# LDI Shallotte 179 Holdings, LLC v. State of N.C. Dep't of Envtl. Quality

> Court of Appeals of North Carolina · January 21, 2026

URL: https://www.frixlaw.com/law-library/cases/11243846

## Case

- **Court:** Court of Appeals of North Carolina
- **Decided:** January 21, 2026
- **Precedential status:** Published
- **Opinion:** Opinion by Judge Jeff Carpenter
- **Cited by:** 0 later opinions in the Frix Law Library

## Citator (automated)

- No negative treatment found by the automated citator. That is not the same as a confirmation that the case is good law; read the citing cases.
- Full citator and citing cases: https://www.frixlaw.com/law-library/cases/11243846

## How later opinions describe it (automated extraction)

- explaining the enforcement of environmental regulations is a “core police power”

## Opinion text

IN THE COURT OF APPEALS OF NORTH CAROLINA

No. COA24-443

Filed 21 January 2026

Brunswick County, No. 23CVS001307-090

LDI SHALLOTTE 179 HOLDINGS, LLC, Plaintiff,

v.

STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL
QUALITY, DIVISION OF ENERGY
MINERAL, AND LAND RESOURCES, Defendant.

Appeal by Plaintiff from judgment entered 21 February 2024 by Judge Jason

C. Disbrow in Brunswick County Superior Court. Heard in the Court of Appeals 5

November 2024.

Shipman & Wright, LLP, by Gary K. Shipman and Thomas R. Harvey, III, for
Plaintiff-Appellant.

Attorney General Jeff Jackson, by Special Deputy Attorney General T. Hill
Davis, III, and Assistant Attorney General Carolyn A McLain, for Defendant-
Appellee.

CARPENTER, Judge.

LDI Shallotte 179 Holdings, LLC (“Plaintiff”) appeals from the trial court’s: 21

February 2024 order (the “Dismissal Order”) granting the motion to dismiss filed by

The North Carolina Department of Environmental Quality, Division of Energy

Mineral, and Land Resources (“Defendant”); and 21 February 2024 order (the

“Summary Judgment Order”) denying Plaintiff’s motion for partial summary
LDI SHALLOTTE 179 HOLDINGS, LLC V. STATE OF N.C. DEP’T OF ENVTL. QUALITY

Opinion of the Court

judgment. On appeal, Plaintiff argues the trial court erred by granting Defendant’s

motion to dismiss and denying Plaintiff’s motion for partial summary judgment.

After careful review, we conclude Plaintiff adequately alleged an unconstitutional

temporary regulatory taking. Thus, the trial court erred by granting Defendant’s

motion to dismiss on this basis. The trial court did not err by granting Defendant’s

motion to dismiss as to Plaintiff’s procedural and substantive due process claims.

Finally, the trial court properly denied Plaintiff’s motion for partial summary

judgment. Accordingly, we affirm in part, reverse in part, and remand.

I. Factual & Procedural Background

On 8 February 2001, Defendant issued a stormwater permit (the “Owendon

Permit”) to Don Owen covering a parcel of land he planned to develop into a

residential subdivision called Owendon Plantation. Owen intended to develop the

parcel in five phases and completed phases one and two. Sometime in 2004, Owen

decided against developing phases three, four, and five (the “Property”) and formally

withdrew the Property from the Declaration of Owendon on 1 October 2004.

Thereafter, in October 2004, February 2005, and April 2005, Defendant issued three

notices of violation (“NOVs”) to Owen concerning the Owendon Permit. According to

Plaintiff, beyond the continued requirement of the maximum built upon area, the

NOVs were for violations associated with activity on phases one and two of Owendon

Plantation, not the Property. Owen did not resolve the NOVs and Defendant did not

take any action to enforce Owen’s compliance.

-2-
LDI SHALLOTTE 179 HOLDINGS, LLC V. STATE OF N.C. DEP’T OF ENVTL. QUALITY

Opinion of the Court

Eventually, after a series of conveyances, Plaintiff purchased the Property in

May 2021. Like Owen, Plaintiff planned to develop the Property into a residential

subdivision called Summers Walk. Shortly after purchasing the Property, Plaintiff

commenced efforts to obtain a stormwater permit from Defendant. Pursuant to the

Express Review Program, Plaintiff submitted a Request for Express Permit Review

and Express Stormwater Narrative,1 seeking permission to submit an application to

modify the Owendon Permit. On 14 July 2021, Defendant emailed Plaintiff advising

that Plaintiff was not eligible for the Express Review Program, because the “current

permittee,” Owen, was “not the entity requesting the modification” and “transfers

cannot be processed” through the Express Review Program. Defendant purportedly

based its decision on a footnote included in the Express Application Review Fee Chart

“disallowing applications for properties that in its opinion (a) overlapped with

another permit and (b) would not resolve existing compliance issues.”

In the correspondence, Defendant provided Plaintiff with a “recommended

path forward,” which included the following steps: (1) apply to transfer the Owendon

Permit to Plaintiff and submit a plan to resolve the NOVs; (2) apply to modify the

Owendon Permit to divide the original development plan into two parts, resulting in

1 The Express Review Program was created by our General Assembly. See N.C. Gen. Stat. § 143B-
279.13(a) (2023). Under section 143B-279.13(a), Defendant is required to develop an Express Review
Program and “determine the project applications to review from those who request to participate in
the program.” See id. The statute further provides that the Express Review Program may be applied
to a number of programs, including stormwater permits. See id. at § 143B-279.13(a)(1).

