# 225 Northport, LLC v. McMullen

> District Court, E.D. New York · September 30, 2025

URL: https://www.frixlaw.com/law-library/cases/11157517

## Case

- **Full name:** 225 Northport, LLC v. Village of Northport, the Northport Village Board of Trustees, Damon McMullen, Jeremy Maline, Thomas Kehoe, Mercy Smith, Ian Milligan, Donald Tesoriero, and Timothy Brojer
- **Court:** District Court, E.D. New York
- **Decided:** September 30, 2025
- **Opinion:** 100trialcourt
- **Cited by:** 0 later opinions in the Frix Law Library

## Citator (automated)

- No negative treatment found by the automated citator. That is not the same as a confirmation that the case is good law; read the citing cases.
- Full citator and citing cases: https://www.frixlaw.com/law-library/cases/11157517

## How later opinions describe it (automated extraction)

- noting that a selective enforcement claim requires specific examples of similarly situated comparators
- noting that class of one claims “do[] not require proof of a defendant’s subjective ill will towards the plaintiff”
- holding under New York law that “[t]he only proper defendant in a lawsuit against an agency of a municipality is the municipality itself”

## Opinion text

UNITED STATES DISTRICT COURT
EASTERN DISTRICT OF NEW YORK

225 Northport, LLC,

24-CV-2967 (ARR) (ARL)
Plaintiff,

OPINION & ORDER
-against-

Village of Northport, the Northport Village Board of
Trustees, Damon McMullen, Jeremy Maline, Thomas
Kehoe, Mercy Smith, Ian Milligan, Donald Tesoriero, and
Timothy Brojer,
Defendants.

ROSS, United States District Judge:
This action arises out of plaintiff 225 Northport, LLC’s efforts to develop and operate a
hotel and restaurant, operated from a single structure (the “Building”), located in the Village of
Northport (the “Village”). See Second Amended Complaint (“SAC”), ECF No. 1-6. Defendants
are the Village of Northport, the Northport Village Board of Trustees (the “Board”), Messrs.
Damon McMullen, Jeremy Maline, Thomas Kehoe, Mercy Smith, and Ian Milligan (five of the
Board’s members), Donald Tesoriero (Plans Examiner and Assistant to the Mayor of Northport),
and Timothy Brojer (Village Administrator of Northport). Id. ¶¶ 5, 31. Before me now is
defendants’ motion to dismiss the SAC’s “Seventh Cause of Action,” which asserts various
claims under 42 U.S.C. § 1983 premised on defendants’ alleged violation of plaintiff’s (1) First
Amendment right to petition the courts (2) Fourteenth Amendment right to equal protection (3)
Fourteenth Amendment right to substantive due process and (4) Fifth Amendment Right to be
free from exactions under the Takings Clause.1 See id; see also Mem. in Supp of Mot. to Dism.
(“Mot.”), ECF No. 16; Pl.’s Mem. in Opp. (“Opp.”), ECF No. 27; Def.’s Reply (“Reply”), ECF
No. 28. In brief, those claims are premised on various zoning decisions, fees, and permits that
defendants allegedly denied, limited, or obstructed.
For the reasons set forth below, I agree with defendants that the SAC largely fails to

sufficiently allege its § 1983 claims. I therefore GRANT in part and DENY in part defendants’
motion to dismiss. Specifically, I DISMISS all of plaintiff’s claims, except for plaintiff’s Fifth
Amendment Takings Clause claim against the Village.
BACKGROUND
I. Events Alleged in the SAC
Plaintiff is the owner of the parcel of land located at 225 Main Street, Northport, NY (the
“Premises”). SAC ¶ 3. Mr. Brojer was the immediate supervisor of the town’s Building
Inspector, Loary Gunn, and in practice functioned as the Building Inspector. Id. ¶¶ 21, 22.2
At some point prior to the summer of 2016, plaintiff began planning to develop the
Premises into a hotel and restaurant. Id. ¶¶ 14–16. By law, plaintiff was required to obtain site
plan approval from the Northport Village Planning Board prior to applying for and receiving a
building permit. Id. ¶ 15. The site plan approval process was “fraught with . . . unreasonable

delays and wholly unnecessary obstructions,” mostly due to the “machinations” of Mr. Brojer. Id.
¶ 20. For example, Mr. Brojer claimed that each of the hotel’s rooms was required to have an
alternative means of egress, such as a fire escape. Id. ¶ 24. Plaintiff’s “counsel, architects, and

1 The motion was filed by all defendants except for Mr. Brojer. Mr. Brojer has filed a separate motion to dismiss the
claims against him, ECF No. 30, which will be resolved in a separate order.
2 The SAC does not make clear what responsibilities were carried out by the Building Inspector title, or the role of
the Building Inspector in the various municipal application and permitting processes.
engineers” rebutted Mr. Brojer’s demands.3 Id. ¶ 25. According to plaintiff, Mr. Brojer bore “ill
will” toward plaintiff and its project to develop the Premises. Id. ¶ 28.
In the Spring and Summer of 2019, plaintiff and the Village executed an agreement to
outsource the site approval process to an outside firm, in order to remove Mr. Brojer from the
approval process and expedite proceedings. Id. ¶¶ 32–40. At some point prior to February 4,

2020, that outside firm completed the building plan review. Id. ¶ 41.
After the site plan review had been completed, plaintiff applied for a Building Permit. In
order to issue the Building Permit, the Village demanded a fee in excess of $87,000. Id. ¶ 46.
That demand was apparently conveyed by Mr. Tesoriero, who at the time was the Village’s Plan
Examiner. Id. ¶ 81. Plaintiff asserts that the Village improperly calculated the fee under the
Northport Village Code, and that the properly calculated fee should have been $28,697.30. Id. ¶
46. Although plaintiff continues to dispute the fee, plaintiff paid the full fee under protest on
February 4, 2020. Id. ¶ 12. On February 4, 2020, the Village granted plaintiff a Building Permit
to build a hotel and restaurant on the Premises. Id. ¶ 10.

