# Matter of Metro-North R.R. Collision at Valhalla, N.Y. Feb. 3, 2015

> New York Supreme Court, Westchester County · December 8, 2022

URL: https://www.frixlaw.com/law-library/cases/11473324

## Case

- **Court:** New York Supreme Court, Westchester County
- **Decided:** December 8, 2022
- **Precedential status:** Unpublished
- **Opinion:** Opinion
- **Cited by:** 0 later opinions in the Frix Law Library

## Citator (automated)

- No negative treatment found by the automated citator. That is not the same as a confirmation that the case is good law; read the citing cases.
- Full citator and citing cases: https://www.frixlaw.com/law-library/cases/11473324

## Opinion text

Matter of Metro-North R.R. Collision at Valhalla, N.Y.
Feb. 3, 2015
2022 NY Slip Op 35193(U)
December 8, 2022
Supreme Court, Westchester County
Docket Number: Index No. 64924/2015
Judge: Lewis J. Lubell
Cases posted with a "30000" identifier, i.e., 2013 NY Slip
Op 30001(U), are republished from various New York
State and local government sources, including the New
York State Unified Court System's eCourts Service.
This opinion is uncorrected and not selected for official
publication.

file:///LRB-ALB-FS1/Vol1/ecourts/Process/covers/NYSUP.64924-2015.WESTCHESTER.024.LBLX038_TO.html[07/02/2026 3:46:27 PM]
FILED: WESTCHESTER COUNTY CLERK 12/08/2022 02:28 PM INDEX NO. 64924/2015
NYSCEF DOC. NO. 788 RECEIVED NYSCEF: 12/08/2022

SUPREME COURT OF THE STATE OF NEW YORK
COUNTY OF WESTCHESTER To commence the statutory time
period for appeals as of right
(CPLR 5513[a]), you are
advised to serve a copy of
this order, with notice of
entry, upon all parties.

PRESENT:
HON. LEWIS J. LUBELL
JUSTICE OF THE SUPREME COURT
. .
--------------------------------------------------------------------

IN RE METRO-NORTH RAILROAD
COLLISION AT VALHALLA, NEW YORK' DECISION & ORDER
FEBRUARY 3,2015 Index No.: 64924/2015

----------------------------------------------~---------------------
Defendants Metropolitan Transportation Aut40rity, Metro-North Commuter
Railroad, Argent Ventures, LLC, Midtown TDR Ventures LLC, and Steven Smalls move
(MotiOli #31) for summary judgment, dismissing certain state law claims ._

The following papers were read:
Notice of Motion, Affirmations (2),and E~ibits (43) 1-46
Affirmation in Opposition and Exhibits (10) 47-57
Affirmation in Opposition 58
Affirmation in Reply and Memo of Law 59-60

By way of background, on February, 3, 2015, at approximately 6:30'p.m.,
locomotive engineer Steven Smalls was operating a train (Train) northbound on the Harlem
Line of the Metro-North Railroad and collided (Accident) with a motor vehicle (SUV),
which was operated by Ellen Brody;, tha~ was on the train tracks at their intersection with
Commerce Street, Valhalla, New York (Commerce Street Crossing). Subsequently, the
National Transportation Safety Board (NTSB) performed an investigation and issued
various reports. After the Accident, various actions were commenced. One of these actions
was commenced by Steven Smalls ~gainst Alan Brody, as Administrator of the Estate of
Ellen G. Brody, and several others named Steven Smalls as a defendant. All'of these
actions were ultimately consolidated for joint discovery .and JOInt trial on liability. 'Now,
defendants Metropolitan Transportation Authority (MTA), Metro-North Commuter
Railroad (Metro-North), Argent Ventures, LLC, Midtown TDR Ventures LLC, and Steven
Smalls (Smalls) (collectively, defendants) move for summary judgment as to certain claims
asserted by plaintiffs.

