September 15, 2026

CBCA 8853-FEMA

In the Matter of CITY AND COUNTY OF SAN FRANCISCO, CALIFORNIA
Alexander J. Holtzman and Michael Levin-Gesundheit, Office of the City Attorney,
San Francisco, CA; Chris Bomhoff of Baker, Donelson, Bearman, Caldwell & Berkowitz,
PC, Fort Lauderdale, FL; and Wendy Huff Ellard of Baker, Donelson, Bearman, Caldwell
& Berkowitz, PC, Jackson, MS, counsel for Applicant.
Carl DeNigris, Assistant Chief Counsel, Jasmine Jones, Senior Counsel, and Trevor
Morris-Seekins, Counsel, California Office of Emergency Services, Mather, CA, counsel for
Grantee; and Robert Larsen, Public Assistance Officer, Eli Owen, Assistant Director, Fan
Jia, Program Manager, and Tama Harville and Destiny Saechou, Associate Governmental
Program Analysts, appearing for Grantee.
Alecia Frye and Emanuel Rier Soto, Office of Chief Counsel, Federal Emergency
Management Agency, Department of Homeland Security, Washington, DC, counsel for
Federal Emergency Management Agency.
Before the Arbitration Panel consisting of Board Judges LESTER, SHERIDAN, and
NEWSOM.
LESTER, Board Judge, writing for the Panel.
Applicant, the City and County of San Francisco, California (the City), seeks public
assistance (PA) funding pursuant to the Robert T. Stafford Disaster Relief and Emergency
Assistance Act (Stafford Act), 42 U.S.C. §§ 5121-5207 (2024), for costs incurred to support
emergency protective measures (EPMs) that it put in place during the first four months of the
COVID-19 pandemic. Most of the costs for which the City seeks PA funding relate to the
City’s transition of the Moscone Center South into a temporary emergency operations center
(EOC), but some claimed costs relate to work performed to benefit temporary field offices

CBCA 8853-FEMA

2

and medical clinics that the City established to combat the spread of the COVID-19 virus,
rather than the EOC. The specific costs for which the City seeks PA funding here are as
follows:
•
•
•
•
•

•
•

•

•

$1,260,787.28 in contract labor costs that the City incurred to convert
the Moscone Center South from a convention center into an EOC;
$19,603.06 in utility costs that the City paid during the first four months
of the operation of the Moscone Center EOC;
$603,045.23 in costs associated with renting and installing audio/visual
(A/V) equipment for use at the Moscone Center EOC;
$55,740.39 in costs of purchasing disinfecting supplies for the EOC;
$595,991.70 in costs (both for increased bandwidth and labor) related
to facility alterations through which telecom, internet, and electrical
services were supplied to the EOC;
$982,956.47 in costs for meals that the City provided to employees
working at the EOC between March and June 2020;
$117,549.18 in straight-time labor-hour costs of temporary City
employees who were reassigned from their original work projects so
that they could assist in technology work at the Moscone Center EOC;
$918,430.30 in costs for EPMs at both the Moscone Center EOC and
various temporary field offices and medical clinics that the City
established; and
$51,025 in costs incurred to rent portable toilets and handwashing
stations at a particular field care clinic at which the City provided the
public with COVID-19 testing.

After considering the record that the parties developed in this arbitration, we find that
the City has provided sufficient support to obtain PA funding for some of the costs for which
it seeks reimbursement, but we deny some of the City’s requests.
Background
I.

FEMA’s COVID-Related Policies

On March 22, 2020, the President declared the COVID-19 pandemic a major disaster
in the state of California (FEMA-4482-DR-CA), with an incident period beginning on
January 20, 2020, and eventually running through May 11, 2023.
See
https://www.fema.gov/disaster/4482 (last visited Sept. 15, 2026). The President’s disaster
declaration authorized PA funding for Category B EPMs. Id.

CBCA 8853-FEMA

3

On March 19, 2020, FEMA released its “Fact Sheet, Coronavirus (COVID-19)
Pandemic: Eligible Emergency Protective Measures” (March 2020 Fact Sheet), in which it
“urge[d] officials to, without delay, take appropriate actions that are necessary to protect
public health and safety pursuant to public health guidelines and conditions and capabilities
in their jurisdictions.” FEMA Exhibit 2 at 1. In this March 2020 Fact Sheet, FEMA stated
that “eligible emergency protective measures taken to respond to the COVID-19 emergency
at the direction or guidance of public health officials may be reimbursed under Category B
of FEMA’s [PA] Program.” Id. Such EPMs included, but were not limited to, the following
categories, if not funded by another federal agency: “[m]anagement, control, and reduction
of immediate threats to public health and safety,” including EOC costs; the “[p]urchase and
distribution of food, water, ice, medicine, and other consumable supplies, to include personal
protective equipment”; the “[m]ovement of supplies and persons”; and “[c]ommunications
of general health and safety information to the public.” Id. at 1-2. FEMA also stated that its
Public Assistance Program and Policy Guide (PAPPG) (Apr. 2018) provided “[f]urther
information about eligible emergency protective measures.” Id. at 2.
FEMA Policy FP 104-009-19 (Sept. 1, 2020), titled “Coronavirus (COVID-19)
Pandemic: Work Eligible for Public Assistance (Interim),” superseded the March 2020 Fact
Sheet for “work performed on or after September 15, 2020.” FEMA Exhibit 1 at 1. For
work “[p]rior to this date, policies in place when the work was completed [would] apply.”
Id. at 2. Because the costs at issue in this arbitration run from March through June 2020, this
policy is not applicable here.
On April 5, 2021, FEMA issued Policy FP 104-21-0003, titled “Coronavirus
(COVID-19) Pandemic: Safe Opening and Operation Work Eligible for Public Assistance
(Interim)” (FEMA Safe O&O Policy). See FEMA Exhibit 3. Pursuant to a revision to that
policy issued September 8, 2021, the FEMA Safe O&O Policy applied to work conducted
from January 20, 2020 (the beginning of the incident period) until the declared conclusion
of the disaster. Id. at 2.
II.

The City’s EOC Activities

On January 30, 2026, as concerns about what became known as the COVID-19 virus
were increasing, the City activated its EOC, which was located at 1011 Turk Street in
San Francisco. Applicant Exhibit 23 ¶ 3. The Turk Street EOC could accommodate
approximately fifty people in normal situations but far less than that when social distancing
was required. Id. The City’s 911 call center was also located at 1011 Turk Street. Id. As
the virus spread and the number of infections increased, the City determined that, because
of the health risks to employees at the combined EOC/911 call center due to the small size

CBCA 8853-FEMA

4

of the Turk Street space, it was not feasible for the EOC, which served as a unified command
center, to remain at that location.
Accordingly, on March 16, 2020, the City relocated its EOC to the much larger
Moscone Convention Center South, where it remained until June 30, 2021 (although the
City’s claims here run from March 2020 through only June 2020). Applicant Exhibit 23 ¶ 3.
The City also brought significantly more workers into the EOC than when the EOC was
stationed at Turk Street but worked to adopt and enforce appropriate social distancing
requirements. The City owns the Moscone Center, which is normally used year round as a
conference and special events venue. Applicant Exhibit 21 at 1. Nevertheless, the City had
a management agreement with the Moscone Center Joint Venture (MCJV) to operate the
property on the City’s behalf. Under the management agreement, the City “is generally
responsible for costs of operation of the Convention Center in accordance with an approved
budget,” as well as “necessary capital expenditures,” Request for Arbitration (RFA) Exhibit
4 at 00018, while the MCJV receives a management fee, can enter into agreements to rent
out the convention center, and can run food and beverage concessions and merchandise
operations (with a percentage of sales being returned to the City). Id. at 00021, 00062-63.
Between March and June 2020, to reconfigure and set up the south building of the
Moscone Center as an EOC, the City paid for MCJV contract labor, which worked to install
various protective barriers, install telecom and internet lines, upgrade electrical and A/V
capabilities, and perform other necessary work in the building. The City also decided to
provide meals at the EOC for its employees because of what it believed were the scarce
options for the purchase of nearby food while working. Separately, outside the context of
the EOC, the City purchased cleaning and infection-protective supplies as EPMs for various
facilities and pulled some of its existing straight-time force account labor (FAL) from other
projects to assist in establishing EPMs.
III.