In addition to a variety of claims brought under New York law not at issue here, the SAC
asserts a 42 U.S.C. § 1983 claim against all defendants. In a vague series of paragraphs, plaintiff
alleges that “[b]oth before and after” plaintiff was issued the Building Permit and paid the
$87,000 fee on February 4, 2020, defendants interfered with plaintiff’s constitutionally protected
rights. SAC ¶ 94. Among other conduct, defendants (1) discriminatorily imposed “illegal and
excessive fees”; (2) discriminatorily imposed “irrational and illegal pre-conditions and
limitations on permits, approvals, and the issuance of a Certificate of Occupancy”; (3) imposed
an “illegal and discriminatory limitation on the number of seats allowed” in plaintiff’s restaurant;

3 The SAC does not explain whether Mr. Brojer withdrew his objections to plaintiff’s site plan, or whether some
other decision-making entity in the Village, such as the Planning Board, rejected Mr. Brojer’s demands.
and (4) discriminatorily required plaintiff to “incur completely unnecessary costs in connection
with municipal approvals.” Id. Plaintiff alleges that it “was and is being discriminated against in
part because its restaurant will compete with other restaurants in the [Village]” in which “Village
officials had ownership or other interests and who were political supporters of Village officials
and [Board] members.” Id. ¶ 99.

In addition, the SAC alleges that Mr. Brojer “engaged in a years-long and multi-faceted
campaign of unlawful and discriminatory conduct” against plaintiff, by raising various issues
with plaintiff’s building plans during the site approval process. Id. ¶ 96.
Finally, plaintiff alleges that the defendants “adversely treated and discriminated against”
plaintiff in retaliation for filing this lawsuit, by “substantially and artificially” reducing the
seating capacity and occupancy of plaintiff’s restaurant to be far less than that permitted by the
applicable fire and building codes. Id. ¶¶ 100, 104. Plaintiff’s restaurant was the “only restaurant
located in the . . . downtown area of the [Village]” whose seating and occupancy was artificially
reduced. Id. ¶ 104. For example, the restaurant “Rockin Fish,” which is located within several

hundred feet of plaintiff’s restaurant, was not required to reduce its seating and occupancy below
that permitted by the applicable codes. Id. ¶¶ 105, 106.
Without explaining which facts are relevant to which constitutional violation, the SAC
asserts that the above actions violated its Fourteenth Amendment Due Process rights, Fourteenth
Amendment Equal Protection rights, right to be free from exactions under the Fifth Amendment
Takings Clause, and First Amendment right to be free from retaliation for having petitioned the
courts.
II. Procedural History
On August 3, 2020, plaintiff commenced this action by filing a complaint in New York
Supreme Court, Suffolk County. Notice of Petition (the “Original Complaint), ECF No. 1-2.
Plaintiff alleged various state law claims, all of which challenged the Village’s Building Permit
fee, as either improperly calculated, excessive, or as an unlawful tax. See id. On October 21,
2020, plaintiff amended the complaint to add additional allegations. See Amended Notice of

Petition (the “First Amended Complaint” or “FAC”), ECF No. 1-4. However, plaintiff did not
add any new causes of action. Id.
On November 27, 2023, Plaintiff sought leave to amend the Amended Complaint and for
permission to file the SAC. Defendants opposed the motion. On March 21, 2024, the court issued
a one-page Order granting Plaintiff leave to amend the Amended Complaint and denied the
cross-motion for a protective order. See Order Granting Leave to Amend, Donnelly Dec. Exhibits
D, ECF No. 15-4. The SAC newly asserted a claim under 42 U.S.C. § 1983, predicated upon
violations of the First, Fifth, and Fourteenth Amendments. See generally, SAC. On April 22,
2024, defendants removed this case to this district, citing this court’s federal question

jurisdiction. Notice of Removal, ECF No. 1.
LEGAL STANDARD
In deciding a motion to dismiss under Rule 12(b)(6), a court “must construe [the
complaint] liberally, accepting all factual allegations therein as true and drawing all reasonable
inferences in the plaintiff[’s] favor.” Sacerdote v. N.Y. Univ., 9 F.4th 95, 106–07 (2d Cir. 2021).
To survive a motion to dismiss, a complaint must “contain sufficient factual matter, accepted as
true, to state a claim to relief that is plausible on its face.” Ashcroft v. Iqbal, 556 U.S. 662, 678
(2009) (quotation marks omitted). A claim is plausible “when the plaintiff pleads factual content
that allows the court to draw the reasonable inference that the defendant is liable for the
misconduct alleged.” Id. Legal conclusions are not entitled to the presumption of truth, and
therefore “[t]hreadbare recitals of the elements of a cause of action, supported by mere
conclusory statements, do not suffice.” Roe v. St. John’s Univ., 91 F.4th 643, 651 (2d Cir. 2024)
(quotation marks and citation omitted).
DISCUSSION
I. Plaintiff’s § 1983 Claims Are Not Barred by Limitations on Article 78 Proceedings.
N.Y. Village Law §§ 7-740, 7-725-a provides that an individual aggrieved by a site plan

determination of a municipal planning board must bring an Article 78 proceeding within thirty
days after the filing of the decision. In their opening brief, defendants argue that plaintiff’s §
1983 claims “relat[ing] to any determinations by the [Village] Planning board” are unreviewable
due to plaintiff’s failure to commence an Article 78 proceeding in New York’s state courts. Mot.
at 10. According to defendants, Article 78 is the “exclusive” method for challenging village and
municipal determinations on site plan and special permit applications, and therefore plaintiff’s §
1983 claims were “brought in an improper form and are barred by the statute of limitations”
applicable to Article 78 proceedings. Id.
Defendants’ argument is meritless. Generally, “exhaustion of state [administrative]
remedies is not a prerequisite to an action under § 1983” in federal court. Heck v. Humphrey, 512

