# Samho Enterprise

> Armed Services Board of Contract Appeals · August 13, 2025

URL: https://www.frixlaw.com/law-library/cases/11127471

## Case

- **Court:** Armed Services Board of Contract Appeals
- **Decided:** August 13, 2025
- **Precedential status:** Published
- **Opinion:** Opinion
- **Judges:** Woodrow
- **Cited by:** 0 later opinions in the Frix Law Library

## Citator (automated)

- No negative treatment found by the automated citator. That is not the same as a confirmation that the case is good law; read the citing cases.
- Full citator and citing cases: https://www.frixlaw.com/law-library/cases/11127471

## How later opinions describe it (automated extraction)

- holding that ASBCA possesses jurisdiction to entertain contractor’s challenge to Navy’s exercise of a contractual option

## Opinion text

ARMED SERVICES BOARD OF CONTRACT APPEALS

Appeal of - )
)
Samho Enterprise ) ASBCA No. 63587
)
Under Contract No. W91QVN-21-D-0042 )

APPEARANCE FOR THE APPELLANT: Ik T. Kim, Esq.
CIL Foreign Legal Consultant Office
Seochojungang-ro, South Korea

APPEARANCES FOR THE GOVERNMENT: Dana J. Chase, Esq.
Army Chief Trial Attorney
John C. Degnan, Esq.
MAJ Brandon P. Mark, JA
Trial Attorneys

OPINION BY ADMINISTRATIVE JUDGE WOODROW
ON THE GOVERNMENT’S MOTION TO DISMISS

Pending before the Board is the government’s motion to dismiss for lack
of subject matter jurisdiction because the Board lacks authority to grant specific
performance and for failure to state a claim on which relief may be granted due to the
absence of a sum certain in its claim and complaint. Subsequently, the parties filed a
joint statement indicating that appellant did not intend to file a response and that
no additional briefing was needed.

For the reasons stated below, we grant the government’s motion and dismiss the
appeal without prejudice, allowing appellant to refile a proper claim with the
contracting officer.

STATEMENT OF FACTS FOR PURPOSES OF THE MOTION

On July 28, 2021, the Army awarded Contract No. W91QVN-21-D0042 to
Samho Enterprise (Samho; appellant) for repair and preventative maintenance of food
service equipment at U.S. Army Warrior Restaurants in Korea (R4, tab 1 at 1-4, 49-
50). The firm-fixed-price contract had a base period of August 1, 2021, to July 31,
2022, and four one-year option periods extending to July 31, 2026 (id. at 50).

The contract incorporated Federal Acquisition Regulation (FAR) 52.217-9,
OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) (id. at 75).
Paragraph (a) stated, in relevant part, that the government “may extend the term of this

1
contract by written notice . . . . [t]he preliminary notice does not commit the
government to an extension” (emphasis added) (id.). Pursuant to paragraph (b), “[i]f
the Government exercises this option, the extended contract shall be considered to
include this option clause” (id.). Thus, this clause gives the government the unilateral
right to extend the contract (provided it gives the contractor the requisite notice) at its
sole discretion.

On July 22, 2022, the contracting officer (CO) sent a letter to Samho, notifying
appellant that the government did not intend to exercise the first option year,
effectively allowing the contract to expire at the end of the base period (R4, tabs 8;
8a).

Shortly thereafter, on July 29, 2022, appellant’s counsel emailed an attorney
memorandum, employee statements, and a letter to the CO (R4, tabs 9; 9a; 9b; 9c). In
its memorandum, Samho alleged, among other things, that the Army’s decision not to
exercise the option was arbitrary and capricious (due to failure to state a reason for the
decision), made in bad faith (retaliatory in nature due to complaints by Samho’s
employees), and as such, constituted a breach of contract. Samho requested the
following remedy:

that [Department of the Army] (DOA) rescind its decision
not to exercise the option and extend the contract at least
for one more year or DOA fully compensate for the
damages incurred by the Contractor. The total damages
for one year will be no less than 427,500,000 KRW. 1

