# BOROUGH OF EDGEWATER v. WATERSIDE CONSTRUCTION, LLC

> District Court, D. New Jersey · September 3, 2021

URL: https://www.frixlaw.com/law-library/cases/10271502

## Case

- **Court:** District Court, D. New Jersey
- **Decided:** September 3, 2021
- **Opinion:** 100trialcourt
- **Cited by:** 0 later opinions in the Frix Law Library

## Citator (automated)

- No negative treatment found by the automated citator. That is not the same as a confirmation that the case is good law; read the citing cases.
- Full citator and citing cases: https://www.frixlaw.com/law-library/cases/10271502

## How later opinions describe it (automated extraction)

- discussing a case in which the failure of a lessor to prevent or halt discharger when it knew or should have known of the danger of contamination was an act or omission resulting in the releasing, spilling, and leaking of pollutants
- describing CERCLA Section 107 and Section 113

## Opinion text

Not for Publication
UNITED STATES DISTRICT COURT
DISTRICT OF NEW JERSEY

BOROUGH OF EDGEWATER,

Plaintiff,
Civil Action No. 14-5060
v.
OPINION
WATERSIDE CONSTRUCTION, LLC; 38
COAH , LLC; DAIBES BROTHERS, INC.;
NORTH RIVER MEWS ASSOCIATES, LLC;
FRED A. DAIBES; TERMS
ENVIRONMENTAL SERVICES, INC.;
ALCOA INC.; ALCOA DOMESTIC, LLC, as
successor in interest to A.P. NEW JERSEY,
INC.; HUDSON SPA, LLC; JOHN DOES 1-
100; ABC CORPORATIONS 1-100,

Defendants
and
WATERSIDE CONSTRUCTION, LLC; 38
COAH LLC; DAIBES BROTHERS, INC.;
NORTH RIVER MEWS ASSOCIATES, LLC;
FRED A. DAIBES,

Defendants/ Third-Party Plaintiffs
v.
NEGLIA ENGINEERING ASSOCIATES,
Third-Party Defendants,
and
ALCOA DOMESTIC, LLC as successor in
interest to A.P. NEW JERSEY, INC.,

Defendant/Third-Party Plaintiff,
v.
COUNTY OF BERGEN; RIVER ROAD
IMPROVEMENT PHASE II, INC.; HUDSON
SPA, LLC,

Third-Party Defendants.

John Michael Vazquez, U.S.D.J.
Presently before the Court is a motion for summary judgment (D.E. 343) filed by TERMS
Environmental Services, Inc. (“TERMS”). The Court has reviewed all submissions made in
support and in opposition to the motion and considered the motion without oral argument pursuant
to Fed. R. Civ. P. 78(b) and L. Civ. R. 78.1(b). For the reasons stated below, TERMS’ motion for
summary judgment (D.E. 343) is GRANTED in part and DENIED in part.1
I. BACKGROUND
This matter stems from an allegation that certain Defendants used polychlorinated biphenyl
(“PCB”)2 contaminated material as fill in a public park project. The park is owned by Plaintiff

1 The current motion is part of a large number of motions for summary judgment filed in this
matter. All pending motions are listed in the Procedural History section of this Opinion. If the
Court were to address all motions in a single opinion, the results would be unwieldly. As a result,
the Court addresses the motions individually or in a group. The Court also does not repeat each
and every alleged fact in each opinion. Instead, the Court focuses on the facts pertinent to each
motion (or motions) as asserted by the parties to the motion(s). Therefore, if the facts in one
opinion appear to be distinguishable from facts in another opinion, it is because those are the facts
asserted by the party or parties in its/their respective motions.
2 According to the Environmental Protection Agency, PCBs are a group of man-made organic
chemicals consisting of carbon, hydrogen and chlorine atoms. United States Environmental
Protection Agency, Learn about Polychlorinated Biphenyls (PCBs),
https://www.epa.gov/pcbs/learn-about-polychlorinated-biphenyls-pcbs. PCBs have been
demonstrated to cause a variety of adverse health effects. Id.
Borough of Edgewater (“Edgewater”), but the contaminated materials (or at least some of them)
came from a property previously owned by Alcoa Corporation (“Alcoa”), now known as Arconic.
A. Facts3
Alcoa constructed and operated an industrial plant (the “Alcoa Property”) from 1914-1965
in Edgewater, New Jersey. BE SOMF ¶ 1. A structure, referred to as “Building 12,” was

constructed on that site in 1938. BE SOMF ¶ 3. The site was subsequently acquired by Amland
Properties Corporation (“Amland”), who then discovered PCB contamination throughout the
property. Amland sued Alcoa, which resulted in a settlement and the site being conveyed to an
Alcoa entity, A.P. New Jersey, Inc. (“AP”), which later became Arconic Domestic, LLC. BE
SOMF ¶ 12. The Amland settlement agreement required that the deed of conveyance contain a
legend notice stating that “[t]his property may be contaminated with hazardous substances
including Polychlorinated Biphenyls.” BE SOMF ¶ 11.
In 1997, Alcoa sold the property to North River, an entity affiliated with Fred Daibes.
Pursuant to the terms of the Purchase and Sale Agreement (“PSA”) and the related Multi-Party

Property Acquisition Agreement (“MPAA”), AP agreed to pay RRIP up to $12,000,000 for the
demolition, removal, and proper disposal of the buildings on the site pursuant to a Remedial Action
Work Plan. BE SOMF ¶ 41. Later that year, North River requested permission to postpone the
demolition of Building 12. BE SOMF 52. In 2006, the portion of the Alcoa Property containing