U.S. 477, 480 (1994) (quotation marks omitted). “Only where Congress has carved out specific
statutory exceptions to this rule, or where a procedural due process claim puts in issue state post-
deprivation remedies, is this general rule abrogated.” Acista v. City of New York, No. 03-CV-
1452, 2004 WL 691270, at *4 (S.D.N.Y. Mar. 31, 2004) (collecting cases). Because the SAC
does not assert any procedural due process claims, and defendants do not contend that any of the
specific statutory exceptions apply, the availability of relief under Article 78 proceedings does
not impose an exhaustion requirement. Defendants are therefore mistaken in arguing that the
§ 1983 claims can only be asserted in an Article 78 proceeding. Mot. at 10.4
II. Plaintiff’s Claims of Constitutional Violations Based Upon 42 U.S.C. § 1983 Are Not
Time Barred on the Face of the SAC
Defendants contend that plaintiff’s § 1983 claims premised on the Fifth and Fourteenth
Amendments are untimely. The statute of limitations claims for § 1983 claims are governed by
“the statute of limitations for personal injury actions under state law,” which in New York is
three years. Hogan v. Fischer, 738 F.3d 509, 517 (2d Cir. 2013). Defendants concede that
plaintiff is entitled to the benefit of New York’s 228-day tolling of the statute of limitations due
to Covid, see Mot. at 11, and therefore plaintiff may assert claims that accrued up to 3 years and

228 days prior to commencing their claims.
Defendants argue that the § 1983 claims “commenced for statute of limitation purposes”
on the date that plaintiff moved to amend the complaint to include those claims. See Mot. at 11.
Since that motion was filed on November 27, 2023, defendants assert that plaintiff may not
assert claims that occurred before April 13, 2020. Id. According to defendants, plaintiff’s § 1983
claims premised on the Fifth and Fourteenth Amendments accrued between February and March
2019, and are therefore untimely. Id. at 12.
Defendants are partially mistaken, as their initial motion ignores the relation-back
doctrine. Under Rule 15(c)(2), an amended pleading relates back to—i.e., is deemed commenced
on—the date of the original pleading when the amendment asserts a claim that “arose out of the

conduct, transaction, or occurrence set out” in the original pleading. Fed. R. Civ. P. 15(c)(1)(B).

4 In their Reply, defendants offer a different argument, not raised in their principal brief. Namely, defendants assert
that the § 1983 claims are not yet ripe because plaintiff has “failed to proceed . . . in an Article 78 proceeding” and
therefore the state has not reached a “final decision.” Mot. at 4. However, it is well-established in this circuit that
“[a]rguments may not be made for the first time in a reply brief” and that “new arguments first raised in reply papers
in support of a motion will not be considered.” Forbes v. Specialized Loan Servicing, LLC, No. 18-CV-6561, 2020
WL 13659754, at *2 (E.D.N.Y. Sept. 30, 2020).
“[T]he central inquiry is whether adequate notice of the matters raised in the amended pleading
has been given to the opposing party within the statute of limitations by the general fact situation
alleged in the original pleading.” Slayton v. Am. Express Co., 460 F.3d 215, 228 (2d Cir. 2006)
(quotation marks omitted). Rule 15(c) also permits relation back if “the law that provides the
applicable statute of limitations allows relation back.” Fed. R. Civ. P. 15(c)(1)(a). Since the

statute of limitations for § 1983 claims are governed by state law, see Hogan v. Fischer, 738 F.3d
at 517, plaintiff’s § 1983 claims also relate back if permitted by New York’s relation back rules.
As provided by N.Y.C.P.L.R.§ 203(f), amended claims relate back “unless the original pleading
does not give notice of the transactions, occurrences, or series of transactions or occurrences, to
be proved pursuant to the amended pleading.” N.Y. C.P.L.R. § 203(f).
In their reply, defendants contend that relation back is inapplicable because the Original
Complaint and the FAC “set forth only common-law state court claims,” and “did not set forth
any federal claims” nor “invoke[] any federal rights statute.” Reply at 5. That argument rests on a
misreading of Rule 15. For relation back purposes, the plaintiff need not have invoked the same

legal theory or cause of action in her earlier pleadings; the entire purpose of relation back is to
permit plaintiffs to assert new causes of action. Rule 15(c)(1)(A), by its terms, directs courts to
examine whether the original and amended pleadings assert claims arising from the same
“conduct, transaction, or occurrence.” Fed. R. Civ. P. 15(c)(1)(A). Thus, what matters is whether
the claim “ar[ose] out of the conduct set forth in the original pleading.” Slayton, 460 F.3d at 228
(emphasis added and quotation marks omitted); see also id. (“the central inquiry is whether
adequate notice” was given “by the general fact situation alleged in the original pleading.”
(emphasis added and quotation marks omitted)).5 Accordingly, plaintiff’s failure to invoke §
1983 in their prior pleadings is no impediment.
Nonetheless, I agree with defendants that at least part of plaintiff’s Fifth and Fourteenth
Amendment claims do not relate back to their Original or First Amended Complaints. The
Original and First Amended Complaints asserted claims that were limited “to the calculation of

and collection of an unlawfully levied fee for the issuance of the [Building Permit].” FAC ¶ 38.
However, in a section titled “History Antedating the Present Matter Before the Court,” the
Original and First Amended Complaints allege that the Village Planning Board imposed
“unreasonable delays and wholly unnecessary obstructions,” such as Mr. Brojer’s attempts to
claim that each hotel room required a separate exit and “that the International Building Code
limited the size of the hotel restaurant.” Id. ¶¶ 18, 22. Those objections were “rebutted,” but only
after plaintiff had expended “substantial wasted time and money.” Id. ¶¶ 21–22.
Meanwhile, the SAC alleges four categories of wrongs which assertedly violated
plaintiff’s constitutional rights, though it does not clearly articulate which wrong purportedly

violated each right. First, the permit fees were an unlawful deprivation of property. SAC ¶ 94.
Second, defendants arbitrarily and discriminatorily imposed delays, limitations, and costs on
plaintiff during the Building Permit and Site Plan Application process. Id. ¶¶ 94, 96. Third,
defendants unlawfully limited the number of seats allowed at plaintiff’s restaurant. Id. ¶ 94.
Fourth, defendants imposed unlawful limitations on “the issuance of a Certificate of Occupancy.”
Id.
The first two categories arise from the same “conduct, transaction or occurrence” as facts
alleged in the prior pleadings. Both the SAC and the Original Complaint set forth challenges to

5 By contrast, “even where an amended complaint tracks the legal theory of the first complaint, claims that are based
on an entirely distinct set of factual allegations will not relate back.” Id. (quotation marks omitted).
the Village’s permit fees and permitting process, and therefore provide adequate notice that
plaintiff sought to challenge those actions. Since the Original Complaint was filed on October 3,
2020, and defendants concede that plaintiff’s claims as to those incidents accrued in 2019, see
Mot. at 12, those categories of § 1983 claims are within the three-year statute of limitations and
are therefore timely.