(R4, tab 9a at 6) (emphasis in original)

On October 17, 2022, the CO responded, pointing out that appellant’s
submission could not be accepted as a claim pursuant to the Contract Disputes Act
(CDA), 41 U.S.C. § 7103(b), because it was not certified (R4, tab 11 at 1).
Nonetheless, the CO provided a further explanation for why the government did not
exercise the next option year for the contract, stating:

However, since I have read your letter, please allow me
to broadly respond to the substance thereof. Aside from
documented performance concerns during the current
contract’s base year, the government’s decision not to
exercise the contract option was principally based upon a
determination to re-structure the requirement. During the
base year, the government recognized problems related to

1
This amount is equivalent to approximately $315,000.

2
lead times for the delivery of materials from the U.S.
These issues could not be satisfactorily addressed within
the previous contract structure. The government intends to
establish a BPA for such parts and to maintain a stock
managed by the Government, reforming the service
component of the requirement for a separate solicitation.
These decision factors are recorded in contemporaneous
documentation.

As such, the government’s decision not to exercise the
option was not primarily based upon the issues raised in
your letter, but rather legitimate and documented problems
with performance arising from delivery issues inherent in
the terms and conditions of the contract. In order to
resolve those issues, a completely new approach to the
requirement was required. Such a revision was outside the
scope of the previous contract and therefore mandated a
decision not to exercise the option.

I hope this information clarifies the rationale supporting
the government’s actions.

(R4, tab 11 at 1)

On November 30, 2022, appellant’s counsel emailed the CO a letter, an
attorney memorandum, and employee statements (R4, tabs 13, 13a, 13b, 13c). The
mailing included a certification signed by Samho (R4, tabs 13, 15, 15a). In appellant’s
memorandum, which was identical in content to its previous July 29, 2022 submittal,
under remedy sought, Samho again requested the following:

that DOA rescind its decision not to exercise the option
and extend the contract at least for one more year or DOA
fully compensate for the damages incurred by the
Contractor. The total damages for one year will be no less
than 427,500,000 KRW.

(R4, tab 13b at 6) (emphasis in original)

On January 26, 2023, the CO issued a final decision 2 on Samho’s July 29, 2022
certified claim. The CO’s letter set forth the government’s reasons for not exercising

2
The letter included the following language in the reference section of the CO’s letter:

3
the option to renew the contract for an additional one-year period. The CO
acknowledged that there were performance concerns during the contract’s base year
but that the “government’s decision not to exercise the contract option was principally
based upon a determination to re-structure the requirement.” The CO stated that
restructuring the contract was outside the scope of the current contract and not
“primarily based upon the issues raised” in Samho’s claim, and “therefore mandated a
decision not to exercise the option.” While not explicitly denying Samho’s claim, the
implication of the letter served as a rejection Samho’s position while clarifying “the
rationale supporting the government’s actions.” (R4, tab 14a)

Although the final decision did not include the mandatory appeal language
found at FAR 33.211(a)(4)(v) (informs the contractor that it may appeal the decision to
the agency board of contract appeals within 90 days from receipt of the final decision),
nevertheless, on April 20, 2023, appellant timely appealed the CO’s final decision.
The Board docketed the appeal as ASBCA No. 63587. In its complaint, which
requests the same relief as the claim, appellant sought the following remedy:

Therefore, the Contractor requests that the government
rescind its decision not to exercise the option and extend
the contract for at least one more year, or fully
compensate the Contractor for the damages incurred. The
Contractor estimates that the total damages for one year
would be no less than $326,276 USD (as of this filing date,
approximately, 427,500,000 KRW). If the Contractor
prevails in court, it will be adequately compensated by an
award of damages for the wrongful failure to exercise the
option.