3 Many of the facts are derived from Plaintiff Borough of Edgewater’s statement of material facts
(D.E. 319-1), which will be referred to as “BE SOMF”; TERMS’ statement of material facts (D.E.
312-1) will be referred to as “TERMS SOMF”; TERMS’ statement of facts in response to
Edgewater’s statement (D.E. 322) will be referred to as “TERMS Response”; Edgewater’s
statement in response to TERMS’ statement of facts (D.E. 323-1) will be referred to as “BE
Response”; and Arconic’s responsive statement of facts (D.E. 361) will be referred to as “A
Response.”
Building 12 was transferred from North River to 38 COAH, another entity affiliated with Fred
Daibes. BE SOMF ¶ 65. In 2010, certain areas of the exterior walls on Building 12 became
unstable and fell. BE SOMF ¶ 68.
In 2011, Plaintiff Edgewater looked to improve Veterans Field, a 27-acre public park
owned by the borough. BE SOMF ¶¶ 75-76. TERMS, an environmental consulting firm, was

retained as a consultant and Licensed Site Remediation Professional for the project. After a
bidding process, Waterside, a construction company managed by Fred Daibes, was awarded the
contract for the improvement project. BE SOMF ¶¶ 80, 85, 86.
When the amount of fill needed at the Veterans Field project increased, Waterside imported
and used the PCB-contaminated material from Building 12 as fill on Veterans Field. BE SOMF ¶
93. The parties dispute whether this was done with TERMS’ knowledge and/or approval.
Edgewater further asserts that on September 7, 2013, after advising Neglia, the engineer assigned
to the project, that no work would be performed over the weekend, Waterside dumped unapproved
fill on the site and then covered the fill when the Neglia supervisor arrived to the site. BE SOMF

¶¶ 95-98. Edgewater alleges that Waterside continued to import contaminated materials from
September 7, 2013 to October 3, 2013, when TERMS issued a letter advising of the PCB
contamination and closed the Veterans Field site for an assessment. BE SOMF ¶¶ 106-107.
Waterside disputes this.
Veterans Field had PCB contamination before the project began, with the highest level
being 2.5 parts per million (“ppm”). BE SOMF ¶ 78. Sampling done after the site was closed in
October 2013 found that fill materials used throughout the site were contaminated with PCBs,
including (1) crushed concrete with levels ranging from 100-350 ppm used for concrete sidewalks
and cement pads, and (2) concrete combined with soil with levels ranging from 10-350 ppm used
as fill on the field and under paved areas. BE SOMF § 11. Impacted materials were excavated
pursuant to an EPA-approved Self-Implementing Plan and disposed off-site. BE SOMF § 115.
I. Procedural History
Edgewater first filed suit on August 12, 2014. D.E. 1. On February 27, 2018, the separate
matters docketed as 14-8129 and 14-50560 were consolidated. D.E. 255. Multiple parties have
filed multiple motions for summary judgment in this matter. The motions are as follows:
e Motion by TERMS for summary judgment against Edgewater (D.E. 343);
e Motion by Hudson Spa for summary judgment against Edgewater (D.E. 342);
e Motion by Arconic for summary judgment against Edgewater (D.E. 344);
e Motion by Arconic for summary judgment against Fred Daibes and North River;
e Motion by Bergen County for summary judgment against Alcoa, North River, and RRIP
(D.E. 346);
e Motion by Edgewater for summary judgment against the Waterside Entities on Count XI
(D.E. 347);
e Motion by Edgewater for summary judgment against the Waterside Entities on Counts II
and VI (D.E. 348);
e Motion by Edgewater for summary judgment against Alcoa on Count I (D.E. 349);
e Motion by Edgewater for summary judgment against the Waterside Entities on Count I
(D.E. 350);
e Motion by Arconic for summary judgment against North River, 38 COAH, and RRIP (D.E.
351);
e Motion by Edgewater for summary judgment against Alcoa on Count II (D.E. 352); and
e Motion by Edgewater for summary judgment against the Waterside Entities on Count II
(D.E. 353).
This Opinion address only the motion for summary judgment filed by TERMS (D.E. 343).
Ii. LEGAL STANDARD
A moving party is entitled to summary judgment where “the movant shows that there is no
genuine dispute as to any material fact and the movant is entitled to judgment as a matter of law.”
Fed. R. Civ. P. 56(a). A fact in dispute is material when it “might affect the outcome of the suit
under the governing law” and is genuine “if the evidence 1s such that a reasonable jury could return

a verdict for the nonmoving party.” Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 248 (1986).
Disputes over irrelevant or unnecessary facts will not preclude granting a motion for summary
judgment. Id. “In considering a motion for summary judgment, a district court may not make
credibility determinations or engage in any weighing of the evidence; instead, the nonmoving
party’s evidence ‘is to be believed and all justifiable inferences are to be drawn in his favor.’”

Marino v. Indus. Crating Co., 358 F.3d 241, 247 (3d Cir. 2004) (quoting Anderson, 477 U.S. at
255)). A court’s role in deciding a motion for summary judgment is not to evaluate the evidence
and decide the truth of the matter but rather “to determine whether there is a genuine issue for
trial.” Anderson, 477 U.S. at 249.
A party moving for summary judgment has the initial burden of showing the basis for its
motion and must demonstrate that there is an absence of a genuine issue of material fact. Celotex
Corp. v. Catrett, 477 U.S. 317, 323 (1986). After the moving party adequately supports its motion,
the burden shifts to the nonmoving party to “go beyond the pleadings and by her own affidavits,
or by the depositions, answers to interrogatories, and admissions on file, designate specific facts

