# Scribner's Mill Preservation v. Maine Dep't of Envtl. Protection

> Superior Court of Maine · September 9, 2009

URL: https://www.frixlaw.com/law-library/cases/10809325

## Case

- **Court:** Superior Court of Maine
- **Decided:** September 9, 2009
- **Precedential status:** Unpublished
- **Opinion:** Opinion
- **Judges:** Robert E. Crowley
- **Cited by:** 0 later opinions in the Frix Law Library

## Citator (automated)

- No negative treatment found by the automated citator. That is not the same as a confirmation that the case is good law; read the citing cases.
- Full citator and citing cases: https://www.frixlaw.com/law-library/cases/10809325

## How later opinions describe it (automated extraction)

- stating that an "administrative agency's interpretation of a statute administered by it, while not conclusive or binding on this [CJourt, will be given great deference and should be upheld unless the statute plainly compels a contrary result."
- holding that "it is only proper to bring a suit for a corporation through a licensed attorney"

## Opinion text

· I, \ " \ ': 1 ~~,
STATE OF MAINE SUPERIOR COURT
CUMBERLAND, ss CIVIL ACTION

", . ~:'-j _. C\, \
'J ,...,. 2.("\,
L' '-'
DI~C! The affected area of the Crooked
River is classified as Class A. 4

SMPI also further revised the project by reducing the slope of the proposed

fishway to a 2.6% slope, compared to a 5% slope included in the original

proposal. On October 24, 2008, the Commissioner issued a draft order denying

SMPI's application. The Commissioner received comments on the draft order

from SMPI, the IF&W, and the Natural Resources Council of Maine. The

3 In their Reply Brief, Petitioners allege that the BEP relied on misleading information
from the IF&W to describe the impact of the proposed dam. SMPI Reply Brief, pp. 6-7.
The BEP's reference to 10.8 acres and the distance upstream that would be affected by
the impoundment appear to be misstated. According to the report prepared by SMPI's
consultant, 1.1 miles upstream is the theoretical upper limit of the area affected by the
impoundment and water elevation will only increase by approximately three inches. R.
Tab 314, p. 238k.k., Woodlot Report. Additionally, the wetted surface area of the area
upstream from Scribner's Mill is currently 8.9 acres during normal flow conditions, and
with the dam the wetted area will increase by 1.9 acres to a total of 10.8 acres. Id.
However, this misstated information was only in the BEP's description of the project
under "Procedural History," and neither of these figures appears to have directly factored
into the BEP's consideration of the permitting criteria pursuant to 38 M.R.S. § 636.

4 As pointed out by the amicus parties, a recent amendment to Maine's water quality laws
establishes "the Crooked River and its tributaries, except as otherwise provided,
excluding existing impoundments" as a Class AA waterway. 38 M.R.S. § 467(9)(B)(2)
(2009). Prior to this amendment, and the standard in effect when SMPI tiled its
application, the entirety of the Crooked River and its tributaries were classified as Class
AA, with the exception of existing impoundments on the river and the area of the river
previously impounded at Scribner's Mill, which were classified as Class A. 38 M.R.S. §
467(9)(B)(2) (2008). Class AA waters are the highest water quality classification, which
is "applied to waters which are outstanding natural resources and which should be
preserved because of their ecological, social, scenic or recreational purposes." 38 M. R. S.
§ 465( I). Class AA waters must be free-flowing and natural. Id.

3
Commissioner issued its final order on December 31, 2008, denying SMPI's

application. SMPI filed a timely appeal to the BEP on February 4,2009.'

On April 16, 2009, the BEP issued its decision, which incorporated and

upheld the Commissioner's decision. Specifically, the BEP found that SMPI has

not met its burden of affirmatively demonstrating 6 that its proposed project

meets the public benefit, environmental mitigation, environmental and energy

considerations, and water quality criteria necessary for approval under the

Maine Waterway Development and Conservation Act, 38 M.R.S. §§ 636 (3), (6),

(7), and (8). The failure to meet the applicable water quality standards led to the

denial of a water quality certification under Section 401 of the Clean Water Act.

