# PSP NE, LLC v. PWAB; Appeal of: BLLC

> Supreme Court of Pennsylvania · May 19, 2026

URL: https://www.frixlaw.com/law-library/cases/11328519

## Case

- **Court:** Supreme Court of Pennsylvania
- **Decided:** May 19, 2026
- **Precedential status:** Published
- **Opinion:** Opinion of the court
- **Judges:** Mundy, Sallie
- **Cited by:** 0 later opinions in the Frix Law Library

## Citator (automated)

- No negative treatment found by the automated citator. That is not the same as a confirmation that the case is good law; read the citing cases.
- Full citator and citing cases: https://www.frixlaw.com/law-library/cases/11328519

## Opinion text

[J-18-2025]
IN THE SUPREME COURT OF PENNSYLVANIA
MIDDLE DISTRICT

TODD, C.J., DONOHUE, DOUGHERTY, WECHT, MUNDY, BROBSON, McCAFFERY, JJ.

PSP NE, LLC : No. 38 MAP 2024
:
: Appeal from the Order of the
v. : Commonwealth Court dated March
: 30, 2023 at No. 576 CD 2022
: Reversing the Order of the
PENNSYLVANIA PREVAILING WAGE : Pennsylvania Prevailing Wage
APPEALS BOARD : Appeals Board dated May 17, 2022
: at No. PWAB-1G-2020.
:
APPEAL OF: BUREAU OF LABOR LAW : ARGUED: April 8, 2025
COMPLIANCE :

OPINION

JUSTICE McCAFFERY DECIDED: May 19, 2026
Pennsylvania is one of 32 states that have a “Little Davis-Bacon Act.” 1 These acts

set a minimum wage for workers on government-funded construction projects.

Pennsylvania’s version, enacted relatively late in 1961, is known as the Prevailing Wage

Act (PWA), 43 P.S. §§ 165-1 – 165-17, and is strikingly concise in its command: “Not

less than the prevailing minimum wages as determined hereunder shall be paid to all

work[ers] employed on public work.” 43 P.S. § 165-5.

1 President Herbert Hoover signed the Davis-Bacon Act, 40 U.S.C. §§ 3141-3148, into

law in 1931. The Davis-Bacon Act requires that all construction workers on a government
project be paid the typical wages for the relevant geographical area. See 40 U.S.C. §
3142(b). Prevailing wage acts enacted by various states are often referred to as “Little
Davis-Bacon Acts.” See John T. Kupchinsky, The Role of Pennsylvania’s Commonwealth
Court in the History of the State’s Prevailing Wage Law, 21 WIDENER L.J. 105, 105 (2011).
In this appeal, we are asked to determine whether a build-to-suit lease for the

benefit of the Pennsylvania State Police (the State Police) constitutes “public work” for

the purposes of the PWA. 2 “Public work means construction, reconstruction, demolition,

alteration and/or repair work other than maintenance work, done under contract and paid

for in whole or in part out of the funds of a public body[.]” 43 P.S. § 165-2(5) (emphasis

and internal quotation marks omitted). Our prior precedent refused to adopt the Phoenix

Field Office test, see 500 James Hance Court v. Pa. Prevailing Wage Appeals Bd., 33

A.3d 555, 572 (Pa. 2011) (“In view of the looseness inherent in the framing of the Phoenix

Field Office factors, we do not believe it would be useful for us to adopt [the factors]

here.”), and instead required that “risk allocation should be a prominent consideration” in

assessing whether a pre-development lease is subject to the dictates of the PWA. Id. at

573. Today, we recognize that the explicit text of the PWA requires a consideration of all

relevant circumstances to determine whether a pre-development lease is a bona fide

lease. Here, the circumstances clearly indicate that public funds paid for, at least in part,

construction. We therefore reverse.

I. FACTUAL AND PROCEDURAL HISTORY

The factual background of this appeal is supplied through stipulation in lieu of a

hearing before the Prevailing Wage Appeals Board (PWAB). In mid-June 2018, the State

Police generated a 128-page document providing detailed specifications for a new

headquarters, barracks, and training facility to be built and located in northeast

Pennsylvania. A little over one year later, the Commonwealth (through the Pennsylvania

2 The parties stipulated the State Police, as a Commonwealth agency, is a public body.

See Stipulated Facts, R.R. 29a.

[J-18-2025] - 2
State Police) entered into a lease agreement (Lease or Lease Agreement) with PSP NE,

LLC (“Developer”). 3

A. Relevant lease terms

The Lease required Developer to “construct building facilities for exclusive use by

the State Police on land and in building facilities owned by” Developer. Stipulated Facts,

R.R. 29a. As such, the Lease is a “build to suit lease arrangement” between Developer

and the State Police, requiring Developer “to construct the building facilities within a

specific enumerated timeline.” Id. (internal quotation mark omitted) The State Police

agreed to pay rent to Developer “for the use and occupancy of the Premises.” Lease,

R.R. 37a.

The initial term of the lease is 20 years, with two five-year optional extensions. See

Stipulated Facts, R.R. 29a; Lease Cover Sheet, R.R. 31a. According to the Lease, the

State Police may not cancel the contract before 10 years in the absence of exceptional

circumstances. 4 After 10 years, the State Police may cancel the contract at its discretion

but must pay two penalties. See Lease, R.R. 38a. First, a penalty of three months’ rent.

See id. Second, a penalty in the form of reimbursing the Developer for its “unamortized

costs of renovations[.]” Id.

The total development cost for the project is $17,158,680, of which the Developer

borrowed $15,615,940, referred to as “amortized costs” in the Lease Agreement, from

3 Despite the name, Developer “is a privately owned entity, organized in the
Commonwealth of [Pennsylvania], which operates as a private real estate developer and
landlord.” Stipulated Facts, R.R. 29a.
4 “[I]f the governmental function for which the Premises are being leased[] is abolished,

limited, or restricted[] by any Act of Legislature, including a failure of sufficient
appropriation by the General Assembly to continue payment of the Rent or any other
amount hereunder, or by Law of Congress, or by any legal action taken under authority
conferred by such acts or laws, or decision of court; then the [State Police] shall have the
right to cancel this Lease [through one month’s written notice.]” Lease, R.R. 38a.

[J-18-2025] - 3
First National Community Bank (FNCB). Stipulated Facts, R.R. 30a; Lease Cover Sheet,

R.R. 31a. Developer thus was directly responsible for $1,542,740 in costs – defined as

“unamortized costs” in the Lease. See Stipulated Facts, R.R. 30a. The FNCB loan is

intended to “fund the purchase of the Premises, to finance the construction of the Project

and to pay for closing costs.” Loan Agreement, R.R. 209a. Through the loan agreement,

FNCB required the State Police’s “annual rent [be] sufficient to cover [Developer’s] debt

service and all real estate taxes and insurance on the Premises.” Id., R.R. 221a. On the

same date it consummated the loan agreement, Developer purchased the land on which

the project would be built for $1.5 million. See Stipulated Facts, R.R. 30a.

B. Department of Labor and Industry intercedes

After the Lease was executed, Developer sought confirmation from the

Department of Labor and Industry, Bureau of Labor Law Compliance, that, despite

language in the Lease to the contrary, 5 the project was not subject to the PWA. However,

on February 7, 2020, the Bureau ruled that the project was governed by the PWA:

While your company will provide the initial funds for this project, the lease
payments from State Police will reimburse this initial outlay and, as such,
are the ultimate funding source for this construction. The lease spells out
with detail the exact specifications for the construction that is to occur and,
tellingly, provides that the PWA applies to this construction. Thus, the lease
is essentially a construction contract because without the lease the
construction would not have occurred. As such, the PWA covers all
construction to renovate the space [the] State Police is leasing.
Letter, 2/7/2020, at 2, R.R. 2a.