showing that there is a genuine issue for trial.” Id. at 324 (internal quotation marks omitted). To
withstand a properly supported motion for summary judgment, the nonmoving party must identify
specific facts and affirmative evidence that contradict the moving party. Anderson, 477 U.S. at
250. “[I]f the non-movant’s evidence is merely ‘colorable’ or is ‘not significantly probative,’ the
court may grant summary judgment.” Messa v. Omaha Prop. & Cas. Ins. Co., 122 F. Supp. 2d
523, 528 (D.N.J. 2000) (quoting Anderson, 477 U.S. at 249-50)).
Ultimately, there is “no genuine issue as to any material fact” if a party “fails to make a
showing sufficient to establish the existence of an element essential to that party’s case.” Celotex
Corp., 477 U.S. at 322. “If reasonable minds could differ as to the import of the evidence,”
however, summary judgment is not appropriate. See Anderson, 477 U.S. at 250-51.
IV. DISCUSSION
TERMS’ motion addresses Edgewater’s Spill Act and Comprehensive Environmental
Response, Compensation, and Liability Act (“CERCLA”) claims against it; breach of contract

claims asserted by TERMS, Edgewater, and Waterside Construction, LLC, 38 COAH, LLC,
Daibes Brothers, Inc., North River Mews Associates, LLC, and Fred Daibes (“the Waterside
Defendants”); and claims for contribution and indemnification asserted by Alcoa and A.P.
(collectively, “Arconic”) and the Waterside Defendants.4
CERCLA
TERMS first moves for summary judgment on the CERCLA claims asserted against it by
Edgewater. Congress enacted CERCLA, codified as 42 U.S.C. § 9601 et seq., “to promote the
timely cleanup of hazardous waste sites and to ensure that the costs of such cleanup efforts were
borne by those responsible for the contamination.” Burlington N. & Santa Fe Ry. Co. v. United

States, 556 U.S. 599, 602 (2009) (internal quotations omitted). “CERCLA provides two
mechanisms that allow potentially responsible parties (“PRPs”) to recover costs they have
expended to decontaminate a polluted site: § 107(a) cost recovery claims and § 113(f) contribution
claims.” Agere Sys., Inc. v. Advanced Envtl. Tech. Corp., 602 F.3d 204, 216 (3d Cir. 2010).
Section 107(a), in part, allows private parties to hold PRPs responsible for “any other necessary
costs of response incurred by any other person” consistent with CERCLA. 42 U.S.C. §

4 TERMS’ brief in support of its motion (D.E. 339) will be referred to as “TERMS Brf.”; Arconic’s
brief in opposition (D.E. 370) will be referred to as “Arconic Brf.”; Edgewater’s brief in opposition
(D.E. 367) will be referred to as “BE Brf.”; and TERMS’ brief in reply (D.E. 390) will be referred
to as “TERMS Reply.”
9607(a)(4)(B); Agere Sys., Inc., 602 F.3d at 225. Section 113(f)(1) provides for a right to
contribution following a civil action under CERCLA, stating that “[a]ny person may seek
contribution from any other person who is liable or potentially liable under section 9607(a) of this
title, during or following any civil action under section 9606 of this title or under section 9607(a)
of this title.” 42 U.S.C. § 9613. Section 113(f)(3)(B) provides for a right to contribution after

liability to a State or the United States has been determined in “an administrative or judicially
approved settlement.” 42 U.S.C. § 9613 (Section 113(f)(3)(B) referring to 113(f)(2)); see also
Agere Sys., Inc., 602 F.3d at 217-18 (describing CERCLA Section 107 and Section 113).
Under CERCLA, PRPs consist of the following:
(1) the owner and operator of a vessel or a facility,
(2) any person who at the time of disposal of any hazardous
substance owned or operated any facility at which such hazardous
substances were disposed of,
(3) any person who by contract, agreement, or otherwise arranged
for disposal or treatment, or arranged with a transporter for transport
for disposal or treatment, of hazardous substances owned or
possessed by such person, by any other party or entity, at any facility
or incineration vessel owned or operated by another party or entity
and containing such hazardous substances, and
(4) any person who accepts or accepted any hazardous substances
for transport to disposal or treatment facilities, incineration vessels
or sites selected by such person, from which there is a release, or a
threatened release which causes the incurrence of response costs, of
a hazardous substance[.]

42 U.S.C. § 9607(a)(1)-(4); see also Litgo New Jersey Inc. v. Comm'r New Jersey Dep't of Envtl.
Prot., 725 F.3d 369, 379 (3d Cir. 2013).
Edgewater’s Complaint asserts a claim for cost recovery under CERCLA (Count II).
Compl. at ¶¶ 120-135. TERMS argues that it does not qualify as a PRP with respect to the
discharge at Veteran’s Field. Edgewater did not respond to TERMS’ motion for summary
judgment as to the CERCLA claims and stated explicitly that it does not oppose TERMS’ position
that it is not a PRP under CERLA Section 107(a). BE Brf. at 8. TERMS’ motion as to the
CERCLA claim asserted by Edgewater is therefore granted. See Smith v. Chase Bank, Civ. No.
18-16428, 2021 WL 753897, at *3 (D.N.J. Feb. 25, 2021) (treating the explicit abandonment of a
claim in a brief as dismissal upon consent).
TERMS has also moved for summary judgment as to the CERCLA contribution claims

asserted by Arconic and the Waterside Defendants. Arconic’s claim for CERCLA contribution is
moot as this Court has granted Arconic’s motion for summary judgment on the CERCLA claim
asserted against it by Edgewater. TERMS’ motion as to the CERCLA contribution claim asserted
by Arconic is therefore granted.
The Waterside Defendants have not responded to TERMS’ motion. The Waterside
Defendants’ crossclaim states that “Defendants are or were each an owner and/or operator of the
Veteran’s Field site within the meaning of Section 101(20) of CERCLA, 42 U.S.C. § 9610(20)
and/or arranged, by contract, agreement, or otherwise, for disposal of hazardous substances.”
The crossclaim does not go into further detail as to which category of PRP they allege TERMS

