# Union Pacific Railroad v. Santa Fe Pacific Pipelines, Inc.

> California Court of Appeal · November 5, 2014 · 231 Cal. App. 4th 134

URL: https://www.frixlaw.com/law-library/cases/2748503

## Case

- **Full name:** UNION PACIFIC RAILROAD COMPANY, Plaintiff and Respondent, v. SANTA FE PACIFIC PIPELINES, INC., Et Al., Defendants and Appellants
- **Court:** California Court of Appeal
- **Decided:** November 5, 2014
- **Citations:** 231 Cal. App. 4th 134; 180 Cal. Rptr. 3d 173; 2014 Cal. App. LEXIS 1007
- **Precedential status:** Published
- **Opinion:** Opinion by Kussman
- **Judges:** Kussman
- **Cited by:** 46 later opinions in the Frix Law Library

## Citator (automated)

- No negative treatment found by the automated citator. That is not the same as a confirmation that the case is good law; read the citing cases.
- Full citator and citing cases: https://www.frixlaw.com/law-library/cases/2748503

## How later opinions describe it (automated extraction)

- describing issues raised on appeal
- describing trial court proceedings

## Opinion text

Filed 11/5/14
CERTIFIED FOR PUBLICATION

IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA

SECOND APPELLATE DISTRICT

DIVISION EIGHT

UNION PACIFIC RAILROAD B242864
COMPANY,
(Los Angeles County
Plaintiff and Respondent, Super. Ct. No. BC319170)

v.

SANTA FE PACIFIC PIPELINES, INC.,
et al.,

Defendants and Appellants.

APPEAL from judgments of the Superior Court of Los Angeles County, Eli
Chernow, Temporary Judge. (Pursuant to Cal. Const., art. VI, § 21.) Affirmed in part;
reversed in part and remanded.
Mayer Brown, Donald Falk, Neil M. Soltman, Michael F. Kerr, Germain D. Labat,
Matthew Marmolego; Cooley, Steven M. Strauss, M. Ray Hartman III and Summer J. Wynn
for Defendants and Appellants.
McKenna Long & Aldridge, Thomas F. Winfield III and Michael H. Wallenstein for
Plaintiff and Respondent.
INTRODUCTION

This is the latest of multiple appeals in a case in which courts have been called upon
to determine the amount of rent a pipeline company must pay to a railroad for the use of
land underneath its rights-of-way, most of which were initially granted to it by the federal
government beginning in the mid-19th century in order to build and operate transcontinental
railroads. The rent is to be determined by the terms of a settlement agreement entered into
in 1994 arising out of previous litigation between the parties—former sister companies that
separated, and have been involved in lawsuits ever since.
Appellants are Santa Fe Pacific Pipelines, Inc., previously known as Southern Pacific
Pipelines, Inc.; SFPP, L.P., Kinder Morgan Operating L.P. “D”; and Kinder Morgan G.P.,
Inc. (collectively the Pipeline). Respondent is Union Pacific Railroad Company, successor
to Southern Pacific Transportation Company (the Railroad). The two companies previously
existed under the same corporate umbrella. In that context, they entered into master
agreements in the mid-1950’s under which the Railroad granted easements to the Pipeline in
the subsurface underlying the Railroad’s rights-of-way in order to convey its oil, gas and
other petroleum products across the western United States. In 1983, the parties revised and
revamped their master agreement, maintaining the essential element that the Pipeline
continue to use the subsurface to move its commodities. But in the late 1980’s—30 years
after the initial easements were granted—their parent company merged with another
company. The Railroad was divested, and the companies were no longer sisters. Soon
thereafter, disputes arose between the Railroad and the Pipeline companies. Litigation
began in 1991 when the Railroad sued the Pipeline, complaining that the master agreement
under which they were operating was not negotiated at arms-length, and that the Railroad
was not receiving a fair deal. Three years later, this case resolved. In 1994, the parties
executed a settlement agreement that set the parameters for how rent would be determined
on the Pipeline’s easements.
Since then, there have been three court trials and five appellate decisions relating to
the enforcement of this settlement agreement. The first case was brought in 1994. We are

2
now called upon to review the most recent court trial, which generated over 42,000 pages of
testimony and concomitant volumes of exhibits and appendices and other documents. The
judgment under review arose out of a declaratory relief action where the Railroad sought a
determination of the rent due from the Pipeline for the continued use of its easements from
2004 to 2014.1 The Railroad obtained a declaration that the rent due was in excess of $14
million per year. The trial court entered a judgment reflecting that the total back rent due
was $81,589,584, plus interest in the amount of $19,372,195.50, up to the date of entry of
the judgment. The Pipeline appealed.
On appeal, the Pipeline makes the following claims: (1) The trial court erred in
finding that the prior judgment did not collaterally estop the relitigation of several issues and
deciding them anew in the instant case; (2) the trial court made errors in applying the
formula to calculate the rent due; (3) it was error to include rent for easements on land that
had been sold by the Railroad before the 1994 settlement agreement was executed; (4) the
trial court lacked authority to issue a money judgment, as opposed to a mere declaration of
the amount of rent due, and therefore lacked the authority to award prejudgment interest.
As to the trial court’s ruling declining to apply collateral estoppel to this action, we affirm.
As to the remaining issues, we reverse and remand for the reasons discussed below.
A recurrent, yet heretofore unresolved, theme permeating this and prior cases
between the parties is the nature of the Railroad’s interest in the property through which the
pipelines run. This issue—whether the Railroad had sufficient interest in the land beneath
its rights-of-way to grant the subsurface easements and collect rent for their use—was raised
by the Pipeline in the 1994 case and raised again in the instant case. It was extensively
litigated. In the 1994 case, the court assumed (but did not find) that the Railroad held the
land in fee. In this case, the court concluded the Railroad had sufficient interest in the land
to collect rent from the Pipeline, without determining the actual nature of that interest.
There is a large body of law—reflected by federal statutes, judicial opinions, and
regulatory decisions—that bear on the nature of a railroad’s property rights, whether it can

1 An earlier judgment determined the rent due from 1994 to 2004.

3
grant easements to third parties and collect rent from them, and the interests of adjacent
landowners and the federal government. The trial court appears to have reached its
conclusions and entered its judgment without fully analyzing this body of law, or applying it
to these facts. The absence of a determination on this issue undermines the judgment.
We address the law relating to railroad rights-of-way in an effort to resolve the legal
issues that apply to property interests in this land and, by extension, the Railroad’s right to
grant and lease subsurface easements to the Pipeline. To this end, we begin with a brief
summary of the historical context within which this dispute arises.

HISTORICAL CONTEXT

American Railroads in the 19th Century
As America spread west in the first half of the 19th century, its frontier expanded
from the Mississippi River to the coast of California and the Oregon Territory. Access to
the great expanses of the prairies and mountains, as well as to the states and territories on
the Pacific Coast, was necessary. The country was young and did not have a lot of money.
But it had lots of land. Beginning in approximately 1850, Congress embarked upon a policy
of subsidizing railroad construction by paying for it with “lavish grants from the public
domain.” (Great Northern Ry. Co. v. U.S. (1942) 315 U.S. 262, 273 (Great Northern).)
With the onset of the Civil War, the need for a transcontinental railroad took on particular
urgency, and the ability to reach the west coast over land was considered a military
necessity. President Abraham Lincoln signed the Pacific Railroad Act on July 1, 1862 (ch.
120, §§ 1-20, 12 Stat. 489), and subsequent acts were signed by him and his successors.
These initial “Congressional Acts” granted vast areas of land to several transcontinental
railroads, encouraging them to build tracks across the nation. Some of the land was
transferred to the railroads as their own property, to sell and finance their progress in

4
constructing and running the railroad. Other parts were granted as rights-of-way over the
surface upon which to build tracks and related structures.2
While the early grants were “lavish”—after all, vast areas of land owned by the
federal government were given to private companies—they did have strings attached. For
example, if a railroad ceased to use the land for railroad purposes, it would revert to the
government (or to its grantees, if any). (Northern Pacific Ry. v. Townsend (1903) 190 U.S.
267, 271 (Townsend).) The government was also concerned about losing potential wealth
below the surface upon which the rails would be built. In the initial act of 1862, there was
an express exception for “all mineral lands” (other than timber, which was granted to the
railroad company). (Pacific Railroad Act of 1862, ch. 120, § 3, 12 Stat. 489.) In late 1862,
a report from the Secretary of the Interior out of the General Land Office extolled the great
potential wealth expected to be found in the western mineral lands. (U.S. Dept. of Interior,
Abstract from the 1862 Annual Report of the Commissioner of the General Land Office
(Nov. 29, 1862).) It is clear from this report that the Secretary considered this subsurface
wealth in the public lands to be the property of the United States. In 1864, the second major
railroad act was enacted. (Act of July 2, 1864, ch. 216, § 1-22, 13 Stat. 356.) It amended
the Pacific Railroad Act of 1862, providing land grants to the railroads, reiterating that the
government retained rights to the “mineral lands,” with the exception of coal and iron
(which obviously, along with timber, were major components of railroad construction). In
1866, Congress passed a law providing that “[i]n all cases lands valuable for minerals shall
be reserved from sale, except as otherwise expressly directed by law.” (30 U.S.C. § 21.)
In the same year that he signed the Pacific Railroad Act of 1862, President Lincoln
signed the Homestead Act (Ch. 75, §§ 1-8, 12 Stat. 392), which granted large swaths of land
to settlers, who owned and developed the land near, and with the help of, the railroads. The

2 A checkerboard pattern was utilized, where odd numbered parcels were granted to
the railroads as their property, to sell and finance their venture. As to the even numbered
parcels, the railroads were granted a right-of-way “through the public lands . . . for the
construction of [the] railroad . . . .” (Pacific Railroad Act of 1862, ch. 120, §§ 2, 3, 12 Stat.
489.)

5
laws to encourage construction of the railroads and foster the infusion of settlers brought
results, and the entire project was a success. (United States v. Union Pacific R. Co. (1957)
353 U.S. 112, 126-127 (Union Pacific) (dis. opn. of Frankfurter, J.).) On May 10, 1869, the
Union Pacific and Central Pacific Railroads drove the last spike at Promontory Summit,
Utah Territory, completing the first Transcontinental Railroad and connecting America’s
east and west coasts.
By then, the Civil War had ended. Public sentiment soon turned, and the mood of
uncritical enthusiasm toward railroad enterprises began to veer. (Union Pacific, supra, 353
U.S. at pp. 126-127.) The largesse of land granted to the railroads was seen as a massive
government giveaway. By the 1870’s, legislators across the political spectrum had
embraced a policy of reserving public lands for settlers rather than granting them to
railroads. (Brandt Revocable Trust v. United States (Mar. 10, 2014, No. 12-1173) ___ U.S.
___ [134 S.Ct. 1257] (Brandt).) However, there was still a need to provide the railroads
with the ability to complete the massive project, and Congress passed the General Right-of-
Way Act of 1875.3 (18 Stat. 482, 43 U.S.C. § 934 et seq.) Like the earlier acts in the
1860’s, this legislation provided the railroads with a right-of-way through the public lands
for the construction of a railroad. (Ibid.) But now Congress made it clear that it was
providing the railroads with “mere easements” over the land on which they could lay their
tracks and run their trains. (Brandt, supra, at p. 1264, citing Great Northern, supra, 315
U.S. at p. 271.) They were given no fee interest in the property itself (ibid.); rather, title
remained in the federal government. (Great Northern, supra, at p. 275, fn. 13.)
Eventually, the need for rail service diminished with the advent of the internal
combustion engine as cars and trucks appeared on the landscape. Railroads sold,

3 After the General Right-of-Way Act of 1875 (formerly reflected in 43 U.S.C. §§ 934-
939) was enacted, several other rights-of-way acts were passed relating to railroads. (See,
e.g., 43 U.S.C. former § 942 & §§ 943-945.) None of these acts conveyed a greater interest
in the property than the 1875 Acts. For convenience, and to be consistent with the terms
used in the case law, when referring to the “1875 Act” we mean the right-of-way acts of
1875 and beyond (even if enacted after the turn of the 20th century). And when referring to
the “pre-1871 Acts” we mean the earlier land grant acts.

6
abandoned, or discontinued much of their tracks as their need for the rights-of-way granted
by Congress diminished. In response, Congress enacted laws governing the disposition of
abandoned or forfeited railroad rights-of-way, which provided that any transfer would “be
subject to and contain reservations in favor of the United States of all oil, gas, and other
materials in the land.” (43 U.S.C. § 912.) Pipelines appeared on the scene, carrying oil,
gas, coal slurry and other fuels. Congress passed laws governing subsurface oil and gas
pipelines through federal lands, providing for annual rental payments to the government.
(See, e.g., 30 U.S.C. § 185 et. seq.) Consistent with its practice of retaining the value of the
subsurface to the United States, Congress passed a law providing that the government could
grant leases for oil and gas deposits “in or under lands embraced in railroad or other rights
of way acquired under any law of the United States, whether the same be a base fee or mere
easement . . . .” (30 U.S.C. § 301 et. seq.)
By this time, a hodge-podge patchwork of easements and ownership interests in
railroad rights-of-way had spread across the west. As one might imagine, disputes over the
rights of railroads, landowners, and the government arose, resulting in numerous federal and
state lawsuits and appellate decisions, as well as several landmark opinions from the United
States Supreme Court. Many of the cases dealt with the rights to the subsurface beneath the
railroads’ rights-of-way, and many dealt with ownership rights once the rights-of-way were
no longer used for railroad purposes. Both issues arise in the instant case.