-3-
LDI SHALLOTTE 179 HOLDINGS, LLC V. STATE OF N.C. DEP’T OF ENVTL. QUALITY

Opinion of the Court

a new Owendon Permit and the need for a separate permit for the Property; (3) apply

to obtain a new permit for the Property; and then (4) apply to transfer the new

Owendon Permit to the Owendon Home Owners Association. Thereafter, Plaintiff

submitted two applications to Defendant: one to transfer the Owendon Permit; and

another to obtain a new permit for the Property. Defendant confirmed it received

Plaintiff’s new permit application, but it did not review or process the new application

as Plaintiff had yet to apply to modify the Owendon Permit to divide the original

development plan into two parts, per Defendant’s “recommended path forward.”

Then, on 18 November 2021, Defendant requested that Plaintiff assume

responsibility for the NOVs. Plaintiff did not respond to the request, and on 20

December 2021, Defendant returned Plaintiff’s application to transfer the Owendon

Permit to Plaintiff because Plaintiff did not submit a plan for bringing the Owendon

Permit into compliance.

On 5 January 2022, Defendant suggested an alternative avenue by which

Plaintiff could obtain a stormwater permit for the Property. Defendant advised it

could issue a new permit for the Property if Owen submitted an application to

transfer and modify the Owendon Permit and, in doing so, resolve the NOVs.

Disinclined to take that approach, Plaintiff requested that Defendant modify or

revoke the Owendon Permit in accordance with Defendant’s discretionary authority

-4-
LDI SHALLOTTE 179 HOLDINGS, LLC V. STATE OF N.C. DEP’T OF ENVTL. QUALITY

Opinion of the Court

under section 15A N.C. Admin. Code 2H.1040(6).2 Defendant elected not to exercise

its discretionary authority to modify or revoke the Owendon Permit.

In March 2022, Defendant sent Owen a Transfer Notice Request, asking if he

would jointly file, with Plaintiff, an application to transfer the Owendon Permit to

Plaintiff. In the notice, Defendant informed Owen that the NOVs must be resolved

as part of the joint application to transfer the Owendon Permit to Plaintiff.

Defendant provided Owen with six months to submit a plan for compliance. Owen

informed Defendant that he had no objection to the Owendon Permit being

transferred to Plaintiff, but advised that he would not be resolving the NOVs.

Ultimately, Owen did not apply to transfer the Owendon Permit to Plaintiff.

On 19 April 2022, Plaintiff filed a petition for contested case hearing in the

Office of Administrative Hearings (“OAH”). On 28 June 2022, Defendant filed a

motion to dismiss Plaintiff’s petition, and on 8 July 2022, Plaintiff filed a response.

On 15 August 2022, Administrative Law Judge Donald R. van der Vaart (the “ALJ”)

denied Defendant’s motion to dismiss. On 19 August 2022, Plaintiff moved for

summary judgment. On 29 August 2022, Defendant filed a response to Plaintiff’s

motion and also moved for summary judgment. On 14 September 2022, the ALJ

conducted a hearing.

2 The North Carolina Administrative Code provides Defendant’s director with the authority to revoke

or modify a stormwater permit on sixty days’ written notice “for good cause” including “violations of
any terms or conditions of the permit . . . .” See 15A N.C. Admin. Code 2H.1040(6)(a) (2023).

-5-
LDI SHALLOTTE 179 HOLDINGS, LLC V. STATE OF N.C. DEP’T OF ENVTL. QUALITY

Opinion of the Court

On 15 November 2022, the ALJ issued a Final Decision favorable to Plaintiff.

The ALJ concluded that Defendant erred at the outset by excluding Plaintiff from the

Express Review Program because the footnote upon which Defendant relied was not

an enforceable statutory provision or regulation but was a “policy statement” and the

“North Carolina Administrative Procedure Act prohibits policy statements

masquerading as rules . . . .” The ALJ further concluded that “[i]n the series of

proposed ‘paths forward’ that included as preconditions strategies to correct past

violations, [Defendant] erred by withholding review of [Plaintiff’s] application.”

Additionally, the ALJ concluded Defendant did not have authority to impute

responsibility of the Owendon Permit NOVs to Plaintiff and also erred by “refus[ing]

to exercise its authority to modify the [Owendon Permit] under 15A N.C. Admin. Code

2H.1040(6), which provides for precisely situations like this one.” Accordingly, the

ALJ ordered that Defendant “revoke [the Property] from the current permit holder,”

Owen, and “review [Plaintiff’s] application for [the Property] under the Express

Review Program as a new permit.”

On 16 December 2022, Defendant filed a petition for judicial review of the

ALJ’s Final Decision in superior court (the “trial court”). On 4 January 2023, Plaintiff

filed a motion to dismiss Defendant’s petition. On 13 February 2023, the trial court

conducted a hearing on Plaintiff’s motion and dismissed Defendant’s petition with

-6-
LDI SHALLOTTE 179 HOLDINGS, LLC V. STATE OF N.C. DEP’T OF ENVTL. QUALITY

Opinion of the Court

prejudice because it was not timely.3 Defendant eventually processed Plaintiff’s

application and issued a new stormwater permit for the Property on or about 1

August 2023, approximately six months after the trial court dismissed Defendant’s

petition for judicial review.

On 3 August 2023, Plaintiff filed a complaint against Defendant, asserting

claims for inverse condemnation, unconstitutional taking, denial of substantive due

process, and denial of procedural due process. In addition to damages, Plaintiff

requested certain declaratory relief. On 16 October 2023, Defendant filed a motion

to dismiss. On 19 January 2024, Plaintiff filed an amended complaint (the

“Complaint”). On 29 January 2024, Plaintiff filed a motion for partial summary

judgment, arguing the trial court and the parties were bound by the ALJ’s Final

Decision under the principles of res judicata and collateral estoppel. On 30 January

2024, Defendant filed a motion to dismiss the Complaint. On 1 February 2024,

Plaintiff filed a request for judicial notice.