Developer filed a notice of grievance from the Bureau’s decision to the PWAB.

After the parties submitted a joint stipulation, the PWAB rejected Developer’s grievance:

5 The issue of whether Developer is contractually required to pay prevailing wage rates

for the project is not before this Court.

[J-18-2025] - 4
As the Lease Agreement was required by the lender in order for
[Developer] to obtain financing, the terms of the Lease Agreement and the
Loan Agreement must be read in tandem.

… [Developer] failed to establish that it alone bears the financial risk
and obligation associated with the construction of the Project. [Developer]
contends that the risks and obligations [associated] with the construction
funding fall solely on [Developer] under the terms of the Loan Agreement
between [Developer] and the lender bank. The amount of the loan provided
for in the Loan Agreement is $15,400,000.00. However, the Lease
Agreement provides repayment of the amortized construction costs in the
amount of $15,615,940.00, either through rental payments made by the
Commonwealth or reimbursement if the lease is terminated or cancelled.
As such, [Developer] does not solely bear the financial risk associated with
the Project.

… [W]e believe that there is a public financing component for the
construction of the Project. The purpose of the loan is to provide funds to
purchase the premises and to finance construction of the Project. The Loan
Agreement requires that the Lease must provide annual rent to be paid by
the Commonwealth that is sufficient to cover [Developer’s] debt service,
which specifically includes construction of the Project. As such, it is clear
that the terms and conditions in the Loan Agreement establish that the
Commonwealth has a significant role in funding the construction work.

Lastly, we do not believe that the relationship between [Developer]
and the Commonwealth is that of a simple landlord and tenant. The Lease
constitutes a “build to suit” lease arrangement between [Developer] and the
Commonwealth. The plans and specifications set forth in the Lease
Agreement were designed specifically for the State Police’s intended use of
the facility as a barracks and training facility and the Lease requires
[Developer] to construct the building facilities within a specific enumerated
timeline. Once construction was complete, the State Police would take
occupancy of the building facilities and begin lease payments to [Developer]
for the term of the 20-year lease. In addition, the Lease Agreement required
that prevailing wages be paid to workers in the construction of the building.
Final Decision and Order, 5/17/2022 at 9-11, R.R. 275a-277a. Developer appealed the

PWAB’s decision to the Commonwealth Court.

II. COMMONWEALTH COURT DECISION

In a unanimous, three-Judge, published opinion, the Commonwealth Court

reversed the PWAB. The panel classified the issues before it as turning on a “single legal

question of whether construction of the facility is public work subject to the Act.” PSP NE,

[J-18-2025] - 5
LLC v. Pa. Prevailing Wage Appeals Bd., 292 A.3d 1175, 1178 (Pa. Cmwlth. 2023). The

Court recognized that the PWA is a remedial Act designed to protect workers from being

paid less than the prevailing minimum wage on public work projects. It highlighted Section

2 of the Act, which this Court has defined as requiring “(1) there must be certain work; (2)

such work must be under contract; (3) such work must be paid for in whole or in part with

public funds; and (4) the estimated cost of the total project must be in excess of $25,000.”6

Id. at 1179 (citation omitted). The Court then explained that if a grievant can establish

the contract at issue is a bona fide lease, the burden shifts to the Bureau to “establish

that the economic reality of the transaction is different from its appearance.” Id. (citing

Hance, 33 A.3d at 573-574). 7

The Court concluded that the Commonwealth agreed to pay “rent for the use and

occupancy of the premises and not for construction.” PSP NE, 292 A.3d at 1182 (citing

Lease at ¶ 4) (internal quotation marks and brackets omitted). Further, Developer paid

for the construction and is solely responsible to repay the construction loan. See id. The

Court highlighted the Bureau’s stipulation that “no funds will be provided directly by the

Commonwealth for the purchase, development and construction of the facilities.” Id.

(emphasis and citation omitted).

The Court then minimized the fact that the Lease requires the Commonwealth to

reimburse Developer for unamortized costs. See PSP NE, 292 A.3d at 1182. “An early

termination of the lease at the end of year 10, for example, would leave unamortized costs

substantially below $15,615,940, possibly as little as half that amount.” Id. (citing

6 There is pending legislation to increase the $25,000 “floor” to $257,000. See 2025
House Bill No. 160.
7 The Hance Court used the term “bona fide” twice without providing an explicit definition.

See Hance, 33 A.3d at 575, 577. The opinion merely distinguishes a bona fide lease
from a construction contract. See id. at 575.

[J-18-2025] - 6
Developer’s Brief at 19-20). Regardless of whether the Commonwealth would be

required to pay the unamortized costs under these circumstances, the Court noted that

Developer “will nevertheless be liable for as much as $10 million on the bank loan.” Id.

(citing Developer’s Brief at 19-20).

The Court concluded the PWAB erred in determining the Lease was not a bona

fide lease. See PSP NE, 292 A.3d at 1182. The Court opined that the PWAB failed to

give any weight to Developer’s reversionary interest in the project which “facially”

supports a conclusion that the Lease is bona fide. See id. (citing Hance, 33 A.3d at 575).

Based on that conclusion, the burden shifted to the PWAB to show that the

economic realities were different from a lease. The Court found that the PWAB presented

no evidence to meet that burden. See PSP NE, 292 A.3d at 1182-1183. It rejected the

PWAB’s “suggestion” that Section 32 of the Lease, 8 requiring compliance with the PWA,

was in any way relevant to whether the project is a “public work.” Id. at 1183.

Finally, the Court rejected the argument that the possible 30-year term of the Lease

qualifies under the Tax Code as a real estate transfer requiring the payment of realty

transfer tax. See PSP NE, 292 A.3d at 1183. The Court opined that the initial term of the

8 Section 32 of the Lease provides, in relevant part:

Payment of Prevailing Minimum Wages. Lessor and Lessor’s contractor(s)
must comply with the following conditions, provisions, and requirements in
the construction of the building, substantial rehabilitation of the building
and/or substantial alterations to the Premises:
a. Lessor and Lessor’s contractors shall pay at least the wage rates as
determined by the Secretary of the Pennsylvania Department of Labor and
Industry and shall comply with the conditions of the Prevailing Wage Act of
August 15, 1961, 43 P.S. § 165-1 et seq., and the regulations issued
thereto, to assure the full and proper payment of the rates.
Lease, R.R. 52a (emphasis omitted).

[J-18-2025] - 7
Lease is only 20 years, and the Commonwealth’s exercise of its two five-year options was

entirely speculative. See id.

III. ISSUES ON APPEAL TO THIS COURT

We granted the Bureau’s petition for allowance of appeal to explore how the Hance

test works in practice. We proposed three issues for the parties to address:

1. Is risk allocation the only consideration in determining whether a pre-
construction lease is covered by the Prevailing Wage Act?

2. How much risk must a developer bear to ensure that public funds do not
“in part” pay for construction under 500 James Hance Court v. Pa.
Prevailing Wage Appeals Bd., 33 A.3d 555 (Pa. 2011), such that a pre-
construction lease does not implicate the Prevailing Wage Act?

