# Sedco International, S. A. v. Cory

> District Court, S.D. Iowa · August 21, 1981 · 522 F. Supp. 254

URL: https://www.frixlaw.com/law-library/cases/1519284

## Case

- **Full name:** SEDCO INTERNATIONAL, S. A., Plaintiff, v. William F. CORY and Marcella McKillip, Executors of the Estate of Roy J. Carver, Deceased, Defendants and Counterclaim Plaintiffs, v. SEDCO INTERNATIONAL, S. A., Sedco, Inc., and Sedco Energy Corporation (Formerly TerraMar Consultants, Inc.), Counterclaim Defendants
- **Court:** District Court, S.D. Iowa
- **Decided:** August 21, 1981
- **Citations:** 522 F. Supp. 254; 9 Fed. R. Serv. 607; 1981 U.S. Dist. LEXIS 9777
- **Precedential status:** Published
- **Opinion:** Opinion by Hanson
- **Judges:** Hanson
- **Cited by:** 33 later opinions in the Frix Law Library

## Citator (automated)

- No negative treatment found by the automated citator. That is not the same as a confirmation that the case is good law; read the citing cases.
- Full citator and citing cases: https://www.frixlaw.com/law-library/cases/1519284

## How later opinions describe it (automated extraction)

- applying Iowa law in diversity case

## Opinion text

OPINION AND ORDER FOR JUDGMENT
HANSON, Senior District Judge.
I.
This litigation is the aftermath of a Middle East oil venture gone sour. The principal questions in the case are whether the original defendant and counterclaim plaintiff, Roy J. Carver,
1
was induced to join the venture through fraudulent or negligent misrepresentations of certain agents of the counterclaim defendants, Sedeo International, S.A., Sedeo, Inc., and Sedeo Energy Corporation (formerly TerraMar Consultants, Inc.); and, if so, how far the counterclaim defendants are liable for the expenses Carver incurred.
In brief outline, the facts are as follows. Carver was a citizen of Iowa whose Muscatine-based businesses, first in pumps (through Carver Pump Co.) and later in the recapping of tires (through Bandag, Inc.), made him a large personal fortune. Sedeo, Inc., a Texas corporation with headquarters in Dallas, is a petroleum drilling contractor which through various of its divisions and subsidiaries also provides other services to the petroleum industry, including consulting services. Carver’s (ostensible) partner in the venture here at issue was R. Eugene Holley, former lawyer, Georgia state senator, speculator in real estate and Texas oil wells, and paper multi-millionaire since come to grief. In October 1975 Holley and Carver formed the Holcar Oil Co., for the immediate purpose of reentering and exploiting three abandoned oil wells located in the waters of the Persian Gulf about 60 miles off the eastern shores of the state of Qatar. Carver had been led to believe by Amos Carter, a Sedeo, Inc. vice president for mideast drilling operations, and by Robert Smith, president of TerraMar Consultants, Inc. (then operated as a division of Sedeo, Inc.) that the wells could be reentered and production of saleable oil begun in less than three months for a total front-end investment of between $2 million and $2.5 million, with subsequent quick return of the investment and eventual enormous profits. Holcar contracted with the government of Qatar for (among other things) the right to reenter and produce the wells, and with Sedeo International, S.A., a wholly-owned subsidiary of Sedeo, Inc., for the services of an offshore drilling rig and its crew, to be used to reenter the wells and ready them for production. TerraMar, through Robert Smith and others, was to provide a wide range of services in aid of the venture. Carver and Holly both personally guaranteed payment of Holcar’s debts to Sedeo International, although Holley and Carver had agreed that the front-end investment would be made in whole by Car- • ver, through the device of loans made by him to Holcar.
Work on the project began in Qatar in late January 1976. Things did not go as had been expected, for two main reasons. First, it was soon revealed that the effluent of the wells included large quantities of hydrogen sulfide (H2S), a gas that even in relatively small quantities has deleterious effects on equipment and on humans — on the latter to the point of quick fatality. To speak of nothing else, the presence of the H2S rendered any oil the wells might produce unsaleable absent prior elaborate and expensive separation of the gas from the oil: Carver was advised by experts in such matters that installation of the required production facilities would take at least nine months and cost from $13 to $14 million in addition to the expense connected with reentering and reworking the wells. Second, the reentry and workover of the wells did not itself proceed quickly or smoothly. Instead of taking less than three
*262
months, it took six, at an average daily cost of between $40,000 and $45,000. Even at that, work on one of the wells — the best producer of the three — was not completed, and that well may indeed have been ruined during its workover. By mid-August 1976, when Sedeo reclaimed its rig and crew for rental to another customer, Holcar (hence Carver) had spent between $7 and $8 million on reentries and workovers alone. For this there was to show no saleable oil, and not even the prospect of saleable oil for many more months and millions to come. An additional $5 to $7 million (the exact figure is in dispute) was eventually expended on other aspects of the venture, including attempts to assemble production equipment capable of rendering saleable any oil the wells might eventually produce.
Carver was arguably on notice of the severity of the H2S problem as early as February 25, 1976, when relatively little had been spent: that is, an attempt was made to make him aware that the large amounts of H2S in the wells could very well prevent the generation of any income unless and until he invested some $13 to $14 million in completely unforeseen front-end expenses and waited at least nine more months, no matter how quickly the reentry and workover program should go. This raises the question whether, even assuming fraud or negligence in the inducement, Carver should be permitted to recover amounts expended after he knew the cost and time projections on the basis of which he had joined the venture were radically too low. Resolution of this question turns on the quality of the notice actually had on February 25 and afterwards, and on whether Carver acted, as he became increasingly aware of the huge additional front-end costs, in reasonable efforts to mitigate damages already incurred. In fact, he continued to act into the first months of 1977 in reliance on the advice of Amos Carter, who consistently assured him his further investments of time and money need not be nearly as great as others said, and of Robert Smith, who (along with Carter) assured him that even the largest further front-end expenditures being discussed would still be paid back, and with good profits besides, eventually. Whether or not this was good or even honest advice, which has been a subject of dispute between the parties, it is in any case clear that Carver acted on it as and while he did, both in continuing to fund the workover program and in investing in production equipment, in good faith efforts to salvage as much as possible of investments already made.
Carver’s ability to generate cash to invest was not however unlimited; nor was his faith in Amos Carter and Robert Smith. By early 1977 he found himself unable to borrow the large sums still required on terms acceptable to him. Holley was on the verge of bankruptcy and unable to contribute anything. It was becoming increasingly clear that installation of production facilities would indeed cost many months and about $15 million, despite what Amos Carter had been saying. Finally, Carver was given reason to doubt that the wells were capable of producing sufficient oil to pay back his investment, let alone generate a reasonable profit. Beginning in early 1977, Holcar’s efforts to develop the wells by itself ceased, and both Carver and Holley began looking for a partner for Holcar willing to invest the further sums needed to bring the venture to fruition. Such a partner was eventually found in the person of the Attock Oil Company, a Pakistani corporation, with which final agreement was reached in November 1977. By then, however, the government of Qatar had become disenchanted with Holcar, for reasons that require to be explored in further detail. The government refused to permit Attock to join the venture as Holcar’s partner, and in early 1978 ended, matters by cancelling its agreement with Holcar. Holcar never made a cent.
This suit was commenced in this district on December 14, 1977, by Sedeo International, against Holcar and Carver, to recover amounts still owing for the services of Sedco's drilling rig, whose payment Carver
*263
had personally guaranteed.
2
Holcar was quickly dismissed from the action;
3
subject matter jurisdiction of this Court over the action against Carver (now his executors) is proper under 28 U.S.C. § 1332 . By way of answer to the claim against him, Carver set up defenses of improper and incomplete workmanship by Sedeo International, and fraud in the inducement of the personal guaranty sued upon. By way of counterclaim against Sedeo International, and additionally against Sedeo, Inc., TerraMar, Amos Carter, and Robert Smith, Carver alleged fraud, conspiracy to defraud, and negligent misrepresentations; subject matter jurisdiction of the counterclaim is again proper under 28 U.S.C. § 1332 .
4
Sedeo, Inc., TerraMar, Amos Carter, and Robert Smith all moved to dismiss the claims against them, arguing that this Court lacked personal jurisdiction over them. Following a hearing on the motion to dismiss, the Court (per Judge Stuart)
5
dismissed Amos Carter and Robert Smith from the action, but found sufficient basis for the exercise of personal jurisdiction over Sedeo, Inc. and TerraMar.
6
In their joint answer to the counterclaim, Sedeo International, Sedeo, Inc., and TerraMar raised by way of denial and affirmative defense a variety of issues that shall be addressed herein. Trial of the case was to the Court, beginning on September 2, 1980 and ending on October 9, 1980. The issues were subsequently fully briefed and orally argued, and proposed findings of fact and conclusions of law submitted by the parties. This opinion, which shall constitute the findings and conclusions required by Rule 52, F.R.Civ.P., is based on the entire record in the case, including the pleadings, the testimony and exhibits offered and received at trial,
7
and the arguments of the parties.
II.
A.
Sedeo, Inc., began in the 1930s as the Southeastern Drilling Company, a “one rig land operation in northern Mississippi;” since then it has grown, by its own account, to be “one of the petroleum industry’s largest and most respected drilling contractors,” Ex. 441, owning and operating world-wide more than 30 on- and offshore drilling rigs costing as much as $80 million apiece. Sedco’s drilling business is conducted in large part through a number of partly- and wholly-owned subsidiaries, among them the wholly-owned Sedeo International, S.A., the Panamanian corporation through which Sedeo evidently conducts its drilling operations in the Middle East. From at least late 1970 until September 23,1975, the president of Sedeo International was Amos Carter, who worked out of the company’s offices in Tehran. Carter began working for Southeastern Drilling Company in 1951 as an oil-field roughneck; he went to the Middle East in c. 1957 as an employee of Sedeo International and worked his way up to the top position in that company. During his years there he gained a great familiarity
*264
with both on- and offshore drilling and oil exploration in the Middle East. Among other things, he personally managed drilling operations in various countries; he made necessary arrangements with the governments of countries in which drilling operations were carried out; he was involved in the resolution of labor disputes; he solicited business for Sedco’s rigs; and he negotiated drilling contracts with oil companies in need of Sedco’s services. Over the years he became well-acquainted in government and other circles throughout that part of the world. In the fall of 1975, wishing to return to live in the United States, he left his job with Sedeo International (though continuing as a director) and became a vice president of Sedeo, Inc. for Middle East operations, a position he held at the time of trial. His replacement as president of Sedeo International was Carl Thorne, who had gone to Tehran in 1970 or 1971 as vice president of that company, after having begun as a lawyer in 1968 in Sedeo, Inc.’s headquarters in Dallas.
Besides contract drilling, Sedeo, Inc. has branched out into pipeline construction, the manufacture of drilling-related equipment, petroleum consulting, and the provision of engineering services to the petroleum industry. Engineering services are provided through Earl and Wright Consulting Engineers, a wholly-owned subsidiary of Sedeo, Inc., of which more will be heard later. Petroleum consulting was provided through TerraMar Consultants, Inc., organized in July 1970 under the laws of Texas, with headquarters in Dallas. The first officers of TerraMar were Phil Porter, president; Robert Smith, senior vice president; E. R. Schroeder, vice president; and Carl Thorne, secretary and treasurer. In late 1973 Robert Smith became president of the company, a position he retained until August 1977, when he took other employment. TerraMar was operated as a division of Sedeo, Inc. until late in 1975, when 1000 shares of stock were issued to Sedeo; even after that, as late as June 1977, the TerraMar letterhead still indicated that it was “A Division of SEDCO.” At all material times Sedeo, Inc. represented TerraMar and its personnel as possessing a depth of technical knowledge acquired in productive consulting work in all parts of the world, in such areas as reservoir analysis, reserve estimates, reservoir stimulations, production studies, geological analysis, valuation of permits and concessions, prospect valuation, geological interpretation of geophysical data, exploration program planning, management studies, exploration organization, feasibility studies, investment planning, and concession and joint operation contracts. Sedeo specifically represented Robert Smith as having been a consultant for many years in the petroleum industry in many areas of the world including the Persian Gulf, and as having furnished solutions to a variety of technical problems to private oil companies, governments, and government agencies.