(Compl. at 20) (emphasis added)

On August 9, 2023, the Board ordered the parties to file briefs addressing
whether the language in the claim describing the remedy sought constituted a “sum
certain” within the definition of “claim” found at FAR 2.101 and applicable Board
case law. Regarding the applicable Board case law, the Board cited Sandoval
Plumbing Repair, Inc., ASBCA No. 54640, 05-02 BCA ¶ 33,072 at 163,933. Shortly
thereafter, the Board followed up with a second order directing the parties to address

Contracting Officer’s Final Decision regarding Samho
Enterprise’s Notice of Intent submitted on 29 July 2022
against the Notice of Intent NOT to exercise the option.

Thus, we find that this letter constitutes the CO’s final decision on
the matter.

4
the impact, if any, to the Board’s jurisdiction to entertain the appeal in light of the
recent decision by the United States Court of Appeals for the Federal Circuit in ECC
Int’l Constructors, LLC v. Sec’y of Army, 79 F.4th 1364, 1380 (Fed. Cir. 2023).

On September 20, 2023, Samho filed its brief in response to the Board’s orders,
arguing that ECC International Constructors prevents dismissal for lack of a specific
monetary claim and that other factors should be considered before dismissing the
appeal (app. br. at 2). Samho also argued that the CO waived the sum certain issue by
not addressing it in the final decision (id. at 6). Samho requested permission to amend
its complaint if the Board were to conclude that a specific monetary amount is required
(id. at 7). On October 20, 2023, the Army filed its opposition to Samho’s brief, and on
November 2, 2023, Samho filed its reply to the Army’s opposition.

On March 12, 2024, the Army filed a motion to dismiss for lack of subject
matter jurisdiction and failure to state a claim on which relief may be granted.
Subsequently, the parties filed a joint statement indicating that appellant did not intend
to file a response and that no additional briefing was needed.

DECISION

I. Standard of Review

Samho bears the burden of establishing the Board’s jurisdiction under the
Contract Disputes Act (CDA), 41 U.S.C.A. §§ 7101-7109, by a preponderance of the
evidence. Parsons Glob. Servs., Inc., ASBCA No. 56731, 11-1 BCA, ¶ 34,632
at 170,653, aff’d 677 F.3d 1166 (Fed. Cir. 2012), (citing Reynolds v. Army and Air
Force Exchange Servs., 846 F.2d 746, 748 (Fed. Cir. 1988)). Samho must
demonstrate that it is more likely than not that the Board possesses jurisdiction to
entertain this appeal.

The relevant facts are not in dispute. The government presented a statement of
undisputed facts in support of its motion, and Samho failed to raise specific objections
to that statement. Therefore, pursuant to our rule 7(c)(2), we deem those facts
undisputed. Enfield Enters., Inc., ASBCA No. 63631, 24-1 BCA ¶ 38,574 at 187,487.
Therefore, our focus is on the legal questions of whether we possess jurisdiction to
entertain Samho’s request for relief and whether Samho’s complaint states a claim
upon which relief can be granted.

II. Jurisdiction Regarding Contract Option Disputes

The Contract Disputes Act (CDA) grants this Board jurisdiction to decide
appeals from contracting officer decisions related to contracts made by Department of
Defense agencies. 41 U.S.C.A. §§ 7101 – 7109. This includes decisions concerning

5
the exercise (or non-exercise) of contractual options. Cessna Aircraft Co. v. Dalton,
126 F.3d 1442, 1447-48 (Fed. Cir. 1997), cert. denied, 525 U.S. 818 (1998) (holding
that ASBCA possesses jurisdiction to entertain contractor’s challenge to the Navy’s
exercise of a contractual option). Under the CDA, we review the claim, not the
complaint, to determine whether the jurisdictional requirements have been satisfied.
See Am. Gen. Trading & Contracting, WLL, ASBCA No. 56758, 12-1 BCA ¶ 34,905
at 171,639.

