# Kidd Constr. Grp.

> Court of Appeals of North Carolina · May 19, 2020

URL: https://www.frixlaw.com/law-library/cases/10485893

## Case

- **Court:** Court of Appeals of North Carolina
- **Decided:** May 19, 2020
- **Precedential status:** Published
- **Opinion:** Opinion
- **Cited by:** 0 later opinions in the Frix Law Library

## Citator (automated)

- No negative treatment found by the automated citator. That is not the same as a confirmation that the case is good law; read the citing cases.
- Full citator and citing cases: https://www.frixlaw.com/law-library/cases/10485893

## How later opinions describe it (automated extraction)

- holding that the Public Enterprise Statutes lacked “the essential ‘to be’ language.”

## Opinion text

IN THE COURT OF APPEALS OF NORTH CAROLINA

No. COA19-910

Filed: 19 May 2020

Pitt County, No. 18-CVS-2376

KIDD CONSTRUCTION GROUP, LLC, ROCKY RUSSELL BUILDERS, INC., and
TOMMY WILLIAMS BUILDERS, LLC, Plaintiffs,

v.

GREENVILLE UTILITIES COMMISSION, Defendant.

Appeal by Plaintiffs from order entered 3 June 2019 by Judge Lamont Wiggins

in Pitt County Superior Court. Heard in the Court of Appeals 28 April 2020.

Whitfield, Bryson, and Mason, LLP, by Daniel K. Bryson, Martha A. Geer, Scott
C. Harris, and J. Hunter Bryson, for Plaintiffs-Appellants.

Hartzog Law Group, LLC, by Dan M. Hartzog, Jr., and Katherine Barber-
Jones, for Defendant-Appellee.

BROOK, Judge.

Kidd Construction Group, LLC, Rocky Russell Builders, Inc., and Tommy

Williams Builders, Inc. (collectively “Plaintiffs”) appeal from the trial court’s order

entering summary judgment in favor of Greenville Utilities Commission (“Defendant”

or “GUC”). On appeal, Plaintiffs argue that Defendant lacked the authority to charge

impact fees for water and sewer services and that the charging of such fees is ultra

vires. Plaintiffs argue that the trial court erred in concluding otherwise and that we

must reverse the trial court’s order. For the following reasons, we agree with

Plaintiffs.
KIDD CONSTR. GRP. V. GREENVILLE UTILS. COMM’N

Opinion of the Court

I. Factual and Procedural Background

The North Carolina General Assembly created GUC, a local government entity

(“LGE”) in 1991 by passing Session Law 1991-861, “An Act to Amend and Restate the

Charter of the Greenville Utilities Commission of the City of Greenville” (the

“Charter”). The bill delegated power to GUC for “the proper management of the

public utilities of the City of Greenville,” including “electric, natural gas, water, and

sewer services[.]” GUC provides water and sewer services to all of Pitt County.

GUC’s Charter states in pertinent part:

Sec. 5. The Greenville Utilities Commission shall
have entire supervision and control of the management,
operation, maintenance, improvement, and extension of
the public utilities of the City, which public utilities shall
include electric, natural gas, water, and sewer services,
and shall fix uniform rates for all services rendered[.] . . .

Sec. 6. The Greenville Utilities Commission shall
employ a competent and qualified General Manager whose
duties shall be to supervise and manage the said public
utilities, subject to the approval of the Greenville Utilities
Commission. The General Manager, under the direction of
and subject to the approval of the Greenville Utilities
Commission, shall cause the said utilities to be orderly and
properly conducted; the General Manager shall provide for
the operation, maintenance, and improvement of utilities;
the General Manager shall provide for the extension of all
utilities, except sewer extensions made beyond the area
regulated by the City of Greenville are subject to the
approval of the City Council, and shall furnish, on
application, proper connections and service to all citizens
and inhabitants who make proper application for the same,
and shall in all respects provide adequate service for the
said utilities to the customers thereof; the General

-2-
KIDD CONSTR. GRP. V. GREENVILLE UTILS. COMM’N

Opinion of the Court

Manager shall attend to all complaints as to defective
service and shall cause the same to be remedied, and
otherwise manage and control said utilities for the best
interests of the City of Greenville and the customers
receiving service, and shall provide for the prompt
collection of all rentals and charges for service to customers
and shall promptly and faithfully cause said rentals and
charges to be collected and received, all under such rules
and regulations as the Greenville Utilities Commission
shall, from time to time, adopt and in accordance with the
ordinances of the City of Greenville in such case made and
provided.

