# Kiewit Offshore Services, Ltd. v. U.S. Department of Labor

> District Court, S.D. Texas · January 25, 2023

URL: https://www.frixlaw.com/law-library/cases/10676233

## Case

- **Court:** District Court, S.D. Texas
- **Decided:** January 25, 2023
- **Opinion:** 100trialcourt
- **Cited by:** 0 later opinions in the Frix Law Library

## Citator (automated)

- No negative treatment found by the automated citator. That is not the same as a confirmation that the case is good law; read the citing cases.
- Full citator and citing cases: https://www.frixlaw.com/law-library/cases/10676233

## Opinion text

Southern District of Texas
ENTERED
IN THE UNITED STATES DISTRICT COURT January 25, 2023
FOR THE SOUTHERN DISTRICT OF TEXAS ee
HOUSTON DIVISION
KIEWIT OFFSHORE SERVICES, §
§
Plaintiff, §
§
v. § CIVIL ACTION NO. 4:22-cv-03716
§
U.S. DEPARTMENT OF LABOR, ef ai., §
§
Defendants. §
§
§
§
§
§

ORDER ON PRELIMINARY INJUNCTION
Pending before the Court is the Plaintiff Kiewit Offshore Services, Ltd.’s (“Plaintiff’ or
“Kiewit”) Motion for Preliminary Injunction (Doc. No. 4-2) against Defendants U.S. Department
of Labor (““DOL” or “Labor Department’); Martin J. Walsh (“Walsh”), Secretary of the U.S.
Department of Labor; the Employment and Training Administration (“ETA”); and Brent Parton
(“Parton”), Principal Deputy Assistant Secretary of Employment and Training Administration
(collectively, “Defendants”). Defendants responded in opposition (Doc. No. 19) and Plaintiff
replied (Doc. No. 21). Having considered Plaintiff's Motion, the supporting declarations and
exhibits, and other evidence and argument presented to the Court, the Court hereby DENIES
Plaintiff's Motion for Preliminary Injunction.

I. Background
This dispute centers upon whether the DOL’s denial of Plaintiff's request for labor
certifications in the H-2B non-immigrant visa process violates the Administrative Procedure Act
(“APA”).
Plaintiff is one of the largest construction and engineering firms in North America and the
largest provider of integration services on floating platforms for the oil and gas industry. (Doc.
No. 4-2 at 2, 4). Plaintiff employs more than a thousand United States workers in various trades
such as pipe fitters, pipe welders, structural fitters, and structural welders. (/d. at 4).
In 2021, Plaintiff was approached by New Fortress Energy Inc. (““NFE”) to build liquid
natural gas (“LNG”) production facilities that could result in faster delivery of LNG to the market.
This initial project was awarded to Plaintiff in July 2021 with a two-year time frame for
delivery (“Project 1”). In this project, Plaintiff was contracted to retrofit existing offshore oil rigs
to work as LNG facilities. @d.). In February 2022, Russia invaded Ukraine, which impacted the
delivery of LNG internationally. (/d.). In light of the projected increase in demand for LNG, NFE
requested that Plaintiff take on two additional projects designed to enable more LNG production
domestically. (“Project 2” and “Project 3”). These projects entailed similar work on two additional
facilities similar to Project 1. (/d.). Projects 2 and 3 were scheduled to be completed in April 2023.

According to Plaintiff, there is “substantial overlap” between the three projects. (/d. at 5).
Projects 1 and 2 will overlap for eight months, from November 2022 to June 2023. (/d.). For six
of these months, from January 2023 to June 2023, all three projects will overlap. (/d.). Since there
is overlap between Projects 1, 2, and 3 (collectively, the “Projects”), Plaintiff contends that despite

its best efforts, it could not fill the demand for labor on these projects with workers in the United
States. (Ud.).
To address this gap, Plaintiff applied for a temporary labor certification to secure foreign
labor through the H-2B visa program. That program is administered in part by the DOL, as well
as the Department of Homeland Security (“DHS”) and United States Citizenship and Immigration
Services (“USCIS”). Ud. at 6). To begin the H-2B process, an employer must first secure a
temporary labor certification from the DOL by submitting Form ETA-9142B. (7d. at 7). This form
requires employers to show that it has tried, but failed, to fill positions with workers from the
United States and that this country’s workers will not be adversely affected by filling the positions
with H-2B workers. (/d.). The present case centers around this first step in the H-2B process.
Second, once DOL certifies the employer’s request for temporary employment certification, the
employer must file Form I-129, Petition for a Nonimmigrant Worker, with USCIS, which has the
ultimate authority to determine eligibility for the visa under applicable regulations. (/d.). Third,
following approval from USCIS, any potential worker seeking an H-2B outside the United States
must secure a visa from the Department of State (“DOS”). Ud). Finally, once a foreign worker
secures a visa from DOS, the worker must be admitted to the United States by USCIS under H-2B
status to begin work. (/d.).
As part of the initial steps of securing temporary foreign labor through the H-2B visa
program, Plaintiff filed four applications with supporting evidence and documentation with the
DOL seeking: (1) 150 structural fitters, (2) 50 pipe welders, (3) 125 structural welders, and (4) 125
pipe fitters. Ud. at 10). Once filed with the DOL, these applications were initially reviewed by a
certifying officer (“CO”). After reviewing Plaintiffs applications, the CO sent Plaintiff a Notice
of Deficiency for each application, that identified perceived weaknesses in Plaintiff's applications.