It is well-established that the Board does not possess jurisdiction to order
equitable relief, namely specific performance. BR Goup, ASBCA Nos. 63507, 63744,
24-1 BCA ¶ 38,699 at 188,159, citing Tex. Eng’g Sols., ASBCA Nos. 53669, 54087,
03-1 BCA ¶ 32,272 at 159,660 (“the Board has neither authority nor jurisdiction to
order a contract reinstated); Erik Robinson d/b/a The Artwork Factory, ASBCA
Nos. 63727, 63809, 24-1 BCA ¶ 38,633 at 187,805 (the Board “indisputably” lacks
jurisdiction to entertain a request for specific performance). We cannot order a party
to take specific actions.

In this appeal, Samho’s claim to the contracting officer explicitly requested that
the contracting officer exercise the contractual option and extend the contract for an
additional year. The claim requested:

that [Department of the Army] DOA rescind its decision
not to exercise the option and extend the contract at least
for one more year or DOA fully compensate for the
damages incurred by the Contractor. The total damages
for one year will be no less than 427,500,000 KRW.

(R4, tab 9a at 6) (emphasis in original). In essence, appellant is requesting that the
Board reinstate the expired contract for at least a one-year term, or award it estimated
damages.

The request for the Board to order the Army to exercise the option is a request
for specific performance. Specific performance is a remedy in which a court orders a
party to fulfill the terms of a contract, as monetary damages would be an inadequate
substitute. Specific Performance, BLACK’S LAW DICTIONARY (11th ed. 2019). Because
Samho’s claim includes a request that we order the Army to exercise the option,
thereby in effect reinstating the expired contract, that aspect of the claim falls outside
the Board’s jurisdiction.

However, Samho’s claim is not solely limited to a request for specific
performance. The claim also requests, in the alternative, that “[the Army] fully
compensate [Samho] for the damages incurred by the contractor” (R4, tab 9a at 6).
We interpret this as a request for monetary damages stemming from the Army’s

6
decision not to exercise the option to renew. The Board does possess jurisdiction
to entertain Samho’s claim for money damages arising from the Army’s decision,
focusing on whether the Army’s decision was reasonable under the circumstances.

Disputes arising from options are decided under the CDA. This includes
decisions concerning the exercise of contractual options. Alliant Techsystems, Inc. v.
United States, 178 F.3d 1260, 1264–65 (Fed. Cir. 1999), reh’g denied, 186 F.3d 1379
(Fed. Cir. 1999); see also Cessna Aircraft, 126 F.3d at 1447 (holding that ASBCA
possesses jurisdiction to entertain contractor’s challenge to Navy’s exercise of a
contractual option). Therefore, we possess jurisdiction to entertain Samho’s claim
insofar as it seeks monetary damages for the contracting officer’s refusal to exercise
the renewal option in Samho’s contract.

III. Appellant’s Claim Does Not State a Sum Certain

A. Background: the Government’s Motion to Dismiss

The government moves to dismiss appellant’s claim for failure to state a claim
upon which relief can be granted. Specifically, the government argues for dismissal
without prejudice, contending that appellant’s damages claim lacks a “sum certain,” a
mandatory requirement under the CDA and FAR (gov’t mot. at 14). The Navy
contends that appellant’s use of the phrase “no less than” is insufficient to state a sum
certain and that the appellant itself acknowledged the difficulty in calculating a precise
sum (id. at 12-14). The Navy proposes that a dismissal without prejudice allows the
appellant to revise and resubmit its claim within the statute of limitations (id. at 15).