1

1 of 9
[* 1]
FILED: WESTCHESTER COUNTY CLERK 12/08/2022 02:28 PM INDEX NO. 64924/2015
NYSCEF DOC. NO. 788 RECEIVED NYSCEF: 12/08/2022

Defendants' Contentions

Initially, defendants proffer evidence that the speed limit for the Train in the subject
area was 60 mph and that the Train, at all times relevant to this action, was traveling within
the 60-mph speed limit. Defendants proffer evidence that the crossing before the
Commerce Street Crossing was a crossing at the intersection with Lakeview Avenue
(Lakeview Avenue Crossing) and that the distance between the two crossings was
approximately 1,800 feet. Defendants note that Smalls testified that, at some point after
passing the Lakeview Avenue Crossing, he observed a reflection on or near the tracks at
the Commerce Street Crossing. Defendants note that Smalls testified that, when he realized
that the reflection was a vehicle, Smalls put on the emergency brakes, which occurred about
230 feet before the collision with the SUV. Defendants proffer evidence that, after the
Train struck the SUV, the Train and SUV continued to travel north along the tracks and
came to a stop about 665 feet north of the Commerce Street Crossing. Defendants proffer
evidence that, while the Train and the SUV continued to travel north after the collision, the
third rail that was located on the west side of the track penetrated through the SUV and
into several cars of the Train. Now, defendants contend that five of plaintiffs' claims are
preempted by the Federal Railroad Safety Act (FRSA), 49 USC S 20101 et seq.

First, defendants assert that plaintiffs allege in the supplemental bill of particulars,
dated July 15,2021 (NYSCEF Doc. No. 584, p.2), that the Train should have braked and
slowed down when an "unknown object" was first observed by Smalls as he approached
the Crossing. Regarding this allegation, defendants assert that plaintiffs have not cited a
federal safety regulation, order, or internal standard adopted pursuant to a federal safety
regulation. Defendants note that the Train was traveling within the 60-mph speed limit and
thus, defendants contend, any claim concerning excessive speed is preempted. Defendants
acknowledge that there are two exceptions to this conclusion, the first being an "essentially
local hazard" and the second being a "specific individual hazard." As to the "essentially
local hazard," defendants contend that a car on the tracks does not qualifY as such a hazard,
as that phrase is used in the FRSA. As to the "specific individual hazard," defendants
contend that this exception is limited to an imminent collision, such as with a car stuck on
the tracks. However, defendants contend, the mere presence of a car on the tracks does
not, by itself, constitute a threat of an imminent collision. Defendants contend that Smalls
did not have any duty to initiate any emergency procedures until he realized that there was
something on the tracks that either would not or could not move away from the tracks.
Defendants assert that a locomotive engineer can assume that the operator, once alerted to
an oncoming train, will take reasonable measures to remove the vehicle from the tracks.
Defendants assert that a locomotive engineer is also obligated not to indiscriminately
employ the emergency braking procedures. Defendants assert that Smalls complied with
these obligations in that he maintained the Train within the 60-mph speed limit; he properly
sounded the Train's horn as it approached the Lakeview Avenue Crossing and the
Commerce Street Crossing; when he observed a reflection on the tracks at the. Lakeview
Avenue Crossing, there was time for the object (that he testified he could not identifY) to

2

2 of 9
[* 2]
FILED: WESTCHESTER COUNTY CLERK 12/08/2022 02:28 PM INDEX NO. 64924/2015
NYSCEF DOC. NO. 788 RECEIVED NYSCEF: 12/08/2022

move from the tracks; and once Smalls realized that there was a vehicle on the tracks
(approximately 230 feet from the Commerce Street Crossing), he initiated the emergency
brakes.)

Second, defendants assert that plaintiffs may allege that defendants' warning
systems at the Crossing did not provide adequate warning of an oncoming train. Regarding
this potential claim, defendants assert that plaintiffs have not cited a federal safety
regulation or internal standard adopted pursuant to a federal safety regulation. Regardless,
defendants contend that the evidence demonstrates that the crossing gates operated in
compliance with federal regulation.

Third, defendants assert that plaintiffs may allege that Smalls negligently used the
locomotive horn, that claim should be preempted. Regarding this allegation, defendants
assert that plaintiffs have not cited a federal safety regulation, order, or internal standard
adopted pursuant to a federal safety regulation. Regardless, defendants contend that the
evidence demonstrates that Smalls complied with federal regulations regarding the use of
the Train's horn. .

Fourth, defendants assert that plaintiffs alleged in the supplemental bill of
particulars, dated July 15, 2021 (NYSCEF Doc. No. 584, at pages 1-2), that "Smalls was
inadequately trained and should have received specific training on how to respond to an
unexpected presence on the tracks of a person, an animal, or a vehicle." Regarding this
allegation, defendants assert that plaintiffs have not cited a federal safety regulation, order,
or internal standard adopted pursuant to a federal safety regulation. Defendants assert that
there are comprehensive federal regulations relating to the qualification and certification
of locomotive engineers (see, e.g., 49 CFR S 240.1 et seq.), which, defendants contend,
substantially subsume any state law claim plaintiffs might wish to pursue.