to be or what facts support that claim. Without the benefit of a brief in opposition (and, more
importantly, evidence that raises a genuine dispute of material fact), the Court is not
independently aware of a reason that summary judgment should not be granted. TERMS’ motion
as to the CERCLA contribution claims asserted against it is therefore granted.
Negligence Claims
Edgewater asserts a negligence claim against TERMS in Count XIII of its Fifth Amended
Complaint. That claim indicates that TERMS owed a duty of care to Edgewater “as the
environmental consultant, LSRP for the Veteran’s Field Project” to do the following:
[E]nsure that contaminated fill materials were not imported and
placed on the Site, to prevent the cross-contamination at the Site, to
perform proper and adequate sampling of contamination of the Site,
and to prepare a [Self-Implementing Plan] which conformed with
the [Environmental Protection Administration] regulations and
guidelines in such a manner as to not cause Edgewater injury or
damages.

Compl. at ¶ 270.
TERMS first argues that Edgewater’s negligence claim is barred by the economic loss
doctrine. TERMS Brf. at 35. “The economic loss doctrine prohibits plaintiffs from recovering in
tort economic losses to which their entitlement only flows from contract.” Chen v. HD Dimension
Corp., No. 10-863, 2010 WL 4721514, at *8 (D.N.J. Nov. 15, 2010). Thus, “whether a tort claim
can be asserted alongside a breach of contract claim depends on whether the tortious conduct is
extrinsic to the contract between the parties.” Id. Edgewater counters that New Jersey law
recognizes an independent duty separate from contractual obligations for certain professions,
including environmental consultants.
Edgewater cites to Ford Motor Co. v. Edgewood Props. for the proposition that an
environmental consultant must conform to a standard of care possessed by members of the
profession in good standing. Civil Action No. 06-1278 (ES), 2012 WL 4172133, at *63-64 (D.N.J.
Aug. 31, 2012) (citing Bonnieview Homeowners Ass'n, LLC v. Woodmont Builders, LLC, No. 03-
4317, 2006 WL 1982882, at *6 (D.N.J. July 11, 2006)). In Ford Motor, the court addressed the
economic loss doctrine as it related to an environmental consultant. Though contract claims had
not been asserted against the consultant, the court noted that recovery would nonetheless flow from
an independent duty imposed by law. Id. at *74. TERMS did not respond to Edgewater’s
argument that environmental consultants owe an independent duty, leaving the Court with no basis
to disagree with the decision in Ford Motor. The Court will therefore deny TERMS’ motion as
far as its argument that Edgewater’s negligence claim is barred by the economic loss doctrine.5
TERMS next argues that Edgewater cannot establish that TERMS acted negligently.
TERMS Brf. at 38. “The fundamental elements of a negligence claim are a duty of care owed by
the defendant to the plaintiff, a breach of that duty by the defendant, injury to the plaintiff

proximately caused by the breach, and damages.” Shields v. Ramslee Motors, 223 A.3d 172, 176
(N.J. 2020) (quoting Robinson v. Vivirito, 86 A.3d 119, 124 (N.J. 2014)). “Whether a duty of care
exists is a question of law that must be decided by the court.” Jerkins ex rel. Jerkins v. Anderson,
922 A.2d 1279, 1284 (N.J. 2007) (citation omitted). “In making that determination, the court must
first consider the foreseeability of harm to a potential plaintiff . . . and then analyze whether
accepted fairness and policy considerations support the imposition of a duty[.]” Id. (citations
omitted). As discussed, an environmental consultant must conform to a standard of care possessed
by members of the profession in good standing. Ford Motor, 2012 WL 4172133, at *63-64 (citing
Bonnieview Homeowners, LLC, 2006 WL 1982882, at *6)).

Edgewater asserts that TERMS acted negligently by adopting an inappropriate protocol for
fill material at Veterans Filed, failing to shut down Veterans Field until October 3, 2012, and
producing an inadequate Self-Implementing Plan (“SIP”). As to the protocol for the project, it is
undisputed that the project specifications required that the remedial cap consist of “certified or
crushed virgin stone” and “be installed in the presence of the Borough’s LSRP.” BE SOMF ¶84.
It is further undisputed that, at the request of Waterside, TERMS established a protocol that

5 TERMS also argues that Edgewater’s negligence claim is barred by CERCLA. TERMS Brf. at
38. Because TERMS’ motion for summary judgment as to Edgewater’s CERCLA claim is
granted, Edgewater’s negligence claim is not barred.
permitted Waterside to use non-virgin fill as long as it tested as certified clean fill prior to being
imported to Veterans Field. BE SOMF ¶89. Edgewater asserts that TERMS “became lax” with
the protocol throughout the project and that TERMS deviated from the agreed upon project
specifications, failed to ensure that the new protocol was implemented correctly, and did not
document Waterside’s disregard of the protocol. Delaney Rpt., Corriston Cert. Ex. DDDD, at 29.

TERMS replies that Edgewater, through Neglia and the Borough Administrator, was aware that
the protocol for the use of non-virgin fill material had been developed and permitted it to be
implemented. TERMS further asserts that TERMS made it clear, via email to Waterside's project
manager Matt Vereb, that Waterside was to inform TERMS prior to bringing any proposed fill
material to Veteran's Field. TERMS SOMF ¶ 47.
Edgewater also argues that an LSRP is required to immediately notify both the person
conducting the remediation and the New Jersey Department of Environmental Protection
(“NJDEP”) if he or she learns of an immediate environmental concern. BE Brf. at 13 (citing
N.J.S.A. § 58:10C-16(j)).6 Edgewater asserts that TERMS did not inform NJDEP or Edgewater

immediately. BE Brf. at 18-19. Edgewater also argues that TERMS breached its professional
standard of care by keeping the site open after receiving the initial sampling results on September
23, 2013. BE SOMF ¶105. The Court will now turn to the facts in the record to determine
whether the parties have met their respective burdens at the summary judgment stage.

