# Standing Rock Sioux Tribe v. United States Army Corps of Engineers

> District Court, District of Columbia · June 14, 2017 · 255 F. Supp. 3d 101

URL: https://www.frixlaw.com/law-library/cases/4177559

## Case

- **Full name:** STANDING ROCK SIOUX TRIBE, Et Al., Plaintiffs, v. U.S. ARMY CORPS OF ENGINEERS, Et Al., Defendants
- **Court:** District Court, District of Columbia
- **Decided:** June 14, 2017
- **Citations:** 255 F. Supp. 3d 101; 2017 U.S. Dist. LEXIS 91297; 2017 WL 2573994
- **Precedential status:** Published
- **Opinion:** Opinion by Boasberg
- **Judges:** Judge James E. Boasberg
- **Nature of suit:** Civil
- **Cited by:** 38 later opinions in the Frix Law Library

## Citator (automated)

- No negative treatment found by the automated citator. That is not the same as a confirmation that the case is good law; read the citing cases.
- Full citator and citing cases: https://www.frixlaw.com/law-library/cases/4177559

## How later opinions describe it (automated extraction)

- rejecting plaintiffs’ position regardless of whether claim is maintained under only APA or also under cause of action inferred from fiduciary responsibilities

## Opinion text

UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF COLUMBIA

STANDING ROCK SIOUX TRIBE, et al.,

Plaintiffs,
v. Civil Action No. 16-1534 (JEB)
U.S. ARMY CORPS OF ENGINEERS, et
al.,

Defendants.

MEMORANDUM OPINION

Designed to transport oil from the Bakken oil fields in North Dakota to a storage hub in

southern Illinois, the Dakota Access Pipeline (DAPL) has also borne substantial controversy in

its wake. Most significant has been the opposition from Indian tribes whose reservations lie in

close proximity to the pipeline’s crossing of the Missouri River at Lake Oahe. To block Dakota

Access LLC’s construction of that last segment and its operation of DAPL, the Standing Rock

Sioux Tribe filed this suit in July 2016, and the Cheyenne River Sioux Tribe intervened shortly

thereafter.

The Tribes have since mounted two substantial legal challenges to DAPL, neither of

which yielded success. The first contended that the grading and clearing of land for the pipeline

threatened sites of cultural and historical significance, and that the U.S. Army Corps of

Engineers had flouted its duty to engage in tribal consultations pursuant to the National Historic

Preservation Act. See Standing Rock Sioux Tribe v. U.S. Army Corps of Eng’rs (Standing Rock

I), 205 F. Supp. 3d 4, 7 (D.D.C. 2016). The second maintained that the presence of oil in the

pipeline under Lake Oahe would desecrate sacred waters and make it impossible for the Tribes to

1
freely exercise their religious beliefs, thus violating the Religious Freedom Restoration Act. See

Standing Rock Sioux Tribe v. U.S. Army Corps of Eng’rs (Standing Rock II), No. 16-1534, 2017

WL 908538, at *1 (D.D.C. Mar. 7, 2017).

Now that the Court has rejected these two lines of attack, Standing Rock and Cheyenne

River here take their third shot, this time zeroing in DAPL’s environmental impact. They seek

summary judgment on several counts related to the Corps’ alleged failure to comply with the

National Environmental Policy Act. In particular, the Tribes believe that the Corps did not

sufficiently consider the pipeline’s environmental effects before granting permits to Dakota

Access to construct and operate DAPL under Lake Oahe, a federally regulated waterway. This

volley meets with some degree of success. Although the Corps substantially complied with

NEPA in many areas, the Court agrees that it did not adequately consider the impacts of an oil

spill on fishing rights, hunting rights, or environmental justice, or the degree to which the

pipeline’s effects are likely to be highly controversial.

To remedy those violations, the Corps will have to reconsider those sections of its

environmental analysis upon remand by the Court. Whether Dakota Access must cease pipeline

operations during that remand presents a separate question of the appropriate remedy, which will

be the subject of further briefing.

2
Table of Contents

I.   Background ............................................................................................................... 4
A.  NEPA 4
B.  Factual History 6
C.  Litigation 11
1.  Filing of Suit .................................................................................................... 11
2.  Further Consideration ...................................................................................... 12
3.  A New Administration..................................................................................... 16
II.   Legal Standard ........................................................................................................ 19
III.   Analysis of Standing Rock’s Claims ...................................................................... 21
A.  Decision Not to Prepare EIS 21
1.  Hard Look / Convincing Case ......................................................................... 22
a.  Extent of Record ............................................................................................. 23
b.  Spill-Risk Analysis......................................................................................... 27
c.  Impacts Analysis Re: Treaty Rights ............................................................... 36
2.  Alternatives ...................................................................................................... 43
3.  Environmental Justice...................................................................................... 47
B.  Decision to Grant the Easement 54
1.  Policy Change .................................................................................................. 55
2.  Trust Responsibilities ...................................................................................... 59
C.  NWP 12 63
D.  Remedy 66
IV.  Analysis of Cheyenne River’s Claims .................................................................... 67
A.  Section 408 Decision 68
1.  Impairment....................................................................................................... 69
2.  Injurious to Public Interest .............................................................................. 71
3.  Other Arguments ............................................................................................. 72
B.  Easement Decision 75
1.  Section 185(b)(1) ............................................................................................. 76
2.  Section 185(h)(2) ............................................................................................. 78
3.  Section 185(x).................................................................................................. 79
C.  Trust Responsibilities 80
D.  Consultation 81
V.  Conclusion .............................................................................................................. 91

3
I. Background

To familiarize the reader with the background information relevant to its analysis, the

Court first briefly sets out the National Environmental Policy Act’s statutory framework and then

separately discusses the factual history and litigation to date.

A. NEPA

The National Environmental Policy Act, the statute under which the majority of the

Tribes’ claims are brought, has two aims: it “places upon an agency the obligation to consider

every significant aspect of the environmental impact of a proposed action,” and “it ensures that

the agency will inform the public that it has indeed considered environmental concerns in its

decisionmaking process.” Baltimore Gas & Elec. Co. v. Natural Res. Def. Council, Inc., 462

U.S. 87, 97 (1983) (citation omitted). NEPA’s requirements are “procedural,” requiring

“agencies to imbue their decisionmaking, through the use of certain procedures, with our

country’s commitment to environmental salubrity.” Citizens Against Burlington, Inc. v. Busey,

938 F.2d 190, 193-94 (D.C. Cir. 1991). Importantly, “NEPA does not mandate particular

consequences,” id. at 194, and courts are discouraged from substituting their own policy

judgments for that of the agency. See N. Slope Borough v. Andrus, 642 F.2d 589, 599 (D.C. Cir.

1980); see also Marsh v. Or. Nat. Res. Council, 490 U.S. 360, 378 (1989). “NEPA merely

prohibits uninformed — rather than unwise — agency action.” Robertson v. Methow Valley

Citizens Council, 490 U.S. 332, 351 (1989). Agency actions with adverse environmental effects

can thus be NEPA compliant where “the agency has considered those effects and determined that

competing policy values outweigh those costs.” Ohio Valley Envtl. Coal. v. Aracoma Coal Co.,

556 F.3d 177, 191 (4th Cir. 2009) (citations omitted).

4
Under NEPA, an agency must prepare an Environmental Impact Statement for any

proposed major federal action “significantly affecting the quality of the human environment.” 42

U.S.C. § 4332(2)(C). An EIS must detail the environmental impact of the proposed action, any

unavoidable adverse effects, alternatives to the proposed action, the relationship between short-

term uses of the environment and long-term productivity, and any irreversible commitments of

resources. Id.

To determine whether an agency must prepare an EIS, it first drafts an Environmental

Assessment. See 40 C.F.R. § 1501.4(b). An EA is a “concise public document” that “[b]riefly

provide[s] sufficient evidence and analysis for determining whether to prepare an environmental

impact statement or a finding of no significant impact.” Id. § 1508.9(a). The EA must discuss

the need for the proposal, the alternatives, the environmental impacts of the proposed action and

alternatives, and the agencies and persons consulted. Id. § 1508.9(b). If, after preparing an EA,

the agency determines that an EIS is not necessary, it must prepare a Finding of No Significant

Impact (FONSI) setting forth the reasons why the action will not have any significant impact on

the environment. Id. §§ 1501.4(e), 1508.13; cf. Grand Canyon Trust v. FAA, 290 F.3d 339, 340

(D.C. Cir. 2002) (“If any ‘significant’ environmental impacts might result from the proposed

agency action then an EIS must be prepared before agency action is taken.”) (quoting Sierra Club

v. Peterson, 717 F.2d 1409, 1415 (D.C. Cir. 1983)). If the action will not have such impact

because of the agency’s commitment to ensure the performance of mitigation measures, the

agency prepares a Mitigated FONSI. See Council on Environmental Quality, Appropriate Use of

Mitigation and Monitoring and Clarifying the Appropriate Use of Mitigated Findings of No

Significant Impact 2, 7 (2011), https://energy.gov/sites/prod/files/NEPA-

CEQ_Mitigation_and_Monitoring_Guidance_14Jan2011.pdf. Mitigation includes “[a]voiding

5
an impact by not taking a certain action”; “[m]inimizing an impact by limiting the degree or

magnitude of the action”; “[r]ectifying an impact by repairing, rehabilitating, or restoring the

affected environment”; “[r]educing or eliminating an impact over time, through preservation and

maintenance operations”; and “[c]ompensating for an impact by replacing or providing substitute

resources or environments.” Id. at 4-5. As will be explained below, the Corps here prepared an

EA and a Mitigated FONSI. The central question this Opinion answers is whether that was

sufficient.

B. Factual History

As those who have followed this litigation and the concomitant public debate well know,

DAPL is a nearly 1,200-mile pipeline designed to move more than half a million gallons of crude

oil from North Dakota to Illinois every day. Standing Rock I, 205 F. Supp. 3d at 7. Although no

government approval is necessary for oil pipelines traversing private lands, it is required for

those segments that cross federally regulated waters. Id. DAPL crosses such waterways at

hundreds of discrete places along its route, including, most prominently, at Lake Oahe. Id.

Created by the Corps in 1958 via a dam constructed on the Missouri River, Lake Oahe is

a reservoir that spans North and South Dakota and borders the Standing Rock and Cheyenne

River Sioux Reservations to the east. Id. at 13; ECF No. 172-1 (Environmental Assessment) at

35, 75; ECF No. 97-1 (CRST Second Amended Complaint), ¶ 29. DAPL crosses the Lake 0.55

miles north of the Standing Rock Reservation and 73 miles north of the Cheyenne River

Reservation. See Standing Rock II, 2017 WL 908538, at *1; EA at 75. For orientation purposes,

the southern border of the former Reservation also acts as the northern border of the latter. See

ECF No. 117-5 (Map of Current Sioux Reservations).

6
Lake Oahe holds special significance for the Standing Rock and Cheyenne River Sioux

Tribes. Its creation necessitated the taking of approximately 56,000 acres of some of “the best

land” from Standing Rock’s Reservation, as well as 104,420 acres of Cheyenne River’s trust

lands. See Act of Sept. 2, 1958, Pub. L. No. 85-915, 72 Stat. 1762; S. Rep. No. 102-267, at 188

(1992); Standing Rock II, 2017 WL 908538, at *16 (citing South Dakota v. Bourland, 508 U.S.

679, 683 (1993)). Today, Standing Rock members rely on Lake Oahe’s waters to service

“homes, a hospital, clinics, schools, businesses and government buildings throughout the

Reservation” and to support agriculture and industrial activities. See ECF No. 117 (SRST MSJ)

at 4. The Lake is also the primary source of water for the Cheyenne River Reservation. See

CRST Second Amend. Compl., ¶ 2. Both Tribes consider the waters to be “sacred” and “central

to [their] practice of religion.” SRST MSJ at 4; see Standing Rock II, 2017 WL 908538, at *6, 8.

Dakota Access notified the Corps of its intent to construct a portion of DAPL under Lake

Oahe in June 2014, see ECF No. 183-1 (Email from Monica Howard, Dir. Envtl. Sci., Dakota

Access, to Jason Renschler, Project Manager, Corps, June 23, 2014), and first sought the Corps’

approval to do so in October 2014. See ECF No. 159-1, Exh. A (Letter from Monica Howard to

Brent Cossette, Nat. Resource Specialist, Corps, Oct. 21, 2014). Specifically, the Company

needed three authorizations from the Corps: (1) verification that its activities satisfied the terms

and conditions of Nationwide Permit 12; (2) permission under the Rivers and Harbors Act, 33

U.S.C. § 408; and (3) a real-estate easement under the Mineral Leasing Act, 30 U.S.C. § 185.

See ECF No. 172-6 (Memorandum from John Henderson, Omaha District Commander &

Engineer, Corps, Dec. 3, 2016), ¶ 4. The Court has previously discussed some of the details of

these permitting schemes, see Standing Rock I, 205 F. Supp. 3d at 10-12, and will not repeat

them here.

7
In December 2015, the Corps published and sought public comment on a Draft

Environmental Assessment that evaluated the environmental effects of DAPL’s proposed

crossing of Lake Oahe and concluded that “construction of the proposed Project [was] not

expected to have any significant direct, indirect, or cumulative impacts on the environment.”

