# Spira v. Aeroflat -Russian Airlines

> District Court, E.D. New York · August 6, 2021

URL: https://www.frixlaw.com/law-library/cases/10306604

## Case

- **Court:** District Court, E.D. New York
- **Decided:** August 6, 2021
- **Opinion:** 100trialcourt
- **Cited by:** 0 later opinions in the Frix Law Library

## Citator (automated)

- No negative treatment found by the automated citator. That is not the same as a confirmation that the case is good law; read the citing cases.
- Full citator and citing cases: https://www.frixlaw.com/law-library/cases/10306604

## How later opinions describe it (automated extraction)

- holding that the plaintiff could not bring a claim in a United States court under a European Union airfare regulation because, “when read together, [the regulation’s] provisions establish[ed] that direct actions to enforce [the contract] rights are limited to courts in EU Memb…

## Opinion text

UNITED STATES DISTRICT COURT
EASTERN DISTRICT OF NEW YORK
-------------------------------------------------------x
NACHMAN SPIRA et al.,

Plaintiffs,
MEMORANDUM & ORDER
- against - 20-CV-4224 (PKC) (RLM)

AEROFLOT-RUSSIAN AIRLINES,

Defendant.
-------------------------------------------------------x
PAMELA K. CHEN, United States District Judge:
Before the Court is Defendant Aeroflot-Russian Airlines’ motion to dismiss the Complaint
of Plaintiffs Nachman Spira and 58 others. For the reasons below, the Court grants Defendant’s
motion and denies Plaintiffs’ request for leave to amend the Complaint.
BACKGROUND
I. Factual Background1
On July 4, 2017, Plaintiffs were on a school trip to Israel. They were scheduled to depart
from John F. Kennedy International Airport in Jamaica, New York, and arrive in Tel Aviv, Israel,
on Defendant’s Flight SU 103 (the “Flight”). (Complaint (“Compl.”), Dkt. 1, ¶¶ 6–7.) The Flight
was delayed for more than three and a half hours. (Id. ¶ 9.) During that time, Plaintiffs were given
inadequate access to food, water, and ventilation. (Id. ¶¶ 10–12.) The Flight was ultimately
cancelled, and Plaintiffs were placed on a replacement flight 24 hours later. (Id. ¶ 15.)

1 The factual background is based on the allegations in the Complaint, which the Court
accepts as true for purposes of this motion. See Forest Park Pictures v. Universal Television
Network, Inc., 683 F.3d 424, 429 (2d Cir. 2012).
By purchasing a ticket for the Flight, Plaintiffs agreed to Defendant’s “Conditions of
carriage” (the “Contract”).? The Contract includes a provision entitled “Liability”:
Fee) aN

Information about rights of air passengers in case of flight delay or flight cancellation
Aeroflot aims to inform its passengers who are affected by delays or cancellations of flights as soon as possible and
to assist its customers locally. Based on the applicable General Conditions of Carriage, effective as of 21 October, 2007,
Aeroflot offers the following compensation:
1.1n case of flight irregularities (delay/cancellation), aircraft replacement or other unexpected circumstances, passengers are eligible for
either a single free of charge phone call or fax transmission.
2.In the event of delays of more than four hours, passengers (independent of the flight class and «OK Status» of their ticket«) are eligible
for meals and drinks corresponding to the waiting time and the time of day (either breakfast, lunch or dinner).
3.Drinks will be offered for delays of two hours or more.
4.lf the delay is six hours or more during the night, or eight hours or more during the day, Aeroflot provides checked-in passengers (or with
«OK Status») with hotel accommodation plus catering services and transfer to and from the hotel.
Information for passengers flying to (from) Israel:
Israeli Aviation Services Law (Compensation and Assistance for Flight Cancellation or Change of Conditions)
(Pdf, 135 Kb)

Liability, AEROFLOT RUSSIAN AIRLINES, https://www.aeroflot.ru/xx-en/information/legal/liability
(last visited July 22, 2021). The bottom portion of this section, “Information for passengers flying
to (from) Israel,” provides a link to Israel’s Aviation Services Law (“ASL”), which, in turn,
concerns “Compensation and Assistance for Flight Cancellation or Change of Conditions.”
AVIATION SERVICES LAW, https://www.aeroflot.ru/media/aflfiles/docs/legal/aviation
_services law_eng].pdf (last visited July 22, 2021), at 1° Under the ASL, “[a] passenger for
whom a Flight Ticket has been issued which has been canceled, will be entitled to .. . Benefits”

