# County of Cook v. Kellogg Company

> District Court, N.D. Illinois · March 19, 2019

URL: https://www.frixlaw.com/law-library/cases/10140341

## Case

- **Court:** District Court, N.D. Illinois
- **Decided:** March 19, 2019
- **Opinion:** 100trialcourt
- **Cited by:** 0 later opinions in the Frix Law Library

## Citator (automated)

- No negative treatment found by the automated citator. That is not the same as a confirmation that the case is good law; read the citing cases.
- Full citator and citing cases: https://www.frixlaw.com/law-library/cases/10140341

## Opinion text

IN THE UNITED STATES DISTRICT COURT
FOR THE NORTHERN DISTRICT OF ILLINOIS
EASTERN DIVISION
COUNTY OF COOK, a body politic and )
corporate of the state of Illinois, )
)
Plaintiff/Counter-Defendant, )
) 16 C 3399
v. )
) Judge John Z. Lee
KELLOGG COMPANY, a Delaware )
corporation, )
)
Defendant/Counter-Plaintiff. )

MEMORANDUM OPINION AND ORDER
In this diversity case, Cook County (“the County”) has sued Kellogg Company (“Kellogg”)
under Illinois law for unjust enrichment, as well as for a declaratory judgment that the County is
not obligated to provide free steam heat to Kellogg. Kellogg, in turn, has countersued the County
for a declaratory judgment that the County is so obligated and for breach of a covenant running
with the land. The County has moved for summary judgment on its claims. Kellogg has cross-
moved for summary judgment as to the County’s claims, as well as Kellogg’s own declaratory
judgment claim. For the reasons provided below, the County’s motion is denied, and Kellogg’s
motion is granted. Because Kellogg has not moved for summary judgment on its breach-of-
covenant counterclaim, it is the only claim that remains for trial.
Facts1

Prior to December 27, 1973, the City of Chicago (“the City”) owned a municipal heating
plant. Def.’s LR 56.1(b)(3)(C) Stmt. ¶ 1, ECF No. 94. On that date, the City and the County
entered into an agreement entitled, “Contract for the Sale of a Municipal Heating Plant from the

1 The following facts are undisputed unless otherwise noted.
City of Chicago to the County of Cook” (“1973 Agreement”). Pl.’s Ex. 1, 1973 Agreement at 10,
ECF No. 88-1. The County Board of Commissioners approved the 1973 Agreement on December
20, 1973. Id.
At the time of the 1973 Agreement, seventy percent of the steam output manufactured by
the heating plant was used by the County for its existing facilities, while the remaining thirty

percent was used by the City. Id. at 2. The County, however, planned to build and rehabilitate
additional facilities that would require significantly more steam heat. Id. at 1. To service these
additional facilities, the plant needed to undergo the construction of an addition as well as other
improvements. Id. Given this, the City and the County agreed that it would be better for the
County to possess fee title to the plant, rather than the City. Id. at 4.
In pertinent part, the 1973 Agreement provides:
1. The City will sell certain real property as legally described in
Exhibit “A”, to the County and that the County shall in perpetuity,
or so long as the City in its sole discretion may require, furnish steam
heat for the property described in Exhibit “B” presently owned by
the City. The City shall have the right to receive steam heat for the
existing buildings, or any other building which may be constructed
by the City within the complex described in Exhibit “B”.

2. The City, its successors or assigns shall have the right to receive
the same quantity of steam heat servicing the property located on
Exhibit “B” from the County at no cost to the City for as long as the
City in its discretion shall require.

3. The right of the City to receive steam heat from the Municipal
Heating Plant shall be a “covenant running with the land” for the
benefit of those properties delineated in Exhibit “B”.

