# In re: In the Matter of Offshore Oil Services, Inc.

> District Court, E.D. Louisiana · March 22, 2023

URL: https://www.frixlaw.com/law-library/cases/10189154

## Case

- **Court:** District Court, E.D. Louisiana
- **Decided:** March 22, 2023
- **Opinion:** 100trialcourt
- **Cited by:** 0 later opinions in the Frix Law Library

## Citator (automated)

- No negative treatment found by the automated citator. That is not the same as a confirmation that the case is good law; read the citing cases.
- Full citator and citing cases: https://www.frixlaw.com/law-library/cases/10189154

## Opinion text

UNITED STATES DISTRICT COURT
EASTERN DISTRICT OF LOUISIANA

IN THE MATTER OF OFFSHORE CIVIL ACTION
OIL SERVICES, INC.
NO. 21-1522

SECTION: “E” (2)

ORDER AND REASONS
Before the Court is a Motion for Summary Judgment (“Motion”) filed by Third
Party Defendant Island Operating Company, Inc. (“IOC” or “Defendant”).1 Third Party
Plaintiff Offshore Oil Services, Inc. (“Offshore” or “Plaintiff”) opposes.2 IOC filed a reply.3
Offshore filed a sur-reply with leave of Court.4 The Court held a status conference with the
parties on February 16, 2023, where, inter alia, IOC’s Motion was discussed.5 During the
status conference, the Court granted Offshore further leave of Court to file a second sur-
reply,6 which Offshore did.7 IOC then filed a supplemental reply.8 For the reasons that
follow, IOC’s Motion is GRANTED IN PART and DENIED IN PART.
BACKGROUND
This action arises out of a limitation of liability petition filed by Offshore on August
11, 2021.9 Offshore is the owner and operator of the M/V Anna M (“vessel”), seeking

1 R. Doc. 65.
2 R. Doc. 68.
3 R. Doc. 72.
4 R. Doc. 75.
5 R. Doc. 79.
6 Id.
7 Offshore lodges an objection to any new arguments made and evidence presented in IOC’s reply. See R.
Doc. 70 at p. 2. First, there is no new evidence presented in IOC’s reply. See R. Doc. 72. Second, to the extent
there are “new arguments” in IOC’s reply, Offshore was granted leave of Court to file a sur-reply in this
case—on two occasions. See R. Docs. 74, 79. Subsequently, Offshore filed two sur-replies. See R. Docs. 75,
83. The Fifth Circuit instructs that courts may consider new arguments in a reply brief provided “the court
[] give[s] the non-movant an adequate opportunity to respond prior to its ruling.” Vais Arms, Inc. v. Vais,
383 F.3d 287, 292 (5th Cir.2004). The Court has done so in this case.
8 R. Doc. 84.
9 R. Doc. 1.
exoneration from and/or limitation of liability for an alleged injury that occurred to
claimant, Tyrone Felix, during a personnel basket transfer from the deck of the vessel to
a Fieldwood Energy, LLC (“Fieldwood”) platform, an offshore oil and gas production
platform.10 Felix, an employee of IOC, alleged he sustained injuries to his knee, neck, and
back.11 Felix has filed a claim against Offshore in the underlying limitation action,12 as has
IOC’s federal and state compensation insurer, Louisiana Workers’ Compensation
Corporation, in connection with Felix’s alleged incident.13
On May 26, 2022, Offshore filed a third-party demand against IOC,14 in which

Offshore brings three claims pursuant to the Master Services Contract (“MSC”) between
IOC and Fieldwood: (1) a claim for indemnity for the claims brought by Felix and
Louisiana Workers’ Compensation Corporation; (2) a claim for indemnity insurance
coverage “for any damages” Offshore “may be found to” owe; and (3) a claim for defense
costs.15 With respect to defense costs and indemnification, the MSC includes an indemnity
provision, pursuant to which IOC agrees to defend and indemnify, inter alia, Offshore for
personal injuries sustained by IOC’s respective employees regardless of fault.16
Specifically, the MSC provides:
CONTRACTOR17 [i.e., IOC] HEREBY AGREES TO RELEASE,
INDEMNIFY, PROTECT, DEFEND AND HOLD HARMLESS SUCH
OTHER THIRD PARTY CONTRACTOR(S)18 [i.e., Offshore] (AND ANY
SUCH THIRD PARTY CONTRACTOR GROUP) FROM AND AGAINST
ANY AND ALL CLAIMS FOR (1) THE INJURY, ILLNESS OR DEATH OF

10 Id. at p. 2.
11 Id.
12 R. Doc. 4.
13 R. Doc. 5.
14 R. Doc. 30.
15 Id. at p. 30, ¶ 22. These claims are collectively referred to as the “indemnity claims.”
16 R. Doc. 75-2 at ¶ 11. R. Doc. 89-1 at ¶ 11. See R. Doc. 75-4 at 5.
17 The MSC defined “Contractor” as IOC. See R. Doc. 38-1 at p. 1.
18 The MSC defined “Third Party Contractor” as any other contractor, other than IOC, used or employed by
Fieldwood. Id. at p. 6. Offshore was a contractor used or employed by Fieldwood.
ANY MEMBER OF CONTRACTOR GROUP19 [i.e., IOC’s employee Mr.
Felix] AND/OR (2) THE LOSS, DAMAGE, DESTRUCTION AND/OR
WRECK AND DEBRIS REMOVAL OF ANY PROPERTY BELONGING TO
ANY MEMBER OF CONTRACTOR GROUP, WITHOUT REGARD TO
WHETHER ANY SUCH CLAIM IS CAUSED, IN WHOLE OR IN PARTY, BY
THE NEGLIGENCE (WHETHER SOLE, JOINT OR CONCURRENT;
ACTIVE OR PASSIVE), STRICT LIABILITY, STATUTORY LIABILITY,
CONTRACTUAL LIABILITY OR OTHER FAULT (EXCLUDING ONLY
THE GROSS NEGLIGENCE AND INTENTIONAL MISCONDUCT) OF ANY
MEMBER OF THE THIRD PARTY CONTRACTOR GROUP OR BY ANY
DEFECT OR PRE-EXISTING CONDITION (WHETHER KNOWN OR
UNKNOWN; PATENT, LATENT OR OTHERWISE).20

With respect to indemnity insurance coverage, the MSC also provides “[IOC]
agrees that it will support its [] indemnity obligations . . . with insurance . . . .”21
On July 8, 2022, IOC filed a Motion to Dismiss Third-Party Demand or, in the
alternative, Motion for Summary Judgment (“MTD/MSJ”).22 On July 28, 2022, the Court
held a status conference with the parties to discuss IOC’s MTD/MSJ.23 IOC “informed the
Court” of its intention to withdraw its MTD/MSJ because “[t]he parties agree[d]” a
motion for “summary judgment [wa]s the appropriate vehicle for determin[ing] the issues
raised in IOC’s [MTD/MSJ] and that additional discovery [wa]s needed.”24 Thereafter,
upon joint motion of the parties, the Court put in place a discovery order “outlining the
discovery needed prior to submission of [IOC’s] motion for summary judgment.”25 That
period of discovery has concluded, and IOC now moves for summary judgment,26
asserting the defense, indemnity, and insurance coverage provisions in the MSC are null
and void under the Louisiana Oilfield Indemnity Act (“LOIA”). Offshore opposes.27

19 The MSC defined “Contractor Group” as IOC, IOC’s affiliates, IOC’s subcontractors, and IOC’s employees.
Id.
20 Id. at pp. 7-9.
21 Id. at p. 8.
22 R. Doc. 38.
23 R. Doc. 44.
24 Id. at p. 1.
25 See R. Doc. 55; see also R. Doc. 44.
26 R. Doc. 65.
27 R. Docs. 68, 75, 83.
LEGAL STANDARD
Summary judgment is appropriate only “if the movant shows that there is no
genuine dispute as to any material fact and the movant is entitled to judgment as a matter
of law.”28 “An issue is material if its resolution could affect the outcome of the action.”29
When assessing whether a material factual dispute exists, the Court considers “all of the
evidence in the record but refrains from making credibility determinations or weighing
the evidence.”30 All reasonable inferences are drawn in favor of the nonmoving party.31
There is no genuine issue of material fact if, even viewing the evidence in the light most

favorable to the nonmoving party, no reasonable trier of fact could find for the nonmoving
party, thus entitling the moving party to judgment as a matter of law.32
If the dispositive issue is one on which the moving party will bear the burden of
persuasion at trial, the moving party “must come forward with evidence which would
‘entitle it to a directed verdict if the evidence went uncontroverted at trial.’”33 If the
moving party fails to carry this burden, the motion must be denied. If the moving party
successfully carries this burden, the burden of production then shifts to the nonmoving
party to direct the Court’s attention to something in the pleadings or other evidence in the
record setting forth specific facts sufficient to establish that a genuine issue of material
fact does indeed exist.34
If the dispositive issue is one on which the nonmoving party will bear the burden

of persuasion at trial, the moving party may satisfy its burden of production by either (1)

