# United States v. State Water Resources Control Board

> District Court, E.D. California · August 30, 2023

URL: https://www.frixlaw.com/law-library/cases/10055302

## Case

- **Court:** District Court, E.D. California
- **Decided:** August 30, 2023
- **Opinion:** 100trialcourt
- **Cited by:** 0 later opinions in the Frix Law Library

## Citator (automated)

- No negative treatment found by the automated citator. That is not the same as a confirmation that the case is good law; read the citing cases.
- Full citator and citing cases: https://www.frixlaw.com/law-library/cases/10055302

## How later opinions describe it (automated extraction)

- explaining that Section 8 of the Reclamation Act of 1902 requires Reclamation to comply with state law related to the 27 “control, appropriation, use, or distribution of water”

## Opinion text

2
3
4
5
6
7
8
9 UNITED STATES DISTRICT COURT
10 EASTERN DISTRICT OF CALIFORNIA
11
12 UNITED STATES OF AMERICA, No. 2:19-cv-000547-JLT-EPG

13 Plaintiffs, ORDER GRANTING MOTION TO
DISMISS INTERGOVERNMENTAL
14 v. IMMUNITY CLAIM; REQUIRING
SUPPLEMENTAL BRIEFING
15
STATE WATER RESOURCES CONTROL CONCERNING REMAINING STATE
16 BOARD & STATE WATER RESOURCES LAW CLAIMS
CONTROL BOARD CHAIR E. JOAQUIN
17 ESOUIVEL, in his official capacity, (Doc. 17, 60, 61)

18 Defendants. 30 DAY DEADLINE
19
20 I. INTRODUCTION
21 The United States of America, on behalf of the United States Department of the Interior through
22 its Bureau of Reclamation, filed two similar lawsuits, one in Sacramento County Superior Court, the
23 other in this Court, concerning amendments adopted by Defendant State Water Resources Control Board
24 (“State Board” or “the Board”) to the Water Quality Control Plan for the San Francisco
25 Bay/Sacramento-San Joaquin Delta Estuary (“Bay-Delta Plan Amendments,” “Amendments,” or
26 “Amended Plan”)1. (See Docs. 1; 18-6.) The operative First Amended Complaint in this action raised
27

28 1 The Amended Plan itself is reproduced at Doc. 18-3 and is cited hereafter as “AP”. The Amended Plan, along with other
public records cited in this decision, are properly the subject of judicial notice for their existence and content, although not
2 §§ 21000 et seq., along with a cause of action based upon the federal constitutional intergovernmental
3 immunity (“IGI”) doctrine. (Doc. 14.) The United States’ state court complaint alleges the same three
4 causes of action under CEQA but omits the IGI claim. (Doc. 18-6.)
5 In July 2019, the State Board moved to dismiss the FAC, arguing the entire case should be
6 dismissed pursuant to various abstention doctrines and that the IGI claim was both unripe and failed to
7 state a claim. (See Doc. 17.) On December 2, 2019, a previously assigned district judge applied
8 Colorado River abstention to stay the state law (CEQA) claims, while allowing the federal IGI claim to
9 proceed. (Doc. 28.) The United States appealed, and the Ninth Circuit reversed, clarifying that imposing
10 a partial Colorado River stay would only be appropriate in very narrow circumstances not applicable in
11 this case and remanding the case to “allow all of the United States’ claims to proceed, subject to regular
12 issues of justiciability.” (Doc. 49.) As mentioned, the ripeness of the IGI claim was raised in the initial
13 motion to dismiss briefing (see Docs. 17, 20, 21), and was the subject of supplemental briefing (Docs.
14 28, 31, 40, 47, 48), but that issue has yet to be addressed.
15 Following the issuance of the mandate on April 19, 2021, the Court stayed the case at the request
16 of the parties for more than ten months to permit settlement discussions to proceed. (See Docs. 51–59.)
17 When it became clear that the case would not resolve, the Court ordered the parties to file another round
18 of supplemental briefs to update the Court on any recent developments bearing on ripeness. (See Docs.
19 52, 53, 59.) Shortly thereafter, on April 13, 2022, the matter was reassigned to the undersigned. (Doc.
20 62.) The supplemental briefing was complete as of April 21, 2022. (Doc. 64.)
21 For the reasons set forth below, the Court finds that the IGI claim as presently articulated is not
22 ripe for judicial review at this time and dismisses that claim. In addition, the Court calls for
23 supplemental concerning the Court’s exercise of jurisdiction over the remaining state law claims.
24 II. BACKGROUND
25 The originally assigned district judge’s summary of the factual background provides a concise
26 foundation for the analysis in this order:
27