Def.’s LR 56.1(b)(3)(C) Stmt. ¶ 2.
One of the sixteen properties listed in Exhibit “B” is a building described as “WARE
HOUSE.” Id. ¶ 5; 1973 Agreement, Ex. B. The warehouse is located south of W. 31st Street and
west of Sacramento Avenue in Chicago, Illinois, on a parcel assigned PIN 16-36-100-056-0000
by the County Recorder (“Warehouse Property”). Def.’s LR 56.1(b)(3)(C) Stmt. ¶¶ 6–7.
From 1973 to 2015, the County provided steam heat to the Warehouse Property at no cost.
Id. ¶ 29. During this time, various private entities owned, leased, or otherwise occupied the
Warehouse Property. Pl.’s LR 56.1(a)(3) Stmt. ¶ 31, ECF No. 88. For example, the City subleased

the Warehouse Property to Farley Candy Co. (“Farley”) in 1992, and the sublease was recorded
with the County Recorder. Def.’s LR 56.1(b)(3)(C) Stmt. ¶¶ 9–10. At some point thereafter, the
City conveyed the deed to the Warehouse Property to Farley, which was succeeded by Favorite
Brands International, Inc. (“Favorite Brands”). See id. ¶ 11. Favorite Brands then conveyed the
deed in the Warehouse Property to Nabisco, Inc., and the transfer was recorded with the County
Recorder in 1999. Id. ¶¶ 12–13. Nabisco, Inc. then was succeeded in interest by Kraft Foods
Global Inc. (“Kraft”). Id. ¶ 14.
Finally, in 2005, Kraft entered into an asset purchase agreement with Kellogg. And, as
part of that transaction, Kraft conveyed its fee simple interest in the Warehouse Property to Keebler

Company, a wholly owned subsidiary of Kellogg, by special warranty deed, which was recorded
with the County Recorder in June 2005. Id. ¶¶ 15, 16.
Prior to purchasing the Warehouse Property, Kellogg learned, as part of its due-diligence
inquiry, that the owner of the Warehouse Property is entitled to steam heat free of charge as in past
practice with prior owners. Id. ¶ 17. Not surprisingly, this affected the purchase price. Id. ¶ 19.
To date, neither the City nor Kellogg has notified the County that steam heat is no longer
required at the Warehouse Property. Id. ¶¶ 50–51. Nonetheless, the County ceased providing
steam heat to Kellogg in 2015. Id. ¶ 53. On May 15, 2015, the County sent a letter demanding
payment of $2,116,800 for steam heat the County had provided Kellogg from 2005 to 2015. Pl.’s
LR 56.1(a)(3) Stmt. ¶¶ 70–71.
Legal Standard
Summary judgment is proper when “there is no genuine dispute as to any material fact and
the movant is entitled to judgment as a matter of law.” Fed. R. Civ. P. 56(a). In ruling on a motion

for summary judgment, a court must “view the facts in the light most favorable to the nonmoving
party.” Plumhoff v. Rickard, 134 S. Ct. 2012, 2017 (2014). A district court gives the nonmoving
party “the benefit of conflicts in the evidence and reasonable inferences that could be drawn from
it.” Grochocinski v. Mayer Brown Rowe & Maw, LLP, 719 F.3d 785, 794 (7th Cir. 2013). The
Court must not make credibility determinations or weigh conflicting evidence. McCann v.
Iroquois Mem’l Hosp., 622 F.3d 745, 752 (7th Cir. 2010). “The judge must ask whether a fair-
minded jury could return a verdict for the plaintiff on the evidence presented. The existence of a
mere scintilla of evidence supporting a plaintiff's position is insufficient; there must be evidence
on which a jury could reasonably find for the plaintiff.” Insolia v. Phillip Morris, Inc., 216 F.3d

596, 599 (7th Cir. 2000).
Analysis
I. Whether the County Is Obligated Under a Covenant Running with the Land to
Provide Free Steam Heat to Kellogg

“A covenant is a contract to which the ordinary rules of contract construction apply.”
Chiurato v. Dayton Estates Dam & Water Co., 82 N.E.3d 789, 797 (Ill. App. Ct. 2017). “In
interpreting a covenant, the goal of the court is to give effect to the actual intent of the parties when
the covenant was made.” Neufairfield Homeowners Ass’n v. Wagner, 42 N.E.3d 941, 944 (Ill.
App. Ct. 2015).
“Where the covenants are unambiguous and the intent of the parties can be determined by
the covenants’ explicit provisions, courts should effectuate that intent without relying on extrinsic
aids.” Chiurato, 82 N.E.3d at 797. Where the “operative part of the agreement is clear and free
from ambiguity,” its “clearly expressed stipulations cannot be controlled by but must prevail over
the recitals.” Chi. Daily News v. Kohler, 196 N.E. 445, 451 (Ill. 1935).

