# In the Matter of Hartz Mountain Industries, Etc.

> New Jersey Superior Court Appellate Division · December 9, 2024

URL: https://www.frixlaw.com/law-library/cases/10756863

## Case

- **Court:** New Jersey Superior Court Appellate Division
- **Decided:** December 9, 2024
- **Precedential status:** Unpublished
- **Opinion:** Opinion
- **Cited by:** 0 later opinions in the Frix Law Library

## Citator (automated)

- No negative treatment found by the automated citator. That is not the same as a confirmation that the case is good law; read the citing cases.
- Full citator and citing cases: https://www.frixlaw.com/law-library/cases/10756863

## How later opinions describe it (automated extraction)

- explaining "the technique of setting up an argument that does not exist and then refuting that misrepresented argument is called the 'straw man' fallacy"
- explaining "the arbitrary, capricious, or unreasonable standard applicable in the review of administrative agency decisions subsumes the need to find sufficient support in the record to sustain the decision"
- explaining "an expansive view should be taken of the obligation of State agencies to consider information submitted by parties opposed to the grant of a governmental approval"

## Opinion text

NOT FOR PUBLICATION WITHOUT THE
APPROVAL OF THE APPELLATE DIVISION
This opinion shall not "constitute precedent or be binding upon any court." Although it is posted on the
internet, this opinion is binding only on the parties in the case and its use in other cases is limited. R. 1:36-3.

SUPERIOR COURT OF NEW JERSEY
APPELLATE DIVISION
DOCKET NO. A-4009-19

IN THE MATTER OF HARTZ
MOUNTAIN INDUSTRIES
WATERFRONT DEVELOPMENT
INDIVIDUAL PERMIT NO.
0911-01-1001.12; LUP190001.
_____________________________

Argued March 15, 2023 – Decided December 9, 2024

Before Judges Accurso, Vernoia and Firko.

On appeal from the Department of Environmental
Protection, Permit Nos. 0911-01-1001.12;
LUP190001.

Martin R. Kafafian argued the cause for appellant
Rock Eagle Properties LLC (Beattie Padovano, LLC,
attorneys; Ira E. Weiner, of counsel and on the briefs;
Jason A. Cherchia and Martin R. Kafafian, on the
briefs).

Jason T. Stypinski, Deputy Attorney General, argued
the cause for respondent Department of Environmental
Protection (Matthew J. Platkin, Attorney General,
attorney; Sookie Bae-Park, Assistant Attorney
General, of counsel; Jason T. Stypinski, on the briefs).
Neil Yoskin argued the cause for respondent Hartz
Mountain Industries (Cullen and Dykman LLP,
attorneys; Neil Yoskin, on the brief).

The opinion of the court was delivered by

ACCURSO, P.J.A.D.

Third-party objector Rock Eagle Properties, LLC, timely appealed from

the waterfront development individual permit issued to Hartz Mountain

Industries on May 21, 2020, by the New Jersey Department of Environmental

Protection for two new fourteen-story high-rise residential towers attached by

an integrated six-story garage in the Lincoln Harbor section of Weehawken on

the Hudson River. In its merits brief, Rock Eagle contended the structure

Hartz proposed encroached on the Hudson River Walkway conservation

restriction the Department had imposed as a condition of a prior waterfront

development permit issued to Hartz, which Hartz had never recorded, that the

Project failed to comply with the Coastal Zone Management (CZM) High-Rise

Structures Rule, the Traffic Rule, and the Filled Water's Edge Rule, and that

the Department erred in measuring the riparian zone and in its treatment of an

existing parking lot.

Reviewing the record following receipt of Rock Eagle's brief, the

Department discovered Hartz's site plan did not accurately depict the

A-4009-19
2
conservation restriction area. It claimed, however, that "the current permit

application and record" lacked sufficient detail to allow the Department "to

determine whether any encroachments in fact exist and, if they do, whether the

encroachments would violate the correct conservation restriction area and

associated Hudson River Waterfront Area Rule." The Department accordingly

made a motion for remand "to further develop the record and reconsider the

[permit] application in light of the Hudson River Waterfront Area standards,

including the arguments raised by Rock Eagle." The Department urged we

"not retain jurisdiction as Rock Eagle will maintain its appeal rights upon

completion of the proceedings" and "the matter may be resolved by the agency

without the need for further judicial intervention."

Hartz objected, claiming the "facts" on which the Department based its

belief that a remand was warranted "appear not even to be accurate." Claiming

a remand exposed it "to open-ended and vaguely defined procedures," it asked

us to deny the remand or, at least, limit its duration. We granted the

Department's request for remand to allow it "to address, on appropriate notice

to appellant Rock Eagle and any other interested parties, the encroachment

questions and other issues identified in the DEP's remand motion," but retained

jurisdiction, giving it 128 days, until March 15, 2022, to complete the remand

A-4009-19
3
and issue any revised final agency decision. We allowed Rock Eagle the

opportunity to file a supplemental brief, post remand, addressing the remand

outcome with any supplemental appendix.

On remand, Hartz submitted additional information to DEP, which

included a revised site plan dated January 27, 2022, new street and aerial drone

photos with superimposed renderings of the project taken from nearby

residential buildings and roads, as well as a new traffic study dated December

2, 2021. On March 10, 2022, five days before expiration of the remand period,

DEP issued a Remand Report determining the supplemental information

submitted by Hartz on remand demonstrated the project's "compliance with the

traffic rule at N.J.A.C. 7:7-16.12, high-rise structures rule at N.J.A.C. 7:7-

15.14," including that "the project complied with N.J.A.C. 7:7-15.14(b)(4)

because the proposed high-rise structures do not block the views currently

enjoyed from existing residential structures, public roads or pathways to the

maximum extent practicable," and the public access rule at N.J.A.C. 7:7-16.9.

It also determined there was no encroachment on the conservation restriction

area.

Nevertheless, DEP required Hartz to "submit" an application for "an

Administrative WFD (Waterfront Development) Upland IP (Individual Permit)

A-4009-19
4
modification" pursuant to N.J.A.C. 7:7-27.6 and 27.7, in order "to incorporate

[the] additional conditions gathered from [the] supplemental information"

relating to traffic, specifically the December 2, 2021 traffic study that

Weehawken Township engineers prepared in coordination with Hartz's traffic

consultant, which concluded improvements at two locations (19th Street and

Waterfront Terrace) were needed to maintain the existing "D" level of service,

and the creation of a conservation easement. On March 16, 2022, the day after

expiration of the remand, the Department published notice of the Remand

Report in the NJDEP Bulletin providing a thirty-day comment period.

Rock Eagle contends the Department exceeded the scope of our remand

order by accepting and reviewing new documents from Hartz prepared during

the remand that went beyond the encroachment on the conservation restriction

area, specifically those documents supporting the project's compliance with the

CZM High-Rise Structures and Traffic Rules. It challenges the findings in the

Remand Report, arguing the agency's actions were procedurally improper, and

its conclusions erroneous based on unverified, unreliable information as a

result of the Department having failed to afford Rock Eagle and other

interested parties any reasonable opportunity to submit their own comments

and data challenging the new documents.

A-4009-19
5
Although we certainly understand Rock Eagle's position that the remand

should have been limited to the encroachment issue based on the Department's

motion, we conclude our order afforded the Department the leeway to address

"other issues identified in the DEP's remand motion," which, as the

Department notes, included a request it be allowed to "further develop the

record and reconsider the application in light of the Hudson River Waterfront

Area standards, including the arguments raised by Rock Eagle."

That grant was conditioned, however, "on appropriate notice to appellant

Rock Eagle and any other interested parties," which we likewise reasonably

interpret as dependent on the extent of the Department's further development

of the record on remand and reconsideration of "the application in light of the

Hudson River Waterfront Area standards, including the arguments raised by

Rock Eagle." Although we agree with the Department that it did not enlarge

the substantive scope of our remand order by reevaluating viewshed and traffic

impacts in addition to the encroachment issue, its failure to do so with only

constructive notice in the NJDEP Bulletin to interested parties, including

Weehawken, Hoboken, Hudson County, and all individuals and entities who

had previously submitted comments to the Department about the project, and

that only after the fact, thus depriving them of any opportunity to comment

A-4009-19
6
during the remand period, failed to provide those parties "appropriate notice,"

or, indeed, any notice at all. The Department's actions on remand violated our

order and were, thus, ultra vires. We accordingly reverse the Department's

decision on remand and vacate the waterfront development individual permit

issued to Hartz as well as its modification.

Hartz owns approximately 12.93 acres, which includes approximately

10.73 acres of open water (measured below mean high water) and

approximately 2.20 acres of land area (above high water) between Harbor

Boulevard and the Hudson River, immediately north of Hoboken, specifically

identified as Block 34.03, Lots 1.01, 1.02, and 2.03 on the Weehawken tax

map. The property, part of Hartz's larger Lincoln Harbor redevelopment

project, is bordered to the north by Harbor Boulevard, to the east and south by

the Hudson River, and to the west by an elevated section of Park Avenue . The

property is one of the last undeveloped parcels within Lincoln Harbor and has

unimpeded views of the Hudson River and the New York City skyline.