2 Conditions of carriage, AEROFLOT RUSSIAN AIRLINES, https://www.aeroflot.ru/us-
en/information/legal/contract? preferredLocale=us&_preferredLanguage=en (last visited July 22,
2021). The Complaint does not include the Contract, but, as explained below, Plaintiffs seek to
amend the Complaint to include it.
> Although Plaintiffs rely on the ASL, they do not provide its full text. The ASL is available
through the link provided in the Contract, and the Court relies on the linked document.

including (1) “Assistance Services,” (2) “reimbursement,” and/or (3) “monetary compensation.”
Id. at 5. In certain circumstances, “[t]he court [also] may award compensation to a passenger who
has been issued a Flight Ticket independent of the damages . . . , in an amount which will not be
greater than 10,390 New Israel Sheqels,” as “Exemplary Damages.” Id. at 8. Israel’s “Minister
[of Transport, National Infrastructure and Road Safety] is responsible for the execution of [the

ASL].” Id. at 1, 10. “Regulations and orders under [the ASL] require the approval of the
Economics Committee of the Knesset.” Id. at 10.
II. Procedural Background
On September 10, 2020, Plaintiffs initiated this action, based on diversity jurisdiction,
alleging a violation of the ASL, intentional infliction of emotional distress (“IIED”), and seeking
reimbursement for expenses paid by Plaintiffs’ school. (See generally Compl., Dkt. 1.) Plaintiffs
did not sue for breach of the Contract, but sought to bring claims directly under the ASL. (Id.)
On February 12, 2021, Defendant sought a pre-motion conference regarding an anticipated
motion to dismiss the Complaint, in part on the ground that “the Israel [ASL] is not enforceable in
courts in the United States.” (See Defendant’s Letter, Dkt. 7, at 2.) In a response on February 24,

2020, Plaintiffs “conced[ed]” that their IIED claim was “time-barred” and that “the school lack[ed]
standing” to seek reimbursement. (Plaintiffs’ Letter (“Pl. Ltr.”), Dkt. 8, at ECF4 1.) Plaintiffs
agreed to limit their causes of action to those under the ASL and sought to “further amend the
summons to particularize [their] demand for relief pursuant to [the ASL] as a contractual obligation
of [Defendant].” (Id.) They argued that “[s]ince [] Plaintiffs were travelling to Israel, Israel’s

4 Citations to “ECF” refer to the pagination generated by the Court’s CM/ECF docketing
system and not the document’s internal pagination.
[ASL] is part and parcel of [the Contract]” and, “[a]s such, contractually, [Defendant] is bound by
said terms.” (Id. at ECF 2.)
On March 1, 2021, the Court construed Defendant’s pre-motion conference letter as a
motion to dismiss and directed Defendant to file a supplemental brief. (3/1/2021 Docket Order.)
Defendant supplemented its letter on March 19, 2021, addressing Plaintiffs’ argument that the

Contract incorporated the ASL. (See generally Defendant’s Brief (“Def. Br.”), Dkt. 9.) Plaintiffs
filed a reply on April 11, 2021. (Plaintiff’s Reply (“Pl. Reply”), Dkt. 10.) Defendant’s motion to
dismiss is now before the Court.
LEGAL STANDARD
To survive a motion to dismiss under Federal Rule of Civil Procedure 12(b)(6), “a
complaint must contain sufficient factual matter, accepted as true, to ‘state a claim to relief that is
plausible on its face.’” Ashcroft v. Iqbal, 556 U.S. 662, 678 (2009) (quoting Bell Atl. Corp. v.
Twombly, 550 U.S. 544, 570 (2007)). A “claim has facial plausibility when the plaintiff pleads
factual content that allows the court to draw the reasonable inference that the defendant is liable
for the misconduct alleged.” Id. (citing Twombly, 550 U.S. at 556). The “plausibility standard is