B. Standard of Review: Failure to State a Claim

We dismiss a claim if the complaint does not allege facts plausibly suggesting
entitlement to relief. Cary v. United States, 552 F.3d 1373, 1376 (Fed. Cir. 2009).
Though the Board’s rules have no equivalent to Federal Rules of Civil Procedure
12(B)(6) or 12(c), we recognize motions to dismiss for failure to state a claim upon
which relief may be granted. Fluor Intercontinental, Inc., ASBCA Nos. 62550,
62672, 22-1 BCA ¶ 38,105 at 185,095; Parsons Gov’t Servs., Inc., ASBCA
No. 60663, 17-1 BCA ¶ 36,743 at 179,100-01. Our review encompasses the
complaint, matters integral to the complaint, the case record, and the contractor’s
claim submitted to the contracting officer. Fluor, 22-1 BCA ¶ 38,105 at 185,096; see
also Lockheed Martin Integrated Sys., Inc., ASBCA Nos. 59508, 59509, 17-1 BCA ¶
36,597 at 178,281.

7
C. The Sum Certain Requirement

The CDA permits contractors to sue the United States for breach of contract,
but the FAR requires that any claim for monetary relief be stated in a “sum certain.”
41 U.S.C. § 7103(a); FAR § 2.101. This requirement ensures that the CO has
“adequate notice of the basis and amount of the claim,” enabling proper evaluation of
the government’s potential liability and informed decision-making. Cont. Cleaning
Maint., Inc. v. United States, 811 F.2d 586, 592 (Fed. Cir. 1987). This enables the
government to properly assess its potential liability, budget accordingly, and engage in
meaningful settlement negotiations.

The Federal Circuit recently addressed the sum certain requirement. In ECC
Int’l Constructors, LLC v. Sec’y of the Army, 79 F.4th 1364, 1377 (2023), the United
States Court of Appeals for the Federal Circuit reversed the ASBCA’s dismissal of
ECC’s claim, clarifying that while the CDA requires a written claim, the “sum certain”
requirement originates in FAR § 2.101, not the CDA itself. Consequently, the absence
of a sum certain does not deprive the Board of jurisdiction. Id. The appropriate
remedy in such cases is dismissal without prejudice, allowing the appellant to cure the
defect by resubmitting a claim stating a sum certain amount. See Mindseeker, Inc.,
ASBCA No. 63197, 24-1 BCA ¶ 38,666 at 187,961. Therefore, the critical question is
whether appellant’s claim, as presented to the CO, satisfied the sum certain
requirement, even if its absence would not be a jurisdictional bar.

D. Analysis of Appellant’s Claim

Appellant’s claim fails to state a sum certain because it uses the qualifying
language “no less than,” rendering the amount uncertain. Appellant’s claim to the
contracting officer stated:

that DOA rescind its decision not to exercise the option
and extend the contract at least for one more year or DOA
fully compensate for the damages incurred by the
Contractor. The total damages for one year will be no less
than 427,500,000 KRW.

(R4, tab 13b at 6) (emphasis added) Appellant’s complaint included the same
language but added the following contingency concerning the filing date: The
Contractor estimates that the total damages for one year would be no less than
$326,276 USD (as of this filing date, approximately, 427,500,000 KRW). (Compl.
at 20) (emphasis added).

Appellant urges us to preserve its claim, contending that dismissal for failure to
state a sum certain is not appropriate under Parsons Gov’t Svcs., because we cannot

8
conclusively determine that appellant is unable to “prove any set of facts in support of
its claim that would entitle it to relief.” Appellant contends that the complex nature of
its damages and the inherent difficulty in calculating certain elements suggest that the
failure to state a sum certain does not conclusively render the claim unprovable (app.
br. at 3, 5).

Appellant’s reliance on Parsons is misplaced. Parsons involved a claim that
was legally impossible, regardless of the amount requested. In Parsons, the Board
dismissed the claim, not because it failed to state a sum certain, but because the claim
alleged the government violated a federal fiscal statute. According to the Board, the
statute did “not enable contractors to assert a private cause of action,” and
consequently, there was no way that Parsons could prove any set of facts in support of
its claim that would entitle it to relief. Parsons Gov’t Servs., 17-1 BCA ¶ 36,743
at 179,100-01. Here, the claim may be arguably valid, but it is procedurally deficient
for failing to state a sum certain. The two are distinct issues.