By contrast, the latter two categories concern facts that do not relate back to the prior
pleadings. The Original and First Amended Complaints do not mention, or even suggest, that
defendants restricted the seating capacity of plaintiff’s restaurant or limited the Building’s
Certificate of Occupancy. Accordingly, the prior pleadings did not provide adequate notice that
such conduct was at issue or might later be raised in an amended pleading. Because such notice
is a central inquiry of relation back under Rule 15(c)(1)(B) and N.Y.C.P.L.R.§ 203(f), any § 1983
claim premised on the latter two categories does not relate back to the original complaint. See
Cady v. Springbrook NY, Inc., 145 A.D.3d 846, 847 (2d Dep’t 2016) (noting that N.Y.C.P.L.R.§
203(f) does not permit relation back where “the original allegations did not provide the

defendants notice of the need to defend against the allegations of the amended complaint”);
Slayton, 460 F.3d at 228 (2d Cir. 2006) (noting that Rule 15(c) requires the prior pleading to have
given notice of the allegations to be raised in the amended pleading).
Nonetheless, I cannot agree with defendants, at this stage, that the latter categories of
claims are time-barred. “A statute of limitations affirmative defense normally cannot be decided
on a motion to dismiss,” unless “the defense appears on the face of the complaint.” Markel Am.
Ins. Co. v. Mr. Demolition, Inc., 717 F. Supp. 3d 238, 244 (E.D.N.Y. 2024) (quotation marks
omitted). Here, the SAC does not provide even general time periods for when defendants limited
the seating occupancy of plaintiff’s restaurant or restricted the Building’s Certificate of
Occupancy. Given the lack of time frames, the accrual date for plaintiff’s claims cannot be
determined from the SAC.6
I therefore DENY defendant’s motion to dismiss plaintiff’s § 1983 claims as barred by
the statute of limitations.
III. The SAC Fails to State a First Amendment Retaliation Claim
The SAC alleges that defendants unlawfully retaliated against plaintiff based on its

initiation of this lawsuit, in violation of plaintiff’s First Amendment right to petition the courts.
SAC ¶ 100. I agree with defendants that the SAC fails to sufficiently allege such a claim.
To state a First Amendment retaliation claim, a plaintiff must allege “(1) that the speech
or conduct at issue was protected, (2) that the defendant took adverse action against the plaintiff,
and (3) that there was a causal connection between the protected speech and the adverse action.”
Brandon v. Kinter, 938 F.3d 21, 40 (2d Cir. 2019) (quotation marks omitted). The right to petition
the courts is a First Amendment interest, and therefore plaintiff’s initiation of this lawsuit was a
protected First Amendment activity. See BE & K Const. Co. v. N.L.R.B., 536 U.S. 516, 524-25
(2002).
Nonetheless, the SAC fails to state a First Amendment claim because it fails to identify

any adverse actions taken after plaintiff initiated the present case on August 4, 2020. Instead,
plaintiff merely alleges that “adverse and discriminatory treatment continued” after initiation of
this proceeding, which “included additional steps and efforts to block and drive up the costs of
the opening of the Northport Hotel.” SAC ¶ 102. Such conclusory allegations are plainly
insufficient. See Spear v. Town of W. Hartford, 954 F.2d 63, 67 (2d Cir. 1992) (noting that
“allegations which are nothing more than broad, simple and conclusory statements are

6 Conversely, the SAC’s failure to allege even general time periods leads many of those claims to fail on their merits,
as discussed below.
insufficient”). Plaintiff fails to clearly identify when those “additional steps” occurred, or even
what those “additional steps” were. SAC ¶ 102.
At best, the SAC alleges that defendants “substantially reduce[d] the maximum seating
capacity and occupancy to a level far below the maximum . . . permitted by . . . [the] applicable
codes” and restricted the Building’s Certificate of Occupancy. Id. ¶¶ 106, 111. However, the SAC

provides no indication that such actions post-dated this suit. Nor does the SAC sufficiently allege
that such actions were motivated by this litigation.
Indeed, although the SAC does not identify when or how defendants imposed the seating
reduction, its allegations strongly suggest that the complained-of reduction preceded the
commencement of litigation. For example, defendants allegedly made “extortionate demands” to
reduce the restaurants seating as early as September 26, 2018, two years before this lawsuit was
initiated. SAC ¶¶ 97, 101. In addition, plaintiff does not contest defendants’ representations that
they reduced the restaurant’s seating capacity more than a year before the instant litigation,
during the Village’s approval of plaintiff’s site plan application on March 25, 2019. See Mot. at
2.7 Given that defendants apparently imposed the seating reduction far in advance of this suit, it

is impossible for the seating reduction to have been caused by the initiation of this suit.
Even assuming that the seating reduction had post-dated this suit (a fact absent from the
SAC), the SAC fails to adduce any facts suggesting causation. Instead, the SAC merely offers
the conclusory assertion that defendants “adversely treated and discriminated against [plaintiff]
in retaliation” for plaintiff’s exercise of its right to petition the courts. SAC ¶ 100. That is plainly