not akin to a ‘probability requirement,’ but it asks for more than a sheer possibility that a defendant
has acted unlawfully.” Id. (citation omitted).
Determining whether a complaint states a plausible claim for relief is “a context-specific
task that requires the reviewing court to draw on its judicial experience and common sense.” Id. at
679 (citation omitted). “In addressing the sufficiency of a complaint, [the Court] accept[s] as true
all factual allegations and draw[s] from them all reasonable inferences; but [the Court is] not
required to credit conclusory allegations or legal conclusions couched as factual
allegations.” Rothstein v. UBS AG, 708 F.3d 82, 94 (2d Cir. 2013).
When considering the pleadings on a Rule 12(b)(6) motion, “[a] complaint is deemed to
include any written instrument attached to it as an exhibit or any statements or documents
incorporated in it by reference.” Nicosia v. Amazon.com, Inc., 834 F.3d 220, 230 (2d Cir. 2016)
(citation and quotations omitted). “Where a document is not incorporated by reference, the court
may nevertheless consider it where the complaint relies heavily upon its terms and effect, thereby

rendering the document integral to the complaint.” Id. (citations and quotations omitted).
DISCUSSION
I. Plaintiffs’ Complaint Is Dismissed for Failing to State a Claim
Plaintiffs argue that the Court should not dismiss the Complaint because Defendant
“incorporate[ed] [the ASL] into [the Contract]” through the Liability provision. (Pl. Reply, Dkt.
10, at ECF 2.) Plaintiffs thus contend that they are entitled to bring a claim “for relief pursuant to
[the language of the ASL] as a contractual obligation of [Defendant].” (Pl. Ltr., Dkt. 8, at ECF 1.)
This is incorrect.
The Complaint, in fact, does not rely on a contract theory, but instead seeks to bring claims
directly under the ASL. However, the ASL cannot be enforced in this Court. In Bernfeld v. US
Airways, Inc., No. 14-CV-5573 (SJC), 2016 WL 1583057, at *3 (N.D. Ill. Apr. 20, 2016), the

Northern District of Illinois held “that the Israeli [ASL] is not judicially enforceable in [United
States] [c]ourt[s].”5 It explained that “for a [flight] delay damages claim under a foreign statute to
be actionable under a direct claim in the United States, the foreign law must provide for a cause of
action in the United States or, at the minimum, set forth an enforcement regime that could be
implemented by United States courts without violating principles of international comity.” Id.

5 Though there is little authority on this issue and Bernfeld is the only decision of which
the Court is aware that addresses the ASL, the Court finds its reasoning persuasive and therefore
adopts it.
(citing Volodarskiy v. Delta Airlines, Inc., 784 F.3d 349, 357 (7th Cir. 2015)). “The [ASL],” the
Bernfeld court reasoned, “appears to establish a regulatory scheme of passengers[’] rights to be
enforced through administrative actions, as evinced by the law’s provisions that it is to be executed
by [Israel’s] Minister of Transport, National Infrastructure, and Road Safety and that regulations
under the law must be approved by the Economics Committee of the Knesset.” Id. The court thus

concluded that the ASL does not create a cause of action in United States courts. Cf. Volodarskiy,
784 F.3d at 354 (holding that the plaintiff could not bring a claim in a United States court under a
European Union airfare regulation because, “when read together, [the regulation’s]
provisions establish[ed] that direct actions to enforce [the contract] rights are limited to courts in
EU Member States”); Click 2 Refund Inc. v. Brit. Airways PLC, No. 19-CV-5399 (CAS) (SK),
2019 WL 6135123, at *3 (C.D. Cal. Nov. 18, 2019) (same).
Plaintiffs challenge the reasoning in Bernfeld, pointing to the ASL’s provision that “[t]he
court may award compensation to a passenger who has been issued a Flight Ticket independent of
the damages . . . , in an amount which will not be greater than 10,390 New Israel Sheqels.” (Pl.

