# City of Hallowell v. Greater Augusta Util. Dist.

> Superior Court of Maine · March 18, 2013

URL: https://www.frixlaw.com/law-library/cases/10810352

## Case

- **Court:** Superior Court of Maine
- **Decided:** March 18, 2013
- **Precedential status:** Unpublished
- **Opinion:** Opinion
- **Judges:** Nancy Mills
- **Cited by:** 0 later opinions in the Frix Law Library

## Citator (automated)

- No negative treatment found by the automated citator. That is not the same as a confirmation that the case is good law; read the citing cases.
- Full citator and citing cases: https://www.frixlaw.com/law-library/cases/10810352

## Opinion text

STATE OF MAINE SUPERIOR COURT
KENNEBEC, ss CRIMINAL ACTION
DOCKET NO. AP-1.1-~2 /
NJ\1\ ~Kel\.l- 3/J1../2ot3
CITY OF HALLOWELL,
VERONICA MOLLOY,
ROBERT STUBBS,
JANIS CROSS,
DOROTHY MITHEE,
and GERALD MAHONEY,

Plaintiffs

v. DECISION AND ORDER

GREATER AUGUSTA
UTILITY DISTRICT,

Defendant

Before the court is the plaintiffs' appeal, 1 pursuant to Rule SOB, of the 8 I 15 I 11

decision of the defendant Greater Augusta Utility District (GAUD). (Def.'s Ex. 2 at 240-

42.) Pursuant to that decision, effective October 3, 2011, GAUD increased sewer rates

by 35% and stormwater rates by 40%. (Def.'s Ex. 2 at 214, 240-42.)

The plaintiffs challenge three allocation factors used by GUAD to determine the

2011 rate increase: allocation factors F, G, and H. Allocation factor F, customer

accounts, allocates 84% of billing costs to sewer customers and 16% to stormwater

customers, based on the expenses involved with customer accounts. (Def.'s Ex. 2 at

183.) The total cost of customer billing is $281,411.00. (De£.' s Ex. 2 at 207.) The total

operations and maintenance budget is $3,659,193.00 (Def.'s Ex. 2 at 209.)

1
The defendant filed a motion to dismiss based on standing. The court granted the motion as to
Hallowell Citizens for Fair Sewer Rates and denied the motion as to the City of Hallowell. The
plaintiff then amended its complaint to add Veronica Molloy, Robert Stubbs, Janis Cross,
Dorothy Mithee, and Gerald Mahoney as plaintiffs. Ms. Mithee had died by the date of the
hearing in this appeal.
Allocation factor G allocates 63% of operation and maintenance expenses, some

capital expenses, and some debt service costs to sewer customers and 37% to

stormwater customers based on the total flow of sewer and stormwater at the treatment

plant. (De£.' s Ex. 2 at 211.)

Allocation factor H allocates 44% of the costs of the Bond Brook CSO Project to

sewer customers and 56% to stormwater customers based on construction allocations of

the project. (De£.' sEx. 2 at 183-84.)

The plaintiffs argue that these incorrect allocation factors result in GAUD sewer

customers paying higher rates than they should pay, contrary to the legislative

mandate. (Def.'s Ex. 1.)

The court has considered the testimony, exhibits, and written arguments. For the

following reasons, the 8/15/11 decision of GAUD is affirmed.

FINDINGS

In 2007, the sewer, water, and stormwater operations of the Augusta Sanitary

and Water Districts and the sewer operations of the City of Hallowell were merged and

GAUD was created. (Def.'s Ex. 1.) This is a combined sewer system because the pipes

carry sewer and stormwater. (Def.s' Ex 2 at 89.) The legislation provided, in part:

Sec. A-1. Territorial limits; corporate name;
purpose. The inhabitants and territory of the City of
Augusta and the City of Hallowell constitute a body politic
and corporate under the name of the Greater Augusta Utility
District, referred to in this Part as "the district" for the
following purposes:

2. To construct, maintain, operate and provide the sewers
with all their appurtenances, but not stormwater drainage
provided under subsection 3, inside the City of Augusta, the
City of Hallowell, the Town of Chelsea and all that area in
the Town of Farmingdale ...

2
3. To construct, maintain, operate and provide the
stormwater drainage system with all its appurtenances in
the City of Augusta only ...

Sec. A-16. Payments of rates required; purpose of
revenue generally.

The wastewater rates must be established to provide
revenue for the following purposes:

A. To pay the current expenses of operating and maintaining
the sewerage, drainage and treatment systems of the district;

B. To provide for the payment of interest and principal on
the indebtedness created or assumed by the district;

C. To provide funds for paying the cost of all necessary
repairs, replacements or renewals of the sewerage, drainage
and treatment systems of the district; and

D. To pay or provide for all amounts that the district may be
obligated to pay or provide by law or contract, including any
resolution or contract with or for the benefit of the holders of
its bonds and notes.

3. For purposes of establishing water and wastewater rates,
all the district's costs of service must be equitably allocated
between water and wastewater operations to minimize any
cross-subsidies between water ratepayers and wastewater
ratepayers. The district shall maintain records supporting
and documenting the methods used to allocate all costs
between the water and wastewater operations.

4. For the purpose of establishing wastewater rates, all of the
district's costs of service must be equitably allocated
between sewerage service and stormwater service and the
cost of stormwater service must be borne by the ratepayers
of the City of Augusta. The district shall maintain records
supporting and documenting the methods used to allocate
all costs between sewerage service and stormwater service.

(Def.'s Ex. 1 at 1, 2, 10-11.)

A rate increase took place in 2006, before GAUD was formed. A rate increase

was anticipated again in 2011, primarily because of a 17 million dollar construction

3
project,2 (Def.'s Ex. 2 at 251-52.) Prior to the GAUD Board's vote on the 2011 rate

model, public hearings were held. Plaintiff Janis Cross spoke at the 7/28/11 hearing.

(Def.'s Ex. 2 at 271.) Hallowell City Councilor Phillip Lindley spoke at the 7/28/11

meeting, although he did not identify himself as a representative of the City of

Hallowell. (Def.'s Ex. 2 at 269-71.) Dorothy Mithee spoke in opposition to the rate

increase at the 8/15/11 hearing. (De£. Ex. 2 at 240.) The Board requested altematives

but received none. No alternative flow calculation, included in allocation factor G, was

presented.

1. Dennis Kinney

Dennis Kinney began working for public utilities with General Waterworks

Corporation. During that employment, he received his wastewater treatment license

and water operator's license, which permit him to operate water and wastewater

treatment systems throughout Maine. For the past twenty-five years, he has worked for

the Hallowell Water District (HWD) and has operated, maintained, and managed the

water system, the sewer system, and the stormwater collection system for Hallowell.

During this time, he has completed cost of water, treatment, and service studies; has

been involved in water, sewer, and stormwater rate cases; and has been responsible for

HWD's financial documents. He was a nonvoting member of the GAUD Board of

Trustees during the Board's first year.

Sewer services include discharge from toilets, sinks, and showers into the public

sewer system. Stormwater includes rainwater that drains into the collection system.