FACTUAL BACKGROUND AND PROCEDURAL HISTORY

I. Railroad Grants Pipeline Easements Beginning in the 1950’s
The Pipeline owns approximately 1,871 miles of pipeline running through California,
Arizona, Nevada, New Mexico, Texas and Oregon within the Railroad’s right-of-way.
Another 1,400 miles or so of the pipeline veer off intermittently into public and private
lands. In all, there are 1,076 pipeline segments. Some are continuous, some are not.
(Union Pacific Railroad Co. v. Santa Fe Pacific Pipelines, Inc. (Mar. 23, 2005, A103990)
[nonpub. opn.] (Santa Fe II).)

7
In the mid-1950’s, the Railroad and the Pipeline were sister subsidiaries of Southern
Pacific Corporation. The Railroad possessed a valuable transportation corridor along the
rights-of-way granted to it initially by acts of Congress. The Pipeline wished to obtain a
longitudinal easement through which to run its pipelines, which carried petroleum products.
The two sister companies entered into master agreements in 1955 and 1956 wherein the
Railroad rented portions of the subsurface under its rights-of-way to the Pipeline.
By that time, there had been considerable litigation, mostly in federal courts,
regarding who owned the subsurface beneath a railroad’s right-of-way. As to the 1875 Act,
it had been decided by the United States Supreme Court that railroads merely had an
easement over the surface of the land, and that title to the subsurface remained in the federal
government (or its grantee, if any). (Great Northern, supra, 315 U.S. at p. 275.) But as to
the pre-1871 Acts, the issue was unresolved. Railroads took the position that they had been
given the land itself, and therefore could do what they liked with the subsurface. The
federal government disagreed. It sued the Union Pacific Railroad Company, seeking to
enjoin it from extracting oil and gas from the subsurface under a pre-1871 right-of-way. In
1954, a federal district court found in favor of the Railroad, holding that it had full rights to
the subsurface and refusing to enjoin its use for the Railroad’s benefit. (United States v.
Union Pacific Railroad Company (D.Wyo. 1954) 126 F.Supp. 646.) In 1956, the 10th
Circuit United States Court of Appeals affirmed the district court’s ruling that railroads
owned the subsurface and that it could extract oil and gas from it. (United States v. Union
Pacific Railroad Company (10th Cir. 1956) 230 F.2d 690.)
In that same year, an in-house attorney for the Railroad’s predecessor sent a letter to
the Pipeline explaining that the Railroad appeared to have the right to grant pipeline
easements in the subsurface under rights-of-way it obtained via the pre-1871 Acts. But
since the 1875 Act provided only an easement, they would have to obtain consent from the
adjoining landowner in order to use the subsurface for a pipeline.
However, in 1957 the United States Supreme Court issued its seminal opinion in
Union Pacific, supra, 353 U.S. 112. The court held that, while under the pre-1871 Acts a
railroad was entitled to full use of the surface of the land, it could only use the subsurface

8
“‘for railroad purposes.’” (Id. at p. 114, fn. 1.) Since the extraction of minerals from the
subsurface was not a railroad purpose, and was expressly reserved in the statute, the pre-
1871 Acts did not provide a railroad with the right to do so. (Union Pacific, at pp. 114-115.)
The lower court’s ruling was reversed, and the government’s request that the Railroad be
enjoined from extracting minerals from the subsurface was granted. (Id. at p. 120.)
Despite this narrowing of a railroad’s rights to the subsurface underlying its rights-of-
way, the sister companies went forward with their pipeline plan. Leases of pipeline
easements proceeded in earnest in late 1957. Over the following years and decades,
easements were granted and pipelines were built underneath the Railroad’s rights-of-way—
those acquired under both the pre-1871 Acts and the 1875 Act—but not without concern on
the Railroad’s part.
In one 1973 letter, an in-house attorney for the Railroad acknowledged that recent
federal court decisions bearing on “the extent of the rights granted to Railroad under the
March 3, 1871 Act now appear to be more restrictive as to use of the right-of-way for other
than railroad purposes . . .” than previously believed. In a similar 1974 letter, the attorney
wrote regarding a proposed pipeline easement in Contra Costa County, saying, “[n]o
assurance can be given Railroad is entitled to grant the pipeline easement in view of the
unfavorable trend of California decisions interpreting grants to railroad companies.”
Another letter by the same in-house attorney written in 1976 discusses the fact that upon
abandonment of rail operations the limited title properties may result in reversion of title,
and that the easements are subject to loss upon abandonment for railroad purposes. It
concludes that “consideration need [sic] be given as to the advisability of granting to [the
Pipeline] an easement for pipelines in the property classified as limited title and easement
for railroad purposes . . . unless it is feasible for Railroad to take steps necessary to establish
that it is the fee owner of the right of way in which [the] pipeline is located.” Nevertheless,
the Railroad continued to grant easements to the Pipeline.
In 1983, during discussions among the related entities regarding mergers, the
Railroad and the Pipeline entered into a new master agreement addressing the easements.

9
II. Merger of Parent Companies: The Sister Companies Part Ways and Litigation
Begins
The new 1983 master agreement between the two companies revised the arrangement
regarding the Pipeline’s perpetual, nonexclusive easements, and it set forth the amount of
rent to be paid for existing pipeline easements through 1993. Also in 1983, the parent
company of the Railroad and the Pipeline announced a merger with Santa Fe Railroad. The
combination went forward but the Railroad was held in a trust and remained separate from
the other newly combined entities, pending a ruling from the Interstate Commerce
Commission (ICC) on the merger. Ultimately, the ICC disapproved of the consolidation of
the two railroads and required the Railroad to be sold to a third party.4 Meanwhile, the
pipeline company became Santa Fe Pacific Pipelines, Inc. The Railroad and Pipeline
companies were no longer sister subsidiaries.
In 1991 the Railroad sued the Pipeline and related entities, alleging that the 1983
master agreement should be rescinded because it was created while the companies were still
sister entities, and, because it was “not negotiated . . . at arm’s length,” it set artificially low
rent for the pipeline easements. The Railroad claimed that some of the Pipeline’s facilities
and tanks had been dedicated for the Railroad’s continued use, “without regard to the
technical title-holder of such properties, for its fuel needs.” The Railroad also claimed that
it should be permitted continued use of those pipeline facilities as if it had an “actual
ownership interest.”
As the case progressed, the parties entered into a “tolling agreement” to stay the
litigation in order to attempt to reach a global settlement of all issues.
III. Settlement of the 1991 Lawsuit
The parties settled the 1991 lawsuit in April 1994. Pursuant to the settlement
agreement, the 1983 master agreement was rescinded; the master agreements of the 1950’s
were revitalized; the Pipeline’s easement rights were confirmed and the easement locations

4 In 1988, the Railroad was purchased by Rio Grande Industries and operated as a
subsidiary of that company until 1996, when Union Pacific Railroad Company acquired it.

10
were modified, reducing the width of the easement at many segments. The parties
compromised various existing claims. The Pipeline paid over $5.5 million in return for the
Railroad’s dismissal of claims and causes of action, including those related to the Pipeline
facilities allegedly dedicated for the Railroad’s own use. The new settlement agreement
contained no provision for the Railroad’s use of the Pipeline’s facilities for its own fuel
needs.
As to future rent, the settlement agreement provided as follows: ‘Beginning
January 1, 1994, and every ten (10) years thereafter, [the Railroad] may seek an increase of
rent to fair market value. . . .” If the parties could not agree, they would stipulate to an order
for judicial reference pursuant to Code of Civil Procedure section 638.
In July 1994, the parties entered into an amended and restated easement agreement
(AREA), which reflected that the Railroad granted easements to the Pipeline for the
conveyance of petroleum or natural gas, coal slurries, etc., “in, upon, along and across the
property of [the] Railroad.” The AREA reiterated the procedure and mechanism for
determining rent increases set forth in the prior settlement agreement. In September 1994,
the parties also entered into a side letter agreement addressing some outstanding issues. The
letter agreement provided, among other things, that “all Existing Easement Agreements
shall be amended and restated pursuant to the terms of the [AREA]” and that all future
easements would be recorded.5 It also provided that during the pendency of any reference
proceeding or appeal regarding the rent, the Pipeline would continue to pay rent at the
previous rate, subject to consumer price index adjustments, until resolution of the dispute.
IV. The 1994 Case
On August 31, 1994, the Railroad filed an action for declaratory relief when efforts to
agree on a new rental amount failed. The parties proceeded by way of a temporary judge
pursuant to California Constitution, article VI, section 21, rather than by way of the referee
called for in the AREA. At trial, the Pipeline argued that the Railroad did not have a fee
interest in its rights-of-way, since they were largely derived from the 19th century

5 The original agreements in the 1950’s called for the easements not to be recorded.

11
Congressional Acts. The Railroad brought a motion in limine to preclude any evidence
regarding its title. The motion was granted and the Pipeline was prevented from proving
that its easements did not, in fact, run through the “property of the railroad.” Although it
excluded evidence of the Railroad’s property interest, the trial court nevertheless “assume[d]
that the [R]ailroad own[ed] a fee interest.” At the same time, it said that “the court makes
no determination as to whether in fact or in law the [R]ailroad owns a fee interest or, as [the
Pipeline] contends, it owns a lesser legal, and thus lesser valued, interest.”
Judgment was entered in May 1997 in the approximate amount of $5 million base
annual rent as of January 1994.6 The Railroad appealed and the judgment was reversed two
years later in Sante Fe I, supra, 74 Cal.App.4th 1232 on the grounds that the trial court
refused to admit expert evidence regarding the Railroad’s valuation methods and techniques.
The case was tried a second time to the same temporary judge, who then entered judgment
for roughly the same amount in July 2003. The Railroad appealed again. This time the
judgment was affirmed in 2005 (with one minor exception) in Santa Fe II, supra, A103990.
After the Railroad sought prejudgment interest, which the temporary judge granted, another
appeal followed. The Court of Appeal did not reach the merits of the prejudgment interest
issue, but reversed the order on grounds that the request had been untimely. (Santa Fe
Pacific Pipelines, Inc. v. Superior Court (July 26, 2006, A113858) [nonpub. opn.] (Santa
Fe III).) After that, the 1994 litigation finally ended. In the meantime, however, the 2004
litigation had begun.
V. The Instant 2004 Case
A. The Trial
The next stage of this litigation commenced in 2004. Efforts to agree on the amount
of the annual rent increase were made in late 2003, but again failed. In July 2004, the
Railroad filed a complaint for declaratory relief. The complaint sought another 10-year

6 This court takes judicial notice of the May 12, 1997 judgment appealed from in
Southern Pacific Transportation Company v. Santa Fe Pacific Pipelines, Inc. (1999) 74
Cal.App.4th 1232 (Santa Fe I), pursuant to the request of the Pipeline.

12
increase in rent to fair market value on easements “within [the Railroad’s] right-of-way
property” pursuant to the AREA.
In March 2005, the parties stipulated to the appointment of the Honorable Eli
Chernow, Judge (retired), to serve as a temporary judge under California Constitution,
article VI, section 21. Trial commenced in February 2007. The Railroad again brought a
motion in limine to exclude evidence regarding its title, on the grounds that such evidence
was irrelevant to the sole issue in the case—i.e., the amount of rent due for the easements.
This time, the motion was denied. Later in the trial, the Railroad brought a motion to strike
evidence regarding the status of its title, which also was denied.
During trial, the Pipeline brought a cross-complaint against the Railroad regarding
properties in which the Railroad had conveyed its interests to third parties but still continued
to collect rent from the Pipeline. The Railroad brought its own cross-complaint regarding
the Pipeline’s failure to pay rent on certain properties the Pipeline had abandoned. At the
close of the Railroad’s case-in-chief, the Pipeline brought a motion for judgment pursuant to
Code of Civil Procedure section 631.8 on the grounds that the Railroad had not introduced
sufficient evidence of ownership of the land underlying its rights-of-way to prove its case.
After hearing argument, the trial court suggested that the Railroad reopen in order to address
ownership issues. A substantial amount of testimony was then heard and documentary
evidence was received regarding the nature of the Railroad’s ownership interest of the land
in question. Knowledgeable persons with expertise in railroad title and the Congressional
Acts testified. Ultimately, the Pipeline’s motion for judgment was denied.
In April 2012, after more than 250 trial days, the trial court issued a comprehensive
105-page statement of decision. Judgment was entered on May 30, 2012. Concluding that
the Railroad had sufficient property interests in all of the land beneath its rights-of-way to
allow it to collect rent from the Pipeline, the court found that pursuant to the AREA the base
annual rent commencing on January 1, 2004, was $14,080,487; “back rent” due as of the
time of judgment was $81,589,584; and prejudgment interest payable by the Pipeline to the
Railroad was $19,372,195.50. The court also ruled in the Railroad’s favor on both cross-
complaints.