33. USc. § 1341.

III. The Legal Framework

a. The Maine Waterways Development and Conservation Act

The Maine Waterways Development and Conservation Act was passed to

create a single application and permitting process for hydropower development.

5 The Department of Environmental Protection consists of the Commissioner and the
BEP. 38 M.R.S. § 341-A(2). The Commissioner makes most licensing decisions, which
may be appealed to the BEP for review. 38 M.R.S. §§ 341-A(4) and 341-8. An
aggrieved party has 30 days after receipt of notice of final agency action to file a petition
for judicial review. 38 M.R.S. § 346(1),5 M.R.S. § 11002. For this reason, SMPI's
appeal is only from the BEP's April 16, 2009 decision.

6 The DEP's Rules Concerning the Processing ofApplications and Other Administrative
Mailers, 06-096 CMR 2 § 11 (F), provide guidance on an applicant's burden of proof.
Under the rules, "[a]n applicant for a license has the burden or proof to affirmatively
demonstrate to the Department that each of the Iicensing criteria in statute or rule has
been met. ... For those matters relating to a licensing criteria [sic] that are disputed by
evidence the Department determines is credible, the applicant has the burden of proving
by a preponderance of the evidence that the licensing criteria are satisfied."

4
38 M.R.S. § 632(2)? The policy and purpose of the MWDCA states: "[I]t is the

policy of the State to support and encourage the development of hydropower

projects by simplifying and clarifying requirements for permits, while assuring

reasonable protection of natural resources and the public interest in the use of

waters of the State." [d. The MWDCA requires any person initiating

construction or reconstruction of a hydropower project to secure a permit from

the Department of Environmental Protection. 38 M.R.S. § 633. In order for a

permit to be approved, the MWDCA requires the applicant to demonstrate, and

the DEP to approve, that the proposed hydro project meets eight criteria. 38

M.R.S. § 636, Save 0111' Sebnstieaak, flle. v. Bd. aJEl/vtl. Prot., 2007 ME 102, err 14, 928

A.2d 736, 740. In reviewing SMPI's pennitthe BEP found that SMPI's project did

not meet four of the eight criteria. The four criteria under Title 38, Section 636

the BEP determined SMPI did not meet are as follows:

3. Public Benefits. The project will result in significant economic benefits to
the public, including, but not limited to, creation of employment
opportunities for workers of the State.
6. Environmental mitigation. The applicant has made reasonable
provisions to realize the environmental benefits of the project, if any, and
to mitigate its adverse environmental impacts.
7. Environmental and energy considerations. The advantages of the project
are greater than the direct and cumulative adverse impacts over the life of
the project based upon the following considerations:
A. Whether the project will result in significant benefit or harm to soil
stability, coastal and inland wetlands or the natural environment of
any surface waters and their shorelands;
B. Whether the project will result in significant benefit or harm to fish
and wildlife resources. In making its determination, the
department shall consider other existing uses of the watershed and
fisheries management plans adopted by the Department of Inland
Fisheries and Wildlife, the Department of Marine Resources and
the Atlantic Salmon Commission;

7 Under the statute, "hydropower" includes both electrical and mechanical power. 38
M.R.S. § 632(4).

5
C. 'Whether the project will result in significant benefits or harm to
historic and archeological resources;
D. Whether the project will result in significant benefit or harm to the
public rights of access to and use of the surface waters of the State
for navigation, fishing, fowling, recreation and other lawful public
uses;
E. Whether the project will result in significant flood control benefi ts
or flood hazards; and
F. Whether the project will result in significant hydroelectric energy
benefits, including the increase in generating capacity and annual
energy output resulting from the project, and the amount of
nonrenewable fuels it would replace.
The department shall make a written finding of fact with respect to the
nature and magnitude of the impact of the project on each of the
considerations under this subsection ....
8. Water Quality. There is reasonable assurance that the project will not
violate applicable state water quality standards, including the provisions
of section 464, subsection 4, paragraph F, as required for water quality
certification under the United States Water Pollution Control Act, Section
401. This finding is required for both the proposed impoundment and
any affected classified water bodies downstream of the proposed
im poundment.