Rock Eagle owns a high-rise multi-residential development at 1700 Park

Avenue in Weehawken, which is within two hundred feet west (landward) of

Hartz's property. The view of the New York City skyline from Rock Eagle's

A-4009-19
7
building, like those of Hartz's other landward neighbors, will be restricted by

the project.

According to Hartz's consultant, Bohler Engineering:

Lincoln Harbor is the largest full mixed use
development on the New Jersey Hudson River
Waterfront. As originally conceived and as
developed, Lincoln Harbor contains a broad mix of
uses including offices, retail, residential, hotel, marina
and recreational uses. The development provides a
full range of services not only for its occupants, both
business and residential, but for the residents of the
Township of Weehawken, the County of Hudson and
the State of New Jersey through the extensive Park
and Waterfront Walkway system that has been
constructed. Since the issuance of the initial
Waterfront Development Permit, the majority of the
Lincoln Harbor improvements have been constructed
and are in service.

The property is located within the Hudson River Floodplain at an

elevation of NAVD88 12.00-feet, although the elevation of the existing

parking lot is only between 7- and 9.5-feet. DEP's Bureau of Urban Growth

and Redevelopment issued a flood hazard verification in 2017 for Block 34.03,

Lot 2.03, finding it "completely located within the limit of moderate wave

action" in the tidal flood hazard area of the Hudson River "with a flood h azard

elevation of 12 feet NAVD and partially located within the V-Zone with a

flood hazard elevation of 16 feet NAVD." "The flood hazard area of the

A-4009-19
8
Hudson River was established using Method 2 (FEMA Tidal Method) as

described at N.J.A.C. 7:13-3.5, which is based on the FEMA flood mapping."

The Bureau further found "[t]he riparian zone extends 50 feet from the top of

[the] bank of the Hudson River located along the eastern property boundary of

the site."

The Department, which oversees development along New Jersey's

waterfront pursuant to the Waterfront Development Act, N.J.S.A. 12:5-1

to -11, and the Coastal Zone Management Rules, N.J.A.C. 7:7-1.1 to -29.10,

had previously approved Hartz's application for a waterfront development (in -

water) individual permit in November 2010 for construction on Block 34.03,

Lot 2.03, including a portion of the Hudson River Waterfront Walkway built

over the water on pilings. Special Condition No. 9 of the permit required

Hartz to record a conservation restriction that included a minimum thirty -foot

easement or right-of-way for that portion of the Waterfront Walkway. Hartz

completed the proposed portion of the Waterfront Walkway but has never filed

or recorded the required conservation restriction.

Hartz submitted its initial waterfront development individual permit

application to DEP in April 2019, seeking to construct two eighteen-story

high-rise residential towers in the northeast and southwest corners of the

A-4009-19
9
property with 334 residential units, attached by an integrated seven-story, 398-

space parking garage with roof deck and pool, set back fifty feet from the

mean high water line perpendicular to the Hudson River and separated from it

by the existing waterfront walkway. When Hartz submitted its permit

application, there was an old asphalt parking lot surrounded by a chain link

fence on the site likely constructed in connection with the former nearby

container port operations. Lot 2.03, the largest of the parcels, contained most

of the parking lot and fencing along with a portion of the Hudson River. Lots

1.01 and 1.02 were semi-vacant lots adjacent to the elevated section of Park

Avenue.

Hartz served formal notice of its application to the Township, the

County, Hoboken, relevant utility companies, and all property owners within

200 feet, including Rock Eagle. The Department received hundreds of

objections and requests for public hearings, which it did not convene,

including from Rock Eagle and its consultant, Thonet Associates, Inc. Thonet

complained about Hartz's failure to fully comply with public notice

requirements and raised substantive concerns including flooding, stormwater

management and decreased stormwater quality, the existing parking lot, and

compliance with the CZM Rules on filled water edges and high-rise structures.

A-4009-19
10
Most other notified objectors complained about the project's adverse

impact on the daily traffic gridlock on the roads through and surrounding

Lincoln Harbor, and that the height and positioning of the towers would

significantly obstruct their current views of the River and the New York

skyline from other residential buildings and public roads, with some claiming

the height and position of the towers would even diminish the views of New

York City from the Lincoln Tunnel Helix. Other objectors complained the

towers, may "technically satisfy the DEP requirement for a rectangular

building," but are plainly closer to "cubes" dozens of feet higher than the

surrounding buildings in Lincoln Harbor and nearby Hoboken, thus failing to

honor "the intent of the regulation." Some objectors also complained about

how close the buildings would be to the waterfront walkway, with almost no

separation between the two. One specifically complained that there had not

been any traffic studies of the area, which "will be further stressed" from the

then-imminent opening of a new Whole Foods market and a soon-to-be-

completed 565-unit condominium complex, "both part of the Lincoln Harbor

development effort."

On January 22, 2020, Hartz submitted a revised individual permit

application seeking a "WD-IP Residential not SFH/Duplex (Upland/Landward

A-4009-19
11
of MHWL)" for the property, this time including Lot 4.21 which encompassed

a portion of Harbor Boulevard, which Hartz owns. Hartz proposed two

fourteen-story high-rise towers situated diagonally on the site as before, each

109-feet tall for a total of 259 residential units attached by an integrated six-

story parking garage with 323 total parking spaces, along with pedestrian

sidewalks, related hardscaping and landscaping, and site improvements to

Harbor Boulevard (thus the inclusion of Lot 4.21). The sixth story of the

proposed garage would be 70.02 feet above the pre-existing ground elevation

and provides a twenty-four-foot gap between the towers from that level up.

Hartz had also updated its plan "to reflect [an added] walkway along the

southeast edge of the building within the 25-foot riparian [zone] to provide

additional public access to the [Hudson River Waterfront Walkway] as

requested by the Township of Weehawken."

Included with the revised application were new supporting and revised

documents prepared by Bohler, including preliminary and final site plans and

an environmental impact statement/compliance statement, as well as a traffic

impact study prepared by Hartz's consultant, Michael Maris Associates, Inc., in

November 2019.

A-4009-19
12
According to Bohler's January 2020 environmental impact statement/

compliance statement, Hartz's proposal met DEP's CZM Rules. Bohler

explained that the project "falls under the jurisdiction of Waterfront

Development because the [p]roject is located within the regulated waterfront

area and within 500 feet of the mean high water line." As relevant to the

issues on appeal, Bohler concluded the proposal complied with the CZM

Special Area Rules in N.J.A.C. 7:7-9. Specifically,

Filled Water's Edge (N.J.A.C. 7:7-9.23)

The proposed residential development at
Lincoln Harbor will comply with this policy. The
"waterfront portion" of Lincoln Harbor adjacent to the
site has been previously developed with a 30-foot-
wide waterfront walkway [1] at the water's edge part of
the Hudson Riverfront Walkway.

Flood Hazard Areas (N.J.A.C. 7:7-9.25)

The proposed project is located within the Flood
Hazard Area for the Hudson River. A Flood Hazard
Area permit application has been submitted as part of
this permit package to address the Flood Hazard Area
Control Act rules, N.J.A.C. 7:13.

Riparian Zone (N.J.A.C. 7:7-9.26)

According to the approved flood hazard area
verification, the Hudson River has a 50-ft riparian

1
This is an error. The walkway is only sixteen feet wide. Bohler corrected
the error on the January 27, 2022 revised site plan submitted on remand.
A-4009-19
13
zone measured from the mean high water line. The
riparian zone is an actively disturbed area consisting
of asphalt pavement, bulkhead and revetment stone.
Asphalt pavement located within 25-ft of mean high
water will be removed with this project and replaced
with landscaping. The development is proposed over
the area of existing asphalt pavement. No adverse
impacts to any riparian zone will result.

Hudson River Waterfront Area (N.J.A.C. 7:7-9.46)

The project is located within the Hudson River
Waterfront Area. The project complies with those
conditions outlined in the policy. The Hudson
Waterfront Walkway was previously constructed
along the entire waterfront area of the property.
Public access to the walkway is located through the
northern section of the property adjacent to the
existing waterfront park. In addition, a walkway
adjacent to the eastern side of the building is being
provided to allow public access to the Hudson
Waterfront Walkway.

For the CZM Use Rules, N.J.A.C. 7:7-15, Bohler found:

High Rise Structure (N.J.A.C. 7:7-15.14)

This application contains a single structure
supporting two (2) towers, 14-stories in height and
while these structures are defined as high rise
structures pursuant to these regulations, they are also
deemed compatible with this policy in that they are
part of a large high intensity development consisting
of several buildings of varying heights, up to
approximately 202 feet in height, which not only lends
itself to the architectural character of the development
but more importantly does not block any views of the
River or skyline. In addition, as detailed on the plans,

A-4009-19
14
the buildings are setback 50-ft from the mean high
water and perpendicular to the Hudson River and
separated from the River by the existing waterfront
walkway. Therefore, Hartz's application is in
compliance with these policies.

