# MPower Energy NJ v. Illinois Commerce Comm'n

> Appellate Court of Illinois · May 4, 2026 · 2026 IL App (4th) 250130-U

URL: https://www.frixlaw.com/law-library/cases/11320221

## Case

- **Court:** Appellate Court of Illinois
- **Decided:** May 4, 2026
- **Citations:** 2026 IL App (4th) 250130-U
- **Precedential status:** Unpublished
- **Opinion:** Opinion
- **Cited by:** 0 later opinions in the Frix Law Library

## Citator (automated)

- No negative treatment found by the automated citator. That is not the same as a confirmation that the case is good law; read the citing cases.
- Full citator and citing cases: https://www.frixlaw.com/law-library/cases/11320221

## How later opinions describe it (automated extraction)

- discussing the capable of repetition yet avoiding review exception and collateral consequences exception

## Opinion text

NOTICE 2026 IL App (4th) 250130-U
This Order was filed under
FILED
Supreme Court Rule 23 and is May 4, 2026
NO. 4-25-0130
not precedent except in the Carla Bender
limited circumstances allowed 4th District Appellate
under Rule 23(e)(1). IN THE APPELLATE COURT Court, IL

OF ILLINOIS

FOURTH DISTRICT

MPOWER ENERGY NJ LLC, ) Appeal from the
Plaintiff-Appellant, ) Circuit Court of
v. ) Sangamon County
THE ILLINOIS COMMERCE COMMISSION, ) No. 24CH59
COMMONWEALTH EDISON COMPANY, )
NORTHERN ILLINOIS GAS COMPANY, and THE ) Honorable
PEOPLES GAS LIGHT AND COKE COMPANY, ) Robin L. Schmidt,
Defendants-Appellees. ) Judge Presiding.

JUSTICE VANCIL delivered the judgment of the court.
Justices Lannerd and DeArmond concurred in the judgment.

ORDER

¶1 Held: The appellate court dismissed the plaintiff’s appeal as moot, finding it could grant
no effectual relief.

¶2 In November 2024, the Illinois Commerce Commission (ICC) notified Mpower

Energy NJ LLC (Mpower), that Mpower’s certificates to act as an alternative gas and electricity

supplier in Illinois had been revoked. The following month, defendants Commonwealth Edison

Company (CE), Northern Illinois Gas Company (NICOR), and the Peoples Gas Light and Coke

Company (PGL), notified Mpower that they intended to cancel services to MPower’s customers

because of the revocation. Mpower then filed a complaint against the ICC, CE, NICOR, and

PGL in the trial court, seeking injunctive relief requiring defendants to reinstate Mpower’s

certificates and maintain services to their customers. Ultimately, the court dismissed Mpower’s

complaint with prejudice for lack of subject matter jurisdiction and denied its motion to amend
its complaint. Mpower appeals, arguing the trial court erred in finding it lacked subject matter

jurisdiction, denying its motion to amend, and dismissing its complaint with prejudice.

¶3 We dismiss the appeal as moot.

¶4 I. BACKGROUND

¶5 In Illinois, customers have the option to purchase natural gas or electricity from a

supplier other than the utility in their service territory. See generally 220 ILCS 5/19-100 et seq.

(West 2024). When a customer contracts with an “alternative retail electric supplier” (ARES) or

“alternative gas supplier” (AGS), the natural gas or electricity utility continues to deliver the

natural gas or electricity to the customer, and the AGS or ARES supplies the electricity or gas

through the utility’s delivery infrastructure. Every AGS and ARES must receive a certificate to

operate in Illinois from the ICC. See id. §§ 16-115(a), 19-110(b). Without such certificates, a

company is not permitted to supply gas or electricity to customers.