. Fifth, defendants assert that plaintiffs allege in the supplemental bill of particulars,
dated April 26, 2021 (NYSCEF Doc. No. 653, at page 2), that the Train was not
crashworthy because Metro-North failed to have protective devises and a design that would
adequately protect the third rail from penetrating the front of and under the Train car as the
result of a collision or derailment. Regarding this allegation, defendants assert that
plaintiffs have not cited a federal safety regulation, order, or internal standard adopted
pursuant to a federal safety regulation. Defendants assert that there are comprehensive
federal regulations relating to the crashworthiness of the Train (see, e.g., 49 CFR S 238.1
et seq.), which, defendants contend, substantially subsume any state law claim plaintiffs
might wish to pursue.

I Defendants variously make reference to: putting the Train "into emergency," initiating/activating/pulling/applying
the "emergency brake," taking "emergency action," and the "emergency application." Defendants do not explain
whether there is any difference between these operations. As any potential difference does not alter the outcome of
the motion, the Court overlooks it.

3

3 of 9
[* 3]
FILED: WESTCHESTER COUNTY CLERK 12/08/2022 02:28 PM INDEX NO. 64924/2015
NYSCEF DOC. NO. 788 RECEIVED NYSCEF: 12/08/2022

Finally, defendants contend all claims against Smalls' individually should be
dismissed. Defendants proffer evidence that Smalls operated the Train within the
allowable speed limit and that he put the Train into emergency mode as soon as he
identified the SUV. Thus, defendants contend, Smalls was not negligent and the collision
was unavoidable under the circumstances.

Plaintiffs' Contentions

First, plaintiffs contend that the SUV was a specific individual hazard, which
required Smalls to stop or, at a minimum, to slow the Train. Plaintiffs proffer, among other
things, the affidavit of Jimmy Scott, an expert in the correct and safe operations of trains.
Mr. Scott avers that he has reviewed the NTSB report on the Accident, Small's EBT, the
Event Data Recorder (EDR), and the photographs of the scene of the Accident. Mr. Scott
notes that the EDR indicates that the Train accelerated after the Lakeview Avenue
Crossing. Mr. Scott opines that "proper safety procedure called for him to. put the Train
into full service braking as soon as he observed the object, which he knew could not have
been an animal but only a vehicle . . . ." Plaintiffs also proffer the expert affidavit of
Edward Frisch, a mechanical engineer. Mr. Frisch avers that he examined data downloaded
from the Train and used those data to analyze the Train's approach to and passage through
the Commerce Street Crossing and until the Train came to a stop after the Accident. Mr.
Fritsch also avers that he examined data from brake qualification tests of various multi-car
configurations of the same model of Train, which comprised the Train and used those brake
test data to assess the performance of the Train in the Accident and to predict its
performance in alternate scenarios where the collision could have been avoided. Mr. Frisch
opines that the Accident could have been avoided if Smalls had initiated braking2 when he
first observed the object on the tracks at the Commerce Street Crossing.

Second, plaintiffs concede that they will not pursue a claim for negligence based on
the negligent operation of the warning gates and their timing. However, plaintiffs contend
that their claims in the area are not so limited as they have alleged that defendants were
negligent in the ownership, operation, control, and maintenance of the Commerce Street
Crossing. Plaintiffs proffer, among other things, the expert affidavit of John Nawn, a civil
engineer. Mr. Nawn avers that he reviewed, among other things, various documents
relating to the layout and operation of the Commerce Street Crossing. Mr. Nawn opines,
among other things, that, due to the configuration of the Commerce Street Crossing, a
second railroad crossing sign was required and its absence was a substantial cause of the
Accident.

2Plaintiffs variously make reference to: applying the brakes/service brakes/full-service brakes/emergency brakes and
putting the train in "emergency mode." Plaintiffs do not explain whether there is any difference between these
operations. Plaintiffs' expert, Mr. Scott, provides some explanation of the braking modes of the Train, which fal1s
short offul1 clarification. As any potential difference between the various braking modes does not alter the outcome
of the motion, the Court overlooks it.