The City’s Requests for PA Funding

As owner of the Moscone Center, the City did not claim any lease costs for the space.
Applicant Exhibit 21 at 1. It also paid all base maintenance and operating costs to the MCJV,
which it was obligated to do under its pre-COVID management agreement with the MCJV,
and did not seek PA funding for those costs. Id.
The City submitted a request for PA funding of $35,143,959.32 for costs associated
with using the Moscone Center as its EOC (including contract costs that the City paid the
MCJV for the City’s use of the Center) and separately submitted a request for PA funding
of $37,826,272.83 for costs incurred for EPMs, some of which related to facilities other than
the EOC (including straight-time FAL, purchased materials, and the cost of renting portable

CBCA 8853-FEMA

5

toilets and handwashing stations at a field medical care center) and some of which related
to the EOC itself (including meals that the City provided employees at the EOC). In total,
the City sought PA funding of $72,970,232.15.
On April 5, 2025, FEMA issued a determination memorandum (DM) denying
$2,682,313.51 of the $37,826,272.83 in costs that the City had requested to support EOCand non-EOC-related EPMs. FEMA Exhibit 5. On June 19, 2025, FEMA issued a DM
denying $3,119,236.05 of the City’s $35,143,959.32 request for its Moscone Center EOC
costs, asserting that the denied amount was tied to what FEMA described as the City’s
“request for reimbursement for the cost of using its own facility” and finding that the City
had failed to demonstrate how the costs of operating an EOC at its own facility related to
eligible COVID-19 EPMs. FEMA Exhibit 4 at 1, 3.
On August 13 and September 23, 2025, the California Governor’s Office of
Emergency Services (Cal OES or grantee) submitted to FEMA the City’s first appeals of the
two DM denials. In its August 13 appeal, the City disputed $2,023,218.48 of the
$2,682,313.51 that FEMA had denied, and, in the September 23 appeal, it sought recovery
of all $3,119,236.05 that FEMA had denied. On January 27, 2026, the FEMA Region 9
Regional Administrator denied, in its entirety, the City’s September 23 appeal seeking
$3,119,236.05 in funding. See RFA Exhibit 1. On March 3, 2026, the Regional
Administrator partially granted the August 13 appeal by awarding an additional “$108,422.52
in costs associated with laundering related expenses for uniforms, washers and dryers, and
hand sanitizer” but otherwise denied the appeal. RFA Exhibit 2 at 00006.
IV.

Proceedings Before the Board

On March 30, 2026, the City filed a RFA with the Board, challenging the two appeal
decisions in a consolidated filing and seeking to require FEMA to increase by $5,034,032.01
(that is, the $3,119,236.05 and $2,023,218.48 sought in the August 13 and September 23
appeals, less the $108,422.52 amount granted in the August 13 appeal) the amount obligated
as PA funding for the operation of the City’s EOC at the Moscone Center from March
through June 2020 and for field clinic operations that had been denied in the two first
appeals. FEMA filed its response to the RFA on April 30, 2026; the City filed its reply on
May 14, 2026; and FEMA filed a surreply on May 28, 2026.
At the parties’ request, the Board conducted a hearing in this matter on July 16, 2026,
at which the City presented testimony from two witnesses: (1) ChiaYu Ma, who was the
Chief Financial Officer of the City’s Technology Information System (TIS) at the time of the
disaster and who testified about TIS’s budgetary treatment of reassigned temporary
employees used to provide EPM services; and (2) Adrienne Bechelli, the Chief Deputy

CBCA 8853-FEMA

6

Director of San Francisco Department of Emergency Management, who testified about the
reasons that the City had moved its EOC, which the City called its “COVID Command
Center” (CCC), to the Moscone Center and the reason that it incurred the costs for which it
was seeking PA funding. FEMA elected not to present any witnesses at the hearing but
provided oral argument in support of its positions in this matter. The Board subsequently
requested some clarifying information from the City, which the City filed on August 5, 2026.
Discussion
I.

COVID-Related Category B EPM Funding

FEMA may provide PA funding for EPMs that are necessary to save lives and protect
public health and safety. 44 CFR 206.225(a)(1) (2024). For EPMs to be eligible for PA
funding, the applicant must establish that work was required as a result of an immediate
threat resulting from the declared incident. Id. 206.223(a)(1), 206.225(a)(3)(I); PAPPG
at 19, 57-58.
The costs for which the City seeks PA funding here were incurred between March and
June 2020. FEMA issued two policies governing COVID-related PA funding that
supplement the PAPPG and that are applicable to the costs that the City claims here as having
been incurred during that period of time: (1) the March 2020 Fact Sheet and (2) the FEMA
Safe O&O Policy. The March 2020 Fact Sheet specifically identified costs incurred to
support EOCs as eligible for PA funding. March 2020 Fact Sheet at 1. The FEMA Safe
O&O Policy lists a number of specific types of costs, such as the purchase and distribution
of face masks, cleaning and disinfection, and COVID-19 diagnostic testing, as eligible for
funding. FEMA Safe O&O Policy at 5.
II.

The City’s EOC Relocation Costs
A.

Eligibility of Work to Establish and Operate the Moscone Center EOC

In the PAPPG, FEMA recognizes that “Emergency Operation Center (EOC)-related
costs” incurred in response to a presidentially-declared disaster are a part of the “emergency
protective measures and costs that are eligible” for PA funding. PAPPG at 58.
When the pandemic was beginning to spread, the City activated its EOC in a building
on Turk Street, which shared space with the City’s 911 call center. The City asserts that,
soon thereafter, it realized that it could not continue to use its Turk Street facility as its EOC
because it was too small to allow individuals to maintain sufficient distance from one
another, which was a then-prevailing safety protocol. The City decided that the much larger

CBCA 8853-FEMA

7

Moscone Center was a much better place from which to run an EOC during the COVID-19
pandemic because it would allow the City to bring in a significantly larger group of
employees to assist in the COVID-19 response than originally designated and would allow
for appropriate distancing between individuals. The City seeks PA funding for the cost of
retrofitting the south building of the Moscone Center as an EOC and of moving the EOC
from Turk Street to the Moscone Center.
FEMA denied the bulk of the City’s request for PA funding as inconsistent with the
PAPPG. FEMA acknowledges that, under the PAPPG, if a state or local government
“provides essential community services at a facility that is unsafe . . . as a result of the
incident, temporar[y] relocation of these services to another facility is eligible” for PA
funding. PAPPG at 76. FEMA argues, though, that the City “has not satisfied the PAPPG’s
requirements to show that the original facility was ‘unsafe, inaccessible, or destroyed as a
result of the [COVID-19] incident.’” FEMA’s Surreply Brief (May 28, 2026) at 5 (quoting
PAPPG at 76). In addition, FEMA also cites to another PAPPG provision requiring that
“[t]he capacity of the temporary facility must not exceed the pre-disaster capacity of the
facility that housed the displaced services.” PAPPG at 77. It argues that, because the
Moscone Center offered significantly greater square footage and capacity than Turk Street,
the transfer of the EOC to Moscone Center is ineligible for PA funding. FEMA’s position
is that the City was required to attempt to retrofit the Turk Street space, as best as possible,
for continued use as the EOC or to move to a different space of no greater size than Turk
Street. Under FEMA’s view, satisfying the then-common safety guidance for mandatory
physical distancing between individuals by opening a new larger EOC is ineligible for PA
funding.
The circumstances here highlight the awkwardness of attempting to apply the
language in the PAPPG to the COVID-19 pandemic, which clearly was not written with that
type of disaster in mind. See Joint Meeting of Essex and Union Counties, CBCA
7407-FEMA, 22-1 BCA ¶ 38,223, at 185,643 (discussing how “the PAPPG was written with
natural disasters, fires, and floods in mind rather than a pandemic like COVID-19”). The
concept of maintaining the same facility size when transferring to a new temporary building
seems tied to the destruction or loss of the original facility and the need to move into
temporary quarters while the original is being repaired or restored. Here, the Turk Street
building was not destroyed. It just was not feasible for use as an EOC during the COVID-19
pandemic. In light of the nature of the disaster at issue here, it is difficult to square FEMA’s
position that the City was unable to expand the square footage of its EOC to accommodate
the then-common safety guidance to maintain distance between individuals to reduce the
likelihood of spreading the virus with FEMA’s mission of assisting state and local
governments to “save lives [and] protect public health [and] safety.” PAPPG at 58. FEMA’s
suggestion that PA funding would be available only to attempt to retrofit the small Turk

CBCA 8853-FEMA

8

Street space into something useable, without expanding its size, clearly would not have been
workable, given then-current safety protocols.
Reading FEMA’s policy guidance as a whole, we reject the argument that the City was
barred from seeking PA funding for increasing its available square footage to create a safer
EOC in the circumstances here. We interpret the PAPPG and FEMA’s supplementary
COVID-19 policies “in line with meeting the goals behind the PA program[,] . . . consistent
with the President’s emergency declaration and subsequent major disaster declaration.” Joint
Meeting of Essex and Union Counties, 22-1 BCA at 185,644. The PAPPG makes clear that,
when a disaster strikes, a state or local government can establish an EOC to coordinate
disaster relief activities and that the costs of establishing that EOC, including the costs to
lease a facility, are eligible for PA funding:
The Applicant may use its EOC to direct and coordinate resources and
response activities for a period of time. Response activities conducted at
EOCs are eligible provided they are associated with eligible work. Costs
associated with operating the EOC are also eligible, including, but not limited
to:
•
•
•
•

Increased utility costs
Costs to lease a facility
Supply costs
Meal costs, as described in Chapter 2: VI.B.8

PAPPG at 62 (emphasis added). At one point during the hearing in this matter, FEMA
suggested that perhaps the City could have maintained Turk Street but opened a second EOC
elsewhere, splitting the EOC’s functions between locations. Presumably, costs associated
with opening a second EOC would have been eligible for PA funding under the PAPPG. In
fact, in a recent second appeal decision in another matter, FEMA did just that, authorizing
PA funding for costs incurred at several EOCs that a state established and opened in response
to the COVID-19 disaster. See FEMA Second Appeal Decision, Harris County,
FEMA-4485-DR-TX, GMP 698842 (Mar. 4, 2025) (providing PA funding for EOC costs
where the Applicant had “established EOCs in multiple locations to address the COVID-19
pandemic response and significantly expanded emergency response staffing”)
(https://www.fema.gov/appeal/immediate-threat-104 (last visited Sept. 15, 2026)).
Although FEMA views the costs of establishing an EOC at the Moscone Center as a
transfer of work from the Turk Street building, it seems clear that the COVID-19 pandemic
created a situation that required the City to establish a new and expanded EOC from what it
had in place. The City referred to the Moscone Center EOC as its CCC, which was limited