¶6 On December 6, 2024, Mpower filed its complaint in the trial court in Sangamon

County. According to the complaint, in December 2017, Mpower received certificates of service

authority from the ICC permitting Mpower to act as an ARES or AGS in Illinois. After receiving

these certificates, MPower acted as an alternative supplier in the state. In November 2024,

MPower received a notice from the ICC stating that in February 2023, the Illinois Secretary of

State revoked MPower’s admission as a limited liability company in Illinois because Mpower

had failed to file an annual report under the Illinois Limited Liability Company Act. See 805

ILCS 180/50-1 (West 2022). As a result, Mpower’s certificates of service authority were

revoked, as well. The complaint further alleged that on December 3, 2024, CE notified Mpower

that it would cancel services to Mpower’s customers. The following day, Mpower received

notice that NICOR and PGL would also cancel services to its customers.

-2-
¶7 In its complaint, Mpower claimed that the Illinois Secretary of State failed to send

notice that Mpower’s license to transact business in Illinois would be revoked. Mpower asserted,

“Accordingly, the ICC’s cancellation of MPower’s ARES and AGS licenses was equally

improper.” Mpower sought a judgment finding the ICC “was without authority and/or acted

improperly in cancelling Mpower’s ARES and AGS licenses and hence those licenses should be

reinstated.” Mpower further sought an injunction preventing CE, NICOR, and PGL from

canceling Mpower’s customers’ enrollment with Mpower as the supplier of their gas and

electricity.

¶8 Mpower also sought a temporary restraining order (TRO) preventing the ICC

from canceling Mpower’s licenses and prohibiting NICOR, PGL, and CE from changing their

customers’ electricity and gas suppliers. The trial court granted the TRO.

¶9 On December 18, 2024, Mpower filed a motion to amend its complaint.

Mpower’s attached proposed amended complaint restated its request for a declaratory judgment

and injunctive relief. Count II alleged that the cancelation of its licenses violated the due process

clause of the Illinois Constitution (see Ill. Const. 1970, art. I, § 2) because the cancelation was

“wholly arbitrary, irrational, unreasonable and capricious.” Count III asserted a claim under

section 1983 of the federal Civil Rights Act (42 U.S.C. § 1983 (2024)). Mpower alleged, “The

procedure by which the ICC cancelled Mpower’s ARES and AGS licenses without notice and/or

a hearing violated the due process clause of the Fifth Amendment to the Constitution.” See U.S.

Const., amend. V. Mpower further alleged that it was injured “[a]s a result of the cancellation of

Mpower’s ARES and AGS licenses and concomitant violation of Mpower’s due process rights

by the ICC.” Finally, Count IV alleged that the “procedure by which the ICC cancelled”

Mpower’s license violated the due process clause of the Illinois Constitution because Mpower

-3-
did not receive notice and an opportunity to be heard before the cancelation. Like the initial

complaint, Mpower’s proposed amended complaint sought a judgment stating that the ICC “was

without authority and/or acted improperly in cancelling Mpower’s” certificates. Mpower asked

the trial court to order that Mpower’s certificates be reinstated and that CE, NICOR, and PGL be

prohibited from unenrolling Mpower’s customers.

¶ 10 On December 31, 2024, the trial court entered an order setting a briefing schedule.

The court ordered defendants to file any response to Mpower’s motion to amend by January 17,

2025. The court further ordered Mpower to file any reply to defendants’ responses by January

31, 2025. Finally, the court set the motion for hearing on February 4, 2025, at 1:30 p.m.

¶ 11 On January 13, 2025, CE filed a motion to dismiss the complaint. Citing Ameren

Transmission Co. of Illinois v. Hutchings, 2018 IL 122973, CE argued that the trial court lacked

subject matter jurisdiction to review the constitutionality of ICC decisions or ICC proceedings.

The ICC also filed a motion to dismiss, raising the same argument. The ICC further claimed that

Mpower’s complaint was barred by sovereign immunity. On January 28, 2025, after “being

presented with the agreement of the Plaintiff, ICC, and [CE],” the court ordered Mpower to file

responses to the motions to dismiss by January 29, 2025. The court also set the motions for a

hearing on February 4, 2025, at 1:30 p.m.