Finally, for the CZM Resource Rules, N.J.A.C. 7:7-16, Bohler found:

Public Access (N.J.A.C. 7:7-16.9)

The Lincoln Harbor development will continue
to provide full access to the waterfront. The proposed
development is adjacent to the Hudson Riverfront
Walkway. In addition, there is perpendicular access
from Harbor Boulevard to the waterfront via an
accessway through the site. These areas are depicted
on the Site Layout Plan contained in the Site Plan
package. Parking for patrons of the walkway and
waterfront parks will continue to be accommodated
within the Lincoln Harbor development in specified
areas conveniently located to these amenities.

Maris's traffic study described Lincoln Harbor as a mixed-use

development located in Weehawken, near the Lincoln Tunnel, "bounded by the

Hudson River to the east, a NJ Transit light rail line to the west, Port Imperial

to the north and Weehawken Cove to the south." Acknowledging that

"vehicular ingress and egress for Lincoln Harbor" is provided only by 19th

Street, Baldwin Avenue, and Port Imperial Boulevard, although additional

egress is provided by South Harbor Boulevard, a short road connecting Harbor

Boulevard to southbound Park Avenue at 16th Street, the report states the

A-4009-19
15
development "is served by several other modes of transportation that minimize

the use of private vehicles" — including bus, light rail and ferry service to

New York City.

The Maris study catalogued the other projects being developed in the

vicinity of the property both within Lincoln Harbor and nearby at Port Imperial

and in Hoboken, and assessed area traffic under three scenarios: (1) existing

conditions; (2) conditions in two years if the other projects were constructed

and occupied; and (3) conditions in two years if all projects, including Hartz's

project, were constructed and occupied. It then assessed existing levels of

traffic capacity, suggested various mechanisms to mitigate traffic problems,

and addressed parking and property-specific turn-in and turn-out options.

Maris concluded that Hartz's project

will have sufficient parking and will generate a
relatively small amount of traffic due to the
availability of a variety of alternate travel modes
within Lincoln Harbor. Although some intersections
in the area experience delays due to the Project's
proximity to the Lincoln Tunnel, the Project will not
significantly increase the delays and the roadway/
signal improvements identified herein will improve
the traffic operating conditions.

Hartz served formal notice of its revised application to the Township, the

County, Hoboken, and all property owners within 200 feet, including Rock

A-4009-19
16
Eagle, and the Department deemed Hartz's revised application administratively

complete. Within a week, on January 31, 2020, Remington & Vernick, the

Township's municipal engineers, submitted a memorandum to the Weehawken

Planning Board and to DEP questioning Hartz's revised application and Maris's

traffic study. It recommended, among other things, that Hartz should revise

and clarify its site plans, the impact of adjacent roadways and intersections, the

parking-mix table, the stormwater management report, drainage area and

runoff calculations, its proposed mitigation, and the stormwater collection

system and outfalls. The engineers also made specific recommendations to

mitigate and offset the project's impact on traffic circulation, including on

several local intersections, and on grading and drainage issues.

Over the next few months, DEP evaluated Hartz's application, requesting

additional information from the developer, including revised compliance

statements, new architectural plans "clearly identifying the high-rise and low-

rise components," additional flood proofing measures, and a traffic study for

the proposed project. DEP had found that the project as proposed did not meet

water quality standards, and that it was questionable as to its stormwater

discharge, foundation construction, and spot elevations. The Department

noted that "spot elevations on the flood proofing plan . . . appear to show

A-4009-19
17
portions of the building below the flood hazard area design flood elevation. If

there are some areas proposed below the flood hazard area design flood

elevation, . . . these areas must be flood proofed." DEP further found that

Bohler's compliance statement as to N.J.A.C. 7:7-9.23 (filled water's edge)

"referenced the adjacent site and not the subject site," and that Hartz needed to

"clearly show" all proposed elevations of all enclosed spaces.

Bohler submitted responsive documents in April and May 2020, which

included an updated waterproof detail sheet, a stormwater management report

revised April 2020, a drainage and utilities plan dated April 2020, site plan

documents revised May 2020, a revised roof plan diagram dated April 2020,

and another copy of Maris's 2019 traffic study.

According to Bohler's revised stormwater management report, "the entire

site lies within the Hudson River Floodplain at an elevation of NAVD88

12.00-feet," although "the elevation of the existing parking lot and roadway

lies between 5.5- and 12-feet." Bohler also advised "the US Army Corps of

Engineers is planning a floodwall to be constructed along the east side of the

elevated section of Park Avenue on the site" in an easement provided for the

purpose. Bohler advised Hartz's proposed project "will be on the river side of

A-4009-19
18
the future floodwall," which "is intended to protect downtown Weehawken and

the Northern part of Hoboken."

In May 2020, Thonet, on behalf of Rock Eagle, submitted its third set of

detailed comments to the Department about deficiencies in Hartz's application

even after its latest revisions. Thonet asserted, among other objections, that

Hartz's recently submitted waterproof detail, was not signed or dated by a

licensed architect or engineer, and that Hartz had failed to submit any signed

and sealed architectural drawings, and no licensed architect or engineer had

signed the application form's "Statement of Preparer of Plans, Specifications,

Surveyor's or Engineer's Report." Thonet also complained of Hartz's failure to

accurately describe the project site and clearly identify its lots on the proposed

site plan drawings.

Thonet claimed that during the DEP's Flood Hazard Area Flood, that is,

a flood having a 100-year recurrence interval, "the flood elevations in the

Hudson River immediately adjacent to the site and as far inland as Harbor

Boulevard . . . would reach elevation 16-feet NAVD88 with wave heights of

four (4) to five (5) feet" making "the project and its 259 residential units . . .

inaccessible during the duration of the flooding, with no personal, public, or

emergency vehicles capable of entering or leaving the development." Thonet

A-4009-19
19
asserted Hartz needed to better account for the property's "flood prone" nature

and potential inaccessibility during floods, and that its stormwater

management plan provided no calculations demonstrating the project's

compliance with New Jersey's stormwater quality standards in N.J.A.C. 7:8-

5.5. Thonet urged the Department to require Hartz to provide more

information on the existing unused parking lot to support its assertion that

stormwater quality treatment is not required for the proposed project

(explaining how replacing the existing underused 138-car capacity asphalt

parking lot with a project supporting "the comings and goings of 321 cars" will

produce less stormwater contamination to the Hudson than the existing parking

lot) and submit a traffic impact analysis documenting the impact of the

proposed project on traffic flow and safety on Harbor Boulevard and on the

quality of stormwater runoff.

Thonet also contended that "due to the relatively 'square' dimensions of

the proposed towers," (229' x 200' according to Hartz's roof plan diagram) "it

cannot be reasonably argued that the towers are oriented 'perpendicular' to the

Hudson River," as Hartz asserts and N.J.A.C. 7:7-15.14(b)(3) requires. Thonet

claimed "the proposed structure will block about 250-feet of the 350-foot view

(about 70 percent) currently enjoyed by drivers and pedestrians along Harbor

A-4009-19
20
Boulevard." Thonet noted Hartz had "provided no explanation of how the

current design alternative 'minimizes' the obstruction of views from Harbor

Boulevard" as required by N.J.A.C. 7:7-15.14(b)(4). It claimed it was instead

clear that the two proposed "high rise towers on the site were specifically

located and offset from each other to maximize the views of the Hudson River

and the NYC skyline from the residential units themselves."

On May 19, 2020, DEP issued an Engineering Report and an

Environmental Report summarizing its findings regarding the project's

regulatory compliance with the applicable CZM Rules and Flood Hazard Area

Control Act Rules, N.J.A.C. 7:13-1.1 to -24.11. It concluded that, although the

project was in regulatory compliance, various conditions had to be added to

the permit. Thus, DEP decided to "conditionally approve" Hartz's revised

application.

Additionally, due to the pre-existing section of the Waterfront Walkway

present on Hartz's property, DEP concluded the project complied with its rules

concerning prime fishing areas, the public trust, public access, and scenic

resources and design. It explained:

[T]he proposed project is not likely to cause
significant and adverse effects on water quality or
supply, aquatic biota, flooding, drainage, channel
stability, threatened or endangered species or their

A-4009-19
21
current or documented historic habitats, navigation,
energy production, or fishery resources.

The proposed project will not adversely impact
adjacent properties not owned by the applicant. Hartz
Mountain Industries owns the surrounding lots and
Harbor Boulevard. The increase in impervious
surfaces will increase the volume of stormwater
discharged to the Harbor Boulevard stormwater
system. Since this portion of Harbor Boulevard and
the surrounding lots are owned by the applicant, this is
acceptable. Additionally, . . . the flood hazard area is
tidal and the stormwater is discharged directly to the
Hudson shortly after being collected on Harbor
Boulevard.

DEP further explained:

The proposed residential development is
consistent with the surrounding Lincoln Harbor
development as well as other high-rise uses in
adjacent Hoboken. The project is located within a
Metropolitan Planning Area as designated by the State
Plan. The aesthetic design and usage of the proposed
project coincide with the surrounding urban setting.
As shown on the approved landscaping plan,
landscaping buffers will be provided to separate the
existing HRWW and the residential development. The
applicant has demonstrated compliance with [the CZM
Rules concerning Scenic Resources and design,
N.J.A.C. 7:7-16.10, and Buffers and Compatibility of
Uses, N.J.A.C. 7:7-16.11].