Sec. 7. All monies accruing from the charges or
rentals of said utilities shall be deposited into the
appropriate enterprise fund of the Greenville Utilities
Commission and the Greenville Utilities Commission’s
Director of Finance shall keep an account of the same. . . .
[T]he Greenville Utilities Commission shall pay out of its
receipts the costs and expense incurred in managing,
operating, improving, maintaining, extending, and
planning for future improvements and expansions of said
utilities; provided, however, that should the funds arising
from the charges and rentals of said utilities be insufficient
at any time to pay the necessary expenses for managing,
operating, improving, and extending said utilities, then
and in that event only, the City Council of the City of
Greenville shall provide and pay into the appropriate
enterprise fund of the Greenville Utilities Commission a
sum sufficient, when added to the funds that have accrued
from the rents and charges, to pay the costs and expenses
of managing, operating, improving, maintaining,
extending, and planning for future improvements and
expansions of said utilities[.]

An Act to Amend and Restate the Charter of the Greenville Utilities Commission of

the City of Greenville, ch. 861, §§ 5-7, 1992 N.C. Sess. Law 370, 373-74 (hereinafter

“S.L. 1991-861”).

-3-
KIDD CONSTR. GRP. V. GREENVILLE UTILS. COMM’N

Opinion of the Court

Starting in 2008, at the time of a developer’s application for water and sewer

service, GUC began requiring contractors and developers of new construction and

new developments to pay service connection fees, which consist of two components: a

tapping fee and a capacity fee. The tapping fee recovers the cost for physically making

a service tap. Capacity fees, or impact fees, are collected in an effort to “recover a

proportional share of the cost of capital facilities constructed to provide service

capacity for new development or new customers connecting to the water/sewer

system.” Capacity fees are imposed as a precondition to development approval, to the

issuance of building permits, and to receiving service.

In 2016, our Supreme Court decided Quality Built Homes v. Town of Carthage,

369 N.C. 15, 789 S.E.2d 454 (2016) (“Quality Built Homes I”), which examined the

Town of Carthage’s authority to impose impact fees on developers as a precondition

for the issuance of building permits. The Court concluded that municipalities,

including Carthage, did not have the statutory authority to impose impact fees for

future services. Id. at 20-21, 789 S.E.2d at 458. Subsequent appeals led our Supreme

Court to hold that a municipality’s liability to refund unlawful impact fee revenue

was subject to a three-year statute of limitations. Quality Built Homes v. Town of

Carthage, 371 N.C. 60, 74, 813 S.E.2d 218, 228-29 (2018) (“Quality Built Homes II”).

In response to our Supreme Court’s holding in Quality Built Homes I, on 20

July 2017 the General Assembly enacted the Public Water and Sewer System

-4-
KIDD CONSTR. GRP. V. GREENVILLE UTILS. COMM’N

Opinion of the Court

Development Fee Act (“the Act” or “System Development Fee Act”) to clarify a local

government utility’s authority to assess upfront charges for water and sewer services.

S.L. 2017-138, 2017 N.C. Sess. Laws 996, 996-1002 (codified at N.C. Gen. Stat.

§ 162A-200–215 (2019)). The law grants local government utilities specific authority

to assess one type of upfront charge—a system development fee—as long as that fee

is calculated in accordance with the statute’s “written analysis” process. N.C. Gen.

Stat. § 162A-205 (2019). The Act became effective on 1 October 2017, providing,

“Nothing in this act provides retroactive authority for any system development fee,

or any similar fee for water or sewer services to be furnished, collected by a local

government unit prior to October 1, 2017.” S.L. 2017-138 § 11.

After the legislature passed the System Development Fee Act, GUC hired

Raftelis Financial Consultants, Inc. (“Raftelis”), an independent financial consultant,

to perform the financial study required by N.C. Gen. Stat. § 162A-205. GUC adopted

Raftelis’s new fee calculation system, which became effective on 1 July 2018.

Plaintiffs are North Carolina licensed general contractors who work in and

around the Greenville, North Carolina area. Plaintiffs initiated a class action suit on

24 April 2018, alleging that Defendant lacked the authority to collect impact fees from

the three years prior to the commencement of the action, and thus within the three-

year statute of limitations period, and sought recovery of all impact fees paid within

that time period—totaling $1.2 million dollars. Defendant filed a motion for

-5-
KIDD CONSTR. GRP. V. GREENVILLE UTILS. COMM’N

Opinion of the Court

summary judgment on 4 March 2019 contending that its Charter authorized GUC to

collect impact fees prior to the enactment of the System Development Act. On 20 May

2019, Judge Lamont Wiggins heard arguments on Defendant’s motion for summary

judgment and entered an order granting summary judgment in favor of Defendant

on 3 June 2019.