CBCA 8853-FEMA

9

to and focused exclusively on dealing with the effects of the COVID-19 pandemic on the
City’s population. It allowed for life-saving safety protocols that the Turk Street EOC, which
also housed the City’s 911 call center and other City services (which did not move to the
Moscone Center), could not have accommodated. We view the EOC that the City established
at the Moscone Center not as one that transferred from Turk Street but as a new type of EOC,
focused on COVID-19, that required very different safety protocols from what was
previously required. The PAPPG provides that, for a new EOC, costs associated with leasing
a facility to host the EOC are eligible for PA funding. PAPPG at 62. In light of the nature
of the disaster at issue here and the need at the time for social distancing, we cannot accept
FEMA’s position that the Moscone Center’s use as an EOC is ineligible for PA funding
simply because it had a significantly larger square footage than the Turk Street space.
With regard to FEMA’s position that it was unnecessary from a safety standpoint for
the City’s EOC to move to the Moscone Center, we reject it. The Turk Street facility could
accommodate only about fifty people before COVID-19 and even less than that when social
distancing became necessary. Applicant Exhibit 37 (Written Direct Testimony of Adrienne
Bechelli (July 7, 2026) (Bechelli Testimony) ¶ 6). During the pandemic, hundreds of people,
and sometimes up to several hundred at a time, were required to staff the EOC. Id. Evidence
that the City placed into the record and photographs of the Moscone Center EOC seen in
newspaper articles to which the City has cited in its briefing show the large increase in
activity and number of engaged individuals from what a pre-COVID EOC would have seen.
We cannot ignore the well-known safety guidance that was in place early in the pandemic.
The City’s decision to open its EOC at the Moscone Center was reasonable from a safety
standpoint, and the work necessary to open and operate that facility is eligible for PA
funding.
We address the costs that the City claims it incurred to perform that eligible work
below.
B.

Specific EOC Costs Incurred
1.

“Management” (Contract Labor) Costs
a.

Treating “Management” Costs as a Substitute for Rent

The City seeks PA funding of $1,260,787.28 for what it describes as “management”
costs for the Moscone Center EOC, which it believes it should be reimbursed as a substitute
for rent. Because the City owns the Moscone Center, the City did not pay rent to use it.
Nevertheless, the City had a pre-existing management agreement in place with the MCJV
through which the MCJV was managing and operating the Center. Under its management

CBCA 8853-FEMA

10

agreement, the City paid the MCJV an annual fee to manage and operate the Moscone
Center, RFA Exhibit 4 at 00021, but the City still remained “generally responsible for costs
of operation of the Convention Center in accordance with an approved budget,” for “all
necessary capital expenditures,” and “for the cost of all capital improvements.” Id. at 00018,
00024.1
The City asserts that the costs underlying the $1,260,787.28 figure for which it seeks
PA funding were incurred for MCJV employee labor (plus benefits) that the MCJV used to
set up and operate the Center, as part of its management agreement, from March to June
2020:
The $1,250,787.28 claimed . . . is for labor provided by MCJV to make the
Moscone Center operational as an EOC. . . . [T]his included workers to clean
and sanitize the site according to COVID-specific protocols, provide security,
and reconfigure spaces as the pandemic—and the resulting needs at the
EOC—evolved over time.
Applicant’s Supplemental Information Submission (Aug. 5, 2026) at 2 (citing Bechelli
Testimony ¶ 8); see RFA at 13 (“The City incurred $1,260,787.28 in contract labor costs
required to operate the EOC” at the Moscone Center.). The City claims that, “[r]ather than
negotiating an entirely new [management] agreement [with the MCJV], the City utilized its
pre-existing . . . agreement that required [certain] payment terms in order to stand up the
EOC as quickly as possible due to the threat posed to the community by COVID-19.” RFA
at 14.2 “In other words,” it explains, “the costs incurred for the MCJV to manage and operate
the temporary EOC space was the cost to lease the facility.” Id. “Since costs to lease a
temporary facility to house an EOC are eligible under the PAPPG,” the City argues, “the
claimed temporary facility management and operation contract labor is eligible,” without
regard to whether such costs would normally qualify for PA funding. Id. at 14-15.
We reject the City’s position that we render MCJV labor or “management” costs as
automatically eligible for PA funding, without identification of the actual work performed,
1

The term “capital expenditures” is defined in the management agreement as
“all expenditures for building additions, alterations or improvements, and for purchases of
additional or replacement furniture, machinery or equipment.” RFA Exhibit 4 at 00025.
2

In its RFA, the City repeatedly refers to its agreement with the MCJV as a
“lease agreement.” A review of the agreement makes clear that it is a management
agreement through which the City pays the MCJV an annual management fee to manage and
operate the Moscone Center building, not a lease. See RFA Exhibit 4.

CBCA 8853-FEMA

11

by treating the costs as a substitute for a lease. Although lease costs for an EOC used in
response to a disaster are eligible for PA funding, PAPPG at 62, the City incurred no lease
costs because it owns the building in which it opened its COVID-19 EOC. We cannot accept
the City’s view that we should pretend that contract labor costs of more than $1 million were
a substitute for rental costs and that we can award them, in total, without any evaluation of
whether the actual costs incurred are of a type eligible for PA funding. The City has cited
no provisions within the PAPPG that would allow FEMA (or the panel) to create such a legal
fiction. The City can obtain PA funding for the contract labor costs only if it can establish
the eligibility of those costs.
b.

Contract Labor Eligibility

“FEMA provides PA funding for contract costs based on the terms of the contract if
the Applicant meets Federal procurement and contracting requirements.” PAPPG at 30. The
City tells us that the MCJV, pursuant to its management contract with the City, billed it for
the labor costs that it incurred in transforming the Moscone Center into an EOC. According
to the City, “[a]ll of the employees providing the covered labor [totaling $1,260,787.28] were
MCJV employees, not City employees—i.e., contract (not force account) labor.” Applicant’s
Supplemental Information Submission at 3. The City acknowledges that it “does not know
whether the individuals providing the labor were existing or temporary MCJV employees.”
Id. Nevertheless, it asserts that “[a]s the employees were contractors, the status of each
employee is irrelevant to the eligibility of the costs” because, pursuant to policy, FEMA
“provides PA funding for contract costs based on the terms of the contract.” Id. (citing
PAPPG at 30). Because the City’s management contract required it to pay all operations
costs at the Moscone Center, the contract labor costs are, according to the City, automatically
eligible for PA funding.
FEMA’s main argument in challenging the City’s eligibility for PA funding for these
costs is that these contract labor costs are ineligible because the transfer of the EOC to the
Moscone Center is not eligible for PA funding. As previously discussed, we reject FEMA’s
argument about the eligibility of the Moscone Center EOC.
FEMA also objects to costs associated with opening and retrofitting the Moscone
Center because they “simply represent ineligible increased operating costs.” FEMA’s
Surreply Brief at 5. To the extent that FEMA is claiming that, because it operated an EOC
before COVID-19, costs incurred during COVID-19 cannot be considered anything but an
ineligible increase in operating costs, the PAPPG conflicts with that position. The PAPPG
appears to treat EOCs differently than other types of facilities, generally providing funding
for increased costs without regard to the limitations that it imposes on such funding for other
facilities. See PAPPG at 62. Even if an EOC was considered to be like any other facility,

CBCA 8853-FEMA

12

the PAPPG provides that, if an applicant “incur[s] additional costs related to operating a
facility as a result of the incident because of an increased demand for the services the facility
provides,” PAPPG at 60, such costs are eligible for PA funding if they meet the following
criteria:
•
•
•

The services are specifically related to eligible emergency actions to
save lives or protect public health and safety or improved property;
The costs are for a limited period of time based on the exigency of the
circumstances; and
The Applicant tracks and documents the additional costs.

PAPPG at 60-61. Included in that list are “EOC facility costs (e.g., utilities).” Id. at 61.
Here, we have already found that the reconstituted EOC was necessary for safety reasons and
was designed to save lives. Further, the EOC at the Moscone Center operated for a limited
period, running from March 2020 through July 2021 (although the costs claimed here run
from March 2020 through only June 2020). To the extent that the City can document
increased costs from work necessary to open and operate the EOC during the period at issue
here, they would be eligible for PA funding.
c.

The City’s Contract Labor Cost Support

FEMA finally objects that the City has not established what work the contract labor
performed or that all of it was associated with and necessary for the establishment or
operation of the Moscone Center EOC. In one of the two first appeal decisions giving rise
to this arbitration matter, FEMA noted that “the operations summary and invoices [that the
City submitted to FEMA] reflect only the costs paid to the [MCJV] without identifying the
actual work performed,” meaning that the City has failed to “demonstrat[e] how the services
were directly tied to eligible emergency protective measures.” RFA Exhibit 1 at 00003.
Under the PAPPG, to support a claim for necessary contract costs, the applicant
should provide a copy of its contract with the vendor, identify the dates worked, and, “[f]or
time and materials (T&M) contracts, [provide] monitoring information.” PAPPG at 139
(table 10). Regardless of whether the City’s management contract with the MCJV was a
T&M contract on its face, it was applied in that manner, with the City and the MCJV
agreeing that the City would reimburse the MCJV for all labor costs that the MCJV incurred
in converting the Moscone Center into an EOC. See Information Systems & Networks Corp.
v. United States, 64 Fed. Cl. 599, 605 (2005) (“In a time and materials type contract, the
contractor provides ‘supplies or services on the basis of (1) direct labor hours at specified
fixed hourly rates that include wages, overhead, general and administrative expenses, and
profit and (2) materials at cost.’” (quoting 48 CFR 16.601 (1998)).