Under Illinois law, to determine whether a covenant runs with the land, “a court looks to
whether: (1) the grantee and the grantor intended the covenant to run with the land; (2) the covenant
touches and concerns the land; and (3) there is privity of estate between the party claiming the
benefit and the party resting under the burden of the covenant.” Bank of Am., N.A. v. Cannonball
LLC, 12 N.E. 3d 841, 847–48 (Ill. App. Ct. 2014) (citing Streams Sports Club, Ltd. v. Richmond,
457 N.E.2d 1226, 1230 (Ill. 1983)).
The County apparently concedes the latter two elements and focuses solely on the first,
arguing that the City and the County never intended a covenant for free steam to run with the land.
The 1973 Agreement states, in pertinent part:

1. The City will sell certain real property as legally described in
Exhibit “A”, to the County and that the County shall in perpetuity,
or so long as the City in its sole discretion may require, furnish steam
heat for the property described in Exhibit “B” presently owned by
the City. The City shall have the right to receive steam heat for the
existing buildings, or any other building which may be constructed
by the City within the complex described in Exhibit “B”.

2. The City, its successors or assigns shall have the right to receive
the same quantity of steam heat servicing the property located on
Exhibit “B” from the County at no cost to the City for as long as the
City in its discretion shall require.

3. The right of the City to receive steam heat from the Municipal
Heating Plant shall be a “covenant running with the land” for the
benefit of those properties delineated in Exhibit “B”.

***
14. None of the provisions of the Agreement is intended to or shall
be merged by reason of any deed transferring title to the Property
from the City to the County or any successor in interest, and any
such deed shall not be deemed to affect or impair the provisions and
covenants of the Agreement.

1973 Agreement ¶¶ 1–3, 10, 14.
The County first asserts that, under paragraph 2, Kellogg is not the City’s “successor”
because the City was not acquired by, nor did it merge with, Kellogg. The County relies in part
on a case in which an Illinois appellate court affirmed the trial court’s grant of a motion to compel
arbitration where the defendant corporation was deemed a successor due to its merger with a
corporation that had signed the arbitration agreement. See Robert A. Besner & Co. v. Lit Am., Inc.,
574, N.E.2d 703, 704 (Ill. App. Ct. 1991). But Besner has limited value here, because it did not
involve a municipal corporation or real property.
The County also relies on Venner v. Chicago City Railway Co., 86 N.E. 266, 270 (Ill.
1908), to support its theory that the parties anticipated that another municipal corporation, rather
than a private entity, might acquire the City and become its “successor.” But Venner too is
inapposite. First, the Venner court stated, in 1908, that the City was growing through annexation
of surrounding villages and cities, not that it faced acquisition. Second, nowhere does Venner refer
to any annexing entity as a “successor.”
In the end, the Court is unpersuaded by the County’s crabbed reading of the term
“successor.” In the context of a contract involving real property, such as the 1973 Agreement, the
most natural reading of the term “successor” describes one to whom title to the property is
conveyed. See Kessler v. Palmeri, 3278 N.E.2d 813, 815 (Ill. App. Ct. 1972). Because the City
conveyed the deed to the Warehouse Property to Farley, and, after a series of owners, the deed was
ultimately conveyed to Kellogg, the Court holds that Kellogg is the City’s “successor” to the
Warehouse Property as that term appears in the 1973 Agreement.
Additionally, the County argues that paragraph 3, which states that the “right of the City
to receive steam heat from the Municipal Heating Plant shall be a ‘covenant running with the land’
for the benefit of [the Warehouse Property,]” only obligates the County to provide steam heat to