These notices identified various instances where Plaintiff failed to establish that the jobs it intended
to fill with foreign workers were temporary and the basis for the number of workers it was
requesting. (/d. at 11). Plaintiff was given the opportunity to supplement its initial applications and
responded by providing additional evidence and explanations based on the noted deficiencies.
(Ud.).
After considering the additional evidence, the CO then issued four Final Determinations
that denied each of Plaintiff's applications. Each concluded that Plaintiff failed to show that its
need was temporary in nature. (/d.). Plaintiff appealed all four denials to DOL’s internal appellate
review body, the Board of Alien Labor Certification Appeals (“BALCA”). BALCA appeals are
adjudicated by the Office of Administrative Law Judges. A BALCA appeal is heard by an
administrative law judge (“ALJ”) who considers whether the CO’s Final Determinations were
arbitrary and capricious.! On appeal, an ALJ affirmed the CO’s decisions denying Plaintiff's
applications and found the CO’s determinations “reasonable” under the arbitrary and capricious
standard. (/d.).
Plaintiff now seeks a preliminary injunction ordering DOL to grant its requested H-2B
labor certifications. (Doc. No. 4-2 at 30). Specifically, it argues that the DOL acted arbitrarily and
capriciously in violation of the APA by (1) applying an incorrect, “but-for” standard when
considering Plaintiff's request and (2) ignoring or misinterpreting evidence Plaintiff presented

' When conducting an administrative review of a CO’s decision in an H-2B appeal, BALCA “must review the CO’s
determination only on the basis of the Appeal File, the request for review, and any legal briefs submitted” and must
either affirm the CO’s determination, reverse or modify the CO’s determination, or remand to the CO for further
action. 20 C.F.R. § 655.51(e); (Doc. No. 1-2 at 12-13), While the relevant regulations do not define a standard of
review to be applied in administrative review, BALCA has generally adopted the arbitrary and capricious standard
when reviewing the decision of a CO. (Doc. No. 1-2 at 12-13). To overcome the CO’s denial, the ALJ must find that
each of the CO’s findings and conclusions were arbitrary, capricious, an abuse of discretion, or otherwise not in
accordance with the law. (/d. at 13). If the ALJ finds any of the CO’s findings and conclusions reasonable, the ALJ
affirms the decision. (/d.).

about the temporary and peakload nature of its labor needs. (/d. at 3). Defendants responded in
opposition (Doc. No. 19) and Plaintiff replied (Doc. No. 21).
I. Legal Standard
A preliminary injunction is an extraordinary remedy that should only be granted if the
movant has clearly carried the burden of persuasion on all four factors. Lake Charles Diesel, Inc.
v. Gen. Motors Corp., 328 F.3d 192, 196 (Sth Cir. 2003). The movant need not prove its entire
case. Lakedreams v. Taylor, 832 F.2d 1103, 1109 (5th Cir. 1991). To obtain a preliminary
injunction, the movant must show: (1) a substantial likelihood they will prevail on the merits, (2)
a substantial threat that they will suffer irreparable injury if the injunction is not granted, (3) their
substantial injury outweighs the threatened harm to the party whom they seek to enjoin, and (4)
granting the preliminary injunction will not disserve the public interest. City of El Cenizo, Texas
v. Texas, 890 F.3d 164, 176 (Sth Cir. 2018).
I. Analysis
A. Likelihood of Success on the Merits
Plaintiff argues that it is likely to succeed on the merits because DOL’s denial of its
applications is arbitrary and capricious in violation of the APA. (Doc. No. 4-2). Specifically,
Plaintiff claims that DOL (1) applied an incorrect but-for standard in their determination and (2)
misinterpreted and failed to consider the evidence it presented concerning its temporary labor force
needs. (/d.). In response, the DOL contends it applied the correct standard of review in both the
Final Determinations and the BALCA opinion and rationally considered the totality of the
evidence submitted when it denied Plaintiffs applications. (See Doc. No. 19).