13
B. The Trial Court’s Rulings re “Property of the Railroad”
In various motions and pleadings, the Pipeline challenged the Railroad’s title to the
land through which its easements ran—i.e., the “subject property.”7 Witnesses testified
about the pre-1871 and 1875 Congressional Acts. Title cards prepared by the Railroad were
presented, delineating which acts granted each right-of-way, and also noting if the right-of-
way had been acquired from different sources. The Pipeline demonstrated that in many
cases the Railroad did not own the property in fee, and therefore claimed it had not met its
burden to prove a key element of its case—i.e., that rent was due for easements within the
property of the railroad. The Railroad did not prove otherwise; rather, the thrust of its
counter-argument was that it did not have to prove title. It could collect the rent regardless
of who owned the property, because the Pipeline had the easements and had agreed to pay
rent to the Railroad for them. In other words, it did not have to prove the “property of the
railroad” was the Railroad’s property.
After hearing evidence relating to the Congressional Acts and testimony about the
title cards, the trial court noted that the records “most commonly showed that [the Railroad]
originally acquired title through one or more land grants under certain Acts of Congress.”
Other parcels were acquired “by grant[s] from states or other grantors.” The court also
noted that “[i]t is undisputed that much of the property held by the [R]ailroad is held in less
than full fee ownership” and that the Railroad “did not offer direct evidence of its title to the
Subject Property.” But there is little indication that the trial court considered in detail the
application of the Congressional Acts, or the case law promulgated under them, in
determining the nature of the Railroad’s property interest.
Instead, the trial court believed it was “not dealing with a situation in which evidence
has been presented that some third party is the owner of title.” It stated that there was “no
evidence disputing the Railroad’s title to virtually all of the subject property.” And it

7 As used by the trial court, the “subject property” refers to the land containing the
pipeline easements. The “property of the railroad” is a broader term referring to railroad
rights-of-way generally. Thus, the AREA provides that the “subject property” is within the
“property of the railroad.”

14
concluded that “in the absence of any disputing evidence, the Railroad’s ownership has been
adequately shown for purposes of this proceeding.” The court based its ruling in part on the
fact that “no other person or entity has attempted to collect rent for the use of the property”
or disturbed the Pipeline’s peaceful occupancy, although it implied the situation might be
different if a valid claim was raised by a third party entitled to collect the rent.
As discussed below, there are numerous federal and state judicial opinions casting
doubt on the rights of railroads to the subsurface underlying their rights-of-way based upon
the Congressional Acts. Yet despite the Pipeline’s repeated challenges to the Railroad’s
ownership under these acts, the trial court stated that “no challenge to [the Railroad’s]
ownership [had] been made by [the Pipeline]” and that “there [was] no evidence disputing
the Railroad’s title to virtually all of the subject property . . . .” On that basis, the trial court
held that “in the absence of evidence challenging the [R]ailroad’s title,” the Railroad’s
ownership of the property had been “adequately shown” and (with minor exceptions) it was
entitled to rent on the easements.
C. The Appeal
The Pipeline timely appealed from the judgment and “all orders and rulings
subsumed therein” as well as various postjudgment orders. At oral argument, we asked
whether the Railroad had the right to grant the Pipeline’s easements in the first instance,
given the terms of the Congressional Acts and the extensive relevant case law. When
counsel for each side did not appear fully prepared to respond to this inquiry, the court
requested supplemental briefing on the subject of the Railroad’s property interests.
In its supplemental briefs, the Pipeline claims the Railroad did not have sufficient
title to the property to grant the subsurface easements in the first instance.8 The Railroad
claims it did have sufficient title to do so. Both sides discuss the nature of the conveyances

8 In the interim, the Pipeline has made a motion to augment the record to include
documents that had been presented at trial when the question of the Railroad’s property
rights was being litigated. The Railroad objected to augmentation of the record. Since the
additional record bears on the issues raised in the supplemental briefing, and since it
contains nothing that has not already been presented to the trial court, the motion to augment
the record is granted.

15
provided by the Congressional Acts. Much of the result turns on the question of what is
meant by a “railroad purpose.” In reviewing the judgment below, we address and resolve
the question of how the Congressional Acts apply to the Pipeline’s subsurface easements
beneath the Railroad’s rights-of-way.
As to the other issues raised on appeal, we affirm the trial court’s ruling that the
judgment in the 1994 case did not collaterally estop the relitigation of issues raised in that
case. However, for the reasons discussed below regarding the outstanding question of the
Railroad’s property rights, the trial court’s rulings as to the calculation of the rent owed, the
Railroad’s right to collect rent for easements in land that had been sold prior to 1994, and
the right of the Railroad to collect prejudgment interest, are reversed and remanded.

STANDARD OF REVIEW

The multiple issues raised in this appeal call for various standards of review. As to
questions of law, such as the construction of the Congressional Acts granting rights-of-way
to the railroads, we employ a de novo standard. (People ex rel. Lockyer v. Shamrock Foods
Co. (2000) 24 Cal.4th 415, 432; Topanga and Victory Partners v. Toghia (2002) 103
Cal.App.4th 775, 780-781.) We also employ a de novo standard of review regarding the
interpretation of contracts and stipulations between the parties where there was no
conflicting extrinsic evidence presented at trial. (Parsons v. Bristol Development Co.
(1965) 62 Cal.2d 861, 865-866.) And we apply the same standard when determining if res
judicata and/or collateral estoppel principles apply, in light of the previous trial and
judgment in the 1994 case. (Estate of Kampen (2011) 201 Cal.App.4th 971, 985.)
As to rulings on the admissibility of evidence, we utilize an abuse of discretion
standard. (Gordon v. Nissan Motor Co., Ltd. (2009) 170 Cal.App.4th 1103, 1111.) And in
assessing the trial court’s findings of fact, we employ a substantial evidence standard.
(Wilson v. County of Orange (2009) 169 Cal.App.4th 1185, 1188.)

16
DISCUSSION

I. The Amount of Rent Due to the Railroad for the Pipeline Easements Requires a
Determination of the “Property of the Railroad”
The AREA requires the Pipeline to pay rent to the Railroad on easements running
through the property of the Railroad. Since the trial court did not make a factual
determination of what the property of the railroad is, we remand the case for the court to
make that determination.
A. What Is the “Property of the Railroad”?
This action is based on the AREA, which addresses the easements granted to the
Pipeline in, upon, along and across the “property of [the] Railroad.” (See, e.g., AREA, para.
1.(a.), p. 2.) The Railroad’s complaint alleges that the Pipeline owes rent on its easements
within the “[R]ailroad’s right-of-way property.” It has long been recognized that the word
“property” is a term with multiple meanings. (Hohfeld, Some Fundamental Legal
Conceptions as Applied in Judicial Reasoning (1913) 23 Yale L.J. 16, 21.) “Sometimes [the
word] is employed to indicate the physical object to which various legal rights, privileges,
etc., relate; then again—with far greater discrimination and accuracy—the word is used to
denote the legal interest (or aggregate of legal relations) appertaining to such physical
object.” (Ibid.) In other words, the word “property” is sometimes used to refer to the
physical parcel of land in question. Other times it refers to the “complex aggregate of rights
(or claims), privileges, powers, and immunities” that one has in that parcel of land.
(Hohfeld, Some Fundamental Legal Conceptions as Applied in Judicial Reasoning (1917)
26 Yale L.J. 710, 746.)
“In a strict legal sense, land is not ‘property,’ but the subject of property. The term
‘property,’ although in common parlance frequently applied to a tract of land or a chattel, in
its legal signification ‘means only the rights of the owner in relation to it.’ . . . ‘Property is
the right of any person to possess, use, enjoy, and dispose of a thing.’” (Eaton v. B. C. &
M. R.R. (1872) 51 N.H. 504, 511; see also Wynehamer v. People (1856) 13 N.Y. 378, 433.)

17
Thus, “‘“[p]roperty” is more than just the physical thing—the land, the bricks, the
mortar—it is also the sum of all the rights and powers incident to ownership of the physical
thing. It is the tangible and the intangible. Property is composed of constituent elements
and of these elements the right to use the physical thing to the exclusion of others is the
most essential and beneficial. Without this right all other elements would be of little
value . . . .’” (Dickman v. Commissioner (1984) 465 U.S. 330, 336.) “A common idiom
describes property as a ‘bundle of sticks’—a collection of individual rights which, in certain
combinations, constitute property.” (United States v. Craft (2002) 535 U.S. 274, 278.)
Here, the pipelines run through the physical land below the Railroad’s rights-of-way.
But the “property of the railroad” refers to the rights, privileges, powers and immunities that
the Railroad has in the land through which its rights-of-way run. The question here is
whether, as of 2004, the Railroad had enough “sticks” to allow it to collect rent on the
easements running under its rights-of-way.
The trial court concluded that the Railroad had sufficient property interests to have
granted the Pipeline easements and to collect rent on them (even those that the Railroad had
sold prior to 1994, when the AREA was executed). On appeal, the Railroad argues that the
trial court’s ruling should stand, and that this court should not even address the nature of the
grants made to it by the federal government. According to the Railroad, this court, like the
trial court, should either assume that the Railroad had title to virtually all of the subject
property or, alternatively, did not need to prove it in any event.
The Railroad fashions this case as a “private-rights property dispute” and contends it
is a based upon a “private rental agreement [that does not] involve any matter of public
interest or administration of justice.” We reject that characterization. This case is not
simply a private matter between two corporations that disagree about the amount of money
one owes another in a dispute over private property. Nor is it a lawsuit involving the right
of a landowner who purchased real property in the marketplace and seeks to use it as he or
she sees fit. Public land was allocated to the railroads by the federal government for a
specific purpose—to construct and operate a transcontinental railroad, in order to help
protect the nation during civil strife, to expand its frontier, grow its economy, and develop

18
its future. The land provided by Congress was neither purchased by the railroads nor was it
given to them with no strings attached. Strings were attached.9 We must determine whether
those strings limit the ability of the Railroad to use the land as a private revenue source.
A concept all too often overlooked in railroad litigation and its judicial opinions is
that the grants of rights-of-way to the railroads by Congress were not merely conveyances of
land from the government to the railroads so they could build and operate railroads across
the continent. Certainly, they were that. But they were more. They were laws. It has long
been recognized that “[a] legislative grant operates as a law as well as a transfer of the
property, and has such force as the intent of the legislature requires.” (Schulenberg v.
Harriman (1874) 88 U.S. (21 Wall.) 44, 62.) After all, “[w]hen Congress grants a property
interest, the grant is both a grant of property and a law and Congress is free to specify terms
or elements different from those that otherwise would apply either by virtue of the common
law or in other statutes. This fact seems to have been lost in some of the discussions of
congressional railroad grants.” (Baldwin & Flynn, Federal Railroad Rights of Way,
Congressional Research Service (May 3, 2006) p. 4, italics added.) “‘[W]hile the
vocabulary of the common law of real property is often imported into the discussion of
railroad rights-of-way, where those rights-of-way have been created by federal law, they are
entirely creatures of federal statute, and their scope and duration are determined, not by
common law principles, but by the relevant statutory provisions.’” (Beres v. United States
(Fed.Cl. 2005) 64 Fed.Cl. 403, 411.)
This is not to say, of course, that common law principles have no role to play.
Indeed, in the end they may ultimately be determinative. (See, e.g., Brandt, supra, 134
S.Ct. at p. 1266.) But it does mean that traditional common law principles must be applied,
and sometimes modified, in the context of congressional enactments bearing on the property
in question. We are required to take judicial notice of the statutory and decisional law of
California and of the United States. (Evid. Code, §§ 451, 459.) Numerous statutes and
abundant case law address the question of who owns the land underlying railroads’ rights-

9 Or, put another way, sticks were withheld.

19
of-way. Notwithstanding the Railroad’s argument that we should avoid the issue, this body
of law must be considered and applied here in order to determine what the “property of the
railroad” is.10
The initial enabling statutes passed by Congress have given rise to numerous
ownership questions over the years. As stated by the United States Supreme Court in Leo
Sheep Co. v. United States (1979) 440 U.S. 668, quoting a much earlier case, “‘The solution
of [ownership] questions [involving the railroad grants] depends, of course, upon the
construction given to the acts making the grants; and they are to receive such construction as
will carry out the intent of Congress, however difficult it might be to give full effect to the
language used if the grants were by instruments of private conveyance.’” (Id. at p. 682,
quoting Winona & St. Peter RR. Co. v. Barney (1885) 113 U.S. 618, 625 (Winona).)
In the instant case, the trial court does not explain its analysis of the Congressional
Acts, nor how that analysis led to its conclusion that the Railroad had adequate ownership
interests to charge rent for the Pipeline’s easements. As the trial court did in the 1994 case,
the trial court here essentially decided not to decide what the “property of the railroad” was.
Instead, it appears to have taken a tack similar to that employed by expert witnesses at trial,
who expressed their opinions based upon the assumption that the Railroad had a fee interest
in the land, and thus sufficient ownership to grant and collect rent on the subsurface
easements. But in the face of 150 years of federal and state jurisprudence that define and
delineate the nature of railroad rights-of-way vis-à-vis the rights of the federal government
and adjacent landowners, that is insufficient. Without an analysis of the Congressional Acts

10 The Railroad attached to its supplemental brief a Department of the Interior
memorandum of January 5, 1989, saying that in order to determine the scope of the
Railroad’s right to permit subsurface installations, “it is necessary to examine the statutory
terms of [the Railroad’s] rights-of-way grants. . . . Then we must turn to the Supreme Court
and lower court authority interpreting the scope of the railroad rights-of-way.” (Proposed
Installation of MCI Fiber Optic Communications Line Within Southern Pacific
Transportation Co.’s Railroad Right-of-Way (Jan. 5, 1989, M-36964) 96 I.D. 439.) No less
is required of our analysis here.