Prior to 1972, Hallowell owned a combined system in which sewer and stormwater

combined in one pipe. In 1972, Hallowell and the HWD constructed two separate

systems, which involved upgrades to the parts of the system that previously were

2
Mr. Kinney believes the cost of the project is closer to 30 million dollars.

4
combined. Today, the stormwater does not combine with the sewer in Hallowell. In

Augusta, stormwater and sewer combine at the treatment plant.

In a 2006 rate case, Augusta allocated costs between sewer and stormwater

customers. A rate study identified the Bond Brook Combined Sewer Overflow (CSO)

project as a stormwater only project. 3 The resulting rate increases from the 2006 case

included 7% for sewer and 30% for stormwater. The stormwater rate mcrease

encompassed construction and bond costs from the Bond Brook CSO project.

In 2007, when GAUD was formed, the HWD was very interested in transferring

its sewer service to GAUD but wanted to ensure that only Augusta customers paid for

stormwater services. According to Mr. Kinney, the Charter addressed the concerns of

the HWD regarding uniform rates. (Def.'s Ex. 1, §A-16(3).)

In 2011, rate increases of 35% for sewer services and 40% for stormwater services

were implemented. GAUD intended to raise eight million dollars from the rate

increase. According to Mr. Kinney, the rate study determined the parts of GAUD that

were sewer only, stormwater only, or combined sewer and stormwater. The study used

nine allocation factors to allocate costs among those parts. The plaintiffs do not dispute

the amount of revenue sought by GAUD but do dispute the allocation of that revenue

between sewer customers and stormwater customers through allocation factors F, G,

and H.

Allocation factor F, accounts, includes costs for managing customer accounts,

billing, and collection of money. The plaintiffs argue that 5,098 customers were counted

as sewer service only customers; those customers should have been counted as sewer

3
A similar CSO abatement project, the Rail Trail in Augusta, was in 2006, and continues to be,
allocated 100% to stormwater customers. (Def.'s Ex. 2 at 210, West Side Consol. Conduit.) The
sole function of the Rail Trail project was to contain stormwater overflows, just as with the new

5
and stormwater combined service customers. Accordingly, they argue, the allocation

by GAUD of 84% to sewer services and 16% to stormwater services for the costs for

accounts was not accurate and not equitable. Mr. Kinney prepared a revised allocation

for factor F and concluded that the allocation should have been 49% to sewer services

and 51% to stormwater services. (Pls.' Ex. 2.)

Mr. Kinney further stated in response to Mr. Tarbuck's testimony, discussed

below, that allocation factor F should be based on number of customers or revenue

needs. Mr. Kinney had not previously seen an allocation based on time devoted to

handling different customers.

Allocation factor G includes costs within the treatment plant, including operating

and maintenance costs. GAUD established that treatment plant flow on an average wet

day had a threshold of 5.5 million gallons per day peak flow; an average dry day or

sewer day was established as any amount less than 5.5 million gallons per day. The

plaintiffs challenge this assumption because it does not account for stormwater flow in

a sewer day and does not account for I & I, which is inflow and infiltration into the

sewer and stormwater pipes. (Pls.' Ex. 29.) I & I is very fact specific to the collection

system involved and can vary based on the age and size of the pipes, among other

things. GAUD allocated these costs through allocation factor Gas 63% sewer and 37%

as stormwater.

Mr. Kinney revised the allocation in factor G. (Pls.' Ex. 3.) He began with the

total annual flow at the treatment plant from stormwater and sewer. Trunkline flows

were subtracted. He included known metered flow from customers. He also allocated

a portion of I & I to sewer based on data generated from measured sewer flows from

Mill Park storage facility in the Bond Brook project. The remainder of the Bond Brook project
was allocated based on flow-based costs of operating the project system.

6
three meters at the Hallowell Pump Station. (Pis.' Ex. 7.) The difference between the

flow from the pump station and the amount of metered flow, according the Mr. Kinney,

is I & I. He determined that I & I for fifteen years from Hallowell's sewer system was

24%. He rounded up and factored in an I & I rate of 25%. (Pis.' Ex. 27.) He then

subtracted the sewer flow and I & I from the sewer and stormwater flow to the

treatment plant minus the trunkline to determine stormwater flow. Mr. Kinney's

reallocation of factor G was 51% to sewer and 49% to storm water.

Allocation factor H, Bond Brook CSO III Project includes the capital cost of a

stormwater management project designed to eliminate two old CSOs along the Bond

Brook. (Def.'s Ex. 8.). CSOs are combined sewer overflows or discharges of fluid from

a collection system during a high rain event when the system cannot handle the amount

of water. According to Mr. Kinney, the Department of Environmental Protection

wanted the CSOs that discharged into the Bond Brook and the Kennebec River

eliminated. 4 As part of the project, two combined sewer and stormwater pump stations

were consolidated.

During the 2006 rate case, the Bond Brook CSO Project was allocated 100% to

stormwater. Other CSO projects prior to Bond Brook were similarly allocated.

In 2011, the Bond Brook Project was divided into five categories and allocations

made based on the treatment plant flow for four categories. (Pls.' Exs. 4, 5.) Both

GAUD and Mr. Kinney allocated 100% of the Mill Park storage facility to stormwater.

GAUD allocated the remaining four categories in factor H as 60% sewer and 40%

stormwater. In the final allocation including all five categories, GAUD allocated 44% of

the Bond Brook CSO Project costs to sewer services and 56% to stormwater services.

4
Presumably the DEP objects to the untreated sewer in the combined sewer overflow. GAUD's
argument that sewer customers, therefore, are primarily responsible for the need to eliminate

7
The plaintiffs challenge this allocation under factor H and argue that a treatment

plant is designed differently from a collection system. Mr. Kinney determined that the

Bond Brook facility was designed to operate at full capacity during a high rain event

one time per year for two hours and handle 22.1 million gallons per day of flow, 19.6

million gallons per day of stormwater and 2.5 million gallons per day of sewer; the

stormwater and sewer flow to the treatment plant and are not discharged. (Pls.' Ex. 17.)

The actual capacity is 11.3% sewer flow and 88.7% stormwater flow. Mr. Kinney

believes the designed peak flow is the appropriate way to allocate factor H, not average

flow at the treatment plant. Mr. Kinney would allocate 100% of the Bond Brook project

costs to stormwater "because that's what's driving all of this project ... that's the only

reason it's built."

Mr. Kinney prepared a revised allocation for those four categories and concluded

that the allocation should have been 11.3% to sewer services and 88.7% to stormwater

services. (Pis.' Ex. 4.) Mr. Kinney's final allocations for factor H were 8% sewer and

92% stormwater. (Pls.' Ex. 4.)

Mr. Kinney applied his revisions to factors F, G, and H to the model used for the

2011 rates. He determined the rates that should have been imposed would have been

an 81% increase for stormwater customers and a 1% decrease for sewer customers, as

opposed to the increase of 40% for stormwater customers and 35% for sewer customers

approved by GAUD. (Pls.' Ex. 1 at 8.)