TerraMar did not prove to be as profitable as Sedeo had hoped. As of July 31, 1975, it had accumulated a deficit of $313,-345. Regular discussions concerning Terra-Mar’s losses were had with B. Gill Clements, president of Sedeo, Inc., and John Rhea, senior vice president. Robert Smith was told he and TerraMar had to generate more work; that “you have got to start making money.” Smith reasonably concluded that TerraMar would not be permitted to operate indefinitely at a loss and that he would probably have to find other employment if the losses continued. Smith depo. at 348-350. In fact, TerraMar did make money for about one year — 1976—the year it was actively engaged with the Holcar Oil Company project in Qatar; during that year between 40% and 50% of its income was derived from Holcar. When that work ceased, TerraMar again began showing a loss. Robert Smith left TerraMar on August 8, 1977; and the name of the company itself has since been changed to Sedeo Energy Corporation, under which name it is a party to this lawsuit.
As has already been indicated, there has been some question in the case as to
*265
whether Sedeo, Inc. and TerraMar (which shall be so-called herein) are subject to the
in personam
jurisdiction of this Court. Judge Stuart’s January 7, 1980 ruling on this question turned on the internal treatment accorded Sedeo International and TerraMar by their parent Sedeo, Inc. This treatment was found to be such as to make it fair and just, particularly under the circumstances of this case, to disregard the separate corporate identities and to subject Sedeo, Inc. and TerraMar to the jurisdiction of the Court based on the Court’s unquestioned jurisdiction over Sedeo International. Apparently without wishing to concede the correctness of Judge Stuart’s ruling, counsel for Sedeo, Inc., Sedeo International, and TerraMar made the following stipulation on the first day of trial:
[I]t is not the intention of Sedeo, Inc., to try to avoid any legal responsibility for any judgment that might be rendered on the counterclaim in this case by shifting assets or avoiding payment through the fact that they have the corporate structure that they do. So for the purposes of this litigation, we hereby agree and stipulate that in the event some judgment were to be rendered on the counterclaim in favor of Carver, that that judgment could be jointly and severally against the three corporate entities that are parties to this lawsuit; that is, Sedeo, Inc., Sedeo International, S.A., and Sedeo Energy, formerly TerraMar [Consultants],
I would like to make it clear that in making this stipulation, it’s done for the purposes of simplifying the issues in this trial and without any admission that the tax planning and the substantive corporate identities of those entities is anything other than as represented. We believe that it’s not necessary to address any of those issues, and certainly [] the stipulation is without prejudice to those matters .... [T. 34-35].
Under questioning the next day as to whether by this stipulation Sedeo, Inc., Sedeo International, and TerraMar agreed to be treated as one and the same for all purposes of this suit, counsel for the three at first indicated that such was the purport of the stipulation, saying its purpose was to “facilitate ease of reference,” to “simplify things by collectively calling them Sedeo, and making no distinction,” and to “eliminate any necessity to even address or adjudicate” the question whether “the corporate entities truly or factually should be disregarded,” that point remaining unconceded. T. 148-150. Counsel later appeared to retreat from this construction of the stipulation, however, in the following exchange at least:
THE COURT: Well, I understand you are indicating and contending that they are separate and distinct corporate entities.
MR. McELHANEY: Yes, sir.
THE COURT: I understand that .... And I further understand that for the purposes of the trial of this lawsuit, in all aspects they can be considered one.
MR. McELHANEY: That is not part of the stipulation.
THE COURT: All right. All right. Now, let’s just assume we have a jurisdictional problem, then what?
MR. McELHANEY: We do in fact, and that would be one of the points of error in the event that there was a—
THE COURT: All right. All right. I just want to be sure.
MR. McELHANEY: I say this, though, that we still don’t retreat and fully intend to honor our stipulation and commitment to the Court about the fiscal responsibility. [T. 150-51].
The question then remains as to how far and for what purposes Sedeo, Inc., Sedeo International, and TerraMar did agree to be treated as one. In immediate practical terms the question comes to this: whether the issue of liability on the counterclaim is to be adjudicated separately and severally as to each of the three (absent some finding by the Court that the corporate identities
*266
should be disregarded for this purpose), they having agreed to stand together only in respect of any judgment that might otherwise be entered against fewer than all of them; or whether the issue of liability on the counterclaim is to be adjudicated as if the three were one, no close track being kept or further question raised of which agent or employee was acting for what corporate entity on what occasion, or whether their corporate structure should otherwise be disregarded. The question being put in these terms, the Court finds the answer clear: the three corporations agreed not only to stand together in respect of any judgment that might be entered against any of them, but to stand together as well, no distinction being made between them, for purposes of adjudicating the question of liability on the counterclaim. They will be treated accordingly herein, and will sometimes be referred to collectively as “Sedeo.” This construction of the stipulation is the only one consistent with the various expressed purposes for which it was made; and it is the only one consistent with the way the case was actually tried by counsel for Sedeo, Inc., Sedeo International, and TerraMar, and with the way the briefs and proposed findings and conclusions were written. What bearing the stipulation as so construed may have on the jurisdictional question may be left for the Court of Appeals to consider should the need arise.
B.
The Emirate of Qatar is an independent Arab state located on the eastern side of the Arabian Peninsula, just north of where the peninsula turns sharply eastward before dipping down again to the southeast and then around to the southwest toward the Gulf of Aden. The land portion of Qatar itself forms a small peninsula jutting northward into the Persian Gulf. Qatar was part of what was left of the Ottoman Empire until as late as 1916, when it passed under the protection of Great Britain under treaty terms similar to those then prevailing between Britain and the neighboring Trucial States, now the United Arab Emirates. Qatar is now ruled by the al-Thani family, the present ruler being Khalifa Bin Hamad al-Thani. One of the ruler’s sons is Minister of Finance and Petroleum. The capital of Qatar is Doha, situated on the eastern coast. Qatar has land boundaries with Saudi Arabia and the Emirate of Abu Dhabi (across its neck); since disposition was made of the waters of the Persian Gulf following World War II, it has also shared boundaries in the Gulf with Saudi Arabia on the west; the island nation of Bahrain to the northwest; Iran to the northeast and east; and Abu Dhabi to the southeast and south. These boundaries are indicated on the map included herein as Fig. 1.
Oil in significant quantities was first discovered in Qatar in the early 1940s, in an onshore region along the southwestern coast called Dukhan. Offshore exploration began in 1953, when an affiliate of Shell Oil Company was granted the concession of the whole of Qatar’s territorial waters three miles or more offshore, with rights for a limited time to explore for oil and develop any fields found, the profits obviously to be shared with Qatar. Shell made extensive seismic surveys, mapping the contours of the rock formations deep under the seabed in search of the sorts of structural anomalies where oil might have accumulated.
*267
Subsequent drilling disclosed a large oil field at a place called Idd El Shargi in 1960; another at Maydan Mahzam in 1963; and a third at Bul Hanine in 1970. See Fig. 1. Meanwhile a consortium known as Abu Dhabi Marine Areas (ADMA) had discovered a field along the water border between Abu Dhabi and Qatar, called El Bunduq (put on production in 1972). All these oil fields produce from limestone formations laid down in the middle and upper Jurassic periods of the Mesozoic era, some 160 mil
*268
lion years ago. Two groups of strata in particular have been found to be oil-bearing: the Qatar and the Areaj; the former produce from zones more particularly known as the Arab I to Arab IV. See Fig.-2. These are the same zones from which oil is being produced at Dukhan and in Saudi Arabia. Deeper down, a group of strata known as the Khuff (dating from the Permian period) has been found to contain large deposits of natural gas, demand for which has increased in recent years.
*267
*268
Examination of Fig. 2 will disclose that the Qatar formations just mentioned — i. e., the four Arab zones — are overlaid by deposits of anhydrite; beds of anhydrite also separate the four Arab zones from each other. Ex. 78. Anhydrite is the mineral anhydrous calcium sulfate; its significance here is that its presence in the vicinity of the oil-bearing Arab formations may well account for their contamination by hydrogen sulfide, the “particularly vicious”
8
gas that figures importantly in this case. The obnoxious qualities of H2S may be briefly summarized as follows. It reacts in damaging and sometimes dangerous ways with iron and steel equipment that has not been specially treated beforehand. It can react with water to form sulfuric acid, whose highly corrosive nature is familiar to every student of chemistry. Humans can tolerate extended exposure to it only in low concentrations,
viz.,
in the range of 10 to 50 parts per million (ppm) by volume (.001% to .005%); levels in the range of 1000 ppm of H2S in the air (.1%) produce immediate unconsciousness and death. It is heavier than air, so that upon release to the atmosphere it tends to flow to the lowest point, or “ground” level; thus its presence on an offshore drilling rig, for example, cannot be escaped simply by taking to the lifeboats. When burned in air it produces sulfur dioxide which, though not considered toxic, can damage plant and animal life if present in high enough concentrations. Obviously the presence of H2S in the gasses and crude oil coming out of an oil well requires elaborate safety and other precautions; and in any case the H2S concentrations in the oil itself must be reduced to several hundred ppm at most before the oil is saleable. The record establishes that H2S — known as “sour” gas — is present in most if not all of the fields being produced on the Arab side of the Persian Gulf, and that this fact is well known to those working in the petroleum industry in the area. The amount “varies from well to well and from field to field, and in fact, from different zones penetrated by the same well.” T. 3420 (Elson). In the El Bunduq field, near neighbdr of the scene of events here at issue, the H2S concentrations in the gasses produced by the wells are as high as 350,000 ppm (35%); in the Idd El Shargi field to the north they are around 40,000 ppm (4%).
*269
c.
Under the terms of its agreement with the government of Qatar, Shell was required to relinquish from time to time undeveloped portions of its original offshore concession area. This was done in stages whose end result was the division of Qatar’s territorial waters indicated on Fig. 1. In 1969 a Japanese consortium of power companies operating under the name of Qatar Oil Company (QOC) was granted for 35 years the concession of the (roughly) southwestern third of the whole original territory, an area comprising some 2.5 million acres. QOC agreed, among other things, to spend at least $24 million on exploration for petroleum during the first eight years; to pay certain bonuses to the government upon the happening of stated events (e. g., $2 million on signature of the concession agreement; $2 million on discovery of oil in “commercial quantities”); to relinquish fixed percentages of the concession area at stated times; and to pay certain taxes and royalties on profits.
See
Ex. 742, Ahmed report at 2.
QOC spent about eight months, from August 1969 to April 1970, making and analyzing further seismic surveys of its concession area. Seven possibly interesting subsurface anomalies were identified, dubbed “A structure” to “G structure.” Three of these — A, D, and E — in the far eastern part of the area, were found to be located on the same general structural uplift as Bul Hanine to the northeast and El Bunduq very close by, where oil in commercial quantities had already been found. “A” was the largest
*270
structure — it actually appeared to be two-domed — and the closest to El Bunduq; the decision was made to drill there first. QOC contracted with Sedeo for the services for two years of the Sedeo drilling rig “Gusto,” also called “Rig 75;” Amos Carter and Carl Thorne negotiated the drilling contract for Sedeo. QOC began drilling its first well on January 18,1971; its last was completed on January 9, 1973. Altogether, eight wells were drilled, five on the A structure and three elsewhere in the concession area. Three wells, all on the A structure, tested significant amounts of oil; none other did. After having spent about $35 million on the project, QOC decided to go no farther, at least on its own. During 1973 and early 1974 some consideration was given to farming the concession out to another oil company; in this connection Koch Industries, Inc., of Wichita, Kansas, which was already in the petroleum business elsewhere in Qatar, gave strong consideration to taking over. Koch however concluded the undertaking was too risky to justify the large investment required and broke off negotiations with QOC and the government. On March 10,1974, QOC relinquished its entire concession.
It will be useful for future reference to explore in some detail the reasons why QOC and Koch decided not to proceed with further exploration and development of the concession area. These reasons are expressed in a report prepared by QOC in 1973 (Ex. 113) and a report dated January 24, 1974 prepared for Koch by Alexander Erickson (Ex. 115), who also testified (via deposition) at trial.
1. There appeared to be little hope of finding significant amounts of oil anywhere in the area except in the A structure.