28 FED. R. CIV. P. 56; see also Celotex Corp. v. Catrett, 477 U.S. 317, 322–23 (1986).
29 DIRECTV Inc. v. Robson, 420 F.3d 532, 536 (5th Cir. 2005).
30 Delta & Pine Land Co. v. Nationwide Agribusiness Ins. Co., 530 F.3d 395, 398 (5th Cir. 2008); see also
Reeves v. Sanderson Plumbing Prods., Inc., 530 U.S. 133, 150–51 (2000).
31 Little v. Liquid Air Corp., 37 F.3d 1069, 1075 (5th Cir. 1994).
32 Smith v. Amedisys, Inc., 298 F.3d 434, 440 (5th Cir. 2002).
33 Int’l Shortstop, Inc. v. Rally’s, Inc., 939 F.2d 1257, 1263–64 (5th Cir. 1991) (quoting Golden Rule Ins. Co.
v. Lease, 755 F. Supp. 948, 951 (D. Colo. 1991)).
34 Celotex, 477 U.S. at 322–24.
submitting affirmative evidence that negates an essential element of the nonmovant’s
claim, or (2) demonstrating there is no evidence in the record to establish an essential
element of the nonmovant’s claim.35 When proceeding under the first option, if the
nonmoving party cannot muster sufficient evidence to dispute the movant’s contention
that there are no disputed facts, a trial would be useless, and the moving party is entitled
to summary judgment as a matter of law.36 When, however, the movant is proceeding
under the second option and is seeking summary judgment on the ground that the
nonmovant has no evidence to establish an essential element of the claim, the nonmoving

party may defeat a motion for summary judgment by “calling the Court’s attention to
supporting evidence already in the record that was overlooked or ignored by the moving
party.”37 Under either scenario, the burden then shifts back to the movant to demonstrate
the inadequacy of the evidence relied upon by the nonmovant.38 If the movant meets this
burden, “the burden of production shifts [back again] to the nonmoving party, who must
either (1) rehabilitate the evidence attacked in the moving party’s papers, (2) produce
additional evidence showing the existence of a genuine issue for trial as provided in Rule
56(e), or (3) submit an affidavit explaining why further discovery is necessary as provided
in Rule 56(f).”39 “Summary judgment should be granted if the nonmoving party fails to

35 Id. at 331–32 (Brennan, J., dissenting); see also St. Amant v. Benoit, 806 F.2d 1294, 1297 (5th Cir. 1987)
(citing Justice Brennan’s statement of the summary judgment standard in Celotex Corp. v. Catrett, 477 U.S.
317, 322–24 (1986), and requiring the movants to submit affirmative evidence to negate an essential
element of the nonmovant’s claim or, alternatively, demonstrate the nonmovant’s evidence is insufficient
to establish an essential element); Fano v. O’Neill, 806 F.2d 1262, 1266 (citing Justice Brennan’s dissent in
Celotex, and requiring the movant to make an affirmative presentation to negate the nonmovant’s claims
on summary judgment); 10A CHARLES ALAN WRIGHT, ARTHUR R. MILLER & MARY KAY KANE, FEDERAL
PRACTICE AND PROCEDURE §2727.1 (2016) (“Although the Court issued a five-to-four decision, the majority
and dissent both agreed as to how the summary-judgment burden of proof operates; they disagreed as to
how the standard was applied to the facts of the case.” (internal citations omitted)).
36 First National Bank of Arizona v. Cities Service Co., 391 U.S. 253, 288–89 (1980);
Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 249–50 (1986).
37 Celotex, 477 U.S. at 332–33.
38 Id.
39 Celotex, 477 U.S. at 332–33, 333 n.3.
respond in one or more of these ways, or if, after the nonmoving party responds, the court
determines that the moving party has met its ultimate burden of persuading the court that
there is no genuine issue of material fact for trial.”40
“[U]nsubstantiated assertions are not competent summary judgment evidence.
The party opposing summary judgment is required to identify specific evidence in the
record and to articulate the precise manner in which that evidence supports the claim.
‘Rule 56 does not impose upon the district court a duty to sift through the record in search
of evidence to support a party’s opposition to summary judgment.’”41

FACTS42
I. Undisputed Facts
The following facts are undisputed. In its third-party demand, Offshore seeks
defense and indemnification from IOC for claims brought by Tyrone Felix against
Offshore for bodily injury alleged to have been caused by Offshore.43 To this end,
Offshore’s third-party demand seeks to enforce the January 1, 2014 MSC between
Fieldwood (platform owner/operator) and IOC (Tyrone Felix’s employer).44
Under the MSC, together with the work order applicable to the work of Tyrone
Felix, IOC provided production operators to man Fieldwood offshore production
platforms producing oil and/or gas in the West Delta 90 and 103 blocks, which work
included, inter alia, controlling and/or monitoring wellheads and casing pressures on

40 Id.; see also First National Bank of Arizona, 391 U.S. at 289.
41 Ragas v. Tenn. Gas Pipeline Co., 136 F.3d 455, 458 (5th Cir. 1998) (citing Celotex, 477 U.S. at 324; Forsyth
v. Barr, 19 F.3d 1527, 1537 (5th Cir. 1994) and quoting Skotak v. Tenneco Resins, Inc., 953 F.2d 909, 915–
16 & n.7 (5th Cir. 1992)).
42 The following facts are taken from IOC’s statement of material facts and Offshore’s response. See R. Doc.
65-6; see also R. Doc. 68-4. As reflected in this Order and Reasons and in the parties’ briefing, there are
additional undisputed facts beyond those stated in R. Doc. 65-6 and R. Doc. 68-4.
43 See R. Doc. 65-6 at p. 1, ¶ 1; see also R. Doc. 68-4 at p. 1, ¶ 1 (“Uncontested, but [Offshore] also seeks
additional insured coverage.”).
44 See R. Doc. 65-6 at p. 1, ¶ 2; see also R. Doc. 68-4 at p. 1, ¶ 2.
individual wells, conducting pressure tests, using test separators, checking for leaks on
production equipment, and opening and closing wellheads and production valves.45
Tyrone Felix was called out to work in the West Delta area of the Gulf of Mexico, which is
located on the Outer Continental Shelf, off the coast of the State of Louisiana.46 IOC did
not expect the substantial use of a vessel to complete the MSC and work order.47
II. Disputed Facts
Offshore argues IOC’s motion for summary judgment should be denied because
there are disputed issues of material fact. First, IOC and Offshore dispute the extent to

which the terms of the MSC and applicable work order contemplated additional work,
beyond platform work, involving the use of a vessel. Under the terms of the MSC, IOC
contends the contract contemplated a vessel only being used for marine transportation
purposes.48 In opposition, relying on Section 2(e) of the MSC, Offshore argues the terms
of the MSC contemplated more than marine transportation.49
Second, IOC and Offshore dispute the extent to which the parties to the MSC and
work order, Fieldwood and IOC, expected a vessel to be used in the completion of the
contract. Relying on the deposition testimony of Fieldwood’s corporate representative
and a declaration of IOC’s chief executive officer, IOC argues neither it nor Fieldwood
expected a vessel to play a substantial role in the completion of the contract.50 In
opposition, Offshore argues Fieldwood expected a vessel to play a substantial role in the