CBCA 8853-FEMA

13

As even the City acknowledges, there are problems with the City’s contract labor
record-keeping. As far as we can tell, the City has no documentation showing what the
MCJV contract labor did at any given time—it has presented no “monitoring information”
showing what work was performed, in which portion of the EOC it was performed at any
given time, when it was performed, or who performed it. The City admits that it does not
even “know whether the individuals providing the labor were existing or temporary MCJV
employees.” Applicant’s Supplemental Information Submission at 3. That lack of
documentation is problematic to the City’s funding request. See City and County of San
Francisco, California, CBCA 8852-FEMA, slip op. at 5 (Aug. 25, 2026) (FEMA policy
requires an applicant seeking funding for contractor costs to show the “‘who, what, when,
where, why, and how much’ for each item claimed.” (quoting PAPPG at 133)).
That being said, it is clear from the evidentiary record and the testimony at the hearing
that at least a significant portion of the contract labor work performed was necessary to
convert the Moscone Center into a COVID-related EOC. Although we recognize that “[i]t
is the applicant’s obligation to provide sufficient documentation to support recovery on
claimed costs,” Pedernales Electric Cooperative, Inc., CBCA 8383-FEMA, 25-1 BCA
¶ 38,867, at 189,153 (citing City of Miami Beach, Florida, CBCA 8205-FEMA, 25-1 BCA
¶ 38,738, at 188,324-25), the City in this case has provided documentation showing that it
actually incurred the claimed contract labor costs, and it is clear that at least a significant
portion of that work related to the Moscone Center EOC conversion.
In its DM and first-appeal decision, FEMA’s main opposition to the City’s PA
funding request was the alleged ineligibility of the Moscone Center EOC itself, based on the
increase in size from the Turk Street EOC. The documentary support for the contract labor
costs was not a central focus, and FEMA devoted little time to reviewing contract labor
records to determine whether some of those costs, were the transfer of the EOC to the
Moscone Center deemed eligible for PA funding, would support recovery. With a poorly
developed record on this point, and because it is clear that a significant portion of the
contract labor time was devoted to eligible Moscone Center EOC set-up work, we believe
it appropriate to return this matter to FEMA for further development and review. See, e.g.,
Sevier County, Tennessee, CBCA 8292-FEMA, 25-1 BCA ¶ 38,877, at 189,227 (returning
matter to FEMA for further development of a particular cost claim); Pedernales Electric,
25-1 BCA at 189,154, 189,158 (same); Charlotte County, Florida, CBCA 8405-FEMA, 25-1
BCA ¶ 38,840, at 189,009 (same).
During that review, the City will need to account for those costs that the City would
have incurred for the operation (or non-operation) of the Moscone Center even if it had not
been used as an EOC. As noted above, a provision in the City’s pre-COVID management
agreement with the MCJV for the Moscone Center provided that the “City is generally

CBCA 8853-FEMA

14

responsible for costs of operation of the Convention Center in accordance with an approved
budget.” RFA Exhibit 4 at 00018. It seems clear that, during the early stages of the
COVID-19 pandemic, the City would still have incurred some contract labor costs through
the MCJV to maintain a facility the size of the Moscone Center, even if it had been closed
to public access. Under the PAPPG, an applicant can recover only the “additional costs” of
operating a facility, above and beyond what the applicant would have paid absent the disaster.
PAPPG at 60 (emphasis added). The City tells us that it has extracted from its PA funding
request all base costs that it would have incurred had it not used the Moscone Center as an
EOC, see Bechelli Testimony ¶ 7; Applicant Exhibit 21 at 1, but it never identifies what costs
it incurred but did not charge FEMA, their amount, or any calculations showing how the
costs not requested compare either in type or amount to the costs actually being requested.
That means that we have no ability, based on evidentiary support in the record, to confirm
the City’s assertion. Further, it appears from the City’s submissions that the “base operating
costs” that it excluded from its PA funding request relate solely to “licenses, subscriptions,
taxes, insurance, and non-event-specific supplies.” Applicant’s Supplemental Information
Submission at 3 n.1. Those seem unlikely to be the only Moscone Center costs for which the
City would have been responsible had it not converted the Center into an EOC—ongoing
maintenance and security, if not other activities, would have still been required even if the
building had been temporarily shuttered. To the extent that, upon further review, FEMA
finds that the City has not provided evidence of the costs that it would have incurred absent
the Moscone Center’s conversion to an EOC, it may consider that factor as part of its PA
funding analysis.
2.

Utilities

The City seeks $19,603.06 in PA funding for utility costs ($8474.50 for water and
$11,128.56 for trash) that the MCJV charged while the Moscone Center was being used as
an EOC. See RFA at 5, 18; RFA Exhibit 10 at 00087. Normally, “FEMA does not provide
PA funding for utility, maintenance, or operating costs in a temporary facility, even if these
costs increase.” PAPPG at 79. Increased utility costs for an EOC are an exception to that
rule. Id. at 60-61, 62. Accordingly, increased utility costs, beyond what the City would
normally incur for utilities at the site, are eligible.
One of FEMA’s stated reasons for denying these costs was that, because the Moscone
Center was larger than the Turk Street EOC, any costs incurred to transfer the EOC to the
Moscone Center and then use it as an EOC are automatically ineligible for PA funding. See
FEMA’s Response Brief at 19 (“[N]othing in FEMA policy would allow for the payment of
the Applicant’s transition to the convention center in this matter or the utility costs incurred
at that location.”). We rejected that position above. The City was entitled to open a new

CBCA 8853-FEMA

15

EOC. Costs incurred to establish and operate that new EOC are not ineligible simply because
the new EOC is larger than the original.
Nevertheless, as discussed above, an applicant can recover only the “additional costs”
of operating a facility, above and beyond what the applicant would have paid absent the
disaster. PAPPG at 60 (emphasis added); see id. at 62 (defining as eligible “[i]ncreased
utility costs” at an EOC). The City was responsible for operating costs at the Moscone
Center before it opened the EOC there, and it has provided us with no specific information
identifying what it was paying monthly for utilities there before the COVID-19 pandemic or
what utility costs it would have incurred had the City not opened its EOC there. Instead, the
City says merely that it “is entitled to reimbursement for the costs that are directly attributable
to the emergency use of the facility as an EOC, distinct from its preexisting obligations.”
Applicant’s Reply Brief at 13-14.3 We disagree. The City cannot receive funding for utility
costs that it would have incurred even if it had not opened an EOC at the Moscone Center.
As noted above, “[i]t is the applicant’s obligation to provide sufficient documentation
to support recovery on claimed costs.” Pedernales Electric, 25-1 BCA at 189,153. The City
provides no estimate, much less evidence, of what utility costs it would have incurred.
Normally, its failure to do so means that the City has failed to satisfy its burden of proof for
PA funding. Nevertheless, since we are returning this matter to FEMA to review the City’s
contract labor support, the City may present additional information to FEMA during that
review to attempt to establish what the increase in its utility costs was. See Sevier County,
Tennessee, 25-1 BCA at 189,227; Pedernales Electric, 25-1 BCA at 189,154.
3.

Rented A/V Equipment

The City seeks $603,045.23 in PA funding to cover the costs of equipment rented to
allow it to provide critical emergency response activities at the EOC, including A/V
equipment required by EOC staff to monitor conditions in the City, communicate with
relevant entities, and generate and broadcast public safety messages. See RFA at 18; RFA
Exhibit 19. The City paid that amount directly to MCJV to reimburse it for its payment to
Projection Technology, a company that provided the A/V equipment and the labor necessary
to install and configure it. The City’s records reflect that, during each week beginning
March 16 and running the week of June 29, 2020, the City incurred A/V equipment rental

3

During an opening statement at the July 16 hearing, the City asserted that the
utility costs which the City seeks here are those that were above and beyond the utility costs
normally incurred at the Moscone Center. We can find nothing in the evidentiary record
supporting that statement.

CBCA 8853-FEMA

16

and associated labor costs in the identified amounts at the EOC.
Supplemental Information Submission at 5-6.

See Applicant’s

“When the Applicant leases equipment, FEMA provides PA funding based on the
terms of the lease.” PAPPG at 28. “Leasing costs are eligible if . . . [t]he Applicant
performed an analysis of the cost of leasing versus purchasing the equipment; and . . . [t]he
total leasing costs do not exceed the cost of purchasing and maintaining equipment during
the life of the eligible project.” Id. (footnote omitted).
In addition to its position that the use of the Moscone Center as an EOC is ineligible
for PA funding, a position that we have already rejected, FEMA argues that the City’s
documentation to support it’s A/V costs is insufficient to demonstrate the necessity of the
work or how it is directly tied to an eligible facility. FEMA’s Response Brief at 21-22. Yet,
like its review of the City’s contract labor costs, FEMA has never effectively reviewed the
City’s support for these costs. It originally denied them because the Moscone Center EOC
was, in its view, not an eligible facility. We return this cost claim to FEMA for further
review and evaluation. See Sevier County, Tennessee, 25-1 BCA at 189,227; Pedernales
Electric, 25-1 BCA at 189,154.
4.

