# Royal Blue Organics v. City of Springfield

> Court of Appeals of Oregon · April 7, 2021 · 310 Or. App. 518

URL: https://www.frixlaw.com/law-library/cases/10600787

## Case

- **Court:** Court of Appeals of Oregon
- **Decided:** April 7, 2021
- **Citations:** 310 Or. App. 518; 487 P.3d 440
- **Precedential status:** Published
- **Opinion:** Opinion
- **Judges:** Mooney
- **Cited by:** 0 later opinions in the Frix Law Library

## Citator (automated)

- No negative treatment found by the automated citator. That is not the same as a confirmation that the case is good law; read the citing cases.
- Full citator and citing cases: https://www.frixlaw.com/law-library/cases/10600787

## Opinion text

518

Argued and submitted on January 25; on petitioner-respondent Springfield
Utility Board’s motion to take judicial notice filed December 24, 2020, and
petitioner-respondent Royal Blue Organics’ response to the motion to take
judicial notice filed January 7, Springfield Utility Board’s motion to take
judicial notice allowed in part, denied in part; LUBA order reversed and
remanded on Springfield Utility Board’s petition, affirmed on Royal Blue
Organics’ petition April 7, 2021

ROYAL BLUE ORGANICS,
Respondent,
v.
CITY OF SPRINGFIELD,
Respondent,
and
SPRINGFIELD UTILITY BOARD,
Petitioner.
ROYAL BLUE ORGANICS,
Petitioner,
v.
CITY OF SPRINGFIELD
and Springfield Utility Board,
Respondents.
Land Use Board of Appeals
2019092, 2019094, 2019095, 2019134;
A175041
487 P3d 440

The City of Springfield and Lane County conditionally approved Springfield
Utility Board’s (SUB) applications to construct an electrical substation and power
lines in the community of Glenwood. Royal Blue Organics (RBO) challenged that
conditional approval. It argued, among other things, that (1) the geotechnical
reports submitted by SUB in connection with its hillside development permit
application did not conform to the applicable local standards and (2) SUB was
precluded from building its substation on the proposed site because it contained a
wetland protected from development by the Springfield Development Code (SDC).
The local authorities rejected RBO’s arguments and RBO then appealed to the
Land Use Board of Appeals (LUBA). LUBA rejected RBO’s argument that the
geotechnical reports were deficient but agreed that the wetland on SUB’s pro-
posed site restricted development of the substation. Specifically, LUBA concluded
that the site contained a “watercourse” subject to protection under SDC 4.3-115,
and that remand was necessary to determine whether development would be
prohibited altogether. SUB and RBO each seek judicial review of LUBA’s final
order. Additionally, SUB requests that the Court of Appeals take judicial notice
of several documents related to the project and the local development standards.
Held: First, the Court of Appeals agreed to take judicial notice of some, but not
Cite as 310 Or App 518 (2021) 519

all, of SUB’s proffered documents. On the merits of the parties’ arguments, the
court concluded that (1) LUBA did not err in determining that SUB’s geotechni-
cal reports were sufficient to support hillside development under the applicable
ordinances and (2) LUBA erred in concluding that the wetland on SUB’s pro-
posed site was subject to the prohibitions listed in SDC 4.3-115. The plain text
and context of the applicable ordinances demonstrate that SUB could develop
the site so long as it complied with state and federal wetland permitting require-
ments. Because it had done so, the city correctly approved SUB’s application.
Springfield Utility Board’s motion to take judicial notice allowed in part,
denied in part. LUBA order reversed and remanded on Springfield Utility Board’s
petition; affirmed on Royal Blue Organics’ petition.