20
and their application to the facts presented, one cannot resolve the ownership questions at
the heart of this case.11
B. Did the Congressional Acts Granting Rights-of-Way to the
Transcontinental Railroads Give Them the Right to Rent the Subsurface
to Private Third Parties for Use as a Pipeline?
The Congressional Acts were passed in order to effectuate construction of a
transcontinental railroad (Beres v. United States, supra, 64 Fed.Cl. at p. 410), but they used
two different mechanisms to accomplish their goal: The initial “land grant” statutes before
1871, and the subsequent “easement” statutes from 1875 and beyond. Since the nature,
scope, and extent of these enactments differ significantly, we address them separately.
1. The 1875 Act Did Not Provide the Railroad with Sufficient Property
Interests to Justify Its Collecting Rent on the Pipeline’s Subsurface
Easements
With the 1875 Act, the railroads obtained a “mere easement[]” over the land, which
otherwise remained the property of the owner of the servient estate. This issue was
addressed and confirmed in the recent case of Brandt, supra, 134 S.Ct. 1257. There, the
United States Supreme Court pointed out that the act itself used language that was “‘wholly
inconsistent with the grant of a fee interest.’” (Id. at p. 1264.) Congress provided that “all
such lands over which such right of way shall pass shall be disposed of subject to such right
of way.” (43 U.S.C. § 937.) As the United States Supreme Court stated, “‘[a]pter words to
indicate the intent to convey an easement would be difficult to find.’” (Great Northern,
supra, 315 U.S. at p. 271.) In light of the conclusion that the railroad had a mere easement,
the court then applied traditional common law principles to find that, when the beneficiary

11 Contrary to the Railroad’s contention, we do not raise these questions sua sponte, nor
has the Pipeline waived its claims regarding this issue. Challenges to the Railroad’s
property rights were raised again and again at trial by the Pipeline. The record is replete
with pleadings, motions, and arguments addressing the nature of the Railroad’s rights-of-
way as granted by the Congressional Acts. The trial court’s conclusions regarding title are
reflected in its multiple rulings and its statement of decision, which are encompassed by the
Pipeline’s notice of appeal.

21
of an easement ceases to use it for its intended purpose, it disappears and the owner of the
servient estate (i.e., the federal government or its grantee) resumes full and unencumbered
interest in the land. (Brandt, supra, at p. 1265.)
Much of the analysis in Brandt was based upon an earlier case, which dealt directly
with the use of the subsurface underlying a railroad right of way. In Great Northern, a
railroad sought to drill for and remove gas, oil and other minerals from beneath its right-of-
way, which it had obtained through the 1875 Act. The United States Supreme Court pointed
out that Congress had merely granted an encumbrance upon the land, but no actual land to
the railroad company.12 (Great Northern, supra, 315 U.S. at p. 272.) The court made it

12 During the debate on the General Right-of-Way Act of 1875, Senator Stewart of
Nevada stated, “If [railroad companies] do not build a railroad and do not use [the easement]
for that purpose, they do not have it at all. The title is for this purpose.” (Remarks of Sen.
Stewart, 2 Cong. Rec. 2900 (1874); see Geneva Rock Products, Inc. v. United States (2012)
107 Fed.Cl. 166, 171-172.)
“In explaining why the House Public Lands Committee had inserted a clause similar
to § 4 of the 1875 Act in a special right of way bill considered in 1872, Congressman Slater
stated:
“‘The point is simply this: the land over which this right of way passes is to be sold
subject to the right of way. It simply provides that this right of way shall be an incumbrance
upon the land . . . ; that those who may afterward make locations for settlement shall not
interfere with this right of way.
“‘Mr. Speer, of Pennsylvania. It grants no land to any railroad company?
“‘Mr. Slater. No, sir.’ Cong. Globe, 42d Cong., 2d Sess. 2137.
“And in the House debate on the 1875 Act itself, Congressman Hawley said:
“‘It simply and only gives the right of way. It merely grants to such railroad
companies as may be chartered the right to lay their tracks and run their trains over the
public lands; it does nothing more.’ 3 Cong. Rec. 407.
“The earliest administrative construction of the 1875 Act plainly stated that the
railroad received an easement rather than a fee. The Land Department Circular of
January 13, 1888, said:
“‘The act of March, 3, 1875, [sic] is not in the nature of a grant of lands; it does not
convey an estate in fee, either in the ‘right of way’ or the grounds selected for depot
purposes. It is a right of use only, the title still remaining in the United States.’ 12 L.D.
423, 428.” (Union Pacific, supra, 353 U.S. at p. 129 (dis. opn. of Frankfurter, J.).)

22
clear that with the 1875 Acts title to the land remained in the federal government. (Id. at
p. 275.) Since the act granted only an easement, but no title to the subsurface lying in the
servient estate, the railroad “had no right to the underlying oil and minerals.” (Id. at p. 279.)
Put another way, the federal government gave the railroad the right to use the surface of the
land to construct and operate its railroad, but it did not give it the right to extract value from
the subsurface, which was still owned by the federal government (or, later, its grantees).
The Railroad here argues to the contrary, claiming that the 1875 Act granted it far
more than a simple easement. It argues in its supplemental briefs that the 1875 Acts
authorized the Railroad “to conduct . . . all activities on the surface or subsurface of the
property” that derive from or further a railroad purpose. However, the Railroad has cited no
case holding that the 1875 Act allowed “all activities [in the] subsurface,” whether derived
from or furthering a railroad purpose or not.
On the other hand, to consider the right-of-way provided by the 1875 Act as an old-
fashioned common law easement is not accurate. While Brandt made clear that the right-of-
way is a mere easement for purposes of what happens when it is no longer used by the
railroad, and that it is a surface easement passing over the land of another (Brandt, supra,
134 S.Ct. at p. 1262), cases have recognized that even under the 1875 Act railroads obtained
more than a traditional easement at common law.13 From the beginning, courts have
recognized the unique aspect of a railroad right-of-way. As noted early on by the United
States Supreme Court (when discussing a right-of-way under an 1866 land grant), “[a]
railroad right of way is a very substantial thing. It is more than a mere right of passage. It is
more than an easement.” (Western Union Tel. Co. v. Penn. R. R. (1904) 195 U.S. 540, 570
(Western Union).) It is an “interest in the land, special and exclusive in its nature.” (Ibid.)
In distinguishing a railroad right-of-way from an easement at common law—which was

13 Certainly, Brandt appears to describe the 1875 Act under traditional property law as a
“‘nonpossessory right to enter and use land in the possession of another.’” (Brandt, supra,
134 S.Ct. at p. 1265.) But Brandt was addressing a circumstance where the railroad had
abandoned its right-of-way. There was no issue of the railroad’s rights while the land was
being still used to run its trains.

23
considered a nonpossessory and incorporeal interest in property—the court referred to New
Mexico v. United States Trust Co. (1898) 172 U.S. 171, which stated that if a railroad right-
of-way was an easement it was “one having the attributes of the fee, perpetuity and
exclusive use and possession; also the remedies of the fee, and, like it, corporeal, not
incorporeal, property.” (Id. at p. 183.)
State courts also contributed to the lexicon of railroad rights-of-way. The Iowa
Supreme Court opined that “[t]he easement is not that spoken of in the old law books, but is
peculiar to the use of a railroad, which is usually a permanent improvement, a perpetual
highway of travel and commerce . . . .” (Smith v. Hall (1897) 72 N.W. 427, 428.) Thus, a
railroad right-of-way, whether called an easement or not, is different than “a medieval right
of way that authorized merely taking horses or wagons across a field” owned by someone
else. (Home on the Range v. AT&T Corp. (2005) 386 F.Supp.2d 999, 1014 (Home on the
Range).)
Early on—before the days when subsurface pipelines were even feasible—courts also
recognized there was a difference between the surface and subsurface. In Western Union,
the United States Supreme Court extolled the substantiality of the railroad rights-of-way, but
nevertheless opined that they were simply a “‘fee in the surface and so much beneath as may
be necessary for support.’” (Western Union, supra, 195 U.S. at p. 570, citing Pennsylvania
Schuylkill Valley R.R. Co. v. Reading Paper Mills (Pa. 1892) 24 A. 205.) Thus, the land
underneath the surface is not necessary for the railroad, except as a physical foundation.
“‘“[O]rdinarily the fee is of little or no value unless the land is underlaid by a quarry or
mine.”’” (San Gabriel v. Pacific Elec. Ry. Co. (1933) 129 Cal.App. 460, 464.) It is the
distinction between the surface and the subsurface that the Railroad obscures here. But this
distinction makes a difference when it comes to using the land underlying the right-of-way.
A railroad easement may be a “substantial thing” that is more than a traditional
nonpossessory, incorporeal interest in land. After all, a “railroad company . . . acquires
more than the mere right of passage over [the] land[,] [i]t acquires the right to excavate
drainage ditches; to construct beneath the surface supports for bridges and other structures;
to erect and maintain telegraph lines and supporting poles with part of the poles beneath the

24
surface; to construct passenger and freight depots, using portions of the land below them for
foundations; to construct signals; to make fills and cuts to decrease the grades of their rail
lines, and to use material from the land covered by the right of way to make such fills; and
to construct a roadbed and lay its ties and the rails thereon. Hence, it has substantial surface
and subsurface rights, which it is entitled to have protected.” (Kansas City South. Ry. Co. v.
Arkansas Louisiana Gas Co. (1973) 476 F.2d 829, 834-835 (Kansas City).) The 1875 Act
granted more than a “mere” easement, if that term is used to mean an old-fashioned,
temporary passageway that is incorporeal in nature. To operate its trains, a railroad needs,
and has, more than that.
But all of the above functions and needs of the railroad are for the purpose of
constructing and running the railroad itself. As the Kansas City court pointed out, those
things “cannot deprive the owner of the servient estate . . . from making use of the land in
strata below the surface and below substrata which are used or needed by the railroad
company, and which in no wise . . . interferes with the construction, maintenance and
operation of the railroad.” (Kansas City, supra, 476 F.2d at p. 835.) Thus, in that case, it
was the owner of the servient estate—not the railroad—that had the right to build a pipeline
below the railroad’s right-of-way.
As to rights-of-way granted by Congress in 1875 and beyond, the Railroad has
exclusive rights to the surface and, in addition, “broad and extensive rights of sub-lateral
and subjacent support to prohibit interference with railroad operations and maintenance.”
(Energy Transp. Systems, Inc. v. U. Pac. R. Co. (D.Wyo. 1977) 435 F.Supp. 313, 317
(Energy Transp. I); see Home on the Range, supra, 386 F.Supp.2d at p. 1013.) However,
the subsurface must be used to support the construction or operation of the railroad (i.e, for
railroad purposes). Under the 1875 Act, the railroads “did not own [and] could not dedicate
or grant any part . . .” of their right-of-way (Himonas v. Denver & R. G. W. R. Co. (10 Cir.
1949) 179 F.2d 171, 172.), nor could they “grant any part of [their] right of way for private
use . . . .” (Id. at p. 173.)
California cases are in accord. In Atchison, T. & S.F. Ry. Co. v. Abar (1969) 275
Cal.App.2d 456 (Atchison), a private fee owner granted an easement over his property to a

25
railroad company in order to build and operate its railroad. (Id. at pp. 458-459.) Decades
later, the railroad expanded its operation to include a “team track.”14 While the grant
creating the easement provided for switches and turnouts, it did not provide for team tracks.
(Ibid.) Applying California law, the Court of Appeal said that “[w]here an easement is
founded upon a grant, only those interests expressed in the grant and those necessarily
incident thereto pass from the owner of the fee.” (Id. at p. 464.) The court pointed out that
“[t]he scope of an easement is determined by the terms of its grant,” citing Civil Code
section 806.15 Thus, the easement holder’s use is “limited by the requirement that it be
reasonably necessary and consistent with the purposes for which the easement was granted.”
(Atchison, at p. 464.)
Even though the team track was involved with railroad operations and functioned in
conjunction with its trains, it was beyond any use encompassed by the grant. An easement
holder’s use must be consistent with “‘normal future development within the scope of the
basic purpose [citations], but not an abnormal development, one which actually increases
the burden upon the servient tenement. . . .’” (Atchison, supra, 275 Cal.App.2d at p. 464.)
Holding that the team track was not permitted, the Atchison court explained that “[s]o long
as an easement exists, both parties have the right to insist that it shall remain substantially
the same as it was when granted . . . .” (Id. at p. 465.) In the instant case, a subsurface
petroleum pipeline is clearly an “abnormal development” not encompassed by the original
grant, which increases the burden on the servient tenement. “‘California courts have set
their faces firmly against such increases in the burden upon the servient tenement.’” (Id. at
pp. 464-465.)