2. The A structure and the manner of oil accumulation in it proved more complex than had been expected or hoped. Instead of two local culminations, or likely reservoirs, QOC found four. Oil was found in both the Arab III and Arab IV zones of two of the culminations into which wells were drilled. But even the local behavior of these culminations proved unpredictable. In the north dome, one well (Al) produced only from the Arab IV zone, while another (A4) produced only from the Arab III. In the southwest dome, well A2 produced from both the Arab III and Arab IV. The porosity of the rock — through which oil must migrate toward wells during production— changed erratically especially in the Arab IV zone, leading Erickson to conclude that “the predictability of probable porosity trends [in Arab IV] is essentially zero.” Moreover, bottom water was found in the Arab IV reservoirs, giving rise to the clear danger of “water coning” during production, that is, pulling up water through a well into which oil is not migrating fast enough.
3. QOC concluded that “more wells would be required to be drilled to confirm the magnitude of total original oil in place in Anomaly-A,” and that in any case “the real extention of oil pool was limited and small.”
4. QOC was uniformly disappointed by the “pay” and “porous zone” thicknesses disclosed by the producing wells — that is, by the vertical and lateral extensions of rock from which each well could be expected to produce oil. Low pay and porous zone thicknesses, plus bottom water, tend to mean that many wells are needed to produce reasonably high percentages of the oil in place; they also tend to mean either low producing rates for each well, or short-lived wells, or both.
5. Volumetric analysis of the oil-bearing strata in the north and southwest domes led Koch to estimate the total recoverable reserves at a “probable” 15 million barrels of oil and a “possible” additional 7 million barrels. Such volumes are considered relatively small by Middle East standards. Furthermore, about % of the “probable” reserves were assigned to the Arab IV zone and “are considered high risk because of bottom water and erratic pay development;” Erickson’s report stated that “the actual value of these calculated reserves should be reduced by a comparatively high risk factor.” Erickson testified that he was unable to assign any “proved” reserves to
*271
the A structure based on the data available to him, which included most of the QOC data and the QOC report on the results of its exploration. T. 2147. There are evidently no fixed definitions in the petroleum industry of the terms “proved,” “probable,” and “possible” as applied to “reserves,” but the following definition of “proved reserves” will serve to convey what is meant by this term: “Proved reserves are the reserves that are proved to be present beyond a reasonable doubt,
which can be produced under current economic conditions."
This definition was characterized by Robert Smith of TerraMar as “a good definition.” T. 3612.
6. Wells Al, A2, and A4 produced at the following rates (barrels of oil per day (BOPD)) during flow tests performed by QOC:
9
Well Arab III Arab IV
Al 0 154
A2 2051 1900
A4 1838 0
Al’s rate was low because the well was tested without prior “acidization;” QOC estimated it would have tested at about 2000 BOPD from the Arab IV zone had this been done. Acidization is done by pumping hydrochloric acid down through the well and out into the surrounding rock; the acid cleans and enlarges the pores of the rock, increasing its permeability.
7. Erickson estimated that “four producing wells [the three already drilled plus one yet to be drilled] should be more than adequate to support a[n initial] producing rate of 10,000 BOPD.” The producing rates of wells of course decline over time; how much and how quickly depends on the size and character of the reservoirs they drain and how fast they are made to produce. In making his economic calculations Erickson assumed the estimated initial producing rate of 10,000 BOPD from four wells would begin to decline after one, two, or three years, depending on the volume of recoverable reserves in the reservoirs. The one-year period assumed 10 million barrels recoverable; the two-year period assumed 15 million barrels; the three-year period assumed 20 million.
8. Analyses done for QOC of the effluents of the three wells showed that the concentrations of H2S in the produced gasses ranged between 4% and 7% from the Arab III zones and between 27% and 35% from the Arab IV. One sample from the Arab IV zone penetrated by well A2 showed 60.41% H2S in the produced gasses.
9. Wells Al and A2 had been capped at the ocean floor when the drilling rig had moved on; A4 had been left with pipe sticking up out of the water. If the wells were to be put on production, it was necessary to do something more with them; it was also necessary to provide somehow for pre-sale processing and storage of the oil they would produce. QOC considered two production possibilities: transmission of the oil (presumably through pipelines) to El Bunduq or Idd El Shargi for processing and sale; and installation of independent production facilities at the A structure. Why the first idea was rejected is not clear. As to the second, QOC said the following:
With all the existing data obtained, the Company estimated the amount of oil reserves in Anomaly-A. But the amount turned out to be too small to be developed economically with the independent development system.
At the time this statement was made, sometime in 1973, the price of oil was around $2-$3 per barrel. The statement and the economic study on which it was presumably based confirmed the opinion expressed on March 28, 1972 by Don Canada of TerraMar Consultants, Inc., who had done a study for QOC (before well A4 was drilled) “to provide better definition of the petroleum prospects of the QOC concession by analyzing and combining the seismic and well data.” According to the Canada report:
It is doubtful if the “A-l” or “A-2” structures can be economically produced due to the thin oil columns and small productive areas. The thin oil column
*272
would probably result in production problems due to water coning and also necessitate many development wells. A thorough economic study should be made to determine the feasibility of producing the “A-l” and “A-2” structures. [Ex. 78, p. 00105].
10. In doing his economic study of the feasibility of producing the A structure, Erickson estimated that the total front-end investment required to put the structure on commercial production (using an independent production system) would be around $20 million. This figure included the cost of drilling two new wells ($3.5 million); farm-in and “commercial discovery” bonuses to the government ($1 million and $2 million, respectively) (it was assumed the first new well would qualify the project as a commercial discovery — i. e., raise the production capacity of the field to some minimum); and further development costs of around $13.4 million. The further development costs were for such things as construction of a production platform (presumably over one of the wells) and production equipment capable of processing the effluent of the wells prior to sale of the oil ($2.2 million); construction of tripods or “jackets” around three otherwise unprotected producing wells ($1.5 million); floating facilities (tanker or barge) for storage and sale of processed oil, and the means of anchoring the same ($5.5 million); flow lines from three wells to the production facilities and from there to floating storage ($1 million); and mobilization of the whole venture ($2 million). Erickson estimated it would have taken from one to two years to begin production, essentially all the above costs being incurred before any oil was ready for sale. T. 2154-55. Erickson’s projections were made without regard to the costs of drilling into and testing the deep Khuff strata for natural gas, an operation required by the Qatar government. Erickson estimated that “The required Khuff test could conceivably increase [the] cost another $1-2 million.”
There are several things to be noted particularly about Erickson’s projected front-end “development” costs of $13.4 million. First, they were based on “a fairly detailed, in-depth study prepared by one of our former engineers who was attached to [Koch’s] International Division.” T. 2150. Second, they remain roughly the same whether or not any new well is drilled and put on production: the only savings effected by producing only from Al, A2, and A4 are in the number of protective jackets and the lengths of flow line needed — surely representing less than $1 million. Third, Erickson made his development cost projections without regard to the special problems presented by the high H2S contents of the wells, of which he was aware. Even without the H2S, various other gasses had to be separated from the oil prior to sale; and in Erickson’s view, and that of other experts who testified at trial, a production platform and production equipment, along with floating storage facilities and the rest, were needed in any case if the oil was to be processed and sold from the A structure, H2S only serving to raise the cost of some of these items.
10
Fourth, even if it might have been possible, absent H2S, to cut costs somewhat by installing the production facilities on the storage tanker instead of building a separate (unmanned) platform to hold them, the presence of such large quantities of H2S put this out of the question: it would simply have been too dangerous to the people necessarily on the tanker.
11. Erickson testified that “our preliminary studies indicated that it was economically feasible until we progressed along with the engineering work, when it became evident that it, from an economic standpoint, could be a very high risk project. * * [F]rom an engineering standpoint, why, the reserves were somewhat limited when you compare reserve potential with other fields in the area.” T. 2147. In his study Erickson assumed a market price for crude oil of $11.53 per barrel; the posted price in the
*273
Middle East had by then gone to $12.40. In one respect Erickson proved a poor prophet: he feared oil prices might come down. He recommended that Koch terminate its negotiations for the QOC concession area for two reasons:
a. Uncertainty in crude oil pricing. Economics were based on a posted price of $12.40 (market 11.53). Future crude oil prices will probably be controlled by alternate fuel costs, shale oil tar sands and coal ($7 — 10/bbl.).
b. The minimal reserve potential coupled with high risk will not justify the anticipated front end costs.
D.
The QOC operations generated a lot of information about the A structure and what was to be found there. This and other information related to the potential attractiveness of investing in the A structure was known or available in 1975 as follows.
The history and results of the QOC’s efforts were documented in, among other things, analyses of seismic surveys; daily drilling reports; well logs; pressure buildup studies; pressure-volume-temperature (PVT) analyses; flow test results; and analyses of the composition and character of the effluents of the wells. Copies of these documents, which contained all the basic data on the QOC wells and the reservoirs they penetrated, were kept by QOC in Tokyo, and were probably available from there on some terms; in fact, QOC made the documents available to Koch for Erickson’s 1973 study. Copies were also kept by the Qatar Department of Petroleum Affairs in Doha. Once the concession area was relinquished by QOC and became available for re-letting, it was possible, by persuading the Qatar government that one was either a bona fide independent consultant attempting to interest oil companies in the area or was representing a company already interested, to get permission from the government to sit down with the files and make notes on them. T. 2482. It was well known in the petroleum industry, particularly in the Middle East, that QOC had relinquished its concession; and during 1974 and 1975 at least three independent broker/consultants gained access to the QOC files kept by the government, and using information gleaned therefrom attempted to interest a variety of oil companies in the area. No takers were found.
The fact that Sedeo had drilled the wells for QOC meant Sedeo had independent access to information on them, in two forms. First, as the drilling contractor, Sedeo made out daily drilling reports, on standard forms prepared by the International Association of Drilling Contractors (IADC). These reports, the basis for a driller’s billing to the oil company for which it works, contain information on what is done each day the drilling rig is over a well. Among other things, they indicate the flow rates established during production tests and how a well is left when the drilling rig moves on. Although some question was raised about this at trial, Billy Joe Peterson, Sedco’s rig manager during part of the QOC operations, testified that the daily drilling reports should also contain information on the H2S concentrations in the effluents of the wells. T. 1311. Multiple copies of each report are made out and disposed of per the instructions of the oil company. In the case of Sedco’s work for QOC, one copy of each daily drilling report was given to QOC, one went to the government of Qatar, and one was kept by Sedeo in its office in Doha. Copies of these reports were never introduced in evidence in this case. The evidence supports the conclusion that Sedco’s copies were in Doha at all times material hereto, and the Court so finds. Second, quite apart from the daily drilling reports, there was much information about the QOC operations stored up in Sedco’s collective memory. In particular, even if the exact percentages of H2S in the wells were not recorded on the drilling reports, it is nevertheless certain that the approximate percentages at least were known to the Sedeo personnel on the rig when the wells were drilled and tested, to whom they were contractually required to be disclosed for safety reasons. T. 173 (Amos Carter). The
*274
Court has no doubt that this information was in turn communicated to Amos Carter and Carl Thorne, Sedco’s top men in the area.
See
Thorne depo. at 153. Billy Joe Peterson, who did not work on any of the wells here in question, learned when he came on the scene (to work on the last four wells drilled for QOC) that the H2S concentrations in wells Al, A2, and A4 were as high as 33%. T. 1312-13. Peterson will reappear later in this account.
TerraMar, through Don Canada,' had of course done a study of the petroleum prospects of the QOC concession area in 1972, using seismic information and well data supplied by QOC. This report was on file in TerraMar’s office in Dallas. In addition, TerraMar represented itself as follows in an August 25, 1975 letter from Robert Smith to R. Eugene Holley:
In 1972 personnel of TerraMar Consultants completed engineering studies of all the producing fields in Qatar. TerraMar Consultants has also reviewed for other clients the exploratory prospects of Qatar, both onshore and offshore. . .. [Ex. 8, p. 1],
It is clear that TerraMar knew, or claimed to know, a good deal about the oil business in Qatar, and about the A structure in particular.