3. Under Hance, what is the distinction between a grievant’s burden to
prove a “facially legitimate lease” and the Board’s burden to prove “that
the economic reality of the transaction is different from its appearance?”
PSP NE, LLC v. Pa. Prevailing Wage Appeals Bd., 318 A.3d 1262-1263 (Pa. 2024)

(brackets omitted).

IV. STANDARD OF REVIEW

The questions before us concern the correct application of the PWA and are issues

of statutory construction. As a result, our primary duty is to determine and apply the

Legislature’s intent in enacting the statute. See Crown Castle NG East LLC v. Pa. Pub.

Util. Comm’n, 234 A.3d 665, 674 (Pa. 2020). While “[t]he best indication of legislative

intent is the plain language of the statute[,]” we identify the plain meaning by considering

“the statutory language in context and give words and phrases their common and

approved usage.” Id. (citations and internal quotation marks omitted). We do not read

the provisions in isolation, but instead understand each provision in the context of the

entire statute. See A.S. v. Pa. State Police, 143 A.3d 896, 906 (Pa. 2016).

[J-18-2025] - 8
V. THE PREVAILING WAGE ACT

As noted above, the PWA is what is known as a “Little Davis-Bacon Act.” The

federal Davis-Bacon Act, as amended in 1935, requires the payment of a “prevailing

wage” to workers on federal construction contracts. See Kupchinsky, 21 WIDENER L.J. at

105. Before 1961, prevailing wage requirements in Pennsylvania were established by a

patchwork of state and local enactments. See id. The PWA was enacted in 1961 to

create a comprehensive system with uniform state-wide application. See id. at 105-106.

The central duty set forth in the PWA is contained in Section 165-5: “Not less than

the prevailing minimum wages as determined hereunder shall be paid to all work[ers]

employed on public work.” 43 P.S. § 165-5. “Public work” is defined as:

[C]onstruction, reconstruction, demolition, alteration and/or repair work
other than maintenance work, done under contract and paid for in whole or
in part out of the funds of a public body where the estimated cost of the total
project is in excess of twenty-five thousand dollars ($25,000), but shall not
include work performed under a rehabilitation or manpower training
program.
43 P.S. § 165-2(5). Notably, public bodies have an affirmative duty to comply with the

PWA:

It shall be the duty of every public body which proposes the making of a
contract for any project of public work to determine from the secretary the
prevailing minimum wage rates which shall be paid by the contractor to the
[worker] upon such project. Reference to such prevailing minimum rates
shall be published in the notice issued for the purpose of securing bids for
such project of public work. Whenever any contract for a project of public
work is entered into, the prevailing minimum wages as determined by the
secretary shall be incorporated into and made a part of such contract and
shall not be altered during the period such contract is in force.
43 P.S. § 165-4.

The PWA is a remedial statute intended to protect workers on public works projects

from substandard pay. See Pa. Nat. Mut. Cas. Ins. Co. v. Dep’t. of Labor and Indus., 715

A.2d 1068, 1072 (Pa. 1998) (“Penn National I”). It accomplishes that goal by having the

[J-18-2025] - 9
Department of Labor calculate a “prevailing minimum wage,” and then requiring that

workers on public works projects be paid at least that amount.

The seminal case interpreting the PWA is Penn National I. There, this Court

utilized a four-step test to determine whether a project qualifies as “public work” under the

PWA: “(1) there must be certain work; (2) such work must be under contract; (3) such

work must be paid for in whole or in part with public funds; and (4) the estimated cost of

the total project must be in excess of $25,000.” Penn National I, 715 A.2d at 1074. While

elements one, two, and four of the Penn National I test have some litigation history, the

source of most disputes on the scope of the PWA is element three – the “paid for … with

public funds” element. Id.

A. The “paid for … with public funds” element

There are two distinct types of disputes under element three: (a) whether the funds

used to pay for the project were “public funds” (nature of funding dispute) and (b) whether

admittedly public funds paid for the construction (causation dispute).

Penn National I, arose from a causation dispute. There, public funds paid for

demolition and asbestos removal at a building owned jointly by the City of Harrisburg and

a redevelopment authority. Once the asbestos was removed and the existing building

demolished, the property was conveyed to a private company, PNI (or in the end, PNI’s

wholly owned subsidiary known as PNRT) 9 to construct a new building for its own

purposes. The Commonwealth Court affirmed an administrative ruling that the entire

project was paid for with public funds since the asbestos removal was publicly funded. In

essence, the Commonwealth Court “looked at the whole project as a comprehensive

undertaking.” Penn National I, 715 A.2d at 1074.

9 See Pa. State Bldg. and Const. Trades Council, AFL-CIO v. Prevailing Wage Appeals

Bd., 808 A.2d 881, 891 n.2 (Pa. 2002) (Saylor, J., dissenting) (“Penn National II”).

[J-18-2025] - 10
This Court held to the contrary, determining that only the asbestos and demolition

work qualified as “public work” under the PWA. Penn National I, 715 A.2d at 1074. To

do so, this Court determined that the construction work was distinct from the asbestos

and demolition work. Since the demolition phase was distinct from the construction

phase, this Court found that the subsequent construction phase was not paid for with

public funds simply because the initial, demolition, phase was publicly funded. See id.

Nonetheless, the rest of the construction project was financed through a Tax

Increment Financing (“TIF”) district. TIF districts are economic development subsidies

authorized by the Tax Increment Financing Act, 53 P.S. §§ 6930.1 - 6930.13. This Court

opined that the factual record was insufficiently developed to allow the Court to address

whether the TIF financing scheme meant that the second phase of the project was paid

for by public funds. See Penn National I, 715 A.2d at 1075. As a result, the Court

remanded for further proceedings.

Those proceedings ultimately culminated in Penn National II. Penn National II

arose from a dispute over the nature of the funding: whether the TIF funds were public

funds. After further development of the record on remand, the Commonwealth Court held

that the TIF district financing used public funds to pay for the project, and the PWA applied

to the remainder of the construction project. See Penn National II, 808 A.2d at 886. We

affirmed, explaining how the TIF district used public funds to pay for the work. First, the

redevelopment authority issued bonds in the amount of $10.5 million. See id. The

redevelopment authority was not liable in any way for repayment of the bonds, but instead

the payments would be satisfied through a tax increment fund which was funded through

payments from various local tax authorities that all had agreed to participate in the TIF

district. See id. At its simplest, the scheme allowed local authorities to maintain their

existing tax income from the current assessed value of the properties in the TIF district.

[J-18-2025] - 11
However, any increase in tax income received by the taxing authorities (generally through

an increase to the assessed value which is presumed to arise from the development of

the property) after the completion of the project were then sent to the tax increment fund

for 20 years, which used this revenue to pay off the bonds. See id. at 886-887.

Interestingly, the TIF bonds were purchased by PNI, which was the parent

company of the TIF district property owner, PNRT. Thus, the financing scheme flowed

as follows. PNI paid $10.5 million to purchase bonds from the redevelopment authority.