1. Whether DOL Applied the Correct Stadard of Review
Plaintiff first argues that the DOL acted arbitrarily and capriciously by applying a “but-
for” cause standard without authority or precedent.” (Doc. No. 4-2 at 15). Specifically, Plaintiff
focuses on a sentence from the BALCA opinion that states: “[a]lthough the war in Ukraine is
causing a higher demand of LNG, Employer has not shown that but for the war, it would not have
a need for supplemental workers.” (Doc. No. 1-2 at 15) (emphasis added). Based on this single
sentence, Plaintiff contends that DOL applied the incorrect standard and erroneously required that
they show that the Russia-Ukraine war was a “but-for” cause of their peakload labor need. (Doc.
No. 4-2 at 14). Plaintiff contends that the relevant regulations—8 C.F.R. § 214.2(h)(6)(ii)(B) and
20 C.F.R. §§ 655.6—only require that an employer show that a peakload need exists, not why the
peakload need is occurring. (/d. at 15).
In response, Defendants contend DOL did not apply an improper “but-for” standard.
Defendants point to the BALCA opinion, where the ALJ concluded that Plaintiff failed to establish
its needs were temporary in nature as required by 20 C.F.R. § 655.6, which outlines that employers
seeking certification must establish temporary need. 20 C.F.R. § 655.6(a)-(c); (Doc. No. 1-2 at
13). That regulation specifies that an employer seeking certification for H-2B visas must establish
its temporary need as a one time occurrence, seasonal, peakload, or intermittent. 20 C.F.R. §

2 Separately, Plaintiff also argues that DOL “impliedly applied” a “bright line limitation” that the length of a peakload
need period must be nine months or less. (Doc. No. 4-2 at 19). Despite Plaintiffs insistence that this is a “tortured
area of law,” Defendants contend that Plaintiff misconstrued DOL’s position. This Court agrees. First, nowhere in
either the Final Determinations or BALCA opinion is a nine month, bright line limitation applied or “impliedly
applied,” as Plaintiff argues. (See Doc. No. 1-2). Plaintiff is unable to cite to any instance of this limitation being
applied. Second, Plaintiff attested under penalty of perjury that its period of need was nine months. (Doc. No. 19 at
20). DOL, based on the totality of the evidence, determined that Plaintiff's need appeared to be ongoing and would
last beyond the nine months it purported to have a peakload need. As Defendants stated in their brief, “[t]he
applications were not denied simply because Plaintiff's need appeared to be beyond nine months” but rather because
Plaintiff failed to establish its need was only within those nine months. (/d.). Furthermore, while length of time may
have been a factor DOL considered in its determinations, it was no way dispositive. The totality of the evidence and
discussion show that Plaintiff failed to meet its burden to show a short term need. There is thus no reason for the Court
to consider further argument on this issue.

655.6(b). Defendants further contend that DOL denied Plaintiffs applications after evaluating its
evidence and concluding—based on 20 C.F.R. § 655.6—hat it failed to establish a peakload need,
justify its requested dates of need, and demonstrate the temporary nature of the need. □□□□□□
Moreover, since Plaintiff, itself, explained that the war in Ukraine was a motivation reason for the
company’s peakload need, Defendants contend the ALJ included the “but-for” sentence because
Plaintiff had failed to explain how this need driven by the war would “end in the near, definable
future” if Plaintiff also anticipates it may have future “unexpected” and additional projects. (Doc.
Nos. 4-2 at 11). Thus, Defendants conclude that the DOL reasonably found that the evidence
Plaintiff submitted regarding the war in Ukraine showed a continuous, rather than temporary, need
to fill ongoing contracts. (Doc. No. 1-2 at 14).
When the DOL reviews H-2B registrations, the central question is whether the employer
has shown its need for additional workers is temporary. DHS regulations provide an operative
definition of “temporary” work for the purposes of H-2B eligibility. Although DHS does not
provide an explicit definition of “temporary” employment, it notes that employers must show that
its needs are for “a limited period of time,” that they will end in the “near, definable future,” and
that “[g]enerally, the period of time will be limited to one year or less.” See 8 C.F.R. §
214.2(h)(6)(4i)(B).
An employer seeking certification has the burden of showing its need for workers is
temporary and that the request is a one-time occurrence, seasonal, peakload, or intermittent need.
20 C.F.R. § 655.6(a). Plaintiff sought to have its applications approved under the category of
peakload. To establish a peakload need, an employer must demonstrate: (1) the employer regularly
employs permanent workers to perform the services of labor at the place of employment; (2) the
employer needs to supplement its permanent staff at the place of employment on a temporary basis