DEP also found that the project conditionally comported with flood

hazard and stormwater regulatory requirements. For example, when

considering the CZM Filled Water's Edge Rule, N.J.A.C. 7:7-9.23, DEP

A-4009-19
22
referenced the 2010 permit previously requiring Hartz to construct a portion of

the Waterfront Walkway on its property. Because the rule considers walkways

to be a water dependent use in non-Coastal Area Facility Review Act, N.J.S.A.

13:19-1 to -21, areas, DEP determined that Hartz's construction under the 2010

permit would comply if Hartz had recorded a conservation restriction to

permanently protect that section.

DEP also found that, because "the eastern and southeastern-most

portions of the property are within a V-Zone with a 100-year flood elevation of

16 feet NAVD88," the project complied with the CZM Coastal High Hazard

Area Rule, N.J.A.C. 7:7-9.18. It explained:

The site is located within the tidal flood hazard area of
the Hudson River. No work is proposed within the
mapped floodway. There is no state flood mapping
for the project site. On the effective FEMA FIRM, the
site is entirely within Zone A with a 100-year flood
elevation of 9 feet NAVD88. On the preliminary
FEMA FIRM, the majority of the site is within a
Coastal A Zone with a 100-year flood elevation of 12
feet NAVD88, although a small western portion of the
property is outside of the Limit of Moderate Wave
Action and is within Zone A with a 100-year flood
elevation of 12 feet NAVD88. The eastern and
southeastern-most portions of the property are within
a V-Zone with a 100-year flood elevation of 16 feet
NAVD88. Therefore, the regulatory flood hazard area
elevation is 12 to 16 feet NAVD88.

A-4009-19
23
DEP noted that "[t]he entire site is being raised so that the building can

meet the elevation requirements," and that Hartz had proposed also raising

"Harbor Boulevard approximately 3 to 4 feet so it will be at elevation 6 to 10

feet NAVD88. While not one foot above the flood hazard area design flood,

this is acceptable since to raise it even further would result in excessive fill

and unfeasible slopes."

As to the CZM Riparian Zone Rule, N.J.A.C. 7:7-9.26, DEP relied on

the October 2017 flood hazard area verification that established the riparian

buffer for the property and an approved site plan that set a fifty-foot buffer

from the mean high-water line of the Hudson River. It explained:

The subject site is located along the Hudson
River. This section of the Hudson River is classified
as a non-trout, non-Category One, FW2-NT/SE2
watercourse with a 50-ft. riparian zone adjacent to it.
A[n] FHA Verification (LUR file no.: 0911-01-
1001.10; FHA170001) was issued on October 31,
2017, identifying the 50-ft. riparian zone on the
subject site. Since the bank of the slope is heavily
manipulated and the [Hudson River Waterfront
Walkway] is located waterward of the river's bank, it
was determined during the FHA Verification
application review that the 50-ft. riparian zone will be
measured from the [Mean High Water Line] and not at
the top of the hard-armored bank. The 50-ft. riparian
zone is identified on the proposed site plan and it
encompasses the hard-armored river bank and a
section of the existing paved parking lot. The
applicant has proposed to construct a pedestrian

A-4009-19
24
sidewalk and related amenities within the riparian
zone. No impacts to riparian zone vegetation are
proposed. According to N.J.A.C. 7:13-11.2(b)3, the
removal of existing pavement within the 25-ft. [top of
bank] is not required since "the regulated activity lies
within an actively disturbed area adjacent to a lawfully
existing bulkhead, retaining wall, or revetment along a
tidal water or impounded fluvial water." The
applicant has demonstrated compliance with this rule.

Notwithstanding those findings, DEP concluded that the "approved

building must be dry flood-proofed" and waterproofed up to a depth of "at

least one foot above the flood hazard area design flood elevation so that

floodwaters cannot enter the structure during a flood."

As to the CZM High-Rise Structures Rule, N.J.A.C. 7:7-15.14, DEP

found that the project's high-rise components, the two fourteen-story

residential towers, were properly oriented perpendicular to the waterway . It

explained:

The applicant has proposed to construct two 14-
story high-rise residential towers and a 6-story parking
garage at the subject site. Based on a review of the
roof top plan submitted, the total length of the
combined high-rise structures, from west to east, will
be 248 ft. in length and the combined high-rise
structures, from north to south, will be 228 ft. in
length. The longest lateral length of 248 ft. of the
combined high-rise structures are oriented
perpendicular to the main stem of the Hudson River.
Additionally, the high-rise component of the building
is set back 50-ft. from the [Mean High Water Line] of

A-4009-19
25
the Hudson River. The high-rise structures proposed
are consistent with the height of the surrounding
development located within Lincoln Harbor. The
applicant has demonstrated compliance with this rule.

In other words, because the tallest components were set back fifty feet from

the Hudson River's mean high water line, although the ground level

components were not, DEP found the project met the rule.

DEP next considered Hartz's traffic study by Maris under both the CZM

Traffic Rule, N.J.A.C. 7:7-16.12, and Secondary Impacts Rule, N.J.A.C. 7:7-

14.3. DEP found that, although the project would increase traffic, Remington

& Vernick had recommended several traffic circulation and mitigation

measures to ensure minimal adverse effect. Thus, DEP decided to include a

permit condition requiring Hartz to comply with those mitigation

requirements.

On May 21, 2020, DEP approved the permit application, allowing Hartz

to construct "a residential development consisting of 259 residential units in

two (2), 14-story high-rise towers, a 6-story parking garage, pedestrian

sidewalks, hardscaping and landscaping amenities, and improvements to

Harbor Boulevard, in association with Lincoln Harbor Development on the

parcels." Because the conservation restriction from the 2010 permit was never

recorded, DEP added a pre-construction condition requiring Hartz to "file a

A-4009-19
26
conservation restriction for the authorized 30-foot easement and Hudson River

Waterfront Walkway with related walkway amenities."

In addition, Special Condition Four of the permit included the following

requirements:

The approved building must be dry flood-proofed to
meet the requirements at N.J.A.C. 7:13-12.5(s) and
shall be designed and constructed to be waterproof up
to a depth of at least one foot above the flood hazard
area design flood elevation so that floodwaters cannot
enter the structure during a flood. Specifically, the
building's foundation, floor slab and walls shall be
designed to resist hydrostatic pressure up to the flood
hazard area design flood elevation. In addition, any
exterior wall opening below the flood hazard area
design flood elevation, such as a door or window,
shall be equipped with waterproof seals and/or panels
and shall also be designed to resist hydrostatic
pressure up to the flood hazard area design flood
elevation.

And Special Condition Six required Hartz to "adhere to, and implement, the

traffic mitigation measures" referenced in Remington & Vernick's

memorandum dated January 31, 2020.

On remand, Hartz submitted additional information to DEP, which

included: (1) a revised site plan prepared by Bohler, dated January 27, 2022,

with new street and aerial drone and envisioned photos; and (2) a new "19th

A-4009-19
27
Street Corridor Study" prepared by Remington & Vernick, dated December 2,

2021.

For the revised site plan, Bohler identified and added a thirty-foot-wide

waterfront easement with a sixteen-foot-wide walkway along the eastern and

southern boundaries of the site for clarification purposes. Essentially, Bohler

simply redrew the easement boundary line, eliminating any encroachment that

DEP had discovered from Rock Eagle's merits brief. Bohler provided no

explanation for the relocation of the boundary line or why its revised signed

site plan was more accurate than its original signed site plan.

For the Corridor Study, the Board had asked Remington & Vernick to

work with Maris, Hartz's traffic consultant, to: (1) evaluate the existing and

proposed traffic conditions at five intersections and one traffic corridor near

the project; (2) identify specific improvements that could be implemented to

help mitigate impacts from the project on the traffic corridor; and (3) improve

overall service and delay at those intersections. Accordingly, Remington &

Vernick and Maris conducted joint field reconnaissance and collaborated in

refining and analyzing the traffic model that Hartz had originally submitted to

the Board. Based on their findings, Remington & Vernick concluded that

certain improvements were "warranted and necessary" at the intersection of

A-4009-19
28
19th Street and Waterfront Terrace because of the proposed project and other

area Lincoln Harbor development, and "should be instituted prior to the

issuance of any certificates of occupancy for the development." Those

improvements included optimizing traffic signal length and splits and

submitting a second phase plan of improvements that provided for upgraded

signal display, traffic striping, pavement markings, and traffic signal timing

changes for a new traffic pattern.

On March 10, 2022, DEP issued its "Waterfront Development Remand

Report" wherein it reevaluated traffic impacts, viewshed impacts, public

access and the project's impact on the Hudson River waterfront.