28 for the truth of the matters set forth therein. Fed. R. Evid. 201; Lee v. City of Los Angeles, 250 F.3d 668, 688–90 (9th Cir.
2001).
The history of regulation and litigation of issues related to the San
2
Francisco Bay/Sacramento-San Joaquin Delta Estuary (“Bay-Delta”) is
3 long, wide, and deep. Without question, the Bay-Delta itself is a critically
important natural resource that is both the hub of California’s water supply
4 and a vital estuary and wetland supporting numerous beneficial uses.
Central to the present dispute is the fact that the State Water Board holds
5 authority under California’s Porter-Cologne Water Quality Control Act,
Cal. Water Code § 13000, et seq., to adopt water quality control plans to
6
protect the waters of California. The Board adopted its original Water
7 Quality Control Plan for the San Francisco Bay/Sacramento-San Joaquin
Delta Estuary (“Bay-Delta Plan”) in 1978, and amended that plan in 1991,
8 1995, and 2006. The most recent effort to amend the Bay-Delta Plan
began in 2009, and, over a nine-year period, the Board considered various
9 amendments and prepared environmental documentation analyzing the
potential environmental impacts of the Bay Delta Plan Amendments under
10
[the California Environmental Quality Act (“CEQA”)].
11
The Board held numerous publicly noticed meetings and reviewed
12 thousands of comments regarding the proposed Amendments and related
drafts of the Substitute Environmental Document (“SED”) prepared in
13 accordance with CEQA. On December 12, 2018, the Board adopted the
SED and Amended Plan.
14

15 In general, the Amendments are designed to accomplish several goals
relevant to this case. First, they increase the flows required to be left in the
16 three main salmon-bearing tributaries to the San Joaquin River (the
Stanislaus, Tuolumne, and Merced Rivers) during critical months
17
(February through June). These flow increases are designed to improve
18 spawning, rearing, and migratory habitat conditions in the Lower San
Joaquin River. The Board plans to implement the flow objectives
19 “adaptively,” within broad constraints, to adjust timing and flow patterns
to better balance multiple beneficial uses when scientific information
20 indicates doing so is appropriate.

21
Second, the Amendments provide that the Board will include minimum
22 reservoir carryover storage targets or other requirements to ensure that
providing the flows to meet the objectives will not have adverse
23 temperature or other impacts on fish and wildlife.