due to a short-term demand; and (3) the temporary additions will not become a permanent part of
the employer’s operation. 8 C.F.R. § 214.2(h)(6)(ii)(B)(3). The CO rejected Plaintiff's applications
—and the ALJ affirmed—because Plaintiff failed to establish its job opportunity was temporary
in nature as required by 20 C.F.R. § 655(a)-(b) and failed to sufficiently establish a peakload need,
justify its requested dates of need, and explain how it determined the number of workers needed
as required by 8 C.F.R. § 214.2(h)(6)(ii)(B)(3). (Doc. No. 1-2 at 13-14).
The Court does not find that DOL applied the incorrect standard of review. Contrary to
Kiewit’s argument that DOL erroneously applied a but-for standard, the Final Determinations and
BALCA opinion clearly considered the evidence based on the standards set out in 20 C.F.R. §§
655.6(a) and 8 C.F.R. § 214.2¢h)(6)(ii)(B).
In both the Final Determinations and BALCA opinion, the CO and ALJ consistently
weighed Plaintiffs evidence against the proper relevant regulatory standards. (Doc. No. 1-2 at 14).
For example, the BALCA opinion opens with a lengthy summary of the CO’s findings based on
the relevant regulations. (/d. at 2-13). The opinion then proceeds to discuss the basis of DOL’s
ultimate decision, which was that Plaintiff failed to establish a temporary, peakload need in
accordance with 20 C.F.R. § 655.6(a) and 8 C.F.R. § 214.2(h)(6)(ii)(B), the very regulations that
Plaintiff contends DOL deviated from. (/d.).
In addition to discussing the relevant regulations broadly as the basis of its decision, the
BALCA opinion also considers whether Plaintiff's evidence meets the burdens in both 20 C.F.R.
§ 655.6(a) and 8 C.F.R. § 214.2(h)(6)(ii)(B) separately. For instance, in holding that Plaintiff failed
to establish a need that was truly temporary in accordance with 20 C.F.R. § 655.6(a), the ALJ
determined that Plaintiff's evidence, including its charts, a topic addressed below, illustrate a
continuous need, rather than a temporary one. (/d. at 16-17). Based on evidence, the ALJ then

concluded that such a continuous need did not satisfy the temporariness requirement in 20 C.F.R.
§ 655.6(a). (Id.). Similarly, in accordance with the peakload need test set out in 8 C.F.R. §
214.2(h)(6)(ii)(B), the ALJ acknowledged that there was no dispute that Plaintiff satisfied the first
element of the peakload need test since its extensive payroll records showed that it regularly
employs permanent structural fitters, structural welders, pipe fitters, and pipe welders. (/d.). The
central question on appeal was thus “whether [Plaintiff] has established that its needs temporarily
supplement its existing staff due to a short-term demand, and that the supplemental staff will not
become a permanent part of its operations,’ which is the second prong of 8 C.F.R. §
214.2(h)(6)(ii)(B). (Id.). The ALJ then analyzed the defects identified by the CO for each position
and how the evidence failed to establish a peakload need and that the job opportunities were
temporary in accordance with 8 C.F.R. § 214.2(h)(6)(ii)(B) and 20 C.F.R. § 655.6(a). Ud. at 5, 15,
17).
By fixating on the sentence mentioning the Ukrainian war and allegedly applying a “but-
for” standard, Plaintiff mistakenly has focused on the forest while forsaking the need to focus on
the trees. Nowhere in the BALCA opinion does DOL appear to base its decision using a “but-for”
standard. The Court acknowledges the phrasing of the sentence is less than desired and that this
sentence, taken on its own, has the potential to suggest DOL applied the incorrect standard in its
analysis. Nevertheless, the inclusion and wording of that sentence alone was not dispositive nor
critical to DOL’s final determination and analysis. Outside of this sentence, the remainder of the
BALCA opinion demonstrates that it weighed Plaintiff's evidence against the standards set by the
relevant regulations. It did not use a “but-for” standard. The DOL appears to consistently consider
the evidence as proving or failing to prove a peakload need or establishing or failing to establish
that Plaintiffs job opportunities are temporary in nature. The BALCA decision reiterates the CO’s

findings that Plaintiff failed, based on the totality of the evidence, to establish that its needs were
temporary was supported by the facts. Thus, despite the inclusion of this sentence, the DOL clearly
came to its conclusion and denied Plaintiff's applications on the basis of the relevant regulations.
Thus, the Court finds that DOL did not apply an improper “but-for” standard and adhered to the
relevant regulations.
2. Whether Defendants Misinterpreted Plaintiff's Evidence
Plaintiff also contends that Defendants erroneously misinterpreted and disregarded data it
provided to support its requests for certification, which was arbitrary and capricious. (Doc. No. 4-
2 at 17). In its applications, responses to the Notices of Deficiency, and requests for administrative
review, Plaintiff attached a significant amount of supporting evidence. Plaintiff, however,
specifically takes issue with how DOL considered the: (1) evidence surrounding the nature and
operations of Plaintiff's business; (2) charts for each employee position that show Plaintiff's
projected labor needs compared with its average needs during non-peakload periods; and (3)
payroll records to establish the permanency of currently employed workers in the positions
requested. In response, Defendants argue that DOL considered the totality of the evidence and
provided a reasoned and rational explanation for how Plaintiff fell short of meeting its burden.
(Doc. No. 19 at 20).
The petitioning employer has the burden to provide sufficient evidence and an explanation
of its business operations and need to demonstrate eligibility for the immigration benefit it seeks.
8 U.S.C. § 1361. When analyzing whether Defendants improperly misinterpreted or disregarded
evidence arbitrarily and capriciously in violation of the APA, this Court may only consider
“whether the decision was based on a consideration of the relevant factors and whether there has
been a clear error of judgment.” See City of Shoreacres v. Waterworth, 332 F.Supp.2d 992, 1004

