U.S. Department of Labor

Administrative Review Board
200 Constitution Ave. NW
Washington, DC 20210-0001

In the Matter of:
PATRICIA REED,
ADMINISTRATRIX OF
THE ESTATE OF
S. SCOTT SITTNER,
COMPLAINANT,

ARB CASE NOS. 2019-0062
2019-0066
ALJ CASE NO. 2017-PSI-00001
DATE: March 31, 2021

v.
JACOBS ENGINEERING GROUP,
SOUTHERN CALIFORNIA GAS,
and SEMPRA ENERGY,
RESPONDENTS.
Appearances:
For Patricia Reed, Administratrix of the Estate of S. Scott Sittner:
Richard E. Condit, Esq.; Cleveland Lawrence III, Esq.; Ezra
Bronstein, Esq.; Mehri & Skalet PLLC; Washington, District of
Columbia
For the Respondent:
Rick Bergstrom, Esq.; Koree Blyleven, Esq.; Jones Day; San Diego,
California; Nikki L. McArthur, Esq.; Jones Day; Washington, District
of Columbia
Before: James D. McGinley, Chief Administrative Appeals Judge, James A.
Haynes and Stephen M. Godek, Administrative Appeals Judges

2
DECISION AND ORDER
PER CURIAM. This case arises under the employee protection provisions of the
Pipeline Safety Improvement Act of 2002, 49 U.S.C. § 60129 (2020) (PSIA), and its
implementing regulations at 29 C.F.R. Part 1981 (2020). S. Scott Sittner1 filed a
complaint alleging that Respondents Jacobs Engineering Group (Jacobs), Southern
California Gas (SoCalGas), and Sempra Energy (Sempra) retaliated against him
because he engaged in PSIA-protected activities. On June 13, 2019, an
Administrative Law Judge (ALJ) issued a Decision and Order (D. & O.) denying the
complaint. For the following reasons we affirm the ALJ.
BACKGROUND
Jacobs, a technical and scientific services company, provided project
management consulting services to SoCalGas, a distributor of natural gas in
California. SoCalGas is indirectly owned by Sempra.
The California Public Utilities Commission (CPUC) required SoCalGas to
maintain a Pipeline Safety Enhancement Plan (PSEP) for testing and replacing
pipelines. Jacobs administered a PSEP Quality Plan (Quality Plan) as a service for
SoCalGas to organize documents related to SoCalGas’ pipeline construction
activities.
The Quality Plan was not mandated by CPUC or any federal or state law or
regulation.2 It was developed, implemented, and utilized by Jacobs’ Quality
Auditors. The Quality Auditors were not responsible for inspections, testing,
engineering, or construction but instead were required to “ensure that there was
agreement and consistency” in Quality Plan documents.3
In 2015, Jacobs decided to hire a PSEP Quality Manager whose duties would
include managing Quality Auditors and updating the Quality Plan. Phillip Andrew,
a Jacobs Program Director, was responsible for hiring and supervising the Quality
Manager. Delia Meraz, a SoCalGas Quality Risk and Compliance Manager,
participated in the selection process because the new Quality Manager would
interact with her on a regular basis.4

On September 17, 2020, Sittner’s counsel filed a Motion for Substitution of Party,
informing the Board that Sittner had passed away on December 19, 2019. The Board
granted the Motion on September 22, 2020.
1

2

D. & O. at 21.

3

Id.

4

Id. at 8.