Zack Mittge argued the cause for petitioner-respondent
Royal Blue Organics. On the opening brief for petitioner
were William H. Sherlock, Jonathan Hood, and Hutchinson
Cox. On the answering brief for respondent were William H.
Sherlock, Zack Mittge, and Hutchinson Cox.
Michael J. Gelardi argued the cause for petitioner-
respondent Springfield Utility Board. Also on the briefs was
Gelardi Law P.C.
No appearance for respondent City of Springfield.
Before DeVore, Presiding Judge, and DeHoog, Judge, and
Mooney, Judge.
MOONEY, J.
Springfield Utility Board’s motion to take judicial notice
allowed in part, denied in part. LUBA order reversed and
remanded on Springfield Utility Board’s petition; affirmed
on Royal Blue Organics’ petition.
520 Royal Blue Organics v. City of Springfield

MOONEY, J.
The City of Springfield (city) approved the
Springfield Utility Board’s (SUB) applications for site plan
review, tree felling, and hillside development permits for
a new electrical substation and related power lines in the
unincorporated community of Glenwood, in Lane County.
Royal Blue Organics (RBO) appealed those decisions to
the local planning commission and hearings official, who
jointly affirmed the city’s approvals. RBO filed an appeal
with the Land Use Board of Appeals (LUBA) and LUBA,
in turn, remanded all three decisions for further consid-
eration of limited issues. RBO and SUB each seek judicial
review of certain aspects of LUBA’s final order. In its sole
assignment of error, SUB seeks reversal of LUBA’s deter-
mination that the substation site is a “watercourse” subject
to protection under Springfield Development Code (SDC)
4.3-115. In its sole assignment of error, RBO seeks reversal
of LUBA’s determination that the geotechnical reports sub-
mitted by SUB in connection with its hillside development
permit application conformed to the applicable local stan-
dards. We reverse on SUB’s petition and we affirm on RBO’s
petition.
SUB’S MOTION TO TAKE JUDICIAL NOTICE
We begin by resolving SUB’s motion to take judicial
notice of certain laws, plans, and facts in order to clarify
the record on review. SUB filed a motion requesting that we
take judicial notice of several categories of documents that
are not in the record, to which RBO filed a memorandum in
opposition. We deferred ruling on the motion and turn to it
now, beginning with general principles of jurisdiction and
the record before us for review.
Jurisdiction for judicial review of LUBA orders resides
exclusively with the Court of Appeals. ORS 197.850(2) and (3).
The “entire record of the proceeding under review” is that
which is transmitted to us by LUBA. ORS 197.850(5). Our
review is confined to that record and “we may not substi-
tute [our] judgment for that of the board as to any issue of
fact.” ORS 197.850(8). ORAP 4.67 requires the petitioner
to include “copies of all provisions of local government
documents (e.g., ordinances, plans) * * * pertinent to its
Cite as 310 Or App 518 (2021) 521

arguments on judicial review in the excerpt of record if the
provisions are part of the record or in an appendix * * * if
the provisions are not part of the record.” The purpose of
the appendix is to provide “materials that would be helpful
in understanding and resolving an issue raised on appeal,”
but it should not include “materials from the record of the
tribunal from which the appeal is taken that should be in
the excerpt of record.” ORAP 5.52. With these principles and
rules in mind, we turn to the specific documents that SUB
requests we judicially notice.
OEC 202(7) provides for taking judicial notice of
city and county ordinances and comprehensive plans.1 In
accordance with that provision, we take judicial notice of
the following ordinances:
i.  Springfield Development Code (SDC) sections 4.3-110,
4.3-115, 4.3-117, 5.17-125, and 6.1-110. SUB’s Opening
Brief, Appendix 1-27.
ii.    Ordinance No. 6021, including Water Quality Limited
Watercourse Map. SUB’s Opening Brief, Appendix
28-73.
iii. Ordinance 6265 (2011). Appendix 139-140.
We decline to take judicial notice of the following docu-
ments, because they are neither city nor county ordinances
or plans:
i.   Glenwood Local Wetland Inventory Report (2010).
ii.    Springfield Natural Resource Study Report, October
2005 (updated 2011).
OEC 202(2)2 provides for taking judicial notice of
official acts of the state and federal governments, and OEC

1
OEC 202 provides, in part:
“ ‘Law judicially noticed’ is defined as:
“* * * * *
“(7) An ordinance, comprehensive plan or enactment of any county or
incorporated city in this state, or a right derived therefrom.”
2
OEC 202 provides, in part:
“Law judicially noticed is defined as:
“* * * * *
522 Royal Blue Organics v. City of Springfield