Plaintiffs timely noticed appeal.

II. Analysis

On appeal, Plaintiffs argue that the trial court erred by granting Defendant’s

motion for summary judgment because GUC’s Charter does not specifically authorize

GUC to charge impact fees for future water and sewer services. Plaintiffs further

argue that GUC’s Charter only authorizes the charging of uniform rates and charges,

not impact fees. Finally, Plaintiffs argue that the charging of impact fees is outside

the authority of GUC because these fees are not reasonably necessary or expedient to

carry GUC’s express powers into execution and effect.

After careful review, we conclude that GUC does not possess the authority to

charge impact fees and that the charging of such fees was ultra vires. We therefore

do not reach Plaintiffs’ arguments in the alternative.

A. Standard of Review

“Summary judgment is properly granted when the pleadings, depositions,

answers to interrogatories, and admissions on file, together with the affidavits, if any,

-6-
KIDD CONSTR. GRP. V. GREENVILLE UTILS. COMM’N

Opinion of the Court

show that there is no genuine issue as to any material fact and that any party is

entitled to a judgement as a matter of law.” Campbell v. Duke Univ. Health Sys, Inc.,

203 N.C. App. 37, 42, 691 S.E.2d 31, 35 (2010) (citations and marks omitted). This

Court reviews a trial court’s ruling on summary judgment de novo. Forbis v. Neal,

361 N.C. 519, 524, 649 S.E.2d 382, 385 (2007). “The de novo standard also applies to

questions of statutory interpretation.” JVC Enters., LLC v. City of Concord, ___ N.C.

App. ___, ___, 837 S.E.2d 206, 209 (2019). “Under a de novo review, th[is C]ourt

considers the matter anew and freely substitutes its own judgment for that of the

lower tribunal.” State v. Williams, 362 N.C. 628, 632-33, 669 S.E.2d 290, 294 (2008)

(citation and internal marks omitted).

B. Merits

“The primary rule of construction of a statute is to ascertain the intent of the

legislature and to carry out such intention to the fullest extent.” Burgess v. Your

House of Raleigh, Inc., 326 N.C. 205, 209, 388 S.E.2d 134, 137 (1990). “The best

indicia of that intent are the language of the statute . . . , the spirit of the act[,] and

what the act seeks to accomplish.” Coastal Ready-Mix Concrete Co., Inc. v. Bd. of

Comm’rs, 299 N.C. 620, 629, 265 S.E.2d 379, 385 (1980). Thus, “[i]n resolving issues

of statutory construction, we look first to the language of the statute itself.” Walker

v. Bd. of Tr. of the N.C. Local Gov’t. Emp. Ret. Sys., 348 N.C. 63, 65, 499 S.E.2d 429,

430 (1998) (citation omitted). “When the language of a statute is clear and without

-7-
KIDD CONSTR. GRP. V. GREENVILLE UTILS. COMM’N

Opinion of the Court

ambiguity, it is the duty of this Court to give effect to the plain meaning of the statute,

and judicial construction of legislative intent is not required.”1 Diaz v. Div. of Soc.

Servs., 360 N.C. 384, 387, 628 S.E.2d 1, 3 (2006).

Our Supreme Court’s holding in Quality Built Homes I is instructive in the

case at hand by providing the framework with which we interpret GUC’s Charter. In

holding that the Town of Carthage lacked the statutory authority to charge

prospective fees for water and sewer services, our Supreme Court compared the

language of the North Carolina Water and Sewer Authorities Act governing county

water and sewer districts with the Public Enterprise Statutes governing cities and

towns. 369 N.C. at 20, 789 S.E.2d at 458. The enabling statutes for water and sewer

districts included the language “services furnished and to be furnished” and thus

“plainly allowed the charge for prospective services, which are not limited to the

financing of maintenance and improvements of existing customers[.]” Id. (emphasis

in original) (citations and marks omitted). The enabling statutes for municipalities,

on the other hand, provided that “[a] city may establish and revise . . . rents, rates,

fees, charges, and penalties for the use of or the services furnished by any public

enterprise,” id. (quoting N.C. Gen. Stat. § 160A-314(a) (2015)) (emphasis added), “[a]

city shall have authority to acquire, construct, establish, enlarge, improve, maintain,

1 The rules of statutory construction are equally applicable when analyzing a local act of the

General Assembly like GUC’s charter. See, e.g., Lanvale Props., LLC v. Cty. of Cabarrus, 366 N.C.
142, 164, 731 S.E.2d 800, 815 (2012) (“[a]pplying these rules of statutory construction” when analyzing
whether a session law conferred certain authority to a county).