3
Sittner applied for the position and, instead of hiring him as a permanent
employee, Jacobs hired him for a two-month trial period in order to determine if he
would be suitable for the position. Jacobs made no guarantee that Sittner’s
employment would be extended beyond this trial period.5 Soon after being hired
Sittner tried to convince one of the Quality Auditors to tell Andrew that he had
another job offer, in the hopes that this would “manipulate the situation” and lead
to him being hired as a permanent employee.6
Sittner’s first day of employment was June 8, 2015. Early in his tenure he
was engaged in a number of professional and personal conflicts with Jacobs’ staff.
He performed his supervisory duties in a “brusque and confrontational manner.”7
He made derogatory comments about employees and engaged in at least one
“heated argument.”8 Sittner also expressed his dissatisfaction with the
qualifications of the Quality Auditors.9 By Sittner’s third week of employment,
Andrew had on multiple occasions spoken to Sittner about his behavior. Around this
same time Sittner sent Meraz an email expressing his belief that Quality Auditors
were not properly utilizing audit checklists.10
Sittner understood that Andrew and Meraz expected him to make the
Quality Plan update his top work priority. But by the end of his fourth week, Meraz
informed Andrew that she had not seen any progress from Sittner regarding the
Quality Plan. Andrew met with Sittner and told him that the likelihood of him
being hired as a permanent employee “was not looking good.”11
At the end of Sittner’s fifth week of employment Meraz rated his performance
as “very low.”12 Sittner had demoralized staff and failed to produce any tangible
work product related to a revision of the Quality Plan.13 But he had continued to
Joint Exhibit (JX) 24 at 2 (“Temporary Employment Dates – Begin June 1, 2015.
End on July 31, 2015. This is our preferred timing. There is no guarantee of future
efforts.”).
5

6

D. & O. at 15.

7

Id. at 12.

8

Id. at 13.

9

Id. at 12-14.

JX 57 (“Instead of being thorough on the checklist, they use the report as the final
catch of information and are even filling out the checklist after they have done the report …
Adequate, properly documented training and written procedures/desk instructions detailing
the processes they are evaluating supports your stance as a manager.”).
10

11

D. & O. at 24.

12

Id. at 17.

13

Id.

4
express his dissatisfaction with what he perceived as a lack of auditor training. On
July 8, 2015, Sittner sent an email from his work account to his personal account
documenting his concerns and opining that the absence of proof of training created
a “stop work situation.”14 The email does not indicate that such documentation was
required by law.
On July 11, 2015, Sittner sent an email with twelve numbered paragraphs to
Andrew and Ted Potter, Andrew’s supervisor. In the twelfth paragraph Sittner
stated: “As the only Certified ANSI/ASME Quality Auditor in this effort, I can
honestly state that a Stop Work condition has existed for at least a year or more.
Sempra just doesn’t have procedures that would permit it. Which I suppose is a
stellar idea.”15 Andrew did not know what Sittner meant by a “Stop Work”
condition.
Andrew met with Sittner on July 13, 2015, to discuss the July 11 email.
During the meeting Andrew came to believe that Sittner felt a “Stop Work”
condition existed because “the quality audits and Quality Auditors had not been
certified or trained by [Sittner].”16 Andrew did not believe Sittner’s statement
addressed a safety regulation or standard that applied to the gas industry, and he
did not believe that Sittner had reported a safety concern or violation. Andrew also
began to question Sittner’s general understanding of the natural gas industry.17
After meeting with Sittner, Andrew discussed Sittner’s performance with
Meraz. They agreed that Sittner’s performance had been unsatisfactory. Andrew
then met with Potter, and they discussed Sittner’s unprofessional behavior and lack
of progress in updating the Quality Plan. Andrew decided to end Sittner’s trial
period two weeks prior to its anticipated eight-week term. On July 16, 2015, Sittner
met with Andrew, Potter, and Paul Gemmel, Jacobs’ Human Relations Business
Manager. They informed Sittner that his temporary employment would end on July
24, 2015. He was told that his employment was ending because he failed to update
the Quality Plan and had performed his job in an unprofessional and disruptive
manner.18
JX 68 at 1 (“1) I informed Delia for the 2nd time that the auditors had no official
training. 2) She said that is why they have [on-the-job training. 3) I asked her what
documentation she had and she said none. 4) I said we need to document all training (I had
stated this before). 5) As well the question comes up that if nobody in the group is certified
and qualified how did they qualify to be auditors? 6) Essentially this is a stop work
situation.”).
14

15

JX 75 at 2.

16

D. & O. at 18.

17

Id.

18

Id., citing Transcript (Tr.) 162-63, 594-95, 727-28.