Moreover, as the Federal Circuit held in ECC International, a sum certain is a
mandatory element of a CDA claim. 79 F.4th at 1377. The relevant question is not
whether the claim as stated is “unprovable,” but whether the claim satisfies the
mandatory requirement of stating a sum certain. “A claim that does not state a sum
certain has not sufficiently pleaded the elements of a claim under the CDA and may be
denied by the contracting officer and dismissed on appeal to [the Board] for failure to
state a claim.” Id. at 1381. In our view, the qualifying language of “no less than
$326,276” fails to provide the contracting officer with adequate notice of the amount
of the claim.

We have consistently held that the use of qualifying language in describing a
requested amount does not constitute a sum certain. In J.P. Donavan Constr., Inc.,
ASBCA No. 55335, 10-2 BCA ¶ 34,509 at 170,171, aff’d, 469 Fed. Appx. 903 (Fed.
Cir. 2012), we held that the contractor’s use of the qualifying word “approximately”
to describe a requested amount was insufficient. Likewise, in Freeport Techs., Inc.,
ASBCA No. 56665, 10-2 BCA ¶ 34,492 at 170,128, we held that including
unspecified amounts “TBD” (to be determined) is not a sum certain. Similarly, in
Northrop Grumman Sys. Corp. Space Sys. Div, ASBCA No. 54774, 10-2 BCA
¶ 34,517 at 170,233, we held that an alternative claim for an amount “in excess of” the
stated monetary amount was not stated in a sum certain.

Indeed, appellant’s own description of the difficulties in establishing a sum
certain underscores the necessity of this requirement. Appellant does not contend that
a sum certain may be ascertained from documents it submitted with its claim. Rather,
appellant cites Korean labor law, the depreciation of investments, and the inherent
difficulty in estimating lost profits due to the “requirement portion” of the contract
(app. br. at 4). These complexities highlight why a vague or open-ended demand

9
is unacceptable; it prevents the contracting officer from accurately assessing the
government’s potential liability and hinders any meaningful settlement discussions.

We have also held on multiple occasions that this exact “no less than”
qualifying language is not a sum certain for purposes of the CDA. In Sandoval
Plumbing Repair, Inc. d/b/a/ Sandoval Constr. Co., ASBCA No. 54640, 05-2 BCA
¶ 33,072 at 163,933, we held that appellant’s request for damages “in an amount of
no less than” a specific amount rendered the request too uncertain. Likewise, in Atl.
Indus., Inc., ASBCA No. 34832, 88-1 BCA ¶ 20,244 at 102,472, we observed that a
request for an amount “not less than” was not a sum certain.

Therefore, because appellant’s claim fails to state a sum certain, and fails to
include documents from which a sum certain may be ascertained, it must be dismissed
without prejudice to allow for refiling with a proper claim.

CONCLUSION

The Board lacks jurisdiction over the portion of appellant’s claim seeking
specific performance compelling the exercise of a contractual option. Accordingly,
the government’s motion relating to that portion of the appeal is granted. The
government’s motion to dismiss appellant’s monetary claim for failure to state a claim
due to the lack of a sum certain is granted. We dismiss the appeal without prejudice to
allow appellant to refile a proper claim with the contracting officer.

Dated: August 13, 2025

KENNETH D. WOODROW
Administrative Judge
Armed Services Board
of Contract Appeals

I concur I concur

OWEN C. WILSON MICHAEL N. O’CONNELL
Administrative Judge Administrative Judge
Acting Chairman Vice Chairman
Armed Services Board Armed Services Board
of Contract Appeals of Contract Appeals

10
I certify that the foregoing is a true copy of the Opinion and Decision of the
Armed Services Board of Contract Appeals in ASBCA No. 63587, Appeal of Samho
Enterprise, rendered in conformance with the Board’s Charter.

Dated: August 13, 2025

PAULLA K. GATES-LEWIS
Recorder, Armed Services
Board of Contract Appeals

11

---