the building, not to provide it for free. But the intent of the parties “is not determined by viewing
a clause or provision in isolation, or in looking at detached portions of the contract.” Thompson v.
Gordon, 948 N.E.2d 39, 47 (Ill. 2011). Rather, “[a] contract must be construed as a whole, viewing
each provision in light of the other provisions.” Id.
Given the immediately preceding paragraphs, the plain language of paragraph 3 indicates
that the City had the right to convey the Warehouse Property to a successor and that the County’s
obligation to provide free steam heat to the City would inure to the successor’s benefit. Otherwise,
the parties would not have agreed that the County was required to furnish steam heat for the
Warehouse Property “in perpetuity.” See 1973 Agreement ¶ 1. And it is useful to contrast the

County’s obligation to provide steam heat “in perpetuity” with the parties’ recognition that the
impacted properties include those “presently owned” by the City. Id. If the parties had intended
the County’s obligation to end once the City’s ownership ended, the word “presently” would not
be necessary. See Dowd & Dowd, Ltd. v. Gleason, 693 N.E.2d 358, 368 (Ill. 1998) (“Courts will
generally avoid interpretations that render contract terms surplusage [.]”). Nor would the parties
have agreed that “[t]he City, its successors or assigns shall have the right to receive the same
quantity of steam heat servicing the property located on Exhibit ‘B’ from the County at no cost to
the City for as long as the City in its discretion shall require.” 1973 Agreement ¶ 2; see Dorsey v.
St. Louis, A. & T.H.R. Co., 58 Ill. 65, 67 (1871) (“A covenant is said to run with the land when
either the liability for its performance or the right to enforce it, passes to the assignee of the land
itself.”).2
The County also argues that the 1973 Agreement’s liquidated-damages provision evinces
the parties’ intent that the County’s obligation to provide free steam heat would cease after ten
years. According to the County, at the ten-year mark, the City would have recouped the plant’s

value, $3,360,000, in free steam heat. Pl.’s Reply Br. at 13–14, ECF No. 95 (citing the 1973
Agreement). But this argument is belied by the unambiguous language in the 1973 Agreement,
discussed above. What is more, it is inconsistent with the liquidated-damages provision itself.
Paragraph 9 requires the County to pay to the City $3,360,000 in damages (less the aggregated
value of the steam heat service as of the date of default) if the County defaults within ten years and
requires the County to pay to the City “its actual damages, if any,” thereafter. 1973 Agreement ¶
9. If the parties had intended the County’s obligation to expire after ten years, the parties would
not have agreed to require the County to pay any damages after that period.3
For these reasons, the Court denies the County’s motion for summary judgment and grants
Kellogg’s cross-motion as to its request for declaratory judgment.4 The Court declares that the

2 As Kellogg observes, noticeably absent from the 1973 Agreement is any language establishing the
County’s right to cease providing steam heat to the City’s successor or assign in the event of nonpayment.
The parties surely would have included such a provision had they intended that the City’s successor or
assign would have to pay for the steam heat.

3 Furthermore, “[a]s a general principle of contract law, statutes and laws in existence at the time a
contract is executed are considered part of the contract.” Braye v. Archer-Daniels-Midland Co., 676 N.E.2d
1295, 1303 (Ill. 1997). “It is presumed that parties contract with knowledge of the existing law.” Id. It is
thus presumed that the City and County were aware that, “[w]here a covenant runs with the land, the owner
of the land at the time of its breach, whether an immediate or a remote grantee or assignee, may maintain
an action for the breach in his own name against any or all of the covenantors.” 14 Ill. L. & Prac. Covenants
§ 6 (1968).