201(b)3 permits judicial notice of facts not subject to reason-
able dispute that are capable of accurate and ready determi-
nation. We take judicial notice of the fact that Army Corps
Permit No. NWP-2018-610 (2020) and Oregon Department
of State Lands (ODSL) Removal-Fill Permit No. 61795-RF
(2020) were issued by each respective agency. See McGee
Plumbing, Inc. v. Building Codes Div., 221 Or App 123, 131,
188 P3d 420 (2008) (“An agency decision is an official act
within the scope of [OEC 202(2)].”). Except as to the fact of
permit issuance itself, we decline to take judicial notice of
the associated “permit documents.”
We likewise decline to take judicial notice of SUB’s
city code interpretation application (Appendix 473-483)
and the city planning director’s response (Appendix 484).
Neither the application nor the response are official acts
noticeable under OEC 202(2).
BACKGROUND
The pertinent facts and procedural background
are taken from LUBA’s final order and from undisputed
evidence in the record. Glenwood is situated alongside the
Willamette River between the City of Springfield on the east
and the City of Eugene on the west. Glenwood is partly within
Springfield city limits, partly within unincorporated Lane
County, and entirely within the Springfield urban growth
boundary (UGB). Its development has been discussed and
studied extensively since at least 1982, when the Eugene-
Springfield Metro Plan (Metro Plan) established a process to
urbanize Glenwood. In 2014, the Glenwood Refinement Plan
(Glenwood Plan) was adopted to govern the development of
Glenwood’s riverfront. It requires SUB to provide electric

“(2) Public and private official acts of the legislative, executive and judi-
cial departments of this state, the United States, any federally recognized
American Indian tribal government and any other state, territory or other
jurisdiction of the United States.”
3
OEC 201(b) provides:
“A judicially noticed fact must be one not subject to reasonable dispute in
that it is either:
“(1) Generally known within the territorial jurisdiction of the trial court;
or
“(2) Capable of accurate and ready determination by resort to sources
whose accuracy cannot reasonably be questioned.”
Cite as 310 Or App 518 (2021) 523

service to Glenwood and to work with the city to evaluate
sites for the installation of a new electrical substation and
transmission lines to facilitate Glenwood’s mixed-use urban-
ization. In 2015, the Eugene-Springfield Metropolitan Area
Public Facilities and Services Plan (PFSP) was amended
to reflect general locations for the substation and power
lines.
In 2019, SUB applied for a federal wetland fill
permit and for associated Oregon DEQ water quality cer-
tification for the substation site. Both were granted. SUB
also applied for and received city approval of the substa-
tion and power line project from the city planning direc-
tor. RBO appealed the director’s decisions concerning the
substation site to the Springfield planning commission,4
and it appealed the director’s decisions concerning the tree
felling and hillside development permits to the Springfield
hearings official.5 The planning commission and the hear-
ings official conducted joint hearings and affirmed the site
plan approval, hillside development permit, and tree fell-
ing permit with some conditions attached. RBO appealed
those decisions to LUBA. While the LUBA appeals were
pending, the city planning director issued an interpretation
related to the site plan approval. RBO filed an appeal of that
interpretation as well. LUBA consolidated the four appeals
and issued its Final Opinion & Order in LUBA Nos. 2019-
092/094/095/134 on November 12, 2020. LUBA rejected
some assignments of error, sustained others, and remanded
for further proceedings at the local level.
The questions on appeal have been narrowed con-
siderably, with RBO and SUB each raising a single assign-
ment of error in their respective petitions.
STANDARD OF REVIEW
Our task is to determine whether LUBA’s order is
“unlawful in substance or procedure[.]” ORS 197.850(9)(a).
4
The planning commission has jurisdiction over the substation site, tax
lot 101, and a portion of tax lot 1100, because that property is located within
Springfield city limits.
5
The hearings official has jurisdiction over the site for utility poles and trans-
mission lines, because the property in question, tax lots 300, 1000, and a portion
of 1100, is located outside city limits but within the urban growth boundary.
524 Royal Blue Organics v. City of Springfield