¶ 12 On January 31, 2025, Mpower filed a reply to the ICC’s response to its motion to

amend its complaint. Mpower argued that sovereign immunity did not bar its suit because

Mpower was seeking to prevent future unconstitutional action “rather than redress a past wrong

with monetary damages.” See Walker v. Chasteen, 2025 IL 130288, ¶ 23 (“[A] complaint

seeking to prospectively enjoin unlawful conduct may be brought in the circuit court without

offending sovereign immunity principles.”).

-4-
¶ 13 On February 4, 2025, at 9:53 a.m., Mpower filed a “Supplement to the Motion by

Mpower to Amend the Complaint for Injunctive Relief and Declaratory Relief.” Mpower asked

for leave to file a “revised proposed Amended Complaint.” Count I of this supplemental

amended complaint asserted that section 4-204 of the Public Utilities Act (220 ILCS 5/4-204)

(West 2024)) violated article I, § 2 of the Illinois Constitution (Ill. Const. 1970, art. I, § 2), and

count II alleged that statute violated the fourteenth amendment to the United States Constitution

(U.S. Const., amend. XIV). Count III alleged section 4-204 failed to comply with section 10-65

of the Illinois Administrative Procedure Act) (5 ILCS 100/10-65 (West 2024)). In its prayers for

relief, the supplemental amended complaint asked for a declaratory judgment stating that section

4-204 of the Public Utilities Act was unconstitutional on its face and violated the Administrative

Procedure Act. It further asked for an injunction preventing the ICC from enforcing section 4-

204 and an injunction against CE, NICOR, and PGL preventing them from canceling Mpower’s

customer enrollment.

¶ 14 At a hearing later that day, Mpower argued that the trial court had jurisdiction

over its complaint because it was not challenging any specific ICC decision, order, hearing, rule,

or procedure. Instead, it was “challenging the constitutionality of the statutory structure.”

Counsel for CE argued that the court should not consider the supplemental motion to amend

because Mpower did not file it until the morning of the hearing and the proposed supplemental

motion to amend included entirely new claims challenging the constitutionality of section 4-204.

The trial court found that the Public Utilities Act provided for direct appeal of ICC actions to the

appellate court rather than the trial court and that Mpower failed to exhaust its administrative

remedies before filing suit. The court found that it lacked subject matter jurisdiction, and it

dismissed Mpower’s complaint with prejudice. The court added, “The supplement that was filed

-5-
today by Mpower will not be considered as it was not timely, but I do agree that it contained

other potential causes of actions.”

¶ 15 This appeal followed.

¶ 16 Before oral argument in this case, NICOR and PGL filed a motion to dismiss the

appeal as moot as to those two defendants. NICOR and PGL asserted that Mpower’s only

requested relief against NICOR and PGL was an order prohibiting those companies from

canceling Mpower’ s customers’ enrollment with Mpower as their gas supplier. After the trial

court dismissed the case, however, NICOR and PGL canceled those enrollments. NICOR and

PGL claimed that no relief could undo this action, the court could not grant Mpower any relief,

and the case was moot. In their response, Mpower stated,

“NICOR and [PGL], as well as [CE], canceled Mpower’s customers which then

resulted in a substantial immediate loss due to the canceled contract [citation], as

well as future loss of customers because of the cancelation [citation]. It is true that

the damage that has been done by [the ICC], [CE], [PGL], and NICOR cannot be

undone. However, there now stands a cause of action for damages that should go

forward in the Circuit Court of Sangamon County.”

Mpower also suggested that dismissing the appeal as moot could have implications for

res judicata and collateral estoppel if Mpower chose to pursue other claims in the future. We

took the motion with the case.

¶ 17 II. ANALYSIS

¶ 18 On appeal, Mpower argues the trial court erred in refusing to consider its

supplemental motion to amend. It further argues that the court erred in finding that it lacked

subject matter jurisdiction and in dismissing this case with prejudice.