-8-
KIDD CONSTR. GRP. V. GREENVILLE UTILS. COMM’N

Opinion of the Court

own, operate, and contract for the operation of any or all of the public enterprises . . .

to furnish services,” id. (quoting § 160A-312(a)), “and that ‘a city shall have full

authority to finance the cost of any public enterprise by levying taxes, borrowing

money, and appropriating any other revenues therefor,’” id. (quoting § 160A-313).

The Court held that “[t]hese enabling statutes clearly and unambiguously

empower Carthage to charge for the contemporaneous use of water and sewer

services—not to collect fees for future discretionary spending” because “[a]

municipality’s ability to establish and revise its various fees is limited to the use of

or the services furnished by the enterprise, which provisions are operative in the

present tense.” Id. at 20, 789 S.E.2d at 458 (emphasis added) (internal marks

omitted). “[U]nlike similar county water and sewer district enabling statutes, the

language at issue here fails to authorize Carthage to charge for services ‘to be

furnished.’” Id. (emphasis in original). “While the enabling statutes allow Carthage

to charge for contemporaneous use of its water and sewer systems, the plain language

of the Public Enterprise Statutes clearly fails to empower the Town to impose impact

fees for future services.” Id. at 19-20, 789 S.E.2d at 458.

Here, the language in GUC’s Charter is nearly identical to that at issue in

Quality Built Homes I. Section 5 of the Charter provides that

The Greenville Utilities Commission shall have entire
supervision and control of the management, operation,
maintenance, improvement, and extension of the public
utilities of the City, which public utilities shall include

-9-
KIDD CONSTR. GRP. V. GREENVILLE UTILS. COMM’N

Opinion of the Court

electric, natural gas, water, and sewer services, and shall
fix uniform rates for all services rendered[.] . . .

S.L. 1991-861 § 5 (emphasis added). Not only is “services rendered” functionally

equivalent to Quality Built Homes I’s “services furnished,”2 it also fails to confer

prospective charging authority by lacking the critical “to be” language. Compare JVC

Enters., LLC, ___ N.C. App. at ___, 837 S.E.2d at 210 (holding that the language

“furnished or to be furnished” authorized the levying of prospective fees), with Quality

Built Homes I, 369 N.C. at 20-21, 789 S.E.2d at 458 (holding that the Public

Enterprise Statutes lacked “the essential ‘to be’ language.”). The impact fees at issue

here were not charged for contemporaneous services but for future services and

therefore required prospective charging power. Just as the “services furnished”

language did not empower Carthage to impose impact fees prior to any service being

provided, so too does “services rendered” fail to empower GUC to impose impact fees

on builders and developers as a condition of final development approval. See id. at

22, 179 S.E.2d at 459.

Defendant argues that when sections 5, 6, and 7 of the Charter are read

together, GUC possesses the requisite authority to charge impact fees. Defendant

2 “To furnish” means “to provide with what is needed” or to “supply, give,” Furnish, Merriam-

Webster Dictionary, https://www.merriam-webster.com/dictionary/furnish (last visited 1 May 2020),
while “to render” means “to transmit or deliver,” Render, Black’s Law Dictionary (11th ed. 2019); see
also Fid. Bank v. N.C. Dep’t of Revenue, 370 N.C. 10, 19, 803 S.E.2d 142, 149 (2017) (“In the event that
the General Assembly uses an unambiguous word without providing an explicit statutory definition,
that word will be accorded its plain meaning.”).

- 10 -
KIDD CONSTR. GRP. V. GREENVILLE UTILS. COMM’N

Opinion of the Court

argues that the Charter specifically authorizes GUC to “collect[] . . . rentals and

charges for service to customers,” S.L. 1991-861 § 6, and to pay out of such receipts

“the cost and expense incurred in managing, operating, improving, maintaining,

extending, and planning for future improvements and expansions of said utilities[,]”

id. § 7. According to Defendant “such language clearly authorizes the collection of

fees for future use, in contrast to the language analyzed in Quality Built Homes.”

While section 5’s “services rendered” is not the only reference to GUC’s

charging authority in the Charter, references elsewhere do not countenance more

expansive authority. Section 6, for instance, speaks of GUC’s charging authority in

terms of “the customers receiving service,” not customers who may receive service.