RBO’S PETITION
RBO seeks reversal of LUBA’s order affirming
approval of the hillside development permit. It challenges
the order as “unlawful in substance,” assigning error only to
that “portion of LUBA’s order that affirmed a local hearings
official’s determination that [SUB’s] geotechnical reports
conformed to applicable hillside development and site
review standards.” In particular, RBO argues that LUBA
“misconstrued geotechnical report requirements,” affirmed
“inadequate findings” with respect to debris flows, land-
slides, and minimum variance from natural conditions, and
affirmed findings with respect to slope movement that are
“not based on substantial reasons and substantial evidence
in the whole record.”
RBO argues that the standard of review for “LUBA’s
evaluation of local code provisions” is to apply “the ordinary
principles of statutory construction” as per PGE v. Bureau
of Labor and Industries, 317 Or 606, 611-12, 859 P2d 1143
(1993), and State v. Gaines, 346 Or 160, 171-72, 206 P3d 1042
(2009). SUB counters that RBO “does not identify any issue
with how LUBA construed the City’s rules,” but instead chal-
lenges the sufficiency of the evidence in the record by claim-
ing that LUBA erred in affirming the local determination
that the reports satisfied the report requirements. We agree
that RBO’s argument that the Foundation Engineering, Inc.
(FEI) reports do not contain all the information required by
SDC 3.3-530(A) is a challenge to the adequacy of the content
of SUB’s geotechnical reports and not to LUBA’s interpreta-
tion of the city’s rules regarding those reports.
It follows that our task under ORS 197.835(9)(a)(C)
is to evaluate whether LUBA properly applied the substan-
tial evidence standard. In doing so,
“we do not substitute our judgment for LUBA’s on whether
a reasonable person could make a finding of fact based
upon the entire local government record. Instead, we eval-
uate whether LUBA properly stated and applied its own
standard of review. If LUBA does not err in the articulation
of its substantial evidence standard of review under ORS
197.835(9)(a)(C), we would reverse LUBA’s decision only
when there is no evidence to support the finding or if the
evidence in the case is ‘so at odds with LUBA’s evaluation
Cite as 310 Or App 518 (2021) 525

that a reviewing court could infer that LUBA had mis-
understood or misapplied its scope of review.’ ”
Citizens for Responsibility v. Lane County, 218 Or App 339,
345, 180 P3d 35 (2008) (quoting Younger v. City of Portland,
305 Or 346, 359, 752 P2d 262 (1988)).
The parties agree that the Hillside Development
Overlay District requirements (SDC 3.3-500) apply here,
because portions of the property proposed for the utility poles
and power lines intended to connect the substation to an
existing uphill power source exceed 15 percent in slope. SDC
3.3-510. SUB was, thus, required to submit certain reports,
including a geotechnical report, along with its application
for a hillside development permit, in order to “prevent or
mitigate possible hazards to life and property and adverse
impacts on the natural environment[.]” SDC 3.3-530. The
geotechnical report must contain
“data regarding the geology of the site, the nature, distri-
bution, and strength of existing soils, conclusions and rec-
ommendations for grading procedures, design criteria for
corrective measures, and options and recommendations to
maintain soil and slope stability and minimize erosion of
the site to be developed in a manner imposing the minimum
variance from the natural conditions. Where geologic condi-
tions of the site indicate that a hazard may exist, the report
shall show that the proposed Subdivision or Partition shall
result in lots/parcels that are suitable for development.
The investigation and report shall be prepared by a civil
engineer/geologist or a geotechnical engineer.”
SDC 3.3-530(A).
SUB submitted three geotechnical reports in the
course of the hillside development application process:
1. The September 19, 2018, “Geotechnical Investigation
and Seismic Hazard Study: SUB Glenwood Sub-
station” prepared by FEI;
2. The December 27, 2018, “Slope Stability Review in
Felling Areas” memorandum prepared by FEI; and
3. The July 24, 2019, “ Geotechnical Investigation for
Transmission Line Pole Structures” memorandum
prepared by FEI.
526 Royal Blue Organics v. City of Springfield