Pursuant to the CZM Traffic Rule, N.J.A.C. 7:7-16.12, DEP found that

the new Corridor Study

was based on an analysis of existing conditions at
future traffic volumes at specific locations;
comparison of traffic volumes in 2019 and 2020;
traffic projections for the Design Year 2025; the
Synchro Model of peak AM and PM highways hours
in 2019 and projected 2025; the Synchro Analyses of
existing traffic conditions; potential roadway and
signal improvements; and an analyses of [Maris's]
Synchro Analyses. According to the report, the 2025
traffic volumes included the 2019 volumes increased
by an annual traffic growth rate published by the New
Jersey Department of Transportation (NJDOT).

A-4009-19
29
The [Corridor Study] report concluded that
improvements at two (2) specific locations (19th
Street and Waterfront Terrace) are necessary to
maintain below level of service D. [2]

Thus, DEP declared that these "improvements" would be included as

new conditions in "the WFD modification permit" after remand. DEP stated:

"[t]hese conditions, in addition to the pre-existing conditions which will

continue in the WFD modification permit, that the applicant must work with

2
According to NJDOT's Roadway Design Manual, p. 2-7 (2015, including
baseline document change announcements to July 17, 2023, https://nj-
dot.nj.gov/transportation/eng/documents/RDM/):

The level of service concept places various traffic
flow conditions into 6 levels of service. These levels
of service, designated A through F, from best to worst,
cover the entire range of traffic operations that may
occur.

....

Level of Service D approaches unstable flow, with
tolerable operating speeds being maintained though
considerably affected by changes in operating
conditions. Fluctuations in volume and temporary
restrictions to flow may cause substantial drops in
operating speeds. Drivers have little freedom to
maneuver, and comfort and convenience are low, but
conditions can be tolerated for short periods of time.

See https://nj-dot.nj.gov/transportation/eng/documents/RDM/documents/
2015RoadwayDesignManual_20231226.pdf (last visited Dec. 3, 2024).
A-4009-19
30
and address all municipal traffic conditions and requirements, will ensure

compliance with the Traffic Rule."

Pursuant to the CZM High-Rise Structures Rule, N.J.A.C. 7:7-15.14,

DEP first found that, because Hartz had proposed the construction of two,

fourteen-story residential towers and a six-story parking garage, the project

contained both low-rise (one to five stories) and high-rise (six to sixteen

stories) structures. Thereafter, for the following reasons, DEP determined that

the project was "consistent" with the rule's subsections and no additional

conditions were required. 3

First, DEP explained that the project complied with N.J.A.C. 7:7-

15.14(b)(1) because "the proposed high-rise structures will be located in an

urban area of existing high-rise and high density settlements."

Second, the project complied with N.J.A.C. 7:7-15.14(b)(2) because "the

proposed high-rise structures are separated from coastal waters by a 50 ft.

setback as shown on the roof top plan submitted during the original

application."

3
N.J.A.C. 7:7-15.14(b)(5) does not apply. It states: "High-rise structures
outside of the Hudson River waterfront special area as defined by N.J.A.C.
7:7-9.46 shall not overshadow the dry sand beach between 10:00 A.M. and
4:00 P.M. between June 1 and September 20, and shall not overshadow
waterfront parks year round[.]" N.J.A.C. 7:7-15.14(b)(5).
A-4009-19
31
Third, the project complied with N.J.A.C. 7:7-15.14(b)(3) because,

based on a review of the roof top plan submitted
during the original application, . . . the total length of
the combined high-rise structures, from west to east,
will be 248 ft. in length and the combined high-rise
structures, from north to south, will be 228 ft. in
length. The longest lateral length of 248 ft. of the
combined high-rise structures is oriented
perpendicular to the main stem of the Hudson River.

Fourth, the project complied with N.J.A.C. 7:7-15.14(b)(4) because "the

proposed high-rise structures do not block the views currently enjoyed from

existing residential structures, public roads or pathways to the maximum

extent practicable." DEP explained:

On January 25, 2022, the permittee submitted
viewshed drone photos taken from near-by residential
buildings and public roads surrounding the project
site. The rendered photos show the view from each
specific building studied looking towards the Hudson
River. Viewshed photos from the following locations
were provided: Zerman Place, Troy Tower pool deck,
Troy Tower 11th floor, 19th Street and 18th Street,
18th Street, 18th and Lawrence Place, Chestnut Street
and 19th and Willow Street. Drone viewshed photos
were also provided from approximately the 8th floor
of The Gateway. The Gateway property is a 10-story
residential building located at 1700 Park Avenue
[Rock Eagle's building], immediately landward and
northwest of the subject site.

Based on its review of those photos, DEP determined that

A-4009-19
32
while some views of the Hudson River and the New
York City skyline are blocked due to the proposed
structures, a majority of the river and skyline's view is
still available along Harbor Boulevard. There's
currently an existing 16-ft. wide waterfront walkway
along the eastern and southern property boundaries of
the subject site. The view of the Hudson River and
the New York City skyline can be viewed from the
entire length of the waterfront walkway at this
location. The Department recognizes that views that
are blocked from the proposed structures are also
currently blocked by existing buildings of similar
height. The high-rise structures proposed are
consistent with the height of the surrounding
development.

Fifth, DEP determined that the project complied with N.J.A.C. 7:7-

15.14(b)(6) because "the proposed high-rise structures are in character with the

surrounding transitional heights and residential densities." DEP explained:

The Township of Weehawken is known for its high-
rise structures, which provides for views of the
Manhattan skyline. The proposed project is consistent
with the overall Lincoln Harbor (Atir) development
area, where buildings range from 4 stories to 10
stories high. Such residential and commercial
buildings include Hamilton Cove and the Sheraton
Lincoln Harbor hotel.

Sixth, DEP determined that the project complied with N.J.A.C. 7:7-

15.14(b)(7) because "the proposed high-rise structures do not have an adverse

impact on air quality, traffic, and existing infrastructure." DEP explained that,

in addition to its finding that the project had "no adverse impacts to traffic,"

A-4009-19
33
"there will be no adverse impact to air quality or existing infrastructure

because there is no significant impact to traffic."

And seventh, DEP determined that the project complied with N.J.A.C.

7:7-15.14(b)(8) because "the proposed high-rise structures are architecturally

designed so as to not cause deflation of the beach and dune system or other

coastal environment waterward of the structure." DEP explained: "As shown

on the approved site plans, no activities are authorized waterward. The

proposed high-rise structures will not cast shadows on any beaches or

waterward parks within the vicinity of the project area and will have no impact

to the Hudson River."

Pursuant to the CZM Public Access Rule, N.J.A.C. 7:7-16.9(a),

(k)(2)(iv)(1), and (r), and the Hudson River Waterfront Area Rule, N.J.A.C.

7:7-9.46, DEP noted that, since it had granted the 2010 permit, Hartz had

constructed the sixteen-foot-wide Waterfront Walkway on pilings on Lot 2.03,

and the walkway was accessible to the public. Hartz, however, had not yet

recorded the required public access walkway conservation easement that was

included as a condition in the 2010 permit. Thus, DEP determined that it

would modify the 2020 permit by including a new condition requiring Hartz

"to record a conservation restriction for the 30-ft. public access easement on

A-4009-19
34
the revised plan submitted." In addition, DEP declared that it would allow

"amenities such as planter boxes, benches, and seating areas" to be placed

within the easement area because such structures "provide[d] a public benefit"

and were "encouraged" within a public access easement.

In conclusion, based on its review of "the high-rise viewshed analyses, a

final traffic report, and a revised site plan," DEP determined in its Remand

Report that the supplemental information submitted by Hartz on remand

demonstrated the project's "compliance with the [CZM] traffic rule at N.J.A.C.

7:7-16.12, high-rise structures rule at N.J.A.C. 7:7-15.14. and the public access

rule at N.J.A.C. 7:7-16.9." Nevertheless, DEP required Hartz to "submit" an

application for "an Administrative WFD Upland IP modification" pursuant to

N.J.A.C. 7:7-27.6 and 27.7, in order "to incorporate [the] additional conditions

gathered from [the] supplemental information," that is, relating to traffic and

the creation of a conservation easement.

In an email to DEP on March 14, 2022, Rock Eagle's counsel requested

copies of all communications exchanged between DEP and Hartz since August

20, 2021, and all documents received and/or relied upon by DEP in reaching

its conclusions in the Remand Report. DEP provided the information to

counsel on March 15, 2022. Previously, Rock Eagle's counsel had been copied

A-4009-19
35
on emails between DEP and Hartz during the remand in November 2021,

December 2021, January 2022, and February 2022, with attached copies of a

site plan revised in May 2020, a subdivision plat, a shadow study, several new

photos depicting the proposed construction from various views, and

Remington & Vernick's Corridor Study.

Within a week, Rock Eagle filed the supplemental brief we'd permitted

in our remand order, arguing that, although our order had permitted DEP to

address "the encroachment questions and other issues identified in the DEP's

remand motion," the only issue identified was the encroachment. Thus, the

Department had violated our order by accepting and reviewing new documents

from Hartz prepared during the remand that went beyond encroachment issues,

specifically those documents supporting the project's compliance with the

CZM High-Rise Structures and Traffic Rules. In addition, Rock Eagle claims

DEP erred by failing to afford it and other interested parties the opportunity to

submit their own comments and data challenging the new documents. In

related arguments, it claims the Department's decision on the encroachment

issue was procedurally improper and based on unverified, unreliable

information, and that the new photos on which the Department relied do not

support its finding regarding the High-Rise Structure Rule, N.J.A.C. 7:7-15.14.