There can be no doubt, particularly in view of the high H2S contents of the wells, that elaborate and expensive production facilities were needed if oil was to be produced for sale from the A structure itself. Despite his protestations of lack of familiarity with the “production end” of the oil business, the Court finds that Amos Carter knew this all along, and that Robert Smith of TerraMar realized it once he became aware of the H2S contents of the wells.
11
As to the investments of time and money required to install the required production facilities, it may be said in general that these are very high in the Middle East because of the need to import so much of the materials and so many of the personnel required to do the work. This too must have been well known to Amos Carter and Robert Smith.
III.
A.
Roy Carver was born in a small town in Illinois in 1910. He graduated from the University of Illinois in 1934 with a degree in “general engineering.” He then began working as a superintendent of construction in Davenport, Iowa, and later went to work for a company that was putting in locks and dams on the Mississippi River. In 1938 he went into business on his own, making pumps. During the first years of World War II he made some pumps for use by the British armed forces under contract with the U. S. Army Corps of Engineers; after the United States joined -the war, he was given substantially larger contracts. In 1942 he bought an old sauerkraut factory in Muscatine, Iowa, converted it into a pump factory, and was on his way. Although it has expanded considerably in the meantime, Carver Pump Co. is still headquartered in Muscatine.
In 1958 Carver happened to be in Frankfort, W. Germany, visiting an acquaintance. He noticed something different about the tires on his friend’s car, inquired about it, and learned that the tires were recaps made using a new process and “We get twice the mileage of a new tire.” T. 715. He went next day to see the inventor of the recapping process, and secured the right to exploit it in the United States. The result was Bandag, Inc., engaged in the manufacture of retread rubber and tire recapping machinery. Like Carver Pump, Bandag is headquartered in Muscatine, Iowa and has manufacturing plants there. Bandag is publicly held and traded on the New York Stock Exchange; it is now a worldwide operation, doing business in some 90 countries.
*275
Carver was chief executive officer of both Carver Pump and Bandag until 1968, when he retired to become chairman of the boards of both corporations. He still held these positions at the time of trial. In addition, he was chairman of the board of Carver Tropical Products, a cattle-raising operation in Belize, Central America. After he retired from day-to-day involvement in the affairs of his companies, Carver gave himself over to a life largely of travel, the enjoyment of his wealth, and good works. Although he kept an apartment in Muscatine and maintained his legal residence there and voted there, his “haunts” were “the Cote d’Azure and Miami and the Isles of the Caribbean, places like that.” Carver’s second depo at 237-38. He served however on the board of trustees of Augustana College in Rock Island, Illinois and on the board of the University of Iowa Foundation, a “money-raising institution” for the university. Carver’s first depo. at 13-14. The University of Iowa particularly benefited from his largesse: he made large contributions both to the department of athletics and to the university hospital, whose new wing is called the Carver Pavilion.
Id.
at 28 . In addition, just before he became involved in the oil venture here at issue, Carver had purchased about 340 acres of land in Muscatine which he planned to develop into a park and recreational facility for the city.
Id.
at 27 . It was partly because the costs of this project grew so large (c. $20 million) that Carver decided to go into the oil business in Qatar.
Carver was first interested in the Qatar project through R. Eugene Holley and Amos Carter, at a meeting on Carver’s yacht off Cannes, France, on July 25, 1975. In the process Carver was drawn into a tight little circle of friends and business associates, the details of whose relationships he did not learn until much later.
Holley and Amos
12
had met in 1973 on a flight from Iran to the United States. They had become friends; Amos had helped Holley promote one of his ventures by introducing him to various prominent Middle Eastern businessmen and government officials;
13
and Amos and Holley were themselves in the cattle business together in Texas.
14
Among those to whom Amos had introduced Holley were Ali and Kassem Jaidah of Doha, Qatar, with whom Amos had long been on friendly terms. Ali Jaidah was then director of Qatar’s Department of Petroleum Affairs; he and his brother Kassem operated Jaidah Motors and Trading Company in Doha, with which Sedeo did a good deal of business; and Kassem also acted as Sedco’s agent in Qatar, earning a 4% commission on all revenues taken in by Sedeo from work done in the country.
15
Amos and Kassem were also about to go into business together on their own.
16
*276
During one of his discussions with Holley in the early summer of 1975, Ali Jaidah mentioned that the old QOC concession was open, evidently told him something about it, and suggested that Holley might be interested in investing in its development. Holley indicated he would like to take a look at it, and turned to Amos for advice. Amos must have encouraged him — at any rate, Holley waxed enthusiastic. Amos however warned him that he was not “heavy enough” financially to undertake the project on his own. Holley was then worth $40 to $50 million on paper, although his assets were probably overvalued and were in any case already heavily borrowed against. Holley began looking for a partner willing to finance the venture, through which he hoped to quickly improve his cash flow position; and his thoughts turned to Roy Carver. Holley and Carver had met earlier in the year, when Carver had sold Holley a $3.3 million airplane on easy terms.
17
Believing that Carver was “a very good man to deal with,” T. 1138, and knowing that Carver needed additional funds so he could begin work on his charitable project in Muscatine, Holley decided to try to interest him in the Qatar venture. Hence the meeting in Cannes on July 25, 1975, which Holley initiated and to which he brought Amos (whom Carver had never met).
The substance of the July 25 conversation was memorialized in the form of a recorded and transcribed telephone call that Holley made on August 4, 1975 to Marcella McKillip, Carver’s administrative assistant. Ex. 105. According to Holley, his remarks to McKillip reflected his thinking at the time based on what he had been told by Amos, T. 1196; and Carver testified that Amos told him “exactly” and “almost word for word” what Holley told McKillip on August 4. T. 723-24. The Court finds Ex. 105 to be a faithful reflection of the representations made by Amos on' July 25.
As McKillip said at one point in the telephone conversation, “It sounds absolutely incredible;!’ and Amos certainly did make investment in the A structure sound like an attractive proposition. The crux of his message was that for an investment of roughly $2.5 million it would be possible to uncap the three producing wells drilled by QOC, run pipe down into them, produce them directly into a tanker or barge at a rate of at least 5500 BOPD
18
for five years without any decline in production (with declining production for five to ten years after that), recoup the $2.5 million within the first six months from sale of the oil, and then net about $500,000 a month for a total recovery (in the first five years) of about $30 million on the $2.5 million investment. With minor variations, this (misinformation is what Carver believed and acted on until well into 1976, when he learned otherwise. Amos represented these figures as “conservative” and characterized the wells as “sleepers”
19
and the deal as “one of the finest . . . you’ll find in the Middle East because of the little risk involved” (the wells already having been drilled and
*277
known to produce at certain rates). He explained that QOC had abandoned the wells because “they [were (unnecessarily)] going to run a pipe line out to these wells which were sitting 30 miles off the coast and go to a tremendous expense. Based on the value of oil [when QOC gave up] and the fact that [it’s] not a big producer at all [in] the Middle East [, t]hey determined that they would .. . surrender their lease, which they did.” He evidently said the major oil companies were not interested in the A structure because by Middle East standards “this is a marginal deal. In other words this is a little bit of production.” On the other hand Carver was warned to keep quiet about the deal until it was firmly in hand, for fear that someone else — including the Qatar government — might find out how good it was and steal it away. Carver was given good — and, the Court finds, sufficient — reason to rely on Amos in these matters. He was informed that Amos was a vice president of Sedeo, Inc., “the largest drilling firm in the world;” that Sedeo, Inc. was involved not only in drilling but also in petroleum consulting (through TerraMar); that Amos had long worked for Sedeo in the petroleum business in the Middle East; and that Amos knew a great deal about the QOC concession in particular since Sedeo (under his supervision) had drilled the QOC wells.
20
Moreover, Holley’s opinion of Amos was high: “[L]ike I say I trust Amos Carter with every nickel I got and I’ve known him a good while and I have spent a lot of time with him and I know what he tells me is true.” Amos said nothing about H2S, nothing about the need for costly production equipment, and nothing about the fact that reentry of the wells might prove complicated and expensive in its own right. These were all matters on which he was well informed and which he knew were highly relevant to the investment decision Carver was presented with. The Court can only find that on July 25 (and thereafter) Amos deliberately misrepresented the value of the A structure by affirmatively and knowingly misrepresenting the costs in time and money required to put it on production and by failing to disclose information known to him that was inconsistent with the figures he gave out. At the very least, Amos’s assertions were made with a reckless disregard for the truth of the matters asserted. The Court specifically rejects Amos’s testimony to the effect that he was not aware on July 25 that the A structure was under particularly interested discussion, and that whatever he may have said about it was more in the nature of casual and unconsidered conversation than advice he had any reason to believe would be relied upon. According to Amos, Holley and Carver were just talking about possible Middle East oil deals in general terms, the A structure being one among many possible deals they bandied about. The Court finds, on the contrary, that Amos knew at the July 25 meeting that Carver’s- interest was already focused on the A structure, and that what he said about it was being taken as the advice of a professional in the oil business in the Middle East and being relied on as such. In any case, if Amos didn’t know these things on July 25, he surely came to know them very soon after that; and he didn’t change his tune.
In fact, by the end of the July 25 meeting, Holley and Carver had reached a “gentlemen’s agreement” to actively pursue the right to develop the A structure. The arrangement between them Was roughed out: at Amos’s suggestion they would form an oil company; Holley, using his and Amos’s friendship with Ali and Kassem Jaidah, would contribute the rights to the old QOC concession and Carver would contribute the $2.5 million needed to develop it; Carver’s investment would be repaid out of the first
*278
proceeds (within six months); and “after that, he and I would then divide the V2 million a month — 50% to him, 50% to me.” Before Carver spent any money, however, Holley was to see to it that he was provided with some hard information about the project. Holley was to get this information through TerraMar: “[T]hey know something about this particular thing and I am going to have the benefit of what they do know when I go back over there;” additionally “we [will] get all the data that the country has got on the thing. They’ll give us more information to evaluate it.” Finally, Holley and Carver were to have the help of Carl Thorne, “Amos Carter’s understudy in the Middle East” who “draws Sedco’s contracts with these countries,” when it came time to draw their contract with Qatar. All told, Holley was of the opinion that with Sedco’s help “we have an awful lot going for us.”
B.
The basic fallacy in what Amos told Carver on July 25 was that the three producing wells QOC had drilled on the A structure could be reentered and put on production quickly, for the modest investment of around $2.5 million. Given this, the questions of how much oil could eventually be recovered from the wells, at what daily rates, and on what terms, paled into relative insignificance: any set of reasonable assumptions about these matters based on the QOC well data and likely terms with the government supported the conclusion that the investment was a good one, at worst relatively risk-free and at best extremely lucrative. Between August 1975 and January 1976 Carver was given additional reason to believe Amos’s cost and time projections, and, with one exception, no reason to doubt them. Carver’s commitment to the project — which took shape in much the manner discussed on July 25 — was based ultimately on these projections.
In early August Holley commissioned Robert Smith, president of TerraMar, to write a preliminary report on the QOC concession and two other areas within the territorial waters of Qatar. It was made clear to Smith that the report would be submitted to Carver in an effort to convince him of the attractiveness of investing in the A structure; and in fact Carver saw and relied upon the report.
Smith’s report came out on August 25. Ex. 8. In it Smith gave Carver good and sufficient reason to believe he knew whereof he spoke. Although he warned that “We have by no means complete files on the former Qatar Oil Company concession,” and in consequence “the conclusions reached may be subject to revision as additional data are obtained,” he went on to say that:
In 1972 personnel of TerraMar Consultants completed engineering studies of all the producing fields in Qatar. TerraMar Consultants has also reviewed for other clients the exploratory prospects of Qatar, both onshore and offshore and made a thorough review of the exploratory prospects of the Qatar Oil concession for Qatar Oil Company. By virtue of this background in Qatar we feel that the conclusions reached in this study are valid and represent a reasonable basis for negotiations with the Government of Qatar.
The report itself was a pastiche of information that Smith took from Don Canada’s 1972 report for QOC and that was given to him by Amos. Curiously, although Smith correctly indicated that QOC had drilled a total of 8 wells, he apparently did not realize that A4 — drilled after the Canada report was written — had tested oil. He faithfully reiterated the flow rates of Al and A2 as stated in Canada’s report, and included Canada’s evaluation that the areal extents of the oil accumulations were questionable and the presence of bottom water could prevent sustained production from the wells at the test rates. However, he estimated that a minimum of 3.3 million barrels of oil could be recovered from Al and a minimum of 8 million barrels from A2. And he drastically parted company with Canada’s conclusion (which he did not mention) that it was doubtful whether Al or A2 could be produced economically.