The terms of the bonds promised that PNI would be repaid the principal ($10.5 million)

plus interest over 20 years. PNI’s $10.5 million payment was placed in a sinking fund to

pay PNRT a portion of the construction costs for the building. PNRT, as property owner,

paid taxes to the local authorities. During the 20-year term, any increase in tax revenues

generated from the property to those authorities would then be turned over to the tax

increment fund. The tax increment fund would periodically disburse payments to PNI

according to the terms of the bonds. In essence, PNI was self-financing the construction,

but receiving a modest sum of tax-derived income through the interest on the TIF bonds

over the 20-year life of the bonds. Of note, self-financing is not required for TIF districts

— the bonds can be sold on the open market to third parties. But PNI kept the financing

“in house.”

The Penn National II Court concluded that

the monies paid to the taxing authorities as tax increments, which, in turn,
are used to pay off the bonds that are used to pay the cost of construction
are public funds for purposes of the [PWA.] … [P]ursuant to the TIF Act,
the taxing bodies actually collect the tax increment dollars in question.
Although the taxing bodies only retain the monies paid on the property’s tax
base and the tax increment dollars are paid over to the trustee to be used
to pay off the tax increment bonds, nevertheless … for a time these monies
do rest in the public coffers. Significantly, the statutory financing at issue
here is not a tax abatement, where the taxing authority agrees to forego
receiving property taxes on a certain property for a certain time. To the
contrary, the tax money is actually collected by the taxing bodies, and, in

[J-18-2025] - 12
turn, these dollars are used to pay off the tax increment bonds that are used
to pay the cost of construction on the project.
Penn National II, 808 A.2d at 889 (footnote omitted).

In sum, these two cases established the contours of the “paid for … with public

funds” requirement under the PWA. In Penn National I, this Court addressed a causation

dispute and held that if a project is separated into distinct phases based on economic

realities — not purely a desire to evade the application of the PWA — the project is to be

assessed based on whether public funds paid for each phase independently. 10 The Court

in Penn National II built upon this framework by addressing a nature of funding dispute.

Noting the plain language of the PWA simply required the work be done under contract,

the Court rejected the assertion that the public body needed to be a party to the

construction contract. See Penn National II, 808 A.2d at 890. Thus, direct payment of

public funds to contractors is not required to establish the applicability of the PWA;

reimbursement of such costs is sufficient. See id. at 889 (“[T]he tax money is actually

collected by the taxing bodies, and, in turn, these dollars are used to pay off the tax

increment bonds that are used to pay the cost of construction on the project.”).

More recently, this Court addressed the issue of what constitutes “public funds”

under the Penn National I test. See Ursinus Coll. v. Prevailing Wage Appeals Bd., 310

A.3d 154 (Pa. 2024). Ursinus College arose from a dispute over the nature of the funding;

there was no question the funds at issue “paid for” the project. There, a private college

10 In this respect, Pennsylvania differs from other jurisdictions that have Little Davis-Bacon

Acts. For example, California’s Little Davis-Bacon Act requires the payment of a
prevailing wage on “public works projects.” Cinema West LLC v. Baker, 220 Cal.Rptr.3d
415, 423 (2017). And “public works” is defined as “[c]onstruction, alteration, demolition,
installation, or repair work done under contract and paid for in whole or in part out of public
funds.” Id. (citation omitted). The California Court of Appeals concluded that a private
theater developed concurrently with a publicly funded parking lot was part of a “complete
integrated object” and as a result was subject to the prevailing wage requirement. See
id. at 431-432.

[J-18-2025] - 13
sought to erect new buildings through the issuance of tax-exempt bonds. To be tax-

exempt, the bonds had to be issued through a county authority. 11 Thus, the private

college utilized a county higher education authority to issue tax-exempt bonds to finance

the construction. See id. at 163. While the authority was the nominal issuer of the bonds,

it bore no liability for paying them off — the college was solely liable on the bonds. See

id. at 165-166. Those bonds were purchased by a private underwriter. See id. at 164. In

turn, the proceeds from the sale were deposited directly into a trust fund managed by a

private bank and designated solely to pay for the costs of the construction project. See

id. at 165.

We observed that nothing about Section 165-2(5)’s phrase “paid for in whole or in

part out of the funds of a public body” is ambiguous or unclear. Ursinus College, 310 A.3d

at 172. After reviewing dictionary definitions of the various words at issue, this Court

opined that the phrase “paid for … out of the funds of a public body” requires “the receipt

of payment … from available pecuniary resources from or possessed by” the

Commonwealth or its agents. Id. (citation omitted). Nonetheless, application of Section

165-2(5) does not involve simply accepting the plain language of how the parties label a

transaction. See id. Instead, we must independently examine the “economic reality” of

the transaction to determine whether the PWA applies. Id. (citation omitted). We noted

this result is congruent with Penn National II, since there, the construction was paid for

with funds that were collected as taxes. See id. at 174. We also stated the Penn National

II majority explicitly distinguished the case before it from tax abatement cases, where the

11 Though the opinion does not explicitly address the issue, the Court did not acknowledge

any dispute over whether the county authority qualified as a public body. The opinion
focuses exclusively on whether any funds of the county authority were utilized in the
transaction.

[J-18-2025] - 14
taxes are never collected and therefore never possessed by the relevant public body.

See id.

Ursinus College tied its analysis directly to the language of the PWA and held the

PWA does not apply when the payment for the construction does not include assets

owned by the Commonwealth or any of its agencies.

B. “Paid for … with public funds” as applied to pre-development leases

Nearly a decade after Penn National II, but over a decade before Ursinus College,

this Court addressed the application of the PWA to pre-development leases. See Hance,

supra. Hance arose from a causation dispute: there was no dispute over the legal nature

of the funds at issue, only whether those funds were paid in exchange for construction.

There, the lessor was a developer who agreed to construct and lease a building to a

charter school. 12 The original lease agreement required the charter school to pay rent as

well as make a $1.6 million payment which was titled a security deposit. This security

deposit was to be used by the lessor to purchase materials and equipment for the interior

fit-out of the building to suit the charter school’s needs. See id. at 558. After five years,

the charter school had an option to purchase the building. See id.

The Bureau of Labor Law Compliance intervened shortly after the original lease

agreement was executed. See Hance, 33 A.3d at 558. In response to the Bureau’s

inquiry, the school asserted that since the lessor bore the responsibility for the

construction of the building, the school did not contract for construction of the building.

See id. The school’s initial response did not address the $1.6 million security deposit.

See id. at 559.

12 Technically, the lessee was a foundation associated with the charter school. The
foundation and the charter school subsequently merged and the Court treated the two
bodies interchangeably for purposes of the appeal. See Hance, 33 A.3d at 558 n.3.
Further, for reasons arising from the law authorizing charter schools, the charter school
was treated as a public body. See id. at 557-558.

[J-18-2025] - 15
The Bureau subsequently determined the PWA applied to the project based on the

circumstances of the lease agreement: (1) the school’s status as lessee; (2) rental

payments exceeding $600,000 annually; (3) the school’s option to purchase after five

years; (4) the $1.6 million security deposit; (5) the leasehold mortgage obtained by the

school, which was authorized by the lease agreement and a condition of the financing the

school utilized to pay the security deposit; and (6) the intended use of the building as a

charter school. See Hance, 33 A.3d at 559.

The lessor lodged a grievance of the determination with the PWAB. In its

grievance, the lessor conceded for the first time that the interior fit-out of the project was

subject to the PWA. See Hance, 33 A.3d at 559. The lessor maintained, however, that

there was a bright-line distinguishing the fit-out — which the lessor now alleged was to

be undertaken at the school’s sole cost — and the construction of the building’s shell —

which the lessor asserted was its sole responsibility. See id. at 559-560. Thus, the lessor

argued the construction of the building’s shell was not subject to the PWA.