45 See R. Doc. 65-6 at p. 1, ¶ 3; see also R. Doc. 68-4 at pp. 1-2, ¶ 3 (conceding IOC’s statement is accurate
but “incomplete”).
46 See R. Doc. 65-6 at p. 2, ¶ 4; see also R. Doc. 68-4 at p. 2, ¶ 4.
47 See R. Doc. 65-6 at p. 2, ¶ 5; see also R. Doc. 68-4 at p. 2, ¶ 5 (only offering evidence to dispute Fieldwood’s
expectation).
48 See R. Doc. 65-6 at p. 2, ¶ 5. In its briefing, Offshore also suggests the MSC and work order contemplated
work at Fieldwood’s West Delta 75 platforms as well.
49 R. Doc. 68-4 at p. 2, ¶ 5.
50 See R. Doc. 65-6 at p. 2, ¶ 5.
completion of the contract on the basis of Fieldwood’s corporate representative’s
deposition testimony.51
Third, IOC and Offshore dispute the extent to which a vessel was actually used to
complete the work governed by the MSC and applicable work order. On the basis of
Fieldwood’s corporate representative’s deposition testimony and a declaration by IOC’s
chief executive officer, IOC argues the completion of the work was solely on the platforms
at issue.52 In opposition, relying on the deposition testimony of Fieldwood’s corporate
representative and certain job safety analysis reports, Offshore argues the actual work

performed also entailed offloading and backloading equipment from vessels and taking
on potable water from vessels to platforms.53
LAW AND ANALYSIS
IOC moves for summary judgment,54 thereby asserting the indemnity, defense, and
indemnity insurance coverage provisions in the MSC are null and void under the LOIA.
At this juncture, the parties do not dispute that, should the provisions at issue be found
enforceable, Offshore would be entitled to the relief it seeks in its third-party demand.55
The only dispute is whether the provisions are enforceable. The answer to this question,
as discussed below, turns on whether state law or federal maritime law applies. If state
law applies, the LOIA bars enforcement of the indemnity provisions, assuming other
statutory requirements are met, as discussed infra, but only bars Offshore’s claim for

defense costs if Offshore is found at fault after a trial on the merits. If federal maritime
law applies, however, all the provisions are enforceable.

51 R. Doc. 68-4 at p. 2, ¶ 5.
52 See R. Doc. 65-6 at pp. 1-2, ¶¶ 3-5.
53 R. Doc. 68-4 at pp. 1-2, ¶¶ 3-5.
54 R. Doc. 65.
55 Again, that is indemnification from the claims asserted by Felix and IOC’s worker compensation carrier
in the underlying limitation action, indemnity insurance coverage, and defense costs.
I. Louisiana law applies pursuant to the OCSLA.
To determine whether the indemnity provisions in the MSC are enforceable, the
Court must first determine which law applies. The parties dispute whether the Outer
Continental Shelf Lands Act (“OCSLA”) choice-of-law analysis applies to this matter.56 If
the OCSLA’s analysis does apply, it supersedes the normal choice-of-law rules that the
forum would apply, and instead requires courts to apply the “civil and criminal laws of
[the] adjacent state.”57 In this case, it is undisputed that the Fieldwood platforms at issue

are anchored to the seabed off the coast of Louisiana,58 meaning, if the OCSLA’s analysis
applies, Louisiana law governs the instant dispute because it is the state adjacent to
Fieldwood’s platforms.
Courts look to the three-part test formulated by the United States Supreme Court
in Rodrigue v. Aetna Cas. & Surety Co.59 to determine whether the OCSLA requires
application of the adjacent state’s law in the present matter. This test requires, “(1) The
controversy must arise on a situs covered by the OCSLA (i.e. the subsoil seabed, or
artificial structure permanently or temporarily attached thereto). (2) Federal maritime
law must not apply of its own force. (3) The state law must not be inconsistent with federal
law.”60 Only the second element is contested in this case.

56 Compare R. Doc. 65-1 at pp. 3-6 with R. Doc. 68 at pp. 6-11.
57 43 U.S.C. § 1333(a)(2)(A). See Snyder Oil Corp. v. Samedan Oil Corp., 208 F.3d 521, 522-23 (5th Cir.
2000).
58 See R. Doc. 65-6 at p. 2, ¶ 4; see also R. Doc. 68-4 at p. 2, ¶ 4.
59 395 U.S. 352 (1969). See also Union Texas Petroleum Corp. v. PLT Engineering, Inc., 895 F.2d 1043,
1047 (5th Cir. 1990).
60 Rodrigue, 395 U.S. at 359.
A. Element 1: The controversy must arise on a situs covered by the OCSLA.
“When a case involves a contractual indemnity provision, the Fifth Circuit holds
that ‘a contractual indemnity claim (or any other contractual dispute) arises on an OCSLA
situs if a majority of the performance called for under the contract is to be performed on
stationary platforms or other OCSLA situses enumerated in 43 U.S.C. § 1333(a)(2)(A).’”61
The parties do not contest that the controversy arose on a situs covered by the OCSLA.62
B. Element 2: Federal maritime law must not apply of its own force.
The primary question before the Court is whether federal maritime law applies of

its own force. The parties agree this depends on whether the “contracts at issue” are
maritime contracts (requiring application of federal maritime law) or nonmaritime
contracts (requiring application of Louisiana law pursuant to the OCSLA).63
At the outset, the Court clarifies what documents constitute the “contracts at
issue.” It is uncontested that the relevant contracts are the January 1, 2014 MSC between
Fieldwood (platform owner/operator) and IOC (Felix’s employer) and the applicable
December 16, 2020 work order (collectively, “the Contract”).64 This accords with Fifth
Circuit precedent, which suggests courts should consider not only general master
agreements, but also more specific work orders or bids.65 Courts look to both the MSC and
work order because the MSC merely provides the framework or “rules of the game” for
subsequent contracts if the contracting parties “decide to play ball” as reflected by later

61 Cardoso-Gonzales, 326 F.Supp.3d 273, 280 (E.D. La. 2018) (citing Grand Isle Shipyard, Inc. v. Seacor
Marine, LLC, 589 F.3d 778, 787 (5th Cir. 2009)).
62 R. Doc. 65-1 at p. 3; see also R. Doc. 68 at p. 6.
63 R. Doc. 65-1 at p. 3; see also R. Doc. 68 at p. 6.
64 See R. Doc. 65-6 at p. 1, ¶ 3; see also R. Doc. 68-4 at pp. 1-2, ¶ 3 (conceding IOC’s statement is accurate
but “incomplete”). Paige v. Gulf Oil Corp., 775 F.2d 1311, 1315 (1985); Matte v. Zapata Offshore Co., 784
F.2d 628, 630 (5th Cir. 1986). For brevity, the Court will refer to the MSC and work order collectively as
“the Contract.”
65 Crescent, 896 F.3d at 360.
verbal or written work orders, which each party remains free to accept.66 With this in
mind, the Court now turns to the substance of the second element.
Offshore argues the second element of the OCSLA analysis cannot be met because
the Contract is either a maritime contract or, at a minimum, genuine issues of material
fact remain for trial on this point.67 By contrast, IOC argues “it is evident that the Contract
is not maritime in nature” and Offshore has failed to present a genuine dispute of material
fact to prevent summary judgment.68 As a result, the Court must determine whether there
is a genuine dispute of material fact as to whether the Contract is maritime or

nonmaritime.
In the context of a “contract for performance of specialty services to facilitate the
drilling or production of oil or gas on navigable waters,”69 as is the context here, the Fifth
Circuit created a two-prong test to determine whether a contract is maritime in nature in
In re Larry Doiron, Inc.:
First, is the contract one to provide services to facilitate the drilling or production
of oil and gas on navigable waters? . . . Second, if the answer to the above question
is “yes,” does the contract provide or do the parties expect that a vessel will play a
substantial role in the completion of the contract? If so, the contract is maritime in
nature.70

66 Phoenix International Holdings, Inc. v. UH Services Group, LLC, 2021 WL 3021932 (E.D. La.
7/16/2021).
67 R. Doc. 68 at p. 6.
68 R. Doc. 65-1 at p. 5.
69 In re Larry Doiron, Inc., 879 F.3d 568, 569 (5th Cir. 2018) (en banc).
70 Id. at 576. It is said “[o]nly if these questions do not resolve the maritime-nonmaritime issue, such as if
the scope of the contract or the extent to which the parties expect vessels to be involved in the work remain
unclear, may the Court examine the Davis factors.” Carr v. Yellowfin Marine Servs., LLC, 423 F.Supp.3d
316, 321 (E.D. La. 2019) (Ashe, J.). Because the Fifth Circuit’s two-part test resolves the maritime-
nonmaritime issue, the Court cannot reach the Davis factors.
“An affirmative answer to both questions is necessary before the label ‘maritime’ may be
applied to the contract.”71 “This test places the focus on the contract and the expectations
of the parties.”72 The Court will answer each question in turn.
i. Was this a contract to provide services to facilitate the drilling or
production of oil and gas on navigable waters?