See 38 M.R5. § 636.

The Department of Environmental Protection further defined the

requirements of 38 M.R.S. § 636 by administrative rule. Me. Dep't of Envtl. Prot.,

Ad771il1istmtive Rules for Hydropower Projects, 06-096 CMR 450. H To meet the

"public benefit" criterion under 38 M.R.S. § 636(3), the rules require the applicant

to show that the economic benefits "claimed from the proposed project are real,

in that these benefits would not result but for the project. ... [and] the applicant

must demonstrate that the project's economic benefits are greater than it's [sic]

economic costs, and that the resulting net benefit is significant." 06-096 CMR 450

§ 5(A)(3). The rules acknowledge that the terms "benefit" and "significant"

inherently require comparisons between alternative conditions. [d.

8 Available at thef()llowing website address:
http://www.maine.gov/sos/cec/rules/06/chaps06.htm

6
Under 38 M.R.S. §636(6), the criterion for "environmental mitigation," the

rules define "mitigation" as "any action taken or not taken to avoid, minimize,

rectify, reduce, eliminate, or compensate for actual or potential adverse

environmental impacts." 06-009 CMR 450 § 3(H). The reasonableness of an

applicant's provisions to mitigate adverse environmental impacts depends on the

significance of the resources affected. 06-096 CMR 450 § 5(A)(6). Additionally,

under the criterion "environmental and energy considerations," 38 M.R.S. §

636(7), the rules provide the criterion will be met when the balance of the

project's advantages are greater than the project's adverse impacts based on the

specified environmental and energy considerations enumerated under Section

636(7)(A)-(F). 06-096 CMR 450 § 5(A)(7).

b. The Clean Water Act

SMP!' s proposed project is subject to the requirements of the Federal

Clean Water Act because it qualifies as an "activity ... which may result in [a]

discharge into the navigable waters [of the United States]." 33 U.s.c. §

1341(a)(1). Under Section 401 of the CWA, an applicant for a federal license or

permit to conduct an activity that may result in a discharge must comply with

state water quality standards. [d. This requirement is reiterated in the MWDCA

under Section 636(8), which requires reasonable assurance that the project will

not violate applicable state water quality standards. 38 M.R.S. § 636(8).

The State of Maine classifies water quality standards based on (1)

designated uses and related characteristics of those uses, (2) water quality criteria

necessary to protect those uses, and (3) a water quality antidegradation policy.

38 M.R.S. § 464(1). Class A waters are the second highest water quality

classification. 38 M.R.S. § 465(2). Class A waters must be characterized as

7
natural, and certain designated uses that disrupt the flow are permitted. 38

M.R.S. § 465(2)(A). The designated uses for Class A waters include recreation,

habitat for fish and other aquatic life (which must be characterized as natural),

fishing, navigation, and certain hydroelectric power generation. [d. The water

quality criteria for Class A waters require that the dissolved oxygen content be

not less than 7 parts per million or 75% saturation, whichever is higher; and the

aquatic life and bacteria content of Class A water shall be as naturally occurs. 38

M.R.S. § 465(2)(B). The antidegradation policy provides that "[e]xisting in­

stream water uses and the level of water quality necessary to protect those

existing uses must be maintained and protected," and that "[e]xisting in-stream

water uses are those which have actually occurred on or after November 28,

1975, in or on a water body whether or not the uses are included in the standard

for classification of the particular water body." 38 M.R.S. § 464(4)(F).