7 Although the seating capacity was apparently further reduced on July 14, 2022, plaintiff does not contest that
plaintiff voluntarily initiated the reduction when it sought, and received, Village approval of a modified site plan that
would increase the number of rooms in its hotel and reduce the size of its restaurant. See Mot. at 2. Plaintiff offers
no explanation for how approval of its own request constitutes an adverse action. Indeed, the SAC and plaintiff’s
briefing do not even attempt to explain which seating reduction is the basis for its retaliation claim, or when that
reduction occurred.
insufficient. See Schubert v. City of Rye, 775 F. Supp. 2d 689, 713-14 (S.D.N.Y. 2011)
(dismissing First Amendment retaliation claim where plaintiff relied on “boilerplate allegations”
and facts alleged failed to “plausibly support[] an inference of retaliatory motive”). To the extent
that the SAC pleads any facts at all, they undermine an inference of retaliatory motive. For
example, the SAC alleges that the Village’s prior “extortionate demands to reduce the number of

seats at its restaurant[] were exposed” during this litigation. SAC ¶ 101. But again, those
demands predate this litigation and therefore could not have been motivated by this suit.
Similarly, the SAC fails to provide sufficient facts regarding the alleged restrictions on
the Building’s Certificate of Occupancy. Indeed, the SAC provides no facts, and instead merely
alleges that defendants imposed “irrational and illegal” or “unlawful” restrictions on “the
issuance of a Certificate of Occupancy.” SAC ¶¶ 94, 111. I cannot accept that threadbare legal
conclusion.8 See Ashcroft v. Iqbal, 556 U.S. 662, 678 (2009) (courts “are not bound to accept as
true a legal conclusion couched as a factual allegation” (quotation marks omitted)). The SAC is
silent on when defendants restricted the certificate, nor does it explain what those restrictions
even were.9 Although the parties’ briefing supplies some of those facts, assertions contained in

legal memoranda are not properly before the court in evaluating the sufficiency of a complaint.
See Stratakos v. Nassau County, No. 15-CV-7244, 2016 WL 6902143, at *5 (E.D.N.Y. Nov. 23,

8 Plaintiff was issued a 180-day “Temporary Certificate of Occupancy” on July 27, 2023. See Temporary Certificate
of Occupancy, ECF No. 15-11. Plaintiff’s building did not receive a plenary Certificate of Occupancy because the
building contained an overhang projection onto a neighboring property, in violation of N.Y.S. Build. C. §705.2. Id.
The Temporary Certificate of Occupancy provided that a plenary Certificate of Occupancy “for the entire structure
with the projections intact” would “be determined via agreement with the adjoining owner or outcome of litigation
or further proceedings with the adjoining owner or application to municipal boards or agencies with jurisdiction over
the encroachment resulting in a determination of the encroachment issue.” Id.

Plaintiff concedes that it has encroached on its neighbor’s property, but contends that the encroachment is de
minimis and thereby inactionable under New York law. Opp. at 15 (collecting cases). In plaintiff’s view, defendant’s
decision to delay issuance of a plenary Certificate of Occupancy was therefore “based on a meritless and pretextual”
violation. Id.
9 Although the parties’ briefing indicates that the refusal occurred on July 27, 2023, three years after initiation of this
suit, the SAC fails to allege that date. See SAC ¶ 94.
2016) (noting that statement contained in legal memorandum but not complaint is “not directly
relevant to the Court’s evaluation of the pleading”). Given the vagueness of the SAC, I cannot
conclude that plaintiff has stated a First Amendment claim based on its scattered references to the
Certificate of Occupancy.10
For the above reasons, I GRANT defendants’ motion to dismiss the First Amendment

Claim.
IV. The SAC Fails to State a Fourteenth Amendment Equal Protection Claim

The SAC also asserts that defendants engaged in various discriminatory actions that
violated plaintiff’s right to Equal Protection under the Fourteenth Amendment. SAC ¶ 108. The
Second Circuit “has identified two distinct pathways under which a plaintiff can assert a ‘non-
class-based Equal Protection violation’”: (1) a selective enforcement (LeClair) claim and (2) a
class of one (Olech) claim. Demarest v. Town of Underhill, No. 24-147, 2025 WL 88417, at *2
(2d Cir. Jan. 14, 2025) (citing Hu v. City of New York, 927 F.3d 81, 93 (2d Cir. 2019)). I agree
with defendants that plaintiff has failed to state a claim under either pathway.
A. Selective Enforcement
To allege a selective enforcement claim under LeClair v. Saunders, 627 F.2d 606 (2d Cir.
1980), a plaintiff must allege “both (1) that [it] was treated differently from other similarly
situated businesses and (2) that such differential treatment was based on impermissible
considerations such as race, religion, intent to inhibit or punish the exercise of constitutional
rights, or malicious or bad faith intent to injure a person.” Cine SK8, Inc. v. Town of Henrietta,

10 Indeed, plaintiff’s claim would fail even if I were to take judicial notice of the Temporary Certificate of
Occupancy. See Int'l Audiotext Network, Inc. v. Am. Tel. & Tel. Co., 62 F.3d 69, 72 (2d Cir. 1995) (noting that a court
may consider a document “upon which [the complaint] solely relies and which is integral to the complaint). The
SAC is totally devoid of allegations demonstrating that the limitations to the Certificate of Occupancy were
motivated by retaliatory animus.
507 F.3d 778, 790 (2d Cir. 2007) (quotation marks omitted). The test “requires proof of disparate
treatment and impermissible motivation,” and a plaintiff cannot merely rest on a demonstration
of different treatment, but must also “prove that the disparate treatment was caused by the
impermissible motivation.” Bizzarro v. Miranda, 394 F.3d 82, 87 (2d Cir. 2005).
The first prong of a selective enforcement claim requires a plaintiff to identify a