10

(S.D. Tex. 2004), aff'd, 420 F.3d 440 (Sth Cir. 2005). This Court is not permitted to reweigh the
evidence. Jd.
a. Plaintiff's Evidence About the Nature and Operations of its Business
First, Plaintiff contends that DOL improperly considered its evidence about the nature and
operations of the business. (Doc. No. 4-2 at 21). Specifically, it argues that DOL’s analysis was
“replete with errors,” “focused on irrelevant evidence,” and that DOL conducted an “analysis that
ignored substantial evidence in the record as a whole.” (/d.). Based on the administrative record,
the CO requested Plaintiff to provide background information about Plaintiff's business in one of
its Notices of Deficiency so that it could explain the change in dates of need. (Doc. No. 1-2 at 6).
Plaintiff complied by submitting a background summary document with information about its
employee programs and various company initiatives. (Doc. No. 4-2 at 21). Once submitted, the
CO found that that the evidence submitted by Plaintiff “appeared to read like an employer manual”
and provided an “at a glance reference to [Plaintiff]’s plans and procedures...but does not
demonstrate a temporary need.” (Doc. No. 1-2 at 5).
The Court does not find this conclusion to be a clear error of judgment. As an initial matter,
it is Plaintiff's burden, as the petitioning employer, to provide sufficient evidence, an explanation
of its business operations, and how this evidence and explanation relate to its temporary need. In
the CO’s Notices of Deficiency, a disclaimer reads, “Note: If the submitted document(s) and its
relationship to the employer’s need is not clear to a lay person, then the employer must submit an
explanation of exactly how the document(s) support its requested dates of need.” (See Doc. No.
30-7 at 49). Here, although Plaintiff responded to the CO’s request, it failed to explain why the
evidence was relevant. In its briefs, DOL also points out that “it is unreasonable to place that
burden on the CO, who lacks technical expertise in Plaintiff's specific business operations.” (Doc.

11

No. 19 at 21). This Court agrees. Defendants properly considered Plaintiff's evidence—it simply
came to a conclusion that Plaintiff did not prefer, at least in part, because of Plaintiff's own lack
of a cogent explanation. This does not constitute clear error.
b. Plaintiff?s Charts In Support of Its Claim of Temporary Need and Duration of Need
Plaintiff claims that to demonstrate its peakload need, Plaintiff provided a series of charts
showing its needs for each type of worker encompassing a period of 18 months from July 2022 to
December 2023, with its peak need spanning nine months from October 2022 through July 2023.
(Doc. Nos. 30-8 at 288 (Structural Fitter Chart); 30-13 at 27 (Pipe Welder Chart); 30-22 at 176
(Structural Welder Chart); 30-40 at 39 (Pipe Fitter Chart). Each chart appears to demonstrate how
many workers Plaintiff predicted needing compared to the average number of workers employed.
(Id.). In the Final Determinations, the CO found that three out of four charts Plaintiff provided—
specifically for structural fitters, pipe welders, and pipe fitters—showed a continuous need for
supplemental workers rather than a temporary one. (See Doc. Nos. 30-8 at 288; 30-13 at 27; 30-
40 at 39). Moreover, although the chart for structural welders addressed the temporariness
requirement provided in the regulations on its own, the CO found that Plaintiff failed to explain
why its period of need and project start dates did not align. (Doc. No. 1-2 at 17). Without a proper
explanation for this discrepancy, the CO concluded that Plaintiffs need for structural welders was
also ongoing, rather than short term, even though the chart appeared to support the temporariness
of the application. (/d.).
On appeal, each chart was evaluated individually, beginning with the charts concerning
structural fitters, pipe welders, and pipe fitters. The ALJ found that the structural fitters evidence
demonstrated a need for more structural fitters than its usual average staff in 17 out of 18 months
depicted. (/d. at 16). The pipe welder and pipe fitter charts demonstrated a similar pattern, with a