6 In a footnote, TERMS disputes that it is or could be an LSRP as only individuals can be an LSRP.
TERMS Brf. at n.1. However, the proposal executed by TERMS and Edgewater provides for
“LSRP Services.” Pierce Cert., Ex. D, Task 6. Without further support, the Court is unconvinced
that regulations affecting LSRPs do not apply to TERMS. Regardless, the duty possessed by an
environmental consultant is sufficient for Edgewater’s negligence claim to survive summary
judgment.
Edgewater asserts that TERMS “did nothing” to ensure that Waterside stopped importing
the suspect material and that TERMS merely instructed Waterside not to utilize any more suspect
material or disturb the piles remaining at Veterans Field. BE SOMF ¶103. Because of TERMS’
lack of action, Edgewater continues, Waterside was able to import contaminated material for
three additional weeks. BE SOMF ¶105, 130. Edgewater adds that TERMS had numerous

opportunities to shut down the project during that time but did not do so. TERMS responds that
after learning of Waterside’s improper activities, TERMS instructed Waterside that it was not to
spread or utilize the relevant material and not to import any additional material from that source.
TERMS SOMF ¶ 73. After receipt of the analytical results on September 23, 2013, TERMS
asserts that it notified Neglia and Waterside that the crushed concrete material was not suitable
for use at Veteran's Field and had to be removed. TERMS SOMF ¶ 80.
TERMS explains that after receipt of the initial sampling results on September 23, 2013,
TERMS had multiple discussions with Neglia and the Borough Administrator for Edgewater in
which TERMS recommended that the Project be shut down. TERMS SOMF ¶ 81. TERMS

asserts that in these conversations, Edgewater did not agree to halt the project and that, in fact,
Neglia and the administrator expressed legal concerns about shutting it down. TERMS Response
¶ 2. TERMS adds that it was not able to shut down the project without Edgewater’s consent.
TERMS Brf at 12.
In support of its arguments, TERMS cites to the depositions of Peter Lakatos (a TERMS
employee), Michael Neglia (President of Neglia Engineering Associates), and Ronald Dooney
(owner and president of TERMS). Lakatos stated that TERMS recommended around October
2013 that the job be shut down. Pierce Cert., Ex. L (“Lakatos Dep.”) at 7/19/17, 138:20-146:16.
Lakatos also stated that around September 29, 2013, he told Mark Iafelice, a Waterside employee,
that there was serious problem after receiving the initial samples. Lakatos continued that as a
result, he and some of the Waterside personnel covered the deposited material with plastic and
that some of the work stopped. Lakatos then referenced ongoing conversations but stated that
they were either in late September or early October. Again, the site was shut down on October
4, 2013, so conversations in early October would be consistent with promptly shutting down the

site. Lakatos also testified that he did not recall a specific discussion with Edgewater’s Borough
Administrator Gregory Franz regarding a recommendation to close the field. Id. at 143:25-
144:10.
Michael Neglia testified that “it was discussed to stop and cease all operations on the site”
but did not clarify when that was discussed. Pierce Cert., Ex. R (“Neglia Dep.”) at 11/27/17,
35:7-37:18. In his deposition, Dooney agreed that “there was no determination or
recommendation prior to October 3rd, 2013, to close the site.” Pierce Cert., Ex. M (“Dooney
Dep.”), at 7/20/17, 117:4-118:12; 128:2-17. Dooney did testify that he felt he needed to have the
town in favor of the shutdown in order to do so but did not explain his basis for that feeling. Id.

at 128:7-12.
TERMS also cites to the deposition testimony of Michael Berliner of Neglia, who stated
that Edgewater “did not want to see the Project come to a halt.” Pierce Cert., Ex. G (“Berliner
Dep.”) at 47:5-20. However, Berliner did not recall when he communicated that to Dooney or
Lakatos, indicating that it was probably “during the project when things were probably getting
slow and I was probably with the governing body who said we have to move this along.” Id. at
47:14-47:25.
The cited testimony does not provide a clear or undisputed timeline on which the Court
can rule that summary judgment is appropriate.
Edgewater also argues that TERMS deviated from the professional standard of care by
creating an inadequate SIP under the Toxic Substances Control Act (“TSCA”). Pursuant to the
TCSA, “[a]ny person conducting self-implementing cleanup of PCB remediation waste must
characterize the site adequately to be able to provide the information required by paragraph (a)(3)
of this section.” 40 C.F.R. § 761.61(2). Paragraph (a)(3) in turn provides that in order to

adequately characterize the site, the person must identify “[t]he location and extent of the
identified contaminated area.” 40 C.F.R. §761.61(a)(3)(i)(C). Edgewater asserts that TERMS
failed to ensure that the new protocol was correctly implemented and did not document where
Waterside brought non-tested material. BE Brf. at 21. Because of this, and allegedly inadequate
sampling, Edgewater argues that TERMS produced an inadequate SIP. BE Brf. at 22.
Edgewater has also presented the expert report of B. Tod Delaney asserting that TERMS
behavior failed to meet the professional standard of care. Delaney Rpt., Corriston Cert. (D.E. 355),
Ex. DDDD, at 28. Whether TERMS’ behavior met the relevant standard of care, or breached its
duty, is a question of fact that cannot be resolved on this motion. Jerkins v. Anderson, 191 N.J.