14 A “team track” consists of railroad tracks that are used to switch railroad cars off the
main line for the purpose of storing them, in order to allow the owner of the freight to
unload it from a team driveway with vehicular access. (Atchison, supra, 275 Cal.App.2d at
pp. 460-461.)
15 Civil Code section 806 states: “The extent of a servitude is determined by the terms
of the grant, or the nature of the enjoyment by which it was acquired.”

26
To summarize, the railroad’s rights to the land underneath its rights-of-way granted
by the 1875 Act were limited to what was necessary to support the railroad itself.
Otherwise, the rights to the subsurface remained with the owner of the servient estate. Put
another way, the 1875 Act granted the Railroad substantial rights to the surface of the land
over which it operates its trains, but it did not make the subsurface the “property of the
railroad.”
Therefore, the Railroad’s right to collect rent from the Pipeline for use of its
subsurface easements cannot be based solely on acquisitions obtained via the 1875 Act or its
progeny.
2. The Pre-1871 Acts Did Not Provide the Railroad with Sufficient
Property Interests to Justify Its Collecting Rent on the Pipeline’s
Subsurface Easements
a. Under the pre-1871 Acts, railroads were required to use their
rights-of-way for railroad purposes only
A railroad’s rights to the lands granted to them in the pre-1871 Acts raise different
issues than those raised in the 1875 Act. Rather than a simple easement along the surface,
railroads were actually given an estate in the land. (For example, the Pacific Railroad Act of
1862 provides that “there be, and is hereby, granted to the said company, for the purpose of
aiding in the construction of said railroad . . . every alternate section of public land,
designated by odd numbers” [all mineral lands excepted, other than timber].) (Ch. 120, § 3,
12 Stat. 489.) Under the Act of July 2, 1864, the railroads could condemn land “necessary
for the construction of its road” and thereby “acquire full title to the same for purposes
aforesaid.” (Ch. 216, § 3, 13 Stat. 356.) However, the land grants had strings attached. The
railroads were not given full fee title. The land had to be used for the “legitimate purposes
of the railroad,” and there was an “implied condition of reverter in the event that the
company ceased to use or retain the land for the purpose for which it was granted.”
(Townsend, supra, 190 U.S. at p. 271.) Thus arose the term “limited fee” when referring to
rights-of-way under the pre-1871 Acts. (Townsend, at p. 271.)

27
While the Railroad here cites Townsend’s “limited fee” language frequently, that case
does not stand for the proposition that the railroad could do whatever it wanted with the
land, both surface and subsurface, as if it was owned in fee. As Townsend itself explained,
“[t]he substantial consideration inducing the grant was the perpetual use of the land for the
legitimate purposes of the railroad,” and it belonged to the railroad only “so long as it was
used for the railroad right of way.” (Townsend, supra, 190 U.S. at p. 271.) Thus, even in
the pre-1871 cases, Congress never conveyed to the railroads full title to the land, to do with
it as they pleased.
The landmark 1957 United States Supreme Court decision in Union Pacific, bears
this out. Referring to the pre-1871 Acts, the court confirmed that a railroad’s right-of-way
was granted for “‘the construction of [a] railroad and telegraph line.’” (Union Pacific,
supra, 353 U.S. at p. 114, citing the Pacific Railroad Act of 1862, ch. 120, § 2, 12 Stat. 489.)
As the high court explained, “[t]hat purpose is not fulfilled when the right of way is used for
other purposes.” (Ibid.) Citing Townsend, the court said that “whatever may be the nature
of Union Pacific’s interest in the right of way, drilling for oil on or under it is not a railroad
purpose within the meaning of . . . the Act.” (Union Pacific, supra, at p. 114.) Referring to
the “limited fee” concept that Townsend coined, the court opined that “[t]he most that the
‘limited fee’ cases decided was that the railroads received all surface rights to the right of
way and all rights incident to a use for railroad purposes.” (Union Pacific, at p. 119, italics
added.) Subsequent federal courts have recognized that the “limited fee” concept was
“severely cut back in . . . Union Pacific[, supra,] 353 U.S. 112.” (Energy Transp. Systems,
Inc. v. U. Pac. R. Co. (10th Cir. 1979) 606 F.2d 934, 936 (Energy Transp. II).)
Nevertheless, in the instant case the Railroad contends that as to the pre-1871 Acts, it
“owns the land (except the mineral estate) in ‘fee,’ subject only to rights of reversion.”16 As

16 The Railroad also contends that Brandt confirmed the holding in Townsend. But
Brandt merely discusses Townsend as part of the evolution of the rights-of-way cases
involving pre-1871 Acts, on its way to pointing out that it was not applicable to the case
before it—which involved an 1875 Act easement. Nothing in Brandt implies that the court

28
noted above, this misconstrues the law. Townsend did not say the railroad could do
whatever it wanted with the land until reversion occurred. It said the railroad had the use of
the land “so long as it was used for the railroad right of way.” (Townsend, supra, 190 U.S.
at p. 271.)
b. The Railroad’s lease of the subsurface underlying its rights-of-
way in order to generate revenue for itself was not a “railroad
purpose”
Implicitly acknowledging that its rights-of-way must be used for railroad purposes,
the Railroad argues in its supplemental briefs that the pipelines serve a railroad purpose after
all. To support this proposition, it claims that the Railroad uses the fuel transported through
the pipeline system to power its locomotives. There is nothing in the record supporting this
claim, and no admissible evidence to that effect was ever proffered.17 But even if true, the
mere fact that the Railroad used fuel from the pipelines in its locomotives would not mean
the pipeline easements themselves served a railroad purpose. This recent assertion is fully
consistent with the Railroad simply purchasing fuel that was transported through the
pipeline at an off-site terminal open to the public. Moreover, the question is not whether the
contents of the pipeline are ultimately used by the Railroad. The question is whether
sinking a pipeline under the Railroad’s right-of-way in order to generate revenue for itself
serves a railroad purpose.
The case law does not support the Railroad’s interpretation. In Great Northern, the
United States sought to enjoin a railroad from drilling for or removing gas, oil and other
minerals from beneath its right-of-way. As in this case, the railroad countered that it was
using some of the oil residue on its locomotives and some as fuel for its trains. (Great
Northern, supra, 315 U.S. at p. 270.) Nevertheless, the Supreme Court concluded that it

disavowed anything in Union Pacific’s holding that had undermined the “limited fee”
concept.
17 The Railroad states that “[t]hese facts are not in the record because this issue was
never raised below but they are not subject to serious dispute.” But as will be seen below,
the question of what constituted a railroad purpose was discussed at length during the trial.

29
should be enjoined. In Chicago & North Western Ry. Co. v. Continental Oil Co. (10th Cir.
1958) 253 F.2d 468, a railroad claimed to be entitled to extract oil from beneath its right-of-
way, in part because it used the oil itself. The court disagreed that this was a railroad
purpose, stating “we do not regard the production of oil on the right of way an appropriate
incident to the operation of a railroad, even though the refined product thereof might
eventually be used for diesel fuel or other related uses.”18 (Id. at p. 473.)
Thus, the mere fact that a railroad leases the subsurface to a third party to transport
material that the railroad may ultimately use does not, by itself, make the lease a “railroad
purpose.” Courts have recognized the distinction between using the end product and renting
out the land to transport that product. In Home on the Range, a railroad leased out its right-
of-way to run fiber-optic telecommunications cable. The court noted that even if running
the cable within the right-of-way facilitated the operation of the railroad itself, “the question
would remain whether leasing the rights to a third party, as the railroad here did, is within
the scope of its granted rights.” (Home on the Range, supra, 386 F.Supp. at p. 1021.) For
something to be a railroad purpose, it must be used to “construct and operate a railroad and
to use the land ‘for such other purposes as are necessary and incident to railroad
construction, maintenance and operation.’” (Cash v. Southern Pacific R.R. Co. (1981) 123
Cal.App.3d 974, 977 (Cash).) Renting the subsurface to a third party and collecting rent for
its use hardly fits that bill. If “railroad purpose” were defined so broadly as to encompass
anything that generates revenue for the railroad, it would be “hard to imagine anything the
railroads would be unauthorized to do within the right of way.” (Home on the Range, supra,
at p. 1021, fn. 10.)
In Energy Transp. I, the district court addressed subsurface rights pursuant to the
Pacific Railroad Acts of 1862 and 1864. An adjacent landowner sought to build an
underground slurry pipeline under a railroad’s right-of-way. The court addressed the
“limited fee” cases as well as the Union Pacific case. It drew a distinction between a

18 While both Great Northern and Chicago & North Western Ry. Co. were cases
involving the 1875 Act, we see nothing in the legislative history of either act indicating that
the phrase “railroad purpose” should be defined differently in the pre-1871 Acts.

30
“limited fee” right of the railroad in the land’s surface versus the servient estate in the
subsurface. (Energy Transp. I, supra, 435 F.Supp. at pp. 315-316.) As the court explained,
“Congress granted the railroad exclusive use of the surface of the right of way, with broad
and extensive rights of sub-lateral and subjacent support to prohibit interference with
railroad operations and maintenance; but, from that Hohfeldian bundle of sticks, Congress
held back some, like the right of reverter and the subsoil and mineral rights except where
the lands were ‘coal or iron lands.’” (Id. at p. 317, italics added; affirmed in Energy
Transp. II, supra, 606 F.2d 934.)
Thus, the Energy Transp. I court held that as to the pre-1871 cases, a railroad did
acquire more than a “mere passage over the land.” Indeed, it acquired “all rights necessarily
incidental to the use of the railroad. Such rights do not preclude reasonable use of the
subsurface, for support of trackage or for cuts or tunnels or similar roadbed changes.”
(Energy Transp. I, supra, 435 F.Supp. at p. 318.) But the railroad could not prevent the
owner of the servient estate from using the subsurface to build a pipeline in a way that did
not “interfere with the [railroad’s] valid railroad operations.” (Ibid.) Once again, the court
separated the surface grant of the right-of-way from the servient estate underlying it, opining
that “the ‘land forming the right of way’ did not include the subsoil, servient estate.” (Ibid.)
We recognize that using the subsurface for the extraction of oil and gas is not the
same thing as leasing it to others for the conveyance of oil and gas. But in either case, the
Railroad is seeking value from the use of the servient estate, an estate in which its property
rights were limited under the Congressional Acts. To paraphrase Union Pacific, we would
have to forget history and read legislation with a jaundiced eye to hold that when Congress
granted only a right-of-way to the railroads, it nonetheless endowed it with the “untold
riches underlying the right of way.” (Union Pacific, supra, 353 U.S. at p. 116.)
The Railroad cites Mellon v. Southern Pacific Transport Co. (W.D.Tex. 1990) 750
F.Supp. 226 (Mellon) and International Paper v. MCI Worldcom Network (W.D.Ark. 2002)
202 F.Supp.2d 895 (International Paper) in support of its position. However, neither case
does so. In Mellon, the railroad’s easement was acquired through a grant from the State of
Texas and an adjacent landowner owned the servient estate. The railroad nonetheless

31
granted an easement to a telecommunications company to run a cable beneath its right-of-
way. Under Texas law, the court found this to be an “incidental use” of the right-of-way
with regard to the erection of telegraph and telephone lines. (Mellon, supra, at p. 230.) The
court also found that the right-of-way surface included the nonmineral topsoil that would be
occupied by a buried fiber-optic line, and which would not burden the subsurface in the
estate retained by the plaintiff. (Id. at p. 231.) That is a far cry from the instant case, in
which the Railroad claims to control the servient estate itself and to have the right to bury
pipelines deep within it.
International Paper was does not support the Railroad either. That case was decided
under Arkansas law. Again, it involved running a telecommunications cable in the topsoil
of the surface right-of-way, not a pipeline through the servient estate. The railroad had a
right-of-way running through land owned in fee by the plaintiff, International Paper.
Arkansas state law provided that railroad easements conveyed an interest in the ground that
entitles the railroad to lease or license the surplus right-of-way to third parties for railroad
purposes. (International Paper, supra, 202 F.Supp.2d at p. 901.) Nevertheless, the
International Paper court noted that “an easement for railway purposes is not a fee.” (Id. at
p. 900.) In determining if the running of defendant’s fiber-optic cable served a railroad
purpose, the court pointed out that “‘[a] railroad purpose is one which is primarily for the
benefit of the public, and not a private individual.’” (Id. at p. 902.)
As in Mellon, the easement in International Paper dealt with a fiber-optic cable
buried in the topsoil and did not present a significant burden to the servient estate.
(International Paper, supra, 202 F.Supp.2d at p. 903.) In the instant case, the pipelines
burden the subsurface owned by others, allegedly being buried as deep as 40 to 60 feet in
some places. Moreover, the Railroad makes no claim that the pipeline “primarily serves a
public purpose.” Indeed, the Railroad argues this case simply relates to the enforcement of
a “private rental agreement,” which does not involve any matter of public interest. But that
is precisely the point: The rental agreement between the parties is a private arrangement
that serves each company’s own interest, not the public interest for which the Railroad’s
rights-of-way were granted.