*279
We estimate a capital expenditure of $2,000,000 should be adequate to re-enter and complete both wells, to install flow lines, and to purchase and install a tanker to provide storage for produced oil. Oil would subsequently be loaded on tankers from the captive tanker.
Smith thus confirmed Amos’s basic misrepresentations as to the cost and manner of producing the wells. Included in his report was a series of economic projections based on alternative combinations of assumptions about capital costs ($2 million or $3 million), production rates (6000, 4000, or 2000 BOPD, declined at a rate of 15% annually), and percentages of produced oil accruing to Holley and Carver.
The only case which does not even recover the invested capital is the case of a $3,000,000 investment to be recovered out of 15 percent of the oil from wells having initial potentials of only 2000 barrels of oil per day. Furthermore, it appears that only in the case of a 15 percent working interest project with initial well potentials of only 2000 barrels of oil per day would neither the $2,000,000 nor the $3,000,000 investment meet good investment criteria; that is, yield a discounted cash flow rate of return greater than 10 percent. The effect of doubling operating costs does not alter conclusions significantly although percent profit is decreased and payout times are increased.
In fact, Carver was expecting to recover his investment out of far more than 15% of the oil. And Smith’s bottom line was this:
The re-entry of the QOC wells and production therefrom is an attractive oil field investment. Considerable additional study is warranted but the risk of complete failure is very low in view of the fact that test data have demonstrated production capability of approximately 4000 barrels per day from only one well [A2].
Carver was encouraged when he received Smith’s report. At the end of August he, Holley, and Amos (with others in the party) flew to the Middle East “to talk about this concession and to look into the business aspects of it and check it out.” T. 733. They stopped first in Beirut, where they had dinner at Sedco’s expense with Ali and Kassem Jaidah, Carl Thorne, and some others.
21
This was evidently intended as an opportunity for Carver to meet the Jaidahs and vice versa, and no business was discussed. From Beirut, Carver, Holley, and Amos traveled on to Doha; Amos arranged for Billy Joe Peterson, then Sedco’s general manager for drilling operations on the Arab side of the Persian Gulf, to meet them there. Peterson was introduced as someone who would know the flow rates of the QOC wells, since he had worked on the rig that drilled them. But Peterson had not worked on Al, A2, or A4, and the best he could come up with was confirmation that one well had tested at 4000 BOPD. He and Amos did however describe to Carver the enormous success some oil companies had been having in the area by heavily acidizing their wells to stimulate greater oil production. There was additional information that could have been made available to Carver then and there: Peterson was well aware of the huge amounts of H2S in the QOC wells; and the meeting with Peterson was held only five minutes away from Sed
*280
co’s Doha offices, where copies of the IADC daily drilling reports on the QOC project were on file.
See
p. 273,
supra.
Although Peterson knew Carver was actively considering investing in the A structure, he did not volunteer any of this information; nor did Amos. The meeting with Peterson only served to confirm in Carver’s mind the attractiveness of the venture.
At this point Carver believed he had sufficient corroborative information to permit him to join with Holley in making an offer to the Qatar government, and on September 7 the two submitted a proposal to the Minister of Finance and Petroleum. Ex. 7. They relied on the advice of Amos and Robert Smith in setting the terms of the proposal, which stated that they would work over five wells previously drilled by QOC and drill at least three exploratory wells within a period of two years. They indicated they would be “applying new techniques for realizing commercial production” from the QOC wells — i.e., the massive acidization that Peterson and Amos had explained to them. They said they were willing to enter into a service contract agreement with the government “under mutually agreeable terms currently applied in OPEC countries,” the critical question being how profits from the oil would be split. The terms they expected (apparently via Amos’s discussions with Ali Jaidah), and ultimately got, were that capital and operating expenses would be recovered out of up to 40% of the proceeds from sale of the oil, the remaining 60% to be split 80/20 between the government and themselves.
In anticipation of acceptance of their proposal by the government, Carver and Holley incorporated Holcar Oil Company in the Grand Cayman Islands on October 10, 1975, upon a capital investment of $1,000 each with each receiving fifty percent of the stock.
22
It was understood that the capital costs of the project would be paid by Carver through loans made by him to Holcar. After each of Carver’s loans, Holley was to draft a promissory note to Carver for one half of the amount loaned, each note maturing nine months after date of demand. This facet of the agreement was reduced to writing on January 5, 1976. Ex. 605.
Holcar was formed with Carver’s understanding that although Holcar would be the party contracting with the Qatar government to perform the reentry and workover operations, Sedeo — including TerraMar— would provide the expertise required to carry out this work. In particular, Carver relied on Smith of TerraMar to provide Holcar with technical personnel. Carver testified:
I was assured by Amos that TerraMar could handle all my technical problems. He was going to do everything he could to help me, with his long background in the Near East and drilling wells for SED-CO. No, I wouldn’t have gotten into this thing at all if I thought I had to furnish the technical expertise. I didn’t have that. [T. 786].
Likewise, Holley expected that, “As far as geology was concerned, we were relying wholly on TerraMar. The rig would be manned by SEDCO personnel fully, except for [Holcar’s manager] being there.” T. 1229. Smith was well aware of Holcar’s reliance on him and TerraMar. In a December 16, 1975 memo he wrote, “Holcar has no technical staff whatsoever. They are counting on SEDCO to provide all of the necessary field personnel.” Ex. 56. He wrote Carver and Holley on December 17 and assured them that TerraMar would be able to provide the technical personnel Holcar would need, saying Holcar would have to supply only a manager responsible for overseeing the entire project.
23
Ex. 602.
*281
Even so, Smith indicated that upon request' TerraMar would find someone suitable to manage the operation.
During the latter part of 1975 Smith performed a number of services for Holcar in preparation for the workover and completion of the QOC wells. He prepared a second report on the economic prospects of the ventures; he went to Doha to obtain the additional data on file with the government; he helped Holley negotiate the production-sharing agreement with the government; and he went to London to meet with and answer questions raised by a consulting firm that had (at Carver’s request) performed a cursory examination of the project. Throughout all these endeavors, Smith, by various misrepresentations, succeeded in smoothing the path for Holcar’s ultimate commitment to both the Qatar government and to Sedeo, TerraMar again included.
Smith sent his second report to Holley on November 14. Ex. 83. There is no doubt that Carver received and relied on this report; in any case he, through Holcar, paid for it. Carver believed the report to be based on additional information about the wells that Smith had received since his report of August 25; and there was no indication to the contrary in the second report itself. In fact, the only new data at Smith’s disposal were the terms of the proposal Carver and Holley had submitted to the government, and the expected cost recovery provisions of the yet-to-be-finalized production-sharing agreement. In a cover letter Smith reiterated that “It is certainly obvious that this is a very attractive venture. I believe examination of these data by personnel with the. Ministry in Qatar would be detrimental to your case.” The report itself was based on a series of economic projections supporting Smith’s assertion that “The economics of this project are extremely attractive.” Various producing schedules were created under two sets of assumptions about flow rates and recoverable reserves: one schedule assumed Al and A2
24
would produce at a combined rate of 7500 BOPD with a 15% annual decline and total recoverable reserves of 14.48 million barrels; the other assumed a rate of 6000 BOPD, the same annual decline, and recoverable reserves of 11.58 million barrels. Smith increased the projected capital expenditure from $2 million to $8 million, but it was still understood that Holcar could get Al and A2 onstream at a cost of about $2 million, T. 1376; Smith explained that “The assumption of an $8,000,000 capital expenditure might, for example, represent the unsuccessful drilling of several exploratory wells after production had been developed for the re-entered wells.” He gave the impression that even if he had underestimated the capital costs,
25
there would be little change in his economic projections or his ultimate conclusion about the project’s attractiveness: “The economics of the venture seem relatively insensitive to great changes in capital expenditures, primarily because very high rates of oil production are anticipated and capital recovery is permitted out of 40 percent of the revenue stream.” The only caveat in this report was that the wells might not attain the predicted flow rates; otherwise it reinforced the basic misrepresentations made to Carver.
Smith finally got some genuinely new (to him) data about the wells in late November, when he travelled to Doha (at Carver’s expense) to examine the records on file with
*282
the government.
26
According to Smith, before this he did not know about the massive quantities of H2S in the wells, and accordingly had no reason to doubt they could be put on production in the manner and for the costs in time and money projected by Amos; nor, he testified, did he learn any differently while he was in Doha in November. According to Carver, Smith discovered the true facts in November when he examined the QOC records on file with the government, but deliberately suppressed them. The Court so finds.
Conclusions about the extent of what Smith learned in November 1975 in Doha depend largely on interpretation of Ex. 81, the handwritten notes Smith made as he examined the government files. The Court makes the following findings with respect to Ex. 81: (1) All 13 pages of Ex. 81 were written in November 1975. This finding contradicts Smith’s claim at trial that some of the pages were written in January 1976 when he examined the government documents a second time; but it is consistent with his deposition testimony,
see
T. 3541; and with the fact that all the notes are on identical sheets of paper written upon with what clearly appear to be the same two differently-colored pens. (2) Smith made Ex. 81 in the course of examining documents that clearly indicated that the effluents of wells Al, A2, and A4 included large amounts of various gasses, including large amounts of H2S in particular.
See
T. 3544-47. Thus, even assuming, as Smith claimed at trial, that he was not given access by the government to all the data he would have liked to see, the fact remains that he had access to sufficient data to apprise him of the fact that the wells could not be put on production as simply, quickly, or cheaply as (he knew) Amos had led Carver to believe. (3) When he made Ex. 81, Smith clearly realized and noted that there would be “PROBLEMS WITH GAS!!” Ex. 81 at p. 4163. As he said in explanation of this notation, “Well, there is always going to be gas associated with oil production. In this case because of the reported gas-oil ratios, which were pretty high, we knew that there would be a relatively larger volume of gas than ordinarily one would expect.” T. 3673. It was the problem of what to do with all that gas that Smith was thinking about. (4) Smith testified that even if he had known about the “problems with gas” in November 1975 (which he did), he would not have known about their significance in relation to the production of the wells. The Court finds, on the contrary, that by reason of his education, his experience, and his specific knowledge of the composition of the effluents of the wells, Smith was well aware when he made Ex. 81 that gas, including H2S, would make it impossible to put the wells on production for anything like the time and money or in the manner suggested by Amos.
Smith learned several other significant facts at this time. On the positive side, he finally learned that well A4 had tested oil at a rate of 2160 BOPD from the Arab III zone, and that A2 had once tested 3000 BOPD from the Arab III, whereas his previous data had indicated a highest test rate of 2051 BOPD. On the negative side he learned that whereas Amos had told him that both Al and A2 were “free-standing and live,”
27
in fact both had been plugged with cement and capped at the sea bed, making them more difficult and expensive to reenter and ready for production than Smith had previously believed. T. 1417-23.
There is no doubt about what Smith should have done with all the new information at his disposal: he should immediately have disclosed it to Carver, and urgently suggested that he undertake a thorough reevaluation of the project before further committing himself. This he did not do. Instead he disclosed only the
favorable
information, giving Carver the impression that examination of the government’s data
*283
only further confirmed the belief that, as Smith put it, Carver was privy to “one of those rare opportunities in the Middle East.” T. 2202 (Griffith). Moreover, if it is true (as Smith claims) that he was not given access in November to all relevant information in the government’s possession, he neither disclosed this fact to Carver nor suggested that he hold off until more data could be obtained. Instead Smith proceeded directly to join Holley in finalizing negotiation of the production-sharing agreement with the government.
“Negotiation” of the agreement had proceeded almost exclusively through Amos, who was in close contact with Ali Jaidah throughout the fall of 1975 regarding the Holcar venture. On November 10, Amos sent a telex to Holley “to confirm that Ali Jaidah has discussed your proposal with the ruler and has verbal agreement to same,” Ex. 231; this message was in turn passed on to Muscatine, Ex. 9.