IV. SMPI's Grounds for Appeal

On appeal, SMPI argues that the BEP's permit denial is inconsistent with

the MWDCA and constitutes legal error. SMPI argues that: (1) because the BEP

concluded that several alternatives to the proposed dam were available, the BEP

incorrectly applied an "alternatives" test to the MWDCA, and did not properly

balance the statutory criteria of the MWDCA; (2) the BEP improperly relied on a

factually incorrect, results driven report by the IF&W, and that the BEP

unlawfully delegated its decision-making authority to the IF&W; and (3) the BEP

failed to recognize that the Legislature has pre-determined that fish passage

facilities are sufficient mitigation for any adverse impacts a project will have on

upstream and downstream fish migration.

DISCUSSION

8
I. Standard of Review

When the Superior Court acts in an appellate capacity to review a decision

of an administrati ve agency, the court reviews the agency's decision directly for

an abuse of discretion, error of law, or findings not supported by the evidence.

Ulinllo v. Bd. of Envtl. Prot., 2009 ME 89, 9I 12, 977 A.2d 400, 407. In evaluating an

80C Appeal, it is not for the court to determine whether it would have reached

the same result as the agency, but to decide whether the record contains

competent and substantial evidence in support of the decision reached. CWCO,

Inc. v. Superintendent of I7zsurmzce, 1997 ME 226, 9I 6, 703 A.2d 1258, 1261. "An

administrative decision will be sustained if, on the basis of the entire record

before it, the agency could have fairly and reasonably found the facts as it did."

Id. The party seeking review of final agency action has the burden of proof.

Greely v. COlllllz'r, Dep't of Hili 11 n11 Servs., 2000 ME 56, 9I 9,748 A.2d 472,474. In

order to meet this burden, a petitioner must demonstrate that the record compels

a contrary conclusion. Kroeger v. Dep't of Ellvtl. Prot., 2005 ME 50, 9I 8, 870 A.2d

566, 569. "Inconsistent evidence will not render an agency decision

unsupported./I Seider v. Bd. of Exnllz'rs of Psyc1lOlogists, 2000 ME 206, 9I 9, 762 A.2d

551,555.

II. Alternatives Analysis

SMPI contends that the MWDCA is unlike other statutes within the DEP's

jurisdiction, such as the Natural Resources Protection Act, 38 M.R.S. § 481,

because the MWDCA specifically promotes the creation of hydropower projects,

and because the MWDCA does not require an "alternatives analysis," i.e., a

showing by the applicant that no less environmentally damaging alternative to

9
the proposed project is possible. 9 SMPI contends that the MWDCA does not

contain an alternatives analysis and that the BEP committed legal error when it

applied the alternatives analysis to the "environmental mitigation" and "public

benefits" criteria under 38 M.R.S. § 636. SMPI argues that instead of an

alternatives analysis, the MWDCA requires a balancing of factors for the "public

benefits" and "environmental mitigation" criteria.

Contrary to SMPI's assertions, the BEP did not commit legal error by

applying an alternatives analysis to its evaluation of SMPI's proposed project.

With respect to the environmental mitigation criterion, the BEP found:

[T]hat appellant has not presented any persuasive evidence that
reasonable provisions have been made to realize the environmental
benefits, if any, and to mitigate the adverse environmental impacts
of the proposed project. The evidence in the record supports the
findings that there are several feasible altenzatives that would allow
operation of some or all of the sawmill machinery, thus avoiding
the adverse environmental impacts associated with the
reconstruction of the dam. 10

April 16, 2009 Order, p. 8 (enlphasis added) ("BEP Order"). Under the

environmental mitigation criterion, an alternatives analysis is implied. The term

"mitigation" is defined as "any action taken or not taken to avoid, minimize,

rectify, reduce, eliminate, or compensate for actual or potential adverse

environmental impacts." 06-096 CMR 450 § 3(H). Mitigation actions include:

') See, e.g., 09-096 CMR 310 § 9(A), which provides an alternatives analysis for
applicants proposing regulated activities in, on, over, or adjacent to a wetland or water
body.

