary’’ link or from the
Commission’s Public Reference Room or call (202)
502–8371. For instructions on connecting to
eLibrary refer to the end of this notice. Copies of
the appendices were sent to all those receiving this
notice in the mail.

PO 00000

Frm 00021

Fmt 4703

Sfmt 4703

Currently Identified Environmental
Issues
At this time no formal application has
been filed with the FERC. For this
project, the FERC staff has initiated its
NEPA review prior to receiving the
application. The purpose of our NEPA
Pre-Filing Process is to involve
interested stakeholders early in project
planning and to identify and resolve
issues before an application is filed with
the FERC.
We have already identified several
issues that we think deserve attention
based on a preliminary review of the
proposed facilities, environmental
information provided by Questar,
discussions with staff of the Bureau of
Land Management, and comments
gathered from concerned citizens at
Questar’s open house held on March 28,
2006. This preliminary list of issues
may be changed based on your
comments and our analysis.
• Potential effect on perennial
streams and intermittent streams
crossed by or close to the route;
• Potential effect on vegetation and
wildlife resources, including critical big
game ranges and sage grouse habitat;
• Potential effect on endangered and
threatened species;
• Potential effect on historic and
prehistoric sites;
• Potential effect on recreation and
public interest areas, including traffic
impacts along the Nine Mile Canyon
Scenic Backcountry Byway;
• Potential visual effect of the
pipeline corridor;
The EA Process
The FERC will use the EA to consider
the environmental impact that could
result if it issues Questar a Certificate of
Public Convenience and Necessity.
This notice formally announces our
preparation of the EA and the beginning
of the process referred to as ‘‘scoping.’’
We are soliciting input from the public
and interested agencies to help us focus
the analysis in the EA on the potentially
significant environmental issues related
to the proposed action.
Our independent analysis of the
issues will be included in an EA that
will be prepared for the project. Our
evaluation will also include possible
alternatives to the proposed project or
portions of the project, and we will
make recommendations on how to
lessen or avoid impacts on the various
resource areas of concern.
The EA will be mailed to Federal,
State, and local government agencies;
elected officials; environmental and
public interest groups; Native American
tribes; affected landowners; other

E:\FR\FM\14APN1.SGM

14APN1

Federal Register / Vol. 71, No. 72 / Friday, April 14, 2006 / Notices

wwhite on PROD1PC65 with NOTICES

interested parties; local libraries and
newspapers; and the FERC’s official
service list for this proceeding. A 30-day
comment period will be allotted for
review of the EA. We will consider all
comments submitted on the EA in any
Commission Order that is issued for the
project.
We are currently involved in
discussions with other jurisdictional
agencies to identify their issues and
concerns. These agencies include the
U.S. Army Corps of Engineers, U.S. Fish
and Wildlife Service, Bureau of Land
Management, Divisions of Wildlife and
Water Resources of the Utah Department
of Natural Resources, Division of Water
Quality of the Utah Department of
Environmental Quality, and the Utah
State Historic Preservation Office. By
this notice, we are asking these and
other Federal, State, and local agencies
with jurisdiction and/or special
expertise with respect to environmental
issues to formally cooperate with us in
the preparation of the EA. Agencies that
would like to request cooperating status
should follow the instructions for filing
comments provided below.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the
proposals. Your comments should focus
on the potential environmental effects,
reasonable alternatives and measures to
avoid or lessen environmental impact.
The more specific your comments, the
more useful they will be. To ensure that
your comments are timely and properly
recorded, please mail your comments so
that they will be received in
Washington, DC, on or before May 12,
2006, and carefully follow these
instructions:
• Send an original and two copies of
your letter to: Magalie R. Salas,
Secretary, Federal Energy Regulatory
Commission, 888 First St., NE., Room
1A, Washington, DC 20426;
• Label one copy of the comments for
the attention of Gas Branch 3, DG2E;
and
• Reference Docket No. PF06–18–000
on the original and both copies.
Please note that the Commission
encourages electronic filing of
comments. See Title 18 Code of Federal
Regulations 385.2001(a)(1)(iii) and the
instructions on the Commission’s
Internet Web site at http://www.ferc.gov
under the ‘‘eFiling’’ link and the link to
the User’s Guide. Prepare your
submission in the same manner as you
would if filing on paper and save it to
a file on your hard drive. Before you can
file comments you will need to create an
account by clicking on ‘‘Login to File’’