32
In its supplemental brief, the Railroad attaches memoranda from the Department of
the Interior regarding the running of fiber-optic cables through the Railroad’s rights-of-way
and the application of the pre-1871 and the 1875 Acts, pursuant to title 43 of the United
States Code sections 1761 through 1763. But telecommunications cables stand on different
footing than pipelines because (1) the original congressional grants were not only for
railroad transportation corridors but also telegraph communication corridors; and, (2) the
cables generally run through the surface topsoil and do not significantly burden the servient
estate. The Railroad does not attach Department of the Interior opinions relating to use of
the subsurface in terms of oil or gas leases or pipelines carrying such products.
For example, in 1906, the Department of the Interior was asked to opine on a lease
provided by the Missouri, Kansas and Texas Railway Company to an individual operating
several oil bearing wells on a portion of the railroad’s right-of-way. It appears that part of
the right-of-way was granted in 1866 and part was granted in 1902, both by the federal
government. In its initial opinion in 1905 (33 L.D. 470), the department opined that the
grant under the 1866 act was similar to a grant under the 1864 act and concluded that “upon
authority of the case of the Northern Pacific Railway Company v. Townsend (190 U.S., 267,
271), . . . the Missouri, Kansas and Texas Railway Company is not authorized to use or
permit the use of its right of way for a purpose not contemplated by the granting act, and
that although said company took a base fee under its grant of right of way, yet it did not
acquire the right to take mineral oils therefrom.” (34 L.D. 504-505.) When it came to the
portion of the lease relating to the 1902 act, the department was even more emphatic, stating
there was no doubt that “a right-of-way acquired under this statute is a mere easement—a
title of even less dignity than that given by the granting act of 1866—and therefore with
better reason it follows that the company is not authorized to use it except for ‘depot
grounds, terminals, and other railway purposes.’” (Ibid.) The lease for minerals underneath
the surface “did not appear to be needed for any railway purpose” and were “clearly not
within the privilege granted by the act. . . .” The department went on to state that this was a
“manifest invasion of rights belonging to the owner of the fee,” advised that the owner was

33
entitled to “the protection of the United States government,” and suggested that the matter
might be “referred to the Department of Justice.” (Ibid.)
The Railroad may use the subsurface underlying its pre-1871 rights-of-way for things
that support the construction and operation of their railroad—i.e., for railroad purposes. But
it cannot use the subsurface for other purposes. Renting out the subsurface to a third party
from a different industry for private gain cannot reasonably be considered a railroad
purpose.
Therefore, the Railroad’s right to collect rent from the Pipeline for use of subsurface
easements under the Railroad’s “right-of-way property” cannot be based solely on
acquisitions obtained via the pre-1871 Acts.
3. Our interpretation of the Congressional Acts is consistent with both
public policy considerations and historical context
Despite the differences between the pre-1871 and the 1875 Acts, their goal was the
same—to build and run a transcontinental railroad and telegraph line. They were simply
two different means to the same end. To determine the nature and extent of the Railroad’s
rights under these acts, we must look to what Congress intended at the time of each grant, if
such intention can be discerned. (United States v. Illinois Cent. R. Co. (E.D.Ill. 1949) 89
F.Supp. 17, 21.) It has long been held that when it comes to the railroad acts, “they are to
receive such a construction as will carry out the intent of Congress, however difficult it
might be to give full effect to the language used if the grants were by instruments of private
conveyance.” (Winona, supra, 113 U.S. at p. 625.) To ascertain intent, “we must look to
the condition of the country when the acts were passed, as well as to the purpose declared on
their face, and read all parts of them together.” (Ibid.)
It is helpful to step back from the maze of railroad adjudication and the cross-current
of state and federal decisional law it spawned. Taking a broader view of what the country
was trying to accomplish with its railroad land grants and easements helps clarify whether
the Railroad’s conduct here comports with what Congress intended.
In the circumstances of a new country engaged in a great civil war for its very
existence, the federal government created a new form of property—railroad rights-of-way.

34
It had many of the indicia of common law property, but was a unique legislative creation
that first granted land, and then easements, to the railroads in return for their promise to
build a transcontinental railroad.19 Each side lived up to its promise. The great railroads
were born, and carried America into the future. But the law regarding this new form of
property gave rise to dispute, conflict, and litigation as both public and private entities tried
to pound the new square peg of federally created property interests into the round hole of
common law property rights. Sometimes the peg just did not fit; sometimes more heat than
light was generated, leaving splinters and sawdust in its wake.
The Railroad’s attempts to analogize from landlord-tenant law to the easements in
this case highlight one failure of such an approach. The Railroad calls the money paid to it
by the Pipeline for its perpetual, nonexclusive easement “rent.” But that does not make the
Railroad a landlord or the Pipeline a tenant, nor does it make the AREA a lease. At
common law, an easement is an incorporeal, intangible and nonpossessory right to use the
land of another, while the owner of the underlying fee retains the rights of possession,
subject to the holder’s use. A lease is an agreement that grants to the tenant the rights of
exclusive possession and use of real property for a specific period of time and vests
exclusive possession of the leasehold in the lessee against all persons, including the owner
of the fee. It creates an estate in real property, while an easement merely creates an interest
in real property that is not an estate. (6 Miller & Starr, Cal. Real Estate (3d ed. 2006)
Easements, § 15.4, pp. 15-17 to15-18.) Here, the Pipeline’s possession of the subsurface is,
by the AREA’s terms, nonexclusive; and the easements are perpetual, not for a specific
period of time.20

19 Congress actually created transcontinental railroads from the early acts. Indeed,
section 1 of the Pacific Railroad Act of 1862 “created and erected into a body corporate and
politic in deed and in law, by the name, style, and title of ‘The Union Pacific Railroad
Company . . .’.”
20 The Railroad also claimed that a tenant may not challenge a landlord’s title, pursuant
to Evidence Code section 624. Like the trial court, we are not persuaded. Certainly, where
there is a mistake of law regarding a landlord’s title, it has long been recognized that the rule
preventing a tenant from denying his title does not apply. (Tewksbury v. Magraff (1867) 33

35
The panoply of issues and questions has gone on for a century and a half, and
probably will not be fully resolved anytime soon. But a relatively narrow question is
presented here: Did the federal acts give the Railroad the right to rent the subsurface under
its rights-of-way in order to generate revenue for themselves? Perhaps the answer is best
found not in the myriad of cases and opinions interpreting differing laws and unique fact
situations, but in what Congress actually did, and why.
From the start, Congress provided the railroads with the right to lay their tracks
across the land through the use of land grants and easements. Although reasonable minds
may differ on a definition of “railroad purpose,” it must, if words mean anything, be
something that furthers the purpose of the railroad act itself—which was, expressly, “An
Act to aid in the construction of a railroad and telegraph line from the Missouri River to the
Pacific Ocean and to secure to the government the use of the same for postal, military, and
other purposes.” (Pacific Railroad Act of 1862, ch. 120, 12 Stats. 489, capitalization
omitted.)
At the time, little could be done with the subsurface other than extract minerals, if
present, but Congress did not ignore it completely. The initial Pacific Railroad Act of 1862
expressly exempted “mineral lands.” Indeed, the nation was aware of the potential great
value and wealth in the subsurface. As noted above, in late 1862, the Secretary of the
Interior issued a report extolling the value within the “Western Mineral Lands.” (U.S. Dept.
of Interior, Abstract from the 1862 Annual Report of the Commissioner of the General Land
Office (Nov. 29, 1862).) Clearly, the government considered the land underlying the
railroad rights-of-way part of the nation’s immense potential wealth. (Ibid.)
Not long after, Congress made it even more explicit, passing title 30 of the United
States Code section 21, which confirmed that “[i]n all cases lands valuable for minerals
shall be reserved from sale, except as otherwise expressly directed by law.” In 1922, as the
need for railroads began to lessen, Congress enacted a law dealing with the disposition of

Cal. 237, 245.) In any event, in light of our analysis of the rights granted by the
Congressional Acts, we view the relationship between the Railroad and the Pipeline as being
quite different than a typical landlord-tenant arrangement.

36
abandoned or forfeited railroad grants (43 U.S.C. § 912), which addressed how the railroads
could convey their rights-of-way. That section expressly reserved all oil, gas, and other
minerals in the land to the United States. As stated in Great Northern when referring to the
1875 Act, “[t]he Act was designed to permit the construction of railroads through the public
lands and thus enhance their value and hasten their settlement. The achievement of that
purpose does not compel a construction of the rights of way grant as conveying a fee title to
the land and the underlying minerals; a railroad may be operated though its right of way be
but an easement.” (Great Northern, supra, 315 U.S. at p. 272, italics added.)
Once pipelines did become a factor, Congress acted on them as well. In 1920, it
enacted title 30 of the United States Code section 185,which addresses rights-of-way for
pipelines through federal lands. The Department of the Interior was authorized to provide
leases for such pipelines in return for annual payments of fair market value. (30 U.S.C.
§ 185(l).) In 1930, Congress specifically addressed the land under railroad rights-of-way in
terms of authorization for leases of oil and gas deposits. It expressly applied the new law to
leases “in or under lands embraced in railroad or other rights of way acquired under any law
of the United States, whether the same be a base fee or mere easement” (30 U.S.C. § 301,
italics added), and provided for royalties to be paid to the United States. (30 U.S.C. § 305.)
Thus, when it came to leases in the subsurface, Congress expressly eliminated any
distinction between the pre-1871 and 1875 acts. This hardly reflects an intent on the part of
Congress that the Railroad could use the subsurface under its rights-of-way as it pleased.
Quite the contrary.
Of course, times change, circumstances change, and “the views of a subsequent
Congress form a hazardous basis for inferring the intent of an earlier one.” (United States v.
Price (1960) 361 U.S. 304, 313.) Because legislative goals change over the years,
“[r]esort[ing] to using subsequent congressional activity of any variety to interpret earlier
legislation should be cautiously approached . . . .” (Beres, supra, 64 Fed.Cl. 403, 416.) Yet
one cannot help but note that subsequent acts of Congress are protective of the value to be
found in the subsurface, which is fully consistent with the express reservations in the pre-
1871 Acts relating to mineral lands, and the case law interpreting the 1875 Acts granting

37
rights-of-way as mere easements, leaving ownership of the subsurface with the government.
Combining this with the conventional rules that “any ambiguity in a grant is to be resolved
favorably to a sovereign grantor” (Great Northern, supra, 315 U.S. at p. 272) and that
“‘nothing passes but what is conveyed in clear and explicit language’” (ibid., quoting
Caldwell v. United States (1919) 250 U.S. 14, 20), one would have to engage in a terrible
distortion of law and logic to find that somehow the railroad, not the government or its
grantees, obtained the rights to the subsurface underneath its rights-of-way to do with it as it
saw fit—especially when a railroad purpose must be something that furthers the goal of the
legislative enactment, not something that merely serves the economic interests of a private
company.
And yet, that is essentially the position taken by the Railroad here. It argues that it
has what is tantamount to a fee interest in the subsurface underlying its rights-of-way (both
via pre-1871 and 1875 Acts), and that it may rent it out for its own private gain. It has
submitted no evidence, indeed it makes no claim, that its collecting rent from the Pipeline in
some way helps the Railroad itself run, as opposed to merely providing revenue to the
company for the benefit of its shareholders.21 Yet it must be recalled that the rights-of-way