285, 305, 922 A.2d 1279 (2007) (citing Anderson v. Sammy Redd & Assocs., 278 N.J. Super. 50,
56, 650 A.2d 376 (App. Div. 1994), certif. denied, 139 N.J. 441, 655 A.2d 444 (1995)). Proximate
cause, too, is generally an issue of fact to be resolved by the jury. Scafidi v. Seiler, 574 A.2d 398,
402 (N.J. 1990). The Court will therefore allow Edgewater’s negligence claim against TERMS
to proceed past summary judgment, but notes that to the extent both the negligence and breach of
contract claims are successful, the Court will mold the verdict if necessary to avoid double
recovery.
Breach of Contract Claims
TERMS moves for summary judgment on three separate breach of contract claims:
Edgewater’s claim against TERMS, TERMS’ claim against Edgewater, and the Waterside
Defendants’ claim against TERMS. The Court will address each claim below but first reviews the
applicable law.

To state a claim for breach of contract under New Jersey law, a party must allege (1) the
existence of a contract; (2) breach of the contract; (3) damages as a result of the breach; and (4)
that the complaining party performed its own duties under the contract. Pollack v. Quick Quality
Restaurants, Inc., 452 N.J. Super. 174, 188 (App. Div. 2017) (citing Globe Motor Co. v. Igdalev,
225 N.J. 469, 482 (2016)). In interpreting a contract, a court must determine the intention of the
parties as reflected in the language in the agreement. Globe Motor, 225 N.J. at 483 (citation
omitted). As a result, the plain language of the contract is ordinarily the best indicator of the
parties’ intent. Chubb Customs Ins. Co. v. Prudential Ins. Co. of Am., 195 N.J. 231, 238 (2008)
(citation omitted). In other words, unless an actual ambiguity in the contract exists, a court should

not engage in a strained reading of the agreement to justify a different result than that which the
parties bargained for. Id. (citation omitted). An ambiguity exists when a contract term is
“susceptible to at least two reasonable alternative interpretations[.]” Id. (citing Nester v.
O’Donnell, 301 N.J. Super. 198, 210 (App. Div. 1997)). If a contract’s term is ambiguous, a court
may consider extrinsic evidence to interpret the term. Id. (citation omitted). A court will also
normally construe the ambiguous term against the drafting party if the parties had “unequal
bargaining power.” Id.
1. Edgewater’s Breach of Contract Claim
Count XII of Edgewater’s Fifth Amended Complaint asserts a claim for breach of contract
as to TERMS. Edgewater claims that Edgewater and TERMS entered into a valid contract in 2012
and that TERMS breached that contract by failing to ensure that unapproved fill materials were
brought to and utilized at Veterans Field. Compl. at ¶¶ 258, 265. Edgewater argues that the

contract, together with the protocol established by TERMS, created an obligation for TERMS to
act as a “gatekeeper.” The June 6, 2012 remediation proposal provided that TERMS would
provide “environmental oversight related to the soil remediation . . . performed by others.” Pierce
Cert. (D.E. 340), Ex. D. Thereafter, the Borough accepted TERMS proposal and entered into a
contract with TERMS. BE Brf. at 25; BE SOMF ¶ 80; TERMS Brf. at 3. TERMS subsequently
established a protocol for the approval of proposed fill materials. TERMS SOMF ¶ 38, 41;
TERMS Brf. at 41. Edgewater argues that that protocol essentially constituted an oral agreement
reached after the execution of the written contract between the parties. BE Brf. at 27-28. The
written contract required TERMS to provide oversight over the sampling, approval, and placement

of fill at the Site; the subsequent protocol required TERMS to regulate which non-virgin clean fill
could be imported and used at Veterans Field. BE SOMF ¶¶ 89-90.
Edgewater then argues that TERMS beached the contract by failing to ensure that only
approved fill materials were brought to and used at Veterans Field. BE Brf. at 30. Edgewater
acknowledges that it was Waterside who dumped the Building 12 material at Veterans Field and
that TERMS did not grant approval. However, Edgewater argues that TERMS “failed to take the
appropriate actions to prevent Waterside from continuing to utilize the contaminated fill at the Site
for almost a month.” BE Brf. at 31.
The language of the contract combined with the subsequent protocol create an ambiguity
as to TERMS’ role. The determination of whether a contract or a specific term therein is clear or
ambiguous is a question of law for the court to decide. Nevets C.M., Inc. v. Nissho Iwai Am. Corp.,
726 F. Supp. 525, 531 (D.N.J. 1989). An ambiguity exists if a contract is “susceptible to two
reasonably alternative interpretations.” Id. The contract does not define “oversight,” and as a
result, the Court must give the word its ordinary, plain, and usual meaning. See, e.g., Boddy v.
Cigna Prop. & Cas. Cos., 760 A.2d 823, 826 (N.J. Super. Ct. App. Div. 2000). In aid of this

endeavor, courts often turn to dictionary definitions. Id. at 827.
Garner’s Dictionary of Legal Usage in 2011 defines oversight as “intentional and watchful
supervision.” Oversight, GARNER’S DICTIONARY OF LEGAL USAGE (3d ed. 2011). Oxford defines
oversight as “[t]he action of overseeing something; supervision, inspection; authority,
management; (also occasionally) an instance of this. Also: supervisory responsibility or authority;
custodianship, charge[.]” Oversight, OXFORD ENGLISH DICTIONARY (3d ed. 2004).7 In addition
to defining oversight, another critical inquiry is the scope of that oversight along with the
applicable standard (for example, objective reasonableness). Here, it is possible to interpret the
contract’s requirement of “oversight” as involving the sort of “watchful supervision” or giving
“charge” such that the contract would require TERMS to take a more proactive role in regard to