The original lease agreement, however, did not support any of these distinctions.

See Hance, 33 A.3d at 560. In apparent recognition of this deficiency, the lessor attached

a different, unexecuted lease to its grievance which supported its litigation position. See

id. Notably, the lessor did this without acknowledging that this was not the original lease

agreement. See id. Further, the lessor asserted that its intent to construct the shell

building predated the school’s involvement. See id.

An amended lease was subsequently executed by the lessor and the school that

provided for bifurcation of the project into two stages: the exterior shell and interior fit-

out. See Hance, 33 A.3d at 560. The security deposit was explicitly deleted from the

amended lease. See id. On the same day the amended lease was executed, the lessor

also: (1) amended its construction contract to reflect the bifurcation of the project; and (2)

[J-18-2025] - 16
obtained private financing for the construction of the shell. See id. at 560-561. The school

subsequently entered into its own construction contract for the interior fit-out. See id. at

561.

The PWAB concluded that the PWA applied to the whole project — both the

construction of the shell and the internal fit-out — and denied the lessor’s grievance. See

Hance, 33 A.3d at 562. In doing so, the PWAB adopted a test developed by the United

States Labor Department’s Administrative Review Board (U.S. ARB) in applying the

federal Davis-Bacon Act, referred to as the Phoenix Field Office test. 13 See id. at 563.

There, the U.S. ARB addressed circumstances that are strikingly similar to the present

case:

In April 1998 the [U.S. Department of the Interior’s] Bureau of Land
Management [(“BLM”)] issued a solicitation inviting bids for a leased facility
in Phoenix, Arizona. BLM identified the solicitation as a 15-year lease,
with a ‘firm’ lease period of 10 years, i.e., the government could terminate
the lease after the first 10 years. The solicitation specified precisely the
geographic boundaries of the area within Phoenix that would be acceptable
to BLM, and described the size and architectural design of the project with
significant, particularized detail[.]

…

From the offers received, BLM decided to award the lease contract to
Federal Builders, LLC, which proposed to build a new facility to meet BLM’s
needs.

In re Phoenix Field Office, Bureau of Land Mgmt., ARB Case No. 01-010, 2001 WL

944696 (June 29, 2001) (emphasis in original; citations omitted). Addressing the question

of whether the construction of the new building was covered by the Davis-Bacon Act, the

U.S. ARB applied a totality of the circumstances test. See id at 5. Specifically, the U.S.

ARB considered:

13 In re Phoenix Field Office, Bureau of Land Mgmt., ARB Case No. 01-010, 2001 WL

944696 (June 29, 2001).

[J-18-2025] - 17
the length of the lease, the extent of government involvement in the
construction project such as whether the building is being built to
Government requirements and whether the Government has the right to
inspect the progress of the work, the extent to which the construction will be
used for private rather than public purposes, the extent to which the costs
of construction will be fully paid for by the lease payments, and whether the
contract is written as a lease solely to evade the requirements of the Davis-
Bacon Act.
Id. (citation omitted).

Applying the Phoenix Field Office test to the lease before it, the PWAB concluded

the PWA applied since the initial lease term was 24 years, the charter school was the sole

use for the construction project, the rent payments would fully pay for the shell

construction after six years, and, notably, the lessor had not met its burden because it

failed to place the plans and specifications for the building into evidence. See Hance, 33

A.3d at 564. Of further note, the PWAB did not address the lessor’s allegation that it would

have proceeded with the project even in the absence of the contract with the charter

school. See id. at 565.

The Commonwealth Court reversed but did not address the PWAB’s use of the

Phoenix Field Office test. See Hance, 33 A.3d at 566 (“Without discussing the Phoenix

Field Office test, which lay at the heart of the Board’s determination … the Commonwealth

Court majority pronounced that rent payments simply are not the equivalent of

construction funding.”) . Instead, the Commonwealth Court majority concluded the PWAB

failed to provide any support for its conclusion that the rent payments were in fact

payments for construction of the shell building. See id. A dissent, authored by Senior

Judge Kelley, observed that the evidence before the PWAB established the shell building

would not have been built but for the lease agreement with the charter school.

Accordingly, the dissent concluded the PWA applied. See id.

This Court accepted review of the Bureau’s appeal to address the applicability of

the Phoenix Field Office test and the sufficiency of the evidence to establish PWA

[J-18-2025] - 18
coverage. See Hance, 33 A.3d at 569 (“The present case is centered on the correctness

of the legal framework employed by the Board to resolve Appellees’ grievance and on

evidentiary sufficiency.”). As defined by the Hance majority, the issue before the Court

was “whether the Phoenix Field Office test, or some other appropriate litmus, should

pertain to screen against artful drafting of contracts to evade wage regulation.” Id. at 572.

The Hance majority began by noting “the pre-development lease scenario most

closely implicates the element entailing payment, in whole or in part, with public funds[.]”

Hance, 33 A.3d at 572 (citations omitted). Pursuant to the amended lease before the

Hance Court, the construction of the building shell was “facially” privately funded. Id.

Nonetheless, the majority opined that “the labels appended to transactional documents

do not exclusively determine the applicability of regulation” under the PWA. Id. Instead,

the “economic reality” of the transaction controls whether the PWA applies. Id. (citation

omitted).

After briefly setting forth the Phoenix Field Office test, the majority quickly

dismissed it, opining that the test only provided “generalized guidance” and was loosely

related to the question of whether the PWA should apply. Hance, 33 A.3d at 572. Most

important to the majority, the Phoenix Field Office Test failed to “account sufficiently for a

key aspect of business transactions, namely, the allocation of risk.” Id. at 573. Thus, the

Hance majority clearly held the Board’s exclusive use of the Phoenix Field Office test was

improper. See id. at 572 (“In view of the looseness inherent in the framing of the Phoenix

Field Office factors, we do not believe it would be useful for us to adopt them here.”). The

Court refused to defer to the Board on this issue as the Board’s interpretation was

“imprudent or inconsistent with legislative intent.” Id. at 573 (citation omitted).

Instead, the Hance majority imported a test developed by the United States

Supreme Court to determine ownership of property for the purpose of calculating federal

[J-18-2025] - 19
income tax obligations. See Hance, 33 A.3d at 573 (citing Frank Lyon Co. v. U.S., 435

U.S. 561, 576-577 (1978)). According to the majority, the Lyon test’s focus on risk

allocation appropriately reflected the prominence of risk allocation in assessing the

economic reality of a transaction for the purpose of applying the PWA. As such, the

majority opined that

a grievant which presents evidence that it is incurring the risk and
obligations of an owner/mortgagor in construction, that there is no public-
financing component in the work … [or] relevant major phase of construction
… and that its relationship with the covered entity is as a lessor under a
facially legitimate lease, has established a prima facie case that wage
regulation is not implicated[.]
Id. Once the grievant has established this prima facie case, the majority held that it was

the Bureau’s burden to present evidence that “the economic reality of the transaction is

different from its appearance.” Id. at 573-574. “Where the Bureau does so sufficiently,

the ultimate burden should rest with the grievant.” Id. at 574 (citations omitted).

In applying its burden shifting test, the Hance majority declined to “hypothesize the

range of circumstances which might counterbalance a prima facie case in the pre-

development lease setting.” Hance, 33 A.3d at 574. Instead, the majority concluded the

Bureau had failed to establish the economic reality of the transaction was inconsistent

with the label “lease.” In doing so, it rejected several arguments to the contrary.