Ltr., Dkt. 8, at ECF 3.) Plaintiffs appear to argue that the reference to “the court” suggests that the
ASL creates a cause of action in any court, including courts of the United States. But the Seventh
Circuit rejected essentially the same argument in Volodarskiy, where “[t]he plaintiffs insist[ed]
that [a foreign flight-delay statute’s] reference to ‘courts’ and the ‘procedures of national law’
mean[t] that direct claims under [the statute] can be brought in the courts of any country.” 784
F.3d at 354. The Seventh Circuit concluded that this “reading ignore[d] the broader context of
th[e] [statutory] passage.” Id. at 354–55. Here, similarly, Plaintiffs ignore the broader context of
the ASL, which contemplates execution by Israel’s “Minister of Transport, National Infrastructure,
and Road Safety” “through administrative actions,” Bernfeld, 2016 WL 1583057, at *3,
compensation in “New Israel Sheqels,” AVIATION SERVICES LAW at 8, and a regulatory scheme
“requir[ing] the approval of the Economics Committee of the Knesset,” id. at 10.
Accordingly, because the Complaint contains only a direct claim under the ASL, which is
not enforceable in this Court, and Plaintiffs withdraw their IIED and reimbursement causes of
action, the Complaint is dismissed for failure to state a claim.

II. The Contract Does Not Incorporate the ASL
Presumably to avoid this defect in their direct claim under the ASL and apparently
abandoning that claim, Plaintiffs argue in their reply to the dismissal motion that Defendant
“incorporate[ed] [the ASL] into their Conditions of carriage,” and thus Plaintiffs can sue
Defendant for breach of contract based on the provisions of the ASL. (Pl. Reply, Dkt. 10, at ECF
26.)
As noted, Plaintiffs did not attach the Contract to the Complaint and did not raise a contract
argument until their response to Defendant’s motion. (See Pl. Ltr., Dkt. 8, at ECF 4). Plaintiffs
thus ask to “amend the summons to particularize [their] demand for relief pursuant to [the ASL]
as a contractual obligation of [Defendant].” (Id. at ECF 1.) But even were the Court to treat

Plaintiffs’ Reply as a motion seeking leave to amend their claim to a contract theory, the proposed
amendment would be futile. See Chunn v. Amtrak, 916 F.3d 204, 208 (2d Cir. 2019) (“Leave to
amend may be denied if the proposed amendment would be futile.”).
As an initial matter, Plaintiffs are correct that even where a claimant would otherwise lack
a cause of action under a particular statute, parties to a contract “may incorporate into the contract

6 (See also Pl. Ltr., Dkt. 8, at ECF 4 (seeking to distinguish Bernfeld: “In Bernfeld, there
is no evidence that [the] [p]laintiff’s attorney introduced the airlines’ general conditions of
carriage, which included Israel’s [ASL], by reference, nor is there any evidence that said attorney
requested that said law be applied as part of the airline’s contractual obligation to their passengers
flying to Israel.”).)
by reference extrinsic material which may, among other things, be the provisions of some foreign
law.” Restatement (Second) of Conflict of Laws § 187 cmt. n.c (1971). Thus, a foreign statute
“referred to in a written instrument and sufficiently described may be made a part of the instrument
as if incorporated into the body of it.” In re Lehman Bros. Holdings Inc., 970 F.3d 91, 101 (2d
Cir. 2020) (per curiam) (citation, quotations, and brackets omitted).7 “[T]he paper to be

incorporated into a written instrument by reference must be so referred to and described in the
instrument that the paper may be identified beyond all reasonable doubt.” PaineWebber Inc. v.
Bybyk, 81 F.3d 1193, 1201 (2d Cir. 1996) (emphasis in original) (quoting Chiacchia v. National
Westminster Bank USA, 507 N.Y.S.2d 888, 889–90 (N.Y. App. Div. 1986)). “[A] party will not
be bound to the terms of any document unless it is clearly identified in the agreement.” Id. (citation
omitted).
“[W]hile express identification of a document is a necessary condition for incorporation of
that document, it is not a sufficient one.” Intesa Sanpaolo, S.p.A. v. Credit Agricole Corporate &
Inv. Bank, No. 12-CV-2683 (RWS), 2013 WL 4856199, at *3 (S.D.N.Y. Sept. 10, 2013). “In

addition to language explicitly identifying the referenced document, there must also be language
that ‘clearly communicates that the purpose of the reference is to incorporate the referenced
material into the contract, rather than merely to acknowledge that the referenced material is
relevant to the contract, e.g., as background law.’” Id. (brackets omitted) (quoting Northrop
Grumman Info. Tech., Inc. v. United States, 535 F.3d 1339, 1345 (Fed. Cir. 2008)).

