# New Cingular Wireless PCS, LLC, d/b/a AT&T Mobility v. County of Marin California

> District Court, N.D. California · February 19, 2021

URL: https://www.frixlaw.com/law-library/cases/10066810

## Case

- **Court:** District Court, N.D. California
- **Decided:** February 19, 2021
- **Opinion:** 100trialcourt
- **Cited by:** 0 later opinions in the Frix Law Library

## Citator (automated)

- No negative treatment found by the automated citator. That is not the same as a confirmation that the case is good law; read the citing cases.
- Full citator and citing cases: https://www.frixlaw.com/law-library/cases/10066810

## How later opinions describe it (automated extraction)

- finding plaintiff’s claim 19 against City unripe because Sprint still needed “to seek a special use permit” and “subdivision plat 20 approval from the [City’s] Plan[ning] Commission” – leaving it with “further recourse before the 21 local zoning board”
- stating that the doctrine derives from both Article III and from prudential reasons 23 for refusing to exercise jurisdiction

## Opinion text

1
2
3 UNITED STATES DISTRICT COURT
4 NORTHERN DISTRICT OF CALIFORNIA
5
6 NEW CINGULAR WIRELESS PCS, LLC, Case No. 20-cv-07915-SI

7 Plaintiff,
ORDER GRANTING IN PART AND
8 v. DENYING IN PART DEFENDANT’S
MOTION TO DISMISS COMPLAINT
9 COUNTY OF MARIN CALIFORNIA,
Re: Dkt. No. 22
10 Defendant.

11
12 On February 12, 2021, the Court held a hearing on defendant’s motion to dismiss the
13 complaint. For the reasons set forth below, the motion is GRANTED in part and DENIED in part.

14
15 BACKGROUND
16 The following facts are drawn from plaintiff’s complaint, which the Court treats as true for
17 the purpose of this motion to dismiss.
18 On November 11, 2020, plaintiff New Cingular Wireless PCS, LLC (“AT&T”) filed this
19 lawsuit against defendant County of Marin (the “County”) alleging three causes of action pursuant
20 to the Telecommunications Act of 1996 (the “TCA”), 47 U.S.C. §§ 253, 332.1 Dkt. No. 1, Compl.
21 ¶ 7. Plaintiff alleges that the County’s denial of its application (the “Application”) for a use permit
22 to allow for construction and operation of a wireless communications facility violates Sections 253
23 and 332 of the Act because: (1) the County’s denial effectively prohibited plaintiff from closing a
24

25
1 Section 332 prohibits a local government from denying an application for a
26 telecommunications facility where doing so would “prohibit or have the effect of prohibiting the
provision of personal wireless services.” 47 U.S.C. § 332(c)(7)(B)(i)(II). Section 253 provides,
27 “[n]o State or local statute or regulation, or other State or local legal requirement, may prohibit or
1 significant coverage gap in the provision of wireless service in violation of 47 U.S.C. §§ 253,
2 332(c)(7)(B)(i)(II); (2) the County’s denial of the Application was not supported by substantial
3 evidence contained in a written record in violation of 47 U.S.C. § 332(c)(7)(B)(iii); and (3) the
4 County improperly regulated the placement, construction, and modification of personal wireless
5 service facilities on the basis of environmental effects of radio frequency emissions in violation of
6 47 U.S.C. § 332(c)(7)(B)(iv). Id. ¶¶ 57-80. Plaintiff maintains that the proposed facility is
7 consistent with the Marin County General Plan and Marin County Telecommunications Facilitates
8 Policy Plan (“TFPP”). Id. ¶ 4.
9 In 2019, plaintiff AT&T began the process of submitting the Application to construct a 30-
10 foot-tall bell tower situated at the rear entrance to the main church building (the “Proposed Facility”)
11 to be located on the property of St. Luke’s Presbyterian Church (the “Church”) at 10 Bayview Drive,
12 San Rafael, Marin County, California. Id. ¶ 1. The tower served to address plaintiff’s significant
13 gap in its wireless service coverage in the vicinity of the Proposed Facility. Id. ¶ 28. Plaintiff
14 demonstrated its significant service coverage gap in the County’s administrative proceedings by
15 submitting radio frequency propagation maps as exhibits to its Radio Frequency Statement. Id. ¶ 30.
16 To close the gap, plaintiff proposed to install a wireless communications facility disguised as a bell
17 tower attached to the rear entrance of the Church’s main building. Id. ¶ 32.
18 Marin County’s TFPP establishes location policies and preferences for wireless
19 communications facilities.2 Id. ¶ 34. Plaintiff alleges that it thoroughly investigated alternative sites
20 and designs to ensure its Proposed Facility was the best available and least intrusive means for
21 closing its service coverage gap. Id. ¶ 33. Plaintiff claims there are no industrial, agricultural, mixed
22 use, open space, or recreational sites in the gap area. Id. ¶ 35. Plaintiff claims to have investigated
23 all non-residential properties in the area, including commercial sites near the harbor, two elementary
24 schools, the San Rafael Fire Station, and the Church. Id. Over time, plaintiff also claims to have
25