4 Because the County’s unjust enrichment claim necessarily rises and falls with its declaratory
judgment claim, the Court also denies the County’s motion for summary judgment and grants Kellogg’s
cross-motion as to Count II of the County’s amended complaint.
1973 Agreement obligates the County to provide to Kellogg the same quantity of steam heat that
it had provided to the City during the City’s ownership of the Warehouse Property free of charge,
for as long as the City in its discretion shall require.
II. Whether the County’s Obligation to Provide Free Steam Heat to the City’s Successors
and Assigns under the 1973 Agreement Violates the Illinois Constitution

Next, the County argues that interpreting the 1973 Agreement to require it to provide free
steam heat to Kellogg violates the Illinois Constitution, which provides that “[p]ublic funds,
property or credit shall be used only for public purposes.” Ill. Const., art. VIII, § 1(a). To establish
a violation of this provision, a plaintiff must show “that governmental action has been taken which
directly benefits a private interest without a corresponding public benefit.” Empress Casino Joliet
Corp. v. Giannoulias, 896 N.E.2d 277, 293 (Ill. 2008). The “crucial test is whether the attempted
use of the municipal [funds] subserves the public interest and benefits a private individual or
corporation only incidentally. If the private benefits are purely incidental to the public purposes
of the act, then art. VIII, section 1(a), of the Illinois Constitution is not violated.” O’Fallon Dev.
Co. v. City of O’Fallon, 356 N.E.2d 1293, 1299 (Ill. App. Ct. 1976).
In Empress Casino, the Illinois Supreme Court explained:
This court has long recognized that what is for the public good and
what are public purposes are questions which the legislature must in
the first instance decide. In making this determination, the
legislature is vested with a broad discretion, and the judgment of the
legislature is to be accepted in the absence of a clear showing that
the purported public purpose is but an evasion and that the purpose
is, in fact, private. In the words of Justice Holmes, “a declaration by
a legislature concerning public conditions that by necessity and duty
it must know, is entitled at least to great respect.”

Id. at 294 (internal quotation marks and citations omitted). The Supreme Court continued:
What is a ‘public purpose’ is not a static concept, but is flexible and
capable of expansion to meet the changing conditions of a complex
society. Moreover, the power of the State to expend public moneys
for public purposes is not to be limited, alone, to the narrow lines of
necessity, but the principles of wise statesmanship demand that
those things which subserve the general wellbeing of society and the
happiness and prosperity of the people shall meet the consideration
of the legislative body of the State, though they ofttimes call for the
expenditure of public money. The consensus of modern legislative
and judicial thinking is to broaden the scope of activities which may
be classified as involving a public purpose.

Id. (internal quotation marks and citations omitted).
The County concedes that the 1973 Agreement served a public purpose because, through
it, the City conveyed to the County title to a multi-million dollar plant that provided steam heat to
the County’s existing buildings. The conveyance also enabled the County to upgrade the plant to
provide heat to additional buildings. This, in turn, aided the County in providing additional public
services to its citizens. The public purpose was further served because the 1973 Agreement created
an arrangement that saved the County from having to pay the City $3,360,000 from public coffers.
What is more, the Cook County Board of Commissioners, the legislative body of the
County, reviewed the 1973 Agreement—including the requirement that the County would provide
free steam heat to the City and its successors—and approved it. The Board’s approval of the
agreement deserves “at least great respect.” See id.
Nonetheless, the County argues that the Illinois Constitution categorically prohibits the
County from providing free steam heat to Kellogg, because the benefit to Kellogg is more than
incidental to the public purpose of the 1973 Agreement. The County leans heavily on O’Fallon,
356 N.E.2d at 1299, and Wilmot Mountain, Inc. v. Lake County Forest Preserve District, 859 F.
Supp. 2d 932, 936–37 (N.D. Ill. 2012). But, as Kellogg notes, O’Fallon and Wilmot involved a
private entity’s use of public land for a private purpose, whereas here Kellogg owns the land.
O’Fallon is also distinguishable because the municipality in that case received nothing in return
for the private benefit; by contrast, the County received title to a municipal heating plant in return
for its promise. Compare 356 N.E.2d at 1296 (“[N]o compensation has been paid to the city[.]”),
with Def.’s LR 56.1(a)(3) ¶ 14 (“the City did, in fact, transfer all rights, title and interest in the
Municipal Heating Plant to the County.”). Wilmot is likewise distinguishable because the
governmental action did not create a corresponding public benefit. See 859 F. Supp. 2d at 937.
The County also compares the appraised value of the municipal heating plant in 1973