The new rates became effective on October 3, 2011. Mr. Kinney concluded the

sewer customers have been overcharged by $943,564.00. Because the new rates will be

in effect for five years, Mr. Kinney recommended that sewer customers receive a refund

of $235,891.00, which is the overcharge divided by four, during each of the next four

the CSOs is not without merit. (Def.' s Reply Br. at 9.)

8
years. This results in a rate increase of 91% for storrnwater customers and a 10% rate

decrease for sewer customers during the next four years, based on pre-October 2011

rates. (Pls.' Ex. 6.) Mr. Kinney believes his revisions provide that the Hallowell sewer

customers would not be required to pay for stormwater services in Augusta and his

revisions, therefore, meet the requirement of GAUD's Charter. (Def.'s Ex. 1.)

2. Ronald Norton

Ronald Norton has a Ph.D. in economics from Boston College. (Pls.' Ex. 13.) He

is designated as a certified rate of return analyst in the Society of Utility and Regulatory

Financial Analysts. He teaches economics at various institutions. He also has worked

as a house analyst and now as a consultant to the Public Utilities Commission (PUC).

He has been involved in approximately 50 utility rate cases with the PUC, which

involve the allocation to customers of increased rates. He had never testified previously

in a case involving apportionment of sewer charges. He has never worked for a sewer

utility and has never reviewed a sewer rate case or had experience with apportioning

sewer and storrnwater flow.

Dr. Norton was hired by the plaintiffs to assist Mr. Kinney in examining the 2011

rate model. Dr. Norton tried to understand how the Raftelis model was set up and

determine whether certain "stylized" aspects of the model were reasonable, fair, and

equitable.

He believes the cost causation principle is fundamental to utility regulation. He

labeled this principle as common sense: determine who is responsible for the need for a

particular expense. He determined that allocation factors F, G, and H did not follow the

cost causation principle directly and allocation factor E did not follow that principle

indirectly because factor E encompasses factor G. Dr. Norton agreed that the cost

causation principle is not an exact science and that assumptions have to be made. For

9
example, there is no method to measure sewer and stormwater as they enter the

treatment plant.

With regard to allocation factor F, Dr. Norton concluded the allocation of

customer accounts as 86% sewer and 14% stormwater was grossly inequitable. He

complained that the 759 sewer only customers were combined with the 5,098 combined

sewer and stormwater customers and designated as sewer. He concluded that the

plaintiffs' revision to allocation factor F was a more equitable allocation of costs because

the combined accounts were added to sewer and stormwater. (Pis.' Ex. 2.)

With regard to allocation factor G, Dr. Norton agreed that the allocation of

operation and maintenance expenses based on average annual flow at the treatment

plant was appropriate. 5 He disagreed with the calculation of average annual flow,

which he described as confusing, convoluted, and unnecessarily complex. Once again,

he worked with Mr. Kinney to revise allocation factor G. (Pis.' Ex. 3.) The trunk line

was subtracted from the total flow through the treatment plant. Using water utility

readings as a reasonable estimate of sewer discharge, the sewer flow was adjusted

upward by including a rate of 25%, discussed above, for I & I. The sewer flow was

subtracted from the adjusted treatment plant flow to obtain the stormwater flow. The

resulting ratio was 51% sewer and 49% stormwater, as opposed to GAUD's ratio of 63%

sewer and 37% stormwater.

With regard to allocation factor H, Dr. Norton concluded that the allocation of

the capital costs for the Bond Brook project based on average annual flow at the

5
Dr. Norton agrees that operating and maintenance expenses, including those for pump
stations, should be allocated on the basis of average flow, although based on a different ratio.
(Pls.' Ex. 1 at 3.) If a new pump station were built, however, he believes peak flow must be
considered because the new pump station would be a capital investment. The size of the design
determines cost. With regard to debt service, however, he used allocation factor G for capital

10
treatment plant was not equitable. He worked with Mr. Kinney to revise allocation

factor H. (Pis.' Ex. 4.) He determined the capacity of the entire system was designed for

a major storm day of 22.1 million gallons. He assumed that all aspects of the project,

shown on defendant's exhibit 8, were designed to handle 22.1 million gallons per day. 6

(Def.'s Ex. 8.) He concluded that the investment is made to handle the presence of

stormwater during such an event and, accordingly, the allocation must be made based

on peak flow and not average flow. He did not consider an incremental cost increase

based on the capacity of the system. He agreed that if his assumption regarding the

capacity of the entire system was wrong, his revision of allocation factor H might

change.

Dr. Norton and Mr. Kinney inserted the plaintiffs' revisions of the GAUD

allocation factors F, G, and H into GAUD's Raftelis model. (Pis.' Ex. 1.) The resulting

rate changes included a rate increase of 91% for storm water customers and a rate

decrease of 10% for sewer customers. Based on the plaintiffs' revised allocation factors,

Dr. Norton agreed with Mr. Kinney that during the first year of the five-year effective

period for these rates, the sewer customers have overpaid $943,564.00 and that the

overpayment should be recovered during the next four years at the rate of $235,891.00

per year to avoid "rate shock." 7 (Pis.' Ex. 6.)

projects, including a treatment plant upgrade, a pump station replacement, and a CS03. (Pls.'
Ex. 1 at 7.)
6
The sewer and force main are designed to handle 2.5 million gallons per day.
7
Dr. Norton agreed that his assessment that the rates in 2011 should have been an 91% increase
in stormwater rates and a 10% decrease in sewer rates would have resulted in "rate shock" but

II
3. Harold Smith

Harold Smith is a vice president with Raftelis Financial Consultants in North

Carolina. (Pls.' Ex. 26Y Raftelis does financial consulting for water and sewer utilities

nationally. Ninety percent of Raftelis's work is water and sewer rate setting; ninety-

nine percent of the firm's clients are municipal utilities. Seventy-five percent of Mr.

Smith's time is devoted to stormwater and sewer rate setting for utilities. His work

includes allocating costs between stormwater and sewer customers by determining why

the costs are incurred and efficiently allocating the costs without incurring more costs in

the process. He has worked for approximately 200 utilities in New England or in

southwestern United States.

Mr. Smith's relevant project experience includes utilities with separate sewer and

stormwater systems and a utility with a combined system. He has done that combined

system utility's water rate filings for ten or twelve years. He has testified previously

regarding allocation of costs between sewer and stormwater for rate making.

In calculating rates for this case, he employed the cost causation principle,

discussed above, in which costs are allocated to the customers who cause the cost to be

incurred. Equitable allocation of costs among different customers is a goal in rate

making.

In 2011, he was contacted by GAUD. He was asked to use the 2006 rate study

and create a model that calculated rates based on that 2006 study and update some of

the allocation factors based on the current situation. He reviewed a hard copy of the

that is preferable to allowing some customers to subsidize other customers. A cross subsidy is to
be avoided. He agreed there was no evidence that GAUD intended a cross subsidy.
8
Mr. Smith did not prepare a resume specifically for this case. Plaintiff's exhibit 26 was likely
taken from the Internet. He has worked on at least 200 projects, not three.

12
2006 study but was unable to review the schedules or rework the spreadsheets. He saw

nothing of concern during his review of the 2006 study.