-6-
¶ 19 We first address Mpower’s supplemental motion to amend. In its brief, Mpower

contends that it offered its supplemental amended complaint to clarify its claims and correct

ambiguities in its prior filings, and the trial court erred in refusing to consider it.

¶ 20 This is clearly untrue. Mpower’s initial complaint and its proposed amended

complaint challenged the revocation of its licenses by the ICC. Mpower did not challenge the

constitutionality of any statute in either its initial complaint or proposed amended complaint.

Instead, Mpower first raised these claims in its supplemental amended complaint. By including

claims challenging the constitutionality of section 2-204 on its face for the first time in its

supplement, Mpower plainly attempted to raise new claims.

¶ 21 The trial court rightly refused to consider this supplement. “The court has the

right and duty to control its own docket,” and it “is vested with wide discretion in granting or

denying extensions of time to file pleadings or motions.” Hutchcraft v. Independent Mechanical

Industries, Inc., 312 Ill. App. 3d 351, 354 (2000). Moreover, a trial court’s inherent authority to

control its docket “includes the discretion to strike tardy pleadings.” Landreth v. Raymond P.

Fabricius, P.C., 2018 IL App (3d) 150760, ¶ 54. In its order setting a briefing schedule, the trial

court ordered Mpower to file any reply to defendants’ responses to its motion to amend by

January 31, 2025. Instead of complying with this order, Mpower filed its supplemental motion to

amend the morning of February 4, 2025, hours before the hearing on the motion to amend.

Mpower did not provide defendants adequate notice and opportunity to respond to this pleading

asserting entirely new claims, and the trial court acted within its discretion when it refused to

consider this untimely pleading. Accordingly, we also disregard the claims in Mpower’s

supplemental motion to amend.

¶ 22 We next address NICOR and PGL’s claim that the case is moot as to them. “As a

-7-
general rule, courts in Illinois do not decide moot questions, render advisory opinions, or

consider issues where the result will not be affected regardless of how those issues are decided.”

In re Alfred H.H., 233 Ill. 2d 345, 351 (2009). “An appeal is moot if no actual controversy exists

or when events have occurred that make it impossible for the reviewing court to render effectual

relief.” Commonwealth Edison Co. v. Illinois Commerce Commission, 2016 IL 118129, ¶ 10. “It

is well established that a case may become moot when, pending the decision on appeal, events

occur which render it impossible for the reviewing court to grant effectual relief.” Maday v.

Township High School District 211, 2018 IL App (1st) 180294, ¶ 46. We review questions of

mootness de novo. Alfred H.H., 233 Ill. 2d at 350.

¶ 23 As NICOR and PGL contend, Mpower’s only claim for relief against them is an

order prohibiting those defendants from canceling their customers’ services. In its response to the

motion to dismiss the appeal and reply brief, Mpower concedes that NICOR and PGL already

canceled these services and that this cancelation is irreparable. In its reply brief, Mpower states

that “the outcomes that were anticipated when the original Complaint was filed on December 6,

2024—i.e., that irreparable harm would occur to Mpower if [CE, PGL, and NICOR] were

allowed to cancel its customers—which did in fact occur.” Mpower adds, “Accordingly, the

cause of action against [CE, PGL, and NICOR] is now damages rather than injunctive or

declaratory relief.”

¶ 24 Mpower did not assert a claim for damages in its complaint, its amended

complaint, or even its supplemental complaint. Mpower essentially concedes that the case is

moot as to NICOR as PGL.

¶ 25 We agree. NICOR and PGL already canceled Mpower’s customer enrollment. A

court order cannot undo this action. Mpower requested no other relief. Therefore, we cannot

-8-
grant effective relief, and the case is moot.