RBO submitted its own reports written by licensed engi-
neering geologist Gunnar Schlieder, Ph.D., of GeoScience,
Inc.:
1. July 30, 2019, letter concerning “Slope Stability
Concerns, SUB Power Line, Vicinity of E. 22nd
Avenue”; and
2. August 6, 2019, letter concerning “Review of FEI
7/24/19 Submission, SUB Power Line, E. 22nd
Avenue.”
In the end, RBO’s challenge to LUBA’s order affirming the
hillside development permit and SUB’s response to that
challenge amount to a battle between the experts regarding
current and historic geologic features of the subject property,
assessment of landslide, erosion, and seismic risks, and rec-
ommendations to maintain stability, mitigate erosion, and
minimize impact. Assessing the credibility of the evidence—
which includes resolving competing expert opinions—
is up to the factfinder. Root v. Klamath County, 260 Or App
665, 671, 320 P3d 631 (2014); Tigard Sand and Gravel, Inc. v.
Clackamas County, 151 Or App 16, 20, 949 P2d 1225 (1997),
rev den, 327 Or 83 (1998). RBO’s arguments concerning the
weight to be given to the competing reports is beyond the
scope of our review. LUBA’s review was for substantial sup-
porting evidence in the whole record.
LUBA’s order reflects its understanding of the sub-
stantial evidence review that was its task to conduct.
Specifically, LUBA concluded:
“[RBO] argues that the hearings official improperly con-
strued applicable law and made a decision that is not
supported by adequate findings or substantial evidence
in concluding that SUB’s geotechnical reports conformed
to SDC 3.3-530(A). [RBO] argues that the hearings offi-
cial’s decision is not based on substantial evidence because,
according to [RBO], SUB’s geotechnical reports did not
adequately respond to GeoScience’s slope stability concerns
or criticism that FEI’s subsurface samples are not repre-
sentative of actual soil conditions.”
It then went on to say that
“[t]he hearings official found, and we agree, that FEI
adequately responded to GeoScience’s concerns. [RBO]
Cite as 310 Or App 518 (2021) 527

provides us no reason to second-guess the hearings offi-
cial’s decision to give more weight to SUB’s geotechnical
evaluation. We conclude that the hearings official did not
misconstrue SDC 3.3-530(A) and the finding that SDC
3.3-530(A) is satisfied is supported by substantial evidence.”
We infer that LUBA understood its role in reviewing for
substantial evidence from its reference to the substantial
evidence standard and its statement that it had “no reason
to second-guess” the local hearings official’s decision to “give
more weight” to FEI’s reports.
It is important to note that, in describing the hear-
ings official’s findings concerning slope stability and earth
movement hazards, LUBA described the FEI reports, the
various concerns raised by GeoScience about test locations
and methods, and FEI’s response to those concerns, all of
which were in the record before the hearings official. To be
sure, the engineering experts provided different views about
soil stability, historic earth movement data, and risk assess-
ments for the proposed utility pole installations and hillside
development. But, as LUBA clearly understood, it was not
LUBA’s role to substitute its own judgment about the evi-
dence for that of the hearings official. And we cannot say
that the hearings official’s findings were “so at odds” with
the evidence in the entire record that we must “infer that
LUBA misunderstood or misapplied its standard of review.”
Root, 260 Or App at 671.
We affirm on the sole assignment of error in RBO’s
petition for review.
SUB’S PETITION
SUB seeks reversal of that portion of LUBA’s final
order that concludes that tax lot 101, the proposed site for the
substation, contains a watercourse subject to water quality
protection under SDC 4.3-115. SUB assigns error to LUBA’s
interpretation of the SDC 4.3-115 water quality rules, and
it argues that LUBA’s remand order is “unlawful in sub-
stance or procedure.” ORS 197.850(9)(a). Specifically, SUB
argues that LUBA “conflated” the city’s definition of “water-
course” with the city’s definition of “water quality limited
watercourse” when LUBA found that “[w]etlands are spe-
cifically shown on the [Water Quality Limited Watercourse
528 Royal Blue Organics v. City of Springfield