On 12 February 2024, the trial court conducted a hearing on the motions. The

trial court denied Plaintiff’s motion for partial summary judgment and granted

Defendant’s motion to dismiss. On 21 February 2024, the trial court entered the

Dismissal Order and Summary Judgment Order. In the Summary Judgment Order,

3 “To obtain judicial review of a final decision under this Article, the person seeking review must file

a petition in superior court within 30 days after the person is served with a written copy of the decision.
A person that fails to file a petition within the required time waives the right to judicial review under
this Article.” See N.C. Gen. Stat. § 150B-45(a) (2023).

-7-
LDI SHALLOTTE 179 HOLDINGS, LLC V. STATE OF N.C. DEP’T OF ENVTL. QUALITY

Opinion of the Court

the trial court concluded that the ALJ lacked “the authority to decide constitutional

matters” and, as a result, his finding and conclusions did “not have any res judicata

or collateral estoppel effect.” In the Dismissal Order, the trial court concluded the

Complaint failed to state claims upon which relief could be granted under Rule

12(b)(6). On 29 February 2024, Plaintiff filed written notice of appeal from both

orders.

II. Jurisdiction

This Court has jurisdiction under N.C. Gen. Stat. § 7A-27(b)(1) (2023).

III. Issues

The issues are whether the trial court erred by: (1) granting Defendant’s

motion to dismiss; (2) denying Plaintiff’s motion for partial summary judgment; and

(3) denying Plaintiff’s request for certain declaratory relief.

IV. Analysis

A. Motion to Dismiss

First, Plaintiff asserts the trial court erred by granting Defendant’s motion to

dismiss because the Complaint adequately alleged a temporary taking and

procedural and substantive due process violations. Because the Complaint sets forth

sufficient allegations of a temporary regulatory taking by Defendant, the trial court

erred by granting Defendant’s motion to dismiss on this basis. The trial court did not

err by granting Defendant’s motion to dismiss Plaintiff’s due process claims.

Accordingly, we affirm in part, reverse in part, and remand.

-8-
LDI SHALLOTTE 179 HOLDINGS, LLC V. STATE OF N.C. DEP’T OF ENVTL. QUALITY

Opinion of the Court

1. Standard of Review

This Court “review[s] de novo an order granting a Rule 12(b)(6) motion to

dismiss.” Taylor v. Bank of America, N.A., 382 N.C. 677, 679, 878 S.E.2d 798, 800

(2022). “‘Under a de novo review, [this Court] considers the matter anew and freely

substitutes its own judgment’ for that of the lower tribunal.” Craig ex rel. Craig v.

New Hanover Cnty Bd. of Educ., 363 N.C. 334, 337, 678 S.E.2d 351, 354 (2009)

(quoting In Re Greens of Pine Glen Ltd. P’ship., 356 N.C. 642, 647, 576 S.E.2d 316,

319 (2003)).

In reviewing a motion to dismiss, “[t]he appellate court, just like the trial court

below, considers ‘whether the allegations of the complaint, if treated as true, are

sufficient to state a claim upon which relief can be granted under some legal theory.’”

Taylor, 382 N.C. at 679, 878 S.E.2d at 800 (quoting Bridges v. Parrish, 366 N.C. 539,

541, 742 S.E.2d 794, 796 (2013)).

2. Inverse Condemnation & Unconstitutional Taking

Plaintiff argues it sufficiently alleged claims for inverse condemnation and

unconstitutional taking because it set forth facts in the Complaint demonstrating

that Defendant’s refusal to consider Plaintiff’s application for a stormwater permit

until Plaintiff resolved the NOVs resulted in Plaintiff being deprived of all

economically beneficial or productive use of the Property for approximately two years.

We agree.

Before analyzing the sufficiency of the Complaint, we first address Defendant’s

-9-
LDI SHALLOTTE 179 HOLDINGS, LLC V. STATE OF N.C. DEP’T OF ENVTL. QUALITY

Opinion of the Court

argument that Plaintiff did not “clear[] the initial hurdle of showing a final

deprivation of a property interest.” In essence, Defendant contends that no taking

could have occurred because Defendant never formally denied Plaintiff’s request for

a stormwater permit. Defendant cites two cases in support of its argument: Cary

Creek Ltd. P’ship v. Town of Cary, 203 N.C. App. 99, 690 S.E.2d 549 (2010) and Messer

v. Town of Chapel Hill, 125 N.C. App. 57, 479 S.E.2d 221, vacated on other grounds,

346 N.C. 259, 485 S.E.2d 269 (1997). These cases, however, are distinguishable for

the reasons set forth below.

Cary Creek involved a stormwater management ordinance enacted by the

Town of Cary which required riparian buffers for lands adjacent to certain

enumerated streams and surface waters. 203 N.C. App. at 101, 690 S.E.2d at 551.

The plaintiff sought, and was denied, a variance from the riparian buffer

requirement. Id. at 101, 690 S.E.2d at 551. Thereafter, the plaintiff pursued a

certiorari proceeding challenging the Town’s denial of its request for a variance and

sought declaratory relief that the relevant ordinances were invalid and

unenforceable, or in the alternative, that the Town of Cary was required to

compensate the plaintiff under principles of inverse condemnation. Id. at 100, 690

S.E.2d at 550. The Town of Cary moved to dismiss for lack of subject-matter

jurisdiction and failure to state a claim, which the trial court denied. Id. at 100, 690

S.E.2d at 550. Then, the Town of Cary and the plaintiff filed cross-motions for

summary judgment. Id. at 100, 690 S.E.2d at 550. After the trial court granted

- 10 -
LDI SHALLOTTE 179 HOLDINGS, LLC V. STATE OF N.C. DEP’T OF ENVTL. QUALITY

Opinion of the Court

summary judgment in favor of the Town of Cary, the plaintiff appealed, and the Town

of Cary cross-appealed, arguing, in pertinent part, that the trial court should have

dismissed the plaintiff’s inverse condemnation claim for lack of subject-matter

jurisdiction. Id. at 101, 690 S.E.2d at 551.