10 The three feasible alternatives based on SMPI's alternatives analysis mentioned in the
BEP's findings are: "installing a gate in the breached section of the dam that could be
opened to allow fish passage/ spawning activity and closed to allow mill operation; using
various forms of auxiliary power to operate the mill; and using pumps to fill a headbox
with river water that would then power the mill in the absence of a reconstructed dam."
BEP Order, p. 8.

10
"[a]voiding an impact altogether by not taking a certain action or parts of an

action," and "[m]inimizing an impact by limiting the magnitude or duration of

an activity or by controlling the timing of an activity." Id. As the BEP argues,

under this definition of mitigation, alternative may be considered to avoid

potentially adverse environmental impacts.

SMPI argues that BEP's findings of feasible alternatives for the

environmental mitigation criterion led the BEP to also find that SMPI did not

meet the public benefit criterion. With respect to the economic benefits under the

public benefit criterion, the BEP found that "[t]he evidence in the record supports

the findings that there are several feasible alternative that would allow operation

of some or all of the sawmill machinery, and this diminishes the economic

benefits that can be claimed for the project." BEP Order, p. 10. An alternatives

analysis may also be used to evaluate the potential public benefits of a proposed

project. The Ad1l1illistmtive Regulatiolls for Hydropower Projects provides the

following explanation of "benefit" as it is used in 38 M.R.S. § 636(3):

"Benefit" is a term which requires a comparison between at least
two conditions.... [I]n order to accurately evaluate the existence
and extent of the economic benefits that may result from a
proposed hydropower project, it is necessary to compare two
alternative futures: the economic conditions likely to exist if the
project is built versus those likely to exist without the project.

06-096 CMR 450 § 5(A)(3). The regulation clearly contemplates consideration of

the economic outcome with the proposed project as opposed to without the

proposed project. In considering the value of the of the project if built, compared

to the economic outcome without the project, it is reasonable for the BEP to

consider how feasible alternatives to the proposed project may diminish the

overall economic benefit of completing the project. Therefore, the BEP's

11
interpretation of the MWDCA to employ an alternatives analysis is not an error

of law. See Save GilI' Sebasticook, at <If 13, 928 A.2d at 740 (stating that an

"administrative agency's interpretation of a statute administered by it, while not

conclusive or binding on this [CJourt, will be given great deference and should

be upheld unless the statute plainly compels a contrary result.").

III. Balancing the Statutory Criteria

SMPI claims that the MWDCA mandates a balancing test, and claims that

the BEP did not give appropriate weight to the economic and social benefits of

SMPI's project. SMPI claims that the BEP failed to give appropriate weight to

employment opportunities, increases in the purchasing power of Maine citizens,

and the benefits of energy security, and claims that the BEP instead focused on

falsely inflated values assigned to fisheries. SMPI claims that the total value of

the project is $409,191 per year, compared to an estimated loss of fish habitat

worth only $15,325 annually. R. Tab 314, pp. 219-227; SMPI Brief, p. 21.

The DEP's Admil/istrative Regulations for Hydropower Projects provides

further guidance in terms of the types of economic costs and benefits the BEP

should consider when evaluating the "Public Benefit" criterion.

[E]conomic benefits may include, bllt are /lot limited to, increases in
the income or purchasing power of Maine citizens, energy security
from reducing dependence upon fossil fuels, and creation of
employment opportunities for workers of the State.... [E]conomic
costs may include, but are I/ot lil1/ited to, decreases in the income or
purchasing power of Maine citizens, the value of other
hydroelectric generating opportunities diminished or eliminated by
a project, and the elimination of employment opportunities for
workers of the State.