(WQLW)] Map and protected by SDC 4.3-115.” Further, SUB
argues that LUBA was incorrect when it concluded that the
planning commission “misconstrued” the SDC in finding
otherwise. RBO, for its part, responds that LUBA “correctly
determined that the waterside protection regulations pro-
hibited development of an electrical substation” on tax lot
101.
SUB’s challenge to LUBA’s remand order depends
on the correct construction of the SDC. We defer to the city’s
plausible interpretation of its own code when the interpre-
tation in question was made by the city’s governing body.
Hulme v. City of Eugene, 299 Or App 76, 79 n 1, 448 P3d
705 (2019). But the question here is whether the Springfield
Planning Commission and the Springfield Hearings Official,
both subordinates of the city governing body, properly con-
strued the city development code. Given that posture, “we
apply our ordinary principles of statutory construction with-
out any deference to the planning commission’s, or LUBA’s,
construction of the” city code. Simons Investment Properties,
LLC v. City of Eugene, 303 Or App 199, 205, 463 P3d 57
(2020). Thus, in reviewing whether LUBA’s decision was
“unlawful in substance,” ORS 197.850(9)(a), we review the
pertinent city code provisions to determine whether LUBA
interpreted them consistently with the ordinary principles
of statutory, or code, construction.
The parties appear to agree that the proposed sub-
station site (tax lot 101) contains a “wetland.” The city devel-
opment code defines “wetlands”:
“Wetlands. Areas inundated or saturated by surface or
groundwater at a frequency and duration sufficient to sup-
port, and that under normal circumstances to support, a
prevalence of hydrophilic vegetation typically adapted for
life in saturated soil conditions. Wetlands include swamps,
marshes, bogs, and similar areas excluding those con-
structed as water quality or quantity control facilities.”
SDC 6.1-110 (boldface in original). SDC 6.1-110 also defines
“watercourse” to include wetlands:
“Watercourse. Rivers, streams, sloughs, drainages
including intermittent stream and seeps, ponds, lakes,
aquifers, wetlands and other waters of the State. This
Cite as 310 Or App 518 (2021) 529

definition also includes any channel in which a flow of water
occurs, either continuously or intermittently, and if the lat-
ter with some degree of regularity. Watercourses may be
either natural or artificial. Specific watercourses that are
protected by this Code are those shown on the water qual-
ity Limited Watercourse Map.”
SDC 6.1-110 (boldface in original). The question is whether
the most restrictive water quality protection standards
of SDC 4.3-115 apply to the proposed substation site or
whether, instead, the natural resources standards of SDC
4.3-117 apply. LUBA concluded that SDC 4.3-115 applies.
We construe the water quality and natural resources rules
to determine if LUBA was correct.
We begin our navigation through the complex and
interconnected provisions of the SDC where the parties and
LUBA have focused their attention: SDC 4.3-115. That ordi-
nance regulates development on lands containing, or adja-
cent to, certain water features. The parties agree that, if the
most restrictive components of SDC 4.3-115 apply to tax lot
101, development of the substation would be prohibited. As
pertinent here, section 4.3-115 applies “only to those sites
that require * * * approval as specified in Section 5.12-100.”
Section 5.12-125(E), the relevant ordinance within SDC
5.12-100, in turn, states that “[p]hysical features, including,
but not limited to * * * watercourses shown on the WQLW
Map and their associated riparian areas; [and] other ripar-
ian areas and wetlands specified in Section 4.3-117 * * * shall
be protected as specified in this Code or in State or Federal
law.” SDC 4.3-115, thus, applies to (1) “watercourses shown
on the WQLW map and their associated riparian areas” and
(2) “other riparian areas and wetlands specified in Section
4.3-117.”
The development setbacks and other natural
resource protections found in section 4.3-117 apply to
“[l]ocally significant protected wetlands, listed in the
Springfield Local Wetland Inventory shown on the Local
Wetland Inventory Map.” Those protections do not apply
to wetlands that the city does not designate as significant.
SDC 4.3-117(B)(1)(b); SDC 4.3-117(B)(3)(b). And, RBO does
not dispute that the city designated the wetland on tax lot
101 as “non-significant” in 2010. Because the wetland on tax
530 Royal Blue Organics v. City of Springfield