Relying on Messer, this Court determined that the trial court lacked subject-

matter jurisdiction over the plaintiff’s inverse condemnation claim because the claim

was not ripe for adjudication. Id. at 102, 690 S.E.2d at 552 (citing Messer, 125 N.C.

App. at 61, 479 S.E.2d at 223). We explained the plaintiff’s claim was

based on the theory that if the riparian buffer ordinance is
upheld as valid and enforceable in the instant case and if
[the plaintiff] does not prevail in its certiorari proceeding,
a taking will have occurred. Because neither of these
prerequisite events had occurred at the time [the plaintiff]
filed its claim, there had been no taking and there was no
concrete controversy ripe for adjudication.

Id. at 101, 690 S.E.2d at 552.

Messer also involved a challenge to a zoning ordinance which reduced the

number of residential units allowed on a portion of the plaintiffs’ property. 125 N.C.

App. at 60, 479 S.E.2d at 222. The plaintiffs filed a complaint challenging the validity

of the zoning ordinance and the Town of Chapel Hill moved to dismiss. Id. at 60, 479

S.E.2d at 222. The trial court granted the motion and the plaintiffs appealed to this

Court. We concluded the trial court properly dismissed the plaintiffs’ takings claim

because the plaintiffs failed to allege that they “had applied for a development permit

or a variance.” Id. at 61, 479 S.E.2d at 223. In other words, without a determination

- 11 -
LDI SHALLOTTE 179 HOLDINGS, LLC V. STATE OF N.C. DEP’T OF ENVTL. QUALITY

Opinion of the Court

as to how or if the zoning ordinance would affect the plaintiffs’ use of their property,

the plaintiffs could not maintain an action for inverse condemnation. Id. at 61, 479

S.E.2d at 223.

Cary Creek and Messer support the proposition that to properly allege an

unconstitutional regulatory taking based on a zoning ordinance, the plaintiff must

first establish that the zoning ordinance will impact the plaintiff’s use of the property.

See Cary Creek, 203 N.C. App. at 101, 690 S.E.2d at 552; Messer, 125 N.C. at 61, 479

S.E.2d at 223. To make that determination, it is necessary for the plaintiff to have

applied for, and been denied, a variance. Only then can the plaintiff demonstrate

that he has been denied all economically beneficial use of his property. See Nies v.

Town of Emerald Isle, 244 N.C. App. 81, 95, 780 S.E.2d 187, 198 (2015). Absent a

variance denial, the effect of the zoning ordinance on the relevant property is

speculative at best.

Here, Plaintiff’s takings claim, like those in Cary Creek and Messer, is

regulatory in nature. Plaintiff’s claim, however, does not concern the validity of a

land-use regulation. Instead, Plaintiff attacks Defendant’s regulatory action, or

inaction, in applying certain land-use regulations. Because Plaintiff challenges a

regulatory action rather than a regulation itself, a “final determination,” or “final

deprivation” as characterized by Defendant, is not required in this context as there

are no questions regarding whether a particular land-use regulation will impact the

Property. See Messer, 125 N.C. at 61, 479 S.E.2d at 223. To the contrary, Plaintiff’s

- 12 -
LDI SHALLOTTE 179 HOLDINGS, LLC V. STATE OF N.C. DEP’T OF ENVTL. QUALITY

Opinion of the Court

claim sounds in the adverse effects of Defendant unjustifiably withholding review of

Plaintiff’s application for a stormwater permit. Because Plaintiff’s allegations are

ripe for review, Cary Creek and Messer are distinguishable.

To be clear, Defendant does not argue that Plaintiff’s claim is unripe. Instead,

Defendant isolates the “final decision” language appearing in Cary Creek and Messer

and contends it is a substantive element of takings claim. In our view, the absence

of a definitive denial of Plaintiff’s request for a stormwater permit is not necessarily

fatal to Plaintiff’s takings claim. By Defendant’s logic, it could indefinitely hold

applicants in bureaucratic purgatory by simply refusing to process their requests for

stormwater permits. We decline to adopt a rule permanently foreclosing temporary

takings claims after excessive administrative delays. There may be instances where

grossly protracted inaction, if pleaded in detail, may well survive a motion to dismiss

and warrant discovery.

In sum, while a “final decision about what uses of the property will be

permitted” is needed to fulfill the ripeness requirement for a regulatory taking based

on a challenge to a regulation or ordinance, see Messer, 125 N.C. App. at 61, 479

S.E.2d at 223, Cary Creek and Messer do not hold that a “final deprivation” is required

to establish an unconstitutional temporary taking. Thus, we are not persuaded by

Defendant’s argument that Plaintiff was precluded from asserting a takings claim

because Defendant never formally denied Plaintiff’s request for a stormwater permit.

Indeed, Defendant eventually processed Plaintiff’s application and issued a new

- 13 -
LDI SHALLOTTE 179 HOLDINGS, LLC V. STATE OF N.C. DEP’T OF ENVTL. QUALITY

Opinion of the Court

stormwater permit following the ALJ’s Final Decision, but the question remains as

to whether Plaintiff is entitled to compensation for the two-year period in which

Defendant refused to process Plaintiff’s application for a stormwater permit.