The parties agree that the Contract was “one to provide services to facilitate the
drilling or production of oil and gas on navigable waters.”73 Accordingly, the Court will
answer the first question in the affirmative and move to answering the second question.
ii. Does the contract provide or do the parties expect that a vessel
will play a substantial role in the completion of the contract?

In its motion for summary judgment, IOC contends Offshore has no evidence to
establish the Contract provided for, or the parties expected, a vessel to play a substantial
role in the completion of the Contract.74 In support, IOC points to evidence that the parties
did not expect a vessel to play a substantial role in the completion of the Contract and that
the actual work performed did not involve substantial use of a vessel.75 In opposition,
Offshore argues genuine disputes of material fact exist as to whether the second prong of
the Doiron test is satisfied because (1) “the MSC contemplates Fieldwood’s contracting
with third parties for marine transportation to or from the worksite;”76 (2) Fieldwood’s
corporate representative testified work from a vessel is part of the “agreement;”77 and (3)
some vessel-related work was performed.78

71 In re Crescent Energy Services, L.L.C., 896 F.3d 350, 355 (5th Cir. 2018).
72 In re Larry Doiron, Inc., 879 F.3d at 576.
73 R. Doc. 65-1 at p. 6 (“Here, the Contract provides for [IOC] to supply production personnel to produce oil
and gas on fixed platforms.”); see also R. Doc. 68 at p. 7 (“Here, it cannot be disputed that the . . . first prong
of the Doiron test is met.”).
74 R. Doc. 65-1 at p. 5.
75 See R. Doc. 65-6 at p. 2, ¶ 5.
76 R. Doc. 68 at p. 6.
77 Id. at p. 10.
78 Id. at pp. 7-9.
The Fifth Circuit’s Doiron test “places the focus on the contract and the
expectations of the parties.”79 “We must remember that the contracting parties’
expectations are central.”80 “Even significant vessel involvement isn’t enough if that
involvement was” not expected by the parties.81 However, where “[t]he scope of the
contract [is] unclear; [or] the extent to which the parties expect vessels to be involved in
the work [is] unclear . . . courts may permit the parties to produce evidence of the work
actually performed and the extent of vessel involvement in the job.”82
“Among the directions given by Doiron on what ‘substantial’ means is that if [the

contracted for] ‘work is performed in part on a vessel and in part on a platform or on land,
we should consider not only time spent on the vessel but also the relative importance and
value of the vessel-based work to completing the contract.”83 The Fifth Circuit has clarified
that the role of a vessel as transportation to and from the job site is irrelevant in this
analysis.84 Additionally, the fact that the claimant, Mr. Felix, allegedly was injured while
aboard the vessel is not dispositive. To that point, in Doiron, the Fifth Circuit wrote “[t]he
facts surrounding the accident are relevant to whether the worker was injured in a
maritime tort, but they are immaterial in determining whether the worker’s employer
entered into a maritime contract.”85 Indeed, after Doiron, “[w]e are no longer concerned
about whether the worker was on a platform or vessel” when injured.86
Here, it is undisputed that the MSC and applicable work order reflect a contractual

relationship between Fieldwood and IOC whereby IOC was to provide operators to work

79 In re Larry Doiron, Inc., 879 F.3d 568, 576 (5th Cir. 2018) (en banc).
80 In re Crescent Energy Servs., L.L.C., 896 F.3d 350, 359-60 (5th Cir. 2018).
81 Barrios v. Centaur, LLC, 942 F.3d 670, 681 (5th Cir. 2019) (citation omitted).
82 Doiron, 879 F.3d at 577; accord Carr v. Yellowfin Marine Servs., LLC, 423 F.Supp.3d 316, 321 (E.D. La.
2019) (Ashe, J.).
83 Crescent, 896 F.3d at 359 (quoting Doiron, 879 F.3d at 576 n.47).
84 Id.
85 Doiron, 879 F.3d at 573-74.
86 Crescent, 896 F.3d at 356-57.
on Fieldwood’s oil and gas production platforms.87 It also is undisputed that the work
order at issue is a December 16, 2020 email chain between IOC and Fieldwood whereby
Fieldwood asked IOC for additional workers to fill “A op spot[s].”88 The work order does
not itself specify the type of work to be performed by IOC’s workers.89 It is undisputed
that the MSC and applicable work order, taken together, called for IOC to provide
production operators to man Fieldwood’s production platforms producing oil and/or gas
at the West Delta 90 and 103 blocks.90 The parties agree three platforms are located in the
West Delta 90 block that are attached by bridges and the West Delta 103 block contains

one satellite platform.91
In light of the Fifth Circuit’s framework, the Court considers whether, together, the
MSC and work order email “provide[d] or [] the parties expect[ed] that a vessel [would]
play a substantial role in the completion of the contract.”92 Starting with the work order,
it clearly makes no mention of a vessel, so the work order does not create a question of
fact preventing summary judgment.93 With respect to the MSC, Offshore argues only one
provision of the MSC contemplates the use of a vessel in the completion of the contract.94
That provision provides as follows:
Whenever Work to be performed under this Contract involves worksites located
offshore within inland water, Company, unless otherwise agreed to in writing, shall
have the obligation to provide marine transportation for equipment and works in
association with such Work, and may enter into agreements with third parties for
the provision of marine transportation services. Company and contractor

87 See R. Doc. 65-6 at p. 1, ¶ 3; see also R. Doc. 68-4 at pp. 1-1, ¶ 3 (conceding IOC’s statement is accurate
but “incomplete” with respect to actual work performed).
88 See R. Doc. 65-6 at p. 1, ¶ 3; see also R. Doc. 68-4 at pp. 1-1, ¶ 3.
89 R. Doc. 65-3 at pp. 1-4.
90 See R. Doc. 65-6 at p. 1, ¶ 3; see also R. Doc. 68-4 at pp. 1-1, ¶ 3 (conceding IOC’s statement is accurate
but “incomplete” with respect to actual work performed).
91 Compare R. Doc. 65-1 at p. 3 with R. Doc. 68 at p. 13; see also R. Doc. 65-2 at p. 8 (testimony of
Fieldwood’s corporate representative); see also R. Doc. 68-1 at p. 89 (zoomed in photographs of the West
Delta 75, 103, 90, and 79 blocks).
92 Doiron, 879 F.3d at 576.
93 R. Doc. 65-3 at pp. 1-4.
94 R. Doc. R. Doc. 68 at pp. 7, 10.
specifically agree that such transportation, whether provided by Company or
Contractor, is a maritime activity and shall be subject to General Maritime Law of
the United States of America at all times while any member or Contractor Group
(as defined herein) is being transported to or from the worksite, including, without
limitation, while such member is embarking or disembarking or while such
equipment is being loaded or offloaded from any vessel(s).95

This provision of the MSC clearly contemplates work performed may “involve[]
worksites located offshore or within inland waters” and that, when that is the case,
Fieldwood will “provide marine transportation.”96 Beyond this provision, the MSC does
not contemplate the use of vessels.97 As discussed above, the use of a vessel as
transportation to a worksite is not relevant to the Doiron analysis as a matter of law.98 To
the extent Offshore argues the “loading and offloading” of items transported on vessels
makes the use of those vessels substantial, and the Contract a maritime one, the Court
disagrees. Marine transportation, which is a maritime activity,99 must be ignored in the
Doiron analysis. The Court concludes that loading and offloading items, called for under
the MSC as part of the transportation process, must be ignored as well—even though
loading and unloading also is a maritime activity.100 In fact, a section of the U.S. District
Court for the Southern District of Texas, considering an identical provision of a master
services contract, found, inter alia, use of vessels to load and offload equipment as part
of the transportation process “concerns transportation” and, thus, is not considered in the
Doiron analysis under Fifth Circuit precedent.101 This finding comports with decisions
from two different sections of this court; Judges Ashe and Africk faced with an identical