A-4009-19
36
In sum, Rock Eagle argues DEP's Remand Report, to the extent it addresses

any issues other than encroachment of the fifty-foot setback line, must be

disregarded and its determinations reversed because they were arbitrary,

capricious and unreasonable. 4

Hartz argues that Rock Eagle is a third-party objector and, thus, has no

standing to bring an administrative challenge against DEP's issuance of any

permit. We reject the argument as without merit. See In re Waterfront Dev.

Permit No. WD88-0443-1, Lincoln Harbor Final Dev., Weehawken, Hudson

Cnty., 244 N.J. Super. 426, 429, 437 (App. Div. 1990) (holding non-profit

environmental group had standing to challenge permit claiming proposed

project would obscure the scenic vista, "described as 'spectacular,'" of the New

York skyline from the Lincoln Tunnel Helix "now enjoyed by hundreds of

4
Rock Eagle also moved to strike DEP's Remand Report or, in the alternative,
to supplement the record, arguing DEP: (1) went beyond the scope of the
court's remand order by accepting a new site plan and other supporting
documents from Hartz that moved the easement line and provided more
information on traffic and high-rise structure issues; and (2) never provided
Rock Eagle or the public with notice of its intention to accept those documents
or with the opportunity to submit comments or opposition documents. Rock
Eagle requested an additional ninety days to allow it time to review the new
documents and to supplement the record with the comments it would have
submitted. We denied the motion to strike but reserved the motion to
supplement "for the merits panel to assess in its plenary review." We now
deny the motion to supplement the record.
A-4009-19
37
thousands of bus and car passengers each day. Although portions of the view

will remain intact if the project proceeds as planned, it appears that its

panoramic beauty will be substantially lost — except to the commercial

tenants of the two towers."). It also claims the documents submitted during

remand were prepared by licensed professional engineers and, therefore,

contained reliable and verifiable information fully addressing DEP's concerns.

DEP argues the findings in its Remand Report were well within the

scope of the court's remand order, which instructed it to address encroachment

questions and other issues it had identified in its remand motion. DEP further

claims it provided Rock Eagle with appropriate and timely notice of its remand

process and the additional documents it had received from Hartz. DEP claims

Rock Eagle had submitted comments outside any official comment period

before and intentionally chose not to do so during the remand process.

When an appellate court directs an administrative agency to take action,

"the appellate judgment becomes the law of the case and the agency is under a

peremptory duty not to depart from it." Lowenstein v. Newark Bd. of Educ.,

35 N.J. 94, 116-17 (1961). "An agency's powers on remand depend upon the

contents of the court's remand order, which the agency must obey precisely ."

Trantino v. N.J. State Parole Bd., 331 N.J. Super. 577, 606 (App. Div. 2000),

A-4009-19
38
aff'd as modified on other grounds, 166 N.J. 113, modified, 167 N.J. 619

(2001). Whether or not in agreement with the court, agencies have "a duty to

obey the mandate of [the Appellate Division] 'precisely as it is written.'" In re

Denial of Reg'l Contribution Agreement Between Galloway Twp. & City of

Bridgeton, 418 N.J. Super. 94, 100-01 (App. Div. 2011) (quoting Flanigan v.

McFeely, 20 N.J. 414, 420 (1956)). Even when an appellate court's decision is

"manifestly erroneous," those instructions "must be enforced as written, and

relief from its direction 'can be had only in the appellate court whose judgment

it is.'" Tomaino v. Burman, 364 N.J. Super. 224, 233 (App. Div. 2003)

(quoting In re Plainfield-Union Water Co., 14 N.J. 296, 303 (1954)).

We reject Rock Eagle's argument that the Department exceeded the

scope of our remand order. In its motion brief, the Department stated it sought

the remand to further develop the record, i.e., accept additional materials, and

then reconsider "the application in light of the Hudson River Waterfront

standards, including the arguments raised by [Rock Eagle]" in its merits brief.

The Hudson River Waterfront standards are found in N.J.A.C. 7:7-9.46.

The rationale behind that regulation provides:

The Hudson River waterfront area has historically
been, and is currently, heavily populated and
extensively developed. Development pressures are
intense in this area. Given its preexisting density of

A-4009-19
39
development, this rule seeks to encourage further
development if constructed to ensure the safety of
people and property in order to steer development
towards actively disturbed areas and away from
undisturbed areas of the coast. Further, this rule
serves to encourage redevelopment efforts in several
cities in the Hudson River waterfront area to increase
the economic and social vitality of these areas while
making wise use of existing footprints of development
and infrastructure. Building height requirements are
different for buildings in this special area than for
other areas of the coast in order to facilitate this
redevelopment and are balanced by requiring public
open space and visual access to the water through
other means.

The public access requirements for development in the
Hudson River waterfront area are intended to balance
the public trust rights of people to access the water
with site-specific safety needs. The rule facilitates the
completion of the Hudson River Waterfront Walkway,
which is intended to provide contiguous access to the
waterfront for the public in accordance with the Public
Trust Doctrine. . . .

[N.J.A.C. 7:7-9.46(g).]

Given those standards and the issues Rock Eagle raised in its merits

brief, we cannot find DEP expanded the scope of our remand order by

reevaluating the project's impact on traffic, viewshed, public access and its

effect on the Hudson River.

There is no question, however, but that the Department departed from

the mandate to address those issues "on appropriate notice to appellant Rock

A-4009-19
40
Eagle and any other interested parties." Although we do not find the

Department exceeded the scope of our remand order, there is no disputing that

the encroachment issue was the only one the Department mentioned

specifically in its motion. Copying Rock Eagle's counsel on some, but not all,

emails the Department sent to Hartz and making sure Hartz copied Rock

Eagle's counsel on documents Hartz submitted to the Department without

advising Rock Eagle of the issues the Department had apparently advised

Hartz, in telephone conferences and at least one meeting, it would review,

failed to provide Rock Eagle the "appropriate notice" of the issues as required

by our order.

Moreover, the Department simply ignored the well over one hundred

identified interested parties who had already complained to it, chiefly about

the project's potential to block their scenic views and its impact on the traffic

in what is clearly an already congested area and neighborhood. The

Department contends it provided those interested parties "constructive notice"

by its publication of the remand report and the provision of a 30-day public

comment period that commenced on publication of the notice in the March 17,

2022, NJDEP Bulletin. Even were we inclined to agree that "constructive

A-4009-19
41
notice" was "appropriate notice," which we do not, the 128-day remand period

had already ended by that time and jurisdiction returned to this court.

Although the better practice would have been for the Department to have

required Hartz to have re-noticed the local and municipal parties and all

property owners within 200 feet, the remand order made it incumbent on the

Department to have at least required actual notice to those interested parties

who had commented on Hartz's initial application. Cf. In re State & Sch.

Emps.' Health Benefits Comm'ns' Implementation of Yucht, 233 N.J. 267, 282

(2018) (noting that while "an agency's choice of action for providing notice

does not require adoption of a perfect practice . . . , the means of notice in

fulfillment of . . . statutory policy . . . must be designed to reasonably achieve

its intended purpose"). There was certainly sufficient time allotted to have

provided actual notice to those parties and to have allowed them to comment

on Hartz's new and revised submissions. If DEP harbored any concern on that

point, the solution was to have applied to this court, not to deny identified

interested parties actual notice.

Further, the CZM Rules require DEP to "[e]nsure opportunities for

public participation in coastal decision-making." N.J.A.C. 7:7-1.1(c)(7)(iv).

N.J.A.C. 7:7-24.3 requires waterfront development permit applicants to notify

A-4009-19
42
all property and easement owners within 200 feet of the development together

with local and county officials. 5 And, under N.J.S.A. 52:14B-3.1(a) of the

5
In its Remand Report, DEP required Hartz to "submit" an application for "an
Administrative WFD Upland IP modification" pursuant to N.J.A.C. 7:7-27.6
and 27.7, in order "to incorporate [the] additional conditions gathered from
[the] supplemental information." Under N.J.A.C. 7:7-27.5(a), an individual
permit "may be modified . . . through an administrative modification," which
applies to a change to a site plan or other document on which the original
authorization under a[n] . . . individual permit was based but which does not
alter the design or layout of the project. An administrative modification may
include:

1. Correcting a drafting or typographical error on a
plan or report;

2. Improving topographical or other data in order to
make the authorization or individual permit more
accurately reflect the site and/or the permitted
activities; or

3. Adding notes, labels, or other clarifying
information to the approved site plan, if required to do
so by the Department or another government entity.

[N.J.A.C. 7:7-27.5(c).]