7 Neither party in this case argues that the Court should interpret the Contract under a
particular jurisdiction’s law. Because “courts sitting in diversity may properly rely on the forum
state’s law where neither party asserts that another jurisdiction’s law meaningfully differs,”
Johnson v. Priceline.com, Inc., 711 F.3d 271, 276 (2d Cir. 2013), the Court construes the Contract
in light of New York law.
This issue arose in Kogan v. Scandinavian Airlines System, 253 F. Supp. 3d 1022, 1024
(N.D. Ill. 2017), where the plaintiff sued the Scandinavian Airlines System after it delayed her
flight from Copenhagen to Chicago. The plaintiff argued that the airfare contract between the
parties incorporated “EU 261, a regulation setting forth a framework for ensuring that passengers
are adequately compensated for flight delays and cancellations.” Id. She relied on two provisions

in the contract: “actions[,] including actions relating to passenger rights subject to [EU 261,] shall
be limited in accordance with national law,” and
[i]f your flight is delayed 3 hours or more and if the delay is not caused by
Extraordinary Circumstances which could not have been avoided if all reasonable
measures had been taken[,] you will be entitled to compensation if provided by
applicable law. For travel within EU and from a non-EU country into EU[,] [the]
applicable law is [EU 261].
Id. at 1025–26
The court rejected the plaintiff’s argument that these paragraphs incorporated EU 261 into
the airfare contract. Id. at 1026. It explained that the “[m]ere reference to another contract or
document is not sufficient to incorporate its terms into a contract.” Id. at 1025 (quoting Rosenblum
v. Travelbyus.com Ltd., 299 F.3d 657, 666 (7th Cir. 2002)). Although the first relevant paragraph
of the contract mentioned EU 261, it “reflect[ed] no intent to incorporate EU 261 by reference.”
Id. at 1026. Rather, “[i]t merely acknowledge[d] the possibility that some passengers may have
‘rights subject to EU 261.’” Id. (brackets omitted). Likewise, the second relevant paragraph
“simply [gave] passengers notice that an extrinsic body of law may independently provide
compensation.” Id. The court thus granted summary judgment to the defendant. Id. at 1027.
Similarly, in Dochak v. Polskie Linie Lotnicze LOT S.A., 189 F. Supp. 3d 798, 802–03
(N.D. Ill. 2016), the court held that provisions of an airfare contract did not incorporate EU 261.
There, the plaintiff relied on the contract’s provision that, “[i]n the event of denied boarding and
of cancellation or long delay of flights, passengers are entitled to rights provided for in [EU 261],
in accordance with the rules and to the extent set forth by this Regulation.” Id. at 803. The court
granted the defendant’s motion to dismiss, explaining that this paragraph did “not plausibly
constitute incorporation of [EU 261],” but merely gave the “[p]laintiffs notice of their rights under
EU 261.” Id. at 803–04.
As noted, the Liability provision in the Contract includes “[i]nformation about rights of air

passengers in case of flight delay or flight cancellation,” and says:
[Defendant] aims to inform its passengers who are affected by delays or
cancellations of flights as soon as possible and to assist its customers locally. Based
on the applicable General Conditions of Carriage, effective as of 21 October, 2007,
[Defendant] offers the following compensation:

1. In case of flight irregularities (delay/cancellation), aircraft replacement or other
unexpected circumstances, passengers are eligible for either a single free of charge
phone call or fax transmission.

2. In the event of delays of more than four hours, passengers (independent of the
flight class and [preferred status] of their ticket[]) are eligible for meals and drinks
corresponding to the waiting time and the time of day (either breakfast, lunch or
dinner).