24 Third, the Amendments revise southern Delta salinity objectives for
agriculture by adjusting the salinity requirements/restrictions to a slightly
25
higher level, ostensibly to reflect updated scientific knowledge of southern
26 Delta salt levels that reasonably protect agriculture. More specifically, the
Amended Plan revises the salinity objective for agricultural beneficial uses
27 by increasing the April through August salinity objective from a mean
daily electrical conductivity (“EC”) of 0.7 deciSiemens per meter
28 (“dS/m”) to 1.0 dS/m, resulting in a 1.0 dS/m salinity objective for the
Reclamation’s existing [state-issued] water rights [permits] to operate the
2
federal Central Valley Project (“CVP”), including its permits to operate
3 the New Melones Project, a component of the CVP, currently require
Reclamation to meet the [pre-]existing salinity objective of 0.7 dS/m at
4 these locations. The Amended Plan proposes to implement the [revised]
salinity objective for the interior southern Delta by requiring Reclamation
5 to continue operating to meet the 0.7 dS/m salinity limit at Vernalis as
required by its existing water rights. The Amended Plan also proposes to
6
implement the salinity objective through increased inflows provided by
7 application of flow-based (as opposed to salinity-based) objectives for the
Lower San Joaquin River.
8
9 (Doc. 28 at 2–4) (citations omitted) (emphasis in original). In sum, the Amended Plan relaxes the
10 salinity limits in the southern Delta, but nonetheless indicates that Reclamation must operate as though
11 the salinity limits have not been relaxed. The United States’ IGI claim asserts “[b]y imposing on
12 Reclamation, in its operation of a federal reclamation project authorized by Congress, a more stringent
13 salinity requirement at Vernalis than all others, the Board Amendments discriminate against the Federal
14 Government.” (FAC, ¶ 88.)
15 III. STANDARD OF DECISION2
16 The district court is a court of limited jurisdiction and is empowered only to hear disputes
17 “authorized by Constitution and statute.” Kokkonen v. Guardian Life Ins. Co. of Am., 511 U.S. 375, 377
18 (1994); Exxon Mobil Corp v. Allapattah Servs., Inc., 545 U.S. 546, 552 (2005). The federal courts are
19 “presumed to lack jurisdiction in a particular case, unless the contrary affirmatively appears.” A-Z Int’l.
20 v. Phillips, 323 F.3d 1141, 1145 (9th Cir. 2003). Thus, a plaintiff carries the burden of demonstrating the
21 Court has subject matter jurisdiction. Kokkonen, 511 U.S. at 377; Vacek v. United States Postal Serv.,
22 447 F.3d 1248, 1250 (9th Cir. 2006).
23 Pursuant to Rule 12(b)(1) of the Federal Rules of Civil Procedure, a party may challenge a claim
24 for relief for lack of subject matter jurisdiction. A motion to dismiss under Rule 12(b)(1) “may either
25
2 The primary issue before the Court concerns prudential ripeness. Though there is some debate in the caselaw over whether
26 prudential ripeness is truly jurisdictional in all contexts, see Horne v. Dep’t of Agric., 569 U.S. 513, 526 (2013) (questioning
whether the “prudential ripeness” inquiry applicable in takings cases is jurisdictional), it appears to be routine to evaluate
27 most motions to dismiss premised upon prudential ripeness under Federal Rule of Civil Procedure 12(b)(1). See, e.g.,
Underwood v. Mackay, 614 F. App’x 871, 871–72 (9th Cir. 2015); Bugarin v. All Nippon Airways Co., 513 F. Supp. 3d 1172,
28 1184 (N.D. Cal. 2021); Buena Vista Rancheria of Me-Wuk Indians v. Pac. Coast Bldg. Prod., Inc., No. 2:23-CV-00168-
WBS-CKD, 2023 WL 4007716, at *2 (E.D. Cal. June 14, 2023).
2 subject matter jurisdiction in fact.” Thornhill Pub. Co., Inc. v. Gen. Tel. & Electronics Corp., 594 F.2d
3 730, 733 (9th Cir. 1979) (citing Land v. Dollar, 330 U.S. 731, 735 (1947)). Thus, “[a] jurisdictional
4 challenge under Rule 12(b)(1) may be made either on the face of the pleadings or by presenting extrinsic
5 evidence.” Warren v. Fox Family Worldwide, Inc., 328 F.3d 1136, 1139 (9th Cir. 2003) (citing White v.
6 Lee, 227 F.3d 1214, 1242 (9th Cir. 2000)). The Ninth Circuit explained:

7 In a facial attack, the challenger asserts that the allegations contained in a
complaint are insufficient on their face to invoke federal jurisdiction. By
8
contrast, in a factual attack, the challenger disputes the truth of the
9 allegations that, by themselves, would otherwise invoke federal
jurisdiction.
10
11 Safe Air for Everyone v. Meyer, 373 F.3d 1035, 1038 (9th Cir. 2004). On a motion to dismiss under Rule
12 12(b)(1), the standards that must be applied by the Court vary according to the nature of the jurisdictional
13 challenge.
14 If a defendant presents a facial challenge to jurisdiction, the Court must presume the truth of the
15 plaintiff’s factual allegations “and draw all reasonable inferences in his favor.” Doe v. Holy, 557 F.3d
16 1066, 1073 (9th Cir. 2009); Savage v. Glendale Union High Sch. Dist. No. 205, 343 F.3d 1036, 1039 n.1
17 (9th Cir. 2003), cert. denied, 541 U.S. 1009 (2004). The Court should not “assume the truth of legal
18 conclusions merely because they are cast in the form of factual allegations.” W. Mining Council v. Watt,
19 643 F.2d 618, 624 (9th Cir. 1981).
20 On the other hand, if a defendant presents a factual challenge to the Court’s jurisdiction, the
21 Court “may review any evidence, such as affidavits and testimony.” McCarthy v. United States, 850
22 F.2d 558, 560 (9th Cir. 1988), cert. denied, 489 U.S. 1052 (1989); Safe Air, 373 F.3d at 1039 (In
23 resolving a factual attack on jurisdiction, “the district court may review evidence beyond the complaint
24 without converting the motion to dismiss into a motion for summary judgment.”). If a moving party
25 presents a factual attack motion, “the party opposing the motion must furnish affidavits or other
26 evidence necessary to satisfy its burden of establishing subject matter jurisdiction.” Savage, 343 F.3d at
27 1039 n.2 (citing St. Clair v. City of Chico, 880 F.2d 199, 201 (9th Cir. 1989)). Thus, the burden of proof
28 remains with a plaintiff, who has “an affirmative obligation to support jurisdictional allegations with
2 IV. ANALYSIS
3 A. IGI Doctrine Generally
4 The IGI Doctrine is grounded in the Supremacy Clause of the United States Constitution, see
5 Boeing Co. v. Movassaghi, 768 F.3d 832, 839 (9th Cir. 2014), and generally prohibits any “state or local
6 law that directly regulates the conduct of the federal government or discriminates against it . . , even if it
7 is no more restrictive than federal law.” United States v. City of Arcata, 629 F.3d 986, 991–92 (9th Cir.
8 2010). The United States does not invoke the “direct regulation” prong of the IGI Doctrine, focusing its
9 allegations instead on the theory that the Amended Plan unlawfully discriminates against the United
10 States. (See FAC, ¶¶ 83–94.)3
11 There are two elements to any IGI claim: “Intergovernmental immunity attaches only to state
12 laws that [1] discriminate against the federal government and [2] burden it in some way.” United States
13 v. California, 921 F.3d 865, 880 (9th Cir. 2019). “A state or local law discriminates against the federal
14 government if ‘it treats someone else better than it treats’ the government.” Arcata, 629 F.3d at 991
15 (quoting North Dakota v. United States, 495 U.S. 423, 438 (1990)). Put another way, discriminatory
16 regulations are those that are not also imposed on “similarly situated constituents of the State.” North
17 Dakota, 495 U.S. at 438; United States v. New Jersey, No. CV-20-1364 (FLW) (TJB), 2021 WL
18 252270, at *14 (D.N.J. Jan. 26, 2021) (dismissing United States’ IGI claim against state regulation that
19 placed limits on state law enforcement sharing information with the federal civil immigration authorities
20 because United States failed to identify examples of similarly situated civil authorities that the state
21 treated better than it treated the United States). Even regulations that discriminate against the
22 government may survive scrutiny if, “the inconsistency is directly related to and justified by significant
23 differences between the two classes.” Davis v. Mich. Dep’t of Treasury, 489 U.S. 803, 804 (1989)
24

25 3 As a matter of law, it is well established that the State of California may lawfully apply its regulatory authority directly to
water rights held by the federal government for a federal reclamation project, so long as doing so is not inconsistent with
26 clear congressional directives regarding the reclamation project. California v. United States, 438 U.S. 645, 675 (1978)
(explaining that Section 8 of the Reclamation Act of 1902 requires Reclamation to comply with state law related to the
27 “control, appropriation, use, or distribution of water”). The United States acknowledges as much in its complaint. (FAC, ¶
87.) There are limits to this the State Board’s authority. It cannot, for example, impose conditions that are “inconsistent with
28 clear congressional directives respecting the project” in question, California, 438 U.S. at 679. The complaint in this case does
not suggest that the Amended Plan does this and focuses instead on the “discrimination” standard. (FAC, ¶¶ 83–94.)
2 B. State Board’s Ripeness Challenge
3 The State Board argues that the IGI claim is not yet ripe for adjudication. (Doc. 17-1 at 30–31.)
4 Ripeness has both constitutional and prudential components. Thomas v. Anchorage Equal Rts. Comm’n,
5 220 F.3d 1134, 1138 (9th Cir. 2000). The constitutional component “is often treated under the rubric of
6 standing and, in many cases, ripeness coincides squarely with standing’s injury in fact prong.” Id. In
7 assessing the constitutional component, a court must “consider whether the plaintiff faces “a realistic
8 danger of sustaining a direct injury as a result of the statute’s operation or enforcement,” or whether the
9 alleged injury is too “imaginary” or “speculative” to support jurisdiction. Id. at 1139. The State Board
10 does not appear to contest the constitutional component of ripeness here.
11 “Prudential considerations of ripeness are discretionary.” Thomas, 220 F.3d at 1142. In
12 evaluating the prudential component of ripeness, courts generally assess ‘both the fitness of the issues
13 for judicial decision and the hardship to the parties of withholding court consideration.’” Ass’n of Am.
14 Med. Colleges v. United States, 217 F.3d 770, 779–80 (9th Cir. 2000) (citation omitted); see also Nat’l
15 Park Hospitality, 538 U.S. 803, 808 (2003) (evaluating whether administrative action is ripe by
16 examining “(1) the issues’ fitness for judicial decision and (2) the hardship to the parties of withholding
17 court consideration”). Some courts apply a slightly more developed, three-pronged test when evaluating
18 the prudential component of ripeness. In Ohio Forestry Ass’n, Inc. v. Sierra Club, 523 U.S. 726, 733
19 (1998), the Supreme Court considered “(1) whether delayed review would cause hardship to the
20 plaintiffs; (2) whether judicial intervention would inappropriately interfere with further administrative
21 action; and (3) whether the courts would benefit from further factual development of the issues
22 presented.” See also Cent. Delta Water Agency v. U.S. Fish & Wildlife Serv., 653 F. Supp. 2d 1066,
23 1083–89 (E.D. Cal. 2009) (applying Ohio Forestry test).
24 The State Board argues that until the Amended Plan has been “implemented”4 it is not possible
25 for the Court to determine if similarly situated persons have been treated differently. (Doc. 17-1 at 31;
26 see also Doc. 21 at 10 (“The State [ ] Board has yet to impose obligations on any water users under the
27