comparator whose circumstances “bear a reasonably close resemblance” to that of the plaintiff.
Brown v. Daikin Am. Inc., 756 F.3d 219, 230 (2d Cir. 2014) (internal quotation marks omitted).
They need not, however, be “identical.” Id. Nevertheless, the plaintiff must still show that “she
was similarly situated in all material respects to the individuals with whom she seeks to compare
herself.” Hu, 927 F.3d at 96 (quotation marks omitted).
The SAC broadly alleges four classes of “discriminatory” actions. First, plaintiff alleges
that defendants imposed: (1) “excessive fees,” (2) “limitations on permits, approvals, and the
issuance of a certificate of occupancy,” (3) requirements that caused plaintiff “to incur
completely unnecessary costs in connection with municipal approvals,” and (4) a “limitation on

the number of seats allowed in [plaintiff’s] restaurant.” SAC ¶ 94. However, the SAC does not
allege any comparators for the first three categories of actions and therefore fails to state a claim
for selective enforcement premised on those actions. See Hu, 927 F.3d at 99 (noting that a
selective enforcement claim requires specific examples of similarly situated comparators).
Meanwhile, the SAC does identify a single comparator for the fourth category of action.
Specifically, the SAC alleges that the “Rockin Fish” restaurant, which is located “within several
hundred feet of [plaintiff’s] restaurant premises,” was not required to “substantially reduce” its
seating capacity. SAC ¶¶ 105–06. That allegation is insufficient. In Hu, the Second Circuit
considered it a “close” question as to whether the plaintiffs in that case were similarly situated to
other workers who were differentially treated “by the same defendant . . . for the same conduct
. . . at the same jobsite.” Hu, 927 F.3d at 97. Here, plaintiff offers even fewer details. The SAC
does not allege the square footage of either its own restaurant or Rockin Fish. Nor does the SAC
allege the maximum occupancy assessed by the Village and the maximum occupancy requested
by either restaurant. Indeed, the SAC does not even allege when each restaurant’s maximum

occupancy was assessed, or whether they were assessed by the same government officials or
entities. Although the “failure to plead . . . fact-specific details should not bar” a selective
enforcement claim, a plaintiff must still plead sufficient facts to reasonably infer that the plaintiff
is similarly situated to the comparator “in all material respects.” Id. at 98–99. Plaintiff has failed
to do so here
Even if plaintiff had identified suitable comparators, the SAC would fail for lack of
causation. See Bizzarro, 394 F.3d at 87 (noting that a selective enforcement claim requires proof
that the state action was caused by an improper motivation). Plaintiff offers nothing more than
bare allegations that one or more defendants harbored “ill will” or sought to prevent plaintiff

from competing with restaurants owned by village officials or their political supporters. SAC
¶ 94. However, the SAC is totally bereft of facts indicating that defendants actually harbored
such motives, much less that those motives caused their actions.
For the above stated reasons, I GRANT defendants’ motion to dismiss plaintiff’s
Fourteenth Amendment selective enforcement claims.
B. Class of One
To state a “class of one” equal protection claim, a plaintiff must allege that he was
“intentionally treated differently from others similarly situated and that there [was] no rational
basis for the difference in treatment.” Vill. of Willowbrook v. Olech, 528 U.S. 562, 564 (2000).
Unlike a selective enforcement claim, a class of one claim does not require allegations evincing
that the defendant was motivated by improper considerations. See Hu, 927 F.3d at 94 (noting that
class of one claims “do[] not require proof of a defendant’s subjective ill will towards the
plaintiff”). However, the plaintiff must allege specific examples of comparators that are “so
identical as to exclude the possibility that [defendant] acted on the basis of a mistake.” Id. at 100;
see also Ruston v. Town Bd. for Town of Skaneateles, 610 F.3d 55, 59 (2d Cir. 2010) (dismissing

an Olech claim for failure to “allege specific examples” of similarly situated comparators).
The SAC fails to satisfy the “stringent similarity standard for an Olech Claim.” Hu, 927
F.3d at 100. As discussed above, the SAC identifies only a single comparator, the Rockin Fish
restaurant. Given that the SAC fails to allege sufficient facts under the “lower similarity
standard” applicable to selective enforcement claims, it necessarily fails to satisfy the “extremely
high similarity standard” applicable to class of one claims. Id. at 94, 95. I therefore GRANT
defendants’ motion to dismiss plaintiff’s equal protection claim.
V. The SAC States a Fifth Amendment Takings Claim
The SAC alleges that the Building Permit fee was an unlawful “exaction,” SAC ¶ 77, in
violation of the Takings Clause of the Fifth Amendment, which provides that “private property”
shall not “be taken for public use, without just compensation,” U.S. Const. Amend. V. The

Supreme Court has explained that there exist two types of takings. First, the government
commits a “per se taking” when “the government physically acquires private property for a
public use,” and in such cases the government has a “categorical obligation to provide the owner
with just compensation.” Cedar Point Nursery v. Hassid, 594 U.S. 139, 147–48 (2021). Second,
the government commits a “regulatory taking” “when the government . . . imposes regulations
that restrict an owner’s ability to use his own property” that “goes too far.” Id. (quotation marks
omitted).
Plaintiff’s claim that the Building Permitting fees were excessive and unlawful falls
within the per se takings doctrine. “[W]hen the government commands the relinquishment of
funds linked to a specific, identifiable property interest such as a bank account or parcel of real
property, a ‘per se [takings] approach’ is the proper mode of analysis under the Court’s
precedent.” Koontz v. St. Johns River Water Mgmt. Dist., 570 U.S. 595, 614 (2013) (citation

omitted). Although that language suggests that applications for land-use permits are subject to
the ordinary per se takings analysis, permitting conditions are a “special application” of the per
se takings doctrine governed by the Supreme Court’s decisions in Nollan v. California Coastal
Comm’n, 483 U.S. 825 (1987) and Dolan v. City of Tigard, 512 U.S. 374 (1994). Under those
cases, the government is allowed “to condition approval of a permit on the dedication of property
to the public so long as there is a ‘nexus’ and ‘rough proportionality’ between the property that
the government demands and the social costs of the applicant’s proposal. Koontz, 570 U.S. 595,
605–06 (2013). Critically, “the government’s demand for property” must satisfy the nexus and
rough proportionality requirements even where the “demand is for money” rather than use of the