12

need for 17 out of 18 months and 18 out of 18 months, respectively. (/d.). In other words, Plaintiff
appeared to need additional workers even in months that were categorized by Plaintiff as off-peak.
Since Plaintiff appeared to need “more workers than it permanently staffs both before and after the
alleged period of need,” the ALJ concluded that Plaintiff failed to establish a temporary peakload
need for structural fitters, pipe welders, and pipe fitters. (/d.). In other words, the ALJ affirmed the
CO’s findings that Plaintiffs need for these three positions was continuous, rather than temporary,
as required by the relevant regulations. This Court also does not find that DOL improperly
disregarded or ignored Plaintiff's evidence concerning structural fitters, pipe welders, and pipe
fitters. Since DOL came to its conclusion based on the evidence—which depicted a need for
additional workers for 17 months or more out of the 18 month period shown on the chart—a
finding by DOL that Plaintiffs requests were for a continuous need rather than temporary one was
reasoned and not in clear error.
The Court also does not find that DOL improperly evaluated evidence concerning
structural welders. First, the ALJ noted that the structural welder chart differed from the other
charts. Based on the structural welder chart, Plaintiff did not project needing more workers than it
permanently staffs during off-peak months. (/d. at 17). In other words, the structural welder chart
was the only one of the four that appeared, on its own, to address the temporariness requirement
set out in the relevant regulations. (/d.).
Upon closer examination, however, the ALJ found a discrepancy between Plaintiffs period
of need for structural welders and the project start dates. (Ud. at 17). Plaintiff requested 125
structural welders beginning in October 2022. (/d.). Plaintiff, however, had previously represented
that the alleged reason for needing additional welders was because of Projects 2 and 3, which were
set to begin in November 2022, not October. (/d.). Despite being informed of this discrepancy in

13

its Notice of Deficiency for structural welders, Plaintiff did not directly address this discrepancy
in its response. Instead, Plaintiff stated that the regulations did not require it to explain a
discrepancy since nothing in the regulations prevents an employer from having multiple peakload
needs as long as they meet the regulatory standards. (Doc. No. 30-21 at 124). Plaintiff further
stated that its reason for the discrepancy was that it “ha[d] experienced a material and unexpected
change in circumstances since the prior application was certified.” (Doc. Nos. 1-2 at 6; 30-21 at
124). In effect, Plaintiff essentially added a month to its purported duration of need without
explanation. Thus, the ALJ concluded that since Plaintiff's dates of need for structural welders did
not align with the alleged reason for the peakload need, it was reasonable for the CO to inquire
about the change in need and Plaintiff’s inconsistent statements. (Doc. No. 1-2 at 17). Moreover,
in the absence of an adequate explanation for the discrepancy, the ALJ concluded that Plaintiff
failed to establish a peakload need for structural welders and that Plaintiff's need was ongoing,
rather than short-term. (/d.).
Thus, the Court does also not find that DOL committed a clear error in its consideration of
the evidence concerning structural fitters and Plaintiff's discrepancy in projected dates of need. In
light of the discrepancy, the CO requested an explanation for the change. Plaintiff's explanation
of the change did not explain the discrepancy at all. The Court thus finds that it was reasonable for
the ALJ to conclude that Plaintiff failed to establish a peakload need for structural welders because
its dates of need do not align with the start dates of Projects 2 and 3 (the alleged reason for the
peakload need). Thus, no clear error was committed.
c. Plaintiff's Evidence of a Permanent Workforce Through Payroll Records
Finally, Plaintiff contends that DOL ignored or misinterpreted pertinent evidence when it
stated that the payroll records Plaintiff provided were “not dated and could not be correlated with

14

[Plaintiff]’s peakload need.” (Doc. No. 4-2 at 22; Doc. No. 1-2 at 6). Defendants’ Notices of
Deficiency requested Plaintiff to submit monthly invoices between June 2019 and June 2022 that
identified total permanent and temporary staff, their respective hours worked, and earnings
received. (Doc. No. 1-2 at 6). According to Plaintiff, these payroll records were presented to verify
that Plaintiff regularly and historically employed workers in each of the requested positions.
Plaintiff further argues that Defendants acted erroneously because the APA requires that an agency
consider evidence as a whole fairly and “without playing “gotcha” games to cast aside evidence
without reasoned explanation.” (Doc. No. 4-2 at 22).
Upon review of Plaintiff's submitted payroll records, the records are indeed clearly dated
and labeled in columns titled “Pay Period Begin Date” and “Pay Period End date.’ (See Doc. No.
30-12 at 56). This Court, however, does not find that DOL, after evaluating the evidence as a
whole, cast aside or ignored Plaintiffs payroll evidence without a reasoned explanation. Although
the CO may have overlooked the inclusion of these dates, the ALJ rectified that oversight in the
BALCA opinion. (Doc. No. 1-2 at 14). In the BALCA opinion, the ALJ states, “[Plaintiff]’s
copious payroll documentation shows that it regularly employs permanent Structural Fitters,
Structural Welders, Pipe Fitters, and Pipe Welders’”—which shows there was no dispute as to
whether Plaintiff permanently employed workers in these positions. (/d.). In fact, nowhere in the
BALCA opinion does the ALJ ignore the payroll evidence or opine that the records lack dates as
the basis for its denial of Plaintiff's applications. Plaintiff's applications were not denied because
DOL felt Plaintiff did not demonstrate that it permanently employed workers in the areas that it
sought the visas or because the CO overlooked dates on payroll records. They were denied because