26
2 Policy LU 1.4.2 provides a priority listing of locations for new wireless communications
facilities, which establishes the following priority list in order from most preferred to least preferred:
27
“1) industrial sites, 2) Commercial sites, 3) Public facilities sites, 4) Agricultural sites, 5) Mixed use
1 investigated two nearby water tanks – including a water tank suggested by the Planning Commission
2 and Board of Supervisors – and the existing Verizon tower located far outside of plaintiff’s gap area.
3 Id. Plaintiff’s analyses of alternatives were submitted to the County in connection with the
4 Application. Id. ¶ 33.
5 Finding the Church to be the least intrusive location to close its service coverage gap,
6 plaintiff and the Church considered a total of six location and design candidates for the Proposed
7 Facility – including a bell tower (or other architectural element) and a faux pine tree (often referred
8 to as “monopine design”). Id. ¶ 36. The Church, based on its analysis, disfavored monopine designs
9 and authorized plaintiff to construct the Proposed Facility as a bell tower near a rear building
10 entrance. Id.
11 In advance of the May 2020 Deputy Zoning Administrator (“DZA”) Hearing, County Staff
12 issued its Staff Report. Id. ¶ 37. The report asked plaintiff to develop an alternative “taller and
13 skinnier bell tower” design. Id. Plaintiff prepared engineering drawings for this alternative bell
14 tower design on an expedited basis. Id.
15 During the May 2020 DZA Hearing, plaintiff presented its Proposed Facility and alternative
16 “taller and skinnier bell tower” design. Id. Plaintiff alleges that despite County Staff’s
17 recommendation for approval, the DZA denied the application without considering the alternative
18 “taller and skinner bell tower” design. Id. ¶ 38. It is undisputed that plaintiff did not present any
19 plans for a faux pine tree design at the DZA Hearing. See generally Dkt. No. 22 at 3 (County MTD);
20 Compl. ¶¶ 38-40. Plaintiff appealed the denial to the County Planning Commission. Compl. ¶ 38.
21 In mid-July, ahead of the appeal hearing scheduled for July 27, 2020, County Staff issued
22 its Planning Commission Staff Report. Id. ¶ 39. The Staff Report – for the first time – recommended
23 that plaintiff develop, as an alternative design, a “mono-pine antenna structure located amongst the
24 mature trees along the southern property line” of the Site. Id. Plaintiff requested a continuance of
25 the Planning Commission hearing to investigate and develop the recommended alternative
26 monopine design. Id. ¶ 40. The Planning Commission hearing was continued until September 28,
27 2020. Id.
1 preferred locations for monopines on the Church’s property. Id. ¶ 41. Once County Staff identified
2 the preferred locations, plaintiff worked with the Church “to secure authority to place the Proposed
3 Facility designed as a monopine and located per County Staff’s recommendations.” Id. Plaintiff
4 then developed the requested designs, prepared simulated photographs of these two designs, and
5 presented them ahead of the continued Planning Commission hearing. Id.
6 During the September 28, 2020 Planning Commission hearing, multiple Planning
7 Commissioners expressed approval of one of the monopine alternatives. Id. ¶ 43. However, plaintiff
8 alleges that the Planning Commission heeded direction from County Staff not to consider any of the
9 alternative designs. Id. The County justifies County Staff’s actions, claiming that plaintiff failed to
10 submit the “required technical studies for evaluation, including but not limited to photo-simulations,
11 radio frequency report, and noise analysis.” Dkt. No. 22 at 4 (County MTD) (citing Ex. C, p.1, ¶5).
12 The Planning Commission denied plaintiff’s appeal and application of the bell tower design. Id.
13 Plaintiff appealed that decision to the County Board of Supervisors. Id.