Waterside’s behavior. This interpretation could also find support in light of the subsequent
protocol which created situations in which Waterside could use non-virgin fill. On the other hand,
the contract’s use of “oversight” may not reach as far as Edgewater asserts or, more importantly,
it may not encompass situations in which TERMS was actively misled or those in which TERMS
could not have reasonably learned of improper action when exercising proper diligence. Thus, the
Court finds that word oversight is ambiguous. Generally, the interpretation of ambiguous contract

7 Garner’s also defines “oversight” as “an unintentional error,” but that is clearly not the definition
that applies here.
terms is a question of fact. 726 F. Supp. at 531. Having identified a contractual ambiguity, it is
not appropriate to decide Edgewater’s breach of contract claim on a motion for summary judgment.
Further, as explained in the discussion of Edgewater’s negligence claim, disputes of fact
surrounding the time period during which Waterside imported contaminated fill preclude a grant
of summary judgment. These disputes include when TERMS recommended shutting down the

project and whether Edgewater prevented the project from being stopped.
Edgewater’s motion will therefore be denied.
As noted, TERMS also seeks summary judgment against Edgewater. TERMS argues that
Edgewater made it impossible to act as a gatekeeper by giving Waterside a key. While this fact
may certainly help TERMS’ cause, it is not dispositive for purposes of summary judgment. For
example, Edgewater’s instructions when providing the key would be seemingly relevant along
with any corresponding statements as to TERMS’ role.
TERMS also argues that Edgewater is precluded from asserting breach of contract because
of waiver and equitable estoppel. TERMS Reply at 21. TERMS asserts that Edgewater continued
to engage TERMS to investigate and remediate the PCB contamination at Veteran’s Field after

September 2013. This argument is only made in reply, and the Court will not consider it because
it was not asserted in the opening brief and Plaintiff has not had the opportunity to respond. See
e.g., Cobra Enters., LLC v. All Phase Servs., No. CV 20-4750 (SRC), 2020 U.S. Dist. LEXIS
96033, 2020 WL 2849892, at *1 (D.N.J. June 1, 2020). Moreover, determining whether
Edgewater’s claim is waived or estopped presents genuine disputes of material fact, including
when Edgewater became aware of TERMS’ alleged breach.
TERMS’ motion as to Edgewater’s breach of contract claim is also denied.
2. TERMS’ Breach of Contract Claim Against Edgewater
TERMS asserts a breach of contract claim against Edgewater, arguing that Edgewater
failed to pay certain invoices. TERMS Brf. at 51-53. The issue of whether TERMS breached the
contract must be resolved before the Court can rule on this claim. “It is black letter contract law
that a material breach by either party to a bilateral contract excuses the other party from rendering

any further contractual performance . . . . Whether conduct constitutes a breach of contract and, if
it does, whether the breach is material are ordinarily jury questions.” Travelodge Hotels, Inc. v.
Honeysuckle Enters., 357 F. Supp. 2d 788, 797 (D.N.J. 2005) (citing Magnet Resources, Inc. v.
Summit MRI, Inc., 723 A.2d 976, 981 (N.J. App. Div. 1998). If TERMS is found to have breached
the contract, Edgewater’s non-payment may be excused. Because this claim cannot be resolved at
this time, TERMS’ motion is denied.
3. Waterside’s Breach of Contract Claim
TERMS also moves for summary judgment on the breach of contract counterclaim
asserted against it by the Waterside Defendants. Count Six of the Counterclaims (D.E. 24) states

that TERMS approved the use of the recycled concrete fill material under roadways and
sidewalks at Veteran’s Filed and that such approval was in breach of contract. D.E. 24, ¶¶ 67,
68. The counterclaim does not specify what contract was allegedly breached, and none of the
Waterside defendants have opposed TERMS’ motion. Fred Daibes stated in deposition that there
was no contract, written or oral, between TERMS and Waterside. Pierce Cert., Ex. DD, at
173:21-174:6. As there is no evidence of a contract between TERMS and the Waterside
Defendants, TERMS’ motion for summary judgment on the breach of contract claim asserted by
the Waterside Defendants is granted. See Bocobo v. Radiology Consultants of S. Jersey, P.A.,
No. 02-1697 (JEI), 2005 WL 3158053, at *39 (D.N.J. Nov. 21, 2005) (“One who is not a party
to a contract cannot sue in respect to a breach of duty arising out of it.”).
Spill Act Claims
TERMS next moves for summary judgment as to the Spill Act claim asserted against it.
The Spill Act is the New Jersey analog to CERCLA8 and was passed before CERCLA. Like

CERCLA, the Spill Act permits courts to “allocate the costs of cleanup and removal among liable
parties using such equitable factors as the court determines are appropriate.” Litgo New Jersey
Inc. v. Comm'r New Jersey Dep't of Env't Prot., 725 F.3d 369, 392 (3d Cir. 2013). The Spill Act
imposes strict joint and several liability on any person who has discharged a hazardous substance.
NJDEP v. Gloucester Environmental Mgmt. Servs., Inc., 821 F. Supp. 999, 1009 (D.N.J. 1993).
Liability under the Spill Act arises “whether the discharge was the result of ‘intentional or
unintentional’ acts or omissions. Morris Plains Holding VF, LLC v. Milano French Cleaners,
Inc., No. A-0604-16T1, 2018 WL 1882956, at *1 (N.J. Super. Ct. App. Div. Apr. 20, 2018) (citing
N.J.S.A. 58:10-23.11b).