3 The Court notes that some of the payroll records, as filed, appear to be blurry and illegible. (See Doc. Nos. 30-3; 30-
4; 30-5). It is unclear to this Court and based on the administrative record if the CO and BALCA received the same
quality of copies from Plaintiff or if the documents became illegible after they were filed on ECF.
15

Plaintiff failed to establish short term demand or otherwise demonstrate that its need to supplement
existing staff was due to short term demand. Given that the ALJ rectified this issue on appeal, the
Court finds that Defendants did not commit a clear error when evaluating Plaintiffs payroll
records.
Based on the administrative record and a review of Plaintiff's evidence, the Court does not
find that Defendants erroneously misinterpreted evidence or committed a clear error in its analysis
of the evidence. It is clear from the BALCA opinion that Defendants considered all of the evidence
Plaintiff submitted when it concluded Plaintiff failed to meet its burden of proof. The ALJ
extensively examined and discussed the CO’s consideration of Plaintiff's charts, articles on the
current political climate, information about current projects, business history and activities, and
payroll summaries, among other pieces of evidence, but still came to the conclusion that Plaintiff s
“explanation and documentation of its temporary need did not overcome its deficiency.” (Doc. No.
1-2 at 15-17). Since Defendants’ decision was based on the consideration of all of the evidence
Plaintiff submitted and this Court does not find that there was a clear error of judgment, the Court
does not find that Defendants improperly disregarded or misinterpreted evidence.
3. Whether DOL Acted Arbitrarily & Capriciously in Violation of the APA
An agency’s action is held to be arbitrary and capricious in violation of the APA when it
(1) relies on factors Congress did not intend for it to consider, (2) fails to analyze an important
aspect of the problem or offers an explanation contrary to the evidence before it, or (3) offers an
explanation so implausible it cannot be ascribed to a difference in view or a product of agency
expertise. Luminant Generation Co. LLC v. U.S. E.P.A., 714 F.3d 841, 850 (Sth Cir. 2013). If an
agency’s reasoning and policy choices conform to minimal standards of rationality, then its actions
are reasonable and must be upheld. Tex. Oil & Gas Ass’n v. U.S. E.P.A., 161 F.3d 923, 933 (Sth

16

Cir. 1998) (quoting Motor Vehicle Mfrs. Ass’n v. State Farm Mut. Auto. Ins. Co., 463 US. 29. 34,
S. Ct. 2856, 77 L.Ed.2d 443 (1983)). The reviewing court “may not supply a reasoned basis for
the agency’s action that the agency itself has not given.” Motor Vehicle Mfrs. Ass’n, 463 U.S. at
43.
This Court finds that Defendants did not act arbitrarily and capriciously in violation of the
APA. Based on the administrative record, DOL acted reasonably and rationally in its review of
Plaintiff’s evidence and applied the relevant regulatory standards set out in § 214.2(h)(6)(ii)(B)
and 20 C.F.R. § 655.6(a). Moreover, DOL did not commit clear errors when considering Plaintiff's
evidence or fail to analyze important aspects of the problem in coming to its ultimate conclusion
to deny Plaintiff's applications. The conclusions that DOL reached were rationally reasoned and
did not deviate significantly from what a reasonable person would conclude after reviewing the
data. Furthermore, DOL did not render an explanation so implausible it could not be ascribed to a
difference in view or a product of agency expertise.
Although reasonable minds could arguably differ on the conclusions DOL rendered,
Plaintiff's disagreement with Defendants’ assessment of the evidence and its ultimate conclusion
does not mean that Defendants’ denials or consideration process was arbitrary and capricious.
Thus, the Court finds that Plaintiff would be unlikely to succeed on the merits.
B. Substantial Threat of Irreparable Injury
Plaintiff argues that further delays in receiving its temporary labor certification will cause
it to suffer irreparable harm in the form of unrecoverable economic damage:s and potential loss of
customers and goodwill. (Doc. No. 4-2 at 23). If it is unable to onboard its requested 450 workers,
Plaintiff contends that a four to five month delay in the delivery of its Projects can be expected.
(/d.). Plaintiff further contends that although irreparable harm generally does not exist where