95 R. Doc. 38-1 at p. 2.
96 Id.
97 Id.
98 Crescent, 896 F.3d at 359.
99 West of England Shipowners Mut. P&I Ass’n v. Shell Offshore, Inc., 1994 WL 500952, at *3-4 (E.D. La.
9/8/1994) (McNamara, J.).
100 Hertz v. Treasure Chest Casino, LLC, 24 F.Supp.2d 795, 802 (E.D. La. 2003).
101 Fleet Operators, Inc. v. Nautilus Ins. Co., CV 19-313, R. Doc. 57 at pp. 18-20 (S.D. Tx. 8/3/2021) (Brown,
J.).
provision of a master services contract involving a Fieldwood platform held those
contracts “did not provide that a vessel would play a substantial role in the completion of
the contract.”102 As a result, taking the MSC and applicable work order together, the Court
finds there is no genuine dispute of material fact that the Contract plainly did not provide
a vessel would play a substantial role in its completion.
The Court next considers whether the parties expected a vessel to play a substantial
role in the completion of the Contract. The Fifth Circuit has made clear the contracting
parties’ expectations should guide this analysis.103 IOC argues there is no genuine dispute

of material fact that the contracting parties, IOC and Fieldwood, did not contemplate a
vessel would play a substantial role in the completion of the Contract.104 In terms of
evidence, IOC points to the declaration of Gregg Falgout, IOC’s president and chief
executive officer, and the deposition of Fieldwood’s corporate representative.105 Gregg
Falgout is the president and chief executive officer of IOC.106 In his declaration, Mr.
Falgout states that “IOC production operators . . . performed no work upon . . . vessels.”107
Instead, the parties only expected the use of vessels “as a means of transportation to
relocate production workers as necessary among the field platforms and/or to transport
them back to shore.”108 The declaration further states “[n]either IOC nor Fieldwood,” the
two parties to the Contract, “had any expectation of vessels being used as work platforms

102 In the Matter of Aries Marine Corporation, et al., Civ. A. 19-10850, R. Doc. 241 at p. 13 (E.D. La.
2/3/2023) (Africk, J.); Carr v. Yellowfin Marine Servs., LLC, 423 F.Supp.3d 316, 323 (E.D. La.
10/30/2019) (Ashe, J.) (R. Doc. 26-4 at p.2 in 18-4093 provides an identical provision of the MSC); see also
QuarterNorth Energy, LLC v. Supreme Offshore Servs., Inc., 2023 WL 1927364, at *5-6 (E.D. La.
2/10/2023) (dealing with “an agreement to provide both dockage and services [of] loading an unloading
cargo for various vessels,” including “dockage, riggers, foremen, cranes, and forklifts for multiple vessels,”
which is not analogous to the case at bar).
103 Crescent, 896 F.3d at 359-60.
104 R. Doc. 65-1 at p. 5.
105 Id. at p. 5 n.26.
106 See R. Doc. 65-4 at p. 1, ¶ 2.
107 Id. at p. 2, ¶ 11.
108 Id.
by IOC personnel for any work performed or contemplated.”109 Indeed, it is undisputed
that IOC did not expect a vessel to play a substantial role in the completion of the
Contract.110
In opposition, Offshore points to a different part of the Fieldwood corporate
representative’s deposition testimony, which, Offshore argues, creates a genuine dispute
of material fact as to whether Fieldwood contemplated a vessel playing a substantial role
in the completion of the Contract.111 The Fieldwood deposition testimony Offshore points
to reads as follows:

Q. Was it contemplated that Mr. Felix, as an A operator, would be performing any
work from a vessel?
A. [non-responsive answer]
Q. Okay. And I don’t mean transportation to and from a satellite, from a platform
to a platform. I mean actual work performed from a vessel. Would that be
contemplated under the Operators roles and responsibilities?
A. What do you mean by “work from a vessel?”
Q. So for instance if they would be using any kind of equipment connected by lines
that may be connected to a vessel?
A. We typically don’t do that, but it is part – it has been done, yes, sir. I’d say it’s
part of the agreement.112

To the extent this testimony is evidence that Fieldwood expected a vessel to play
some role in the completion of the Contract, this testimony alone is not sufficient to defeat
summary judgment. Courts have held the Fifth Circuit’s “expectations of the parties”
standard requires there to be a shared expectation that a vessel would play a substantial
role.
For example, in In the Matter of Aries Marine Corporation, et al., a different
section of this court decided whether to apply federal maritime law or Louisiana law to a

109 Id.
110 See R. Doc. 65-6 at p. 2, ¶ 5; see also R. Doc. 6804 at p. 2, ¶ 5 (only offering evidence to dispute
Fieldwood’s expectation).
111 R. Doc. 68 at pp. 9-10.
112 R. Doc. 68-1 at p. 15.
master services contract that included an indemnity provision like the one in the case at
bar.113 In analyzing whether the contracting parties expected a vessel to play a substantial
role in the completion of the contract, the court found “[t]here [wa]s sufficient evidence
to conclude that [two of the contracting parties] expected the vessel to play a substantial
role in the completion of the contract.”114 Nevertheless, there was “no evidence that [the
other contracting parties] shared that expectation.”115 The court, relying on Doiron, found
the contracting parties, collectively, must have a shared expectation “that the vessel would
play a substantial role.”116 The Court finds the reasoning of Aries Marine highly

persuasive.
Applying Aries Marine to the case at bar, even if Fieldwood expected a vessel to
play a substantial role in the completion of the Contract, there is no genuine dispute of
material fact that IOC did not share such an expectation. It is undisputed that IOC did not
expect a vessel to play a substantial role in the completion of the Contract.117 Said
differently, the summary judgment record establishes there was no shared expectation
that a vessel would play a substantial role in the completion of the Contract.
Offshore’s focus on the actual work performed involving a vessel flies in the face of
the Fifth Circuit’s instruction to focus on the parties’ expectations. “Th[e] [Doiron] test
places the focus on the contract and the expectations of the parties. This is the proper
approach in a contract case and assists the parties in evaluating their risks, particularly

their liability under indemnification clauses in the contract.”118 Though it is true the Fifth

113 In the Matter of Aries Marine Corporation, et al., Civ. A. 19-10850, R. Doc. 241 at p. 1 (E.D. La.
2/3/2023) (Africk, J.).
114 Id. at p. 14.
115 Id.
116 Id. at pp. 14, 16.
117 See R. Doc. 65-6 at p. 2, ¶ 5; see also R. Doc. 6804 at p. 2, ¶ 5 (only offering evidence to dispute
Fieldwood’s expectation).
118 In re Larry Doiroin, Inc., 879 F.3d 568, 576 (5th Cir. 2018).
Circuit in Doiron stated, when the parties’ expectations are unclear, courts may rely on
evidence of the actual use of the vessel in determining whether a contract is maritime or
nonmaritime,119 the instant matter does not present a problem of clarity. Because it is
undisputed that IOC did not expect the vessel to play a substantial role in the completion
of the work, the Court finds it unnecessary to examine the extent to which the vessel was
used during the work.120 For the foregoing reasons, the Court concludes that the Contract
at issue here fails the second prong of the Doiron test and therefore is nonmaritime.
In sum, maritime law does not apply of its own force to the indemnity provisions

because the Contract is nonmaritime. Thus, the second element of the OCSLA choice-of-
law analysis is satisfied.
C. Element 3: That state law must not be inconsistent with federal law.
The parties do not argue the LOIA is inconsistent with federal law.121 Indeed, the
Fifth Circuit has consistently held the LOIA does not conflict with federal law.122
Accordingly, the third element is met. The Court finds the OCSLA applies in this case.
Notwithstanding the OCSLA, the Court still must consider whether the choice-of-law
provision in the MSC overrides any other legal basis for determining the applicable law.123
In this case, the MSC calls for the application of federal maritime law or, in the
alternative, Texas state law.124 Both federal and Louisiana state courts routinely disregard
choice-of-law provisions in master service contracts when the OCSLA requires the

119 Id. at 577.
120 Even if the Court were to reach the extent to which a vessel was actually used in the completion of the
Contract, the summary judgment record establishes that role was either limited to transportation or
otherwise incidental to the contract, meaning it cannot be “substantial” as a matter of law. Carr v. Yellowfin
Marine Servs., LLC, 423 F.Supp.3d 316, 323 (E.D. La. 10/30/2019) (Ashe, J.).
121 See R. Doc. 65-1; see also R. Doc. 68.
122 See Grand Isle Shipyard, Inc. v. Seacor Marine, LLC, 589 F.3d 778, 789 (5th Cir. 2009).
123 See Duet v. Falgout Offshore, LLC, 757 F. Supp. 2d 598 (E.D. La. 2010).
124 R. Doc. 38-1 at p. 13, ¶ 26.
application of the adjacent state’s law.125 In Matte v. Zapata Offshore Co., for example,
the Fifth Circuit addressed whether a choice-of-law provision that selected general
maritime law trumped the application of the OCSLA.126 The court held the choice-of-law
provision “violates the public policy of both Louisiana and the United States,” and voided
the provision.127 In this case, the Court similarly finds that the choice-of-law provision in
the MSC is void because its conflicts with the application of the OCSLA and the LOIA.128
Accordingly, the Court shall disregard the choice-of-law provision in the MSC and
apply Louisiana law pursuant to the OCSLA. The Court will now consider whether there

are genuine disputes of material fact preventing this Court’s application of the LOIA, a
creature of Louisiana state law, to Offshore’s claims against IOC.
II. The LOIA precludes Offshore’s entitlement to the indemnity sought in
its third-party demand against IOC.