The preparation of the finalized rate model took approximately four months. He

went through several iterations of the model and corrected, improved, and added

functionality to the model. He worked with GAUD staff to ensure the new model was

consistent with the previous model and that he had the most current data with respect

to allocation factors. He concluded that the final rate model resulted in fair and

equitable rates for all GAUD's sewer and stormwater customers. (See Def.'s Ex. 2 at

190-218.)

The final rate model consists of twelve schedules. (De£.' s Ex. 2 at 190-218.)

GAUD's budget was divided, essentially, into three categories. (Def.'s Ex. 2 at 72, 174.)

Raftelis developed allocation factors to apportion expenses between sewer and

stormwater customers. The factors were applied to the three budget categories.

Schedule 1 shows GAUD's sewer and stormwater annual operating and

maintenance expense budget projected for five years beginning in 2011. Using 2013 as

the rate year, schedule 1 reflects rates that will be in effect for the five-year period for

the various categories listed. (De£.' s Ex. 2 at 191-96.)

Schedule 2 shows the plan for capital projects for the next few years. The source

for the projects is either cash or loans. (Def.'s Ex. 2 at 197.)

Schedule 3 shows GAUD's sewer and stormwater debt service from 1998 to 2030.

The rate year again is 2013 and shows the total payments of principal and interest

required from GAUD. (Def.'s Ex. 2 at 198-200.)

Schedule 4 shows accounting for revenue offsets, which is an offset to the

revenue that must be recovered from rates. (Def.'s Ex. 2 at 201-04.)

13
Schedule 5 identifies the allocation between stormwater and sewer of costs for

the day-to-day operations of GAUD. (Def.'s Ex. 2 at 205-09.) These are the amounts

that will be collected from sewer and stormwater customers. Allocation factor G for the

treatment plant, 63% sewer and 37% stormwater, is based on the flow at the treatment

plant. (Def.'s Ex. 2 at 205.) This is a typical method for allocation of costs to ensure the

person causing the cost pays for the cost. Similarly, the same allocation factor is used

for pump stations. The primary cost for a pump station is electricity and power demand

depends on the amount of flow pumped. (Def.'s Ex. 2 at 206.) The same allocation

factor is used for sanitary pipes. (Def.'s Ex. 2 at 206.) Utilities, in general, do not have

detailed and specific data about underground assets that might provide another

method of analysis.

In schedule 5, allocation factor C, 100% stormwater and 0% sewer, is used for

catch basins and storm pipes. (Def.'s Ex. 2 at 207.) Catch basins and storm pipes are

used only for the collection of stormwater.

In schedule 5, allocation factor F, 84% sewer and 16% stormwater, is used for

customer accounts. (Def.'s Ex. 2 at 207, 211.) This allocation is based on the number of

customers; the amount of flow generated by a customer is not related to the cost of

billing. Mr. Smith agreed that if the account numbers he used were not representative

of the actual account numbers, he would have to reexamine that allocation.

In schedule 5, allocation factor E, 42% stormwater and 58% sewer, is used for

"admin and general." (Def.'s Ex. 2 at 208.) This allocation is based on the. allocation of

all other operating and maintenance costs.

The last page of schedule 5 shows the total rate revenue requirements for

operating and maintenance. (Def.'s Ex. 2 at 209.) This page shows also the amounts of

14
that total, which must be collected from stormwater customers and from sewer

customers.

Schedule 6, debt services, reflects the allocation between stormwater and sewer

of loan repayment for capital construction projects. (Def.'s Ex. 2 at 210.) Multiple

allocation factors were used. Allocations are based on a determination of the part ofthe

project related to stormwater and the part related to sewer. Some projects, such as the

Bond Brook project, require more detailed analysis for allocation than would be

available using the value of fixed assets. The total amount allocated to debt service

must be collected from rate revenue.

Schedule 7 shows the allocation factors used to allocate different costs. (De£.' s

Ex. 2 at 211.) Allocation factor G, 63% sewer and 37% stormwater, is based on a

comparison of the average day measured flow at the treatment plant with the average

day wet measured flow. Although GAUD's meter readings at the treatment plant does

not distinguish sewer from stormwater flow, Mr. Smith developed this concept based

on additional data available from GAUD, which is often not available from other

utilities. Measured flow for an average day is a reasonable approximation and is

determined by dividing by 365 the total annual flow to the plant, which includes a

certain level of I & l 9 and probably some stormwater. Average day wet includes a day

with significant stormwater and elevated I & I. The numbers used for that comparison

include the measured flow for an average day, average day wet, average day dry,

maximum day, and minimum day. The data, based on several years of recordkeeping

9
It is possible to determine the amount of I & I in a system. No study of the amount of I & I in
GAUD has been considered or performed. Mr. Tarbuck was unsure whether such a study
would permit more precise allocations. Further, GAUD has not sought assistance to determine
whether cost-effective ways to reduce I & I exist.

15
by GAUD employee, Michael Grove, was provided to Mr. Smith by GAUD. This

calculation method has been used previously.

The ratio of the average day, 4.592 million gallons, and the average day wet, 7.31

million gallons 10, is 62.82 (rounded up) and results in the allocation factor G 63%

(rounded up) allocation to sewer. This allocation is consistent with the 2006 allocation

of 40% stormwater and 60% sewer, which was an indication to Mr. Smith that the

allocation was appropriate. In setting rates, dramatic changes are to be avoided unless

necessary.

Mr. Smith determined that the plaintiffs' reassessment of allocation factor G is

atypical. (See Pls.' Ex. 3.) A determination of flow should be measured based on the

flow that goes into the plant and not based on the flow into pipes. The meter at the

plant is the best source of data for flow to the plant. Further, if the 25% figure for I & I

is inaccurate, the entire allocation would be inaccurate.

Allocation factor H relates to the Bond Brook project11 loan and provides an

allocation of 44% to sewer and 56% to stormwater. (Def.'s Ex. 2 at 211.) The main CSO

abatement component of the project was needed for storage during a heavy storm

event. During such a storm, the system, including sewer and stormwater, backs up into

the storage tank as opposed to the brook and the river. But because this storage tank is

a stormwater project, the tank is allocated 100% stormwater. 12

10
This figure was provided by GAUD. GAUD staff, however, had no knowledge of the way in
which Mr. Smith would use the data in his model.
11
The Environmental Protection Agency is mandating that utilities deal with CSOs. Utilities
are, accordingly, incurring new, additional costs and are determining the best procedures
through which to recover these costs.
12
100% of the storage facility was allocated to stormwater because it functions only during
storm events. Other aspects of the project function only during storm events but were not
allocated as the storage facility was allocated.

16
The cost of the capital project would be allocated based on flow at the treatment

plant, as the existing sanitary pipes are allocated. Mr. Smith determined it would be

inappropriate to allocate the cost of the project based on the peak flow during a one

time per year heavy storm event because the entire project, except for the storage tank,

was not designed for that event. Instead, the project was designed for average flow

through the system 365 days per year. Accordingly, the allocation should be made as

with other costs based on a combined system. (Def.'s Ex. 2 at 208.)