First, the majority noted the fact that rent payments would allow the lessor to

recoup construction costs in six years. Interestingly, it opined “it is evident that few office

buildings would be built if the construction costs, including the cost of servicing the

construction loan, could not ultimately be recouped by anticipated lease payments within

a reasonable time frame.” Hance, 33 A.3d at 574. Instead, analogizing the application

of the PWA to the issue of whether a lease of goods gives a lessor a security interest in

the goods, the majority questioned the relevance of these circumstances in the absence

of evidence establishing whether the six-year term was “substantially shorter than the

[J-18-2025] - 20
industry norm[.]” Id. (citation omitted). The majority did not explain how evidence of the

industry norm should be obtained by the Bureau or even if such a norm exists in a market

where the assets are generally considered unique, based on factors such as convenience

to market, availability of infrastructure, weather risk, subjective aesthetic concerns, and

local governance.

Similarly, once again relying on its conception of risk allocation and ownership, the

Hance majority rejected the Bureau’s reliance on the fact that the charter school was the

sole tenant of the building. The majority questioned the relevance of this circumstance

absent “more pertinent information,” as the sole tenancy “may simply follow from the size

of the building and the School’s needs.” Hance, 33 A.3d at 575. It also dismissed the

Bureau’s reliance on the existence of the school’s option to purchase the building after

five years. If the school exercised its option at five years, “its lease payments will have

already nearly paid for the cost of constructing the shell, including financing costs, and

the sum of its lease payments and the purchase price will be nearly twice the construction

costs.” Id. Left unexplained is how this circumstance demonstrated the lessor bore all

(or any of) the risk in the transaction.

The Hance majority then identified several other circumstances that it opined were

inconsistent with the lease “being a disguised build-to-suit contract.” Hance, 33 A.3d at

575. First, the school was not permitted to make any alterations to the property without

the lessor’s permission after the fit-out was completed. See id. Second, the agreement

required the school to make the property available to the lessor for inspection during

normal business hours and during an emergency. See id.

Based on this analysis, the majority opined that the lessor had met its burden of

establishing a prima facie lease, i.e., its “only relationship with the [charter school] was

[J-18-2025] - 21
per a bona fide pre-development lease. The Bureau failed to go forward with sufficient

evidence to the contrary to overcome this prima facie case.” Hance, 33 A.3d at 576-577.

Thus, Hance built upon the Penn National I test by importing considerations of

“ownership” and “risk allocation” into the “paid for … with public funds” element. To

accommodate these new concerns, Hance created a novel burden-shifting test to be

applied only when a pre-development lease is at issue. Under Hance, a “facially

legitimate lease” is entitled to a presumption that the PWA does not apply — though this

Court provided little guidance as to what qualifies as facially legitimate. Hance, 33 A.3d

at 574. In its own words, the Hance majority opined this presumption can only be

overcome by proving, by a preponderance of the evidence, that “the economic reality of

the transaction is different from its appearance.” Id. at 573-574. While the Hance majority

failed to clarify the issue, this burden would arguably require the presentation of expert

opinion on the question of the economic reality of the transaction. See id. at 574 (noting

that recoupment of construction costs through six years of rent payments is “of little

probative value relative to the question of whether the lease is a disguised construction

contract, absent proofs regarding whether a six-year recoupment period is substantially

shorter than the industry norm for building shells of the type involved here” (citation

omitted)). If the presumption is rebutted, then the grievant bears “the ultimate burden[.]”

Id. (citations omitted). Left unsaid were the contours of this burden given that the Bureau

already would have established, by a preponderance of the evidence, that the economic

reality of the transaction was not a lease.

In a dissent joined by Justice Seamus McCaffery, then-Justice Baer first criticized

the Hance majority for utilizing tax law principles in the context of the PWA:

I conclude that the tax avoidance precedent is inapt. Our Rules of Statutory
Construction classify statutes imposing taxes as one of the few categories
that must be strictly construed against taxation by courts. This strict
construction against the imposition of taxes is entirely consistent with our

[J-18-2025] - 22
established national view of taxes. … The [PWA], however, is not a statute
imposing taxation which is to be strictly construed. Instead, it is a remedial
statute subject to an opposite rule of statutory construction. It is to be
liberally construed to effectuate its objective to protect workers’ rights
to adequate pay when engaged in public work projects.
Hance, 33 A.3d at 578 (Baer, J., dissenting) (citations omitted; emphasis added).

The dissent also criticized the majority’s insertion of “risk allocation” into the PWA

without any basis. See Hance, 33 A.3d at 579. Instead, the dissent determined that the

Phoenix Field Office test better reflected the explicit language of the PWA. See id. at

579-580. As such, the dissent concluded that the PWAB’s application of the Phoenix

Field Office test was appropriate. See id. at 580.

VI. APPLYING HANCE TO THE STATE POLICE LEASE

We accepted review of this case to determine several specific questions raised by

the Commonwealth Court’s analysis. First, whether the Commonwealth Court’s exclusive

reliance on risk allocation was proper under Hance. Second, the propriety of the

Commonwealth Court’s conclusion that, despite several circumstances demonstrating

the State Police bore at least some of the risk, Developer’s risk exposure was sufficient

to excuse the project from prevailing wage requirements. And third, we sought a

clarification of what constitutes a prima facie case that an agreement is a facially

legitimate lease.

A. Is risk allocation the only relevant factor?

Neither party before this Court provided an explicit answer to this question. The

Bureau argues that Hance is entirely distinguishable on the facts. The Bureau asserts

the only relevant question is whether public funds paid for the construction of the barracks.

It then answers its own question by asserting that public funds undisputedly paid for the

construction. Similarly, Developer does not explicitly address the question presented.

Instead, Developer argues the central issue of this case is whether public funds paid for

the construction of the barracks.

[J-18-2025] - 23
We agree with the parties to the extent that our analysis must flow from the explicit

language of the statute. Given that focus, it is immediately obvious that the Hance

majority failed to define what a facially legitimate lease is. Thus, to apply Hance on its

own terms, we must do what Hance failed to do: define what a lease is.

As even the Hance majority acknowledged, our analysis does not end with the title

of the document. The question is, how far beyond the mere title must we go to determine

whether a purported lease is facially legitimate? Since “lease” is not contained in the

PWA, it is not explicitly defined therein. In these circumstances, we turn to dictionary

definitions of the terms to guide our analysis.

A “lease” is “[a] contract by which a rightful possessor of real property conveys the

right to use and occupy the property in exchange for consideration, [usually] rent.” Black’s

Law Dictionary (12th Ed. 2024) (“LEASE”). In turn, “rent” is defined as “[c]onsideration

paid, [usually] periodically, for the use or occupancy of property[.]” Id. (“RENT”). The

Hance test starts with the assumption that a facially legitimate lease is legally distinct from

a “construction contract.” A “construction contract” is “[an agreement between two or

more parties,] setting forth the specifications for a building project’s construction.” Id.

(“CONTRACT”).

It is immediately apparent that a lease contract and construction contract are not

mutually exclusive categories. It requires little imagination to envision a contract that

requires the lessor to both construct a building and to provide the lessee with the right to

use and occupy the building in exchange for rent. Indeed, the Hance majority implicitly

acknowledged that a contract can be both a lease and a construction contract when it

distinguished the lease before it from “a disguised build-to-suit contract.” Hance, 33 A.3d

at 575.