IOC moves for summary judgment on the claims for indemnity asserted against it
in Offshore’s third-party demand. IOC argues the Louisiana Oilfield Indemnity Act bars
the relief sought by Offshore. The LOIA was enacted after an express legislative finding
“that an inequity is foisted upon certain contractors and their employees by the defense
or indemnity provisions . . . contained in some agreements pertaining to wells for oil, gas
or water.”129 As a result, the LOIA “declare[s] null and void and against public policy . . .
any provision in any agreement which requires defense and/or indemnification, for death
or bodily injury to persons, where there is negligence or fault (strict liability) on the part

125 Roberts v. Energy Dev. Corp., 235 F.3d 935, 943 (5th Cir. 2000); Matte v. Zapata Offshore Co., 784
F.2d 628 (5th Cir. 1986); Silverman v. Mike Rogers Drilling Co., Inc., 34 So.3d 1099, 1104 (La. App. 2 Cir.
4/14/10).
126 784 F.2d 628 (5th Cir. 1986).
127 Id. at 631-32.
128 Carodoso-Gonzales v. Anadarko Petroleum Corp., 326 F.Supp.3d 273, 281 (E.D. La. 6/20/2018)
(Morgan, J.) (reaching the same conclusion).
129 LA. REV. STAT. 9:2780.
of the indemnitee . . . .”130 The “LOIA is ‘broadly written and has been broadly interpreted
by Louisiana courts and the Fifth Circuit.’”131 Accordingly, to determine whether the
provisions of the LOIA apply to a given contract, the Fifth Circuit fashioned a two-part
inquiry in Transcontinental Gas Pipe Line Corp. v. Transp. Ins. Co:
First, there must be an agreement that “pertains to” an oil, gas or water well.
If the contract does not pertain to a well, the inquiry ends. Only if we
determine that the contract has the required nexus to a well may we proceed
to the second step of the process, examination of the contract's involvement
with “operations related to the exploration, development, production, or
transportation of oil, gas, or water” . . . Therefore, if (but only if) the
agreement (1) pertains to a well and (2) is related to exploration,
development, production, or transportation of oil, gas, or water, will the Act
invalidate any indemnity provision contained in or collateral to that
agreement. 132

In applying the Fifth Circuit’s analytical framework, the particular job that resulted
in the injury is irrelevant. Whether the LOIA applies should be considered in relation to
the nature of the contract, rather than the task or activity that led to the incident.133 As a
result, the activities giving rise to the claim need not have been rendered at the offshore
site or in connection with the drilling or operation of a particular site in order to fall within
the bounds of the LOIA.134
Further, the Fifth Circuit has held the relevant contract in the LOIA context is the
applicable work order.135 Again, it is undisputed that the work order at issue is a December
16, 2020 email chain between IOC and Fieldwood whereby Fieldwood asked for

130 LA. REV. STAT. § 9:2780(A).
131 Fleet Operators, Inc. v. Nautilus Insurance Co., 2022 WL 5405892, at *2 (S.D. Tex. 7/18/2022) (internal
quotations and alterations omitted).
132 Transcon. Gas Pipe Line Corp. v. Transp. Ins. Co., 953 F.2d 985, 991 (5th Cir. 1992); Fontenot v.
Chevron U.S.A. Inc., 95-1425 (La. 7/02/96); 676 So. 2d 557, 564.
133 Grand Isle Shipyard v. Gray Insurance Co., 589 F.3d 778 (5th Cir. 2009); Hodgen v. Forest Oil Corp.,
115 F.3d 358 (5th Cir. 1997).
134 See Grand Isle Shipyard at 787 (5th Cir. 2009).
135 See Roberts v. Energy Devel. Corp., 104 F.3d 782, 784 (5th Cir. 1997).
additional IOC workers to fill “A op spot[s].”136 By Offshore’s own telling, under the work
order, Felix (the injured worker) was called out to work as an “A Operator” in Fieldwood’s
West Delta field, including at the West Delta 90 A, B, and E platforms (these three
platforms being connected by bridges/catwalks) and the West Delta 103 F platforms.137 It
is undisputed that A Operators work included, inter alia, controlling and/or monitoring
wellheads and casing pressures on individual wells, conducting pressure tests, utilizing
test separators, checking for leaks on production equipment, and opening and closing
wellheads and production valves.138

Turning to the Fifth Circuit’s two-party inquiry, IOC and Offshore agree the second
prong of the LOIA analysis is satisfied—the subject matter of the work order is related to
exploration, development, production, or transportation of oil, gas, or water. However,
Offshore argues there is a genuine issue of material fact as to whether the work at issue
here “pertains to a well,”139 i.e., the first prong of the analysis.
The determination of “whether a contract pertains to a well . . . requires a fact
intensive case-by-case analysis.”140 This is because “[t]he Fifth Circuit has recognized that
there is a point at which the subject of a contract no longer pertains to a well. Th[is] point
is reached when the work relates to [oil or] gas that ‘can no longer be identified with a
particular well or if the [oil or] gas becomes so fundamentally changed by processing,
commingling, or preparing it for distribution to its ultimate end user that it can no longer

properly be attributed to a particular well.”141 The parties agree the applicable work order

136 See R. Doc. 65-6 at p. 1, ¶ 3; see also R. Doc. 68-4 at pp. 1-2, ¶ 3 (conceding IOC’s statement is accurate
but “incomplete” with respect to actual work performed); R. Doc. 65-3 at pp. 1-4 (the work order).
137 R. Doc. 68 at p. 4.
138 See R. Doc. 65-6 at p. 1, ¶ 3; see also R. Doc. 68-4 at pp. 1-2, ¶ 3 (conceding IOC’s statement is accurate
but “incomplete”).
139 R. Doc. 68 at p. 11.
140 Transco, 953 F.2d at 994.
141 Labove v. Candy Fleet, LLC, 2012 WL 3043168, at *3 (E.D. La. July 20, 2012) (Africk, J.) (quoting
Johnson v. Amoco Prod. Co., 5 F.3d 949, 953–54 (5th Cir. 1993)).
called for production operators to work on equipment that contained oil or gas that was
commingled with oil or gas from wells located at either the West Delta 90 platforms
and/or the West Delta 103 F platform.142 Precisely to resolve this “commingled oil or gas”
conundrum, in Transcontinental, the Fifth Circuit identified several factors that may be
relevant to determining the point at which a contract for services does or does not pertain
to a well. These factors are:
(1) whether the structures or facilities to which the contract applies or with which
it is associated are part of an in-field gas gathering system; (2) the geographical
location of the facility or system relative to the well or wells; (3) whether the
structure in question is a pipeline or is closely involved with a pipeline; (4) if so,
whether that line picks up gas from a single well or a single production platform or
instead carries commingled gas originating from different wells or production
facilities; (5) whether the pipeline is a main transmission or trunk line; (6) the
location of the facility or structure relative to compressors, regulating stations,
processing facilities or the like; (7) the purpose or function of the facility or
structure in question; (8) what, if any, facilities or processes intervene between the
wellhead and the structure or facility in question; (9) who owns and operates the
facility or structure in question, and who owns and operates the well or wells that
produce the gas in question; and (10) any number of other details affecting the
functional and geographic nexus between “a well” and the structure or facility that
is the object of the agreement under scrutiny.143

“Factors three, four, five, six, and eight are only relevant when the services provided for
in the contract under scrutiny are related to natural gas transmission systems,”144 like the
one in Transcontinental. “Courts have applied [a] modified five-factor Transcontinental