Facility Internet, Telecom, and Electrical Service Alterations

The City asserts that it incurred $595,991.70 in costs needed to make temporary
alterations to the Moscone Center’s electrical, telecom, and internet systems to accommodate
the needs of the Center’s use as an EOC. RFA at 21; RFA Exhibit 14; Applicant’s
Supplemental Information Submission at 3. This work included installing power outlets,
establishing internet access, setting up phones consistent with established EOC protocols,
and installing a series of large briefing screens that allowed on-site EOC staff to track known
disease spread and the availability of isolation and quarantine rooms in the area. RFA
at 21-22; Bechelli Testimony ¶ 8. The City alleges that “[w]ithout these services, the EOC
could not have functioned properly due to the needs of the EOC for electricity and broadband
exceeding the capabilities” of the Center. RFA at 21-22.
Putting aside its argument about the ineligibility of the Moscone Center as an EOC,
which we have previously rejected, FEMA argues that the City has failed to submit sufficient
documentation to meet its burden of showing that the requested costs were tied directly to
eligible EPMs, FEMA’s Surreply Brief at 8-11, even though it does not challenge that the
costs claimed were actually incurred. The City’s descriptions of the work performed makes
it clear that the work was tied to the establishment of the Moscone Center EOC. Further,
FEMA has previously recognized that “[a]s part of operating EOCs and temporary medical
facilities, necessary supply costs, including IT supplies such as computers, are eligible.”

CBCA 8853-FEMA

17

Second Appeal Decision, Harris County, FEMA-4485-DR-TX, GMP 698842 (Mar. 4, 2025).
We return this claim to FEMA to reconsider the extent to which the claimed costs are eligible
for PA funding. See Sevier County, Tennessee, 25-1 BCA at 189,227; Pedernales Electric,
25-1 BCA at 189,154.
5.

Supplies for the EOC

The City seeks $55,740.39 for disinfecting supplies, such as Clorox wipes, that were
used to disinfect the EOC between March and June 2020. RFA at 18; RFA Exhibit 11.
FEMA policy specifically authorizes funding for that type of activity “in excess of the
Applicant’s regularly budgeted costs.” FEMA Safe O&O Policy at 5; see March 2020 Fact
Sheet at 1-2 (authorizing “[EOC] costs” including “[d]isinfection of eligible public
facilities”). FEMA’s sole objection to paying these costs is that the Moscone Center EOC
is not an eligible facility, an argument that we have already rejected. FEMA has not
questioned whether these costs were actually incurred. These costs are eligible for PA
funding.
6.

Meals for EOC Workers

The City seeks PA funding to cover $982,956.47 in costs for meals that the City
provided to EOC workers during the first four months of the EOC’s Moscone Center
operation. RFA at 24; RFA Exhibit 16. Of that amount, the City paid $584,068.39 to the
MCJV that manages the Moscone Center and $398,888.17 to various San Francisco
restaurants that delivered meals to the Moscone Center between March and June 2020. See
RFA Exhibit 16. The City alleges that, during that time, “EOC workers were working in a
high-paced environment that didn’t facilitate extended breaks for meals, hospitals were
overflowing with patients in critical condition, and uncertainty about how the virus spread
was rampant.” RFA at 22. It asserts that “[b]ecause the EOC played such a critical role in
the COVID-19 emergency response, the City could not afford to have COVID-19 spread
through the EOC and render critical staff unable to perform the[ir] response coordination
activities.” Id. at 23. It also asserts that “EOC employees were working extended/abnormal
hours” on “quick turnaround tasks that did not provide a reasonable amount of time for
employees to provide their own meals.” Id. at 23-24. The City tells us that it “thus
determined that COVID-19 rendered acquisition of food not reasonably available for its EOC
staff because those individuals would have put themselves and the community at significant
risk should they contract and spread COVID-19 while seeking food.” Id. at 24.
In support of its representations, the City offers the declaration of the Chief Deputy
Director of the San Francisco Department of Emergency Management, who explained why
the City believed that it needed to provide food for EOC workers from March to June 2020:

CBCA 8853-FEMA

18

During the early months of the pandemic, many food establishments in the
vicinity of the Moscone Center were closed or operating at severely reduced
capacity. Staff deployed to the COVID-19 EOC at the Moscone Center were
expected to work long hours, often having working meetings during lunchtime.
The intensity and continuity of emergency operations at the EOC left
insufficient time for employees to leave the facility, locate open food
establishments, and return while maintaining infection control protocols
throughout.
Declaration of Adrienne Bechelli (May 14, 2026) ¶ 5.
The PAPPG provides that FEMA may provide PA funding for meals brought in and
provided to employees working at an EOC if the following conditions are satisfied:
Provision of meals, including beverages and meal supplies, for employees and
volunteers engaged in eligible Emergency Work, including those at EOCs, is
eligible provided the individuals are not receiving per diem and one of the
following circumstances apply:
•
•

•

Meals are required based on a labor policy or written agreement that
meets the requirements of Chapter 2:V.A.1;
Conditions constitute a level of severity that requires employees to
work abnormal, extended work hours without a reasonable amount of
time to provide for their own meals; or
Food or water is not reasonably available for employees to purchase.

PAPPG at 63. “FEMA only reimburses the cost of meals that are brought to the work
location and purchased in a cost-effective and reasonable manner, such as bulk meals.” Id.
It is undisputed that the EOC employees did not receive per diem and that the meals
in question were brought to the EOC, meaning that the City has overcome those hurdles to
PA funding entitlement. Nevertheless, to obtain funding, the meals must also satisfy one of
the three specific circumstances identified in the PAPPG. Because it is clear that the City
did not have a labor policy or written agreement requiring it to provide meals to EOC
employees, the City has attempted to show that it meets the other two scenarios: that its EOC
employees’ work conditions were so extended and abnormal that they could not be expected
to obtain their own meals and that food was not reasonably available for purchase.
We do not doubt that, in the circumstances existing in early 2020, the City’s decision
that it should provide meals for its employees at the Moscone Center was reasonable as a

CBCA 8853-FEMA

19

means of showing appreciation for their efforts in a chaotic atmosphere. Nevertheless, the
question before us is whether the City is entitled to PA funding to reimburse it for making
that decision. The Board recently faced a similar situation in Bowling Green-Warren County
Community Hospital Corp., CBCA 8327-FEMA, 26-1 BCA ¶ 38,961 (2025), where an
applicant which ran a medical facility had contracted for food service “[f]or the continuity
of both COVID-19 and non-COVID-19 patient care during a critical staffing shortage.” Id.
at 189,667. There was no question that the facility owner’s decision to provide its staff with
food service was a reasonable discretionary action on its part, but FEMA cannot be expected
to fund costs that are incurred more for convenience and morale than absolute necessity.
Because the applicant in Bowling Green had shown only “that it incurred increased costs in
order to maintain operations,” the Board determined that the meal services were “not eligible
for PA.” Id.
We must find the same here. Although the City cites to the abnormally long hours that
employees assigned to the EOC had to work, which allegedly prevented them from having
any time to provide for their own meals, its employee time records do not provide adequate
support for that position. Further, the City indicates that a shelter-in-place health directive
from the City’s Public Health Department closed restaurants, making it impossible for
employees to obtain meals outside of the Moscone Center, but the directive contained
exceptions for grocery stores and carry-out restaurants, see RFA Exhibit 15 at 00100-02, and
more than 40% of the meal costs for which the City seeks PA funding were for food from
local bakeries, pizzerias, taquerias, and other restaurants and food services in the area. See
RFA Exhibit 16. Although we do not doubt the City’s good faith in deciding to provide
meals for its EOC workers, that does not mean that the costs incurred fit within the
parameters of FEMA’s emergency services funding policies. We, like the panel in Bowling
Green, find that their costs are not eligible for PA funding.
III.

EPM Supplies and Labor
A.