dollars, $3,360,000, to the estimated $2,116,800 in steam heat it has provided to Kellogg from
2005 to 2015, arguing that this proves that the benefit to Kellogg is more than merely incidental
to the benefit that the public gained under the agreement. Compare Pl.’s LR 56.1(a)(3) Stmt. ¶ 8,
with id. ¶ 71. But these figures alone do nothing to advance the County’s argument, and the County
provides little else. For example, the County does not provide the appraised value of the municipal
heating plant in today’s dollars, as opposed to what it was worth in 1973. Nor does it provide a
valuation of the plant that reflects the upgrades that were made possible by the 1973 Agreement.
The County also has not compared the percentage of total steam heat output that was used by
Kellogg versus the percentage utilized by the County from 2005 to 2015. This information would

be helpful, because Exhibit B to the 1973 Agreement shows that the Warehouse Property was only
one of sixteen City buildings to which the County was required to supply free steam heat. 1973
Agreement, Ex. B. Assuming that approximately the same amount of steam output was required
to heat each building in 1973, the Warehouse Property would have used only one-sixteenth of the
steam used by the City (which in turn was only thirty percent of the heating plant’s total output at
the time). Pl.’s LR 56.1(a)(3) Stmt. ¶ 9. Thus, under these conditions, the Warehouse Property
would have received only 1.87% of the plant’s total steam output.
Given that the County received title to the entire plant as part of the 1973 Agreement, the
Count concludes that the County has not provided evidence from which a reasonable jury could
find that its obligation to provide steam heat free of charge to Kellogg is more than incidental to
the public purpose served by the 1973 Agreement.
III. Whether the 1973 Agreement Is Terminable at Will
The County’s final argument is that the 1973 Agreement is terminable at will because it is
a contract of indefinite duration. “Under Illinois law, perpetual contracts are disfavored, so the

law presumes that such contracts are terminable at will by either party.” Burford v. Accounting
Practice Sales, Inc., 786 F.3d 582, 586 (7th Cir. 2015) (citing Jespersen v. Minn. Mining & Mfg.
Co., 700 N.E.2d 1014, 1017 (Ill. 1998)). “This does not mean that Illinois law forbids parties from
making contracts of indefinite duration; Illinois law merely disfavors them and assumes that most
contracting parties do too.” Id. This presumption “can be overcome if the parties clearly agree to
place limits on when termination may take place.” Id. “An agreement without a fixed duration
but which provides that it is terminable only for cause or upon the occurrence of a specific event
is in one sense of indefinite duration, but is nonetheless terminable only upon the occurrence of
the specified event and not at will.” Jespersen, 700 N.E.2d at 1016.

The 1973 Agreement provides, in pertinent part:
The City has the option to require steam heat for the said facilities
so long as it determines that the steam heat is necessary and
desirable for the operation of the property described on Exhibit “B”,
and that in the event the City notifies the County that the City no
longer requires the said steam heat, the County shall have no further
obligation or liability under the terms of this Agreement.

1973 Agreement ¶ 10.
The 1973 Agreement lacks a fixed duration, but the presumption that it is terminable at
will is rebutted by unambiguous language stating that “in the event the City notifies the County
that the City no longer requires the said steam heat, the County shall have no further obligation or
liability under the terms of this Agreement.” Jd. Accordingly, the Court holds that the 1973
Agreement is not terminable at will and denies summary judgment to the County on this ground.
Conclusion
For the reasons set forth above, the County’s motion for summary judgment is denied , and
Kellogg’s motion for partial summary judgment is granted as to the parties’ claims for declaratory
judgment and as to the County’s claim for unjust enrichment. The Court declares that the 1973
Agreement obligates the County to provide to Kellogg the same quantity of steam heat that it had
provided to the City during the City’s ownership of the Warehouse Property free of charge, for as
long as the City in its discretion shall require. Kellogg’s breach-of-covenant counterclaim remains
for trial. The parties shall be prepared to set dates for the final pretrial conference and jury trial,
as Well as deadlines for the filing of the final pretrial order and motions in limine at the next status
hearing on April 3, 2019, at 9:00 a.m.
SO ORDERED ENTER: 3/19/19