28
One week later Amos telexed Holley that “I am confident no other changes and your future meeting will finalize agreement as expected.” Ex. 231. On November 19 Amos suggested to Holley that he “avoid any direct communication with either Ali or Kassem where possible until agreement finalized.” Ex. 228. It was only on November 25 — after Smith had examined the QOC records on file with the government — that Holley, with Smith to advise him, finally sat down with representatives of the government, led by Ali Jaidah, to talk about the proposed agreement. It is not clear how much negotiating actually occurred at this meeting; it may be that Holley won some concessions on the cost recovery provisions of the contract. Holley depo. at 37-38. In any event, soon after the meeting Holley and Smith flew to London to show the contract to Carver and to meet with the independent consulting firm that had looked into the venture on Carver’s behalf.
Carver had retained Secondary Recovery Services Ltd. (SRS) at the suggestion of the Harris Trust Bank, which had recommended that he obtain a second opinion on the project before proceeding. Evidently first contacted on November 21, SRS was unable to obtain enough information to carry out “even a preliminary study” before meeting on November 30 with Carver, Holley, and Smith; the best it was able to do was to “formulate a number of questions which we would have preferred to see answered before you were asked to commit yourself to a binding agreement with the Government of Qatar.” Ex. 169. These questions, which constituted the only warning Carver received in 1975 that the front-end costs of putting wells Al, A2, and A4 on production might not be as represented by Amos and Smith, included the following:
2. The detailed costs of the proposed re-completing and acidising pro-gramme, which were roundly stated at about one million dollars, per well.
3. The engineering feasibility and costs to produce and to separate produced oil from gas and water and to provide storage and loading facilities. We believe on past experience of Arabian Gulf production that it is very easy to underestimate these costs and there may have to be significant investment before the first sales.
4. Considerable thought must be given to the mechanics of the producing, storage and loading of crude oil and to its disposal and marketing. Although your colleagues have some interesting ideas on marketing the crude, much further thought has still to be given to exactly how this will be done.
But, not for the last time, any doubts Carver may have entertained were immediately and effectively quelled, in this case by Smith:
Mr. Smith told me that these were good questions. They were normal questions that would be asked, to be cautious about, and he was going to very carefully con
*284
sider these questions, . . . and he was going to handle it. [T. 879].
* sis * * # *
He said it was going to cost me two to two-and-a-half million dollars to get on-stream, to get oil flowing, and I assumed that within that parameter that the higher cost would be within the two to two- and-a-half million dollars. It would maybe vary from two million to two-and-a-half million. [T. 879-80].
* * * * * *
Mr. Smith assured me over and over and over again, Mr. Amos Carter assured me over and over and over again, that two to two-and-a-half million dollars was what it was going to cost, and Mr. Smith and TerraMar, a company of wide reputation, of excellent reputation in the oil business, how could I — I assumed that they knew what they were talking about. They were backed by one of the big corporations in the world in the oil drilling business, and they were on the New York Stock Exchange. I wasn’t flattering myself thinking that I should question the judgment of Mr. Carter or Mr. Smith. The reputation was well established. [T. 881-82],
The Court recognizes that the assurances as to costs that Carver mentions in this testimony were probably mostly made before the meeting with SRS; but Smith did not gainsay them at or after the meeting, and there is no doubt that Carver continued, to Smith’s knowledge, to rely on them as well as on Smith’s assurances that he would “handle” all the potential problems mentioned by SRS.
From London, Carver, Holley, and Smith returned to Doha where they met with Amos and Carl Thorne to discuss the production-sharing agreement. It is not necessary to review the terms of the agreement in detail here; suffice it to say that it was much as Amos had led Carver to believe it would be. Holcar agreed to reenter five wells and drill three additional wells during the first two years for a total expenditure during that period of at least $6 million.
29
In return it was to receive 40% of the revenues from produced oil toward recovery of capital expenditures and operating costs, the remaining 60% to be split 80/20 between the government and Holcar. It should also be noted that Holcar undertook to provide the government with detailed plans of its reentry and workover programs and later its development and production programs, and with budgets and statements of account; these matters later became sources of friction. Although the term of the agreement was 30 years from the effective date (the date of signing by the government), the government retained the right “to terminate this Agreement and to take without payment all property of whatever nature” belonging to Holcar should Holcar fail, among other things, to fulfill its work obligations or should it commit “any material breach of this Agreement.” For further details see Ex. 606.
The meeting in Doha to discuss the agreement came to very little. Carl Thorne in particular, who had been said by Amos to know about such things, proved to be of little help in advising on the merits of the agreement because, as he told Holley at the time, it was the first production-sharing agreement he had ever seen.
30
The general
*285
consensus of Smith, Thorne, and Amos seemed to Carver to be that this was a good agreement, and Carver and Holley signed and returned it to the government' on December 2, 1975. That evening Ali Jaidah gave a dinner party for them and Amos at his home. The agreement was eventually signed by the oil minister of Qatar, on behalf of the government, on January 1, 1976.
It remained only to plan in more detail how Holcar’s obligations were to be carried out. Holcar’s officers — Carver, Holley, McKillip, and Rhodes — met on January 2 in the Virgin Islands and again on January 9 in Augusta to discuss such matters with Amos and Smith. One important step taken was the hiring of Bernie Carter, Amos’s brother, as Holcar’s general manager. Bernie possessed a wide range of experience as a management consultant for private and government-operated oil companies, and when the first candidate for general manager suggested by Amos proved unavailable, Holcar hired Bernie at a salary of $9000 per month.
31
Most of the day-to-day burdens of running Holcar fell on Bernie; it was Carver’s understanding that he was “to run our little office we had in Qatar, and to coordinate with Amos and with Mr. Robert Smith the work being done, the re-entry program.” Bernie was also to keep Carver and Holley informed about on-site activities on a daily basis. His contact person in the United States was to be John Rhodes, who was to pass the messages along to Holley and to McKillip, Carver’s liaison in Muscatine. It was agreed that Muscatine would be the record headquarters for Holcar, that billing would be directed there, and that McKillip would pay the bills — except for those few paid directly in Doha — from there. McKillip was to handle financial matters with the assistance of Larry Griffith, Carver’s accountant. For further details on financial matters
see
Sec. V-D,
infra.
The other important step taken during the first week of January was the decision to contract for the almost immediate services of Sedco’s Rig 75 for the purpose of reentering the wells and readying them for production. Amos had anticipated all along that if Holcar got the concession a contract for a Sedeo drilling rig would follow; as early as October 14,1975 he had sent Holley a draft of a standard offshore drilling contract, explaining that one of Sedco’s rigs would soon be available. Ex. 11. After Carver and Holley signed the production-sharing agreement, Amos created a sense of urgency about committing for use of Rig 75 by informing them that three other companies were interested in it, but that he was holding it for them for the moment. Ex. 226; T. 288. At the January 2 Holcar meeting Amos again urged them to decide, giving them 14 days to do so. Carver and Holley acceded, and Amos mailed a draft of the drilling contract to Muscatine on January 7.
32
It provided (among other things) that Holcar would pay an inflated day work rate of $14,500 for the services of the rig and its crew;
33
and that it was without specific duration, allowing Sedeo to proceed on a well-by-well basis at Holcar’s direction
*286
unless and until Sedeo should receive an offer for the long-term use of the rig. For further details
see
Ex. 716. Carver and Holley signed the contract on January 15 in Muscatine and Atlanta, respectively.
34
At Sedco’s insistence, Carver also personally guaranteed payment to Sedeo of any Holcar indebtedness up to $500,000. Carver signed the guaranty under which Sedeo International now sues on January 23, in Chicago. Ex. 355. Although he believed Holcar was fortunate to have obtained the services of Rig 75, Carver had actually been done another disservice. Immediately contracting for the rig forced Holcar to begin operations before proper preparations had been made, and later problems were in part attributable to the haste in which the project was begun.
Carver signed the production-sharing agreement, the drilling contract, and the personal guaranty in reliance upon the representations Amos and Smith had made to him over the course of the past months. He believed he would only have to spend between $2 and $3 million to get oil onstream, and that oil would be flowing and revenue coming in by April 1976. These beliefs were perpetuated by Amos and Smith up through the signing of the drilling contract and the guaranty. Three days before they signed the contract, Carver and Holley received a letter from Smith assuming that “all three wells will have been successfully reentered and placed on production by April 1, 1976,” and estimating that the average monthly net income to Holcar from April to December would be $504,336, a figure nearly identical to Amos’s original estimate on July 25, 1975. Ex. 82-88. On the day before the drilling contract was signed, Amos wrote to Carver about insurance for Holcar: “I assume Holcar would prefer to negotiate this coverage for a three month period initially which should cover the first three re-entry wells. .. . ” Ex. 15.
C.
The first substantial expense Carver incurred in connection with the venture was a payment of $1.5 million to the Swiss bank account of Kassem Jaidah, made on January 6, 1976. The facts surrounding this payment, among the murkiest in the case, are important because the character of the payment, upon which much rides, is very much in dispute. Sedeo claims that it was an illegal payoff knowingly made to Ali Jaidah for the corrupt use of his official position to secure the concession for Holcar; and that even assuming Carver would otherwise be entitled to recovery herein, the illegal payment should bar not only his recovery of the amount of the payment itself (which he claims) but also of the rest of the expenses he incurred in the attempt to exploit the concession thus corruptly and illegal obtained. Carver, on the other hand, claims that the payment was not illegal; that even if it was this fact was fraudulently concealed from him by Sedeo (Amos); and that even if Carver knew or should have known the payment was improper or illegal, this should bar his recovery at most of the amount of the payment itself, but not of the rest of the expenses he incurred. On the basis of the often obscure and conflicting evidence of the facts surrounding the payment, the Court reconstructs events as follows.
35
*287
It has already been observed that QOC paid the government of Qatar a $2 million “bonus” upon the signing of its concession agreement, and that Koch Industries expected to have to pay a $1 million “farm-in bonus” should it decide and the government permit it to take over from QOC. Such front-end bonus payments are regularly provided for in concession and production-sharing agreements between oil companies and OPEC countries. They are in the nature of consideration paid to the government for the right (usually exclusive) to explore for and produce oil within the concession area. There is no question that they are perfectly legal and proper. They are to be sharply distinguished from payments made privately to a government official to induce him to use his influence on behalf of an oil company competing for a concession, or to pay him off for having done so. This distinction, between a legitimate payment for a (presumedly) valuable right and a bribe, is fundamental, obvious, and well entrenched both in our law and the law of Qatar.
See post
at 298-319.
The probability that a bonus payment would have to be made to acquire the QOC concession was discussed from the beginning among those associated with the Holcar venture. The evidence indicates that those involved — Carver, Holley, Amos, Smith — thought, to begin with at least, that the bonus would simply be the normal payment to the government usually provided for by contract as consideration for the grant of the concession. Carver was assured by Amos that such payments were usual and proper. Later in the game, however, the character of the contemplated payment turned definitely shady. The process by which this occurred is obscure; but there is no doubt that Ali Jaidah was at the bottom of it: he saw an opportunity to turn the situation to his own advantage and took it. The upshot was that no provision was made in the production-sharing agreement itself — negotiated principally by Ali on behalf of Qatar — for the payment by Holcar of an official front-end bonus.
36
But as Carver, Amos, and Holley were leaving Ali’s house after the dinner party of December 2, 1975 (the day the production-sharing agreement was signed by Holley arid Carver), Ali held Carver back and invited him into his private office for a short talk; Holley and Amos went ahead to the car waiting to take them back to their hotel. The substance of Ali’s message was this: Ali thought he could induce the Minister of Finance and Petroleum to sign the production-sharing agreement; but to insure this Carver would be required to pay $1.5 million into the Swiss bank account of Ali’s brother Kassem. T. 743f. Ali gave Carver a slip of paper bearing the name of Kassem M. Jaidah, account No. 352 723, Swiss Credit Bank, Place Bel Air, Geneva. Ex. 300. Carver protested — the amount demanded was $500,000 higher than he had most recently been expecting to pay in “front money”
37
— and went to the car to discuss the matter with Amos and Holley. Amos’s advice was simple: If that’s what you have to pay to get the concession, that’s what you have to pay. Amos did suggest
*288
that the payment might perhaps be put off until oil was flowing and for sale. Holley also advised payment. Carver returned to the house and told Ali he was willing to pay the $1.5 million as directed; apparently it was agreed that payment would be delayed at least until the production-sharing agreement was signed by the government. This was done on January 1, 1976. The full $1.5 million, which Carver admitted at trial was “payment for services” purportedly rendered by Ali in connection with the award of the concession, T. 948 — 49, was paid into Kassem’s account on January 6. Carver had been hoping the payment might be put off until oil was flowing, as Amos had suggested, but Ali was apparently not willing to wait that long: on January 5 Amos called to relay the message that the payment had to be made immediately, or the project would “not go forth.” Carver deposited the money in Kassem’s Swiss account by straightforward wire transfer from his account at the Harris Trust Bank in Chicago, and the project went forth.