S.L. 1991-861 § 6; see also Dunn v. Pac. Emp’rs Ins. Co., 332 N.C. 129, 134, 418 S.E.2d

645, 648 (1992) (“Ordinary rules of grammar apply when ascertaining the meaning

of a statute[.]”). It goes on to authorize GUC to “pay out of its receipts the cost and

expense incurred in managing, operating, improving, maintaining, extending, and

planning for future improvements and expansions of said utilities[,]” S.L. 1991-861

§ 7, but “rentals and charges for service to customers”—operative in the present

tense—form the bases for these “receipts,” not rentals and charges for service to be

provided to customers or to customers who may be served. See Quality Built Homes

I, 369 N.C. at 20, 283 S.E.2d at 458; see also JVC Enters., LLC, ___ N.C. App. at ___,

837 S.E.2d at 209-10 (charter authorized charging of fees “to be paid by the owner,

- 11 -
KIDD CONSTR. GRP. V. GREENVILLE UTILS. COMM’N

Opinion of the Court

tenant[,] or occupant of each lot or parcel of land which may be served by such

electrical, sewer[,] and water facilities[.]”) (emphasis in original). Moreover,

Defendant’s argument is indistinguishable from that which our Supreme Court

rejected in Quality Built Homes I. 369 N.C. at 19, 789 S.E.2d at 458 (“Carthage

asserts that . . . it has broad authority to ‘collect monies’ for the ‘operation,

maintenance and expansion’ of its water and sewer systems, and that such authority

extends to the collection of impact fees.”). As in Quality Built Homes I, GUC’s Charter

“clearly and unambiguously empower[s] [GUC] to charge for the contemporaneous

use of water and sewer services—not to collect fees for future discretionary spending”

on water and sewer expansion projects. Id.

While the legislature could have included language like “services to be

rendered” or “services which may be rendered[,]” or other similar prospective

language in GUC’s Charter, it did not. And, as our Supreme Court noted in Quality

Built Homes I, other municipalities had previously sought specific legislative

authority to assess impact fees that the Town of Carthage had not. Id. at 21, 789

S.E.2d at 459 (citing An Act to Allow the Town of Rolesville to Impose Impact Fees,

ch. 996, § 1, 1987 N.C. Sess. Law 178, 178 (enabling Rolesville to “provide by

ordinance for a system of impact fees”); An Act Making Sundry Amendments

Concerning Local Governments in Orange and Chatham Counties, ch. 460, § 14.1,

1987 N.C. Sess. Laws 609, 613 (same for Pittsboro); An Act to Make Omnibus

- 12 -
KIDD CONSTR. GRP. V. GREENVILLE UTILS. COMM’N

Opinion of the Court

Amendments Concerning Local Governments in Orange and Chatham Counties, ch.

936, § 5.34, 1985 N.C. Sess. Laws 221, 221 (same for Chapel Hill)). The language in

these special acts specifically authorized the charging of “impact fees to be paid by

developers,” see, e.g., S.L. 1985-936 § 5.34(a), while GUC’s Charter, enacted two to six

years after those acts cited above, does not use such language, see State v. Benton,

276 N.C. 641, 658, 174 S.E.2d 793, 804 (1970) (“It is always presumed that the

legislature acted with care and deliberation and with full knowledge of prior and

existing law.”). As Plaintiffs noted in their brief to this Court, “If the General

Assembly had intended to grant the same powers to GUC as it had previously granted

to cities and towns like Chapel Hill, Rolesville, and Pittsboro, it easily could have

done so by using the same language in the GUC Charter.”

Though GUC’s Charter allows it to charge for “services rendered,” “the

language at issue here fails to authorize [GUC] to charge for services to be

[rendered].” Quality Built Homes I, 369 N.C. at 20, 789 S.E.2d at 458 (emphasis in

original). While the Charter “clearly and unambiguously” empowers GUC “to charge

for contemporaneous use of its water and sewer systems,” it does not contemplate

charges for future services. Id. And, though the Charter authorizes GUC to pay out

its receipts for “extending[] and planning for future improvements and expansions of

said utilities,” S.L. 1991-861 § 7, that does not change the limited sources through

- 13 -
KIDD CONSTR. GRP. V. GREENVILLE UTILS. COMM’N

Opinion of the Court

which those receipts can originate—contemporaneous use. The impact fees charged

by GUC were for future services and, therefore, not authorized by the Charter.

III. Conclusion

For the above stated reasons, we hold that the trial court erred in granting

summary judgment in favor of Defendant.

REVERSED AND REMANDED.

Judges BRYANT and YOUNG concur.

- 14 -

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/cases/10485893. Public record. Not legal advice.