Having established Plaintiff was not required to allege that a “final

deprivation” occurred, we address the sufficiency of the Complaint. “The

fundamental right to property is as old as our state.” Kirby v. N.C. Dep’t of Transp.,

368 N.C. 847, 852–53, 786 S.E.2d 919, 923–24 (2016) (citations omitted). “Property

encompasses every aspect of right and interest capable of being enjoyed as such upon

which it is practicable to place a money value and includes not only the thing

possessed but the right of the owner to the land; the right to possess, use, enjoy and

dispose of it, and the corresponding right to exclude others from its use.” Id. at 853,

786 S.E.2d at 924 (cleaned up). Although “our state constitution does not contain an

express constitutional provision against the taking or damaging of private property

for public use without payment of just compensation, we have long recognized the

existence of a constitutional protection against an uncompensated taking . . . .” Id.

at 853, 786 S.E.2d at 924 (internal quotation marks and citation omitted).

A temporary taking occurs where a landowner is denied all use of his property

for a finite period and “requires just compensation for the use of the land during the

period of the taking.” City of Charlotte v. Combs, 216 N.C. App. 258, 261, 719 S.E.2d

59, 62 (2011) (cleaned up). A regulatory taking may occur if the governmental action

“den[ies] an owner all economically beneficial or productive use of the property.” Nies,

- 14 -
LDI SHALLOTTE 179 HOLDINGS, LLC V. STATE OF N.C. DEP’T OF ENVTL. QUALITY

Opinion of the Court

244 N.C. App. at 95, 780 S.E.2d at 198 (internal quotation marks and citation

omitted).

“Determining if governmental action constitutes a taking depends upon

‘whether a particular act is an exercise of the police power or of the power of eminent

domain.’” Kirby, 368 N.C. at 854, 786 S.E.2d at 924 (2016) (quoting Barnes v. N.C.

State Highway Comm’n, 257 N.C. 507, 514 126 S.E.2d 732, 737–38 (1962)). “Under

the police power, the government regulates property to prevent injury to the public.”

Id. at 854, 786 S.E.2d at 924 (citation omitted). “Police power regulations must be

‘enacted in good faith, and ha[ve] appropriate and direct connection with that

protection to life, health, and property which each State owes to her citizens.’” Id. at

854, 786 S.E.2d at 924 (quoting City of Durham v. Eno Cotton Mills, 141 N.C. 615,

642 54 S.E. 453, 462 (1906)) (alteration in original). But “[a]n exercise of police power

outside these bounds may result in a taking.” Id. at 854, 786 S.E.2d at 924.

The governmental action, or rather inaction, relevant here is Defendant’s

alleged refusal to review and process Plaintiff’s application for a stormwater permit.

Plaintiff alleged that Defendant’s failure to act temporarily deprived Plaintiff’s land

of all economically-viable use. This falls within the scope of the police power. See

N.C. Dep’t of Envtl. Quality v. Dev., LLC, 259 N.C. App. 597, 607, 816 S.E.2d 232, 239

(2018) (explaining the enforcement of environmental regulations is a “core police

power”). An “ends-means” test is used to determine whether an exercise of police

power was excessive. Beroth Oil Co. v. N.C. Dep’t of Transp., 367 N.C. 333, 351, 757

- 15 -
LDI SHALLOTTE 179 HOLDINGS, LLC V. STATE OF N.C. DEP’T OF ENVTL. QUALITY

Opinion of the Court

S.E.2d 466, 479 (2014). The test involves a “two-part inquiry” as to whether: (1) “the

exercise of police power is legitimate, that is, whether the ends sought are within the

scope of the power[;]” and (2) “the means chosen to regulate are reasonable.” Id. at

339, 757 S.E.2d at 472 (cleaned up).

Here, Plaintiff alleged Defendant’s failure to review or process its application

for a stormwater permit until Plaintiff resolved the NOVs “deprived [Plaintiff] of all

reasonable use of its property, and the value of [Plaintiff’s property] was substantially

impacted, and [Plaintiff] was deprived of the opportunity to make substantial profits.”

Plaintiff further alleged Defendant’s conduct “lacked any real, rational or substantial

relationship with health, safety, morals or the general welfare.” Plaintiff’s

allegations were sufficient to allege a temporary regulatory taking as the Complaint

sufficiently describes the conduct at issue, explains the conduct was not a proper

exercise of the police power, and alleges a denial of the full use of its Property for the

relevant time frame. At the motion to dismiss stage, taking all of Plaintiffs

allegations as true, Plaintiff sufficiently alleged an unconstitutional temporary

taking and a claim for inverse condemnation. See N.C. Gen. Stat. § 1A-1, Rule

12(b)(6) (2023). Accordingly, we reverse and remand on this issue.

3. Due Process Claims

Plaintiff also argues Defendant’s refusal to process its stormwater permit

application constituted a violation of its procedural and substantive due process

rights. We disagree.

- 16 -
LDI SHALLOTTE 179 HOLDINGS, LLC V. STATE OF N.C. DEP’T OF ENVTL. QUALITY

Opinion of the Court

“The Fourteenth Amendment states that the government shall not ‘deprive any

person of life, liberty, or property, without due process of law.’” Clayton v. Branson,

170 N.C. App. 438, 451, 613 S.E.2d 259, 269 (2005) (quoting U.S. Const. amend. XIV,

§ 1). “Not every property interest requires procedural due process. A protected

property interest arises when one has a legitimate claim of entitlement as decided by

reference to state law.” Dyer v. Bradshaw, 54 N.C. App. 136, 139, 282 S.E.2d 548,

550 (1981) (citation omitted). “While the United States Supreme Court has

consistently held that some form of hearing is required prior to a final deprivation of

a ‘protected’ property interest, the exact nature and mechanism of the required

procedure will vary based upon the unique circumstances surrounding the

controversy.” Peace v. Employment Sec. Comm’n, 349 N.C. 315, 322, 507 S.E.2d 272,

278 (1998) (citation omitted).