4

4 of 9
[* 4]
FILED: WESTCHESTER COUNTY CLERK 12/08/2022 02:28 PM INDEX NO. 64924/2015
NYSCEF DOC. NO. 788 RECEIVED NYSCEF: 12/08/2022

Third, plaintiffs ~o~cede that they will not pursue a claim for the negligent use of
the hom. However, plamtIffs contend that their claims in the area are not so limited.

Fourth, plaintiffs acknowledge that the training, supervision, and instruction of train
op~ra~ors is addressed and substantially subsumed by federal regulations. Nevertheless,
plamtIffs contend that Metro-North was negligent in not having protocols, procedures, or
standards for the situation when a train operator observed an obstruction on the tracks and
that such a claim is not preempted, citing to Dowe v Natl. R.R. Passenger Corp. (2004 WL
887410 [ND III Apr. 26, 2004]).

Fifth, plaintiffs note that defendants admit that the relevant regulations do not
include anything touching on the strength or penetrability of the exterior floor of the Train
or the potential penetration of the exterior sub floor by the third rail. Plaintiffs also assert
that defendants fail to address plaintiffs' allegation that Metro-North was negligent in
failing to design, manufacture, and install a third rail that was frangible and would break
away harmlessly when struck.

Finally, plaintiffs contend that defendants failed to make a prima facie showing as
to the claims against Smalls. Regardless, plaintiffs again note, among other things, the
expert opinions ofMr..Scott and Mr. Fritsch relating to Smalls' operation of the Train and
their opinions that Smalls should and could have operated the Train to avoid the collision
with the SUV.

Analysis

"Where a state statute conflicts with, or frustrates, federal law, the former must give
way" (CSX Transp., Inc. v Easterwood, 507 US 658, 663 [1993]). Under the FRSA,
Congress mandated that "[l]aws, regulations, and orders related to railroad safety shall be
nationally uniform to the extent practicable" (49 USC ~ 20106 [a]). To this end, the FRSA
preempts state laws relating to railroad safety to the extent a federal regulation or order
covers the same subject (see 49 USC ~ 20106 [a] [2]). The Supreme Court has explained
that the specific test for determining federal preemption under the FRSA is whether there
are federal regulations that "substantially subsume" the subject matter of the state law,
which includes state common law (see Easterwood, 507 US at 664).

The Court addresses defendants' arguments in order. First, the allegation in the
supplemental bill of particulars cited by defendants does not allege that the Train was
traveling in excess of the federally imposed speed limit. Defendants note, in reply, that
numerous complaints allege that the Train proceeded "at an excessive, unsafe speed under
the circumstances." Again, the allegation is not that the Train was traveling in excess of
the federally imposed speed limit. Thus, whether such an allegation would be preempted
by the FRSA is not properly considered at this juncture (see Matter of Kirkland vAnnucci,
150 AD3d 736;738 [2d Dept 2017]). As defendants concede, there is an exception to the

5

5 of 9
[* 5]
FILED: WESTCHESTER COUNTY CLERK 12/08/2022 02:28 PM INDEX NO. 64924/2015
NYSCEF DOC. NO. 788 RECEIVED NYSCEF: 12/08/2022

preemptive effect of FRSA, which is judicially created and will preserve a claim from
~re~~ption, if the claim is that the Train failed to slow or stop to avoid a "specific,
mdlvldual hazard" (Easterwood, 507 US at 675) of a non-permanent nature, such as "a car
stalled on the tracks at a grade crossing" (Macfarlane v Can. Pac. Ry. Co., 278 F3d 54, 59
[2d Cir 2002]). Thus, the issue is whether the reflection on the tracks, which Smalls
?bs.er:ed while passing through the Lakeview Avenue Crossing, constituted a "specific,
mdlvldual hazard." Here, viewing the evidence in the light most favorable to. the non-
moving party (see Pearson v Dix McBride, LLC, 63 AD3d 895, 895 [2d Dept 2009]),
plaintiffs have proffered sufficient evidence to raise a genuine issue of material fact on this
issue.

Defendants' second and third arguments are that plaintiffs may have alleged ~ertain
claims for the negligent operation of the warning gates and their timing or the negligent
use of the Train's hom. In interpreting a federal statute pertaining to a subject traditionally
governed by state law, the Court will be reluctant to find preemption (see Easterwood, 507
US at 64). Common law claims of negligence are traditionally governed by state law. In
addition, defendants have failed to cite to any pleading in which plaintiffs allege that
defendants negligently operated the warning gates or the timing thereof or that defendants
negligently used the Train's hom on the date of the Accident. As such, defendants'
application seeks nothing more than an advisory opinion, which is not a proper exercise of
the judicial function (see u.s. BankN.A. v McCaffery, 186 AD3d 897,899 [2d Dept 2020]).