There is little doubt that the $1.5 million payment was influence money paid to Ali Jaidah by Carver, with Kassem and Amos acting as intermediaries, and was as such illegal under the laws of Qatar and against the public policy of the United States. The consequences for present purposes of this improper payment turn in part on the following considerations.
Carver has implied that he thought the payment demanded by Ali was merely the usual official and perfectly proper front-end bonus that had always been contemplated. The Court believes that Carver’s innocence in the matter was maintained intact — up until the evening of December 2, 1975. At that point the squeeze was applied: Carver was faced, at the last minute, with losing what he believed to be an extremely valuable right that was almost in hand, unless he acquiesced in Jaidah’s demand. There appears to have been no discussion of the propriety of demanded payment on December 2 or thereafter; certainly no such question was raised by Amos. Carver may well have continued to believe, in view of past discussions and Amos’s and Holley’s present advice favoring acquiescence in the demand, that there would be nothing wrong with making the payment. That he did so believe is borne out by the facts that he refused to go along with Amos’s 1977 attempt to cover up the character of the payment,
see
n. 39, infra; that in 1978 he openly mentioned to the United States’ ambassador to Qatar that he had paid “front money” for the concession and was willing to pay more to keep it; and that in the subsequent investigation by the Justice Department Carver made no attempt to conceal any of the facts or circumstances of the payment.
38
Still, however new Carver may have been to the oil business in particular, he was an experienced international businessman; and the difference between an official payment to the government of Qatar in return for the concession, and a private payment to a government official in return for his help in securing the concession, should have been apparent to him, particularly in view of the extremely suspicious circumstances under which the payment was demanded and was to be made. The Court finds that Carver should have known the payment to Ali was improper.
On the other hand, it must be remembered that Carver made the payment because he believed it was necessary to do so to secure a right — the concession — whose value, the Court has already found, was deliberately misrepresented to him by Sedeo, through Amos Carter and Robert Smith. Moreover, Amos’s complicity in the payment itself was close. He unquestionably knew that what Ali was proposing was improper. Yet he did not advise Carver of this fact; he never suggested that Carver insist on paying only an open and legitimate bonus to the government; on the contrary,
*289
he encouraged Carver to agree to pay the $1.5 million bribe and later demanded payment on behalf of Ali; and in 1977 he took steps — with which Carver refused to go along — to cover up the shady character of the payment.
39
Amos’s motives in all this appear to have been complex. Certainly he had an interest on behalf of Sedeo in the furtherance of the Holcar venture, namely, the employment of Rig 75 and of the personnel of TerraMar; and the improper payment, if necessary at all, was necessary to secure Sedco’s interests as well as Holcar’s. Beyond that, Amos had a variety of personal interests in the payment (and later in the concealment of its character) deriving in large part from his friendship with the Jaidahs and his business partnership with Kassem. It is not necessary to go into these matters in further detail.
40
Suffice it to say that through Amos, Sedco’s complicity in the improper payment was at least as great as Carver’s.
Finally, it may after all be doubted whether the improper payment was in any way necessary to the furtherance of the Holcar venture. The whole problem could probably have been dealt with to no ill effect by square confrontation, Carver insisting on paying at most a legitimate front-end bonus to the government. In any case, the production-sharing agreement was signed by the Qatar Minister of Finance and Petroleum before the payment was made; and there is no evidence that the Minister knew anything about it, benefited from it in any way, or considered the proposed agreement otherwise than on its merits as written. These considerations do not mitigate the fact that the improper payment was made; but they do bear in some measure on the severability of this fact and of its consequences from Carver’s main causes of action against Sedeo.
IV.
Holcar’s operations began in late January 1976. Bernie Carter arrived in Doha on around January 18, as did Robert Smith. Bernie began assembling men and materials and making other necessary arrangements; on January 24 he telexed Carver’s headquarters in Muscatine to report that with the addition of one extra person whom he requested (and was granted) permission to hire, “our staff will be lean but fit and completely adequate to operate efficiently through coming months.” Ex. 596. Smith again examined the QOC records at the Department of Petroleum Affairs. On February 5, Amos telexed Muscatine “to advise I am in Doha reviewing work program with Bernie and Smith. They have
*290
everything ready to start work on well A-2 when possible to move rig.” Ex. 22. Rig 75 arrived at A2 on February 8. Things went downhill from there.
A.
Rig 75 was to be used to reenter and “rework” wells Al, A2, and A4. The two wells capped at the ocean floor were to be “tied back” to the surface; cement plugs put in by QOC were to be drilled out and the wells cleaned out; casings were to be tested, and production tests done; and the wells were generally to be left in such condition that oil would flow from them into any production equipment it might prove necessary to install at the surface. Much of the work — e. g., cementing, acidizing, testing — was to be done by third party contractors, but always under the supervision of Bernie Carter and of Holcar’s rig supervisors, the persons in charge of operations at the well site. Holcar’s technical staff, which planned the work programs and supervised their execution, was supplied for the most part by TerraMar.
See
Ex. 440.
One expert who reviewed Holcar’s reentry and workover operations called them “a comedy of errors,” Carver-Freeze Ex. 1; and this view was also taken by other experts who testified at trial. Part of the problem was that Holcar rushed into the workover program without adequate planning or preparation. Despite Bernie’s January 24 telex to Muscatine, Holcar’s staff in Qatar was probably inadequate. Similarly, operations were begun without proper and complete equipment. Certain required tools and tubing were not on hand and proved difficult to obtain quickly; sufficient spare parts had not been assembled; and some equipment used was not properly treated to withstand destruction by the high quantities of H2S in the wells, which was clearly known to Holcar’s technical staff before work began. The services of third party contractors were sometimes badly scheduled and themselves of poor quality. These sorts of problems, which plagued and delayed operations throughout, were at the heart of Bernie’s despairing telex to Robert Smith of April 8, 1976, when Rig 75 had already been over A2 for two months:
DUE TO REPEATED FAILURES OF OTIS GS (GOLF SIERRA) WIRELINE PULLING TOOLS IN H-2-S THE OPERATIONS HAS NOW BEEN SHUT DOWN FOR OVER 36 HOURS AND I DON’T KNOW WHEN IT CAN RESUME THE OPERATIONS.
‡ >ji # jjc $
OTIS/BAHRAIN ADVISES THEY WILL ACCEPT NO RESPONSIBILITY OR LIABILITY FOR ANYTHING WHICH MAY OCCUR DUE TO OPERATING WITH NON H-2-S SURFACE EQUIPMENT. THEY ADVISE TO MOVE OFF WELL UNLESS WE CAN FIND H-2-S SURFACE EQUIPMENT. FLOPETROL/BAHRAIN IS TRYING TO ASSIST. ARE SENDING BY AIR THEIR H-2-S LUBRICATOR. JUST HOPE IT FITS.
FOR YOUR INFO THE ARAB 4 H-2-S CONTENT IS 31.35 PERCENT.
FOR YOUR FURTHER INFO, OTIS/BAHRAIN/D ALLAS TELEXED THAT NICHOLS AND MCELROY[
41
] ORDERED THIS STUFF AS STANDARD REPEAT STANDARD WHICH IS NOT FOR OVER 5 (FIVE) PERCENT H-2-S. I GIVE UP.
GET HOLD OF OTIS AND SEE WHAT YOU CAN DO. RING AMOS AND EXPLAIN MESS TO HIM SO HE WILL KNOW DETAILS AND CAN DEAL with john;[
42
] tell amos i am DOING EVERYTHING POSSIBLE UNDER THE WORST CONDITIONS I’VE EVER SEEN. NO USE CALLING ME AS I AM INCOHERENT.
BARR, MITCHELL, LAMOREAUX, AND KERR ON RIG TRYING TO GET
*291
TEST AND HOLD THE PIECES TOGETHER. [Ex. 245].
Beyond problems with tools, equipment, third party contractors, and sometimes the weather, however, the evidence is strong, and the Court finds, that the work program itself was badly planned and executed by Holcar’s own technical staff. The crux of the matter is that far more complicated, repetitive, and time-consuming work-over procedures were used than were necessary to the completion of the wells, but at the same time the production testing procedures used were inadequate to establish reliable production rate figures. For details
see
T. 1599-1625 (Luck); T. 1983-87 (Crow); T. 547-52 (Charles Smith); T. 2523-27 (Brennan); Carver-Freeze Ex. I.
43
The net effect of all the problems was that six months were consumed where three at most should have been sufficient; in the end, although between $7 and $8 million had been spent on reentries and workovers alone (which cost between $40,000 and $45,-000 per day), none of the wells was left ready to begin production without further workover; excessive acidization and related procedures were carried out to the probable detriment of the ultimate producibility of the wells; the production tests done were inadequate for predictive purposes both because they were too short and because it was often not clear what zones were being produced or whether there was impermissible communication between zones; the tests done on Al, insofar as they were useful at all, simply confirmed what had long been known, that because of the limited reserves and high water content of the well it would probably not be worth the money required to put it on production; and A2, the best producer of the three, was probably “junked,” i. e., put and left in such bad condition during the three months spent on it that it would be cheaper to drill another well than try to complete A2’s workover and produce it. In short, when Rig 75 left Al on August 6, 1976 for rental to another customer, Holcar had little to show for the considerable amounts of money that had been spent.
Cf.
Carver-Freeze Ex. 1.
One of Carver’s defenses to Sedeo International’s claim against him for monies due and owing under the contract for Rig 75’s services is that “Plaintiff charged for work not properly done or completed.” The Court has no doubt that much of the work on the wells was not properly done or completed; but it is less clear that fault for this is attributable specifically to Sedeo International, the lessor of Rig 75, as opposed to TerraMar, certain third party contractors, and perhaps Bernie Carter; and the Court does not construe the counterclaim defendants’ agreement to stand together in respect of any judgment rendered on the counterclaim, to extend to Carver’s defense of improper and incomplete workmanship against Sedeo International’s claim against him. Even considering Amos Carter’s intermittent involvement in the workover operations, the Court finds little evidence that Sedeo International itself was responsible for the problems Holcar encountered during the reentry and reworking of the wells.
In keeping with the pattern of misrepresentation that pervades this case, the true state of affairs at the well sites was never fully disclosed and was sometimes affirmatively misrepresented to Carver during the workover period. For example, on April 8, the date of Bernie Carter’s despairing telex, Amos called John Rhodes to “deal with” him as Bernie had suggested. Amos’s false message, which was in substance relayed to Muscatine, was that “Bernie has a set of the necessary wireline parts on the rig now and these are being installed;” that “with the parts now on the rig, the tests will take
*292
about three days to complete” (Rig 75 remained on A2 for 26 more days); and that “things are looking great.” Exs. 246 and 247. On May 27, during a conference call in which both Carver and Robert Smith took part, Carver expressed the belief that “We have something like 9,000 barrels a day that is ready right now to be sold.” Smith, who knew that none of the wells was then in condition to produce oil, did not disabuse him. Ex. 427. On July 12, Smith wrote to Holley, in a letter a copy or the substance of which was probably passed on to Carver, to say that “The successful re-entry
and completion
of Wells A-2, A — 4 and A-l has proved producing rates which are listed [totalling 12,022 BOPD].” Ex. 84-3; emphasis added. Carver did not learn until the summer of 1977 that all the wells would require further workover before production from them could begin, or that A2 had probably been junked. He was undoubtedly aware during the workover period that many problems had been encountered, but he was consistently assured that work was on the whole proceeding satisfactorily and that oil could be flowing any day, i. e., once production facilities were in place.
B.