property. Id. at 619.
Defendants’ sole argument is that “payment of a fee upon the submission of the
Application for the Building Permit does not constitute a monetary exaction” as “it has no effect
whatsoever on the proposed land use.” Reply at 9. But as Koontz makes clear, building permit
fees must satisfy Nollan and Dolan. Koontz, 570 U.S. at 618–19 (noting that the Takings Clause
applies to permitting fees given the “special vulnerability of land use permit applicants to
extortionate demands for money”). Moreover, building permit fees must satisfy the nexus and
proportionality requirements regardless of whether they result from legislation or administrative
action. See Sheetz v. County of El Dorado, California, 601 U.S. 267, 279–80 (2024).
Accordingly, defendant’s sole argument in favor of dismissal is unavailing. Koontz and Sheetz
plainly permit plaintiff to challenge both the Village’s legislatively enacted schedule of building
permit fees and the manner in which those fees were calculated by its administrators.11 I
therefore DENY defendants’ motion to dismiss plaintiff’s claim that the building permit fees
were an unlawful exaction of property in violation of the Takings Clause.

VI. The SAC Fails to State a Substantive Due Process Claim
To state a claim for substantive due process, a plaintiff must allege that: (1) he “had a
valid property interest” and (2) the “defendants infringed on that property right in an arbitrary or
irrational manner.” Royal Crown Day Care LLC v. Dep’t of Health & Mental Hygiene of City of
N.Y., 746 F.3d 538, 545 (2d Cir. 2014) (quotation marks omitted). To be “arbitrary in the
constitutional sense,” Collins v. City of Harker Heights, 503 U.S. 115, 129 (1992), the challenged
“state action [must have been] so egregious, so outrageous, that it may fairly be said to shock the
contemporary conscience,” Okin v. Vill. of Cornwall–On–Hudson Police Dep’t, 577 F.3d 415,
431 (2d Cir. 2009) (quotation marks omitted).

Plaintiff first asserts that the funds it used to pay the unlawful permit fees constitutes a
“property interest” protected by substantive due process. SAC ¶ 94. That may be so.
Nonetheless, plaintiff cannot premise its substantive Due Process claim on the loss of that
money. “Where another provision of the Constitution ‘provides an explicit textual source of
constitutional protection,’ a court must assess a plaintiff’s claims under that explicit provision
and ‘not the more generalized notion of substantive due process.’” Kia P. v. McIntyre, 235 F.3d

11 Defendants make no argument that plaintiff has failed to allege that the Building Permit fees lacked a nexus and
proportionality to the Village’s land use interests. Defendants also do not argue that the permit application fees are a
tax, which the Supreme Court has repeatedly affirmed are not subject to the Takings Clause. See Koontz, 570 U.S. at
615. I therefore do not consider those issues in deciding the instant motion. See United States v. Marrero, No. 22-
2030, 2024 WL 1253643, at *3 n.4 (2d Cir. Mar. 25, 2024) (“arguments not raised in a principal brief—let alone not
raised even in the reply—are considered waived”).
749, 757–58 (2d Cir. 2000) (quoting Conn v. Gabbert, 526 U.S. 286, 293 (1999)). As discussed
above, plaintiff already alleges that the payment of the permitting fees was an unlawful exaction
in violation of the Takings Clause. Accordingly, plaintiff cannot assert a duplicative substantive
due process claim premised on that precise conduct. See Yu v. Inc. Vill. of Oyster Bay Cove, 579
F. Supp. 3d 391, 398 (E.D.N.Y. 2022) (barring malicious prosecution claim under Due Process

clause “since such claims may be brought under the Fourth Amendment”).
Second, plaintiff asserts that it had a vested interest in the “actual Building Permit that
was issued.” Opp. at 18. Even assuming that the Building Permit is a property interest, the SAC
fails to allege any conduct that infringed upon the permit. There are no allegations that
defendants revoked or modified the Building Permit. As far as can be understood from the SAC,
plaintiff received a Building Permit that has stood unchanged since its inception. I fail to
understand how that violates substantive due process.12
Third, and finally, plaintiff asserts that it had a property interest in the Certificate of
Occupancy. As discussed above, the SAC’s allegations are vague and threadbare. The complete

absence of facts surrounding the Certificate of Occupancy defeats plaintiff’s claim, and I cannot
conclude that the Certificate of Occupancy constitutes a property interest or that defendants
infringed upon the Certificate of Occupancy in an arbitrary or irrational manner.
I therefore GRANT defendants’ motion to dismiss the substantive due process claims.
VII. The SAC Fails to State a Claim Against the Board and the Individual Defendants
Finally, I agree with defendants that the claims against the Village Board of Trustees and
the Individual Defendants should be dismissed. The Board of Trustees is merely an
administrative arm of the municipality and cannot be sued as an independent entity. See

12 Nor can plaintiff premise its claims on the Certificate of Occupancy. As discussed above, the SAC’s allegations
are too vague and threadbare to conclude that the limitations on the Certificate of Occupancy violated due process.
Omnipoint Commc’ns, Inc. v. Town of LaGrange, 658 F. Supp. 2d 539, 552 (S.D.N.Y. 2009)
(holding under New York law that “[t]he only proper defendant in a lawsuit against an agency of
a municipality is the municipality itself”); T-Mobile Northeast LLC v. Town of Ramapo, 701 F.
Supp. 2d 446, 463 n.5 (S.D.N.Y. 2009) (holding that town board is not an independent legal
entity and that proper defendant was town). Since Northport Village is the proper defendant and

is already named as a defendant in this case, I GRANT the motion to dismiss all claims asserted
against the Board of Trustees.13
Likewise, the SAC largely fails to state a claim against any of the Individual Defendants.
An official-capacity claim “is not a suit against the official but rather is a suit against the
official’s office,” and “is no different from a suit against the State itself.” Hafer v. Melo, 502 U.S.
21, 26 (1991) (quotation marks omitted). As a result, an official capacity suit “merge[s] into [the]
claims against the [government entity].” Quinones v. City of Binghamton, 997 F.3d 461, 466 n.2
(2d Cir. 2021). Thus, any claims asserted against the Individual Defendants in their official
capacities are duplicative, and I GRANT defendants’ motion to dismiss those claims.14

13 Although plaintiff asserts that this argument is waived, “[a]n amended complaint . . . supersedes the original and
entitles a defendant to raise substantive arguments aimed at ‘judicial resolution of the controversy’ in a new
responsive pleading, even if those arguments were not raised in response to the original complaint.” In re Parmalat
Sec. Litig., 421 F. Supp. 2d 703, 713 (S.D.N.Y. 2006). Defendants have timely raised the Board of Trustees’ lack of
capacity in response to the SAC, which they have not yet answered.