142 See R. Doc. 72 at p. 7 (IOC conceding this point); see also R. Doc. 68 at p. 13 (Offshore making this point).
In opposition, Offshore presents a declaration of James Philip Amy, who confirms the hydrocarbons at the
relevant platforms were commingled at various points. See R. Doc. 68-3. In reply, IOC asks the Court to
strike Amy’s declaration because Offshore “failed to disclose this witness until after [IOC] filed its Motion
and well after the Limited Discovery period concluded.” R. Doc. 72. The Court will not strike the declaration
because IOC concedes the commingling issue.
143 Labove v. Candy Fleet, LLC, No. 11-1405, 2012 WL 3043168, at *3-4 (E.D. La. July 20, 2012) (Africk,
J.).
144 Katherine Fruge Corry, Removing the Risk from Risk Allocation: Reforming Louisiana’s Oilfield Anti-
Indemnity Act, 81 LA. L. REV. 1038, 1048-49 n.89 (2021) (emphasis added); Broussard v. Conoco, Inc., 959
F.2d 42, 44-45 (5th Cir. 1992); Simar v. Tetra Techs. Inc., 2017 WL 4274348, at *12 (W.D. La. Sept. 26,
2017); Fleet Operators, Inc. v. Nautilus Ins. Co., 2022 WL 5405892, at *4 (S.D. Tex. July 18, 2022).
test in cases involving oil and gas platforms and related structures.”145 IOC has presented
uncontroverted summary judgment evidence that “the platforms [at issue] . . . are
production platforms,”146 and not related to “gas transmission platforms.”147 Accordingly,
the Court will consider only the following Transcontinental factors:
(1) whether the structures or facilities to which the contract applies or with which
it is associated . . . are part of an in-field gas-gathering system; (2) what is the
geographical location of the facility or system relative to the well or wells; . . . (7)
what is the purpose or function of the facility or structure in question; . . . (9) who
owns and operates the facility or structure in question, and who owns and operates
the well or wells that produce the [oil or] gas in question; (10) and any number of
other details affecting the functional and geographic nexus between “a well” and
the structure or facility that is the object of the agreement under scrutiny. 148

A. Factor 1: Whether the structures or facilities to which the contract
applies or with which it is associated are part of an in-field gas-
gathering system.

“[T]he Fifth Circuit specifically lists ‘production platforms’ as one of the ‘structures
of facilities’ to which the contract can apply or be associated with to satisfy this factor.”149
It is undisputed that the applicable work order called for IOC production operators to
work on fixed oil and gas production platforms.150 Specifically, it is undisputed that, under

145 Corry, supra note 137 at 1048-49 n.89; see also Howell v. Avante Servs., L.L.C., 2013 WL 1681436 (E.D.
La. 4/17/2013) (Vance, J.).
146 Offshore also presents evidence establishing some processing is done at the production platforms. See,
e.g., R. Doc. 83 at p. 8. Processing was also done at the production platform at issue in Fleet Operators.
Fleet Operators, 2022 WL 5405892, at *6. Thus, that processing was done at the production platforms does
not frustrate this Court’s finding that “the contract under scrutiny” is not “related to a natural gas
transmission system.”
147 R. Doc. 65-1 at p. 9.
148 In its application of the Transcontinental factors, Offshore attempts to muddy the plain language of
those factors by repeatedly explaining the commingling process at the Fieldwood platforms, even when the
relevant factors make no mention of commingling. Offshore cites nothing to support its interpretation or
application of the relevant Transcontinental factors. The Transcontinental factors are designed to
determine the point at which a contract calling for commingled oil and gas production no longer pertains
to a well. Therefore, reading a “commingling element” into nearly every factor of the Transcontinental test,
as Offshore suggests, would effectively render the factors meaningless as a court would start and stop the
inquiry with the fact of commingling. There is no dispute that there was commingling done at the facilities.
Beating the “commingling drum,” however loudly or repeatedly, does not change the facts or create
applicable law.
149 Fleet Operators, Inc., 2022 WL 5405892, at *4 (S.D. Tex. 7/18/2022).
150 See R. Doc. 65-6 at p. 1, ¶ 3; see also R. Doc. 68-4 at pp. 1-2, ¶ 3 (conceding IOC’s statement is accurate
but “incomplete”). The fact that some “vessel-related work” may have been completed does not frustrate
this Court’s conclusion that the structures to which the work order applied are part of an in-field gas-
the work order, IOC provided production operators to man Fieldwood offshore
production platforms producing oil and/or gas at the West Delta 90 and 103 blocks, which
work included controlling and/or monitoring wellheads and casing pressures on
individual wells, conducting pressure tests, and opening and closing wellheads and
production valves.151
Moreover, there is uncontroverted summary judgment evidence that shows
Fieldwood’s platforms are part of an in-field production system.152 As courts have
recognized, such a “conclusion is unremarkable: the very purpose of production platforms

is, of course, to facilitate in-field production.”153 Accordingly, the Court concludes the
structures to which the work order applies are part of an in-field gas-gathering system.
This factor weighs in favor of applying the LOIA.
B. Factor 2: What is the geographical location of the facility or system
relative to the well or wells?

It is undisputed that the relevant Fieldwood platforms under the work order
include three platforms located in the West Delta 90 Field (West Delta 90 A, B, and E)
and the West Delta 103 F platform.154 It is further undisputed that the relevant Fieldwood
platforms are permanently attached to the seabed on the outer continental shelf adjacent
to the coast of the State of Louisiana.155

gathering system. This is because whether the LOIA applies should be considered in relation to the contract.
See Grand Isle Shipyard v. Gray Insurance Co., 589 F.3d 778 (5th Cir. 2009).
151 See R. Doc. 65-6 at p. 1, ¶ 3; see also R. Doc. 68-4 at pp. 1-2, ¶ 3 (conceding IOC’s statement is accurate
but “incomplete”).
152 R. Doc. 65-2 at p. 44.
153 Fleet Operators, Inc., 2022 WL 5405892, at *5 n.3.
154 See R. Doc. 65-6 at p. 1, ¶ 3; see also R. Doc. 68-4 at pp. 1-2, ¶ 3 (conceding IOC’s statement is accurate
but “incomplete”). In its briefing, Offshore suggests the injured worker also worked at the West Delta 75
satellite platforms. See R. Doc. 83 at p. 5. The veracity of that statement is not material because it is
sufficient for the contract to pertain “to any well.” “The court . . . need [not] . . . look further to see if the
contract pertained to any other wells.” See Lloyds of London v. Transcontinental Gas Pipe Line Corp., 38
F.3d 193, 197 (5th Cir. 1994).
155 See R. Doc. 65-6 at p. 2, ¶ 4; see also R. Doc. 68-4 at p. 2, ¶ 4.
When the contract at issue pertains to multiple platforms, the Fifth Circuit has
instructed it is sufficient to look to only one platform to determine whether the subject
matter of the contract “pertains to a well.”156
The court . . . need [not] . . . look further to see if the contract pertained to any other
wells. [Fifth Circuit caselaw] instructs us to examine the facts to see if the contract
envisioned work which pertained to any well. The fact that the contract also may
pertain to numerous other wells or to objects other than wells is of no
consequence.157

In this case, Offshore has presented uncontroverted summary judgment evidence
establishing the West Delta 90B platform, for example, was associated with wells 17, 24,
and 26.158 Fieldwood’s corporate representative testified the surface location of these wells
are physically located at the West Delta 90B platform.159 This geographical nexus between
platform and well makes it more likely that the contract pertains to a well.160
C. Factor 7: What is the purpose or function of the facility or structure in
question?

As numerous courts have recognized, there is no doubt that the purpose of a
production platform “is to further drilling for oil and gas.”161 As Offshore itself concedes
in its opposition, IOC workers performed services on Fieldwood’s platforms to facilitate
the drilling or production of oil and gas.162 Ample uncontroverted summary judgment
evidence establishes the same.163 This factor weighs in favor of applying the LOIA.