As stated in Godrey Lumber Co., Inc. v. Howard, Defendant “could only have

committed an unconstitutional deprivation if it failed to provide due process to

[P]laintiff.” 151 N.C. App. 738, 741, 566 S.E.2d 825, 827 (2002). In Godrey, this Court

determined that through the Administrative Procedure Act and the contested case

proceeding, the plaintiff received “constitutionally adequate due process of law.” Id.

at 740, 566 S.E.2d at 826. Similarly here, Plaintiff received “constitutionally

adequate due process of law” because it obtained review of Defendant’s actions in the

contested case hearing in the OAH and beyond. See id. at 740, 566 S.E.2d at 826.

Accordingly, the trial court did not err by dismissing Plaintiff’s procedural due

- 17 -
LDI SHALLOTTE 179 HOLDINGS, LLC V. STATE OF N.C. DEP’T OF ENVTL. QUALITY

Opinion of the Court

process claim.

“In general, substantive due process protects the public from government

action that unreasonably deprives them of a liberty or property interest.” Town of

Beech Mt. v. Genesis Wildlife Sanctuary, Inc., 247 N.C. App. 444, 459, 786 S.E.2d 335,

346 (2016) (cleaned up). To establish an as-applied violation of substantive due

process, the plaintiff “ ‘must demonstrate (1) that [it] had property or a property

interest; (2) that the state deprived [it] of this property or property interest; and (3)

that the state’s action falls so far beyond the outer limits of legitimate governmental

action that no process could cure the deficiency.’ ” Id. at 460, 786 S.E.2d at 347

(quoting MLC Auto., LLC v. Town of S. Pines, 532 F.3d 269, 281 (4th Cir. 2008)). In

deciding whether regulatory action “has no foundation in reason and is a mere

arbitrary or irrational exercise of power having no substantial relation to the public

health, the public morals, the public safety or the public welfare in its proper sense,”

we consider, among other factors, whether: “(1) the [regulatory] decision is tainted

with fundamental procedural irregularity; (2) the action is targeted at a single party;

and (3) the action deviates from or is inconsistent with regular practice.” MLC Auto,

523 F.3d at 281.

Here, Plaintiff did not allege that Defendant’s regulatory decision making was

targeted at Plaintiff or that Defendant’s actions were inconsistent with its regular

practice. Under these circumstances, Plaintiff did not adequately plead facts tending

to show that Defendant’s conduct “[fell] so far beyond the outer limits of legitimate

- 18 -
LDI SHALLOTTE 179 HOLDINGS, LLC V. STATE OF N.C. DEP’T OF ENVTL. QUALITY

Opinion of the Court

governmental action that no process could cure the deficiency.” See Town of Beech

Mt., 247 N.C. App. at 460, 786 S.E.2d at 347 (internal quotation marks and citation

omitted). Thus, the trial court did not err in dismissing Plaintiff’s substantive due

process claim.

B. Partial Summary Judgment

Next, Plaintiff asserts the trial court erred by denying its motion for partial

summary judgment because Defendant should have been precluded from litigating

issues raised and resolved by the ALJ under the principles of res judicata and

collateral estoppel. We disagree.

1. Standard of Review

“We review a trial court order granting or denying a summary judgment

motion on a de novo basis, with our examination of the trial court’s order focused on

determining whether there is a genuine issue of material fact and whether either

party is entitled to judgment as a matter of law.” Bartley v. City of High Point, 272

N.C. App. 224, 227, 846 S.E.2d 750, 754 (2020) (internal quotation marks and citation

omitted). “In doing so, we view the evidence in the light most favorable to the

nonmoving party and draw all inferences of fact against the movant and in favor of

the nonmovant.” Id at 227, 846 S.E.2d at 754. “Summary judgment is appropriate

if: (1) the non-moving party does not have a factual basis for each essential element

of its claim; (2) the facts are not disputed and only a question of law remains; or (3) if

the non-moving party is unable to overcome an affirmative defense offered by the

- 19 -
LDI SHALLOTTE 179 HOLDINGS, LLC V. STATE OF N.C. DEP’T OF ENVTL. QUALITY

Opinion of the Court

moving party.” Hillsboro Partners, LLC v. City of Fayetteville, 226 N.C. App. 30, 35,

738 S.E.2d 819, 823 (2013) (citation omitted).

2. ALJ Jurisdiction

We first address Defendant’s assertion that res judicata and collateral estoppel

cannot apply because the ALJ lacked jurisdiction to determine Plaintiff’s

“constitutional claims.” It is a “well-settled rule that a statute’s constitutionality shall

be determined by the judiciary, not an administrative board.” Carolinas Med. Ctr.

Emp’rs & Carriers, 172 N.C. App. 549, 553, 616 S.E.2d 588, 591 (2005) (emphasis

added). Here, Plaintiff did not challenge the constitutionality of a statute or

regulation during the contested case hearing, instead pursuing other issues—

including those explicitly listed in section 150B-23 (a)(1)–(5). See N.C. Gen. Stat. §

150B-23 (a)(1)–(5) (2023) (providing the proper procedure and pleading requirements

for commencement of a contested case hearing). Thus, the precedent offered by

Defendant on this issue, which concerns challenges to an ALJ’s determination that a

particular statute was unconstitutional, are distinguishable. In our view, the ALJ

had jurisdiction to consider the specific issues Plaintiff alleged in its petition for

contested case hearing. See id.