lot 101 is not a locally significant wetland, it is not one that
section 4.3-117 designates for more stringent protections.
The remaining question is whether the wetland on tax lot
101 is a “watercourse[ ] shown on the WQLW map.”
The parties agree that tax lot 101 contains a wet-
land that, by definition, is a watercourse, as shown on the
2016 version of the WQLW map. However, SUB argues that
the wetland’s status as a watercourse does not mean that it
is subject to the most stringent protections of SDC 4.3-115.
We agree. LUBA concluded that subsections (A), (B), and (C)
of SDC 4.3-115 each contain rules that apply to tax lot 101.
However, the plain text of those provisions, considered in
context, demonstrates that they do not, in fact, apply to tax
lot 101. We address them one-by-one, as LUBA did.
First, SDC 4.3-115(A) protects “riparian areas along
watercourses shown on the [WQLW] Map.” It creates a series
of rules regarding setbacks, relocation of watercourses, and
other conservation requirements. LUBA concluded that,
because the wetland on tax lot 101 was shown on the WQLW
map,6 SDC 4.3-115(A) applies to tax lot 101. That reading
disregards the entire context of SDC 4.3-115(A).
SDC 4.3-115(A) reads:
“When addressing criterion E. (as specified in Sections
5.12-125 and 5.17-125) to protect riparian areas along
watercourses shown on the [WQLW] Map, the following
riparian area boundaries shall be utilized:
“1. Along all watercourses shown on the WQLW Map
with average annual stream flow greater than 1,000 cubic
feet per second (CFS), the riparian area boundary shall be
75 feet landward from the top of the bank. Existing native
vegetative ground cover and trees shall be preserved, con-
served, and maintained between the ordinary low water
line and the top of bank and 75 feet landward from the top
of bank.
“* * * * *
“2. Along all watercourses shown on the WQLW Map
with average annual stream flow less than 1,000 CFS the
riparian area boundary shall be 50 feet landward from the
6
We discuss the WQLW map in more detail, below.
Cite as 310 Or App 518 (2021) 531

top of the bank. Existing native vegetative ground cover
and trees shall be preserved, conserved, and maintained
both between the ordinary low water line and the top of
bank and 50 feet landward from the top of bank.
“* * * * *
“3. Where a watercourse divides a lot/parcel and the
existing riparian area along that watercourse is degraded
in riparian function, the applicant may relocate the water-
course to another portion of the property as approved by
the Public Works Director and applicable State or Federal
agency.
“4. If an expansion of the riparian area described
in Subsections 4.3-115A.1. and 2. occurs as a result of a
Federal or State agency permit process, the applicant shall:
“a. Resubmit the preliminary Site Plan for additional
review, as specified in Section 5.17-105;
“b. Submit a Site Plan Modification application, as
specified in Section 5.17-145; or
“c. Resubmit the Tentative Plan for additional review
as specified in Section 5.12-105.”
Importantly, SDC 4.3-115(A) refers specifically to
“riparian areas along watercourses” as specified on the
WQLW map. (Emphasis added.) “Riparian area[s]” are
defined in SDC 6.1-110 as “vegetated areas (generally con-
sisting of trees, shrubs, and grasses) located along both sides
of water bodies and are transitional boundaries between
land and water environments. Riparian zones act as buffers
to protect surface waters from contamination and are hab-
itats for a large variety of animals and birds.” The WQLW
map displays water quality limited watercourses and their
riparian areas (i.e., rivers and streams with their associ-
ated vegetated areas). Subsection (A) clearly applies only to
those bodies of water and their “riparian zones.” It does not
apply to all “watercourses.” Paragraphs 1 and 2 refer only to
the types of watercourses with certain strengths of stream
flows. There is no indication that any of the “watercourses”
referred to in subsection (A) are wetlands. LUBA miscon-
strued subsection (A) by concluding that “watercourses”
referred to all watercourses on the WQLW map.
532 Royal Blue Organics v. City of Springfield