ECF No. 6-19 (Draft EA) at 1; see EA at 1. Standing Rock promptly submitted comments

touching on a range of concerns, including that the Draft EA failed to adequately address

potential harm from the pipeline’s construction and operations to the Lake’s water and the

Tribe’s rights thereto; did not acknowledge the pipeline’s proximity to the Reservation;

insufficiently analyzed the risks of an oil spill; and did not properly address environmental-

justice considerations. See ECF No. 159-1, Exh. C (SRST Comments on Draft EA, Jan. 8, 2016)

at 9-17; id., Exh. D (SRST Suppl. Comments on Draft EA, Mar. 24, 2016) at 2-3. The Tribe,

accordingly, asked that the Corps prepare an Environmental Impact Statement to assess the

pipeline’s effects, a request it had also made prior to the Draft EA’s release. See ECF No. 209-6

(Notes for Feb. 18-19, 2016, Tribal Meeting) at 51; ECF No. 209-9 at 33-34 (Letter from Waste

Win Young, Tribal Historic Preservation Officer, Standing Rock Sioux Tribe, to Martha Chieply,

Omaha District Regulatory Branch, Corps, Feb. 25, 2015). Cheyenne River expressed similar

views. See ECF No. 185-1, Exh. II (Letter from Steve Vance, Tribal Historic Preservation

Officer, Cheyenne River Sioux Tribe, to Richard Harnois, Sr. Field Archaeologist, Corps, May 2,

2016); ECF No. 183-19 (Letter from Steve Vance to John Henderson, May 19, 2016); ECF No.

183-20 (Letter from Harold Frazier, Chairman, Cheyenne River Sioux Tribe, June 3, 2016).

Other federal agencies also weighed in on the Draft EA. Like the Tribes, the Department

of the Interior requested that the Corps prepare an EIS, a step it believed necessary given

DAPL’s “potential impact on trust resources” — i.e., 800,000 acres of land held in trust for the

8
Tribe by Interior, as well as waters on which the Tribe and its members depend for drinking and

other purposes — should a leak or spill occur. See ECF No. 209-7 at 21 (Letter from Lawrence

Roberts, Acting Assistant Secretary for Indian Affairs, Dep’t of Interior, to Brent Cossette, Mar.

29, 2016). Interior criticized the Corps for, inter alia, “not adequately justify[ing] or otherwise

support[ing] its conclusion that there would be no significant impacts upon the surrounding

environment and community” and not assigning a level of intensity to those potential adverse

impacts that were acknowledged. Id.

The Environmental Protection Agency similarly expressed concern that the Draft EA

“lack[ed] sufficient analysis of direct and indirect impacts to water resources,” did not

adequately address “the measures that will be required to assure that impacts from construction

and operation of the pipeline are not significant,” and did “not identify the related effects from

the entire project segment.” ECF No. 209-16 at 184 (Letter from Philip Strobel, Director of

NEPA Compliance & Review Program, EPA, to Brent Cossette, Jan. 8, 2016). Although the

EPA did not believe that the Draft EA “would support a FONSI,” it did not call for the Corps to

prepare an EIS; instead, it suggested that “information and mitigation could be added to the EA

in order to support a mitigated FONSI.” Id. at 187.

After “becom[ing] aware of the proximity” of DAPL to Standing Rock’s Reservation, the

EPA supplemented its comments. See ECF No. 209-8 at 123 (Letter from Philip Strobel to Brent

Cossette, Mar. 11, 2016). It recommended that the Corps revise the Draft EA and provide a

second public-comment period “to assess potential impacts to drinking water and the Standing

Rock Sioux Tribe,” as well as “additional concerns regarding environmental justice and

emergency response actions to spills/leaks.” Id. Notably, the EPA took some issue with the

Draft EA’s spill analysis, stating that although it indicated only a minimal spill risk associated

9
with the project, based on its “experience in spill response,” a break or leak could significantly

affect water resources. Id. at 124. Given DAPL’s proposed capacity of 13,100 to 16,600 gallons

per minute of crude oil and the proximity of drinking-water intakes to the Oahe crossing, the

agency explained, “There would be very little time to determine if a spill or leak affecting

surface waters is occurring, to notify water treatment plants and to have treatment plant staff on

site to shut down the water intakes.” Id. at 125. Finally, the EPA urged the Corps to expand its

analysis for purposes of assessing environmental-justice considerations from “the area of

construction disturbance” to “the impacts of the proposed project,” and to look at route

alternatives. Id. at 126; see also ECF No. 209-9 at 209 (Email “Quick Summary of Conference

Call with EPA,” Feb. 25, 2016) (“EPA concerned over the lack of Environmental justice —

Tribal interests have not been addressed sufficiently.”).

On July 25, 2016, about eight months after releasing the Draft EA, the Corps published

its Final EA and a Mitigated Finding of No Significant Impact. See EA; ECF No. 172-2

(FONSI). The Final EA — like the Draft EA — was prepared by Dakota Access with

involvement from the Corps, as is permitted, when certain conditions are met, by Council on

Environmental Quality regulations. See EA at 1; Draft EA at 1; 40 C.F.R. § 1506.5(a)-(b). The

Mitigated FONSI explained that the Corps had “coordinated closely with Dakota Access to

avoid, mitigate and minimize potential impacts of the Proposed Action” — largely via horizontal

directional drilling (HDD) technology — and that the Company was required to comply with a

set of mitigation measures set out in the EA. See FONSI at 3. Given those measures and its

evaluation of DAPL’s “anticipated environmental, economic, cultural, . . . social[, and] . . .

cumulative effects,” the Corps concluded that the crossing at Lake Oahe would not “significantly

affect the quality of the human environment,” and preparation of an EIS was therefore not

10
required. Id. at 6. The Corps, accordingly, verified that the pipeline activities satisfied the terms

and conditions of NWP 12 and granted permission under Section 408 of the Rivers and Harbors

Act for DAPL’s placement at Lake Oahe. See ECF No. 209-9 at 149-53 (NWP 12 Permit); ECF

No. 209-10 at 54 (Section 408 Permit). The parties disagree as to whether the Corps also at that

time granted an easement pursuant to the Mineral Leasing Act, 30 U.S.C. § 185. See ECF Nos.

57, 66, 73. For purposes of this Opinion — and consistent with its understanding throughout the

litigation — the Court will assume that it did not. Without such easement, Dakota Access could

not construct the pipeline under the Lake.

C. Litigation

1. Filing of Suit

While factual backgrounds to lawsuits are often considerably more involved than the

litigation itself, that is not the case here. In part, that is because this action (as well as the 2016

election) generated significant further maneuvers. To begin, two days after the release of the EA

on July 25, 2016, Standing Rock filed this suit against the Corps for declaratory and injunctive

relief pursuant to the National Historic Preservation Act, National Environmental Policy Act,

Clean Water Act, and the Rivers and Harbors Act. See ECF No. 1 (Complaint), ¶¶ 128-212.

Dakota Access successfully moved to intervene in support of the Corps on August 5, see ECF

No. 7, and the Cheyenne River Sioux Tribe intervened as a Plaintiff on August 10. See ECF No.

11. Cheyenne River then filed its own Complaint, see ECF No. 11-12, which it later amended on

September 8. See ECF No. 37. Like Standing Rock’s Complaint, Cheyenne River’s pleadings

stated claims under the NHPA, NEPA, CWA, and RHA, as well as for breach of trust

responsibility and violations of the Flood Control Act and the Administrative Procedure Act. Id.

at 38-56.

11
The Tribes initially sought a preliminary injunction based solely on the NHPA,

contending principally that the clearing and grading of land along the pipeline route desecrated

sites sacred to them. On September 9, 2016, immediately after this Court issued its Opinion

denying that motion, see Standing Rock I, 205 F. Supp. 3d at 7, the Departments of Justice, the

Interior, and the Army issued a joint statement explaining that, because “important issues raised

by the Standing Rock Sioux Tribe and other tribal nations and their members regarding the

Dakota Access pipeline” remained, “construction of the pipeline on Army Corps land bordering

or under Lake Oahe [would] not go forward” until the Army could determine whether

reconsideration of any of its previous decisions regarding the Lake Oahe crossing under NEPA

or other federal laws was necessary. See ECF No. 42-1 at 1. More specifically, the Corps at that

time refused to grant the necessary MLA easement.

2. Further Consideration

In response to the opportunity for additional consideration, Standing Rock sent several

letters to Assistant Secretary of the Army for Civil Works, Jo-Ellen Darcy, expressing its

concerns regarding DAPL, the EA’s spill-risk analysis, and the impact of a potential spill on

hunting, fishing, and other Treaty rights. See ECF Nos. 117-11 (Sept. 22, 2016), 117-12 (Oct.

28, 2016), 117-13 (Oct. 3, 2016), 117-14 (Oct. 21, 2016). It also submitted an expert review of

the EA, which concluded that it was “seriously deficient and [could not] support the finding of

no significant impact, even with the proposed mitigations.” ECF No. 117-15 (Accufacts, Inc.

Review of EA, Oct. 28, 2016).

As part of the Corps’ internal-review process, its Chief Counsel prepared a memorandum

concluding that the agency had “adequately considered and disclosed the environmental, cultural

and other potential impacts of its actions and that its decisions were not arbitrary or capricious,”

12
and that “supplementation of the EA to address any new information [was] not legally required.”

ECF No. 117-24 (Memorandum from David Cooper, Chief Counsel, Corps, Oct. 20, 2016)

(Cooper Memo) at 36. He also issued a memorandum that listed 36 possible conditions to be

included in an easement that would “provide further protection from any perceived risks posed

by the pipeline crossing at Lake Oahe.” ECF No. 209-3 at 55 (Memorandum from David

Cooper, Oct. 31, 2016).

On November 14, 2016, Assistant Secretary Darcy wrote to Standing Rock and Dakota

Access to inform them that the Army had completed the review called for on September 9,

“accounting for information it . . . received from the Tribes and the pipeline company since

September,” and had “concluded that its previous decisions comported with legal requirements.”

ECF No. 56-1 (Letter from Jo-Ellen Darcy, Nov. 14, 2016). Nonetheless, in light of the United

States’ history with the Great Sioux Nation, the importance of Lake Oahe to Standing Rock, the

government-to-government relationship with Standing Rock, and the mandates of the Mineral

Leasing Act regarding public safety and the interests of those who rely on fish, wildlife, and

biotic resources in the general area of a requested right-of-way, see 33 U.S.C. §§ 185(g),

(h)(2)(D), (k), “the Army determined that additional discussion with the Standing Rock Sioux

Tribe and analysis [were] warranted.” Darcy Nov. 2016 Letter at 2. The Army thus invited

Standing Rock to engage in discussions concerning “[p]otential conditions in an easement for the

pipeline crossing” that would reduce spill risk “or otherwise enhance the protection of Lake

Oahe, the Tribe’s water supplies, and its treaty rights”; the impact of those conditions on spill

risk; “whether to grant an easement for the pipeline to cross Lake Oahe at the location currently

proposed” given those conditions; and anything else “the Tribe believes is relevant to the

proposed pipeline crossing or easement.” Id. Darcy also wrote to Frazier to inform him of the

13
Corps’ decision and to express the Corps’ interest in “confer[ring] with [him] to better

understand” his concerns. See ECF No. 131-4, Attach. A (Letter from Jo-Ellen Darcy to Harold

Frazier, Nov. 14, 2016); see also ECF No. 131-4 (Declaration of Harold Frazier, Feb. 22, 2017),

¶ 15. Two days later, Darcy and other Corps officials met with representatives of the Great

Plains Tribal Chairpersons’ Association, including Frazier, to confirm that the November 14

letters “constituted an invitation to the [T]ribes to provide any new information . . . relevant to

the Corps’ consideration of the easement.” Id., ¶ 16.

During this next review phase, Standing Rock offered further comments urging the Corps

to deny the easement because of the pipeline’s potential harm to its water, hunting, fishing, and

gathering rights. See ECF No. 117-17 (Dec. 2, 2016). The Oglala Sioux Tribe, which had

brought a related case against the Corps that has been consolidated with Standing Rock’s action,

see Minute Order of Mar. 16, 2017, submitted an expert report critiquing the EA’s spill-volume

analysis. See ECF No. 117-18 (EarthFax Review of EA, Dec. 2, 2016). The Corps’ Omaha

District Commander met with representatives of Standing Rock and Dakota Access to review the

Tribe’s concerns and discuss conditions that could be imposed on an easement to reduce the risk

of spill or rupture. See ECF No. 209-5 at 1-2 (Email from Scott Spellmon, Commanding

General, NW Division, Corps, to Jo-Ellen Darcy, Dec. 2, 2016). The day after the meeting, the

District Commander issued a memorandum recommending that the Corps grant an easement to

Dakota Access to cross Lake Oahe. See Henderson Memo.

The Corps also used this review phase to solicit the opinion of the Department of the

Interior “on the extent to which tribal treaty rights . . . weigh in favor of or against authorizations

needed for the Lake Oahe crossing.” ECF No. 117-6 (Memorandum from Hilary C. Tompkins,

Solicitor, Dep’t of Interior, Dec. 4, 2016) at 1. Interior’s Solicitor accordingly supplied a

14
memorandum concluding that the Corps had “ample legal justification to decline to issue the

proposed Lake Oahe easement on the current record,” and that it “would be equally justified in

suspending or revoking the existing Section 408 permit as it relates to the Lake Oahe crossing.”

Id. at 4. Alternatively, the Solicitor recommended that the Corps not make a decision to issue the

easement prior to engaging in government-to-government consultation with the Tribe; preparing

an EIS to “adequately evaluate[] the existence of and potential impacts to tribal rights and

interests,” “consider a broader range of alternative pipeline routes,” and undertake “a

catastrophic spill analysis prepared by an independent expert”; and more comprehensively

assessing “DAPL’s impact on tribal rights, lands, and resources, including the socio-economic

impacts, . . . in light of the fact that the reservation is a permanent homeland for the Tribes, as

well as other federal obligations towards the Tribes.” Id.

On December 4, the same day the Interior Solicitor issued her Opinion, Assistant

Secretary Darcy issued a memorandum to the Corps’ Commander. She explained that, to date,

the Army had “not made a final decision on whether to grant the easement pursuant to [the

Mineral Leasing Act].” ECF No. 172-7 (Memorandum from Jo-Ellen Darcy, Dec. 4, 2016), ¶ 6.