3. Res Judicata & Collateral Estoppel

Res judicata and collateral estoppel “generally appl[ly] to administrative

decisions.” Hillsboro Partners, LLC, 226 N.C. App. at 36, 738 S.E.2d at 824; see

Intersal, Inc. v. Hamilton, 373 N.C. 89, 107, 834 S.E.2d 404, 417 (2019) (“The fact that

- 20 -
LDI SHALLOTTE 179 HOLDINGS, LLC V. STATE OF N.C. DEP’T OF ENVTL. QUALITY

Opinion of the Court

the original claim arose in a quasi-judicial administrative hearing does not preclude

the applicability of res judicata.”) (citation omitted). With respect to issue preclusion,

“[e]ssential issues of fact which have been litigated and determined by an

administrative decision [are] conclusive between the parties in a subsequent action.”

Maines v. City of Greensboro, 300 N.C. 126, 133, 265 S.E.2d 155, 160 (1980). But

whether an administrative decision will be given collateral estoppel or res judicata

effect “depends on its nature.” Catawba Memorial Hosp. v. N.C. Dept. of Human Res.,

112 N.C. App. 557, 565, 436 S.E.2d 390, 394 (1993) (internal quotation marks and

citation omitted). Collateral estoppel or res judicata will not apply to a decision that

was “purely administrative,” but may apply if the decision was “quasi-judicial.”

Hillsboro Partners, LLC, 226 N.C. at 36, 738 S.E.2d at 824 (citing In re Mitchell, 88

N.C. App. 602, 605, 364 S.E.2d 177, 179 (1988)). “Though the distinction between a

‘quasi-judicial’ determination and a purely ‘administrative’ decision is not precisely

defined, [our] courts have consistently found decisions to be quasi-judicial when the

administrative body adequately notifies and hears before sanctioning, and when it

adequately provides under legislative authority for the proceeding’s finality and

review.” In re Mitchell, 88 N.C. App. at 605, 364 S.E.2d at 179.

Here, the ALJ’s Final Decision was not purely administrative because the

parties were notified of the proceedings beforehand and were provided an opportunity

to appeal pursuant to section 150B-45. Thus, the OAH proceeding satisfied both

requirements of a quasi-judicial determination and the ALJ’s Final Decision may

- 21 -
LDI SHALLOTTE 179 HOLDINGS, LLC V. STATE OF N.C. DEP’T OF ENVTL. QUALITY

Opinion of the Court

have res judicata or collateral estoppel effect.

Having determined the contested case hearing was quasi-judicial, we address

the applicability of res judicata and collateral estoppel. “Under the doctrine of res

judicata or ‘claim preclusion,’ a final judgment on the merits in one action precludes

a second suit based on the same cause of action between the same parties or their

privies.” Intersal, 373 N.C. at 107, 834 S.E.2d at 417 (citation omitted). For res

judicata to apply, a litigant must show: “(1) final judgment on the merits in an earlier

lawsuit; (2) an identity of the cause of action in the prior suit and in the later suit;

and (3) an identity of parties or their privies in both suits.” Nicholson v. Jackson Cty.

Sch. Bd., 170 N.C. App. 650, 654, 614 S.E.2d 319, 322 (2005) (citation omitted).

Although we often use the terms “claim” and “cause of action” interchangeably in our

jurisprudence, the focus of res judicata analysis is on the underlying claim or claims

supporting the legal theories or causes of action. See Epcon Homestead, LLC v. Town

of Chapel Hill, 294 N.C. App. 653, 657, 905 S.E.2d 83, 87 (2024) (“Although seemingly

synonymous, claims and causes of action are distinct.”). “[A] claim is a pattern of

allegations that may, or may not, support a cause of action.” Id. at 657, 905 S.E.2d

at 87. “A cause of action, on the other hand, is the legal theory or ‘vehicle for pursuing

a claim.’” Venters v. City of Raleigh, ___ N.C. App. ___, ___, ___ S.E.2d ___, ___ (2025)

(quoting Epcon Homestead LLC, 294 N.C. App. at 657, 905 S.E.2d at 87)). The

distinction may be material in this context because “[w]hen a party asserts a

previously adjudicated claim in a later lawsuit, it is ‘clear that subsequent actions

- 22 -
LDI SHALLOTTE 179 HOLDINGS, LLC V. STATE OF N.C. DEP’T OF ENVTL. QUALITY

Opinion of the Court

which attempt to proceed by asserting a new legal theory or by seeking a different

remedy are prohibited under principles of res judicata.’” Epcon Homestead LLC, 294

N.C. App. at 657, 905 S.E.2d at 87 (emphasis omitted) (quoting Bockweg v. Anderson,

333 N.C. 486, 494, 428 S.E.2d 157, 163 (1993)).

For collateral estoppel to apply, the following elements must be met:

(1) the issues to be concluded are the same as those
involved in the prior action; (2) the issues in the prior
action were raised and actually litigated; (3) the issues
were material and relevant to the disposition of the prior
action; and (4) the determination made of those issues in
the prior action was necessary and essential to the
resulting judgment.

Nicholson, 170 N.C. App. at 655, 614 S.E.2d at 322 (citation omitted).

“The primary difference between the two doctrines is res judicata precludes a

party ‘from bringing a subsequent action based on the ‘same claim’ as that litigated

in an earlier action,’ while collateral estoppel ‘precludes the subsequent adjudication

of a previously determined issue, even if the subsequent action is based on an entirely

different claim.’” Farmers & Merchs. Bank v. Henley, ___ N.C. App. ___, ___, 920

S.E.2d 886, 893 (2025) (emphasis omitted) (quoting Whitacre P’ship v. Biosignia Inc.,

358 N.C. 1, 15, 591 S.E.2d 870, 880 (2004)). “Though distinct, both doctrines ‘advance

the twin policy goals of protecting litigants from the burden of relitigating previously

decided matters and promoting judicial economy by preventing needless litigation.’”