17

injuries are purely economic in nature, economic losses are irreparable where a plaintiff would be
precluded from recovering damages from a federal agency—like DOL—that has sovereign
immunity. (/d.).
In response, Defendants argue that Plaintiff has failed to establish irreparable harm because
its economic losses are not irreparable and its potential losses in customers and goodwill are merely
speculative. (Doc. No. 19 at 23-24). Defendants contend that even if this Court were to grant
Plaintiff's requested relief, there is no guarantee that Plaintiff will successfully secure the 450 H-
2B visas it is requesting from USCIS and the Department of State. (/d.). Even if the case is
remanded back to DOL and the CO grants Plaintiff’s certifications, Plaintiff must then use the
certifications to file Form I-129 non-immigrant visa petitions with USCIS requesting H-2B status
for the workers certified by DOL. (/d. at 25). Moreover, Defendants point out that DHS announced
that the cap for H-2B visas the first half of fiscal year 2023 has already been reached. (/d.).
Irreparable harm generally exists when there is no adequate remedy at law, such as
monetary damages. Janvey v. Alguire, 647 F.3d 585. 600 (Sth Cir. 2011); see also Bond Pharmacy,
Inc. v. AnazaoHealth Corp., 815 F.Supp.2d 966, 975 (S.D. Miss. 2011). To establish a substantial
threat of irreparable injury or harm, the party moving for the preliminary injunction must clearly
show a concrete injury or harm resulting from the opposing party’s actions. Texas First. Nat’l Bank
v. Wu, 347 F.Supp.2d 389, 399 (S.D. Tex. 2004). Although the Fifth Circuit has yet to speak
directly as to this issue, case law from other district courts suggests that where economic losses
are unrecoverable because of sovereign or governmental immunity, the harm may be irreparable.
See Harris v. Cantu, 81 F.Supp.3d 566, 580 (S.D. Tex. 2015), rev’d on other grounds, Harris v.
Hahn, 827 F.3d 359 (Sth Cir. 2016); Teladoc, Inc. v. Tex. Med. Bd., 112 F.Supp.3d 529, 543 (W.D.
Tex. 2015); ESI/Emp. Sols., L.P. v. City of Dallas, 450 F.Supp.3d 700, 736-37 (E.D. Tex. 2020).

18

The Court finds that Plaintiff has established that it will suffer a substantial threat of
irreparable harm. Although injuries that are purely economic in nature are generally not considered
irreparable, DOL’s governmental immunity precludes economic recovery for Plaintiff and thus
establishes the presence of irreparable harm.
C. Whether Plaintiff's Substantial Injury Outweighs the Threatened Harm and
Whether Granting the Preliminary Injunction Would Disserve the Public Interest
When the government is an opposing party in a request for preliminary injunctive relief,
the final two factors of the preliminary injunction test—balancing of the harm to the opposing
party and the public interest—merge. See, e.g., Nken v. Holder, 556 U.S. 418, 435 (2009).
The Court finds that the balance of equities and the public interest do not necessarily weigh
in favor or against injunctive relief here. Although Project 1 is set to be complete sometime in the
summer of 2023 and Projects 2 and 3 are set to be complete in April of 2023 and according to
Plaintiff, the Projects will likely be delayed by four or five months if injunctive relief is not granted,
there is no evidence that Plaintiff will lose its contracts with NFE or that the potential economic
and reputational harms it claims it will suffer are concrete and immediate. Moreover, Plaintiffs
projected delay suggests that even without the workers it is requesting, any harm it will experience
will not necessarily preclude it from ultimately completing the Projects.
Furthermore, while the DOL may be in the best position to adjudicate these applications
and is ultimately charged with ensuring that the employment of temporary, non-immigrant workers
does not adversely affect the United States workforce according to the Administration, there are
significant public policy arguments in favor of increased LNG and energy production domestically
in light of the Ukrainian war that suggest a preliminary injunction serve the public interest. Thus,
in light of these competing arguments, the Court does not find that these final factors weigh in
favor or against injunctive relief.

19

IV. Conclusion
Given that DOL did not act arbitrarily and capriciously in violation of the APA when
considering and ultimately denying Plaintiff's applications, this Court finds that Plaintiff is
unlikely to succeed on the merits. Although Plaintiff established that it will suffer a substantial
threat of irreparable harm, the Court notes that this does not necessarily alter Plaintiff's ability to
receive injunctive relief given that it is unlikely to succeed on the merits. Furthermore, given that
this Court has found the final two factors to be a draw as to injunctive relief, this also does not
change the fact that a failure to succeed on the merits is dispositive as to Plaintiff's ability to
receive injunctive relief. Thus, in the absence of success on the merits, Plaintiff has fallen short of
convincing the Court to grant its requested preliminary injunction.
For the foregoing reasons, the Court DENIES Plaintiff's Motion for Preliminary Injunction
(Doc. No. 4-2).

xX
Signed at Houston, Texas, this @2 day of January, 2023.

Andrew S. Hanen
United States District Judge

20

---