Fourth, defendants assert that plaintiffs alleged in the supplemental bill of
particulars, dated July 15,2021 (NYSCEF Doc. No. 584, at pages 1-2), that "Smalls was
inadequately trained and should have received specific training on how to respond to an
unexpected presence on the tracks of a person, an animal, or a vehicle." As plaintiffs
acknowledged, the training, supervision, and instruction of locomotive engineers is
addressed and substantially subsumed by federal regulations (that is, 49 CFR Parts 217,
240, and 242). Plaintiffs have not presented any evidence that defendants violated any
specific federal regulation governing the training of locomotive engineers and the
suggestion that Smalls should have received different training is an allegation of negligence
that is preempted (see Union Pac. R. Co. v California Pub. Uti!. Com'n, 346 F3d 851,868
[9th Cir 2003]; Natl. R.R. Passenger Corp. v Cimarron Crossing Feeders, 16-1094-JTM,
2018 WL 5962876, at *39 [D Kan Nov. 14, 2018], amended, 16-1094-JTM, 2019 WL
1014727 [D Kan Mar. 4, 2019]; contra Dowe v Nat!' R.R. Passenger Corp., 01 C 5808,
2004 WL 887410, at *5 [ND III Apr. 26, 2004]). However, as defendants do not cite the
specific language of plaintiffs' claim(s), the Court must determine what claims are
preempted. The supplemental bill of particulars specifically provides that defendants were
negligent in:

6

6 of 9
[* 6]
FILED: WESTCHESTER COUNTY CLERK 12/08/2022 02:28 PM INDEX NO. 64924/2015
NYSCEF DOC. NO. 788 RECEIVED NYSCEF: 12/08/2022

"[1 P Failing to properly train engineers and Smalls in particular about safe
ope~ation of train; [2] failing to properly train engineers and Smalls in
partIcular, about how to respond to a situation of seeing an obstacle ahead on
a ~ crossing; [3] failing to have proper training equipment for training of
engm.eers and Smalls in particular especially in light of the dangerous
crossmg known to have safety issues as testified to by Smalls at his SOH and
based. upon the number oftimes gates have been broken by cars, [4] in failing
to tram on how to respond to situation of seeing an obstacle ahead on a RR
crossing including the usage of the emergency braking system as required
when an object is fouling the tracks; [5] failing to have proper simulators to
train engineers and Smalls in particular, in how to respond to situation of
seeing an obstacle ahead on a RR crossing including the application of
emergency brakes and braking system; [6] failing to properly utilize
simulators available to Metro North at the time it trained engineers and
Smalls in particular, on how to respond to an obstacle ahead on a RR
crossing. Said negligence was committed at the Metro-North Training
facilities by their employees including Frank Mesa and Shelly Prettyman."

Items I, 2, and 4 clearly fall within the claim addressed by defendants' motion, that
is, that defendants failed to properly train Smalls. Items 3, 5, and 6, which allege that
defendants failed to have proper equipment relating to training and/or failed to properly
utilize equipment relating to training, do not fall within the claim addressed by defendants'
motion. Whether the preemption of the former necessitates the preemption of the latter is
not an issue addressed by defendants and will not be addressed here.

Fifth, defendants assert that plaintiffs alleged in the supplemental bill of particulars,
dated April 26, 2021 (NYSCEF Doc. No. 653, at page 2), that the Train "was not
crashworthy because Metro-North failed to have protective devises and a design that would
adequately protect the third rail from penetrating the front of and under the train car as the
result of a collision or derailment." Defendants contend that the federal regulations
substantially subsume the subject matter of the crashworthiness of trains like the one
involved in the Accident. Plaintiffs contend that what is not addressed is not preempted.
The mere fact that a federal regulation does not address the specific situation does not, by
itself, mean that the claim is not preempted (see Burlington N. and Santa Fe Ry. Co. v
Doyle, 186 F3d 790, 796 [7th Cir 1999], citing Easterwood, 507 US at 674). Rather, the
question is whether federal regulations "substantially subsume" the subject matter (see
Easterwood, 507 US at 664). In this instance, a federal statute directed the Secretary of
Transportation to "prescribe regulations establishing minimum standards for the safety of
cars used by railroad carriers to transport passengers" (49 U.S.C. S 20133 [aD. Said
regulations were then implemented (see, e.g., 49 CFR S 238. ~ et seq.). Review of Part 238
reveals that, although the federal regulations do not specifically address the strength or