[J-18-2025] - 24
However, the parties have not meaningfully advanced the analysis beyond what is

stated in Hance: “risk allocation should be a prominent consideration in assessing the

economic reality of a business transaction and, in particular, a lease[.]” Hance, 33 A.3d

at 573. Neither party contends that risk allocation should be the sole determining factor.

See Bureau’s Brief at 35; Developer’s Brief at 38. Given this agreement, we must

conclude the Commonwealth Court here erred. The Commonwealth Court failed to

appreciate the other aspects of the Lease Agreement (and other attendant

circumstances) that support a different conclusion. See PSP NE, 292 A.3d at 1184

(concluding the Bureau failed to rebut Developer’s prima facie case because it “presented

no evidence that the timeline for Developer’s expected recoupment of construction costs

was ‘substantially shorter than the norm’” (citation omitted)).

As both parties concede, the essential question is whether admittedly public funds

— payments from the State Police under the Lease — “paid for” construction of the

barracks. See 43 P.S. § 165-2(5). This is a causation dispute, not a nature of the funding

dispute.

This issue is distinct from the “but for” test we rejected in Ursinus College. There,

we held that the mere involvement of a government entity for pass-through financing did

not transform private funds into public funds:
According to the evidence of record, at no point did either the monies used
to pay the Project costs or the monies used to service the bond debt ever
enter, rest in, or otherwise flow through the Authority’s coffers. Moreover,
no Authority or taxpayer funds were used to secure the bonds; neither the
Authority nor taxpayers bore any risk or liability relative to the bonds. In
short, the Project work was marked by the receipt of payment, in whole or
in part, from the available pecuniary resources from or possessed by the
private Trustee (not the Authority) — i.e., the private bond proceeds
generated from the sale of the Authority’s bonds and deposited in the
Project Fund. As such, the Authority simply served as a conduit for
financing the Project, a private endeavor.

[J-18-2025] - 25
Ursinus College, 310 A.3d at 172-173 (footnote omitted). Here, in contrast, the question

is not whether the rent payments under the Lease come from the pecuniary resources

of a government agency. They undoubtedly do. Nor is there any intermediary as in

Ursinus College. Rather, the State Police pay rent directly to Developer, who is not only

the putative landlord, but also, under the same contract, the party responsible for

building the barracks.

The question now is whether the rent payments are exchanged, at least in part,

for the service of constructing the facility. In other words, did Developer promise to

construct the facility in exchange for the payments from the State Police? If so, public

funds paid for the construction.

To answer the question, this Court must apply a totality of the circumstances

analysis, taking into consideration all relevant information, including the Hance risk

allocation factors, to reveal the economic reality of the transaction. Although the Hance

Court found the Phoenix Field Office factors too “loose” for its analysis, those factors

and the “generalized guidance” they provide prove beneficial herein.

Thus, let us begin the analysis with a clear understanding of the undisputed facts

underlying this transaction: (1) the State Police solicited a detailed proposal from

Developer that Developer had no independent plan to build, no other use for, and no

other tenant to occupy; (2) in doing so, the State Police dictated its specific needs and

requirements for a police training facility; (3) the State Police’s occupancy was

conditioned upon Developer’s satisfactory construction of the training facility; (4) the

State Police’s rent and other financial obligations were paid for by public funds and tied

directly to Developer’s debt obligations under the terms of its construction loan; and (5)

in the event of early termination, the Lease Agreement obligated the State Police to pay

a significant portion of the residual costs of construction.

[J-18-2025] - 26
Although the Hance Court was skeptical of adopting the Phoenix Field Office test

to its unique circumstances, those factors — including the Hance risk allocation factor

— clearly guide our analysis here. First, the “length of the lease.” The initial lease

period is 20 years, with the State Police having a right to exercise two five-year options

to extend. The length of the lease is at least four times the lease at issue in Hance.

Thus, it is a “long-term lease of custom built facilities” which “are a common technique

used by enterprises … to acquire new buildings.” Phoenix Field Office. While far from

conclusive, this factor suggests the Lease Agreement may be a disguised construction

contract.

Next, the extent of government involvement in the construction project. In

essence we must assess whether the construction project is to the lessee’s

specifications or is merely a generic structure such as the building shell in Hance. This

is especially relevant if the resulting project is unlikely to have a market outside the

contracting government agency. Here, there is no indication that Developer was going

to build the headquarters facility in the absence of the Lease. Further, the Lease

provides that Developer will “[c]onstruct and renovate the Premises” at Developer’s cost

“and in return for Rent paid by” the State Police, and “in accordance with all plans and

specifications set forth” in the State Police’s 128-page specifications. Lease, R.R. 43a.

Not only does Lease establish that construction is pursuant to the State Police’s detailed

specifications, but it also explicitly states that the construction is in return for the rent

paid by the State Police. As the Bureau contends, the Lease is clearly a build-to-suit

agreement, requiring Developer to not only provide use and occupancy, but also

construction, of the facility. Here, it is undisputed that the construction of the training

facility was performed to the specifications set forth by the State Police in a 128-page

[J-18-2025] - 27
document. This factor strongly supports a conclusion that the Lease Agreement is a

disguised construction contract.

The third Phoenix Field Office factor is the extent to which the construction will

be used for private rather than public purposes. There is no evidence or assertion that

any tenant other than the State Police will ever use the training facility. This factor

strongly supports a conclusion that the Lease Agreement is a disguised construction

contract.

Fourth, the extent to which the costs of construction will be fully paid for by the

lease payments. Where construction is financed by a facially private loan, we must

examine the financing structure to determine the economic reality of the financing. What

appears at a glance to be a private loan, may actually be a disguised conduit for using

public funds to finance construction. If the loan agreement requires, as a pre-condition,

a lease charging sufficient rent to cover the debt payments under the loan, it is clear that

public funds are a pre-condition to the financing of construction costs. On the other

hand, if a developer can establish that the construction would have occurred even in the

absence of the lease with the public body, this would tend to show that the lease

agreement was not merely an attempt to evade the application of the PWA. Here,

Developer arguably provided some of the funds for the construction of the training

facility, but clearly the bulk of the funding came through a loan from FNCB. The FNCB

loan requires that the rent payments — the public funds expended by the State Police

— be sufficient to cover Developer’s payments on the loan and requires assignment of

Developer’s rights under the Lease to FNCB. Further, the Lease Agreement obligates

the State Police to pay for unamortized costs of the project in the event of early

termination of the lease. Since a significant portion, if not all, of the construction costs

[J-18-2025] - 28
will be paid for through the State Police’s rent payments, this factor also strongly

supports a conclusion that the Lease Agreement is a disguised construction contract.

The fifth and final Phoenix Field Office factor, “whether the contract is written as

a lease solely to evade” application of the prevailing wage requirement, is a factual

inference that can only be answered by a consideration of all the circumstances. Here,

we can presume Developer desired to avoid the application of the PWA given the

ensuing litigation. Under the specific circumstances of this case, it is not necessary to

determine whether this was Developer’s sole motivation in structuring the transaction as

a lease. Even if we assume that Developer had other motivations, it simply is not

enough to overcome the circumstantial evidence establishing that the State Police’s rent

payments fund the costs of construction.