Next, LUBA focused on SDC 4.3-115(B)(9). That
code provision states that “[r]epair, replacement or improve-
ment of utility facilities” is permitted “as long as the ripar-
ian area is restored to its original condition.” But, again,
tax lot 101 is not located within a riparian area. It contains
a wetland. Wetlands and riparian areas are distinct hydro-
logical features, and the city code recognizes them as such.
The code’s restrictions on utility facilities within riparian
areas therefore does not apply to tax lot 101, and LUBA was
incorrect in concluding that it did.
Finally, LUBA discussed SDC 4.3-115(C)(1)(a). That
code provision requires that developers “[a]void development”
of [u]nsuitable areas,” including “wetlands and riparian
areas.” And, because tax lot 101 contains a wetland, LUBA
concluded that SUB must “avoid development” on that lot.
LUBA misconstrued that provision, because it ignored its
broader context within the city code. SDC 4.3-115(C) states
that, “[f]or the protection of water quality and protection of
riparian area functions as specified in Section 4.3-110, the
following standards apply[.]” The code then lists a series
of goals and regulations, including the one in paragraph
(C)(1)(a) admonishing developers to avoid development of
wetlands. But it makes clear that it applies only to “riparian
area functions as specified in Section 4.3-110.” (Emphasis
added.)
SDC 4.3-110 governs the city’s stormwater manage-
ment regulations. Its subsection (F) requires the creation
of the WQLW map and assigns the public works director
to “designate certain watercourses” to be included on the
map. Those watercourses include ones that are “included by
the State of Oregon Department of Environmental Quality
(ODEQ) on its most recently adopted ‘303(d)’ List of Impaired
and Threatened Waterbodies,” SDC 4.3-110(F)(1)(a), and
watercourses “with significant water quality impairment
identified by water quality monitoring and sampling done in
accordance with approved quality assurance/quality control
* * * protocols,” SDC 4.3-110(F)(1)(b). Section 4.3-110 also
specifies that the WQLW map shall be adopted as a part of
the city code, and that any revisions must be approved by
the city council as amendments to the code.
Cite as 310 Or App 518 (2021) 533

Returning then to SDC 4.3-115(C)(1)(a), its provision
requiring developers to “[a]void development” in wetlands
refers only to those specified on the WQLW map or deemed
“significant.” The WQLW map was adopted as part of the city
code in 2002 as part of ordinance 6021. However, the map
adopted with, and as a part of, ordinance 6021, does not
reflect that tax lot 101 contains a wetland or that it otherwise
contains a watercourse. The parties’ agreement on the pres-
ence of a wetland on tax lot 101 derives from a newer version
of the WQLW map, which was published—but not formally
adopted by city ordinance—in 2016. The 2016 map states
that it was “reprinted with current base data,” and it indi-
cates that there is a wetland on tax lot 101. That indication,
in turn, derives from the city’s recognition, in 2010, that a
“non-significant” wetland exists on tax lot 101. Thus, the 2016
map contains the base data from 2002, which was adopted
by ordinance, and additional data, which was not adopted by
ordinance. That additional data includes an indication that
there is a wetland on tax lot 101. The fact that the wetland is
shown on the 2016 map is not relevant for purposes of SDC
4.3-110—and therefore not relevant for purposes of SDC
4.3-115—because the wetland on tax lot 101 is neither “sig-
nificant” nor is it identified or shown on the 2002 WQLW map
adopted as part of city ordinance 6021. LUBA was therefore
incorrect in determining that the wetland on tax lot 101 was
a protected watercourse for purposes of the WQLW map.
The water quality protection standards of SDC
4.3-115(C)(1)(a) do not apply to the proposed substation site
on tax lot 101. Instead, the natural resource protections
of SDC 4.3-117 apply and, because the wetland on the site
was designated by the city as nonsignificant, the required
protections are through the federal and state permits SUB
received for the site development.
LUBA’s remand order based on its conclusion that
“the planning commission improperly construed SDC 4.3-115
in approving the substation” is unlawful in substance.
Springfield Utility Board’s motion to take judicial
notice allowed in part, denied in part. LUBA order reversed
and remanded on Springfield Utility Board’s petition; affirmed
on Royal Blue Organics’ petition.

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/cases/10600787. Public record. Not legal advice.