5

Sittner filed his PSIA complaint with the Occupational Safety and Health
Administration (OSHA) on January 18, 2016. On November 18, 2016, OSHA issued
its determination stating that: “Complainant has requested that OSHA terminate
its investigation and issue a determination. Based on the information gathered thus
far in its investigation, OSHA is unable to conclude that there is reasonable cause
to believe that a violation of the statute occurred.”
Sittner thereafter requested a hearing on his complaint with the Office of
Administrative Law Judges, which the ALJ conducted from July 23 to July 27,
2018. Following the hearing the ALJ issued a Decision and Order concluding that
Sittner failed to prove that he engaged in protected activity under the PSIA and
Respondents demonstrated that they would have taken the same personnel action
in the absence of Sittner’s asserted protected activity.19
Sittner appealed the ALJ’s ruling on his complaint to the Board. SoCalGas
and Sempra filed a cross-appeal asking the Board to dismiss them as parties to this
matter.
JURISDICTION AND STANDARD OF REVIEW
The Secretary of Labor has delegated to the Board the authority to review
ALJ decisions under the PSIA.20 The ARB reviews questions of law presented on
appeal de novo, but is bound by the ALJ’s factual determinations if they are
supported by substantial evidence.21 Substantial evidence means “such relevant
evidence as a reasonable mind might accept as adequate to support a conclusion.”22
The Board will also uphold ALJ credibility determinations unless they are
“inherently incredible or patently unreasonable.”23

19

D. & O. at 29.

Secretary’s Order No. 01-2020 (Delegation of Authority and Assignment of
Responsibility to the Administrative Review Board (Secretary’s discretionary review of ARB
decisions)), 85 Fed. Reg. 13186 (Mar. 6, 2020).
20

21

29 C.F.R. § 1981.110(b).

22

Consol. Edison Co. of N.Y. v. N.L.R.B., 305 U.S. 197, 229 (1938).

Jacobs v. Liberty Logistics, Inc., ARB No. 2017-0080, ALJ No. 2016-STA-00007, slip
op. at 2 (ARB May 9, 2019); accord Formella v. U.S. Dep’t of Labor, 628 F.3d 381, 391 (7th
Cir. 2010) (“[T]he resolution of [a credibility contest] belongs in all but the extraordinary
case to the judge who heard and observed the witnesses first hand.”).
23

6
DISCUSSION
Congress passed the PSIA to enhance the safety of the nation’s pipeline
systems. The PSIA’s employee protection provision prohibits discrimination against
an employee who engages in certain types of protected activity, including (1)
providing to an employer or the Federal Government information relating to any
violation or alleged violation of any Federal law relating to pipeline safety; (2)
refusing to engage in any practice made unlawful by the PSIA; (3) providing
testimony before Congress or at any Federal or State proceeding regarding any
Federal law relating to pipeline safety; or (4) commencing, assisting or participating
in a proceeding under any Federal law relating to pipeline safety.24
To prevail on his complaint, Sittner must prove that he engaged in PSIAprotected activity, was subjected to an unfavorable personnel action, and that the
protected activity was a contributing factor in the unfavorable personnel action.25
Relief may not be ordered if the Respondents demonstrate by clear and convincing
evidence that they would have taken the same unfavorable personnel action in the
absence of any protected activity.26
Sittner suffered an adverse personnel action when his trial period was
terminated and he did not receive an offer of permanent employment. But the ALJ
concluded that Sittner never engaged in PSIA-protected activity during his trial
period. We agree.
Sittner’s alleged protected activities include his assertion that a “Stop Work”
condition existed as well as complaints about the qualifications and methods of the
Quality Auditors.27 None of his assertions or complaints constitute PSIA-protected
activity. Sittner’s belief that a “Stop Work” condition existed was based on his belief
that the Quality Auditors had been inadequately trained. But the Quality Auditors
tasks were governed only by the Quality Plan.
The Quality Plan was an internal auditing process that Jacobs and SoCalGas
created as a business practice that was “separate and distinct from the PSEP
requirements imposed on them by the C.F.R. and CPUC.”28 The reports the Quality
Auditors produced contained language indicating that “PSEP QRC review is
intended to provide feedback regarding the content and completeness of the

24

49 U.S.C. § 60129(a).

25

See 49 U.S.C. § 60129(b)(2)(B)(iii).