14 Ahead of the October 13, 2020 Board of Supervisors hearing, plaintiff submitted the
15 engineering designs for the monopine alternatives. Compl. ¶ 46. Plaintiff also reiterated its
16 willingness to construct any one of the four designs presented to the County. Id.
17 At the October 13, 2020 Board of Supervisors hearing, the Board did not consider any of the
18 alternative designs for the Proposed Facility and denied plaintiff’s Application. Id. ¶ 47.
19 On October 26, 2020, the County issued its written denial of plaintiff’s Application in the
20 form of the Denial Resolution. Id. The Denial Resolution specifies that the “revised [faux pine
21 tree] projects the applicant submitted are not the subject matter of this appeal.” See Dkt. No. 22 at
22 4 (County MTD) (citing Ex. C, p.1, ¶6). The Denial Resolution further explained that the Board is
23 denying the proposed bell tower design because “the project…would cause degradation to [certain]
24 views…due to poor design and placement. Specifically, the proposed development would be
25 visually intrusive and adversely affect views from surrounding properties.” Compl. ¶ 47.
26
27 LEGAL STANDARD
1 is entitled to relief,” and a complaint that fails to do so is subject to dismissal pursuant to Rule
2 12(b)(6). Fed. R. Civ. P. 8(a)(2). To survive a Rule 12(b)(6) motion to dismiss, the plaintiff must
3 allege “enough facts to state a claim to relief that is plausible on its face.” Bell Atl. Corp. v. Twombly,
4 550 U.S. 544, 570 (2007). This “facial plausibility” standard requires the plaintiff to allege facts
5 that add up to “more than a sheer possibility that a defendant has acted unlawfully.” Ashcroft v.
6 Iqbal, 556 U.S. 662, 678 (2009). While courts do not require “heightened fact pleading of
7 specifics,” a plaintiff must allege facts sufficient to “raise a right to relief above the speculative
8 level.” Twombly, 550 U.S. at 555, 570. “A pleading that offers ‘labels and conclusions’ or ‘a
9 formulaic recitation of the elements of a cause of action will not do.’” Iqbal, 556 U.S. at 678
10 (quoting Twombly, 550 U.S. at 555). “Nor does a complaint suffice if it tenders ‘naked assertion[s]’
11 devoid of ‘further factual enhancement.’” Id. (quoting Twombly, 550 U.S. at 557). “While legal
12 conclusions can provide the framework of a complaint, they must be supported by factual
13 allegations.” Id. at 679.
14 In reviewing a Rule 12(b)(6) motion, courts must accept as true all facts alleged in the
15 complaint and draw all reasonable inferences in favor of the non-moving party. See Usher v. City
16 of Los Angeles, 828 F.2d 556, 561 (9th Cir. 1987). However, courts are not required to accept as
17 true “allegations that are merely conclusory, unwarranted deductions of fact, or unreasonable
18 inferences.” In re Gilead Scis. Sec. Litig., 536 F.3d 1049, 1055 (9th Cir. 2008) (citation omitted).
19 It is well-established that the existence of a case and controversy is a prerequisite for the
20 exercise of federal judicial power under Article III. One important element of the “case” or
21 “controversy” is satisfying the ripeness doctrine, see Reno v. Catholic Soc. Servs., Inc., 509 U.S. 43,
22 57 n. 18 (1993) (stating that the doctrine derives from both Article III and from prudential reasons
23 for refusing to exercise jurisdiction), which determines when a party may go to court. Ripeness is,
24 essentially, a question of timing.
25 If a court dismisses a complaint, it must decide whether to grant leave to amend. The Ninth
26 Circuit has repeatedly held that “a district court should grant leave to amend even if no request to
27 amend the pleading was made, unless it determines that the pleading could not possibly be cured by
1 internal quotation marks omitted).
2
3 DISCUSSION
4 I. Plaintiff’s Claims Are Ripe Under 47 U.S.C. § 332(c)(7)(B)
5 Plaintiff seeks relief based on the County’s denial of its Application “for construction and