¶ 26 According to Mpower, we should not dismiss the appeal as moot because

dismissal could prevent future actions against these defendants pursuant to the doctrines of

res judicata or collateral estoppel. Under the doctrine of res judicata, “a final judgment rendered

by a court of competent jurisdiction on the merits is conclusive as to the rights of the parties and

their privies, and, as to them, constitutes an absolute bar to a subsequent action involving the

same claim, demand or cause of action.” Nowak v. St. Rita High School, 197 Ill. 2d 381, 389

(2001).

“The doctrine of collateral estoppel applies when a party, or someone in

privity with a party, participates in two separate and consecutive cases arising on

different causes of action and some controlling fact or question material to the

determination of both causes has been adjudicated against that party in the former

suit by a court of competent jurisdiction. The adjudication of the fact or question

in the first cause will, if properly presented, be conclusive of the same question in

the later suit, but the judgment in the first suit operates as an estoppel only as to

the point or question actually litigated and determined and not as to other matters

which might have been litigated and determined.” (Emphasis in original.) Id. at

389-90.

Mpower contends that res judicata and collateral estoppel could prevent other potential lawsuits

against these defendants, and we should allow Mpower to pursue this case further.

¶ 27 We disagree. First, Mpower has cited no cases finding that collateral estoppel or

res judicata provide exceptions to mootness. We will not disregard mootness simply to improve

Mpower’s chances of filing successful complaints in the future. Moreover, perhaps Mpower

-9-
might have avoided the disenrollment of its customers and a mootness finding if it had sought a

stay of the trial court’s ruling pending appeal. The court granted a TRO preventing the

disenrollment of Mpower’s customers, and a stay could have maintained the status quo ante

during the appeal process. But Mpower failed to seek a stay. It is unfortunate for Mpower if this

failure rendered this case moot and may frustrate Mpower’s future litigation efforts, but this does

not establish any exception to the rules of mootness.

¶ 28 Furthermore, the trial court dismissed this case for lack of subject matter

jurisdiction. “[T]he dismissal of a complaint for lack of subject matter jurisdiction is not

considered a decision on the merits of the complaint.” Id. at 390. Mpower does not explain why

dismissal of the appeal as moot would create res judicata or collateral estoppel problems in

future cases where the trial court here dismissed the case for lack of subject matter jurisdiction.

¶ 29 Moving to CE, neither CE’s nor Mpower’s briefs discuss whether the appeal is

moot as to CE. However, we see no basis to distinguish CE from NICOR and PGL. As with

NICOR and PGL, Mpower’s requested relief against CE was only that CE be barred from

canceling its customers’ enrollment. As with NICOR and PGL, no order from this court could

undo CE’s cancelations. And as with NICOR and PGL, Mpower asserted no cause of action for

damages against CE in any of its complaints. Therefore, we find the appeal moot as to CE.

¶ 30 Finally, we move to the ICC. In its brief, the ICC argues that the appeal is moot as

to them regarding any prospective relief. Against the ICC, Mpower requested a judgment

declaring that the ICC acted unlawfully in canceling Mpower’s certificates and reinstatement of

those certificates. Mpower has filed applications for new ARES and AGS certificates, and the

ICC approved those applications. See Mpower Energy NJ LLC, No. 24-0989, 2025 WL 1027571,

*4 (I.C.C. Mar. 27, 2025); Mpower Energy NJ LLC, No. 24-0897, 2025 WL 1766450 (I.C.C.

- 10 -
June 18, 2025), *4-5; see also In re Andrea F., 208 Ill. 2d 148, 156 (2003) (“A reviewing court

can take judicial notice of events which, while not appearing in the record, disclose that an actual

controversy no longer exists, rendering the issue before the court moot.”). The ICC contends that

there is no additional relief this court could grant.

¶ 31 Mpower does not respond to the ICC’s claim. “This court is entitled to have

issues clearly defined with pertinent authority cited and cohesive arguments presented [citation],

and it is not a repository into which an appellant may foist the burden of argument and research.”