Despite the Omaha District Commander’s recommendation that the Corps do so, Darcy stated

that she had “concluded that a decision on whether to authorize the Dakota Access Pipeline to

cross Lake Oahe at the proposed location merits additional analysis, more rigorous exploration

and evaluation of reasonable siting alternatives, and greater public and tribal participation and

comments.” Id., ¶ 12. “Accordingly,” she continued, the Army would “not grant an easement to

cross Lake Oahe at the proposed location based on the current record.” Id. She directed a

“robust consideration of reasonable alternatives . . . , together with analysis of potential spill risk

and impacts, and treaty rights,” which she thought would be “best accomplished . . . by preparing

15
an Environmental Impact Statement.” Id. Darcy emphasized, though, that her “policy decision”

did “not alter the Army’s position that the Corps’ prior reviews and actions have comported with

legal requirements.” Id., ¶ 15.

On January 18, 2017, Darcy followed up by publishing in the Federal Register a notice of

intent to prepare an EIS. See 82 Fed. Reg. 5,543 (Jan. 18, 2017). Cheyenne River sent a letter to

her that same day requesting that the Corps include it as a Cooperating Agency in the preparation

and drafting of the EIS given the potential for the pipeline to affect the Tribe and its Reservation.

See ECF No. 131-4, Attach. B (Letter from Harold Frazier to Jo-Ellen Darcy, Jan. 18, 2017).

3. A New Administration

As we all know, elections have consequences, and the government’s position on the

easement shifted significantly once President Trump assumed office on January 20, 2017. A

Presidential Memorandum issued on January 24 directed the Secretary of the Army to instruct

the Assistant Secretary of the Army for Civil Works and the Corps “to take all actions necessary

and appropriate to . . . review and approve in an expedited manner, to the extent permitted by law

and as warranted, and with such conditions as are necessary or appropriate, requests for

approvals to construct and operate the DAPL, including easements or rights-of-way” and to

“consider, to the extent permitted by law and as warranted, whether to rescind or modify” the

December 4 memorandum and the Notice of Intent to Prepare an EIS. See ECF No. 172-8, § 2.

The Army completed a technical and legal review on February 3 and determined that the

Final EA and FONSI “satisf[ied] the NEPA requirements for evaluating the easement required

for the DAPL to cross Corps-managed federal lands at Lake Oahe” and “support[ed] a decision

to grant an easement.” ECF No. 172-9 (Memorandum from Todd Semonite, Lieutenant General,

Corps, Feb. 3, 2017) at 10. Based on a review of the entire record, including the input received

16
since September 2016, the Corps also concluded that the Final EA did not require further

supplementation, as there were no “substantial changes in the proposed action” or “new

significant circumstances or information relevant to environmental concerns.” Id. at 11 (citing

40 C.F.R. §§ 1502.9(c)(1)(i)-(ii)). The Corps thus published in the Federal Register a notice of

termination of its intent to prepare an EIS, see ECF No. 95-3, provided notice to Congress of its

intent to issue the easement, see ECF No. 172-10 (Congressional Notifications, Feb. 7, 2017),

and did so on February 8. See ECF No. 172-11 (Easement). The final easement contains 36

conditions intended to mitigate the risk of rupture at Lake Oahe and otherwise address the

Tribe’s concerns. Id. at 37-43. To facilitate the Corps’ granting of the easement, the Acting

Secretary of the Interior withdrew the Interior Solicitor’s December 4 Opinion. See ECF No.

127-15 (Memorandum from K. Jack Haugrud, Acting Secretary, Dep’t of Interior, Feb. 6, 2017).

Having finally been given the green light, Dakota Access, by late March, completed construction

of this last segment beneath Lake Oahe and began placing oil in the pipeline. See ECF No. 191

(DA Status Report, Mar. 27, 2017). DAPL became fully operational on June 1, 2017. See

Energy Transfer, Energy Transfer Announces the Bakken Pipeline Is in Service Transporting

Domestic Crude Oil from the Bakken/Three Forks Production Areas, June 1, 2017,

http://ir.energytransfer.com/phoenix.zhtml?c=106094&p=irol-newsArticle.

The day after the Corps granted Dakota Access the easement, Cheyenne River moved for

leave to file a Second Amended Complaint, see ECF No. 97, and also filed a motion for

preliminary injunction and application for a temporary restraining order, both based solely on the

Religious Freedom Restoration Act. See ECF Nos. 98, 99; Standing Rock II, 2017 WL 908538,

at *3. Standing Rock joined the TRO application, but not the preliminary-injunction motion.

See ECF No. 107. In both filings, Cheyenne River argued that its members “believe that the

17
mere existence of a crude oil pipeline under the waters of Lake Oahe will desecrate those waters

and render them unsuitable for use in their religious sacraments,” and that DAPL “correlates

with a terrible Black Snake prophesied to come into the Lakota homeland and cause

destruction.” Standing Rock II, 2017 WL 908538, at *3 (quoting ECF No. 98 at 2-3). After

orally denying the TRO, see Minute Order of Feb. 13, 2017; ECF No. 119 (TRO Oral Arg. Tr.,

Feb. 13, 2017) at 29:20-30:19, the Court issued an Opinion similarly denying the preliminary-

injunction motion, as it concluded that the extraordinary relief requested was not appropriate in

light of the equitable doctrine of laches and Cheyenne River’s unlikelihood of success on the

merits. Standing Rock II, 2017 WL 908538, at *1.

In the midst of these proceedings, Standing Rock — after moving for leave to amend its

Complaint to address new developments since it first filed this case in July 2016, see ECF No.

106 — filed the instant Motion for Partial Summary Judgment on claims concerning the Corps’

decision not to prepare an EIS for the Lake Oahe crossing; its granting of the easement; and its

permitting of the Lake Oahe crossing under NWP 12. The Corps responded with its own Cross-

Motion for Partial Summary Judgment on these causes of action, see ECF No. 172 (Corps SRST

MSJ), and Dakota Access filed briefs opposing Standing Rock’s Motion and joining the Corps’

Cross-Motion. See ECF Nos. 159 (DA SRST Opp.), 184 (Notice of Joinder), 202-1 (DA SRST

Reply). Cheyenne River joined Standing Rock’s Motion, see ECF No. 131 (CRST MSJ) at 8,

and filed its own Motion for Partial Summary Judgment on claims concerning the Corps’

decisions to grant Dakota Access a permit under Section 408 of the RHA and an easement under

the MLA. The Corps and Dakota Access then cross-moved for partial summary judgment on

those claims as well. See ECF No. 183 (Corps CRST MSJ); ECF No. 185 (DA CRST MSJ).

18
These Motions are now ripe. Although the Tribes do not raise exactly the same causes of

action, because their Motions are closely related and sometimes overlap, the Court addresses

both in this Opinion, turning first to Standing Rock’s claims and then to Cheyenne River’s. For

purposes of their resolution, the Court has also today issued a Minute Order granting the Tribes’

motions for leave to amend, such that the claims relating to post-July 2016 events are properly

before it. After setting out the governing legal standard, the Court first addresses the relevant

claims raised by Standing Rock, see Section III, infra, and then turns to those asserted by

Cheyenne River. See Section IV, infra.

II. Legal Standard

The parties have cross-moved for partial summary judgment on the administrative record.

The summary-judgment standard set forth in Federal Rule of Civil Procedure 56(c), therefore,

“does not apply because of the limited role of a court in reviewing the administrative record.”

Sierra Club v. Mainella, 459 F. Supp. 2d 76, 89 (D.D.C. 2006); see also Bloch v. Powell, 227 F.

Supp. 2d 25, 30 (D.D.C. 2002), aff’d, 348 F.3d 1060 (D.C. Cir. 2003). “[T]he function of the

district court is to determine whether or not as a matter of law the evidence in the administrative

record permitted the agency to make the decision it did.” Sierra Club, 459 F. Supp. 2d. at 90

(quotation marks and citation omitted). “Summary judgment is the proper mechanism for

deciding, as a matter of law, whether an agency action is supported by the administrative record

and consistent with the [Administrative Procedure Act] standard of review.” Loma Linda Univ.

Med. Ctr. v. Sebelius, 684 F. Supp. 2d 42, 52 (D.D.C. 2010) (citation omitted), aff’d, 408 Fed.

App’x 383 (D.C. Cir. 2010).

The Administrative Procedure Act “sets forth the full extent of judicial authority to

review executive agency action for procedural correctness.” FCC v. Fox Television Stations,

19
Inc., 556 U.S. 502, 513 (2009). It requires courts to “hold unlawful and set aside agency action,

findings, and conclusions” that are “arbitrary, capricious, an abuse of discretion, or otherwise not

in accordance with law.” 5 U.S.C. § 706(2)(A). Agency action is arbitrary and capricious if, for

example, the agency “entirely failed to consider an important aspect of the problem, offered an

explanation for its decision that runs counter to the evidence before the agency, or is so

implausible that it could not be ascribed to a difference in view or the product of agency

expertise.” Motor Vehicle Mfrs. Ass’n of U.S., Inc. v. State Farm Mut. Auto. Ins., 463 U.S. 29,

43 (1983).

This is a “narrow” standard of review, under which “a court is not to substitute its

judgment for that of the agency.” Id. Rather, the Court “will defer to the [agency’s]

interpretation of what [a statute] requires so long as it is ‘rational and supported by the record.’”

Oceana, Inc. v. Locke, 670 F.3d 1238, 1240 (D.C. Cir. 2011) (quoting C & W Fishing Co. v.

Fox, 931 F.2d 1556, 1562 (D.C. Cir. 1991)). In other words, an agency is required to “examine

the relevant data and articulate a satisfactory explanation for its action including a rational

connection between the facts found and the choice made.” State Farm, 463 U.S. at 43 (quoting

Burlington Truck Lines v. United States, 371 U.S. 156, 168 (1962)). Courts, accordingly, “do

not defer to the agency’s conclusory or unsupported suppositions,” United Techs. Corp. v. Dep’t

of Def., 601 F.3d 557, 562 (D.C. Cir. 2010) (quoting McDonnell Douglas Corp. v. Dep’t of the

Air Force, 375 F.3d 1182, 1187 (D.C. Cir. 2004)), and “agency ‘litigating positions’ are not

entitled to deference when they are merely [agency] counsel’s ‘post hoc rationalizations’ for

agency action, advanced for the first time in the reviewing court.” Martin v. Occupational Safety

& Health Review Comm’n, 499 U.S. 144, 156 (1991). Although a reviewing court “may not

supply a reasoned basis for the agency’s action that the agency itself has not given,” a decision

20
that is not fully explained may, nevertheless, be upheld “if the agency’s path may reasonably be

discerned.” Bowman Transp., Inc. v. Arkansas-Best Freight System, Inc., 419 U.S. 281, 285-86

(1974) (citation omitted).

III. Analysis of Standing Rock’s Claims

As earlier noted, Standing Rock seeks summary judgment on three claims: (1) The

Corps’ July 25, 2016, and February 8, 2017, conclusions that the Oahe crossing did not warrant

an EIS violated NEPA because the agency did not make a convincing case that no significant

impacts would result and failed to take a hard look at the project’s effects on Treaty rights and

environmental-justice considerations; (2) The Corps’ February 8, 2017, decision to grant the

easement was arbitrary, capricious, and contrary to law because the Corps reversed a prior policy

without reasoned justification and because the decision constituted a breach of trust

responsibilities; and (3) The Corps wrongfully concluded on July 25, 2016, that the pipeline

activities satisfied the terms and conditions of NWP 12. The Court addresses each in turn.

A. Decision Not to Prepare EIS

In reviewing an agency’s decision not to issue an EIS, the Court’s role is a “‘limited’ one,

designed primarily to ensure ‘that no arguably significant consequences have been ignored.’”

TOMAC, Taxpayers of Michigan Against Casinos v. Norton, 433 F.3d 852, 860 (D.C. Cir. 2006)

(quoting Pub. Citizen v. Nat’l Highway Traffic Safety Admin., 848 F.2d 256, 267 (D.C. Cir.

1988)). An agency’s decision to issue a FONSI and thus not to prepare an EIS will be

overturned only “if the decision was arbitrary, capricious, or an abuse of discretion.” Sierra Club

v. Peterson, 717 F.2d 1409, 1413 (D.C. Cir. 1983).

When examining the adequacy of the FONSI and the EA upon which it was based, courts

must determine whether the agency:

21
(1) has accurately identified the relevant environmental concern, (2)
has taken a hard look at the problem in preparing its [FONSI or
Environmental Assessment], (3) is able to make a convincing case
for its finding of no significant impact, and (4) has shown that even
if there is an impact of true significance, an EIS is unnecessary
because changes or safeguards in the project sufficiently reduce the
impact to a minimum.

Sierra Club v. Van Antwerp, 661 F.3d 1147, 1154 (D.C. Cir. 2011) (quoting TOMAC, 433 F.3d

at 861) (internal quotation marks omitted). In so doing, courts in this circuit apply “a rule of

reason to an agency’s NEPA analysis” and decline to “‘flyspeck’ the agency’s findings in search

of ‘any deficiency no matter how minor.’” Myersville Citizens for a Rural Cmty., Inc. v. FERC,

783 F.3d 1301, 1322–23 (D.C. Cir. 2015) (quoting Nevada v. Dep’t of Energy, 457 F.3d 78, 93

(D.C. Cir. 2006)).