N.J.A.C. 7:7-27.5(e) provides that a major technical modification under an
individual permit applies

to any change in a project authorized pursuant to the
authorization or individual permit, including any
associated change to an approved site plan or other
document, which is not addressed under (c) or (d)

A-4009-19
43
Administrative Procedure Act, "all interested persons are afforded reasonable

opportunity to submit data, views or arguments, orally or in writing, during

any proceedings involving a permit decision" (emphasis added). Such

presentations and submissions "provide an effective and efficient means for

third-party objectors to voice their concerns with the State officials who will

make the ultimate permitting decision." In re Riverview Dev., LLC, 411 N.J.

Super. 409, 425 (App. Div. 2010). Indeed, whether a third-party objector's due

process rights may be satisfied by an agency's review process depends in

significant part on the objector's ability to participate in the process. See In re

Freshwater Wetlands Statewide Gen. Permits, 185 N.J. 452, 471-74 (2006).

[minor technical modifications] above and that does
not require a new permit in accordance with (f) below.

Under N.J.A.C. 7:7-27.5(f)(7), DEP cannot issue a modification and the
permittee must submit a new application when "[a] change . . . would result in
impacts to a site not owned or controlled by the permittee."

DEP has characterized the traffic-related permit modifications as
"administrative in nature as they constitute improvements to other data that
make the permit more accurately reflect the permitted activities." See
N.J.A.C. 7:7-27.5(c)(2). Rock Eagle contends the Department "has essentially
issued a major technical modification to the permit," without public notice,
contravening both its own regulations and its jurisdiction on remand. We
express no opinion as to whether the permit modifications adding traffic
controls qualify as "administrative in nature" or whether they constitute a
change resulting "in impacts to a site not owned or controlled by the
permittee," requiring a new application. See N.J.A.C. 7:7-27.5(f)(7).
A-4009-19
44
It has long been settled law in this State that "government must 'turn

square corners' rather than exploit litigational or bargaining advantages."

W.V. Pangborne & Co. v. N.J. Dep't of Transp., 116 N.J. 543, 561 (1989).

Because we conclude the Department violated our remand order by failing to

provide "appropriate notice to appellant Rock Eagle and any other interested

parties" that it had determined to accept additional materials from Hartz in

support of the permit, specifically new aerial drone photos with superimposed

renderings of the project taken from nearby residential buildings and roads and

a new traffic study and then reevaluate the project's impact on viewshed,

public access and traffic — and that interested persons were also entitled to

submit data in opposition to the permit and have the Department consider their

views — see In re Issuance of Access Conforming Lot Permit No. A-17-N-

N040-2007, 417 N.J. Super. 115, 131 (App. Div. 2010) (explaining "an

expansive view should be taken of the obligation of State agencies to consider

information submitted by parties opposed to the grant of a governmental

approval"), we reverse the decision on remand and vacate the waterfront

development permit issued to Hartz.

We have considered whether a remand instead of reversal is the correct

course and have decided another remand would be inappropriate at this

A-4009-19
45
juncture. It is difficult, if not impossible, to review this record without

concluding DEP, to which we ascribe no bad faith or ill motive, accepted

additional, important information on remand — without any public notice —

to shore up its initial decision that Hartz had complied with N.J.A.C. 7:7-

15.14(b)(4), which would otherwise lack adequate support in the record. See

CBS Outdoor, Inc. v. Borough of Lebanon Plan. Bd./Bd. of Adjustment, 414

N.J. Super. 563, 586-87 (App. Div. 2010) ("One of the hallmarks of the 'turn

square corners' doctrine is that its application is not dependent upon a finding

of bad faith."). Simply stated, by failing to give interested parties notice that it

was accepting additional submissions from Hartz on traffic and viewsheds,

after which it would reconsider the permit under the Waterfront Development

standards, and that those persons were also entitled to make their views known

and to have them considered by the Department in rendering its decision on the

permit, DEP failed to "turn square corners" in its dealings with the public in its

conduct of our last remand. 6 See Pangborne, 116 N.J. at 561.

6
We recognize that the traffic issues were the subject of hearings before the
Weehawken Planning Board, which affects our consideration of "the
administrative process provided in this matter." See Freshwater Wetlands, 185
N.J. at 472 ("In determining whether the objectors received due process, it is
appropriate to consider the interplay between the DEP and Planning Board
hearings.").
A-4009-19
46
The CZM High-Rise Structures Rule, N.J.A.C. 7:7-15.14, applies only "to

structures which are more than six stories or more than 60 feet in height as

measured from existing preconstruction ground level." N.J.A.C. 7:7-15.14(a).

The rule does not ban these structures, but provides standards for development,

including for orientation and setbacks. N.J.A.C. 7:7-15.14(b) states:

1. High-rise structures are encouraged to locate in an
urban area of existing high density, high-rise and/or
intense settlements;

2. High-rise structures within the view of coastal
waters shall be separated from coastal waters by at
least one public road or an equivalent area (at least 50
feet) physically and visually open to the public except
as provided by N.J.A.C. 7:7-9.46;

3. Where the high-rise structure is a building or
complex of buildings that comprises both a low-rise
component(s) that is six stories or 60 feet or less in
height as measured from preconstruction ground level
and a component(s) that is more than six stories or
more than 60 feet in height as measured from existing
preconstruction ground level, the longest lateral
dimension of each component that is more than six
stories or more than 60 feet in height as measured
from existing preconstruction ground level must be
oriented perpendicular to the beach or coastal
waters . . . ;

4. To the maximum extent practicable, the proposed
structure must not block the view of dunes, beaches,
horizons, skylines, rivers, inlets, bays, or oceans that
are currently enjoyed from existing residential
structures, public roads, or pathways;

A-4009-19
47
....

6. The proposed structure must be in character with
the surrounding transitional heights and residential
densities, or be in character with a municipal
comprehensive development scheme requiring an
increase in height and density which is consistent with
all applicable sections of this chapter;

7. The proposed structure must not have an adverse
impact on air quality, traffic, and existing
infrastructure; and

8. The proposed structure must be architecturally
designed so as to not cause deflation of the beach and
dune system or other coastal environmental waterward
of the structure.

DEP's rationale behind the rule provides:

Considerable recent residential development along the
coast, from the Palisades to the barrier islands, has
taken the form the high-rise, high-density towers.
While conserving land, some high-rise structures
represent a visual intrusion, cause adverse traffic
impacts, and cast shadows on beaches and parks. This
rule seeks not to ban high rise structures, but to
provide criteria for their development at suitable
locations and in appropriate orientation with regard to
the coastline in the coastal zone.

[N.J.A.C. 7:7-15.14(d).]

Rock Eagle argues that even though the project meets the requirement of

N.J.A.C. 7:17-15.14(b)(3) in that the project's longest lateral dimension, from

A-4009-19
48
west to east of 248 feet (exceeding its north to south lateral line by twenty

feet) is perpendicular to the River, DEP was still required to find the two

proposed high-rise towers were designed in accordance with N.J.A.C. 7:17-

15.14(b)(4), so as "to not block," "[t]o the maximum extent practicable," the

existing views of the New York skyline and the Hudson River "currently

enjoyed from existing residential structures, public roads, or pathways."

Rock Eagle maintains Hartz's proposed offset arrangement of the towers

blocks 250 feet of the 350-foot-wide view, nearly 70 percent of the skyline,

and that there was sufficient land available to have allowed Hartz to have

located one tower behind the other or eliminate one tower in favor of

lengthening the other perpendicular to the River in accordance with renderings

it has provided on appeal, greatly reducing the towers' impact on the views

from neighboring streets and residential properties.

DEP argues the "maximum extent practicable" standard is different from

the alternatives analysis found in other environmental regulations, such as

N.J.A.C. 7:7-9.6(b) (alternatives analysis required before developing in

submerged vegetation habitat); N.J.A.C. 7:7-9.44(e) (alternatives analysis

required for linear development in wild and scenic river corridors); N.J.A.C.

7:7-9.47(k) (alternatives for Atlantic City intercept parking); N.J.A.C. 7:7A-

A-4009-19
49
10.2 and -16.9 (requiring alternatives analysis for freshwater wetlands

individual permit); N.J.A.C. 7:8-5.2(e) (alternatives analysis required for

stormwater waiver for certain developments). Unlike those cited rules,

according to DEP, the high-rise structures rule does not use the word

"alternatives" nor does it require the applicant to prepare an analysis

demonstrating alternate development configurations. DEP also asserts that

Rock Eagle could have submitted the design renditions in its merits brief

during the public comment period.

As DEP correctly claims, there is no definition for "maximum extent

practicable." In fact, when DEP was promulgating the stormwater

management rules in 2004, see 36 N.J.R. 670(a) and 781(a) (Feb. 2, 2004)

(adopting N.J.A.C. 7:8), commenters requested "a definition" of "maximum

extent practicable," 36 N.J.R. at 691 (comments 185-86), but DEP declared the

term is "fact-sensitive and cannot be reduced to a standard formula. The

reviewing agency's administrative discretion in determining compliance with

these rules will be guided by the goals of this chapter and its statutory

mandates." 36 N.J.R. at 691 (DEP's response to comments 185-86). DEP

explained that the term was "used to describe the expenditure of effort required

to achieve full compliance with the applicable standard, taking into account the

A-4009-19
50
specific circumstances of the development in question." 36 N.J.R. at 691

(DEP's response to comments 185-86).