VerDate Aug<31>2005

16:37 Apr 13, 2006

Jkt 208001

and then ‘‘New User Account.’’ You will
be asked to select the type of filing you
are making. This filing is considered a
‘‘Comment on Filing.’’
When Questar submits its application
for authorization to construct and
operate the Southern System Expansion
Project II, the Commission will publish
a Notice of Application in the Federal
Register and will establish a deadline
for interested persons to intervene in the
proceeding. Because the Commission’s
Pre-filing Process occurs before an
application to begin a proceeding is
officially filed, petitions to intervene
during this process are premature and
will not be accepted by the Commission.
Environmental Mailing List
If you wish to remain on the
environmental mailing list, please
return the Mailing List Retention Form
included in Appendix 2. If you do not
return this form, you will be taken off
our mailing list.
Availability of Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs
at 1–866–208 FERC (3372) or on the
FERC Internet Web site (http://
www.ferc.gov). Using the ‘‘eLibrary’’
link, select ‘‘General Search’’ from the
eLibrary menu, enter the selected date
range and ‘‘Docket Number’’ (i.e., PF06–
18–000), and follow the instructions.
Searches may also be done using the
phrase ‘‘Southern System Expansion
Project II’’ in the ‘‘Text Search’’ field.
For assistance with access to eLibrary,
the helpline can be reached at 1–866–
208–3676, TTY (202) 502–8659, or at
FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC Internet Web
site also provides access to the texts of
formal documents issued by the
Commission, such as orders, notices,
and rule makings.
In addition, the FERC now offers a
free service called eSubscription that
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. To register for this service,
go to http://www.ferc.gov/
esubscribenow.htm.
Public meetings or site visits will be
posted on the Commission’s calendar
located at http://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information. Finally,
Questar has established an Internet Web
site for its project at (http://
www.questarssxpii.com). The Web site

PO 00000

Frm 00022

Fmt 4703

Sfmt 4703

19497

includes a project overview, contact
information, regulatory overview, and
construction procedures.
Magalie R. Salas,
Secretary.
[FR Doc. E6–5558 Filed 4–13–06; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FERC Docket No. PF06–15–000 and BLM
Reference No. 2880/UTU–82750 and WYW–
67229]

Wyoming Interstate Company, Ltd.;
Notice of Intent To Prepare an
Environmental Assessment And
Proposed Land Use Plan Amendment
for the Proposed Kanda Lateral and
Mainline Expansion Project, Request
for Comments on Environmental
Issues, Notice of Public Scoping
Meetings, and Notice of Site Visit
April 7, 2006.

The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
Wyoming Interstate Company, Ltd’s.
(WIC) planned Kanda Lateral and
Mainline Expansion Project located in
Uintah and Daggett Counties, Utah and
Sweetwater County, Wyoming. This
notice explains the scoping process that
will be used to gather input from the
public and interested agencies on the
project. Your input will help the
Commission staff determine which
issues need to be evaluated in the EA.
Please note that the scoping period for
the project will close on May 19, 2006.
In lieu of or in addition to sending
written comments, you are invited to
attend the public scoping meetings that
have been scheduled in the project area.
These meetings are scheduled for April
24, 2006 in Rock Springs, Wyoming and
April 25, 2006 in Vernal, Utah. Further
instructions on how to submit written
comments and additional details of the
public scoping meetings are provided in
the public participation section of this
notice.
The FERC will be the lead federal
agency for the preparation of the EA.
The document will satisfy the
requirements of the National
Environmental Policy Act (NEPA) and
will be used by the FERC to consider the
environmental impacts that could result
if it issues WIC a Certificate of Public
Convenience and Necessity under
section 7 of the Natural Gas Act.

E:\FR\FM\14APN1.SGM

14APN1

---