Standing Rock contends that the EA for DAPL “runs afoul of these standards.” SRST

MSJ at 19. In particular, the Tribe argues that the Corps did not take a hard look at or make a

convincing case that the Lake Oahe crossing will have no significant environmental impact, and

that it did not sufficiently consider route alternatives or environmental-justice implications. Id.

at 19-31. For these reasons, it asserts that “[t]he Corps’ conclusion that the Oahe crossing was

not significant enough to warrant an EIS is arbitrary, capricious, and contrary to law.” SRST

MSJ at 17; see Nevada, 457 F.3d at 87 (“[Courts] apply the APA’s arbitrary and capricious

standard to a NEPA challenge.”). The Court begins its analysis with environmental impact and

then turns to alternatives and environmental justice.

1. Hard Look / Convincing Case

Pursuant to NEPA’s “hard look” requirement, the agency must ensure that “the adverse

environmental effects of the proposed action are adequately identified and evaluated.”

Robertson, 490 U.S. at 350. In evaluating the significance of a proposed action’s impact, an

22
agency is to consider, inter alia, the effect on “public health or safety”; “[u]nique characteristics

of the geographic area such as proximity to historic or cultural resources”; the extent to which

the environmental effects “are likely to be highly controversial” or “are highly uncertain or

involve unique or unknown risks”; “[w]hether the action is related to other actions with

individually insignificant but cumulatively significant impacts”; and the degree to which the

action “may cause loss or destruction of significant . . . cultural[] or historical resources.” 40

C.F.R. § 1508.27.

The Tribe identifies several ways in which the Corps allegedly failed to take a hard look

at the environmental consequences of permitting DAPL’s construction and operation and to

make a convincing case of no significant impact. It principally argues that the agency did not

properly assess the risk of a spill under Lake Oahe or sufficiently consider the environmental

impacts on Treaty rights of the construction of the pipeline or of a spill. Before proceeding to

address each of the Tribe’s points, however, the Court must dispense with a threshold issue.

a. Extent of Record

To substantiate many of its critiques of the EA’s analysis, the Tribe relies on expert

reports and other records dated after July 25, 2016, when the Final EA and Mitigated FONSI

were published. Dakota Access argues that the Court should not consider these reports or any

evidence from the Tribe that post-dates July 25.

“It is a widely accepted principle of administrative law that the courts base their review

of an agency’s actions on the materials that were before the agency at the time its decision was

made.” IMS, P.C. v. Alvarez, 129 F.3d 618, 623 (D.C. Cir. 1997) (listing cases). Here, in

challenging the Corps’ decision not to prepare an EIS, the Tribe in effect challenges

authorizations made at two different times: the RHA Section 408 authorization and NWP 12

23
verification on July 25, 2016, and the easement approval on February 8, 2017. See ECF No.

196-1 (SRST Reply) at 3. The Section 408 and NWP 12 decisions were based on the conclusion

set out in the EA and FONSI that the permissions would not have a significant impact on the

environment, and the easement decision was also based on “additional review, analysis of terms

and conditions for the easement, and on the Corps’ decision that supplementation of the

EA/FONSI was not required.” Corps SRST MSJ at 10. The Corps thus decided at two junctures

that an EIS was not required, and it prepared an administrative record encompassing the

materials that were before it at each decision date. Although Dakota Access is technically

correct that the expert reports and other evidence submitted after July 25, 2016, are outside the

record for the RHA Section 408 and NWP 12 decisions, that offers them little aid. This is

because the Court can review the materials before the Corps as of February 8, 2017, for purposes

of evaluating the decision to grant the easement absent an EIS. The Court, consequently, will

consider all materials dated up to February 8.

To complicate matters further, however, the Tribe wishes the Court to also review “some

uncontroversial background materials (e.g., maps) and declarations from its expert” that post-

date February 8. See SRST Reply at 3. It argues that such extra-record evidence comes within

the “accepted exceptions to the principle that the court cannot consider information that falls

outside the agency record” — namely, where “the agency failed to examine all relevant factors

or to adequately explain its grounds for decision, or . . . acted in bad faith or engaged in improper

behavior in reaching its decision.” IMS, 129 F.3d at 624; SRST Reply at 3.

On this point, the Tribe first contends that the Corps engaged in improper behavior by

withholding confidential spill-model discussions and geographic-response plans to which its

post-easement expert declarations respond. See SRST Reply at 3-4. But the showing required

24
“to justify supplementing the record” is a “‘strong’” one, IMS, 129 F.3d at 624 (quoting Citizens

to Preserve Overton Park v. Volpe, 401 U.S. 402, 420 (1971)), and the Court does not find that

the Tribe has made it here. The Corps has explained that it withheld from the Tribe and the

public a small number of documents supporting the EA “[b]ecause of security concerns and

sensitivities.” Dec. 4 Memo, ¶ 5. Indeed, the Court recently concluded that there was good

cause to protect from public disclosure certain information in some spill-model reports that, if

released, could endanger life or physical safety. Standing Rock Sioux Tribe v. U.S. Army Corps

of Eng’rs (Standing Rock III), No. 16-1534, 2017 WL 1316918, at *5-6 (D.D.C. Apr. 7, 2017).

Absent a showing to the contrary, the Court thus cannot permit supplementation of the record on

the ground of some withholding impropriety.

The Tribe next argues that its extra-record evidence describes how the Corps failed to

examine all relevant factors and provide adequate grounds for its decision. But “[t]his is not a

case where the agency failed ‘to explain administrative action [so] as to frustrate effective

judicial review.’” IMS, 129 F.3d at 624 (quoting Camp v. Pitts, 411 U.S. 138, 142-43 (1973)).

The EA addressed each factor for which the Tribe marshals extra-record evidence, even if not

with the depth or ultimate conclusion the Tribe would prefer. Compare SRST MSJ at 21

(criticizing Corps’ failure to address “slow leaks in the HDD bore,” which, based on Tribe-

commissioned expert review, would be “‘complicated if not impossible to clean up and likely

would have significant impacts on soils’ and underlying aquifers”) (quoting ECF No. 117-23

(Envy Report, Jan. 5, 2017) at 14); SRST Reply at 11 (“Landslides are a major source of pipeline

failures and a critical factor in route selection.”) (citing ECF No. 195-4 (Corrective Action

Order, Belle Fourche Pipeline Company, Dec. 20, 2016); Accufacts, Inc. Review at 3; ECF No.

120 (Sealed Declaration of Richard Kuprewicz, Feb. 12, 2017), ¶ 21); id. at 12 (describing EA’s

25
failure to acknowledge “undisputed evidence” regarding failure rates of spill-detection systems)

(citing ECF No. 209-5 at 110 (Letter from Sierra Club Indigenous Environmental Network, Oct.

10, 2016); Accufacts, Inc. Review at 5); id. at 12-13 (“[T]he EA fails to acknowledge that with a

pipeline 90 feet underground, there is no way to discover a slow leak until the oil sheen appears

on the surface of the water, at which point a massive release will have occurred that would be

nearly impossible to clean up.”) (citing Envy Report at 13-14; Oct. 28, 2016, SRST Letter at 5);

id. at 13 (stating the EA’s “startlingly optimistic times for responding to a spill after it has been

detected . . . have been the subject of withering criticism”) (citing Accufacts, Inc. Review at 5-6;

EarthFax Report at 9; Sealed Kuprewicz Decl., ¶¶ 15-17; Envy Report at 27); id. at 13-14 (“One

expert review found numerous flaws in the Corps’ analysis of water quality impacts of a spill,

including a failure to identify key pollutants; overstatement of flows that dilute likely pollutant

impacts; use of an inappropriate standard to determine toxicity; and reliance on the wrong

drinking water standard.”) (citing EarthFax Report at 5-7); id. at 14 (arguing EA’s treatment of

impact of winter conditions on spill risk was inadequate) (citing EarthFax Report at 7-8; Oct. 28,

2016, SRST Letter at 5; ECF No. 196-2 (Declaration of Elliott Ward, Mar. 25, 2017), ¶ 12) with

EA at 19, 36 (borehole leaks); 26-28 (landslides); 42, 46, 90-91 (description of leak-detection

system as “capable of detecting leaks down to 1 percent or better of the pipeline flow rate within

a time span of approximately 1 hour or less and capable of providing rupture detection within 1

to 3 minutes”); 36-49 (discussing impacts of spill to water quality); 39, 43, 123 (discussing

impact of “[s]ub-freezing temperatures during the winter months” and means of responding to

spill in winter, including identifying “all-weather access and collection point” downstream of

Oahe crossing and undertaking “full scale winter/ice” emergency response drills/exercises).

26
Disagreement with an agency’s analysis is not enough to warrant the consideration of

extra-record evidence, which, after all, is “the exception, not the rule.” Oceana, Inc. v. Pritzker,

126 F. Supp. 3d 110, 113 (D.D.C. 2015) (quoting Theodore Roosevelt Conservation Partnership

v. Salazar, 616 F.3d 497, 514 (D.C. Cir. 2010)). As it proceeds through Standing Rock’s

arguments regarding the deficiencies in the EA’s analysis, therefore, the Court will not engage

with those contentions that turn on evidence that post-dates February 8, 2017. This procedural

brush now cleared away, the Court tackles the substance of the Tribe’s no-convincing-case

position, beginning with spill risks and continuing to Treaty rights.

b. Spill-Risk Analysis

Although grouped under the “spill-risk” heading, Standing Rock’s challenges here

encompass the risk of spills, the degree of scientific controversy, and the cumulative risk of the

project, each of which is analyzed separately.

i. Risk of Spill

Standing Rock first maintains that the EA understates and does not properly assess the

risk of an oil spill under Lake Oahe. See SRST MSJ at 21 (“[T]he Corps falls back on a rote

mantra that the risk of oil spills is low.”); id. at 22 (citing Solicitor Op. at 28-29 & n.171 (noting

PHMSA data shows average of over 283 significant incidents involving gas, oil, or other

pipelines per year since 1996)). It argues that, although the EA repeats that the spill risk is “very

low,” “unlikely,” or “negligible,” see, e.g., EA at 48, 63, 87, it does not explain what “low”

means. See SRST Reply at 9. And “to conduct a credible assessment of spill risks,” the Corps

should have addressed concerns relating to landslide risks, inadequate spill-detection systems,

underground leaks, response times, spill volumes, water-quality analysis, and winter conditions,

27
id. at 11-14, and looked at portions of the pipeline entering and exiting the boreholes. Id. at 15-

16.

The EA, in fact, devotes several pages to discussing DAPL’s “reliability and safety.” EA

at 88-94. The relevant section first explains that, “[t]o prevent pipeline failures resulting in

inadvertent releases,” DAPL will be constructed and maintained in accordance with “industry

and governmental requirements and standards,” including those from PHMSA, the American

Society of Mechanical Engineers, the National Association for Corrosion Engineers, and the

American Petroleum Industry. Id. at 88. After its installation, the pipeline will undergo

“hydrostatic pressure testing at the crossings, checking coating integrity, and X-ray inspection of

the welds.” Id. The pipeline right-of-ways will also “be patrolled and inspected by air . . . at

least every three weeks and not less than 26 times per year[] to check for abnormal conditions or

dangerous activities, such as unauthorized excavation along the pipeline route.” Id. In addition,

Dakota Access plans to use “a supervisory control and data acquisition . . . system to provide

constant remote oversight of the pipeline facilities,” including the detection of “rapid drops in

pressure,” and pipeline-monitoring software to identify any leaks by tracking “pipeline pressure,

flow, and temperature data” pulled every six seconds. Id. at 89-90. The EA reports that such a

system “is capable of detecting leaks down to 1 percent or better of the pipeline flow rate within

a time span of approximately 1 hour or less and capable of providing rupture detection within 1

to 3 minutes.” Id. at 90. If a leak is detected, remotely operated valves are to be triggered and

closed within three minutes. Id.

Other courts, including this Circuit, have favorably viewed similar agency reliance on

applicable regulatory standards when assessing impacts as part of a NEPA-required analysis.

See, e.g., EarthReports, Inc. v. FERC, 828 F.3d 949, 957 (D.C. Cir. 2016) (holding agency

28
fulfilled its NEPA obligations to evaluate ballast-water impacts by, inter alia, noting

requirements of applicable regulatory agencies); Sierra Club v. Clinton, 746 F. Supp. 2d 1025,

1047 (D. Minn. 2010) (holding agency properly considered impacts of pipeline abandonment by

referencing PHMSA regulations).

The EA then proceeds to review the basis for its conclusion that the risk of an oil spill is

“low.” EA at 92. Specifically, that conclusion comes from a risk analysis conducted by Dakota

Access that was derived from criteria set out in “the W. Kent Muhlbauer Relative Index

Methodology (2004), in accordance with 49 CFR 195.452 ‘Hazardous Liquid Pipelines in High

Consequence Area’, API RP 1160 ‘Managing System Integrity for Hazardous Liquid Pipelines’,

and ASME B31.8S ‘Managing System Integrity of Gas Pipelines.’” Id. That analysis

“addressed nine industry-recognized pipeline integrity threat categories”: (1) third-party damage;

(2) external corrosion; (3) internal corrosion; (4) pipe-manufacturing defects; (5) construction-

related defects; (6) incorrect operations; (7) equipment failure; (8) stress-corrosion cracking; and

(9) natural forces. Id. at 92-94.

The underlying analysis is not itself in the record, see SRST Reply at 8, but the EA

summarizes its conclusions as to each of the nine factors. Although no explanation is provided,

three of the nine factors — external corrosion, internal corrosion, and construction-related

defects — are assessed only as to the crossing at Lake Sakakawea; the other six are applied to

both Sakakawea and Oahe. See EA at 92-94. The EA’s explanation of its choice of

methodology and subsequent treatment of the different factors is nonetheless enough to give

substance to the Corps’ conclusion that the risk of a spill is low. See Sierra Club v. Watkins, 808

F. Supp. 852, 868 (D.D.C. 1991) (explaining courts should “defer to an agency’s decision to use

a particular risk assessment methodology that is consistent with general principles of science”)

29
(citing Sierra Club v. Dep’t of Transp., 753 F.2d 120, 128-29 (D.C. Cir. 1985)). For example,

the EA explains that, at the Oahe crossing, spill risk due to third-party damage is low because the

pipeline is positioned 92 feet below the lakebed; spill risk from manufacturing defects is also

slim because the pipeline will be “hydrostatically strength-tested”; and spill risk from “incorrect

operations (e.g., overpressure event caused by human error)” is low because the pipeline is

designed to withstand twice the maximum-allowable operating pressure. See EA at 92-94. The

EA thus does not simply use “[a]n unbounded term” that “provides no objective standard for

determining what kind of differential makes one impact more or less significant than another.”