21 We have pointed out that raising revenue for its shareholders does not fit the
definition of a railroad purpose under the Congressional Acts. However, the Railroad’s in-
house expert on title issues had another view at trial, where he testified as follows:
“[COUNSEL FOR THE RAILROAD:] One of the phrases that we heard very often
over the last few days was references in title grants of various types utilizing the phrase ‘for
railroad purposes.’ [¶] I don’t think Mr. Kerr ever asked you what that phrase means to
your understanding. Could you please explain that to us? [¶] . . . [¶]
“[THE WITNESS:] To me, ‘railroad purposes’ means whatever the railroad
determines beneficial for its operations. [¶] . . . [¶]
“[COUNSEL FOR THE RAILROAD:] Mr. Oakman, when you used the term that I
think Mr. Kerr helped you to use as your definition of ‘railroad purposes,’ is it accurate that
the definition you’ve just used is your understanding of ‘railroad purposes’ based on your
years of experience working with the two railroads?
“[THE WITNESS:] I think that’s true. [¶] And if I can further explain, I think, you
know, when I go look for a definition of anything, whether a company or not, I would look
for the purpose of that company, what that company is all about, what their mission

38
were given initially so the railroads could perform their “obligations to the United States.”
(Townsend, supra, 190 U.S. at p. 673.) Whatever one considers to be the nature of the
Railroad’s legal interest in this land, it was not sold to the railroads by Congress. It was
granted in return for the railroad’s promise—well fulfilled, indeed—to construct and operate
a transcontinental railroad.
It is difficult to imagine that in a time of national crisis a rational Congress would
pass, and the President would sign, laws to encourage the railroads to construct a
transportation corridor through public lands and across the nation, seen as critical to the
safety and development of the country, and at the same time mean to give the railroads the
right to rent the subsurface under that corridor to private third parties from a nonrailroad
industry, in order to generate revenue for itself. Even more difficult to fathom would be an
intent to have the railroad continue to collect such revenue even after it abandons, sells,
transfers, conveys, or otherwise ceases using the surface rights-of-way at all—for a railroad
or otherwise.22
Indeed, as previously noted, the original grants expressly describe their purpose. For
example, the original Pacific Railroad Act of 1862 was passed “to lay out, locate, construct,
furnish, maintain, and enjoy a continuous railroad and telegraph, with the appurtenances”
and to “aid[] in the construction of [the] railroad and telegraph line.” (Ch. 120, §§ 1, 3, 12
Stats. 489.) The Act of July 2, 1864, was meant for the “construction and working of said
road.” (Ch. 216, § 3, 13 Stats. 356.) And the Act of July 25, 1866, required the railroad
companies “to operate and use the portions or parts of said railroad and telegraph . . . for all
purposes of transportation, travel, and communication, so far as the government and public

statement is. [¶] And to me, the railroad keeps telling us that their mission statement is to
further enhance the value of the shareholders. [¶] To me, that’s the purpose of the railroad,
to further enhance the value of the shareholders.
“[THE COURT:] So are you saying that anything that the railroad determines will
further enhance the value to the shareholders is railroad purposes?
“THE WITNESS: I think within the law, yes, it would be.”
22 See, part III.C., post, re pre-1994 sale of properties.

39
are concerned . . . .” (Ch. 242, § 7, 14 Stats. 239.) There is nothing in the statutory
language, nor its content or context that remotely suggests that Congress meant to give the
railroads the right to use the land under their rights-of-way to generate revenue for
themselves.
At oral argument, counsel for the Railroad claimed that the pipeline served a railroad
purpose because the Pipeline and the Railroad were sister companies at the time the
easements were first granted, citing Faus v. City of Los Angeles (1967) 67 Cal.2d 350
(Faus). The Railroad likewise cites Faus in its supplemental letter brief. But Faus fails to
support the Railroad’s position. In Faus, grants to a railroad (which did not come from the
federal government) provided that the right-of-way was to be used for an electric railway.
When times changed and gas powered vehicles became more prevalent, electric rails
diminished in use. The California Supreme Court held that changing the use from electric
rails to motor coach service complied with the original purpose of the grantors, which was
to provide a means of public transport for adjacent landowners. Switching bus service for a
street car network constituted an “adequate substitute.” (Id. at p. 355.) Stating that “‘a
dedication must be understood and construed with reference to its primary object and
purpose,’” our Supreme Court pointed out that the underlying and main purpose of the
grant—improvement of public transportation by a public utility for the benefit of the
public—was still being achieved. (Id. at p. 356.) Faus is inapposite to the instant case,
where the pipeline had nothing to do with construction of the railroad, and provides no
transportation, travel, or communication, so far as the government and public are concerned.
The Railroad tries to analogize by saying that conveying commodities through a
pipeline is simply a “change in modality of transportation—here, from trains to pipeline—
[which] does not change the railroad purpose” (citing Faus, supra, 67 Cal.2d at pp. 358-359
& fn. 6.) But the analogy fails because leasing the subsurface below the railroad’s tracks in
order to convey oil and gas is a far cry from simply substituting electric trolleys for buses on
the land’s surface to accomplish the same overall goal—transportation of passengers.
The Railroad cites City of Long Beach v. Pacific Elec. Ry. Co. (1955) 44 Cal.2d 599
for the proposition that the phrase “railroad purpose” must be used broadly, to include

40
things like lumberyards built in the right-of-way. But City of Long Beach was a
condemnation action where the railroad had used part of the surface of its right-of-way for a
lumberyard and related purposes. The question was whether the city’s efforts to condemn
an easement across the right-of-way for street purposes warranted more than nominal
compensation to the railroad. The issue of whether the railroad could lease its surface right-
of-way for commercial purposes if it contributes to the railroad’s business was discussed in
dicta, but was not part of, or necessary to, the holding. Importantly, the case had nothing to
do with subsurface rights, or whether the railroad could lease the servient estate to third
parties and collect rent on it. Clearly, the railroad’s interest in the surface right-of-way
stands on different footing than its interest, if any, in the subsurface. Moreover, City of
Long Beach was decided in 1955, before the seminal Union Pacific case addressed the
retained rights of the federal government to the subsurface beneath the rights-of-way.
Therefore, it is not helpful to the present analysis.
Like City of Long Beach, the other cases cited by the Railroad for the proposition that
the proper use of its right-of-way (whether by land grant or easement) should be broadly
construed deal with uses on the surface of the land within the right-of-way. There is little
doubt that as to the surface, the Railroad’s rights are substantial. That makes sense. Its
trains run on the surface. Its stations and terminals are above ground. No one else has a
right to use the surface, or interfere with the Railroad’s use of it, as long as trains run on it.
The Railroad needs to control the surface in order to operate.
The same cannot be said of the subsurface. The Railroad does not need a corridor
under the surface that conveys gas and oil in order to operate its trains. It can operate just as
well without it and did for many years before it granted easements to the Pipeline and,
presumably, still does in areas where there are no subsurface pipelines. Having a pipeline
underneath the surface is not “‘necessary and incident to railroad construction, maintenance
and operation.’” (Cash, supra, 123 Cal.App.3d 974, 977.) As the United States Supreme
Court noted over 70 years ago, “a railroad may be operated though its right-of-way be but
an easement.” (Great Northern, supra, 315 U.S. at p. 272, italics added.) Indeed, that is

41
precisely why the Railroad can lease the subsurface to third parties like the Pipeline—it does
not need it to run its trains.
Finally, the Railroad argues that it can do anything with its rights-of-way that is “not
inconsistent with” railroad purposes. But that is not the law. It is not enough that the
activity is “not inconsistent with” railroad purposes; the activity must actually serve a
railroad purpose. The right-of-way was granted to the Railroad “for the construction of
[the] railroad and telegraph line.’ [Citation.] That purpose is not fulfilled when the right of
way is used for other purposes.’” (Home on the Range, supra, 386 F.Supp.2d at p. 1022,
citing Union Pacific, supra, 353 U.S. 112, 114, italics added by Union Pacific.) As the
Home on the Range court explained, the United States Supreme Court in Union Pacific did
not say or imply that the basis for its holding was that the activity in question was
inconsistent with railroad purposes. Rather, it was “simply . . . not a railroad purpose.”
(Home on the Range, supra, at pp. 1022-1023.) The court then cited a Department of the
Interior decision to that effect, stating that “‘any use of a railroad right of way, or any
portion thereof, for other than railroad purposes is prohibited. A right of way granted by
Congress through the public domain may be used only and exclusively for railroad
purposes.’” (Id. at p. 1023, citing Use of Railroad Right of Way for Extracting Oil (Sept. 8,
1937) 56 I.D. 206, 211, italics added by Home on the Range.)
The novel (and successful) plan put into place via statute to build a transcontinental
railroad may have created a confusing crazy-quilt of laws and customs when attempts are
made to superimpose on it traditional concepts of common law. But in the end, there is
nothing in the language of the statutes, much less the relevant history, purpose, law or
precedent, suggesting that Congress intended to give the Railroad the right to use the land
under its rights-of-way for nonrailroad purposes, like renting it out to third parties.
Congress did not include such a provision, and we will not insert, create, recognize or
enforce such a provision here.
If the Railroad has the right to collect rent pursuant to the AREA for the period of
time between 2004 and 2014, it did not obtain that right from the Congressional Acts of the
1800’s—not from the 1875 Act, which granted the Railroad too few “sticks” to allow it to

42
grant property interests in the servient estate, which was owned by others; and not from the
pre-1871 Acts, because even though it was given more “sticks,” the pipeline itself does not
serve a railroad purpose. The pipeline simply does not further the legislative intent of the
acts. Thus, to the extent the Railroad has the right to collect rent from the Pipeline, it must
have acquired that right from sources other than the Congressional Acts.
C. The Rights of the Railroad to Collect Rent Pursuant to the AREA and
Related Agreements Irrespective of Congressional Authorization
The mere fact that the Congressional Acts did not give the Railroad sufficient interest
in the land to grant subsurface easements to the Pipeline and collect rent therefrom does not
end the inquiry. As discussed in more detail below (part III.B.1., post), the Railroad may
well have acquired additional rights through other means. By 2004, it may have had rights
to the subsurface under some of its rights-of-way that surpassed the rights originally granted
by Congress. Indeed, it appears that evidence was presented during trial suggesting that,
separate and apart from the Congressional Acts, the Railroad claimed title to approximately
50 percent of the land. Since the trial court erroneously concluded that the Railroad had title
to “virtually all of the subject property,” there was no finding by the court as to how much
of the land was actually the “property of the railroad.”
Therefore, the case must be remanded to the trial court for further proceedings to
determine which pipeline easements ran through the “property of the railroad” between
January 1, 2004, and December 31, 2013. Rent may be charged by the Railroad only on
those easements. Rent may not be charged on easements that ran through rights-of-way
acquired by the Railroad solely via the Congressional Acts.
II. Valuation Issues Resolved as Part of the 1994 Case Do Not Collaterally Estop
the Parties from Litigating Them in the Instant Case
In the next two parts of our opinion, we turn away from the property rights of the
Railroad and discuss the valuation methods employed by the trial court. In this part, we
address the Pipeline’s claim that the trial court erred in adjudicating certain valuation issues
because those issues were resolved in earlier litigation between the parties. In part III, we
discuss contentions relating to the specific valuation methods adopted by the trial court.