06-096 CMR 450 § 5(A)(3) (emphasis added). The BEP accepted the

Commissioner's December 31, 2008 findings that SMPl's proposed project would

result in economic benefits to the public in the form of employment in the

12
production and transportation of specialty wood products, no-cost educational

opportunities, and as an enhanced tourist attraction. The BEP also found that the

economic benefits that can be claimed for the projects are much less than asserted

by SMPI because (1) some of the claimed benefits already exist without

constructing the dam, and (2) some of the claimed benefits for the project can be

achieved by alternatives to the construction of the dam, further diminishing the

value of the proposed project. The BEP also agreed with the Commissioner and

found that the proposed project would result in economic costs to the public due

to adverse impacts on an economically significant Crooked River / Sebago Lake

landlocked salmon fishery because the project will reduce upstream passage,

spawning and nursery habitat, and will reduce recreational fishing for

landlocked salmon. The BEP's findings are supported by substantial evidence,

and SMPI has not met its burden in demonstrating by a preponderance of the

evidence that the construction of the dam will result in a significant economic

benefit.

SMPI also contends that the BEP did not properly balance the

environmental and energy considerations required by 38 M.R.S. § 636(7).

Specifically, SMPI contends that the BEP violated the MWDCA by undervaluing

hydro-mechanical projects. This argument is unsupported because SMPI's main

support for this claim is from a September 19, 1985 memo to the Commissioner

of the Department of Conservation - which was written nearly 25 years prior to

the BEP's decision. SMPI Brief, p. 23, citing R. Tab. 5, p. 2. Additionally, SMPI

claims the BEP violated the MWDCA by failing to give sufficient weight to the

benefits of historical preservation.

13
As stated above, the BEP is required to balance advantages of a proposed

project against its direct and cumulative adverse impacts over life of the project

based on the enumerated considerations of Section 636(7). In weighing the

considerations, the BEP concluded that the existing landlocked salmon fishery is

too important a resource to put at risk of diminishment for the sole benefit of the

restoration of a historic water powered sawmill. The BEP found that

reconstruction of the breached dam would substantially alter 2,000 square feet of

the landlocked salmon spawning habitat and would alter 1.4 acres of nursery

habitat. Additionally, the BEP found that the proposed rock ramp fishway

would reduce upstream passage for adult landlocked salmon from 100% to

99.5% and for juvenile landlocked salmon from 45% to 28.2% at river flows

between 25 cubic feet per second (cfs) and 650 cfs, when compared to existing

conditions. The BEP's findings with respect to environmental and energy

considerations are supported by substantial evidence.

IV. The IF&W's Report

SMPI argues that the BEP's reliance on the IF&W's report constituted an

impermissible delegation of the BEP's decision-making authority, and claims that

IF&W's report was biased against the construction of a dam. The BEP

acknowledges that well before any decisions were issued, the DEP had to correct

the IF&W's consulting biologist Francis Brautigam as to the IF&W's limited

advisory role, and noted in that letter that many of Brautigam's

recommendations appeared to go beyond the IF&W's limited role of evaluating

the impacts on fisheries. R. Tab 314, p. 261; Letter from Dana Paul Murch, Dams

and Hydropower Supervisor, Dep't of Envtl. Prot., to Francis Brautigam,

Regional Fisheries Biologist, Maine IF&W (March 24,2008). Brautigam's overly

14
critical analysis was noted in the BEP's Order. BEP Order, p. 7. Based on these

efforts, the DEP and the BEP ensured that the IF&W report was not taken into

consideration beyond its limited advisory role pursuant to 38 M.R.S. § 634(3) and

§ 636(7)(B). SMPI has failed to offer any evidence showing that the DEP or BEP

improperly delegated decision-making authority to the IF&W or improperly

relied on findings in the IF&W's report. As a result, SMPI's claim that the BEP's

use of the IF&W report constituted legal error fails.

a. Water Quality

SMPI alleges that the BEP's reliance on the IF&W's comments led to the

BEP's finding that the proposed project did not meet the water quality standards

under 38 M.RS § 636(8) and Section 401 of the Clean Water Act. 33 USc. §

1341. SMPI claims that this is evidenced by the DEP's change in position from

believing the project would meet water quality standards, to stating in the DEP

Order without explanation that the project would not meet water quality

standards. See SMPI Brief, p. 15 n. 3. In support of its assertion, SMPI references

a form dated May 27, 2003, which contains the comments of two members of the

DEP's Biological Monitoring Program within the Division of Environmental

Assessment. R. Tab 61, p. 13.