Mainella, 459 F. Supp. 2d at 101. Admittedly, the EA does not quantify the risk of a spill with

exact numerical precision. But in setting out the specific factors that undergirded its risk analysis

and explaining their application to DAPL, the EA reasonably gives the necessary content to its

top-line conclusion that the risk of a spill is low.

As noted above in the discussion of extra-record evidence, moreover, the EA did not omit

discussion of borehole leaks (EA at 19, 36); landslides (EA at 26-28); leak-detection systems

(EA at 42, 46, 90-91); water quality (EA at 36-49); or winter temperatures (EA at 39, 43, 123).

To the extent the Tribes’ experts disagree with the Corps’ technical assessments or overall

conclusion, such disagreements are “a classic example of a factual dispute the resolution of

which implicates substantial agency expertise.” Wisc. Valley Improvement Co. v. FERC, 236

F.3d 738, 746 (D.C. Cir. 2001) (quoting Marsh, 490 U.S. at 376). In such situations, courts

“must defer to ‘the informed discretion of the responsible federal agencies.’” Id. at 747 (quoting

Marsh, 490 U.S. at 377); see also Nat’l Comm. for the New River v. FERC, 373 F.3d 1323, 1327

(D.C. Cir. 2004) (“When an agency ‘is evaluating scientific data within its technical expertise,’

30
an ‘extreme degree of deference to the agency’ is warranted.”) (quoting B&J Oil & Gas v.

FERC, 353 F.3d 71, 76 (D.C. Cir. 2004)).

ii. Highly Controversial

Although the Court cannot agree with Standing Rock that the Corps did not adequately

consider or explain its conclusion that the risk of an oil spill is low, a related position gains more

traction. As explained above, CEQ regulations provide that one factor that “should be

considered” in evaluating the significance of a proposed action’s impact is “[t]he degree to which

the effects on the quality of the human environment are likely to be highly controversial.” 40

C.F.R. § 1508.27(b)(4). Standing Rock argues that evidence in the record indicated that the

pipeline’s effects were highly controversial, and that the Corps therefore should have concluded

that the project would have significant impacts on the environment. See SRST MSJ at 20-21.

Such controversy is not measured by newsworthiness; instead, according to the Court of

Appeals, “The term ‘controversial’ refers to cases where a substantial dispute exists as to the

size, nature, or effect of the major federal action rather than to the existence of opposition to a

use.” Town of Cave Creek, Arizona v. FAA, 325 F.3d 320, 331 (D.C. Cir. 2003) (quoting

Found. for N. Am. Wild Sheep v. Dep’t of Agric., 681 F.2d 1172, 1182 (9th Cir. 1982)). Despite

that explanation, however, as other courts in this district have observed, “Just what constitutes

the type of ‘controversy’ that requires a full EIS is not entirely clear.” Nat’l Parks Conservation

Ass’n v. United States, 177 F. Supp. 3d 1, 33 (D.D.C. 2016) (quoting Nat’l Wildlife Fed’n v.

Norton, 332 F. Supp. 2d 170, 184 (D.D.C. 2004)). At a minimum, “something more is required

besides the fact that some people may be highly agitated and be willing to go to court over the

matter.” Id. (quoting Fund for Animals v. Frizzell, 530 F.2d 982, 988 n.15 (D.C. Cir. 1975)).

31
“Many courts have found ‘something more’ to be scientific or other evidence that reveals

flaws in the methods or data relied upon by the agency in reaching its conclusions.” Id. (citing

Nat’l Parks & Conservation Assoc. v. Babbitt, 241 F.3d 722, 736-37 (9th Cir. 2001) (holding

agency action was highly controversial because “comments urg[ing] that the EA’s analysis was

incomplete, and the mitigation uncertain, . . . cast substantial doubt on the adequacy of the Parks

Service’s methodology and data,” and thus the dispute went “beyond a disagreement of qualified

experts over the ‘reasoned conclusions’ as to what the data reveal[ed]”); Nat’l Wildlife Fed’n,

332 F. Supp. 2d at 185 (“Such a controversy exists where the Corps is presented with scientific

evidence specifically evaluating the environmental effects of the proposed project or calling into

question the adequacy of the EA.”); Fund for Animals v. Norton, 281 F. Supp. 2d 209, 235

(D.D.C. 2003) (“While plaintiffs have identified serious gaps in defendants’ assessment of the

local effects of the proposed action, they do not appear to have identified any scientific

controversy per se as to the extent of the effects.”); Sierra Club v. Van Antwerp, 719 F. Supp. 2d

58, 67-68 (D.D.C. 2010) (“While declarations were submitted to the Corps from numerous

experts who claimed that [the development project] will have significant adverse impacts on

Cypress Creek and its wetlands, these declarations alone fail to rise to the level of ‘controversy’

under NEPA.”), aff’d in part, rev’d in part on other grounds, 661 F.3d 1147 (D.C. Cir. 2011), as

amended (Jan. 30, 2012)); but cf. Humane Soc. of U.S. v. Dep’t of Commerce, 432 F. Supp. 2d

4, 19–20 (D.D.C. 2006) (finding agencies’ decision not to prepare EIS highly controversial based

on comments from plaintiff and other agencies indicating disagreement with agencies’

conclusions).

Here, as evidence of controversy, Standing Rock refers only generally to “the multiple

critiques of the Corps’ unexamined conclusions, expert evidence indicating greater risks, and

32
critical comment from other federal agencies.” SRST MSJ at 20-21. The Tribe does not help the

Court to evaluate its argument by, for example, following these general references with specific

statements made by the Tribe, agencies, or experts critiquing the Corps’ methodology or data. In

any event, based on its review of the record, the Court first concludes that none of the evidence

before the Corps as of July 25, 2016 — including Standing Rock’s comments, see ECF No. 159-

1, Exh. C (SRST Comments on Draft EA, Jan. 8, 2016); id., Exh. D (SRST Suppl. Comments on

Draft EA, Mar. 24, 2016); ECF No. 209-6 at 51 (Notes for Feb. 18-19, 2016, Tribal Meeting);

ECF No. 209-9 at 33 (Letter from Waste Win Young to Martha Chieply, Feb. 25, 2015), and

submissions from the EPA and the Department of the Interior, see ECF No. 209-7 at 21 (Letter

from Lawrence Roberts to Brent Cossette, Mar. 29, 2016), ECF No. 209-16 at 184 (Letter from

Philip Strobel to Brent Cossette, Jan. 8, 2016), ECF No. 209-8 at 123 (Letter from Philip Strobel

to Brent Cossette, Mar. 11, 2016), ECF No. 209-9 at 209 (Email “Quick Summary of Conference

Call with EPA,” Feb. 25, 2016) — suggested substantial methodological or data flaws in the

Corps’ analysis.

The expert reports submitted to the Corps after the Final EA was published but before the

Corps again decided in February 2017 that an EIS was not required, see Semonite Memo at 14,

however, do present such scientific critiques. See, e.g., EarthFax Report at 1-3 (critiquing EA

for considering spill volumes from pipelines generally, rather than from pipelines with 16-inch or

larger diameters, like DAPL); id. at 4 (suggesting EA used incorrect river-flow rates to assess

spill impacts); id. at 5-7 (explaining EA used inappropriate benzene-concentration limits); id. at

9 (arguing EA should have included quantitative analysis of risk of failure of system

components); id. at 9 (contending EA wrongly relied upon premise that emergency block valves

would close immediately upon leak detection); Accufacts, Inc. Review at 7 (stating corrosion

33
threats should be assessed based on field readings of in-line inspection runs, not assumed rates);

id. at 9-10 (arguing that complete risk analysis required, inter alia, consideration of pipeline

elevation profile, maximum operating pressure, location of mainline valves, location and type of

“critical leak detection monitoring devices by milepost”).

It may well be the case that the Corps reasonably concluded that these expert reports

were flawed or unreliable and thus did not actually create any substantial evidence of

controversial effects. Dakota Access, for example, offers a scathing assessment of the reports’

“material flaws.” DA SRST Opp. at 21 n.4. But the Corps never said as much. Its February 3,

2017, memo determining that the Final EA and FONSI satisfied NEPA’s requirements and

supported the decision to grant the easement is devoid of any discussion of the methodological

and data flaws identified in the reports. Indeed, it acknowledges receiving only Standing Rock’s

Accufacts, Inc. Review and wholly ignores the others. See Semonite Memo at 12. As the

agency did not demonstrate that it considered, as the CEQ regulations require, the degree to

which the project’s effects are likely to be highly controversial, despite being presented with

evidence of scientific flaws, the Court cannot conclude that the Corps made a convincing case of

no significant impact or took the requisite hard look. The remedy for such violation is discussed

in Section III.D, infra.

iii. Cumulative Risk

Finally, the Tribe contends that the EA “fails to consider the cumulative risk imposed by

the pipeline.” SRST MSJ at 22 (citing 40 C.F.R. § 1508.27(b)(7) (“Significance exists if it is

reasonable to anticipate a cumulatively significant impact on the environment.”)). “Cumulative

impact is the impact on the environment which results from the incremental impact of the action

when added to other past, present, and reasonably foreseeable future actions regardless of what

34
agency (Federal or non-Federal) or person undertakes such other actions.” 40 C.F.R. § 1508.7.

Such impacts “can result from individually minor but collectively significant actions taking place

over a period of time.” Id. Other pipelines cross under the Missouri River, but, the Tribe states,

the EA does not analyze how the addition of DAPL compounds the overall risk of a pipeline spill

in the Missouri River, nor does it consider “the cumulative risk to Tribal resources from the rest

of the pipeline outside Lake Oahe.” SRST MSJ at 23; see also id. at 23 n.12 (criticizing Corps

for “unlawfully segmenting its NEPA review of one pipeline into [three] separate components”).

This argument, like the Tribe’s first in this subsection, does not succeed.

The EA devotes eleven pages to a discussion of cumulative impacts on eleven types of

resources, including geology and soils, water and aquatic life, agriculture, land use, cultural and

historic resources, and environmental justice. See EA at 98-107. It acknowledges at the outset

that in the vicinity of the Oahe crossing are “oil and gas development and associated

infrastructure, utility installation, and agriculture,” and that the pipeline at the Oahe crossing is

co-located with “a natural gas pipeline and a 345 kV power line.” EA at 98. Although the EA

does not expressly state whether the presence of other pipelines increases the risk that DAPL (or

those pipelines) will rupture, it acknowledges the potential for unanticipated releases and refers

back to the analysis of minimization and remediation activities to conclude that the potential

cumulative impacts on water and aquatic resources from spills “would be minor.” Id. at 101. It

also considers the benefits of co-location, such as minimized land-use disturbance from

construction. Id. at 105. The EA therefore does not simply conclude absent any actual analysis

that cumulative impacts would be minimal; on the contrary, there is enough to “allow the Court

to review the agency’s finding.” Friends of the Earth, Inc. v. U.S. Army Corps of Eng’rs, 109 F.

Supp. 2d 30, 42 (D.D.C. 2000).

35
The Corps, moreover, was not required to consider the impacts from the whole pipeline.

See Sierra Club v. U.S. Army Corps of Eng’rs, 803 F.3d 31, 34 (D.C. Cir. 2015) (holding that

where federal easement and CWA permitting encompassed only five percent of pipeline’s

length, “the federal government was not required to conduct NEPA analysis of the entirety of the

. . . pipeline, including portions not subject to federal control or permitting”); Sierra Club v.

Bostick, 787 F.3d 1043, 1051-54 (10th Cir. 2015) (holding Corps was not required to prepare

NEPA analysis of entire pipeline when verifying NWPs for 485-mile oil pipeline crossing over

2,000 waterways); Winnebago Tribe of Neb. v. Ray, 621 F.2d 269, 272-73 (8th Cir. 1980) (same

for electric utility line). That it did not address the cumulative risk from the entire pipeline thus

does not run afoul of NEPA.

c. Impacts Analysis Re: Treaty Rights

In addition to challenging the EA’s analysis of the risk of a spill, Standing Rock raises

concerns about its discussion of the effects of the project, including a potential spill, should one

occur, on the Tribe’s Treaty rights. According to Standing Rock, “NEPA requires the Army

Corps to disclose and assess the suite of risks from the Lake Oahe crossing to the full range of

the Tribe’s Treaty rights, in the context of the Corps’ heightened trust responsibilities.” SRST

MSJ at 24. Here, the relevant Treaty rights are those implicating water, hunting, and fishing. Id.

at 25; Corps SRST MSJ at 20; see also Winters v. United States, 207 U.S. 564, 576-78 (1980)

(holding that when federal government creates an Indian reservation, it impliedly reserves

otherwise unappropriated water to extent necessary to accomplish purposes of reservation); Fort

Laramie Treaty of 1851, art. 55, 11 Stat. 749, 1851 WL 7655 (reserving for the Sioux tribes “the

privilege of hunting, fishing, or passing over” lands described in Treaty); United States v. Dion,

476 U.S. 734, 738 (1986) (“As a general rule, Indians enjoy exclusive treaty rights to hunt and

36
fish on lands reserved to them, unless such rights were clearly relinquished by treaty or have

been modified by Congress.”). The Court first explains the manner of the Corps’ analysis of

these rights and then turns separately to the effect of construction and the impact of a spill on

such rights.

i. Manner of Analysis

Before turning to whether the Corps adequately considered these impacts, the Court

discusses how it was required to do so. The Tribe contends that the Corps had to address these

Treaty rights qua Treaty Rights, see SRST MSJ at 25-26; SRST Reply at 23-24, whereas the

Corps asserts that it needed only to consider the effects on the resources implicated by the Treaty

rights — i.e., water, fish, and game. See Corps SRST MSJ at 20-21 & n.9. To explain more

fully, Standing Rock believes that the Corps’ position “misunderstands the Tribe’s Treaty

rights,” which “embody the fundamental rights of a people tied to a place since time

immemorial” and thus demand a more “existential” analysis. See SRST Reply at 23-24. For

example, the Tribe explains that, although “[e]cological impacts to fish and game habitat and

populations present one dimension” of the impacts of an oil spill on aquatic resources, “[t]he

impact to Tribal members of losing the right to fish and hunt, which provides both much-needed

subsistence food to people facing extensive poverty as well as a connection to cultural practices

that Tribal members have engaged in since time immemorial, is a separate issue.” Id.