Straight-Time Temporary Employee Force Account Labor Costs

The City seeks PA funding of $117,549.18 (a reduction from its original request of
$117,808.46) for the straight-time labor-hour costs of eighty-nine temporary employees from
the City’s TIS department, whom the City assigned to work on technology projects at the
EOC in response to the COVID-19 pandemic.4 RFA at 15-17; RFA Exhibit 20. None of the

4

In its RFA, the City originally sought PA funding for the straight-time labor
costs of one additional employee who performed pandemic-related emergency protective
measures work but whose salary was funded by a state grant that allegedly could not be used

CBCA 8853-FEMA

20

eighty-nine workers was hired specifically to deal with COVID-related issues. Instead, the
City’s employment of each of those eighty-nine employees pre-dated the commencement of
the COVID-19 pandemic, each of them having been hired as temporary exempt (TEX)
employees (as opposed to permanent exempt (PEX) employees). Prior to the COVID-19
outbreak, TIS would assign each TEX employee to work a specific project for another City
department, and that City department benefitting from the work typically would either
assume responsibility for the TEX employee’s salary or reimburse TIS for the labor costs
associated with that project.
Normally, under the PAPPG, although FAL overtime costs incurred by budgeted
employees who provide emergency work in response to a disaster—whether they be
permanent employees or seasonal employees working during their normal season of
employment—might be eligible for PA funding, their straight-time FAL costs would not be.
PAPPG at 24 (fig. 11). For “unbudgeted employees” performing emergency services,
though, both overtime costs and straight-time labor-hour costs may be eligible. Id. The City
claims that the eighty-nine TEX employees who worked on technology projects at the EOC
were “unbudgeted” for reasons explained by Ms. Ma, TIS’s then-Chief Financial Officer:
At [TIS], as an internal service department, we hire PEX/TEX employees not
only to cover the regular operations, but mostly to work on capital projects
and/or work orders. Those PEX/TEX employees track their time and bill their
work by the hour to whatever the projects or work orders they are assigned to.
During the declaration of COVID emergency, we had to reassign these
employees to help support EOC and [Departmental Operations Centers]
activities, and they had to charge their hours to [the] COVID project to reflect
their actual work effort. I believe those hours should be reimbursable by
FEMA as [TIS] did not have a regular operating budget to fund these TEX
employees.
RFA Exhibit 8 at 00081. Ms. Ma expanded on that explanation in her testimony at the
hearing before the Board:
Before the pandemic, to the extent they had already been hired by the City,
these employees were temporarily assigned to City departments other than TIS
to perform specific projects based on those departments’ need for technology

to pay for EPM work. RFA at 17. In its reply brief, the City withdrew its request for PA
funding for this employee’s work. Applicant’s Reply Brief at 5. As a result, we no longer
need to address that PA funding request.

CBCA 8853-FEMA

21

services and billed their time for work they performed to those departments.
The TIS budget did not contain operating funds to pay for these employees.
Instead, the departments to which these employees were providing technology
services paid for the employees’ time.
In the early months of COVID-19, the City reassigned these employees to
work on emergency technological measures for the COVID-19 response . . . .
In working on COVID-19 emergency technology projects, these employees’
salaries were no longer funded by work orders from the other departments to
which they had previously been providing services. Instead, these employees
were now funded and billed their time to the COVID-19 response. TIS still
had no regular operating budget to fund these employees.
Applicant Exhibit 38 (Written Direct Testimony of ChiaYu Ma (July 7, 2026) ¶¶ 8-9).
In the PAPPG, FEMA identifies four types of “unbudgeted” employees potentially
eligible for PA funding: (1) an “[e]ssential employee called back from administrative leave”;
(2) a “[p]ermanent employee funded from [an] external source”; (3) a “[t]emporary employee
hired to perform eligible work”; and (4) a “[s]easonal employee working outside [the] normal
season of employment.” PAPPG at 24 (fig. 11). Because the TEX employees were not
called back from administrative leave to perform COVID-19-related work, the first category
does not apply. Because the City’s employment of the TEX employees at issue here predated the COVID-19 disaster (meaning that they were not hired specifically for the purpose
of performing work in response to that disaster) and because the temporary employees were
asked to perform COVID-related work during their “normal season of employment,” neither
of the third or fourth factors apply. Accordingly, the only way in which the straight-time
labor costs for the City’s TEX employees could qualify for PA funding is under the second
category—that is, if the City’s TEX employees were “funded from [an] external source” that
would not pay for the COVID-related work.5 That is the category under which the City relies
in seeking funding of its TEX employees’ straight-time labor costs here.
The PAPPG provides, in explaining the second category of “unbudgeted” employee,
that “[s]traight-time of a permanent employee [or presumably an in-season temporary
employee] funded from an external source (such as a grant from a Federal agency or

5

We assume, without deciding, for purposes of this decision that, although the
second category refers to “permanent” employees funded from an external source, the
rationale for allowing PA funding would apply equally to a temporary employee working
within his or her season of employment but funded from an external source.

CBCA 8853-FEMA

22

statutorily dedicated funds) is eligible if the employee is reassigned to perform eligible
Emergency Work that the external source does not fund.” PAPPG at 24. The City has not
identified any such source, external to the City itself, that funds the TEX employees. Instead,
the TEX employees were normally paid by the City but for work in departments other than
TIS, the department that was responsible for and ultimately utilized TEX employees for the
COVID-related emergency work. Yet, the applicant in this matter is not TIS. It is the City.
Nothing in the PAPPG’s description of an “external source” would allow us to find that, in
seeking PA funding, the City can focus solely on the operating budget of a particular
department within the City and then claim that, because that department utilized the
employees of other City departments to assist in emergency work, those employees were
funded by an “external source” unrelated to the using department. Clearly, by referencing
an “external source,” the PAPPG is indicating a source external to the City itself, not a source
merely external to the utilizing department. Because the TEX employees were paid by the
City, it matters not which internal department normally processed or funded their paychecks
and which one actually utilized their services during the emergency. Under the PAPPG,
unless funding for the TEX employees came from a source external to the City that the City
was unable to use to pay for the TEX employees’ disaster-related emergency work, the City
cannot claim them as “unbudgeted”—that is, “unfunded”—employees and cannot obtain PA
funding to cover their straight-time labor costs.
To support its belief that its TEX employees should be considered as unbudgeted and
therefore eligible for straight-time labor cost PA funding, the City cites to decisions in which
FEMA authorized funding to cover straight-time pay for what were described in the decisions
as unbudgeted employees. Applicant’s Reply Brief at 3-4 (citing Second Appeal Decision,
Embry-Riddle Aeronautical University, Inc., FEMA-4468-DR-FL, GMP 130519/PW 228
(Oct. 21, 2024) (available at https://www.fema.gov/appeal/immediate-threat-force-accountlabor-equipment (last visited Sept. 15, 2026)) (describing pilots who flew emergency relief
missions with overnight stays as unbudgeted), and Second Appeal Decision, City of San
Antonio, FEMA-4586-DR-TX, GMP 184059/PW 821 (May 15, 2025) (available at
https://www.fema.gov/appeal/force-account-labor-equipment-costs-immediate-threat-28 (last
visited Sept. 15, 2026)) (describing certain police and public works employees who assisted
with emergency water distribution as unbudgeted)). The decisions to which the City cites
provide no detail about the nature of those employees’ duties and schedules or the regular
payment sources for their typical work. The vague descriptions in those decisions do not
create some kind of presumption that, because those employees were identified as
unbudgeted, the City’s TEX employees must also be considered unbudgeted.
The City also argues that, had it not needed the TEX employees to assist with
COVID-related work, it would have released or fired them as soon as the COVID-19
pandemic began because work on the regular projects to which they had been assigned shut

CBCA 8853-FEMA

23

down beginning in March 2020. The City believes that, because it did not budget for the
COVID-19 pandemic and because the City would not have continued to employ the TEX
workers but for the need to have them perform COVID-related work once the pandemic
began, the TEX workers are “unbudgeted.” That is an abject misapplication of FEMA
policy. Because, prior to the disaster, the City had included these eighty-nine TEX
employees’ labor time in its budget, they were “budgeted,” regardless of what work the City
ultimately pulled them from performing so that they could instead assist with COVID safety
efforts.
To the extent that the City believes that FEMA should adopt a policy based on
something other than the “budgeted” and “unbudgeted” employee guideline that it currently
uses, the Board does not make policy for FEMA. It applies the policies that FEMA has put
into place to ensure consistency in their application. See Franciscan Alliance, Inc.,
CBCA 7530-FEMA, 23-1 BCA ¶ 38,278, at 185,868 (“[A]s arbitrators, our job is not to
make public policy but to follow the applicable [FEMA] regulations and policy.”); New York
Society for the Relief of the Ruptured & Crippled Maintaining the Hospital for Special
Surgery, CBCA 7543, 23-1 BCA ¶ 38,268, at 185,810 (“In our role as arbitrators, we look
to determine whether FEMA has properly applied its policies in the factual circumstances
presented to us. We do not set policy for FEMA.”).
FEMA’s denial of PA funding for TEX employees here is consistent with its policy.
Because the City has not identified its TEX employees as routinely being paid by sources
external to the City itself, it has no basis for identifying them as “unbudgeted employees” for
purposes of the PAPPG. The City’s PA funding request for FAL straight-time TEX laborhour costs is denied.
B.

EPM Supplies

The City seeks PA funding for $918,430.30 in costs for supplies purchased between
March and June 2020 as EPMs, including personal protective equipment (such as gloves,
aprons, and masks), computer equipment (such as Universal Serial Bus (USB) data readers,
wristband thermal printers, healthcare point-of-care computing carts, routers, and monitors),
construction materials to build physical COVID-19 barriers for deployment across the City
(including at public transit sites), and other supplies (such as two hand trucks) necessary to
operate the EOC and coordinate the City’s pandemic response. See RFA at 19-20; RFA
Exhibit 12. Although some of these supplies were purchased for and used at the EOC itself,
others were used in temporary field offices and medical clinics across the City.
Under the PAPPG, “[c]osts associated with operating the EOC are . . . eligible,
including, but not limited to . . . [s]upply costs.” PAPPG at 62. Such supplies are “eligible

CBCA 8853-FEMA

24

if . . . [p]urchased and justifiably needed to effectively respond to and/or recover from the
incident; or . . . [t]aken from the Applicant’s stock and used for the incident.” Id. at 28. The
FEMA Safe O&O Policy goes a step further and defines specific supply costs that are eligible
for PA funding as follows:
FEMA may provide assistance to all eligible PA Applicants . . . for the
following measures implemented to facilitate the safe opening and operation
of all eligible facilities in response to COVID-19 declared events:
I.
ii.