Mr. Smith did not recall being told by GAUD that in 2006, the Bond Brook

project was allocated 100% to stormwater. Even if he had been told that, he would not

have included that allocation in his model because that allocation would not be

appropriate based on his examination. The removal of the CSO was required because

of DEP concerns with overflow of sewer into the Bond Brook and Kennebec River.

Because an overflow of stormwater causes the overflow of sewer, the project can be

considered as mandated by both sewer and stormwater.

Schedule 913 shows the calculation of the rate increases. (Def.'s Ex. 2 at 214.) For

stormwater and sewer, the operating and maintenance figure from schedule 5 and the

allocated debt service and cash funded capital figures from schedule 6 are added to

provide the total requirements for stormwater and sewer. The revenue provided under

existing rates is subtracted from the revenue required to provide the additional revenue

required. Dividing the additional revenue required by the revenue under existing rates

provides a rate increase of 35% for sewer and 40% for stormwater.

A total of $6,734,830 must be raised from the rate fares. (Def.'s Ex. 2 at 214.) In

Mr. Smith's experience, most utilities would have simply raised all rates similarly for an

17
interim rate increase because many utilities do a cost of service study only every ten

years. If that typical procedure had been used in 2011, GAUD would have increased

rates for sewer and stormwater customers by 37%. Mr. Smith concluded that the effort

made to allocate costs in 2011 resulted in a more fair determination of the rate increase

for the two types of customers.

4. Brian Tarbuck

Brian Tarbuck is the general manager of GAUD. He was employed by the

Augusta Water District from 2002 until the merger in 2008. He has a civil engineering

degree and is a licensed professional engineer. GAUD employs 37 people and a few

more than half are laborers.

Mr. Tarbuck is supervised by the Board of Trustees, which has seven voting

members; six are from Augusta and one is from Hallowell. Before the Board made the

final decision on the 2011 rate increases, Mr. Tarbuck compiled and delivered

information to the Board. He was assisted primarily by Michael Grove, who has been

the manager of the treatment plant for 28 years. Additional assistance was provided

by Andy Begin, assistant general manager for GAUD; other GAUD personnel; Ralph St.

Pierre, the assistant city manager and controller for Augusta, who provided financial

data to the rate consultants; Greg Leighton, a consultant from Aqua Maine, a water

utility; Raftelis; CDM, an engineering firm in Massachusetts; and Woodard and Curran,

an engineering firm in Maine.

13
Schedule 10 is revenue proof. (Def.'s Ex. 2 at 215.) Schedule 11 is bill impacts. (Def.'s Ex.2 at
216-17.) Schedule 12 is the trunkline budget. (Def.'s Ex. 2 at 218.) Except for a discussion
regarding the factoring out of the trunkline budget, these schedules were not addressed.

18
Allocation factor F, 84% sewer and 16% stormwater, was determined very early

in the 2011 rate case. 14 GAUD does not dispute that the Raftelis model was inaccurate

because the numbers used were incorrect. Accordingly, the allocation based on the

number of accounts is inaccurate.

GAUD believes the allocation itself is, however, equitable. The allocation was

based on billing reports and, according to Mr. Tarbuck, represented an accurate

distribution of actual costs of dealing with customer accounts. He stated that although

it is a common practice in utility rate making to use a per customer calculation when

allocating billing and collection work, this allocation based on actual costs of billing was

discussed and reviewed internally, prior to the filing of this lawsuit. (Def.'s Ex. 2 at

183.) Employees in the billing department believed the allocation was reasonable. The

office staff spends more time on sewer customers than storm water customers. (Def.' s

Ex. 2 at 207 (Salaries & Regular Wages, $96,404.00).) Based on workload for staff in the

office, sewer customers require more work and more time, although no time study was

performed. Amounts paid by stormwater customers are static.

Additional costs are also sewer related. GAUD pays the Hallowell Water District

and the water division of GAUD for sewer meter readings. (Def.'s Ex. 2 at 207

($65,245.00).) Lien expenses are predominantly sewer liens. (Def.'s Ex. 2 at 207

($15,914.00).) Amounts for salaries and wages appear in other categories. (See ~

Def.'s Ex. 2 at 206 (Pump Stations; Sanitary Pipes).) Employees record on a daily basis

where they are working in the system. The hours worked are applied to the task.

Mr. Tarbuck reviewed the plaintiffs' revision of allocation factor F. (Pls.' Ex. 2.)

He agreed with the number of sewer only customers in Hallowell. There are a few

14
In the past, another method was used in which the costs of billing were divided by thirds and
allocated one-third to water, one-third to sewer, and one-third to stormwater.

19
additional sewer only customers in Augusta but the number is not significant. He

disagreed with the plaintiffs' estimation of the number of stormwater customers.

Allocation factor G, 63% sewer and 37% stormwater, is based on average day

flow divided by the average wet day flow. (Def.'s Ex. 2 at 211-12.) The flow data at the

plant, including the sum flow, the minimum flow for the day and the average and the

average wet and average dry day flow, was provided to Raftelis by Mr. Grove. (Def.'s

Ex. 6 at 7.) Mr. Grove maintains this data on an ongoing basis and has data from

1/1/00 to 5/9/11. 15 (Def.'s Ex. 6 at 2-7.)

The engineering term "Max q" represents the maximum flow observed at the

plant during the day. (Def.'s Ex. 6 at 2.) A maximum flow equal to or less than 5.5 is

classified as a dry day. (Def.s' Ex. 6 at 2.) A maximum flow equal to or greater than 9.0

is classified as a wet day using a conservative approach. Mr. Grove chose the cutoff

numbers for representing a dry day and a wet day at the plant based on his years of

experience. The total flow is recorded on the spreadsheet. Data points represent the

number of dry days observed in a particular year. (Def.'s Ex. 6 at 1.) A correlation is

expected between the number of dry days and the rainfall measured with rain gauges at

the plant. 16 (Def.'s Ex. 6 at 1 (compare 2004 with 2005).) The term "%DWF" is

determined by dividing the calculated dry weather flow by the average daily influent

flow. (Def.'s Ex. 6 at 1 (Notes).)

Based on Mr. Grove's formula, the average dry flow, 17 2.874 (sewer and minimal

I & I), divided by the average daily flow, 4.592 (sewer and some stormwater), is 62.58.

15
The data was collected and Mr. Grove's calculations were made long before the need to
increase rates in 2011.
16
The fact that rain or snow fell during a dry day does not make the determination inaccurate.
The issue is whether the precipitation affected the Max q. (Pls.' Ex. 29 at 5 (6/4/08).)
17
This is Mr. Grove's method to isolate sewer.

20
(Def.'s Ex. 6 at 7.) 18 This calculation results in the determination of the sewer flow of

62%. (Def.'s Ex. 6 at 1.) Using these numbers in the calculations, the Raftelis calculation

is within a tenth of a percentage point. (Def.'s Ex. 2 at 211-12.) The rate model divides

the average day, 4.592, by the average wet day, 7.31, which results in 62.81. (Def.'s Ex. 2

at 167.) The percentages, after rounding, are the same. The two different

methodologies were discussed with the Board. The formula of dividing average dry

day by average wet day was presented by Mr. Smith but was not accepted or used. That

calculation results in an allocation of 39.32% to sewer. (Def.'s Ex. 2 at 167.)