In Delaware Riverkeeper Network v. New Jersey Department of

Environmental Protection, 463 N.J. Super. 96, 125 (App. Div. 2020), the court

noted that "[t]he 'MEP' [(maximum extent practicable)] standard has not been

precisely defined" for evaluating New Jersey Pollutant Discharge Elimination

System (NJPDES) general permits. The federal Environmental Protection

Agency told the court "that this phrase was intentionally left undefined 'to

allow maximum flexibility in . . . permitting'" and "should be applied in a site-

specific, flexible manner." Ibid.

In Riverview Development, 411 N.J. Super. at 411, the court was faced

with a challenge to a proposed high-rise development by local residents

asserting that the project would block their views of the Hudson River and

New York City skyline. The appellants were seeking a formal administrative

hearing, which the court rejected but found the CZM High-Rise Structures

Rule "undoubtedly embrace[d] a goal of protecting scenic views of the

waterfront," and that goal of protection was qualified by the phrase "to th e

maximum extent practicable." Id. at 435. The court explained that the

"qualification reflects a balanced regulatory sensitivity to the physical,

A-4009-19
51
economic, and other pragmatic constraints that affect waterfront construction."

Ibid.

The court in Riverview Development also noted that DEP had asked the

applicant to provide a "view shed analysis [that] would depict anticipated

views of the proposed project from various nearby locations." Id. at 414. It

explained, quoting N.J.A.C. 7:7-4.2(a)(5), that "[a] view shed analysis consists

of a group of '[p]hotographs showing the specific location of the proposed

development taken from a minimum of four different locations and labeled as

to orientation.'" Id. at 414 n.2. The requirement of submitting "[p]hotographs

showing the specific location of the proposed development taken from a

minimum of four different locations and labeled as to orientation" was added

to the application process for coastal zone permits effective October 1995, 27

N.J.R. 3976(a) (Oct. 15, 1995), but it was recodified and rewritten out in 2015,

47 N.J.R. 1392(a) (July 6, 2015), and in 2018, 50 N.J.R. 361(a) (Jan. 16, 2018)

(see N.J.A.C. 7:7-23.2, general application requirements). Hartz filed its

application with DEP in 2019 and its revised application in 2020.

Although we agree with the Department that the "maximum extent

practicable" review standard in N.J.A.C. 7:7-15.14(b)(4) does not require DEP

to demand a formal alternatives analysis from a permit applicant as to whether

A-4009-19
52
and to what extent the orientation of the proposed development blocks the

neighbors' scenic views, see In re Appeal by Progressive Cas. Ins. Co., 307

N.J. Super. 93, 102 (App. Div. 1997), we view the Department's defense as

something of a straw man argument as Rock Eagle has not contended a formal

alternatives analysis is required. 7

Rock Eagle's argument is that DEP never considered the project's

compliance with N.J.A.C. 7:7-15.14(b)(4) in its 2020 Environmental Report, a

fact confirmed by the record. Hartz's January 2020 environmental impact

statement/compliance statement declared the project "importantly does not

block any views of the River or skyline." And views are not mentioned at all

in the Department's analysis of Hartz's compliance with the high-rise structures

rule, N.J.A.C. 7:7-15.14, in the 2020 waterfront development individual permit

environmental report.

Instead, as DEP explains in its brief: "Pursuant to DEP's long-standing

rule interpretation," it "[i]n essence, . . . interprets (b)(3) to work in

conjunction with (b)(4)." Thus, the Department concludes, "if a proposed

7
See Kaye v. Rosefielde, 432 N.J. Super. 421, 478, n.30 (App. Div. 2013)
(explaining "the technique of setting up an argument that does not exist and
then refuting that misrepresented argument is called the 'straw man' fallacy")
(quoting Canesi ex rel. Canesi v. Wilson, 158 N.J. 490, 518 (1999) (O'Hern, J.,
concurring)), rev'd on other grounds, 223 N.J. 218, 238 (2015).
A-4009-19
53
development meets the perpendicular orientation requirement imposed by

N.J.A.C. 7:7-15.14(b)(3), DEP finds it has addressed the impacts to view sheds

from existing structures to the maximum extent practicable pursuant to

N.J.A.C. 7:7- 15.14 (b)(4)." DEP asserts in its brief that because "the tallest

components were oriented perpendicular to the waterway, were consistent with

the height of surrounding buildings, and the pre-existing Walkway provided

ongoing views, the Project also did not block existing views to the maximum

extent practicable."

Of course, "[t]he grounds upon which an administrative order must be

judged are those upon which the record discloses that the action was based , not

an after-the-fact [statement] purporting to explain the administrative agency's

decision." In re Petition of Elizabethtown Water Co., 107 N.J. 440, 460 (1987)

(quoting Sec. & Exch. Comm'n v. Chenery Corp., 318 U.S. 80, 87 (1943)).

"An appellate brief is no place for an agency to try and rehabilitate its actions."

In re N.J.A.C. 7:1B-1.1 et seq., 431 N.J. Super. 100, 139 (App. Div. 2013).

As we understand the Department's explanation for the absence of any

discussion of the project's impacts on neighboring views in the 2020 permit

decision, the Department concluded that because the project met the

requirements in N.J.A.C. 7:7-15.14(b)(3), it necessarily also met the

A-4009-19
54
requirements of N.J.A.C. 7:7-15.14(b)(4). Thus, it simply, and improperly,

read (b)(4) out of existence, failing to require Hartz to demonstrate in 2020

that "[t]o the maximum extent practicable," its "proposed structure" did not

"block the view" of the Hudson River or New York skyline "that are currently

enjoyed from existing residential structures, public roads, or pathways ." See

DKM Residential Props. Corp. v. Twp. of Montgomery, 182 N.J. 296, 307

(2005) ("When interpreting a statute or regulation, we endeavor to give

meaning to all words and to avoid an interpretation that reduces specific

language to mere surplusage.").

We "extend substantial deference to an agency's interpretation of its own

regulations, reasoning that 'the agency that drafted and promulgated the rule

should know the meaning of that rule.'" In re Orban, 461 N.J. Super. 57, 72

(App. Div. 2019) (quoting In re Freshwater Wetlands Gen. Permit No. 16, 379

N.J. Super. 331, 341-42 (App. Div. 2005)). An agency may not, however, "use

its power to interpret its own regulations as a means of amending those

regulations or adopting new regulations." Venuti v. Cape May Cnty. Constr.

Bd. of Appeals, 231 N.J. Super. 546, 554 (App. Div. 1989). "[N]o matter how

great a deference the court is obliged to accord the administrative

determination which it is being called upon to review, it has no capacity to

A-4009-19
55
review at all unless there is some kind of reasonable factual record developed

by the administrative agency and the agency has stated its reasons grounded in

that record for its action." In re Issuance of a Permit by Dep't of Env't Prot. to

Ciba-Geigy Corp., 120 N.J. 164, 173 (1990) (quoting State v. Atley, 157 N.J.

Super. 157, 163 (App. Div. 1978)).

Any review of this record makes it readily apparent that the Department

failed to make any finding in issuing the 2020 permit that Hartz's project

complied with the requirements of N.J.A.C. 7:7-15.14(b)(4), and that the

record, as it existed when the Department issued the permit, lacked sufficient

evidence to allow it to do so. See In re Proposed Quest Acad. Charter Sch. of

Montclair Founders Grp., 216 N.J. 370, 385 (2013) (explaining "the arbitrary,

capricious, or unreasonable standard applicable in the review of administrative

agency decisions subsumes the need to find sufficient support in the record to

sustain the decision").

Hartz's supplementation of the record on remand with new street and

aerial drone photos with superimposed renderings of the project taken from

near-by residential buildings and roads, including Rock Eagle's building —

without the opportunity for interested parties to take their own photos of their

own views for submission to and evaluation by the Department — allowed the

A-4009-19
56
Department to make new findings, and in essence, to allow Hartz to backfill its

permit application without public notice.8 It was not our intent in granting the

Department's request to remand for our order to become "an instrument of

mischief"; we shall not allow it to continue. See CBS Outdoor, 414 N.J.

Super. at 587.

Our disposition makes discussion of Rock Eagle's remaining issues

unnecessary. The decision on remand is reversed and the individual waterfront

permit, as modified, is vacated in its entirety.

Reversed.

8
We note those submissions, which Rock Eagle claims are "cherry-picked,"
providing a distorted vision of the views affected from neighboring residential
buildings, and no views from the elevated section of Park Avenue, a public
street, only allowed the Department to conclude that "while some views of the
Hudson River and the New York City skyline are blocked due to the proposed
structures, a majority of the river and skyline's view is still available along
Harbor Boulevard," a road owned by Hartz, and that the views of walkers and
joggers along the Hudson River Waterfront Walkway of the River and the New
York skyline on the river side of the project, remain unobstructed.
A-4009-19
57

---