As noted, Hance stated that an additional factor, risk allocation, must be

considered. Here, as set forth in B. below, we conclude that Developer failed to

establish it bore all of the risk in this transaction. As such, this factor also favors a

conclusion that the PWA applies to the transaction.

Independent of its risk allocation analysis, the Commonwealth Court relied on

Developer’s reversionary interest in the facility. See PSP NE, 292 A.3d at 1182. It

opined that “such a reversionary interest in a predevelopment lease to the developer

facially supports the conclusion that the lease is a bona fide one and not a construction

contract.” Id. (internal quotation marks omitted). Yet, ownership of the resulting project

is not, on its own, a circumstance relevant to the application of the PWA. Nothing in the

plain language of the PWA requires the government to obtain ownership of what is being

constructed. Instead, the PWA applies when public funds are exchanged for

construction services, regardless of who ends up owning the resulting structure. See

22 S. 40th Street Owner LLC v. Pa. Prevailing Wage Appeals Bd., 303 A.3d 857 (Pa.

[J-18-2025] - 29
Cmwlth. 2023) (concluding the PWA applies where private owner used publicly funded

grant to pay for historical renovations of its property). 14 As such, a developer’s

ownership of the resulting facility is merely one circumstance among many, and its

probative value is highly dependent on other circumstances.

To be clear, other factors may, and probably do, exist. We make no attempt to

provide an exhaustive list of possible factors. As always, a totality of the circumstances

analysis means just that — all relevant circumstances should be considered on a case-

by-case basis. See, e.g., Bowser v. Blom, 807 A.2d 830, 836 (Pa. 2002) (declaring that

this Court “need not imagine or account for all conceivable relevant circumstances … in

order to render some guidance on the standard”).

The totality of the circumstances reveal the economic reality of the transaction is

not a bona fide lease. Rather, the Lease clearly contains requirements that Developer

construct a facility specifically designed for the State Police’s use. Thus, the

Commonwealth Court erred in concluding otherwise. While this is sufficient on its own

to reverse the Commonwealth Court’s order, it does not moot the second question

presented in this appeal. We thus turn to that issue.

B. How much risk must a developer bear to avoid application of the PWA

Before this Court, Developer asserts that “[t]o satisfy the first and second elements

of the prima facie case set forth in Hance, a developer must bear all of the risk of funding

or financing a project[.]” Developer’s Brief at 20. Developer’s assertion is justified by the

language of the PWA itself, as a prevailing wage is required if public funds pay for

construction even “in part.”

Yet, despite Developer’s protestations, it does not bear all the risk in this project.

The State Police may be liable for unamortized costs if the Lease is terminated before the

14 Developer does not request this Court overrule 22 S. 40th Street.

[J-18-2025] - 30
initial term of 20 years. The unamortized costs of renovation are clearly not payments

for use or occupancy of the barracks. 15 Even if the State Police are unlikely to terminate

the Lease before the full term and thus avoid this payment, the contractual requirement

represents a definite risk that the State Police, a public entity, may be liable for

construction costs. Thus, if, as Developer asserts, a developer must bear all

development risk to avoid application of the PWA, that requirement is not met here.

Moreover, Developer’s construction loan contains a condition precedent requiring

Developer to charge the State Police sufficient rent to cover its obligations:
2.17 Commonwealth Lease. [Developer] shall have delivered to Lender
an executed Lease between [Developer] and Commonwealth of
Pennsylvania (the “Lessee”) for the Premises reasonably acceptable to
Lender with an annual rent sufficient to cover [Developer’s] debt
service and all real estate taxes and insurance on the Premises.
Loan Agreement, R.R. at 221a (emphasis added). The loan agreement also requires

Developer to “collaterally assign[] to Lender all of its rights under any and all present and

future leases with tenants at the Premises, including, but not limited to, the rents from

such tenants.” Id. at 211a. Thus, through the loan agreement, FNCB guaranteed the

creation of an asset, paid for from public funds, that covers part of, if not all of, Developer’s

financial exposure on the project.

These circumstances may exist in many pre-development leases. As the Hance

majority noted, “it is evident that few office buildings would be built if the construction

costs, including the cost of servicing the construction loan, could not ultimately be

15 It is not entirely clear whether the “unamortized costs of renovation” in the Lease

Agreement refers to the original construction of the facility, or only subsequent
renovations paid for by Developer at the State Police’s request. However, the parties
stipulated that if the Lease were to be terminated early, Developer would suffer “a loss of
any difference between the total project cost and unamortized costs.” Stipulated Facts,
R.R. 30a. This stipulation supports the former interpretation. In any event, Developer
does not assert that the payment of unamortized costs is in exchange for use and
occupancy of the facility.

[J-18-2025] - 31
recouped by anticipated lease payments within a reasonable time frame.” Hance, 33

A.3d at 574. The economic reality is that a developer does not go into business to assume

risk; a developer assumes a subjectively acceptable amount of risk in return for a

subjectively acceptable probability of turning enough profit to justify the risk. Every

development contract represents a balance between risk incurred and profit expected.

However, this does not change the explicit language of the PWA. The PWA is not

an economic development statute, seeking to incentivize development. Instead, it is a

remedial statute, seeking to protect workers from sub-standard wages paid by developers

on public work projects. It requires payment of a prevailing wage when public funds pay

for, even in part, construction of a building, and any analysis of the ‘totality of the

circumstances’ of the questioned transaction should be viewed under that rubric. As

eloquently stated in Phoenix Field Office referencing the Davis-Bacon Act, “[w]hile the

public generally has an undeniable interest in paying as little as possible for the

construction of public works,” the PWA is designed “to subordinate that interest to the

extent necessary to set minimum wage standards for such construction work.” Phoenix

Filed Office.

Here, the Lease Agreement utilizes several tactics to shift the risk from Developer

to the State Police. First, the use of guaranteed years. Through the guarantee of at least

ten years of rent from the State Police, Developer ensures a significant flow of payments

in return for the construction of the facility. Second, as noted previously, the Lease

Agreement requires the State Police to reimburse Developer for its unamortized costs of

construction if the Lease is terminated before the end of the 20-year initial term. Once

again, the payment of unamortized costs is not “rent,” as it is not a payment for the use

or occupancy of the barracks. Instead, it is clearly a payment designed to pay for the

costs of constructing the headquarters facility.

[J-18-2025] - 32
Accordingly, the Lease fails the “all of the risk” test proposed by Developer and

required by the plain text of the PWA. It is clear under the economic realities of the project

that State Police funds pay for construction of the barracks at least in part, if not in full.

Accordingly, the Commonwealth Court erred in concluding that the barracks lease was

not subject to the PWA for this reason as well.

Given our conclusion that the Commonwealth Court erred in applying the PWA to

the facts of record, we need not reach the third issue presented in this appeal.

VII. CONCLUSION

Based on the plain language of the PWA, prevailing wage requirements apply

when public funds are paid to obtain non-maintenance construction, reconstruction,

demolition, alteration or repair services. Risk allocation is but one of many factors to be

considered to determine whether public funds paid for construction under Hance. Since

the totality of the circumstances here establish that public funds paid for construction

costs of the State Police headquarters, the Lease is subject to PWA requirements.

Accordingly, we reverse the Commonwealth Court’s order.

Justices Donohue, Dougherty and Wecht join the opinion.

Justice Mundy files a concurring opinion in which Chief Justice Todd and Justice Brobson
join.

[J-18-2025] - 33

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/cases/11328519. Public record. Not legal advice.