3. Drinks will be offered for delays of two hours or more.

4. If the delay is six hours or more during the night, or eight hours or more during
the day, [Defendant] provides checked-in passengers (or with [preferred status])
with hotel accommodation plus catering services and transfer to and from the hotel.
Beneath this section, in larger font, is the notice, “Information for passengers flying to (from)
Israel,” with a link to the ASL.8
Given the link to the ASL in the Contract, Plaintiffs are right that the ASL is thereby
“referred to and described in the instrument [such] that the [ASL] may be identified beyond all
reasonable doubt.” PaineWebber Inc., 81 F.3d at 1201 (citation and quotations omitted). The

8 Although the Contract is not attached to the Complaint, the Court considers it because it
is attached to Plaintiffs’ proposal to amend, and, anyway, the proposed amended complaint “relies
heavily upon its terms and effect.” See Nicosia, 834 F.3d at 230 (citations and quotations omitted).
question thus becomes whether, “[i]n addition to language explicitly identifying the [ASL], there
[is] language that clearly communicates that the purpose of the reference is to incorporate the
[ASL] into the contract.” Intesa Sanpaolo, S.p.A., 2013 WL 4856199, at *3 (citation, quotations,
and brackets omitted).
Plaintiffs contend that the link to the ASL, under the heading “Information for passengers

flying to (from) Israel,” incorporates the “ASL into [the] terms and conditions of carriage for
passengers flying to (from) Israel,” because the four enumerated forms of “compensation”
Defendant offers in the section above that heading “are applicable for passengers who are flying
other than to or from Israel.” (Pl. Reply, Dkt. 10, at ECF 3 (emphasis removed).) By implication,
Plaintiffs contend, the provision linking to the ASL incorporates the statute as Defendant’s “offer”
of “compensation” to passengers traveling to Israel, such as Plaintiffs.
Plaintiffs’ argument misconstrues the Contract. In contrast to the express language
“offering” four forms of compensation to passengers in the first part of the Liability Section, the
second part of that section merely references the ASL as “information for passengers” flying to or

from Israel. Liability, AEROFLOT RUSSIAN AIRLINES (emphasis added). Nowhere in the Liability
Section does it say that Defendant will provide the compensation listed in the ASL; rather, it merely
advises that the ASL may provide a separate avenue of relief for passengers traveling to or from
Israel. That the Contract specifies the four ways in which Defendant “offers” “compensation” to
passengers confirms that the additional “information” section with the link to the ASL is not
“compensation” Defendant “offers.”
Thus, although the Contract “explicitly identif[ies]” the ASL, there is no “language that
‘clearly communicates that the purpose of the reference is to incorporate the [ASL] into the
[C]ontract, rather than merely to acknowledge that the [ASL] is relevant to the contract, e.g., as
background law.’” See Intesa, 2013 WL 4856199, at *3 (brackets omitted) (quoting Northrop
Grumman Info. Tech., Inc., 535 F.3d at 1345). In this respect, this case resembles Dochak, where
the airfare contract did “not plausibly constitute incorporation of [EU 261]” despite advising
passengers that they “are entitled to rights provided for in [EU 261],” because it merely gave the
“[p]laintiffs notice of their rights under EU 261.” See 189 F. Supp. 3d at 803. This case also

resembles Kogan, where the contract at issue “reflect[ed] no intent to incorporate EU 261 by
reference,” but “merely acknowledge[d] the possibility that some passengers may have ‘rights
subject to EU 261.’” 253 F. Supp. 3d at 1026 (brackets omitted).
Accordingly, because the Contract does not incorporate the ASL, there is no basis for
Plaintiffs’ “demand [for] relief pursuant to [the ASL] as a contractual obligation of [Defendant]”
(Pl. Reply, Dkt. 10, at ECF 2), and Plaintiffs’ request for leave to amend to “particularize” this
demand for relief (Pl. Ltr., Dkt. 8, at 1) must be denied as futile. See Chunn, 916 F.3d at 208.
CONCLUSION
For the foregoing reasons, the Court grants Defendant’s motion to dismiss in its entirety.
The Clerk of Court is respectfully directed to enter judgment accordingly.

SO ORDERED.
/s/ Pamela K. Chen
Pamela K. Chen
United States District Judge
Dated: August 6, 2021
Brooklyn, New York

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/cases/10306604. Public record. Not legal advice.