6 operation of a wireless communications facility designed as a 30-foot-tall bell tower situated at the
7 rear entrance to the main church building.” Compl. ¶ 1. The County contends that plaintiff’s
8 complaint is unripe as a matter of law because the Application was not “final” for purposes of a
9 federal court challenge. Dkt. No. 22 at 1 (County MTD). The County argues that a local government
10 action is only “final” when “the plaintiff has [(A)] taken all administrative steps available to it and
11 [(B)] pursued less intensive alternatives,” which it asserts plaintiff failed to do. Id.
12 In relevant part, the TCA provides, “[a]ny person adversely affected by any final action or
13 failure to act by a State or local government or any instrumentality thereof that is inconsistent with
14 this subparagraph,” governing local regulation of the placement of personal wireless service
15 facilities, may “commence an action in any court of competent jurisdiction.” 47 U.S.C.
16 § 332(c)(7)(B)(v) (emphasis added). While the Ninth Circuit has not considered the meaning of
17 “final action” under the TCA, the Seventh and First Circuits have provided some guidance. See
18 Sprint Spectrum, L.P. v. City of Carmel, 361 F.3d 998, 1004 (7th Cir. 2004) (finding plaintiff’s claim
19 against City unripe because Sprint still needed “to seek a special use permit” and “subdivision plat
20 approval from the [City’s] Plan[ning] Commission” – leaving it with “further recourse before the
21 local zoning board”); Omnipoint Holdings, Inc. v. City of Cranston, 586 F.3d 38, 47 (1st Cir. 2009)
22 (finding plaintiff’s claim ripe because the zoning board had concluded its decision-making process
23 and could take no further action).
24
25 A. Performance of All Available Administrative Steps
26 The “well settled rule in administrative law is that a ‘final agency action’ is one that ‘mark[s]
27 the consummation of the agency’s decisionmaking process.’” Omnipoint, 586 F.3d at 46 (emphasis
1 Sprint Spectrum, 361 F.3d at 1004. However, when a “zoning board ha[s] concluded its
2 decisionmaking process . . . and could take no further action,” “the zoning board’s decision [i]s
3 final.” Omnipoint, 586 F.3d at 47. Hence, a party must “exhaust all administrative options available
4 to it before pursuing a TCA claim in federal court.” Sprint Spectrum, 361 F.3d at 1004. A “final
5 determination” by an administrative agency means that the agency “rendered its last word on the
6 matter.” Omnipoint, 586 F.3d at 46.
7 The County contends that plaintiff has not taken all available administrative steps because
8 plaintiff failed to pursue the alternative faux pine tree design before filing this suit. Dkt. No. 22 at
9 1 (County MTD). As such, the County contends it was never given the opportunity to “[a]rrive at a
10 final, definitive position regarding” plaintiff’s allowable use of the property. Id. at 8 (citing
11 Williamson Cty. Reg’l Planning Comm’n v. Hamilton Bank of Johnson City, 473 U.S. 172 (1985)).
12 Plaintiff responds, “[a]s set out clearly in Paragraph 1 of [its] Complaint,” this action is only
13 challenging the “denial of [its] application for the bell tower design.” Dkt. No. 23 at 2 (Opp. To
14 County MTD). Plaintiff asserts that because the “bell tower design was denied by the County at
15 each level of the administrative process, the decision is now final.” Id. at 5.
16 The Court concludes that plaintiff is challenging a final decision denying plaintiff’s
17 Application to construct the bell tower design. While plaintiff never perfected a new application to
18 the County for one of its faux pine-tree designs, the bell tower design was denied by the County at
19 each level of the administrative process. Unlike Sprint Spectrum, where the carrier “still had further
20 recourse before the local zoning board” because it “had not [yet] completed the multi-level