(Internal quotation marks omitted.) Velocity Investments, LLC v. Alston, 397 Ill. App. 3d 296,

297 (2010). Therefore, Mpower has forfeited any argument this case is not moot. More

importantly, we agree with the ICC that Mpower’s claim that its certificates should be reinstated

is moot when the ICC has already granted Mpower new certificates.

¶ 32 We acknowledge that exceptions to mootness exist. See Commonwealth Edison,

2016 IL 118129, ¶¶ 12-18 (discussing the public interest exception to the mootness doctrine); see

also Alfred H.H., 233 Ill. 2d at 358-363 (discussing the capable of repetition yet avoiding review

exception and collateral consequences exception). However, Mpower does not argue that any of

these exceptions apply. Indeed, Mpower does not mention any of these exceptions. Accordingly,

Mpower has forfeited reliance on any mootness exceptions. See Velocity Investments, 397 Ill.

App. 3d at 297; see also Illinois Supreme Court Rule 341(h)(7) (eff. Oct. 1, 2020) (requiring an

appellant’s opening brief to “contain the contentions of the appellant and the reasons therefor”).

¶ 33 We agree with the ICC’s claim that Mpower’s request for prospective relief is

moot. The ICC does not discuss whether any claim for backward-looking relief is also moot. We

note that before the trial court, in response to the ICC’s sovereign immunity claim, Mpower

insisted that it was seeking only prospective relief. In its briefs on appeal, Mpower does not

- 11 -
respond to the ICC’s sovereign immunity or mootness arguments. If, as Mpower claimed before

the trial court, it sought only prospective relief, then all its claims are moot.

¶ 34 We observe that Mpower’s complaint and proposed amended complaint sought a

declaratory judgment finding that the ICC acted unlawfully in terminating its certificates.

Because Mpower sought this declaratory judgment in conjunction with its request for

reinstatement of its licenses, we agree with Mpower’s claim before the trial court that this was a

claim for prospective relief. Therefore, it is moot.

¶ 35 However, even if we consider the claim for a declaratory judgment to be seeking

retroactive relief, it is still moot. Other than restoration of Mpower’s certificates, we see no way

Mpower can benefit from a declaratory judgment finding the ICC’s procedures unlawful. As

stated above, Mpower already has new certificates. “When it becomes apparent that an opinion

cannot affect the results as to the parties or the controversy before it, the court should not resolve

the question merely for the sake of setting a precedent or to govern potential future cases.”

Sharma v. Zollar, 265 Ill. App. 3d 1022, 1027 (1994). In Jones v. Pritzker, 2024 IL App (4th)

230118-U, ¶ 2, the plaintiffs sought a declaratory judgment finding section 7 of the Illinois

Emergency Management Agency Act (Act) (20 ILCS 3305/7 (West 2020)) and executive orders

issued under that section unconstitutional. However, the relevant executive orders expired before

the trial court heard the case. Jones, 2024 IL App (4th) 230118-U, ¶ 10. We found the plaintiffs’

claim for a declaratory judgment to be moot because the plaintiffs were no longer at risk of

sustaining injury once the executive orders expired. Id. ¶ 31. We explained, “At that point, a

determination of the constitutionality of the Act, absent an actual controversy, would amount to

an advisory opinion.” Id.

¶ 36 Although Jones is an unpublished order, we find its reasoning persuasive and

- 12 -
applicable here. Regardless of whether we characterize Mpower’s claim as a claim for

prospective or retrospective relief, it is seeking a declaratory judgment that can have no practical

effect on any of Mpower’s rights or interests. Like the expiration of the executive orders in

Jones, Mpower’s receipt of new ARES and AGS certificates eliminated any actual controversy,

rendering Mpower’s claim moot.

¶ 37 III. CONCLUSION

¶ 38 For the reasons stated, we dismiss the appeal as moot.

¶ 39 Appeal dismissed.

- 13 -

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/cases/11320221. Public record. Not legal advice.