The discussion with the Board of the apportionment costs of the Bond Brook

Project between sewer and stormwater for the combined sewer elements began in late

2010. The four main components of the project include: demolition of two pump

stations; replacement of the Mt. Vernon interceptor; construction of a new pump station

and force main; and installation of a storage facility. (Def.'s Ex 2 at 147; Def.'s Ex. 9.)

Woodard & Curran prepared a bid tabulation spreadsheet to allocate the costs of

the contractor's bid for the Bond Brook project. (Def.'s Ex. 5.) The columns correspond

to the categories in the memo provided to the Board. (Def.'s Ex. 2 at 147.) The

engineers used their best professional judgment to allocate costs between combined

sewer and stormwater only.

Michael Stein, from Woodard & Curran, determined that three of the four main

components of the project should be allocated to sewer and stormwater. (Def.'s Exs. 9-

10.) Because the combined sewer system carries both sewer and stormwater, GAUD

tried to approximate a reasonable amount to assess to the stormwater customers who

18
Mr. Tarbuck was confused and misspoke about these ratios during his testimony. (Tr. at 268-
69; 383-85, 390-91.) Clearly, 4.592 divided by 2.874 does not equal 62.58. (Tr. at 270.) The
exhibits provide an explanation of the calculations.

21
use that infrastructure. Mr. Tarbuck concluded that the allocation factors for the project

reflect the function of the project.

For planning purposes for the Bond Brook Project, the Board determined to use

60% sewer and 40% stormwater. A stormwater study dated July 31, 2006, prepared for

the District by Brown and Caldwell, was reviewed in preparation for the 2011 rate

study. (Def.'s Ex. 4.) The City of Augusta flows are listed as 60% sewer19 and 40%

stormwater in that study. (Def.s' Ex. 4 at Table 4-1, 4-2.) This allocation was

incorporated in the 2006 rate study and had been used by the Board for years. The

allocation to the sewer flow from Hallowell was 5%. Adding the 5% to the 60% would

be a reasonable approximation of the total amount of sewer flow, as is the Raftelis

allocation of 63% to sewer and 37% to stormwater, and the historical use by the District

of 60% to sewer and 40% to stormwater.

With regard to the plaintiffs' revision of allocation factor G, Mr. Tarbuck

disagreed that the percentage of I & I in Hallowell is representative of I & I in the entire

GAUD system. (Pls.' Ex. 3.) He believed it was unlikely that a small part of the system

can be extrapolated to apply to the entire system. GAUD has many pump stations, with

some sewer only and some combined stations. The Hallowell collection system is

significantly smaller than the Augusta collection system. The GAUD stations would

not mirror the operation of the Hallowell station because of considerations of

geography, pipe age, pipe diameter, length of pipe, and pipe construction. Factors that

dictate I & I are unique, based on each sub-collection area. Additionally, the Hallowell

system is in better condition than the other parts of GAUD.

Mr. Tarbuck prepared a chart to illustrate the amount GAUD was billing from

the Hallowell pump station as opposed to the amount GAUD was actually pumping on

22
a calendar year quarterly basis. (Def.'s Ex. 7.) On the exhibit the red line represents the

amount of sewer pumped from the Hallowell pump station. The blue line represents

the amount of water billed to the Hallowell sewer customers, based on meter readings. 20

The data is shown for 2009 through 2011. 21

The blue line is relatively consistent. The red line is variable because of I & I

entering the system that does not flow through the billing meters. The excess flow,

water that was pumped but not represented in billing statements, in 2009 was 45%; in

2010, 37%, and in 2011, 40%. (Def.'s Ex. 7.) The average is approximately 40%, which

would be consistent with I & I, based on industry standards. 22 Depending on the

location, studies show the range for I & I is 40 - 50%. The Wright-Pierce memo is

consistent with the determination by Mr. Tarbuck that 40% is a reasonable number for I

& I in the GAUD system. (Pis.' Ex. 30.)23

With regard to the plaintiffs' revision of factor G, (Pis.' Ex. 3.), assuming 1430

million gallons per year is accurate for the combined sewer and stormwater and based

on the Raftelis rate model's calculation of flow of 63% sewer and 37% stormwater, there

would be 901 million gallons per year of sewer flow. Assuming the metered sewer flow

through the treatment plant of 552 million gallons per year is accurate, the amount of

excess sewer flow is 39% (901- 552 = 349 divided by 901). Mr. Tarbuck believes that

number is more reasonable than 25% for I & I for GAUD, because of the combined

system, which would result in more inflow.

19
The terms sewer and sanitary wastewater are the same.
20
It is assumed that the amount of drinking water from meter readings that enters the house
will leave the house and enter the sewer.
21
These were years with rain. (Pls.' Ex. 27.) Mr. Tarbuck agreed that weather and the recession
could affect the results. He stated further that the data shows only the gallons of water
gumped.
2
I & I is unique for nearly every pipe.

23
With regard to allocation factor H, the Bond Brook project involves construction

of a combined sewer system, a stormwater storage structure, and the elimination of

pressure sewers and two pump stations?4 The project includes the replacement of

combined sewer lines along Mt. Vernon A venue, through which flows sewer and

stormwater from customers, I & I, and catch basins. (Def.'s Ex. 8.) The project also

involves the removal of two pump stations and construction of a new pump station as a

replacement for the two, which are past their useful life and could fail. 25 (Pls.' Ex. 19 at

7-7.) Replacement was required to accommodate sewer flow. Putting the required pipe

in the ground is less costly than constructing two new pump stations as replacement for

the two older stations. Pipe to the west of pump station #1 will be upgraded and

enlarged to accommodate the area that includes the mall near I-95 and MaineGeneral

Hospital.

The yellow area on defendant's exhibit 8 depicts twin 670 feet box culverts,

which are ten feet wide and tall and are twenty feet underground. These will be used to

store combined sewer when flow exceeds the capacity of the combined sewer pumped

at the pump station. The pump station operates every day of the year. On a dry day,

the pump station pumps sewer and some I & I but virtually no stormwater, the

23
"At many municipal wastewater treatment facilities, over half the flow is clean groundwater
(infiltration) and rain water or storm water (inflow)." (Pls.' Ex. 30.)
24
Variables in the design include size of pipe, size of the storage facility, and capacity of the
pump. No evaluation was done regarding whether the capacity of the collection system
increased as a result of the project. It is unreasonable to assume that the capacity pipes and
collection system increased by a factor of eight or nine. (But see Pls.' Ex. 17.) The function of the
system works as previously but water is conveyed differently. Further, if the size of the pipe is
increased by a factor of two, the costs of the project would not increase by that same factor. The
cost of the pipe increases but other costs remain the same.
25
According to Mr. Stein, other parts of the Bond Brook area infrastructure had an additional
ten-fifteen years of useful life remaining in 2011. (Def.'s Ex. 10 at 2.) If some facilities were,
therefore, replaced prematurely, the project as designed was installed as a cost-effective way to
deal with CSO and combined sewer issues. Mr. Tarbuck noted that the ten-fifteen year
remaining useful life opinion was Mr. Stein's opinion and his alone. A 1995 study concluded

24
combined sewer pipes carry sewer, and the force main 26 conveys water pumped from

the pump station, which is part of the sewer system.