In addition to liability as a direct discharger, the Spill Act provides that one who is “in any
way responsible for any hazardous substance” is strictly liable, upon its discharge, for “all cleanup
and removal costs no matter by whom incurred.” New Jersey Dep't of Env't Prot. v. Dimant, 51
A.3d 816, 829 (2012) (citing N.J.S.A. 58:10–23.11g(c)(1)). However, in “an action to obtain
damages, authorized costs and other similar relief under the Act there must be shown a reasonable

8 At the same time, there are some important differences between the Spill Act and CERCLA.
New Jersey Dep't of Env't Prot. v. Dimant, 51 A.3d 816, 831-32 (2012) (reviewing differences
between the two acts as to liability and causation).
link between the discharge, the putative discharger, and the contamination at the specifically
damaged site.” Dimant, 51 A.3d at 833 (emphasis added).
In Dimant, the New Jersey Supreme Court addressed the liability of a dry cleaner for
groundwater contamination. In analyzing the requisite nexus for liability under the Spill Act, the
Dimant court concluded that the phrase “in any way responsible” requires some connection

between the discharge complained of and the alleged discharger. Id. at 830. Once a party is found
responsible for a discharge, the court in Dimant continued, there also must be a nexus between the
discharge and the contaminated site for which cleanup costs are incurred. Id. at 831. The New
Jersey Supreme Court concluded that “through the requirement of a connection between the
discharge, over which the party had some control or responsibility, and the Spill Act response to
the damage, the focus in the Spill Act remains on proof of a connection between the discharge
complained of and the resultant Spill Act response.” Id. at 831.
Edgewater argues that TERMS is “in any way responsible” for the contamination at
Veterans Field because it has a connection to both Waterside and the hazardous substance.

Specifically, Edgewater argues that TERMS was “integrally involved in the decisions made at the
Site, especially the regulation of certified clean fill imported to Veterans Field.” BE Brf. at 36.
Edgewater continues that TERMS “became lax” and ultimately disregarded the established
protocol, “paving the way for Waterside’s continual illegal disposals.” BE Brf. at 37. Edgewater
states that TERMS “granted itself control over the fill and the contractor.” BE Brf. at 38. TERMS
counters that it had no ability or authority to control the actions of Waterside. TERMS Brf. at 31.
TERMS points out that TERMS was not present on the site the day the discharge occurred.
The Court finds that genuine issues of material regarding TERMS’ level of control over
Waterside preclude a grant of summary judgment. Importantly, the Spill Act encompasses
omissions. See, e.g., Marsh v. N.J. Spill Comp. Fund & Envtl. Claims Admin., 670 A.2d 67, 72
(Super. Ct. App. Div. 1996) (discussing a case in which the failure of a lessor to prevent or halt
discharger when it knew or should have known of the danger of contamination was an act or
omission resulting in the releasing, spilling, and leaking of pollutants). If TERMS is found to have
fallen short in its oversight role, Spill Act liability may be appropriate. TERMS’ motion for

summary judgment as to Edgewater’s Spill Act claim is therefore denied.9
Because the Spill Act asserted against TERMS is not dismissed, TERMS’ motion for
summary judgment as to the Spill Act and common law contribution claims asserted against it is
denied.
Indemnification Claims
The Waterside Defendants and Arconic each assert Crossclaims against TERMS for
common law indemnification. “Indemnification is available under New Jersey law in two
situations: when a contract explicitly provides for indemnification or when a special legal
relationship between the parties creates an implied right to indemnification.” Fireman's Fund Ins.

Co. v. 360 Steel Erectors, Inc., Civ. A. No. 16-2782, 2018 WL 1069417 (D.N.J. Feb. 26, 2018)
(quoting Allied Corp. v. Frola, 730 F. Supp. 626, 639 (D.N.J. 1990), abrogated on other grounds
by Apgar v. Lederle Labs., 588 A.2d 380 (N.J. 1991)); see also Ferriola v. Stanley Fastening Sys.,
L.P., Civ. No. 04–4043, 2007 WL 2261564, at *2 (D.N.J. Aug. 1, 2007); Ramos v. Browning
Ferris Indus. of S. Jersey, Inc., 510 A.2d 1152 (N.J. 1986). “Examples of the special relationship

9 TERMS argues that Edgewater’s Spill Act claim is preempted by its CERCLA claim. TERMS
Brf. at 31-21. As the Court is granting TERMS’ motion as to Edgewater’s CERCLA claim,
TERMS’ preemption argument is moot and the Spill Act claim will not be dismissed on that basis.
that will support a third party's claim for indemnification include that of principal and agent, bailor
and bailee, and lessor and lessee.” Ramos, 510 A.2d 1152, 1158 (citations omitted).
The Waterside Defendants have not opposed TERMS’ motion, and Arconic’s opposition
brief does not address indemnification. Arconic has not shown the existence of a contract with
TERMS. The Waterside Defendants alleged the existence of a contract with TERMS, but as
discussed, that claim has not been supported by the record. Additionally, neither Arconic nor the
Waterside Defendants have demonstrated the existence of a special legal relationship with TERMS
which would support a claim for common law indemnification. The crossclaims for
indemnification against TERMS will therefore be dismissed.
V. CONCLUSION
TERMS’ motion for summary judgment (D.E. 343) is GRANTED in part and DENIED in
part. TERMS motion is granted as to the CERCLA claim asserted by Edgewater and the CERCLA
contribution claims asserted by Arconic and the Waterside Defendants. The motion 1s also granted
as to the indemnification claims asserted against TERMS and the breach of contract claim asserted
by the Waterside Defendants. The motion is otherwise denied. An appropriate Order accompanies
this Opinion.

Dated: September 3, 2021 00 \
3 (

24

---