156 Transcontinental Gas Pipe Line Corp., 38 F.3d at 197.
157 Id.
158 See R. Doc. 68-1 at p. 90.
159 See R. Doc. 65-2 at pp. 32-33.
160 Cf. Hughes v. Pogo Producing Co., No. CIV.A. 06-1894, 2009 WL 667186, at *7 n.8 (W.D. La. Mar. 11,
2009) (holding the LOIA did not apply where there was “evidence there were no active production wells
within five miles of the Grand Isle 115 platform,” but noting that if a well had been nearby, “perhaps the
analysis would be different and more akin to Broussard”).
161 See, e.g., Thibodeaux, 370 F.3d at 494 (“purpose” of production platform “is to further drilling for oil
and gas”); Teaver, 2012 WL 5866042, at *5 (production platform's “purpose was to assist in oil and gas
production”); DeHart, 2010 WL 231744, at *1 (production platform “was ... erected for the purpose of oil
and gas exploration, production and development”).
162 R. Doc. 68 at p. 7.
163 R. Doc. 65-2 at pp. 44-45; see also R. Doc. 65-4.
D. Factor 9: Who owns and operates the facility or structure in question?
Who owns the wells?

It is undisputed that Fieldwood, an oil-and-gas exploration and production
company and a party to the MSC and applicable work order, owns and operates the
platforms at issue.164 Further, IOC has presented uncontroverted summary judgment
evidence that Fieldwood was an owner of the wells at issue.165 Accordingly, the fourth
factor weighs in favor of applying the LOIA.166
E. Factor 10: Any number of other details affecting the functional and
geographic nexus between “a well” and the structure or facility that
is the object of the agreement under scrutiny.

Buttressing this Court’s finding that the first four relevant Transcontinental
factors point inexorably to the conclusion that “the agreement . . . pertains to a well,” is
the case of In the Matter of Aries Marine Corporation, et al.167 In that case, Judge Africk
determined the subject matter of an agreement pertained to a well when a Fieldwood-
owned platform was “directly connected” to wells and where there was evidence
establishing the oil and gas produced from that Fieldwood platform could be traced back
to a particular well with which the platform was associated even as the oil and gas
travelled through pipelines.168 In this case, there is evidence, for example, that the West
Delta 90B platform is associated with wells 17, 24, and 26,169 and the surface locations of

164 See R. Doc. 65-6 at p. 1, ¶ 3; see also R. Doc. 68-4 at pp. 1-2, ¶ 3 (conceding IOC’s statement is accurate
but “incomplete”); see also R. Doc. 30 at p. 3, ¶ 6 (Offshore’s third-party demand); see also R. Doc. 83 at p.
10.
165 See, e.g., R. Doc. 65-2 at p. 45.
166 See Cardoso-Gonzalez, 326 F. Supp. 3d at 277, 281–82 (holding the LOIA applied where owner and
operator of platform was party to master service contract under which indemnity was sought); Simar v.
Tetra Techs., Inc., No. CV 15-01950, 2017 WL 4274348, at *1, 13 (W.D. La. Sept. 26, 2017) (holding the
LOIA applied where owner and operator of platform was party to master service agreement under which
indemnity was sought).
167 In the Matter of Aries Marine Corporation, et al., Civ. A. 19-10850, R. Doc. 241 at p. 1 (E.D. La.
2/3/2023) (Africk, J.).
168 Id. at p. 19.
169 See R. Doc. 68-1 at p. 90.
these wells are physically located at the platform.170 Furthermore, Fieldwood’s corporate
representative testified it is possible “to determine what specific wells the oil came from”
after the oil is produced from the relevant platforms while it is being transported through
oil pipelines.171 As was the case in Aries, this evidence provides “other details affecting the
functional and geographic nexus” and “suggests that the oil and gas produced can be
properly attributed to a particular well.”172 For these reasons, the Court concludes there is
no genuine dispute of material fact as to whether the LOIA applies; all five relevant
Transcontinental factors point in favor of its application.
F. Application of the LOIA.

To recap, there is no genuine dispute of material fact that the MSC and applicable
work order are nonmaritime contracts, meaning Louisiana law applies pursuant to the
OSCLA. Because there also is no genuine dispute of material fact that the subject matter
of the work order pertains to a well and is related to exploration, development,
production, or transportation of oil, gas, or water, the LOIA applies. As a matter of law,
the LOIA precludes Offshore’s entitlement to the indemnity sought in its third-party
demand against IOC;173 that is, indemnity and insurance coverage174 pursuant to the
MSC.175 “And when LOIA applies to an agreement, any purported obligations to indemnify

170 See R. Doc. 65-2 at pp. 32-33.
171 R. Doc. 68-1 at pp. 40-42.
172 Aries, Civ. A. 19-10850, R. Doc. 241 at p. 19 (emphasis in original).
173 R. Doc. 30.
174 As this Court has recognized, the LOIA “expressly invalidates agreements requiring additional named
insured endorsements or any other form of insurance protection which would frustrate or circumvent the
prohibitions of” the Act. See Carodoso-Gonzales v. Anadarko Petroleum Corp., 326 F.Supp.3d 273, 283
(E.D. La. 6/20/2018) (Morgan, J.) (internal quotations omitted). While the Fifth Circuit has recognized an
exception to this rule when the additional named insured “actually pa[ys] for the cost of the insurance,”
there is no evidence before the Court suggesting Offshore paid for the cost of the insurance. See Rogers v.
Samedan Oil Corp., 308 F.3d 477, 481-82 (5th Cir. 2002).
175 The Court denies IOC’s Motion for Summary Judgment with respect to Offshore’s claim for defense costs.
See infra Part III.
are voided, and summary judgment is proper.”176 Accordingly, IOC is entitled to summary
judgment on Offshore’s indemnity claim and indemnity insurance claim against it.
III. The Meloy exception may apply, and the Court will not grant summary
judgment on Offshore’s claim for defense costs.

As a final matter, the Court will address Offshore’s assertion that summary
judgment is premature. In its opposition to IOC’s motion,177 Offshore contends that
granting the motion for summary judgment would be premature based on the Louisiana
Supreme Court’s ruling in Meloy v. Conoco.178 In that case, the Louisiana Supreme Court
established an exception to the LOIA anti-indemnity rule that allows for the payment of
defense costs when a potentially indemnified party is free from fault and the agreement
provides for such an award.179 Offshore argues that, as it may be entitled to recover
attorneys’ fees and costs from IOC if Offshore is found not to be at fault, the motion for
summary judgment in its entirety is premature.
Meloy only serves as an exception to the LOIA’s bar of claims for defense costs
when the potential indemnitee is found free of fault after a trial.180 The question of whether
summary judgment as to an indemnity claim, as opposed to a claim for defense costs, may
be granted under the LOIA before a trial on the merits was not before the Louisiana
Supreme Court in Meloy as the indemnity claim already had been dismissed.181 After all,
once there is a trial in the instant case, either (1) Offshore will be assigned fault and cast
in judgment, in which case the LOIA bars a claim for reimbursement of the monetary
judgment claim (i.e., the indemnity claim) and the costs of Offshore’s defense (i.e., the

176 Fleet Operators, Inc. v. Nautilus Ins. Co., 2022 WL 5405892, at *7 (S.D. Tex. 7/18/2022).
177 R. Doc. 68.
178 Meloy v. Conoco, 86-1466 (La. 4/16/1987), 504 So. 2d 833.
179 Id. at 839.
180 Meloy v. Conoco, 86-1466 (La. 4/16/1987), 504 So. 2d 833.
181 Id. See also Meloy v. Conoco, 784 F.2d 1320, 1321-22 (5th Cir. 1986), opinion withdrawn, 792 F.2d 56
(5th Cir. 1986).
claim for defense costs); or (2) Offshore will be assigned no fault, in which case there
would be no indemnity to recoup, but Meloy allows a limited exception for Offshore to
seek defense costs from IOC. Meloy does not serve as a bar to summary judgment on
indemnity claims. Accordingly, the Court grants IOC’s Motion for Summary Judgment
with respect to Offshore’s indemnity and indemnity insurance coverage claims and denies
the Motion for Summary Judgment with respect to Offshore’s claim for defense costs.
CONCLUSION
For the foregoing reasons;
IT IS ORDERED that Defendant IOC’s Motion for Summary Judgment: is
GRANTED IN PART and DENIED IN PART. IOC’s Motion for Summary Judgment
is GRANTED with respect to Offshore’s indemnity claim and indemnity insurance
coverage claim and DENIED with respect to Offshore’s claim for defense costs.
New Orleans, Louisiana, this 22nd day of March, 2023.
S .
saa Mota
UNITED STATES DISTRICT JUDGE

182 Doc. 65.
30

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/cases/10189154. Public record. Not legal advice.