The December 2006 Long Term Control Plan was prepared by Earth Tech, Inc.

and Brown and Caldwell, engineering companies, to assist with the 2006 rate study.

(Pls.' Ex. 19.) The study provides that the CSO project must include an adequate

upgrade to the dry weather wastewater infrastructure along Mt. Vernon Avenue. (Pls.'

Ex. 19 at 4-2.) Dry weather wastewater infrastructure refers to sewer and minimal I & I,

which is necessary for day-to-day operation of the system. The project is intended to

address requirements of the dry weather wastewater and wet weather or CSO

abatement needs. (Pls.' Ex. 19 at 7-7, 7-9.)

Three memos, two dated August 8, 2011 and one dated August 9, 2011, were

prepared by Woodard & Curran. Mr. Tarbuck asked this engineering firm to

recommend an allocation of costs for the Bond Brook project. These memos were

provided to the Board to ensure the members understood the project and the cost

allocation. (Def.'s Exs. 2 at 147; 9; 10.) In determining the 2011 rates and the allocation

of costs, the Board considered that the project was addressing both sewer upgrades and

control of CSO events.

The allocation of 60% sewer and 40% stormwater was used historically. The

Raftelis rate allocation was 63% sewer and 37% stormwater. The Board continued to

use the 60/40 allocation, as it had during the planning stage. If the Board had used the

Raftelis allocation, allocation factor H would have had a higher percentage allocated to

sewer and a lower percentage allocated to stormwater.

that the pump stations should be slated for replacement. (Def.'s Ex. 3.) Mr. Tarbuck believes it
is irresponsible for a utility to allow components of a system to fail.

25
Mr. Tarbuck assessed the plaintiffs' revision of allocation factor H. (Pls.' Ex. 4.)

He did not agree with the 22.1 million gallons per day as the total flow through Bond

Brook. (Pls.' Ex. 19 at 5-7.) That figure represents the peak instantaneous flow that

would be measured during a one year, two hour wet weather event design used for the

Bond Brook project. Because the storm falls over a wide area, this flow is attenuated

throughout the system. (But see Pls.' Ex. 19 at 5-9.) Approximately one million gallons

per day of rain flow would be collected in the system during such an event.

The project was not designed to withstand 22.1 million gallons per day of flow.

The proposed pump station could not pump 22.1 millions gallons in one day; it could

pump 2.5 million gallons 27 in one day of combined flow? 8 The west side interceptor

limits the capacity of flow to 2.5 million gallons per day. The project was not intended

to increase the capacity of the Bond Brook collection system to 22.1 million gallons per

day; GAUD built a 2.5 million gallon per day system. (Pls.' Ex. 17, Smaller pipe.)

Excess will flow into the storage structure. (Def.'s Ex. 8.) If the storage facility is filled

to capacity, additional water, after potable screening, will flow into the Kennebec River.

Pursuant to the 2006 long-term study, the proposed capacity of the storage tank

is .4 million gallons. (Pls.' Ex. 19 at 5-8.) The calculations were refined and in 2011, the

proposed capacity was revised to .8 million gallons. This proposed capacity was

rounded up to 1 million gallons as a conservative measure. (Def.'s Ex. 8.)

26
The force main will be replaced as part of the project because it is made of concrete and
asbestos and because it is located under Water Street. Pressure sewers will be eliminated and
that flow will be contained in the pump station.
27
Mr. Kinney agreed that the storm would generate 2 million gallons during the storm event
and the pump could discharge all the storm water but not at the peak moment, which could last
for only a few minutes. (Pls.' Ex. 19 at 5-9.)
28
The capacity of the two pump stations that will be replaced was 2.5 million gallons per day.
The limitation of the discharge of the force main was not changed.

26
In 2006, the sewer rate increased by 7% and the stormwater rate increased by

30%. (Def.'s Ex. 4 at ES-1.) The significant stormwater increase was intended to

generate revenue for the Bond Brook project and was based on the 100% allocation of

the Rail Trail and Bond Brook projects to stormwater. Although Mr. Tarbuck did not

recall discussing with Harold Smith the change in allocation of the project in 2011, the

recommended change was discussed with the Board.

The City of Augusta previously was charged for all the impervious areas of the

city streets but the policy was changed. (Def.'s Ex. 2 at 34.) The City of Augusta is

GAUD's largest stormwater customer in terms of payments.

In May 2011, early analysis provided a net rate increase of approximately 34%.

(Pis.' Ex. 21.) An early estimate at that time included a 21% increase for sewer 48% rate

increase for stormwater. (Pis.' Ex. 21 at 624.) Certainly there was concern that the City

of Augusta would react negatively to that stormwater rate increase.Z9 (Pis.' Ex. 21 at 1;

Pls.' Ex. 22.) Ken Knight, the chair of the Board, shared this concern. (Pls.' Ex. 22.) He

concluded, however, "we need to make decisions that work for the majority of the

people and not just one or two." (Pis.' Ex. 22.) A consulting firm was hired to assist in

GAUD's communication with the public and the City of Augusta regarding the rate

increases. (Pls.' Exs. 22, 28; Def.'s Ex. 2 at 66.)

II. CONCLUSIONS

a. Standard of Review

When reviewing governmental action under M.R. Civ. P. SOB, the Superior Court

reviews the operative decision of the municipality for "abuse of discretion, errors of

law, or findings not supported by the substantial evidence in the record." Camp v.

29
In 2004, the City of Augusta attempted to take over the Augusta Sanitary District and the
Augusta Water District; the two districts opposed that effort.

27
Town of Shapleigh, 2008 ME 53, -J/'-'JL...JJ~-- Kennebec Docket No. _ __£A!±P~1~1'--..::!5..=2_ _ _ _ _ _ _ _ __
County

Action ---lP:..te::.Jtl.-iwt~.-iunJ.Ln.L.....Jfun.ur'--"Rue::.Jv._iue::cww..___ _ _ _ __
80C
J. Mills

City of Augusta - Intervenor
CitY~ HAllowell & Hallowell Citizens vs. Greater Au2usta Utility District
Plaintiff's Attorney Defendant's Attorney
William Harwood, Esq. Lee Bragg, Esq. (GAUD)
One Portland Square P.O. Box 5957
Portland Maine 04112 Augusta Maine 04332
Stephen Langsdorf, Esq. (City of Augusta)
PO Box 1058
Augusta, ME 04332-1058
- Michael Hodgins, Esq.
N. Joel Moser, Esq.
Date of PO Box 5057
Entry Augusta Maine 04332-5057

9/14/11 Petition for Review, filed. s/Harwood, Esq.
9/21/11 Acknowledgment of Receipt of summons and Complaint or Post-Judgment Motion
filed. s/Bragg, Esq.
9/27/11 Motion To Specify Future Course Of Proceedings, filed 9/26/11. s/Harwood,
Esq.