Holcar’s greatest crisis during the first half of 1976 did not derive from operational problems at the well sites; it arose from the “discovery” that production facilities costing tens of millions of dollars and from nine months to a year to install would be required before any oil could be sold. This problem was dealt with as follows.
Bernie Carter knew almost as soon as he arrived in Doha that production of the oil would not be as simple and straightforward as Carver had been led to believe. He was quickly told by Robert Smith about the large quantities of H2S and other gasses in the wells; and by January he was discussing with Amos the need for separation and other production equipment, protective well jackets, and expert consultants to help with production facilities design. Ex. 233. The firm brought in was Earl and Wright Consulting Engineers, another wholly-owned
subsidiary of Sedeo, Inc. Bernie, Amos, and Smith quickly met in Doha with Jack Meld-er, an Earl and Wright representative; on February 12 Melder telexed his headquarters in Houston to say that Bernie had authorized Earl and Wright to spend $2000 to conduct a preliminary investigation of Holcar’s production problems. Ex. 432. On February 19 eight Earl and Wright personnel met in Houston to discuss the matter; the initial focus was on Holcar’s desire, as expressed by Amos and Bernie, to “get well A2 onstream as soon as possible with a temporary early production system,” with later installation of a “ ‘permanent’ [unitized] floating production and storage facility to produce three wells.” Ex. 143-1. By February 25, Earl and Wright had put together a preliminary report, Ex. 160, which was presented to Carver and Holley that day at a meeting in Atlanta, Georgia. The report emphasized the seriousness of the H2S problem and discussed the pros and cons of three possible production systems, the second two of which involved unitized floating production and storage facilities:
Case 1 consists of developing the three wells by locating a 4-leg structure adjacent to each existing well. Minimum separation equipment will be placed on single-deck structures Al and A4. The majority of the produced gas at these locations will be separated and flared. The product will then be piped by sub-sea pipeline to the structure at A2, where the production of Al, A4 and A2 will be combined, processed to saleable quality, all separated gas flared, and the sales crude pumped through a sub-sea pipeline to the storage vessel. The A2 structure is a 2-deck platform with flare boom.
Case 2 is similar to case 1 with the exception that minimum separation is achieved at all three well locations. The production from Al, A2 and A4 is combined at the storage vessel where the final processing is accomplished pri- or to product storage. Flaring of the final separation gas is required at the storage vessel, which presents a significant personnel hazard.
*293
Case 3 was discarded as a viable alternative after considerable deliberation. All aspects were considered, and it proved to be a greater risk than warranted. Three similar tripod structures would be installed — one at each well location. These would serve merely as well guards, and a work platform for wireline operations. All production would be piped by subsea pipeline to the processing facilities located on the storage vessel. All processing would be performed on the vessel, and a fourth tripod structure would be required as a flare for produced gas. This presents an extreme hazard to operating personnel both working and living on the storage vessel.
Earl and Wright unequivocally recommended that the Case 1 system be adopted. This recommendation was based on two main considerations: the Case 1 system presented the fewest hazards to personnel and was environmentally the soundest; and “[t]he costs of each development plan compared favorably with one another, so the selection of the recommended plan was based on overall field development plan desirability.” It was estimated that installation of the system would cost between $13 and $14 million and take nine months from the time work was begun.
44
Earl and Wright also investigated the costs of (initially) putting A2 only on production; these were estimated at $9 million and six to seven months. These figures did not include the separate costs of reentering and reworking the wells. The evidence in the record overwhelmingly supports the conclusion, and the Court finds, that no significant savings of time or money could have been achieved by proceeding otherwise than as recommended by Earl and Wright on February 25.
The February 25 meeting should have been a critical event in Holcar’s history. At the time of the meeting at most $2.5 million had been committed to the venture, including the $1.5 million payment to Ali Jaidah and reentry costs incurred to date. At the meeting Carver was in general made aware of the previously undisclosed H2S problem
45
and that in Earl and Wright’s opinion, at any rate, he would have to invest $13 to $14 million and nine months in completely unforeseen costs to bring the venture to fruition, on top of whatever it might cost to complete the reentry and workover of the wells. This was the first time Carver was given anything like a true estimate of the magnitude of the venture he had undertaken. Yet after the meeting Carver did not call a halt, or even a pause, for reconsideration of the venture. Instead the reentry and workover program was allowed to continue, and Earl and Wright was commissioned (among other things) to do a further study of its Case 1 system. The question arises whether by electing to proceed as he did Carver did not in effect waive the misrepresentations on the basis of which he had been induced to join the venture in the first place. Deciding to pour -$15 to $20 million of good money (including further
*294
workover costs) after $2.5 million of bad could hardly be characterized as a reasonable attempt to mitigate damages already incurred when the fraud was discovered.
The fact is that Carver was faced with no such clear-cut choice at the February 25 meeting. The meeting itself was bifurcated: Amos Carter first met for about an hour with Carver, Holley, McKillip, and Rhodes; during this time Bernie, Robert Smith, and Walt Elson, the Earl and Wright engineer who was to present the Earl and Wright report to Carver and Holley, were kept waiting in another room. Amos had had advance notice of the contents of the report: it had been discussed at a meeting in Houston the previous day attended by Bernie, Smith, Elson, McKillip, and Rhodes; and Amos had flown to Atlanta from Texas with this group. By the time Elson was called in to make his presentation, Amos had already discussed the Earl and Wright report with Carver and Holley. Prior and subsequent events support only one conclusion about what he said: he discredited the report, minimized the H2S problem it made so much of, and convinced Carver that sale of oil from the A structure could begin much sooner and for a much smaller investment than Earl and Wright projected. The result was that Carver did not have ears to hear what Elson said to him, and he came away from the meeting believing essentially what he had believed when he went in. There is sufficient' proof of this in the fact that as late as May 27 Carver still believed the effluent of the wells could be pumped straight into barges and transported to market. Ex. 427. With the exception of Elson,
see
T. 3124, no one who attended the meeting — not Amos, or Bernie, or Robert Smith in particular — advised Carver to suspend the reentry program and undertake a complete reevaluation of the venture in the light of the crucial “new information” that had become available; on the contrary. The February 25 meeting, which should have been pivotal, was not. The misrepresentations underlying Carver’s participation in the venture were successfully concealed, and their force and effects continued unabated.
Following this meeting, concentrated efforts were undertaken to find some quick, cheap production solution. The services of Earl and Wright were retained; Elson was dispatched to the Middle East to look into the possibilities. He understood his primary mission to be the investigation of the quickest possible means of implementing the Case 1 plan recommended by Earl and Wright. To this end he searched for suitable used equipment and for companies in the Middle East capable of fabricating and installing equipment, including fixed platforms, on short order; and he checked into the availability of surplus tankers in the area. The possibility of using Rig 75 to erect the platforms, rather than a heavier and more expensive derrick barge, was briefly considered but rejected. Other plans than Earl and Wright’s were also looked into. One was piping the effluent of the wells to El Bunduq or Idd El Shargi for processing and sale — the same idea rejected by QOC several years before. Holcar rejected it partly for technical reasons (deriving from the water cut in the well effluents), partly because no savings would have been effected, and partly (in the case of El Bunduq) because of the political difficulties attendant on piping the raw effluent into another country (Abu Dhabi). As late as May 10 Amos was still promoting the use of barge-mounted production facilities,
see
Ex. 715, an idea to which Earl and Wright remained adamantly opposed because the savings in time and money were insignificant and the risks unacceptable. Finally, Bernie suggested the use of used “jack-up rigs” rather than fixed platforms for the support of the production equipment. This idea survived into early 1977.
On Elson’s return from the Middle East, Earl and Wright prepared a second, more detailed “Field Development Facilities Study for Holcar Oil Company,” which included a “Tanker Survey Report” and a “Mid East Survey Report.” Ex. 159. The conclusions therein drawn confirmed the report of February 25: (1) “[A]n ‘early-on’ system is not a viable solution for the development of Well A2. All the necessary pro
*295
duction equipment is not readily available. The specialized pieces of equipment which would have to be fabricated have deliveries which would cause the installation schedule for the ‘early-on’ system to closely duplicate that for a permanent installation.” (2) Installation of a minimally acceptable system for the production
only
of Al and A2 would take about $13.4 million and
11
months. (3) Installation of an adequate system for the production of all three wells would take $15 million and at least a year. This second Earl and Wright study recommended the adoption of one or another system depending on the final results of the flow tests being done on the wells, and included schematic drawings of the alternative production systems and the platforms on which they would be located. Earl and Wright considered the study to be “strictly a report. It was not a design.” Kirkpatrick depo. at 189. Further detailed design work remained to be done, once a definite plan was adopted, before equipment could be purchased and contracts let for the installation of a production system.
The second Earl and Wright report was sent to Bernie Carter on April 22; it finally reached Carver in late May, coming, as he said, “out of the blue sky.” For the first time, in conference calls made on May 26 and 27 (Exs. 431 and 427), Carver dealt directly with Earl and Wright (with Robert Smith also taking part on May 27). Although he “started out on a very high plan of ass chewing,” Ex. 434, finding “the preliminary study you made completely unacceptable” and demanding “an immediate solution to this problem” so that “we can get the oil [to market] that we have now,” Carver was apparently finally impressed after considerable discussion that “very optimistic[ally] it would take you nine months [and] it will probably take you twelve; and very optimistically it is going to cost you fifteen million dollars. It is just that kind of a problem. It is not a three month, million dollar problem.” The May 27 call ended with Carver’s promising to get back to Earl and Wright after consulting Holley. In an immediately following conversation between Robert Smith in Dallas and Earl and Wright personnel in Houston, Ex. 427 at 7 — 11, the participants congratulated themselves on having finally “got his attention;” “I think he finally has gotten the message[.]” They also reflected on what had been going wrong:
Smith: [W]e have had a lot of input from the outside too which has always gotten us sidetracked.
Kirkpatrick: He sounds to me like someone who has been given some other advice and he has let himself get it because it matched his interest, and he sounds to me like someone a little bit confused, he has gotten conflicting advice now and he doesn’t know quite what to do.
Smith: I think that is right. He has been sheltered a bit by the Carters and also by Gene Holley .[
46
] * * * * * *
Hays [president of Earl and Wright]: Obviously, he is an industrialist, he is not dumb, and it looks to me like if someone could sit with him, and he doesn’t have time to go through that damn volume himself and he doesn’t have anyone else competent to make a reasonable recommendation or a reasonable evaluation, or if they are competent, they’re going to protect their ass because they have told him other things.
Smith: Yeah, well, that’s the whole problem in a nutshell.
* * * # * *
Smith: [E]very time we have bowed our necks to the floor, well Walt [Elson] went through this, in Atlanta in February, it’s already too late, he has already been given some other information which says, there is some hope, we can do temporary facility work.
* * * * * *
*296
Smith: . . . But this is the first time where there hasn’t been someone in on the conversation that would say “Oh yeah Roy, we can do that.”
Kirkpatrick: Or [“]there is a chance we can do this.[”]
Smith: Because as soon as he gets that part, then we don’t talk about the problem anymore, we concentrate on how we are going to cut the corners.
Smith did not reveal his continuing role in deceiving and confusing Carver.
The self-congratulations of May 27 were premature. Before Carver got back to Earl and Wright, he talked with Amos; and Amos once again succeeded in discrediting Earl and Wright. He told Carver that they always over-engineered things; that they were in the habit of designing “Cadillacs” where “Fords” would do; that “Earl and Wright are not to be believed;” and that “I [Amos] can get it done for a lot less. Just trust me, and don’t pay any attention to Earl and Wright’s report. I will get it done for a very realistic amount. Give me a chance, and I will do it.” T. 752; cf. T. 1247-48 (Holley); T. 1851 (McKillip). When Carver called back to Earl and Wright on June 7, it was only to say that Amos had brought in one Nick Popich of International Marine Services
to implement [Earl and Wright’s] designs to fabricate, install, and start up equipment to produce the oil from the field— possibly on a lease basis — for Holcar. Mr. Popich has held out the possibility of implementing these plans and finalizing the installation within a period of six months. [Ex. 715].
Earl and Wright’s further participation in the venture was cut to a minimum, and Amos, Popich, and Bernie began to assemble odds and ends of

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---