Id. at ___, 920 S.E.2d at 893 (quoting Whitacre, 358 N.C. at 15–16, 691 S.E.2d at

880)).

- 23 -
LDI SHALLOTTE 179 HOLDINGS, LLC V. STATE OF N.C. DEP’T OF ENVTL. QUALITY

Opinion of the Court

Issue preclusion has potential offensive and defensive applications. Defensive

use occurs where a “stranger to the judgment, ordinarily the defendant in the second

action, ‘relies upon a former judgment as conclusively establishing in his favor an

issue which he must prove as an element of his defense.’” Shehan v. Gaston County,

190 N.C. App. 803, 807, 661 S.E.2d 300, 303 (2008) (quoting Mays v. Clanton, 169

N.C. App. 239, 241, 609 S.E.2d 453, 455 (2005)). Offensive use occurs where the

plaintiff “seeks to foreclose the defendant from relitigating an issue that the

defendant has previously litigated unsuccessfully in another action . . . .” Rymer v.

Estate of Sorrells, 127 N.C. App. 266, 269, 488 S.E.2d 838, 840 (1997).

When a plaintiff utilizes collateral estoppel offensively, as is the case here:

[It] might be unfair to a defendant, if among other things:
(1) the defendant had little incentive to defend vigorously
in the first action; (2) the judgment relied upon as the basis
for the estoppel is inconsistent with previous judgments;
and (3) the second action affords the defendant procedural
opportunities unavailable in the first action that could
readily cause a different result.

Id. at 270, 488 S.E.2d at 841 (citing Parklane Hosiery Company v. Shore, 439 U.S.

322, 330–31, 99 S. Ct. 645, 651–52, 58 L. Ed. 2d 552, 561–62 (1979)).

Here, in its petition for contested case hearing, Plaintiff’s primary claim was

its entitlement to a stormwater permit. In support of this claim, Plaintiff made

several allegations consistent with section 150B-23. See N.C. Gen. Stat. § 150B-

23(a)(1)–(5). Plaintiff alleged Defendant: (1) deprived Plaintiff of property; (2)

exceeded its authority or jurisdiction; (3) acted erroneously; (4) failed to use proper

- 24 -
LDI SHALLOTTE 179 HOLDINGS, LLC V. STATE OF N.C. DEP’T OF ENVTL. QUALITY

Opinion of the Court

procedure; (5) acted arbitrarily or capriciously; (6) failed to act as required by law or

rule; and (7) otherwise substantially prejudiced Plaintiff’s rights. The parties are the

same as the OAH proceeding and are positioned in the same adversarial roles. The

ALJ issued a Final Decision, but the contested case hearing did not adjudicate the

types of issues raised in the Complaint—whether Defendant’s alleged refusal to

process Plaintiff’s application for a stormwater permit constituted a taking without

the payment of just compensation, an inverse condemnation, or a violation of due

process. Though Plaintiff alleged Defendant deprived Plaintiff of property and

substantially prejudiced Plaintiff’s rights, the trial court action was not a “second suit

based on the same cause of action,” see Intersal, 373 N.C. at 107, 834 S.E.2d at 417

(citation omitted), because the legal theories Plaintiff asserted in its Complaint—

inverse condemnation, unconstitutional taking, and violations of procedural and

substantive due process—were not the subject of the prior action. In fact, section

150B-23(a)(1)–(5) seemingly acts to limit the issues a petitioner may bring forth when

commencing a contested case hearing. See N.C. Gen. Stat. § 150B-23(a)(1)–(5). Thus,

res judicata did not apply and the trial court properly denied Plaintiff’s motion for

partial summary judgment on this basis.

Plaintiff’s collateral estoppel argument also fails. Assuming without deciding

that the elements of collateral estoppel were present, the trial court did not err by

denying Plaintiff’s motion for partial summary judgment on this basis because it

would have been “unfair” to allow Plaintiff to use the doctrine offensively under the

- 25 -
LDI SHALLOTTE 179 HOLDINGS, LLC V. STATE OF N.C. DEP’T OF ENVTL. QUALITY

Opinion of the Court

facts and circumstances of this case. See Rymer, 127 N.C. App. at 270, 488 S.E.2d at

841. The ALJ lacked the authority to award Plaintiff money damages, a remedy that

is available in the current action. Because Defendant “had little incentive to defend

vigorously” in the OAH proceeding, the trial court did not err by denying Plaintiff’s

motion for partial summary judgment based on collateral estoppel. See id. at 270,

488 S.E.2d at 841. Accordingly, we affirm the trial court’s denial of Plaintiff’s motion

for partial summary judgment.

C. Declaratory Judgment

Lastly, Plaintiff argues it was entitled to declaratory relief as to “the legal

applicability of the doctrines of res judicata and collateral estoppel to the factual

determinations set forth in the Final Decision.” Because the trial court properly

determined that neither doctrine applied, Plaintiff was not entitled to declaratory

relief. Accordingly, we affirm.

V. Conclusion

The trial court partially erred by granting Defendant’s motion to dismiss as to

Plaintiff’s inverse condemnation and unconstitutional temporary takings claim but

did not err by granting Defendant’s motion to dismiss the due process violations. The

trial court did not err by denying Plaintiff’s motion for partial summary judgment or

request for declaratory judgment. Accordingly, we affirm in part, reverse in part, and

remand.

AFFIRMED IN PART, REVERSED IN PART, AND REMANDED.

- 26 -
LDI SHALLOTTE 179 HOLDINGS, LLC V. STATE OF N.C. DEP’T OF ENVTL. QUALITY

Opinion of the Court

Judges STROUD and ZACHARY concur.