10/6/11 Opposition to Plaintiffs' Request for Stay and Response to Motion to
Specify the Future Course of Proceedings, filed. s/Hodgins, Esq.
Defendant's Motion to Dismiss Plaintiffs' Complaint with Incorporated
Memorandum of Law, filed. s/Hodgins, Esq.
Proposed Order, filed.

10/11/11 Plaintiffs' Motion For Extension Of Time, filed 10/7/11. s/Harwood, Esq.

10/12/11 ORDER, Murphy, J. (10/11/11)
Plaintiffs' Motion to Extend Deadline to Answer Defendant's Opposition to
Plaintiffs' Request for Stay and Response to Motion to Specify the Future
Course of Proceedings is GRANTED. Plaintiffs' deadline is 10/12/11.
Copy to Attys Harwood and Bragg
10/12/11 Plaintiffs' Reply in Support of Their Request for Stay and Motion to
Specify Future Course of Proceedings, filed. s/Harwood, Esq.

10713/11 Unopposed Motion to Intervene, filed. s/ Langsdorf, Esq. (10/7/11)
Proposed Order, filed.
10/18/11 ORDER, Murphy, J. (10/17/11)
City of Augusta's Motion to Intervene is GRANTED.
Copy to Attys Harwood, Bragg, Langsdorf

10/17/11 Defendant's Response to the City of Augusta's Motion to Intervene, filed.
s/Hodgins, Esq.
10/25/11 Plaintiffs' Motion for a Trial with Incorporated Offer of Proof, filed.
s/Harwood, Esq.
Date of AP'-'-11-52
Entry Docket No.

Attached Exhibits A,B, filed. Record of Proceedings, filed.
10/25/11 Plaintiff's Opposition to Defendant's Motion to Dismiss, filed.
Harwood, Esq.
11/14/11 Opposition to Plaintiffs' Motion for Trial of the Facts, filed.
s/Hodgins, Esq.
11/17/11 Plaintiffs' Reply in Support of Their Motion for Trial, filed. s/Harwood, Esq.

1/6/12 ORDER ON MOTIONS, Mills, J.
The Clerk is directed to incorporate this order into the docket by
reference.
Copies mailed to attys. of record.

1/20/12 Letter requesting a telephone conference, filed. s/Hodgins, Esq.

1/26/12 ORDER, Mills, J.
After telephone conference: parties will agree on a proposed order and
file by 2/6/12. Special assignment will be given after close of
discovery.
Copies to attys. of record.
1/30/12 Plaintiff's Uncontested Motion to Amend Complaint, filed. s/Harwood, Esq.
Proposed Order, filed.
2/1/12 Entry of Appearance, filed. s/Hodgins, Esq.

2/3/12 ORDER ON PLAINTIFFF'S MOTION TO AMEND THE COMPLAINT, Mills, J.
No Objection.
Copies to attys. of record.

2/21/12 Scheduling Order, Mills, J. (2/7/12)
Copy ty attorneys of record.

3/19/12 Plaintiff's Motion for Extension of Deadline to Designate Witnesses,
filed. s/Harwood, Esq.
Proposed Order, filed.
3/21/12 ORDER, Mills, J.
is hereby GRANTED.
Copies to attys. of record.
4/17/12 Letter regarding settlement, filed. s/Harwood, Esq.

Notice of setimg for. l.v/2-fw 'IP/~1..
'Sent to attorneys of record,
5/10/12 Consented to Motion to 6ontinue and Amend the Scheduling Deadlines,
filed. s/Hodgins, Esq.
Proposed Order, filed.
5/17/12 ORDER, Mills, J.
Pursuant to Defendant's Motion, and there being no objection, Defendant'~
Motion to Continue this matter from the trial list and Amend Scheduling
Order is hereby GRANTED.
Copies to attys. of record.
5/25/12 Plaintiffs' Witness Designations, filed. s/Harwood, Esq.
2

Date of AP11-52
Entry

6/15/12 Defendant's Witness Designation of Harold Smith, filed. s/Hodgins, Esq.
6/29/12 Plaintiffs' Supplemental Witness Des~gnations, filed. s/Harwood, Esq.

7/18/12 Motion for Extension of Deadline to File Pretrial Motions, Memoranda
and Stipulation of Facts, and to Exchange Proposed Exhibits, filed.
s/Harwood, Esq.
7/19/12 ORDER, Mills, J.
is hereby GRANTED. The deadline for the Parties to file pretrial motions,
memoranda, and a stipulation of facts, and to exchange proposed exhitibes
is August 10~ 2012. No objection
Copies to attys. of record.
8/3/12 Plaintiffs' Motion for Protection, filed. s/Harwood, Esq.
Proposed Order, filed.

Notice of sertmg tor_.3., Lf4-!:) -~=:..:-~
sent to attorneys ofrecord~:i·''~", .. -.. --' .

8/10/12 Defendant's Trial Brief, filed. s/Hodgins, Esq.

8/10/12 Plaintiffs' Pretrial Memorandum, filed. s/

8/23/12 Plaintiffs' Pretrial Memorandum (Corrected), filed. s/Harwood, Esq.

9/5/12 Non-Jury case held with the Hon. Justice Nancy Mills, presiding.
William Harwood, Esq. for the Plaintiff and Michael Hodgins, Esq. for the
Defendants. Tape 1589 Index 5374-7338, Tape 1590 Index 50-7233, Tape 1591
Index 51-3164. -
9/6/12 Day 2 of Non- Jury trial Tape 1591 Index 3172-7232, Tape 1592 Index 51-
7373, Tape 1593 Index 50-950.
Court to take matter under advisement.
9/12/12 Transcript Order, filed. s/Harwood, Esq.
Transcript Order mailed to Electronic Recording along with a tapes and log
sheets.
Copy of docket sheet mailed to attys. of record

9/28/12 Letter regarding transcript, filed. s/Gray

10/12/12 Proposed Order, filed. s/Hodgins, Esq.

10/15/12 Vol. I and II of Transcript, filed.
ORDER REGARDING BRIEFING SCHEDULE, Mills, J.
The Deadline for each party to file the primary brief on appeal is
November 1, 2012; and
Each Party may file a reply brief on or before November 15, 2012.
Copies to attys. of record.
11/1/12 Defendant's Rule SOB Brief, filed. s/Hodgins, Esq.
Plaintiff's Brief, filed. s/Gray, Esq.

11/5/12 Copies of Transcript Errata Sheet, filed. s/Gray
Date of
Entry A_P_-_1_1_-_5_2_____________________
Docket No. ____

11/15/12 Reply Brief, filed. s/Hodgins, Esq.
Reply Brief, filed. s/Gray, Esq.

1/14/13 Letter from Attv. Harwood regarding appeal. filed.

3/18/13 DECISION AND ORDER, Mills, J.
The 8/15/11 Decision of the Greater Augusta Utility District is
AFFIRMED.
Copy to Attys Harwood, Hodgins, Langsdorf, Bragg

3/20/13 Notice of removal of Record/Exhibits mailed to all attorneys.

3/20/13 Copy of Decision And Order to repositories.

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/cases/10810352. Public record. Not legal advice.