14 I note that defendants argue that all of plaintiff’s 1983 claims against the Village should be dismissed for failure to
satisfy Monell, which sets forth the standard to impose liability against a municipality. As the Second Circuit has
explained, a municipality can only be held liable if “(1) a municipal policy or custom [] (2) cause[d] the plaintiff to
be subjected to (3) the deprivation of a constitutional right.” Agosto v. N.Y.C. Dep't of Educ., 982 F.3d 86, 97 (2d Cir.
2020). I need not decide that issue, as plaintiff’s § 1983 largely fail even assuming the SAC establishes municipal
liability, and the sole remaining claim was plainly part of a municipal policy or custom. Plaintiff’s Takings Clause
claim alleges that the Village’s permitting and land use fees are excessive, and those fees are imposed and calculated
pursuant to the Village’s legislatively enacted code.
Nonetheless, I note that plaintiff’s Monell allegations are threadbare and largely recite the applicable legal standard.
See e.g., SAC ¶ 92 (alleging that defendants “at all relevant times acted pursuant to official policy . . . approved by
the Village and its policymakers”). Plaintiff is advised that, should it wish to amend its dismissed claims, it must
allege facts rather than merely reciting legal principles.
However, defendants go too far in arguing that the defendants were sued exclusively in
their official capacity simply because they undertook the “alleged conduct in their official
capacities.” Mot. at 25. An individual official may be held liable in his personal capacity even
where the wrongful actions were taken in their official capacity. Hafer, 502 U.S. 27 (noting that
§ 1983 liability turns “on the capacity in which state officials are sued,” rather than “on the

capacity in which they acted when injuring the plaintiff”). Admittedly, the SAC does not
articulate whether any Individual Defendant is being sued in his individual capacity. And
plaintiff does not even address the Individual Defendants’ arguments for the dismissal of claims,
much less draw an individual/official capacity distinction. I therefore deem plaintiff to have
conceded that the SAC asserts only official-capacity claims and dismiss all claims against the
Individual Defendants. See Gustavia Home, LLC v. Hoyer, 362 F. Supp. 3d 71, 86 (E.D.N.Y.
2019) (“a party ‘concedes through silence’ arguments made by its opponent that it fails to
address”). Plaintiff may replead any individual capacity claims.15
CONCLUSION

In sum, I GRANT in part and DENY in part defendants’ motion to dismiss the SAC’s
Seventh Cause of Action, asserting plaintiff’s § 1983 claims. First, I GRANT DISMISSAL of the
claims asserted against the Village Board of Trustees and against the individual defendants in
their official capacities. Plaintiff is DENIED permission to amend claims against those

15 I note that to plead individual capacity claims, a plaintiff must plead that the official was personally involved in
the alleged constitutional deprivation. Gaston v. Coughlin, 249 F.3d 156, 164 (2d Cir. 2001) (“Proof of an individual
defendant’s personal involvement in the alleged wrong is, of course, a prerequisite to his liability on a claim for
damages under § 1983.”). For at least five of the seven individual defendants, McMullen, Maline, Kehoe, Smith, and
Milligan, the SAC pleads only a rote recitation that those defendants were “personally involved in the constitutional
violations” because they were “aware of,” “condoned and approved,” and “personally participated in” “the alleged
misconduct of Brojer, the Village, and the Village Board.” SAC ¶ 93. “A complaint that essentially regurgitates the
relevant ‘personal involvement’ standard, without offering any facts indicating that, or how, an individual defendant
. . . was personally involved in a constitutional violation, cannot withstand dismissal.” Davis v. County of Nassau,
355 F.Supp.2d 668, 677 (E.D.N.Y. 2005). Thus, plaintiff’s individual capacity claims would largely fail even if
plaintiff had not conceded that point by failing to address it.
defendants, as they are futile as a matter of law. Kim v. Kimm, 884 F.3d 98, 106 (2d Cir. 2018)
(“It is well established that leave to amend a complaint need not be granted
when amendment would be futile.”). Second, I GRANT DISMISSAL of the claims asserted
against the individual defendants in their individual capacities, except for the claims asserted
against Mr. Brojer.16 Although I am doubtful that plaintiff will be able to marshal sufficient facts

to assert individual capacity liability, in an abundance of caution and “liberal amendment policy
of Rule 15(a),” I GRANT plaintiff permission to amend any individual capacity claims. Mandala
v. NTT Data, Inc., 88 F.4th 353, 361 (2d Cir. 2023) (quotation marks omitted).
As for the claims asserted against the Village, I GRANT DISMISSAL of plaintiff’s
§ 1983 claims premised on theories of (1) First Amendment Retaliation, (2) Fourteenth
Amendment Substantive Due Process, and (3) Fourteenth Amendment Equal Protection.
Although those claims appear to be frivolous, I GRANT plaintiff leave to amend them. Plaintiff
is warned, however, that any amendment must allege facts and cannot simply regurgitate legal
standards, and that pursuit of claims without a basis in fact or law may result in Rule 11

sanctions. Finally, I DENY DISMISSAL of plaintiff’s § 1983 Takings Clause claim against the
Village.
SO ORDERED.
/s/
Allyne R. Ross
United States District Judge

Dated: September 30, 2025
Brooklyn, New York

16 Mr. Brojer has filed a separate motion to dismiss the claims against him, which will be resolved in a separate
order.

---