Purchase and distribution of face masks, including cloth face coverings,
and personal protective equipment (PPE).
Cleaning and disinfection, including the purchase and provision of
necessary supplies and equipment in excess of the Applicant’s regularly
budgeted costs.

....
v.

Acquisition and installation of temporary physical barriers, such as
plexiglass barriers and screens/dividers, and signage to support social
distancing, such as floor decals.

FEMA Safe O&O Policy at 5 (footnotes omitted). The March 2020 Fact Sheet also
authorizes costs associated with “[m]ovement of supplies and persons” and “[EOC] costs,”
including “[d]isinfection of eligible public facilities.” March 2020 Fact Sheet at 1-2.
In its response to the RFA, FEMA challenged this claim by arguing that the City’s
summary documentation “fails to either demonstrate that the items were necessary to conduct
an eligible COVID-19 EPM or related to the safe opening and operating of an eligible
facility.” FEMA’s Response Brief at 21. The City replied by adding all of the invoices
supporting these requested costs to the arbitration record and subdividing them by the City
Department that incurred the costs in question. The City explained that “[d]ifferent
departments had different responsibilities in setting up the EOC,” Applicant’s Reply Brief
at 21, and it detailed each department’s EPM costs, some of which we summarize below:
•

$9432.98 in costs, supported by receipts with contemporaneous
notations by employees identifying the purpose of each purchase, that
the City’s Department of Emergency Management incurred for painter
blue tape to post COVID-19 posters and flyers outside and around the
EOC; cleaning wipes and soap dispensers for the EOC, along with
other cleaning supplies; and forehead thermometers, Ziploc bags,

CBCA 8853-FEMA

25

earbuds, headphones with built-in microphones, and light blue safety
vests for the San Francisco Joint Information Center’s Community
Outreach branch team house at the Moscone Center (Applicant
Exhibit 36; Applicant’s Reply Brief at 17-18);
•

$650,852.08 in costs, supported by receipts, that the City’s Department
of Public Health incurred for computer equipment and printers at
COVID-19 screening, isolation, and temporary clinic locations and
triage tents, plus $74,954.81 in costs, supported by receipts and also
incurred by the City’s Department of Public Health, for face masks,
disposable gloves, bathroom tissue, aprons, and a hand truck, some for
delivery to the EOC and others for delivery to field clinics (Applicant
Exhibit 25; Applicant’s Reply Brief at 18-20);

•

$57,044.63 in costs, supported by Incident Command System (ICS)
Standard Form (SF) 213 Resource Requests, receipts, and
contemporaneous written explanations of need, that the City’s
Department of Public Works incurred for security barricades, cubicle
partitions, and equipment needed to create such barricades and
partitions to reduce the opportunity for COVID-19 transmission at the
EOC (Applicant Exhibit 26; Applicant’s Reply Brief at 20-21);

•

$922.46 in costs, supported by invoices, that the City’s Department of
Human Resources incurred to purchase a printer, printer ink,
whiteboards, a dry erase pens, and glass cleaner for the EOC (Applicant
Exhibits 28, 29, 30, 31; Applicant’s Reply Brief at 23-24); and

•

$15,679.80 in costs, supported by an ICS SF 213 Resource Request,
that the City’s Department of Technology incurred for materials and
communication equipment provided by Converge One to accommodate
the increase in call center usage by the EOC (Applicant Exhibit 34 at 3;
Applicant’s Reply Brief at 26-27).

On their face, those claimed costs appear to fall within the category of eligible EPMs.
With regard to the City’s purchase of computer equipment and printers for its field clinics,
the PAPPG provides that, “[i]f the Applicant purchases equipment that it justifiably needs
to respond effectively to the incident, FEMA provides PA funding for both the purchase
price and either . . . [t]he use of the equipment based on equipment rates . . . or . . . [t]he
actual fuel and maintenance costs.” PAPPG at 26. Similarly, the incremental costs of the
types of cleaning and disinfecting supplies that the City has identified are generally eligible

CBCA 8853-FEMA

26

for PA funding. FEMA Safe O&O Policy at 5; March 2020 Fact Sheet at 2. Further, the
documentation that the City has provided appears consistent with that described in tables 7
and 10 of the PAPPG. See PAPPG at 134, 139-40.
Yet, in its surreply, FEMA tells us that the documentation is insufficient to “provide
that link” tying “those costs directly to eligible [EPMs].” FEMA’s Surreply Brief at 9. It
cites to the PAPPG, which provides that “[t]he Applicant is responsible for showing that
work is required . . . [d]ue to an immediate threat resulting from the declared incident (for
Emergency Work).” PAPPG at 19. FEMA does not tell us with any specificity what is
missing and what more it needs to make an eligibility determination in the City’s favor.
Given the nature of the documentation (including contemporaneous notations as to the
reasons for certain purchases by the individuals purchasing on behalf of the City), the
explanations from the City about the need for each of the supplies, and the fact that the
supplies at issue are clearly the types that were necessary early in the COVID-19 pandemic,
it is difficult to see what more FEMA expects. Telling the panel that there needs to be
“more,” without providing a detailed explanation identifying specific defects in the
applicant’s presentation, is not helpful to the panel. It provides us with no reasoned basis for
denying the applicant’s funding request.
In the circumstances here, we find that the EPM costs that the City has claimed are
eligible for PA funding, with the following exceptions:
First, the City seeks $3975.44 in costs that the City’s Recreation and Park Department
incurred to purchase chains and padlocks to preclude access to city parks during emergency
shelter-in-place orders. See Applicant’s Reply Brief at 24-26; Applicant Exhibits 32, 33.
Although the FEMA Safe O&O Policy allows funding for the “[a]cquisition and installation
of temporary physical barriers,” the types of barriers that it addresses are “plexiglass barriers
and screens/dividers” that would reduce the likelihood of airborne virus spread between
individuals in close proximity to one another. FEMA Safe O&O Policy at 5. If, as it
appears, the chains and padlocks were purchased to be a security measure to protect park
property, the City has not identified a basis for PA funding. Even if they were acquired to
preclude the spread of COVID-19, “FEMA does not extend emergency work eligibility to
implement community-wide mitigation efforts to reduce a future event, such as the
anticipated or potential transmission of COVID-19.” FEMA Second Appeal Decision, City
of Miami Beach, FEMA-4486-DR-FL, GMP 680008/PW 1030 (Mar. 26, 2025) (available
at https://www.fema.gov/appeal/immediate-threat-107#_ftnref11 (last visited Sept. 15,
2026)). This cost is ineligible.
Second, FEMA challenges $31,699.11 in costs that the City’s Fire Department
incurred to purchase stairchairs, cots, grocery bags, uniforms, and washing machines,

CBCA 8853-FEMA

27

asserting that the City “provides little to no explanation as to how these items are directly
related to the performance of eligible, COVID-19-related [EPMs] nor does it provide an
actual policy that allows such items.” FEMA’s Surreply Brief at 9-10. We will allow the
Fire Department’s claim for $2164.93, which represents the cost of paper bags that the City
asserts were purchased to allow for the “safe and sanitary storage of N95 masks.”
Applicant’s Reply Brief at 22. We deny PA funding for the other costs. With regard to the
purchase of new uniforms, there is no allegation that there was anything special or different
about the uniforms being purchased that would make them more protective than the
firefighters’ regular uniforms. “Increased costs of operating a facility or providing a service
are generally not eligible, even when directly related to the incident.” PAPPG at 42.
“[S]hort-term increased costs that are directly related to accomplishing specific emergency
health and safety tasks as part of emergency protective measures may be eligible,” id., but
only if the “services are specifically related to eligible emergency actions to save lives or
protect public health and safety or improved property” and “[t]he costs are for a limited
period of time based on the exigency of the circumstances.” Id. at 61. There is simply
insufficient information in the record to support PA funding for new firefighting uniforms,
new washing machines (presumably for placement at fire stations), and new stairchairs.
Third, FEMA challenges costs of $67,448.42 and $6420.36 (totaling $73,868.78) that
the City’s Department of Technology paid to two companies to set up virtual
communications platforms and obtain licenses to support “offsite/remote Board of Supervisor
. . . meetings” and “other Commission meetings.” Applicant Exhibit 34 at 1, 7; see FEMA’s
Surreply Brief at 10. FEMA asserts that “[n]one of FEMA’s PA policies, COVID-19 related
or not, list the provision of legislative or commission meetings as an eligible [EPM]” and that
“the measures fall squarely under the type [of] administrative operating costs that FEMA has
determined are outright ineligible for reimbursement.” FEMA’s Surreply Brief at 10-11.
Although the City argues, through the written testimony of one of its witnesses, that this
work promoted public health and safety by “allowing for virtual attendance of both
government officials and members of the public to reduce the spread of COVID-19,”
Bechelli Testimony ¶ 13, FEMA policy provides that activities coordinated through an EOC
are eligible only “provided they are associated with eligible work,” PAPPG at 62, which,
with regard specifically to the COVID-19 pandemic, must be “necessary to save lives and
protect public health and safety.” FEMA Safe O&O Policy at 4. FEMA has identified the
EPMs that might constitute eligible work in response to COVID-19 as the purchase and
distribution of face masks, cleaning and disinfection supplies and equipment, COVID-19
diagnostic testing, COVID-19 screening and temperature scanning, acquisition and
installation of temporary physical barriers, and the purchase of personal protective
equipment. Id. at 4-5. We cannot find anything in FEMA’s COVID-19 policies that would
extend PA funding to A/V equipment for local government commission meetings. To the
extent that the City’s documentation indicates that the EOC could have used these platforms

CBCA 8853-FEMA

28

for press conferences, the EOC was not the primary intended user of this technology. We
exclude $73,868.78 from the City’s funding request for Department of Technology costs.
Accordingly, of the City’s request for $918,430.30 in EPM supply costs, we authorize
PA funding of $811,051.90.
IV.