3 The Court has inserted the bracketed numbers for ease of reference.

7

7 of 9
[* 7]
FILED: WESTCHESTER COUNTY CLERK 12/08/2022 02:28 PM INDEX NO. 64924/2015
NYSCEF DOC. NO. 788 RECEIVED NYSCEF: 12/08/2022

penetrability of the exterior floor of the Train or the potential penetration of the exterior
subfloor by the t~ird rail, the federal regulations substantially subsume the subject matter
of the cr~shworthme~s of trains like the one involved in the Accident. Again, as defendants
do .not cIte the specIfic language of plaintiffs' claim(s), the Court must determine what
claIms are preempted. Defendants assert that the claim is to be found on page 2 of the
s~pplemental bill of particulars, which begins in the middle of an allegation; beginning
wIth the first full allegation and ending with the last complete allegation, plaintiffs allege:

"[ 1]4the third rail as designed, manufactured and installed at the Commerce
Street crossing was not in proper condition or safe to operate in the service
to which it was put, was unreasonably and unnecessarily dangerous, perilous,
a trap, hazard, and nuisance and was not properly inspected and tested and
its splice bars and bolts were too robust at the connecting points for each
section of the third rail's connecting points and were not frangible or
crashworthy; [2] the third rail splice plates were not manufactured according
to specifications and were thus less frangible than designed; [3] the third rail
design failed to provide a protective ramp that would allow an object, such
as a motor vehicle, to ride up the rail and over the top of the elevated third
rail thereby preventing it from being pried upward and into the object and the
train; [4] in failing to have a frangible third rail with frangible spice plates
and bolts and/or install third rail protective devices such as ramps, ballasts,
and/or barriers and a design to make the train crashworthy that would prevent
the third rail from penetrating the train causing death and serious injuries ..
"

Each of the items appears to fall within the claim addressed by defendants' motion, that is,
that defendants failed to have protective devises and/or a design that would adequately
prevent the third rail from penetrating the front the Train. Based hereon, these claims are
preempted.

Finally, although defendants have proffered evidence that Smalls was not negligent
in his operation of the Train in the time leading up to the Accident, plaintiffs have proffered
evidence, including from expert witnesses, that Smalls was negligent in his operation of
the Train in the time leading up to the Accident. It is well settled that where conflicting
affidavits and other contradictory evidence is submitted, summary judgment is not
appropriate (see Webar, Inc. v Capra, 212 AD2d 594, 596 [2d Dept 1995]). The reasoning
is that it is not within the purview of the Court to resolve issues of credibility on a motion
for summary judgment (see Halkias v Otolaryngology-Facial Plastic Surgery Associates,
PC, 282 AD2d 650, 651 [2d Dept 2001] ["Resolution of issues of credibility of both
expert and lay witnesses and the accuracy oftheir testimony are matters within the province
of the jury ."]).

4 The Court has inserted the bracketed numbers for ease of reference.

8

8 of 9
[* 8]
FILED: WESTCHESTER COUNTY CLERK 12/08/2022 02:28 PM INDEX NO. 64924/2015
NYSCEF DOC. NO. 788 RECEIVED NYSCEF: 12/08/2022

To the extent not specifically addressed herein, the Court finds the remaining
arguments of the parties to be without merit. Based on the foregoing, it is hereby .

ORDERED that Motion #31 is GRANTED TO THE EXTENT that Items 1, 2, and
4, as defined above, of the supplemental bill of particulars, dated July 15,2021 (NYSCEF
Doc. No. 584, at pages 1-2) and Items 1-4, as defined above, of the supplemental bill of
particulars, dated April 26, 2021 (NYSCEF Doc. No. 653, at page 2) are DISMISSED as
being preempted by federal law and Motion #31 is otherwise DENIED.

Dated: December g, 2022
White Plains, New York

~.~
Justice of the Supreme Court

9

9 of 9
[* 9]

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/cases/11473324. Public record. Not legal advice.