As the BEP points out, SMPI has taken the comments on this form out of

context. According to the BEP, the Biological Monitoring Program assesses the

health of rivers, streams, and wetlands by using water sample results to

determine attainment of water quality standards associated with Class AA, A, B,

and C water bodies. BEP Brief, p. 23. The BEP states the comments from the

Biological Monitoring Program are limited to whether or not SMPI's proposed

project will meet the water quality criteria for Class A water bodies. The

15
Commissioner of the DEP accepted, and the BEP adopted, the Biological

Monitoring Programs finding that with the proposed project in place, the water

would contain sufficient dissolved oxygen to meet the Class A water quality

standards.

However, the BEP found that the proposed project would not meet the

State's anti degradation policy and did not meet the water quality criteria because

with the project in place the river would not remain suitable for the designated

uses of "habitat for fish" and "recreation". R. Tab 1, pp. 12-13. SMPI has failed

to show that the BEP unreasonably relied on the IF&W's report with respect to

the water q uali ty cri teria. The BEP's decision should be upheld because it is

supported by substantial evidence, and because SMPI has failed to show an

abuse of discretion or error of law.

V. Are Fish Passage Facilities Always Sufficient Mitigation?

SMPI argues on page eleven of its brief that by passing the MWDCA the

legislature recognized that dam projects involve adverse impacts and that some

amount of adverse impact is permissible and acceptable. SMPI bases this

conclusion on 38 M.R.S. § 635(l)(A)-(C), which lists permissible approval terms

and conditions. According to Section 635(l)(C), the "terms and conditions IIIny

include, but nrc not limited to: ... Provisions for the construction and maintenance

of fish passage facilities." 38 M.R.S. § 635(l)(C) (emphasis added). The fact that

the legislature allows the DEP to condition the approval of a project on the

construction and maintenance of a fish passage facility does not mean that a fish

passage facility will always be sufficient mitigation for any adverse impacts on

fish l1'ligration that may result from the construction of a dam.

16
DECISION

Therefore, the entry is:

Scribner's Mill Preservation, Inc.'s 80C Appeal is DENIED.

Dated at Portland, Maine this day of ,~L ,2010.

R ert E. Crowley
Justice, Superior Court

17
J Date Filed _0_5_-_1_9_-_0_9 _ CUMBERLAND
County
--o-9_--1--,--6--e
Docket No. - __A_P_-­O

Action _ _8_0_C_A_p"-'p'--e_a_l _

SCRIBNER'S MILL PRESERVATION MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION
C/O SCOTT D. HATCH MAINE BOARD OF ENVIRONMENTAL PROTECTION
232 SCRIBNER MILL RD.
HARRISON, ME 04040 Ys.
Plaintiff's Attorney Defendant's Attorney

PRe-&B JANET MCLINTOCK AAG (MAINE DEP)
SCOTT D. ANDERSON ESQ DEPARTMENT OF THE ATTORNEY GENERAL
VERRILL & DANA 6 STATE HOUSE STATION
PO BOX 586 AUGUSTA ME 04330
PORTLAND ME 04112-0586 DAVID SWETNAM-BURLAND, ESQ.
STACY STITHAM, ESQ. (NATURAL RESOURCES ­
PO BOX 3070 NOT A DIRECT PARTY)
Date of
LEWISTON ME 04243-3070
Entry

2009

---