Standing Rock may be right that the construction and operation of DAPL under Lake

Oahe could affect its members in the broad and existential ways it details, but it offers no case

law, statutory provisions, regulations, or other authority to support its position that NEPA

requires such a sweeping analysis. The Corps, conversely, points to several cases in which

courts have approved an approach consistent with its view of its NEPA obligations — i.e., an

37
agency may assess impacts on treaty rights by analyzing the effects on a specific resource

identified in the treaty. See Ground Zero Ctr. for Nonviolent Action v. Dep’t of the Navy, 918 F.

Supp. 2d 1132, 1152 (W.D. Wash. 2013), on reconsideration in part No. 12-1455, 2013 WL

357509 (W.D. Wash. Jan. 29, 2013) (assessing impact on tribe’s treaty fishing rights by

considering surveys of fish patterns and Navy’s mitigation efforts); Nw. Sea Farms, Inc. v. U.S.

Army Corps of Eng’rs, 931 F. Supp. 1515, 1521-22 (W.D. Wash. 1996) (explaining Corps correctly

concluded that project would impair treaty fishing rights by considering impact on tribe’s access to

fish); No Oilport! v. Carter, 520 F. Supp. 334, 356–57 (W.D. Wash. 1981) (concluding EIS’s

discussion of effect of pipeline rupture on “the fish resource,” including via maps, adequately

evaluated project’s impact on tribe’s treaty fishing rights). Absent any controlling or persuasive

authority to the contrary, the Court sees no basis on which to conclude that NEPA demands the type

of existential-scope analysis the Tribe advocates. Rather, it is sufficient that the agency adequately

analyze impacts on the resource covered by a given treaty.

The next question, then, is whether the agency’s weighing of those relevant Treaty rights here

— viz., water, fishing, and hunting — was adequate. The Court approaches that question by looking

at the Corps’ assessment of the impacts on the different Treaty rights from (1) the construction of the

pipeline, and (2) an unanticipated oil spill. In so doing, the Court keeps in mind the definition of

“hard look” recently articulated by the D.C. Circuit: “[A]n agency has taken a ‘hard look’ at the

environmental impacts of a proposed action if the statement contains sufficient discussion of the

relevant issues and opposing viewpoints, and the agency’s decision is fully informed and well-

considered.” Myersville Citizens for a Rural Community, Inc. v. FERC, 783 F.3d 1301, 1324-25

(D.C. Cir. 2015).

38
ii. Construction

The EA discussed in several places the potential impact of DAPL’s construction on water

resources, fish, and wildlife at Lake Oahe. See EA at 36 (acknowledging that, during HDD-

construction phase, drilling fluid could inadvertently be released “directly or indirectly into the

waterbody” and discussing mitigation measures); id. at 37 (explaining water required for HDD

construction and hydrostatic testing at Oahe crossing would not be obtained from Lake Oahe);

id. at 38 (“No waterbody would be permanently drained or filled as part of the DAPL Project,

and effects on waterbodies are expected to be short-term and minor.”); id. at 45 (addressing

impacts of construction activities on groundwater); id. at 50 (explaining no wetlands exist within

Oahe Project Area or Connected Action Area); id. at 58 (discussing “[t]emporary impacts on

wildlife” that “could occur during construction,” including displacement of “larger and more

mobile animals”); id. (“No impacts to treaty fishing and hunting rights are anticipated due to

construction within the Project Area or Connected Actions.”); id. at 69 (discussing possible

adverse impacts on “fish eggs, juvenile fish survival, benthic community diversity and health,

and spawning habitat,” as well as “fish fry[] and invertebrates inhabiting the river,” from

“subsurface disturbing activities,” inadvertent release of drilling mud, and water withdrawal

from Missouri River); id. at 75 (“The recreational enjoyment of wildlife (such as hunting or bird

watching) may be temporarily affected by construction activities, depending on season and

location.”). Because the EA “clearly addressed” these impacts and concluded that they would

either be insignificant or could be mitigated, the Court finds that, in this respect, it was adequate.

See Minisink Residents for Envtl. Pres. & Safety v. FERC, 762 F.3d 97, 112 (D.C. Cir. 2014)

(finding EA adequately examined compressor-station project’s impact on property values where

it recognized some adverse impacts might accrue but could be mitigated).

39
iii. Spill Impacts

As to the second issue — namely, the spill effects —the Tribe contends that the EA “never

examined the impacts of spills on the Tribe and its Treaty rights.” SRST Reply at 1. The Court

agrees in part.

First, it bears noting that even though a spill is not certain to occur at Lake Oahe, the

Corps still had to consider the impacts of such an event on the environment. “[A]n agency

conducting an EA generally must examine both the probability of a given harm occurring and the

consequences of that harm if it does occur.” New York v. Nuclear Regulatory Comm’n, 681

F.3d 471, 482 (D.C. Cir. 2012). “Only if the harm in question is so ‘remote and speculative’ as

to reduce the effective probability of its occurrence to zero may the agency dispense with the

consequences portion of the analysis.” Id. (quoting Limerick Ecology Action, Inc. v. Nuclear

Regulatory Comm’n, 869 F.2d 719, 739 (3d Cir. 1989)). Yet, “the finding that the probability of

a given harm is nonzero does not, by itself, mandate an EIS: after the agency examines the

consequences of the harm in proportion to the likelihood of its occurrence, the overall expected

harm could still be insignificant and thus could support a FONSI.” Id.; see also Gov’t of the

Province of Manitoba v. Salazar, 691 F. Supp. 2d 37, 50 (D.D.C. 2010) (“It may be that the risk

of a breach is low given the pipeline’s construction, but that is not an excuse for Reclamation to

refuse entirely to analyze the consequences. When the degree of potential harm could be great,

i.e., catastrophic, the degree of analysis and mitigation should also be great.”); Sierra Club v.

Watkins, 808 F. Supp. 852, 868 (D.D.C. 1991) (holding that, given disputed evidence concerning

the possibility of severe accidents, an agency may not simply “refus[e] to include certain low

probability risks” — it must at least “admit that such accidents are possible,” determine the

probability of occurrence, and “discuss[] their potential effects”). Here, the Corps did not wholly

40
ignore the consequences of a possible oil spill, despite its conclusion that the risk of such an

event was low. On the contrary, it adequately discussed the impacts of such “a low risk/high

consequence event,” EA at 92, on water — but not on hunting or aquatic — resources.

As to water resources, the EA offered several comments. It acknowledged that, during

operations, “[d]rinking water intakes located downstream from the Missouri River and Lake

Oahe crossings could be at risk if there was a release that reached these bodies of water in the

vicinity of the intake structures,” and that “the Standing Rock Sioux . . . have intake structures

within the river downstream of the Lake Oahe Project area.” Id. at 38; see also id. at 42 (“In the

unlikely event of a release during pipeline operations, drinking and irrigation water intakes

located downstream from the Missouri River and Lake Oahe crossings could be at risk if

hydrocarbons were to reach these bodies of water in the vicinity of the intake structures.”); id. at

87 (“Concerns have been expressed regarding an inadvertent release reaching intake structures

on Lake Oahe. . . . In the unlikely event of a release, sufficient time exists to close the nearest

intake valve to avoid human impact.”). Later, the EA further explained: “Accidental releases

from the pipeline system during operations could potentially affect groundwater. . . . [C]rude oil

released into soil can migrate toward water where certain constituents can dissolve into

groundwater or surface water in limited amounts.” Id. at 45.

It then presented a model estimating the concentrations of benzene, a potentially toxic

compound found in crude oil, that could be released during a very small, small, moderate, or

large spill at the Oahe crossing, and discussed how those results might vary during winter

months when temperatures are likely to be colder. Id. at 46-47. Even assuming that “[t]he entire

volume of a crude oil spill was released due to a catastrophic failure of the pipeline and reached

the waterbody; [c]omplete, instanteous mixing occurred; [and] [t]he entire benzene content of the

41
crude oil was solubilized into the water column,” the model concluded that under no spill

scenario would the acute toxicity threshold for aquatic organisms be exceeded, and that under the

“most probable spill volume,” benzene concentrations would not “exceed the drinking water

criteria.” Id. In addition, at the conclusion of its discussion of the nine spill-risk factors

previously discussed, the EA, under the header “Consequences,” stated: “In the event that a

pipeline failure occurs and product is released into the Missouri River at either crossing, the

worst case consequence scenario is ranked high because several drinking water intake High

Consequence Areas (HCAs) and multiple ecologically sensitive HCAs could be impacted.” Id.

at 94.

The EA is not similarly attentive, however, to the impacts of a spill on fish or game, the

resources implicated by the Tribe’s fishing and hunting rights. As to aquatic resources, the EA

offered only a cursory nod to the potential effects of an oil spill, stating simply that “[t]he

primary issue related to impacts on the aquatic environment from operation of the Proposed

Action would be related to a release from the pipeline.” Id. at 69. It never explained, though,

what those effects would be. Instead, it simply reasoned that adherence to Dakota Access’s

response plan “would minimize potential impacts on aquatic wildlife.” Id. at 69-70; see also id.

at 101. Likewise, regarding hunting, the EA only discussed the effects of construction on

“recreationally and economically important species and nongame wildlife”; it said nothing about

the effects of a spill. Id. at 57-58.

Standing Rock, though, had alerted the Corps to its fishing- and hunting-related concerns

after the agency published the Draft EA. See, e.g., ECF No. 159-1, Exh. C (SRST Comments on

Draft EA, Jan. 8, 2016) at 13 (“[A] pipeline leak would threaten to damage . . . the fish and

wildlife on which many Tribal members depend for subsistence.”); ECF No. 159-1, Exh. D

42
(SRST Suppl. Comments on Draft EA, Mar. 24, 2016) at 15 (“The waters of Lake Oahe also

provide habitat for fish, wildlife, and plants important to the diet . . . of the Tribe.”). The

Director of Standing Rock’s Department of Game, Fish, and Wildlife Conservation, moreover,

explained that many of the Tribe’s members rely on fishing as “an important supplemental

source of food and nutrition” and that the Tribe issued 199 family fishing permits in 2015. See

ECF No. 117-16 (Declaration of Jeff Kelly, Nov. 28, 2016), ¶ 5. An oil spill, he said, could

“cause extensive fish kills.” Id., ¶ 12. He also spelled out the ways in which an oil spill could

seriously affect game along the Oahe shoreline, including by poisoning animals that ingest,

inhale, or are otherwise externally exposed to oil and preventing those birds and mammals whose

feathers or fur are coated with oil from maintaining their body temperatures. Id., ¶ 13. Although

the Corps did not have Kelly’s declaration before it when it issued the EA in July 2016, his

remarks were before the agency when it concluded that the easement could be issued based on

the EA absent any supplementation.

Without any acknowledgment of or attention to the impact of an oil spill on the Tribe’s

fishing and hunting rights, despite Plaintiff’s efforts to flag the issue, the EA — in this limited

respect — was inadequate. The appropriate remedy for such omission is discussed in Section

III.D, infra.

2. Alternatives

To comply with NEPA, an Environmental Assessment must include a “‘brief

discussion[]’ of reasonable alternatives to the proposed action.” Myersville, 783 F.3d at 1323

(quoting 40 C.F.R. § 1508.9(b)). This consideration “need not be as rigorous as the

consideration of alternatives in an EIS.” Id.; compare 40 C.F.R. § 1508.9(b) (requiring “brief

discussion[]”) with id. § 1502.14(a) (requiring agency to “[r]igorously explore and objectively

43
evaluate all reasonable alternatives” when EIS required). “An alternative is ‘reasonable’ if it is

objectively feasible as well as ‘reasonable in light of [the agency’s] objectives.’” Myersville,

783 F.3d at 1323 (quoting Theodore Roosevelt Conservation P’ship v. Salazar, 661 F.3d 66, 72

(D.C. Cir. 2011)). An agency’s “specification of the range of reasonable alternatives is entitled

to deference.” Id.

Standing Rock believes that the Environmental Assessment lacks an adequate

consideration of such alternatives. Specifically, the Tribe posits that the EA did not

appropriately examine an alternative route that would have had the pipeline cross the Missouri

River further north. See SRST MSJ at 26, 30-31. The Court disagrees: on this front, the EA

adequately discharged the Corps’ NEPA obligations.