43
There, we see how the determination of what constitutes the “property of the railroad” bears
upon the calculation of the amount of rent due.
A. Principles of Issue Preclusion
The Pipeline contends that the judgment in the 1994 case collaterally estops the
Railroad from litigating some of the issues in this 2004 case. The doctrine of collateral
estoppel is one aspect of the concept of res judicata. “In modern usage, however, the two
terms have distinct meanings. The Restatement Second of Judgments, for example,
describes collateral estoppel as ‘issue preclusion’ and res judicata as ‘claim preclusion.’”
(Lucido v. Superior Court (1990) 51 Cal.3d 355, 341, fn. 3 (Lucido).) The purpose of issue
preclusion is “to prevent a party from repeatedly litigating an issue in order to secure a
different result” when it had a full and fair opportunity to do so previously. (Direct
Shopping Network, LLC v. James (2012) 206 Cal.App.4th 1551, 1562-1563 (Direct
Shopping Network).) Collateral estoppel “‘has the dual purpose of protecting litigants from
the burden of relitigating an identical issue with the same party or his privy and of
promoting judicial economy by preventing needless litigation.’” (Smith v. ExxonMobil Oil
Corp. (2007) 153 Cal.App.4th 1407, 1414.) In order for collateral estoppel to apply, the
issue one seeks to preclude from relitigation (1) must be identical to that decided in the
former proceeding, (2) must have been actually litigated in the former proceeding, (3) must
have been necessarily decided in the former proceeding, (4) the decision must have been
final and on the merits, and (5) the party against whom preclusion is sought must be the
same as, or in privity with, the party in the former proceeding. (Lucido, supra, at p. 341.)
Since it constitutes a question of law, the trial court’s application of collateral estoppel is
reviewed de novo. (Smith, at p. 1415.)
Numbers (2) through (5), above, are clearly present in this case. The question turns
on whether the issues that were determined in the first proceeding were “identical” to any of
the issues that were to be determined in this proceeding. The Pipeline claims that certain
factors relating to the value of easements in transportation corridors were fully litigated and
finally determined in the 1994 case, and that the trial court was precluded from adjudicating
them a second time. The Railroad claims that these factors change over time, and therefore

44
the facts and circumstances in 2004 are not identical to those in 1994. Therefore, according
to the Railroad, issue preclusion does not apply.
Collateral estoppel does not bar a later claim if new facts or changed circumstances
have occurred since the prior decision. (Melendres v. City of Los Angeles (1974) 40
Cal.App.3d 718, 730.) Neither res judicata nor collateral estoppel were ever “‘intended to
operate so as to prevent a re-examination of the same question between the same parties
where, in the interval between the first and second actions, the facts have materially changed
or new facts have occurred which have altered the legal rights or relations of the litigants.’”
(Evans v. Celotex Corp. (1987) 194 Cal.App.3d 741, 748 (Evans).) “Collateral estoppel
does not apply where there are changed conditions or new facts which did not exist at the
time of the prior judgment . . . .” (United States Golf Assn. v. Arroyo Software Corp. (1999)
69 Cal.App.4th 607, 616.) Thus, the question here is whether any determinations that
needed to be made in the instant case were identical to those decided in the 1994 case.
B. The Trial Court’s Ruling re Issue Preclusion
The trial court utilized the “Across-the-Fence” (ATF) method to value easements
through transportation corridors. The ATF method utilizes four factors to arrive at the rent:
(1) the total value of the land occupied by the easement and through which it travels; (2) an
“enhancement factor” reflecting the special value of a transportation corridor in that
location; (3) a “use factor” representing the extent or percentage of the fee constituting the
nonexclusive subterranean easement; and (4) the appropriate rental rate, or “rate of
return.”23 These factors will be discussed in more detail below.24 But for present purposes,
we note that the parties were in close agreement on the total value of the land occupied by
the easement. And they agreed that collateral estoppel could not bar a new determination of
the rate of return. Therefore, the arguments as to issue preclusion relate to the remaining
factors, enhancement and percentage of use.

23 The easement rent derived from the ATF formula is shown in the following equation:
(total land value) x (enhancement factor) x (use factor) x (rate of return) = rent.
24 The ATF method was explained in both Santa Fe I and Santa Fe II.

45
On at least three separate occasions—before, during, and after trial—the Pipeline
asked the trial court to find that collateral estoppel should be applied to the use and
enhancement factors, and therefore the Railroad should be bound by those determinations
made by the temporary judge in 1994.25 The Pipeline argued that as to these factors, the
facts and circumstances in 2004 were identical to those in 1994. The Railroad argued that
the use and enhancement factors were not subject to collateral estoppel because they were
based upon expert opinion, not “immutable physical facts.” The temporary judge in the
instant case appeared to give significant weight to this argument. He looked to whether the
prior findings in the 1994 case were a “fixed fact, such as the width of the specific easement
in a specific location, or findings of a market-based fact valid at a particular time, but
subject to change over time.” When applied to the enhancement factor, the trial court stated
that the “essential questions are (1) whether the factor determined by the court is fixed and
permanent or subject to change, and (2) if it is subject to change, what enhancement factor is
shown by the evidence in this case.” The trial court stated that “appraisal opinions . . . are
not fixed facts, but are market driven” and concluded that an expert determination was not a
physical artifact. That is, it was an “economic determination, not a physical determination.”
Therefore, they were inherently “subject to change.” This analysis raises two separate
issues.
First, a fixed or immutable physical determination is not a prerequisite for the
application of collateral estoppel. While it is true that fixed, immutable physical facts, by
definition, cannot change and therefore will be “identical” over time, it does not follow that
findings must be based on fixed, immutable physical facts in order to be accorded collateral
estoppel effect. Indeed, they may well be based upon expert opinion. For example, in a tort

25 The Pipeline’s desire to lock in the 1994 findings regarding the enhancement and use
factors is understandable. In 1994, the temporary judge found an enhancement factor of 1
(i.e., no multiplier) and a use factor of 40 percent. (Santa Fe II, supra, A103990.)
However, the temporary judge in 2004 found an enhancement factor of 1.25 and a use factor
generally of 60 percent (with the exception of a few properties, where a 70 percent use
factor was utilized). Since the rent is the product of four factors, any change in one of them
is multiplied and magnified proportionally.

46
case where an expert testifies that the defendant was professionally negligent and the jury so
finds, that finding may well have issue preclusion effect in subsequent litigation. The
professional negligence is not an “immutable physical fact.” But where the issue was
litigated, decided, final, and on the merits, collateral estoppel applies as between the same
parties (or those in privity with them).26 After all, issue preclusion applied in both Evans
and Direct Shopping Network, above, even though the findings in Evans were based upon
expert opinions regarding negligence and the ruling in Direct Shopping Network turned on
the likelihood of prevailing at trial in an anti-SLAPP case—hardly fixed, permanent (much
less physical) factors. To the extent the trial court concluded that it could apply collateral
estoppel only to fixed, immutable physical facts or artifacts, it employed a faulty analysis.
Second, the phrase “subject to change over time” as used by the trial court is
ambiguous. It is clear that if facts and circumstances change after the first case is final, they
are no longer “identical” by the time the second case rolls along. “[T]he estoppel effect of a
judgment extends only to the facts in issue as they existed at the time the prior judgment
was rendered.” (People v. Carmony (2002) 99 Cal.App.4th 317, 322.) “Some issues are not
static, that is, they are not fixed and permanent in their nature. When a fact, condition,
status, right, or title is not fixed and permanent in nature, then an adjudication is conclusive
as to the issue at the time of its rendition, but is not conclusive as to that issue at some later
time.” (Ibid., citing Lunt v. Boris (1948) 87 Cal.App.2d 694, 695.)
In Hurd v. Albert (1931) 214 Cal. 15, the plaintiff brought an action on a restrictive
residential covenant. Defendant argued that the nature of the property had changed over
time so that the restricted covenant no longer applied, despite a finding in a prior action five
years earlier that the covenant did apply. Defendant argued that in those five years, the
nature of the territory changed, warranting a release from collateral estoppel effect. Our
Supreme Court held that res judicata was never intended to prevent a reexamination of the

26 Of course, if the facts or circumstances upon which the expert based his or her
opinion changed between the two proceedings, this could raise a question of whether issue
preclusion was applicable.

47
same question between the same parties where, over time, the facts have materially changed.
(Id. at p. 26.) In the second trial, the court “may and should consider all the facts that exist,
both prior and subsequent to the first action, so as to determine properly what effect all of
the facts, as they exist at the time of the second trial, have on the rights of the parties.”
(Ibid.)
It is unclear whether, in using the phrase “subject to change over time,” the trial court
here simply meant that the facts underlying the enhancement and use factors might have
changed. If so, this would be an erroneous test. After all, virtually anything could possibly
change over time. The question for issue preclusion purposes is whether the facts did
change over time. However, if the trial court meant that the facts underlying the
enhancement and use factors, by their nature, inherently change over time, then the
conclusion that they had changed between 1994 and 2004 would be a reasonable, if not an
inevitable, one. If things are known to change over time, and a significant amount of time
passes, the inference that those things are no longer “identical” to the way they were is
compelling. Change is implicit in the facts and implied in the conclusion.27 In any event,
we need not determine if the trial court’s reasoning was correct. We review the correctness
of the judgment, not the reasoning or grounds assigned for the ruling, and will affirm a
judgment correct on any theory. (Estate of Kampen, supra, 201 Cal.App.4th 971, 1000.)
The evidence at trial demonstrated changes in facts and circumstances between 1994 and
2004 that affected the rental value of the easements, including the enhancement and use
factors, that would have made issue preclusion improper.
C. Issues Potentially Subject to Preclusion
1. Enhancement Factor
The enhancement factor (sometimes referred to as the corridor factor) in the ATF
valuation method relates to whether there is a special value of a connecting corridor, above

27 When it comes to real estate values, a court may even take judicial notice that they do
not remain constant. (Silva v. City & County of San Francisco (1948) 87 Cal.App.2d 784,
788.)

48
and beyond its highest and best use. Enhancement factors represent a premium, if any, that
a buyer or renter would pay, over the property value, for the benefit of enjoying an already
continuous corridor owned by a single entity. For example, such a premium might be very
small or nonexistent in areas of open desert in New Mexico, and might be substantial in a
heavily developed urban area in California. As the trial court pointed out, such a factor is a
product of market forces and other considerations, rather than a fixed, immutable number.
Over time, the nature and/or development of these various properties are subject to change,
thereby changing the premium that a renter would pay.
The record reveals changes as to these issues between the 1994 case and the instant
2004 case. Evidence was presented of more recent transactions, including transactions
entered into by the Railroad and by the Pipeline. Transactions that were part of the record in
the 1994 case might or might not be entitled to the same weight accorded to them earlier.
The evidence in the instant case included new information about land values and
enhancement factors that did not exist in the earlier case. In addition, the trial court was
presented with evidence that the Pipeline had recently acquired property for new
construction for a Concord-to-Sacramento pipeline. In doing so, it had utilized the ATF
process, and inferences could be drawn from these new facts that did not exist in the 1994
case.
In addition, there was testimony at trial from which one could reasonably infer there
were changes in the facts and circumstances as they related to enhancement (or corridor)
factors. As one example, an expert for the Railroad was asked about any changes in
enhancement factors in the years leading up to 2004. He testified as follows:
“Q Had your ATF or corridor segment value as we use our formula changed?
“A Yes, sir. The ATF value changed dramatically, because the price of real
estate in that area increased rather significantly over that time period, as one
would expect.
“Q Did your enhancement factor or corridor factor change over that period of
time?
“A Yes. And the reason being is my analysis of corridor sales is rather
dynamic. I’m always getting additional corridor sales. And additional

49
[information.] [A]nd so each time I do a valuation I go back and I analyze
those sales again. And so the corridor factor has changed over that period of
time, even though the value, the importance of that corridor as a corridor, has
not really changed.”
Thus, there was substantial evidence of a change in facts and circumstances between
the 1994 case and the 2004 case as regards the parameters that make up the enhancement
factor. The trial court’s ruling relating to collateral estoppel was correct. There was no
error in denying the Pipeline’s request for issue preclusion regarding the enhancement
factor.
2. Use Factor
The use factor is that portion of the fee value attributed to the easement. As noted,
the trial court considered whether the use factor was purely physical (i.e., “physical
artifact”) or a market-based economic element. It pointed out that the appellate court in
Santa Fe II considered it something that required expert appraisal opinion. (Santa Fe II,
supra, A103990.) But more than that, it concluded that an expert opinion based upon
market behavior is “inherently subject to change,” and 10 years had passed between the
1994 and 2004 valuations.
Moreover, the Railroad’s expert testified that the use factor is “market extracted from
actual sales and agreements” and was in the range of 75 percent for subsurface occupancies
such as the easements here. For determining both enhancement and use factors, another
expert for the Railroad testified, and brought documentation of, scores of transactions, many
of which were after 2000 and some as late as 2003. He testified about numerous
transactions between 2000 and 2003 with use rates in the range of 50 percent to 90 percent.
And he compared pre-2000 transactions to post-2000 transactions, placing more weight on
the recent transactions. He also opined as follows:
“Q And do you conclude that use rates for the later transactions of the period
2000 to 2003 are somewhat higher than use rates in earlier transactions for
[the Railroad]?
“A Yes.
“Q What were the use rates you were seeing in the earlier [Railroad]
transactions?

50
“A In the 50 percent range.
“Q Is this an example of use rates changing over time?
“A Yes.
“Q Is this one reason why a determination of use rate in 1994 isn’t
determinative of use rates in 2004?
“A Yes.”
Based on the record, it can hardly be said that the facts from which the use factor was
determined had not changed since 1994. These facts were not fixed or permanent in their
nature. Rather, there was substantial evidence that the facts had changed between 1994 and
2004. As with the enhancement factor, the trial court’s ruling regarding collateral estoppel
relating to the use factor was correct. Precluding either party from relitigating the use factor
would have been an error of law. Allowing the parties to relitigate the issue in order to
update it was not.
D. There Is No Equitable Basis for the Application of Issue Preclusion Here
Besides the classic five criteria for applicability, “[t]here is an equitable component
to collateral estoppel” as well. (Direct Shopping Network, supra, 206 Cal.App.4th at
p. 1562.) “‘[E]ven where the technical requirements are all met, the doctrine is to be
applied “only where such application comports with fairness and sound public policy.”’”
(Ibid., citing Smith v. ExxonMobil Oil Corp., supra, 153 Cal.App.4th at p. 1414.)
Courts must look at the entire record to equitably apply issue preclusion, allowing a
party to avoid having to revisit and relitigate an issue already fairly resolved. But in this
case, there is an extra wrinkle: As part of the settlement of their 1991 litigation, the parties
agreed that the Railroad could seek a rent incre

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---