21 application process with the City, and the City’s various departments or bodies had not yet made a
22 final determination on the application,” there is no next level of review for plaintiff to appeal to and
23 the decision of the County regarding the bell tower design is final. Sprint Spectrum, 361 F.3d at
24 1004; cf. Glob. Tower Assets, LLC v. Town of Rome, 810 F.3d 77 (1st Cir. 2016) (though “Planning
25 Board may have rendered a decision that represents its definitive judgment,” that decision was still
26 subject to an appeal to the Board of Appeals,” and thus decision was not final and federal claim was
27 not yet ripe)).
B. Less Intensive Alternatives
1
The County asserts that plaintiff “failed to fully explore [a less intensive idea] through the
2
County’s administrative procedures (i.e. submitting a new application for the faux pine tree design,
3
as it was told it could do).” Dkt. No. 22 at 9 (County MTD). The County argues that while plaintiff
4
“touts that it presented the faux pine tree designs to the Planning Commission,” those faux pine tree
5
plans “were not denied in the Denial Resolution because the subject of the appeal to the Board was
6
the 33-foot-bell tower design.” Id. The County concludes, “[h]ad AT&T filed a new application
7
for one of its faux pine tree ideas (or some other less intensive proposal than the bell tower design),
8
it would have been afforded a de novo review,” which could have “resulted in approval of the
9
project.” Id.
10
The County’s argument relies heavily on MacDonald, Sommer & Frates v. Yolo Cty., 477
11
U.S. 340 (1986), in which the Supreme Court found the plaintiff’s taking claim unripe because the
12
County’s refusal “to permit the intensive development desired by the landowner [did] not preclude
13
less intensive, but still valuable development.” MacDonald, 477 U.S. at 347. The County contends
14
that although MacDonald is a taking case, it is nevertheless relevant to determining “what
15
constitutes . . . a final action” under the TCA. See Sprint Spectrum, 361 F.3d at 1003 (citing
16
MacDonald).
17
In MacDonald, the Court specified that “a final and authoritative determination” is important
18
given the specific “nature of a regulatory takings claim.” MacDonald, 477 U.S. at 348. The Court
19
continued that it could not “determine where a regulation has gone ‘too far’ unless it knows how far
20
the regulation goes.” Id. The Court held, “[a]bsent final and authoritative determination[s] by the
21
County” as to how it would apply certain regulations, “Court[s] cannot determine whether a taking
22
has occurred.” Id. at 340. While the Court does mention “less intensive alternatives,” it does so in
23
passing, stating that “[w]ithout knowing the nature and extent of [alternative] permitted
24
development[s], [it] cannot adjudicate the constitutionality of the regulations that purport to limit
25
it.” Id. at 351. Unlike MacDonald, where the “appellant still ha[d] yet to receive the Board’s ‘final,
26
definitive position regarding how it will apply the regulations at issue to the particular land in
27
question,’ and “the holdings of both courts below leave open the possibility that some development
1 will be permitted,” here AT&T challenges a final decision denying the Application to build the bell
2 tower design. Cf. Sprint Spectrum, 361 F.3d at 1004 (holding the plaintiff’s claim was not ripe, and
3 citing MacDonald, because the challenged BZA decisions “merely map a procedural route that
4 Sprint must take in order to proceed with its project. It must submit a plan to the commission and
5 apply for a special use permit, neither one of which Sprint has done.”).
6
7 II. Plaintiff Does Not State A Claim Under 47 U.S.C. § 253
8 The County contends that plaintiff cannot state a claim under 47 U.S.C. § 253 in the first
9 cause of action. The County argues that Section 253 is “designed to offer solely ‘facial challenge’