26

29 C.F.R. § 1981.109(a).

27

D. & O. at 20-21; see also Complainant’s Brief (Comp. Br.) at 18-26.

28

D. & O. at 21.

7
documents provided. This review does not validate the accuracy of the information
represented in the documents . . .”29
Sittner argues that, “[b]ecause the auditors were responsible for reviewing
and confirming information and documents related to those activities, the quality
auditors’ undocumented and otherwise inadequate training and insufficient audit
procedures can be reasonably viewed as potential violations of federal standards.”30
But he provided no legal support for this assertion or proof that the Quality
Auditors were performing their tasks in violation of any law. We therefore affirm
the ALJ’s conclusion that Sittner failed to prove that he engaged in activity
protected by the PSIA.31
Additionally, the record supports the ALJ’s conclusion that Sittner’s alleged
protected activity did not contribute to the termination of his trial period. Sittner
performed his job duties in an unprofessional manner and antagonized a number of
employees at Jacobs.32 Andrew and Meraz were dissatisfied with Sittner’s
performance prior to any communication that could potentially qualify as protected
activity. Andrew told Sittner at the mid-point of his trial period that it was unlikely
that he would be offered a permanent position. And Sittner admitted that he acted
unprofessionally and purposely misrepresented his knowledge of applicable
regulations.33 We therefore agree with the ALJ’s conclusion that “Sittner’s work

29

See, e.g., JX 103 at 2.

30

Comp. Br. at 38.

Sittner argues on appeal that the ALJ erred by finding that “Respondents did not
discuss Sittner’s protected activity before they agreed to fire him.” Complainant Scott
Sittner’s Reply Brief at 22. This is incorrect. The ALJ found that “[t]here is no doubt that
Mr. Andrew consulted Ms. Meraz about Complainant’s past e-mail communications.
Similarly, he also discussed Complainant’s e-mails with Mr. Potter and Mr. Gemmel.” D. &
O. at 26. The ALJ acknowledged that Respondents’ managers were aware of Sittner’s July
11, 2015 email, which included his concerns, and concluded that Sittner’s “Stop Work”
assertion did not contribute to his discharge despite the temporal proximity between the
two. See D. & O. at 24-27.
31

See, e.g., Id. at 10 (referred to an employee as a “dumb girl” who “should just be able
to do what he wants”); 12 (bluntly criticized members of the Quality Team in a manner they
found unprofessional or personally offensive); 13 (demonstrated an intent to use
embarrassment and intimidation as tools to motivate the Quality Auditors, sent an email
stating “[a] couple team meetings should pull it off, where I pistol whip with a pencil,” and
an e-mail stating that “Jacobs has no clue what is going on” and characterized the Quality
Auditors as “weak people”) and 14 (failed to fully grasp that he was creating a hostile work
environment, referred to other employees as “dumb” or an “idiot,” injected “chaos” into team
relationships, and caused “discontent” among the quality auditing team).
32

33

Id. at 28.

8
conduct and performance never approached anything that could be legitimately
described as satisfactory to Respondents.”34
Finally, on August 14, 2019, Respondents SoCalGas and Sempra filed a
Petition for Review asking the Board to find that they cannot be responsible for
providing relief to Sittner because they neither employed him nor acted in any
capacity as his employer.35 SoCalGas and Sempra raised this issue before the ALJ.
The PSIA prohibits “employers” from retaliating against “employees.” The
ALJ noted that the parties in this matter have stipulated that it was Jacobs that
hired Sittner. But the ALJ did not make specific findings of fact regarding which
Respondents were liable as “employers” under the PSIA. Instead, the ALJ
concluded that, because he was dismissing the complaint, it was “unnecessary to
resolve the contested issue of whether [SoCalGas and Sempra] are also liable as
employers under this claim.”36
We agree with this conclusion. As we are affirming the ALJ’s dismissal of the
complaint, we need not remand this case to the ALJ to issue additional findings
that would allow us to determine which Respondents would be liable under the
PSIA in Sittner had prevailed in this matter.
CONCLUSION
Sittner failed to prove that he engaged in PSIA-protected activity, and
Respondents have proven that Sittner’s alleged protected activities did not
contribute to the decision to end his employment. We therefore AFFIRM the ALJ’s
D. & O. and DENY the complaint.
SO ORDERED.

34

Id.

35

Respondents’ Brief in Support of Cross-Petition for Review of D. & O. at 4.

36

D. & O. at 20, n.6.

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/agency%3Adol%3A1cf8c38f04d9ac0d. Public record. Not legal advice.