Portable Toilets and Handwashing Stations at a Field Care Clinic

Although the bulk of the City’s PA funding request addresses costs incurred for its
EOC at the Moscone Center, the City has also requested $51,025 in funding for the cost of
renting portable toilets and handwashing stations to support an outdoor COVID-19 testing
clinic at 2401 Keith Street. That outdoor clinic sat next door to the Southwest Family Health
Center medical facility, which sits within a fully constructed permanent building at
2403 Keith Street.
Under FEMA Policy FP 104-010-04, “Coronavirus (COVID-19) Pandemic: Medical
Care Costs Eligible for Public Assistance” (May 2020), FEMA may provide PA funding for
medical care and associated costs related to COVID-19 diagnostic testing provided by a state
or local government. Id. at 2, 5, 9. Such costs include “eligible facility, equipment, supplies,
staffing, and wraparound services” costs. Id. at 2. “Wraparound services . . . include, but
are not limited to, . . . linen and laundry services; food preparation and delivery; biomedical
waste removal, including contaminated items such as personal protective equipment;
perimeter fencing; contracted security guards; professional cleaning; and other related
services.” Id. at 10. Included in allowable costs are administrative activities and “associated
costs” needed to allow for the provision of medical services:
For temporary and expanded medical facilities, and the specific type of
temporary medical facilities known as Alternate Care Sites, administrative
activities and associated costs necessary for the provision of essential medical
services are eligible.
Id. at 5.
FEMA acknowledges “that portable toilets and handwashing stations may qualify as
EPMs” but only if they “are necessary for safely opening and operating an eligible facility.”
FEMA’s Response Brief at 23 (citing FEMA Second Appeal Decision, City of Tallahassee,
F E MA - 4 4 8 6 - D R - F L , G M P 6 7 2 3 7 6 ( J u l y 3 , 2 0 2 5 ) (av a i l a b l e at
https://www.fema.gov/appeal/immediate-threat-123 (last visited Sept. 15, 2026)). But see
FEMA Second Appeal Decision, City and County of San Francisco, FEMA-4482-DR-CA,
GMP 710625/PW 5755 (June 4, 2026) (“Portable toilets are not an eligible emergency

CBCA 8853-FEMA

29

protective measure that is included under any of the categories in the O&O Policy.”)
(available at https://www.fema.gov/appeal/immediate-threat-153 (last visited Sept. 15,
2026)); FEMA Second Appeal Decision, City of San Luis Obispo, FEMA-4482-DR-CA,
GMP 693733/PW 2262 (Nov. 24, 2025) (finding portable toilets ineligible under the O&O
Policy) (available at https://www.fema.gov/appeal/immediate-threat-142 (last visited
Sept. 15, 2026)); FEMA Second Appeal Decision, City of Miami Beach, FEMA-4486DR-FL, GMP 680008/PW 1030 (Mar. 26, 2025) (same) (available at
https://www.fema.gov/appeal/immediate-threat-107#_ftnref11 (last visited Sept. 15, 2026)).
FEMA claims that, in this particular case, the Southeast Family Health Center adjoining the
outdoor field clinic “had restroom facilities onsite” and that the City “has not shown why
additional portable toilets and handwashing stations,” beyond what was already available,
“were necessary to operate the testing site.” FEMA’s Response Brief at 24.
Originally, during its first appeal and again in its RFA and reply brief to the Board,
the City asserted that the portable toilets and handwashing stations, which were distributed
at various locations throughout the City through a program known as the Pit Stop program,
were eligible for PA funding for the following reasons:
[W]hile there may have been restrooms directly at some sites, the volume of
people seeking services was likely to exceed those restrooms’ capacity, the
testing or vaccination sites ran during hours the host location was not open and
on-site restrooms were unavailable (e.g., weekends), or the City was requested
by the host location to provide handwashing or bathroom facilities.
RFA at 25 (citing RFA Exhibit 17). Yet, the evidence of record relating to the 2401 Keith
Street site, to the extent that it exists, conflicts with those representations. Specifically, the
City has identified the Keith Street field clinic’s operating hours as 9 a.m. to 3 p.m. Monday
through Friday (with no service on weekends), which overlapped with and were fully
encompassed within the Southwest Family Health Center’s opening hours (8 a.m. to 5 p.m.
Monday to Friday). Further, when the portable toilets were rented, COVID-19 testing at the
Keith Street clinic was on an appointment-only basis, limiting the number of people visiting
at any one time, and nothing in the record suggests that Southwest Family Health Center
requested the portable toilets or that the number of visitors making appointments
overwhelmed the site. In any event, as FEMA correctly notes, “[i]t is the Applicant’s
responsibility to provide documentation substantiating the necessity and reasonableness of
. . . measures” taken for medical purposes. FEMA’s Response Brief at 23 (citing 2 CFR
200.403(a) (2024); PAPPG at 21, 133). The City has provided no contemporaneous support
indicating why additional bathroom facilities were needed at the Keith Street site.

CBCA 8853-FEMA

30

Just before the hearing in this matter, the City identified a new reason for the portable
toilets and handwashing stations, which was to provide facilities for use by those who tested
positive for COVID-19. The City indicated that only those who tested negative could use
the Southwest Family Health Center’s indoor toilets and that it needed other restroom
facilities for those who tested positive. Even if its argument that only individuals who tested
positive for COVID-19 would use the portable toilets might appear reasonable on its face,6
that new argument, to the extent that it is not inconsistent with its earlier positions, is also
unsupported by any contemporaneous evidence in the record, such as written instructions
given at the time to on-site field clinic staff to segregate restroom facility use between
positive and negative test recipients or photographs of the portable toilets with signs
indicating use only by COVID-19 positive individuals. Without any such evidence, the City
has failed to satisfy FEMA’s documentation requirements.
Our decision here is consistent with FEMA’s recent denials in second appeal decisions
of at least two other requests from the City for PA funding for portable toilets and
handwashing stations at other field COVID-19 testing clinics that, like those at issue here,
were placed through the Pit Stop program. According to its website, the Pit Stop program
“provides clean and safe public toilets, as well as used-needle receptacles and dog waste
stations, in San Francisco’s most impacted neighborhoods.” https://sfpublicworks.org/pitstop
(last visited Sept. 15, 2026). In its second appeal decisions, FEMA found that the Pit Stop
program is “a city-wide effort that is not tied to COVID-19 testing or vaccination.” FEMA
Second Appeal Decision, City and County of San Francisco, FEMA-4482-DR-CA, GMP
710645/PW
5757
(May
11,
2026)
(available
at
https://www.fema.gov/appeal/immediate-threat-154 (last visited Sept. 15, 2026)); see FEMA
Second Appeal Decision, City and County of San Francisco, FEMA-4482-DR-CA, GMP
710645/PW
5755
(June
4,
2026)
(available
at
https://www.fema.gov/appeal/immediate-threat-153 (last visited Sept. 15, 2026)). In those
matters, the City, as it does here, asserted that, despite the availability of restrooms in
permanent buildings next to the COVID-19 testing sites, “portable restrooms were required
due to the volume of people seeking services, irregular operating hours at the testing and
vaccination sites, or due to outside requests.” FEMA denied funding after determining that

6

Given the time frames at issue here, it seems likely (although the record does
not tell us) that the City was providing polymerase chain reaction (PCR) tests at its outdoor
field clinic rather than rapid tests. If so, we do not understand how the City would have the
necessary information when individuals were being tested at the field clinic to distinguish
between those testing positive and those testing negative. A PCR test must be sent to a
laboratory for analysis, and the individuals being tested would not receive their test results
until after they had departed the field clinic site.

CBCA 8853-FEMA

31

the toilets “were not at the same location as the testing and vaccination sites in question,”
meaning that, contrary to the City’s representations, they could not provide support to the
cited testing sites. The situation here is somewhat different in that the portable toilets for
which the City now seeks PA funding were, in fact, placed next to the 2401 Keith Street site.
That being said, the randomness with which the Pit Stop program was placing portable
restrooms around the City does not support the City’s assertion (without any
contemporaneous evidence) that, in this particular case, there was a special need that did not
exist in other placements.
Decision
For the foregoing reasons, the City may receive PA funding of $55,740.39 for
disinfecting supplies for the Moscone Center EOC and $811,051.90 for EPM supplies, for
a total of $866,792.29. We return the City’s requests for EOC contract labor costs, EOC
utilities, A/V equipment rental and labor costs, and EOC internet, telecom, and electrical
service alterations to FEMA for further review and evaluation. The City’s funding requests
are otherwise denied.

Harold D. Lester, Jr.
HAROLD D. LESTER, JR.
Board Judge

Patricia J. Sheridan
PATRICIA J. SHERIDAN
Board Judge

Elizabeth W. Newsom
ELIZABETH W. NEWSOM
Board Judge

---