10 relief from local regulations, not ‘as applied’ challenges to individual local zoning decisions.” Mtn.
11 at 10 (emphasis in original). Because plaintiff “has cited no Marin County ordinance, regulation or
12 guideline that has the effect of categorically prohibiting the provision of telecommunications
13 service,” the County asserts that plaintiff’s Section 253 claim is subject to dismissal under Fed. R.
14 Civ. P. 12(b)(6). Id.
15 Section 253 provides, inter alia, that “[n]o State or local statute or regulation, or other State
16 or local requirement, may prohibit or have the effect of prohibiting the ability of any entity to provide
17 any interstate or intrastate telecommunications service.” 47 U.S.C. § 253(a). While Section 253
18 “provides a cause of action against local regulations, [S]ection 332 gives a cause of actions against
19 local decisions.” Verizon Wireless (VAW) LLC v. City of Rio Rancho, NM, 476 F. Supp. 2d 1325,
20 1337 (D.N.M. 2007) (emphasis in original); see also Sprint Telephony PCS, L.P. v. Cty. of San
21 Diego, 490 F.3d 700, 713 (9th Cir. 2007) (differentiating between the use of Section 332 for
22 “challenges to individual zoning decisions” and Section 253 for a “facial challenge to an entire
23 ordinance”), aff’d in relevant part, 543 F.3d 571 (9th Cir. 2008) (en banc); see also e.g., NextG
24 Networks of Cal., Inc. v. Cty. of Los Angeles, Cal., 522 F. Supp. 2d 1240 (C.D. Cal. 2007)
25 (evaluating a facial challenge to a zoning ordinance under Section 253 to determine whether the
26 County’s zoning ordinance erected a barrier to entry into the telecommunications market).
27 Plaintiff’s complaint alleges that the County’s denial violates both 47 U.S.C. § 253 and
1 ¶ 68. Plaintiff is not bringing a challenge to a Marin County ordinance, regulation, guideline, or
2 legal requirement that has the effect of prohibiting the provision of telecommunication services in
3 violation of Section 253. Instead, plaintiff is challenging an individual zoning decision, specifically
4 the denial of the Application. Plaintiff’s opposition relies on an FCC ruling to assert that the Court
5 should broadly interpret Section 253 to encompass challenges to zoning applications. See In the
6 Matter of Accelerating Wireless Broadband Deployment by Removing Barriers to Infrastructure
7 Inv., 33 F.C.C. Rcd. 9088, ¶ 94 (2018), aff’d in relevant part, City of Portland v. United States, 969
8 F.3d 1020 (9th Cir. 2020). However, that FCC ruling addressed whether a municipality acts in a
9 regulatory capacity – and thus is subject to section 253 – when it authorizes and sets terms for
10 wireless infrastructure deployment in public rights-of-way because “contracts and other
11 arrangements between a state or local government and a party engaged in wireless facility
12 deployment” constitute “legal requirements” under section 253. See In the Matter of Accelerating
13 Wireless Broadband Deployment by Removing Barriers to Infrastructure Inv., 33 F.C.C. Rcd. 9088,
14 ¶ 94.
15 Here, plaintiff is not challenging any “legal requirement” imposed by the County, but rather
16 the denial of the Application. In light of the authority discussed above, and in the absence of any
17 authority holding that a plaintiff may challenge the denial of a zoning application under Section 253,
18 the Court concludes that plaintiff may not proceed under Section 253 in the first cause of action.3
19
20
21
22
23
24 ///
25 ///
26

27
3 Plaintiff may still proceed under Section 332 in the first cause of action. The Court also
1 CONCLUSION
2 Accordingly, defendant’s motion to dismiss the complaint is GRANTED IN PART and
3 || DENIED IN PART.
4
5 IT ISSO ORDERED.
Sin la
7 Dated: February 19, 2021
SUSAN ILLSTON
8 United States District Judge
9
10
11
a 12

15
16

it

Z 18
19
20
21
22
23
24
25
26
27
28

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/cases/10066810. Public record. Not legal advice.