Before settling on the current DAPL route, Dakota Access considered routing the

pipeline to cross Lake Oahe approximately 10 miles north of Bismarck, North Dakota — i.e.,

approximately 50 miles north of its current location, which sits just 0.5 miles north of the

Standing Rock Reservation. See EA at 8, 161 (Figure 13). The Company soon determined,

however, that that route was not “a viable alternative.” Id. The EA explains why. A table

therein compares the Bismarck and Oahe crossings in terms of overall route mileage; co-location

with other pipelines and powerlines; the number of existing pipelines, floodplains, water

features, and powerlines crossed; miles of agriculture, developed/low intensity, developed/open

space, and grass/pasture land crossed; whether Corps-owned land would be crossed; the number

of waterbodies crossed; the number of high-consequence areas affected; and the number of

transportation crossings. Id. at 9-10. A separate table compares the two crossings in terms of

total pipeline and total HDD length, as well as in terms of cost for road/railroad bores,

44
installation for non-HDD areas, HDD, geotechnical investigation, above-ground facilities, right-

of-way acquisition, and engineering and consulting. Id. at 11.

That data reveals that the Bismarck alternative would have required an additional 11

miles of pipeline, “consisting of roughly 165 additional acres of impact,” 11 more floodplain

crossings, 1 more powerline crossing, and 27 more transportation crossings. Id. at 8-10. In

addition, it would have “crossed through or in close proximity to several wellhead source water

protection areas” and “crossed other populated PHMSA high consequence areas” — i.e., “locales

where a release from a pipeline could have the most significant adverse consequences” — “not

present on the [selected] route.” Id. at 8. The North Dakota Public Service Commission,

moreover, requires a 500-foot residential buffer, which would have “severely constrained” the

Bismarck route. Id. By contrast, on the Reservation, the residence closest to the pipeline at

Oahe is located more than 1.5 miles away. Id. at 86. And finally, the Bismarck alternative

would have cost nearly $33 million more and been co-located with other pipelines or utility

corridors for only 3% of the route as compared to the selected route’s 41%. Id. at 9, 11.

Standing Rock largely focuses its critique on the EA’s reliance on a memo prepared by

DAPL consultants, which it argues offers “a one-sided analysis that considered downstream

impacts for the Bismarck alternative, but not for the Oahe crossing.” SRST MSJ at 30. But that

memo, which the EA does not expressly cite, provides another reasonable basis on which the

Corps could have rejected the Bismarck crossing in favor of Oahe. It explains that the two

closest municipal-water intakes to the Bismarck crossing would have been at Mandan, 7.3 miles

downstream and serving 19,381 people, and Bismarck, 11.6 miles downstream and serving

65,123 people. See ECF No. 209-16 at 18 (Memorandum from Tom Siguaw, Dakota Access, &

Steve Rove, HDR Engineering, Apr. 12, 2016). The first downstream intake from the Oahe

45
crossing, comparatively, is 4.2 miles downstream but is non-tribal and for agricultural use. Id.

The second is 7.6 miles downstream and is used by Standing Rock also for agricultural purposes.

Id. The third — and the first to be used for drinking water — is 11.1 miles downstream and

belongs to the South Central Regional Water District, which serves 3,491 people in Emmons

County, North Dakota. Id. The fourth — and the first Standing Rock intake for public

consumption — is 26.2 miles downstream at Fort Yates and serves 229 people in Fort Yates and

up to 4,317 in Sioux County. Id. The Bismarck crossing thus would have been much closer —

nearly four miles — to a drinking-water intake than the Oahe crossing. The drinking-water

intakes near Bismarck also serve many more people than the two closest to the Oahe crossing.

This difference will be even more pronounced once construction is complete on a new water-

intake structure being built to serve all communities on the Standing Rock Reservation, as that

system will be located approximately 50 miles further downstream from the Oahe crossing than

the existing structure serving the Tribe at Fort Yates. See Cooper Memo at 19.

This is not to say that the EA’s analysis of the Bismarck alternative is without flaws. As

the Cooper Memo points out, when counting the number of wetland and water features crossed,

the EA uses raw numbers of crossings, rather than “the total [number] of impacts measured as

acreage or linear feet,” which would have given “a more accurate comparison of the route.”

Cooper Memo at 9. And although the Bismarck route would have crossed PHMSA high-

consequence areas that the Lake Oahe route does not, the Lake Oahe route also crosses high-

consequence areas. Id.; EA at 94. Despite these issues, by identifying and comparing several

features of the two routes as described, the EA easily clears NEPA’s hurdle requiring “brief

discussion” of reasonable alternatives.

46
3. Environmental Justice

Standing Rock next contends that the Corps’ environmental-justice analysis was arbitrary

and capricious. A 1994 Executive Order requires that, “[t]o the greatest extent practicable and

permitted by law,” federal agencies “shall make achieving environmental justice part of [their]

mission by identifying and addressing, as appropriate, disproportionately high and adverse

human health or environmental effects of [their] programs, policies, and activities on minority

populations and low-income populations.” Exec. Order 12,898, Federal Actions to Address

Environmental Justice in Minority Populations and Low-Income Populations, 59 Fed. Reg. 7629

(Feb. 11, 1994), § 1-101. The Order expressly states that it does not create a private right to

judicial review, id. § 6-609, but the D.C. Circuit has permitted challenges to environmental-

justice analyses under NEPA and the APA. See Communities Against Runway Expansion, Inc.

v. F.A.A., 355 F.3d 678, 689 (D.C. Cir. 2004) (“The [agency] exercised its discretion to include

the environmental justice analysis in its NEPA evaluation, and that analysis therefore is properly

subject to arbitrary and capricious review under the APA.”).

As the EA acknowledges, see EA at 84, the Council on Environmental Quality developed

guidance to assist federal agencies in ensuring that environmental-justice concerns “are

effectively identified and addressed.” ECF No. 117-19 (CEQ, Environmental Justice Guidance

Under the National Environmental Policy Act, Dec. 10, 1997) at 1. That guidance instructs that

agencies “should consider the composition of the affected area, to determine whether minority

populations, low-income populations, or Indian tribes are present in the area affected by the

proposed action, and if so whether there may be disproportionately high and adverse human

health or environmental effects on minority populations, low-income populations, or Indian

tribes”; “should recognize the interrelated cultural, social, occupational, historical, or economic

47
factors that may amplify the natural and physical environmental effects of the proposed agency

action”; and “should recognize that the impacts within . . . Indian tribes may be different from

impacts on the general population due to a community’s distinct cultural practices.” Id. at 9.

“Where environments of Indian tribes may be affected,” CEQ advises, “agencies must consider

pertinent treaty, statutory, or executive order rights and consult with tribal governments in a

manner consistent with the government-to-government relationship.” Id. at 14. Finally, the

“unit of geographic analysis” for the environmental-justice assessment should “be chosen so as

not to artificially dilute or inflate the affected minority population.” Id. at 26.

Here, the Corps defined the unit of geographic analysis for its environmental-justice

assessment as a 0.5-mile radius around the crossing, yielding a focus on the two census tracts in

which the HDD boreholes would be drilled — i.e., the places on either side of Lake Oahe at

which the pipeline would enter the ground to pass under the water. See EA at 84. Those two

census tracts were in Morton County and Emmons County; they did not include Sioux County,

where the Reservation is located. Id. at 80, 83.

To identify the impact of the project on the populations in the chosen census tracts, the

Corps compared the average demographic data from the two census tracts to that of “counties in

the general vicinity” of the Oahe crossing — Emmons, Morton, and Sioux Counties — and to

that of North Dakota generally. Id. at 84. Specifically, the Corps compared the areas by

percentage of racial minorities and percentage of persons living below the poverty level. Id. at

83. That data analysis revealed that the minority population in the two census tracts was 2% —

i.e., 29% lower than the minority population in the general-vicinity counties and 9% lower than

the minority population in North Dakota as a whole. Id. at 83, 85. It also showed that the

percentage of persons living below the poverty level in the two census tracts was 9%. Id. at 83.

48
The EA states that this figure was 3% lower than the impoverished population in the general-

vicinity counties and 50% higher than in North Dakota as a whole. Id. Based on these

comparisons, the EA concluded that “there is no concern regarding environmental justice to

minority populations at the Proposed Action Area at . . . Lake Oahe.” Id. at 85. In actuality,

some of the EA’s calculations are incorrect. See Cooper Memo at 24 (identifying one of two

errors). Using the correct figures, the percentage of persons living below the poverty line in the

two census tracts was 11% lower than in the general-vicinity counties and 3% lower than in

North Dakota as a whole. Id. at 83; Cooper Memo at 24. (As will be seen, the calculation errors

play no significant role in the outcome on this issue.)

The Tribe challenges the Corps’ decision to use a 0.5-mile buffer and the resulting

analysis as arbitrary and capricious gerrymandering. See SRST MSJ at 28. The Standing Rock

Reservation is 0.55 miles — or 80 yards beyond the 0.5-mile limit — downstream of the HDD

site, and the Tribe contends that there was no principled basis on which to narrowly exclude it

from the bounds of the Corps’ analysis. Id. at 29. It also notes that the two census tracts selected

as the “affected area” are “mostly upstream of the crossing site” with a 98% white population.

Id. By comparing these tracts to a baseline of three counties that included Sioux County,

Standing Rock argues, the EA “compar[ed] an area that will be almost entirely unaffected by a

spill from the pipeline, and where few Tribal members live, against a baseline that included a

significant portion of the Reservation.” Id. “Unsurprisingly,” the Tribe observes, the “‘affected

area’ did not have a higher population of minority and low-income people than the claimed

baseline, allowing the Corps to dismiss environmental justice concerns.” Id.

The Corps and Dakota Access defend the reliance on a 0.5-mile buffer by repeating the

justification given in the EA: “Transportation projects, such as under the Federal Transit

49
Administration, and natural gas pipeline projects under the Federal Energy Regulatory

Commission . . . typically use a 0.5 mile buffer area to examine Environmental Justice effects.”

EA at 84; see also id. at 87 (“As stated above, linear projects typically use a 0.5 mile buffer area

to examine Environmental Justice effects.”); DA SRST Opp. at 29; Corps SRST MSJ at 27.

Although “[t]he ‘identification of the geographic area’ within which a project’s impacts

on the environmental resources may occur ‘is a task assigned to the special competency of the

appropriate agencies,’” Powder River Basin Res. Council v. BLM, 37 F. Supp. 3d 59, 75 (D.D.C.

2014) (quoting Tri-Valley CAREs v. Dep’t of Energy, 671 F.3d 113, 1127 (9th Cir. 2012))

(quoting Kleppe v. Sierra Club, 427 U.S. 390, 414 (1976)), the Court is hard pressed to conclude

that the Corps’ selection of a 0.5-mile buffer was reasonable. DAPL is neither a transportation

project nor a natural-gas pipeline; it is a crude-oil pipeline. The EA does not identify any project

involving a crude-oil pipeline for which a 0.5-mile buffer was employed. The Corps, likewise,

points only to other types of infrastructure projects. See Corps SRST MSJ at 27 (citing Coal. for

Healthy Ports v. Coast Guard, No. 13-5347, 2015 WL 7460018, at *25 (S.D.N.Y. Nov. 24, 2015)

(project to raise height of bridge); Bitters v. Fed. Highway Admin., No. 14-1646, 2016 WL

159216, at *14 (E.D. Cal. Jan. 13, 2016) (project to reintroduce vehicle traffic lanes to particular

streets)).

The Corps nonetheless rejoins that there is no meaningful distinction between those

projects and DAPL. Id. (“Analysis of a half-mile buffer, which is appropriate for bridges or

other construction projects with street-level noise, traffic or other impacts, is certainly

appropriate for the Lake Oahe crossing, where the construction is deep under the bed of Lake

Oahe and is staged on private lands.”); Corps SRST Reply at 13 n.3 (“[A] bridge that carries rail

cars or truck traffic transporting oil or hazardous substances which could just as easily suffer low

50
probability accidents resulting in releases to the waterways underneath the bridges.”). The

problem with the Corps’ argument, however, is that the cases it cites did not consider an oil spill

when evaluating impacts; if they had, perhaps a different geographic scope may have been

selected. Standing Rock, conversely, points to two oil-pipeline projects for which a much larger

affected area was used to assess environmental-justice impacts. See SRST MSJ at 30 n.16

(citing ECF No. 117-22 (Final Supplemental Environmental Impact Statement, Keystone XL

Project) at 3.10-3) (assessing environmental-justice impacts 14 miles downstream of crossings));

SRST Reply at 25 n.23 (citing ECF No. 195-6 (Draft Supplemental Environmental Impact

Statement for Line 67 Expansion, Jan. 2017) at 3.0-2 (looking at spill impacts up to 40 river-

miles downstream)).

Standing Rock is not the only entity to criticize the 0.5-mile-buffer choice. In its

comments on the Draft EA, the EPA advised the Corps that “the area of analysis to assess

potential impacts to EJ communities should correspond to the impacts of the proposed project

instead of only the area of construction disturbance.” ECF No. 209-8 at 126 (Letter from Philip

Strobel to Brent Cossette, Mar. 11, 2016). “For oil pipeline projects, potential impacts to EJ

communities would include the effects of leaks and spills to downstream water supplies (both

drinking water quality, agricultural uses, and costs) and aquatic resources such as fish and

riparian vegetation used by EJ populations.” Id. Even the Corps’ Chief Counsel expressed

concern about the agency’s geographic selection when reviewing the EA’s legal sufficiency:

The Corps’ determination of the affected environment . . . can be
questioned here. . . . Sioux County is just outside the 0.5-mile
pipeline buffer. While the equally sized buffer on both sides of the
pipeline seems reasonable along land areas, it is arguably less so at
water areas because of the potential for water currents to carry a spill
downstream. Sioux County is located just south and downstream of
the pipeline. Thus, the SRST population present immediately
outside of the proposed area or affected environment and

51
downstream reasonably could have been within the area identified
as the affected environment in the EA. If that area was included, the
EA would then determine whether there might a disproportionately
high and adverse human health or environmental effect on the
SRST.

Cooper Memo at 25-26.

The Corps argues that the Court need not confine its analysis to the use of a 0.5-mile

buffer, however, because the EA also devoted a separate section to environmental-justice

impacts on the Standing Rock Sioux Reservation. See EA at 85-87. That additional section, as it

turns out, does not yield the Corps a full reprieve. The Standing Rock-focused environmental-

justice section begins with the “recogni[tion] that the Standing Rock Sioux Tribe is downstream

of the Lake Oahe Crossing” and “has a high population of minorities and low-income residents.”

Id. at 85. It first discusses impacts from the project’s construction and anticipated operation, and

it explains that: the crossing will be installed via HDD on private lands adjacent to Corps-owned

land, HDD drilling has no anticipated environmental effects, the pipeline’s route “maintain[s] a

minimum distance of 0.5 mile[s] from Tribal land,” and the closest residence on the Reservation

to the Oahe crossing is more than 1.5 miles away. Id. at 85-86. “As a result of this routing

criteria, the nature of the action (construction associated with laying an underground oil

pipeline), the short term duration of effects, construction and operation on private lands, the

concurrent reclamation activities, state of the art construction techniques, [and] use of high

quality materials and standards that meet or exceed federal standards,” the EA concludes, “there

will be no direct or indirect effects to the Standing Rock Sioux Tribe. This includes a lack of

impact to its lands, cultural artifacts, water quality or quantity, treaty hunting and fishing rights,

environmental quality, or socio-economic status.” Id. at 86. Given the absence of impacts, it

52
continues, “there is no resulting adverse or disproportionate impacts of the Proposed Action with

respect to Environmental Justice considerations.” Id.

The problem here, as the Tribe points out, is that this analysis covers only construction

impacts, not spill impacts. See SRST Reply at 26. As to the effects from a spill (as distinct from

the risk of a spill occurring), the EA’s discussion is minimal:

Concerns have been expressed regarding an inadvertent release
reaching intake structures on Lake Oahe. Given the engineering
design, proposed installation methodology, quality of material
selected, operations measures and response plans[,] the risk of an
inadvertent release in, or reaching, Lake Oahe is extremely low.
While the locations of water intakes is not public information for
disclosure in this document, there are private and/or non-tribal
intakes closer to the Lake Oahe crossing than any intakes owned by
the tribe; further demonstrating the lack of disproportionate impacts
of an inadvertent release to the Tribe and the reservation. We
understand that due to the rural nature of this area, tribal drinking
water supplies are obtained from a combination of wells and surface
area. The siting and construction of oil pipelines upstream of
drinking water intakes is not uncommon throughout the United
States and is not considered an Environmental Justice issue. In the
unlikely event of a release, sufficient time exists to close the nearest
intake valve to avoid human impact.

EA at 87. This limited analysis, the Court believes, is not enough to discharge the Corps’

environmental-justice responsibilities under NEPA.

“The purpose of an environmental justice analysis is to determine whether a project will

have a disproportionately adverse effect on minority and low income populations.” Allen v.

Nat’l Institutes of Health, 974 F. Supp. 2d 18, 47 (D. Mass. 2013) (quoting Mid States Coal. for

Progress v. Surface Transp. Bd., 345 F.3d 520, 541 (8th Cir. 2003)). The EA takes some steps

toward satisfying this purpose. It acknowledges that Standing Rock, a community with a high

percentage of minorities and low-income individuals, is based downstream of the Oahe crossing

and could be affected by an oil spill, and it observes — without providing any specifics — that a

53
non-tribal community’s drinking-water intake is closer to the Oahe crossing than is Standing

Rock’s. But these statements are not enough to reasonably support the conclusion that the Tribe

will not be disproportionately affected by an oil spill in terms of adverse human health or

environmental effects. See CEQ Guidance at 9.

The EA is silent, for instance, on the distinct cultural practices of the Tribe and the social

and economic factors that might amplify its experience of the environmental effects of an oil

spill. Id. at 9, 14. Standing Rock provides one such example in its briefing: many of its

members fish, hunt, and gather for subsistence. See SRST MSJ at 41. Losing the ability to do so

could seriously and disproportionately harm those individuals relative to those in nearby non-

tribal communities.

The Corps need not necessarily have addressed that particular issue, but it needed to offer

more than a bare-bones conclusion that Standing Rock would not be disproportionately harmed

by a spill. Given the cursory nature of this aspect of the EA’s analysis, the Court agrees with the

Tribe that the Corps did not properly consider the environmental-justice implications of the

project and thus failed to take a hard look at its environmental consequences. Once again, the

remedy for such omission is considered in Section III.D, infra.

B. Decision to Grant the Easement

The Tribe’s second set of arguments centers around the Corps’ February 8, 2017,

decision to grant an easement to Dakota Access to construct and operate DAPL under Lake

Oahe. As a reminder, the Corps had previously said, in a memo issued on December 4, 2016,

that it would not grant such an easement based on the current record and would undertake

additional analysis before making a final decision. Standing Rock first contends that the Corps’

February 2017 easement decision was an arbitrary and capricious reversal of its previous

54
position. It also asserts that the decision was in conflict with the Corps’ trust-responsibility

obligations. The Court addresses each in turn.

1. Policy Change

When an agency action changes or reverses a prior policy, it must “display awareness

that it is changing position”; it may not, e.g., “depart from a prior policy sub silentio.” FCC v.

Fox Television Stations, Inc., 556 U.S. 502, 515 (2009). It also “must show that there are good

reasons for the new policy.” Id. Generally, however, those reasons need not be better than the

reasons for the old policy. To satisfy the APA’s procedural-correctness requirements, it is

sufficient “that the new policy is permissible under the statute, that there are good reasons for it,

and that the agency believes it to be better, which the conscious change of course adequately

indicates.” Id. Sometimes, though, more is required. If the “new policy rests upon factual

findings that contradict those which underlay its prior policy,” the agency must “provide a more

detailed justification than what would suffice for a new policy created on a blank slate,” for “[i]t

would be arbitrary and capricious to ignore such matters.” Id.; see also id. at 537 (Kennedy, J.,

concurring) (“[A]n agency's decision to change course may be arbitrary and capricious if the

agency ignores or countermands its earlier factual findings without reasoned explanation for

doing so. An agency cannot simply disregard contrary or inconvenient factual determinations

that it made in the past, any more than it can ignore inconvenient facts when it writes on a blank

slate.”). The agency need not, though, “refute the factual underpinnings of its prior policy with

new factual data.” United States Sugar Corp. v. Envtl. Prot. Agency, 830 F.3d 579, 626 (D.C.

Cir. 2016), on reh’g en banc in part No. 11-1108, 2016 WL 7427434 (D.C. Cir. Dec. 23, 2016),

and on reh’g en banc, 2016 WL 7427453 (D.C. Cir. Dec. 23, 2016). It is enough that it offer a

55
“reasoned explanation . . . for disregarding facts and circumstances that underlay . . . the prior

policy.” Fox, 556 U.S. at 516.

Standing Rock argues that the Corps’ decision to grant the easement on February 8, 2017,

was a reversal of the decision announced in the December 4, 2016, memorandum. Because the

Corps “failed to address, let alone provide a reasoned explanation for, abandoning the

determinations undergirding its December 4 decision to require an EIS,” the Tribe contends, its

action was arbitrary and capricious. See SRST MSJ at 36.

In response, the Corps and Dakota Access first argue that Fox simply does not apply: the

decision to grant the easement was not a change in policy because the Corps had never denied

the easement in the first place. See Corps SRST MSJ at 34; DA SRST Opp. at 32. That

position, however, mischaracterizes the Tribe’s argument. Standing Rock does not assert that the

Corps previously denied the easement; indeed, it could not plausibly do so. Assistant Secretary

Darcy clearly stated in her December 4 memo: “To date, the Army has not made a final decision

on whether to grant the easement.” Dec. 4 Memo, ¶ 6. Instead, Standing Rock’s argument is

that the Corps announced on December 4 that it would “not grant an easement to cross Lake

Oahe at the proposed location based on the current record” — as “additional analysis, more

rigorous exploration and evaluation of reasonable siting alternatives, and greater public and tribal

participation and comments” were merited, id., ¶ 12 (emphases added) — but nonetheless

granted the easement on February 8 without having undertaken such additional analysis. The

reversal, then, is the decision to grant the easement on the current record — i.e., as it stood on

December 4 — when the Corps had previously said it would not do so. This, the Tribe believes,

was arbitrary and capricious. Standing Rock does not, it clarifies in its Reply, assail the

withdrawal of the notice of intent to prepare an EIS. See SRST Reply at 30 n.24.

56
The Corps’ reversal plainly constituted a change in “official policy.” See, e.g., Alaska

Oil & Gas Ass’n v. Pritzker, 840 F.3d 671, 682 (9th Cir. 2016) (applying Fox to policy change in

agency’s approach to assessing foreseeable threats to endangered species triggered by internal

agency memorandum); Sierra Club v. Bureau of Land Management, 786 F.3d 1219, 1226 (9th

Cir. 2015) (explaining Fox did not apply to an agency’s “evolving analysis” that “was not a

change in a published regulation or official policy”); Loving v. I.R.S., 742 F.3d 1013, 1021 (D.C.

Cir. 2014) (suggesting Fox applies where initial policy was articulated via testimony to Congress

and guidance document — i.e., not final agency actions — and policy change was accomplished

via rulemaking). As the decision to grant the easement on the record as of December 4 did not

rest on new factual findings not relied upon by Darcy or ignore or countermand prior factual

findings absent reasoned explanation, the Corps need only have shown good reasons for its new

policy. Taking Fox’s framework into account, the Court concludes that the Corps here satisfied

its dictates.

First, the Corps displayed “awareness that it [was] changing position.” Fox, 556 U.S. at

515. The February 3, 2017, memo from the Corps’ Lieutenant General that recommended

granting the easement acknowledged that Darcy had previously “directed the Corps to engage in

additional review and analysis concerning” alternative locations, the potential risk of an oil spill

and potential impacts to the Tribe, and the Tribe’s treaty rights, but explained that, “[a]fter

reviewing the record in its entirety and giving further consideration to the input received over the

past four months, including additional review and analyses of the subjects identified by [Darcy],

other federal executive offices, and the SRST, the Corps finds that the Final EA concerning the

crossing of the DAPL at Lake Oahe is sufficient and does not need further supplementation.”

Semonite Memo at 9, 11.

57
Second, the Corps provided a reasoned explanation for its new policy. Darcy’s memo

affirmed that “the Corps’ prior reviews and actions” — including the EA and FONSI —

“comported with legal requirements.” Dec. 4 Memo, ¶ 15. Her “policy decision” that “a more

robust analysis of alternatives [could] be done and should be done” was “based on the totality of

the circumstances” — namely, “the specific mandates of the Mineral Leasing Act (30 U.S.C.

§ 185), the involvement of historic tribal homelands, the close proximity to reservation lands that

extend into the potentially affected waters, and the potential impacts on treaty hunting and

fishing rights.” Id. In reversing course, the Corps started from the same premise as Darcy —

viz., that the EA and FONSI satisfied NEPA’s requirements. See Semonite Memo at 10. It then

explained that the EA “fully informed . . . the decision on whether to grant an easement under the

Mineral Leasing Act.” Id. Supplementation of an EA or EIS, it noted, is required by CEQ

NEPA regulations only when there are “substantial changes in the proposed action that are

relevant to environmental concerns” or when “significant new circumstances or information

relevant to environmental concerns” emerge after an EA or EIS is final. Id. at 11 (quoting 40

C.F.R. §§ 1502.9(c)(1)(i), (ii)).

Here, the proposed action described in the EA did not change between July 2016 and

February 2017. Id. The Corps also concluded that no new significant circumstances or

information relevant to environmental concerns, including the federal government’s trust

relationship to the Tribe, the Corps’ analysis of alternatives, risks from oil spills, and the impact

of a spill on the Tribe’s Treaty rights and water intakes, had emerged since the EA was finalized.

It did so by comparing the various letters received from the Tribe after the EA was issued,

including its expert report, with comments the Tribe previously submitted on the Draft EA, as

well as by looking at the Corps’ analysis in the Final EA, the subsequent review memos, and the

58
36 special conditions imposed on the easement. Id. at 11-13. In response to the Interior

Solicitor’s memo “address[ing] a series of issues rooted in the perceived risk that the DAPL

would leak into Lake Oahe,” the Corps explained that, as set out in the EA and Cooper Memo,

the risk of a spill was low and was further mitigated by the easement conditions. Id. at 13.

By explaining why it was not compelled by the Tribe’s letters, the Interior Solicitor’s

Opinion, or the Corps’ post-EA reviews to supplement the EA — which Darcy did not dispute

was legally sound — the Corps did enough to satisfy the APA’s requirements regarding policy

reversals.

2. Trust Responsibilities

In addition to challenging the decision to grant the easement as an arbitrary-and-

capricious reversal of prior agency policy, Standing Rock contends that this and other

authorizations to cross Lake Oahe violate the Corps’ trust responsibility to protect the Tribe’s

Treaty rights. This trust responsibility, the Tribe argues, is “even higher than the one imposed by

NEPA.” SRST MSJ at 39. In other words, “compliance with general environmental statutes” is

not sufficient “to discharge [the Corps’] trust duty”; a greater fiduciary duty is required. See

SRST Reply at 34.

As best the Court can tell from the briefing, the Tribe argues that the Corps’ failure to act

in accordance with its trust-responsibility obligations renders the granting of the easement

arbitrary and capricious under the APA. See SRST MSJ at 35-43 (situating discussion of Treaty

rights under heading stating “The Granting of the Easement and Other Corps Authorizations is

Arbitrary, Capricious, and Contrary to Law”); SRST Reply at 30-34 (similar). Whether that is so

or Plaintiff intends to also state a separate breach-of-trust action, see ECF No. 106-1 (SRST First

Amended Complaint), ¶¶ 266-285 (stating separate claims for relief for breach of t

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---