28 4 According to the State Board, the Amended Plan is “not self-implementing.” (Doc. 17-1 at 11.) Rather, the State Board
“will implement the revised flow and salinity objectives through future water right or water quality actions.” (Id.)
2 Reclamation] to meet the salinity limit will be more burdensome than releases required of others.”).) In
3 addition, whether a burden is discriminatory must be viewed in the context of the entire regulatory
4 program. (Id.) As the State Board highlights, the United States’ claim focuses on only one component of
5 a broader regulatory program. (Doc. 31 at 5.) The State Board asserts that assignment of responsibility is
6 likely to be a complex and lengthy process, with the State Board attempting to influence salinity through
7 various means. (Id. at 11.) The State Board offers more detailed arguments corresponding to the three
8 Ohio Forestry factors, which the Court discusses below.
9 C. Hardship Caused by Delay
10 “‘To meet the hardship requirement, a litigant must show that withholding review would result in
11 direct and immediate hardship and would entail more than possible financial loss.’” Wolfson v.
12 Brammer, 616 F.3d 1045, 1060 (9th Cir. 2010) (quoting Stormans, Inc. v. Selecky, 586 F.3d 1109, 1126
13 (9th Cir. 2009)). Delayed review alone ordinarily is not a sufficient hardship to render a challenge ripe,
14 “absent showing that delay will result in irreparable losses, intrusion into daily business decision-
15 making, or the imposition of a Hobson’s choice of whether to comply with a possibly invalid regulation
16 or to violate it in order to challenge it.” U.S. W. Commc’ns v. MFS Intelenet, Inc., 193 F.3d 1112, 1119
17 (9th Cir. 1999).
18 The State Board asserts that Reclamation could not possibly be harmed by the Amended Plan
19 because the Amended Plan did not change Reclamation’s obligations. (Doc. 17-1 at 31.) Relatedly, the
20 Board claims that it cannot enforce any new obligation set forth in the Amended Plan until the Plan is
21 implemented, so the Amended Plan does not force Reclamation to modify its behavior in any way. (Doc.
22 31 at 14.) It is technically true that the Amended Plan did not alter Reclamation’s obligations. The
23 Amended Plan specifically indicated as much. (AP at p. 345 (“As part of implementing the salinity water
24 quality objective for the interior southern Delta, [Reclamation] shall be required to continue to comply
25 with [preexisting] salinity levels, as a condition of its water rights.”).) But, as Reclamation puts it: “the
26

27 5 Unless otherwise indicated, the Court’s page references refer to the page number of the .pdf file available on the Court’s
electronic filing system. (E.g., Doc. X at ##.) However, when the Court wishes to refer to the internal page number of a
28 particular record document, it will refer to that document by its name or abbreviated name followed by “p. ##.”
2 point and precisely what Reclamation is challenging in this litigation.” (Doc. 40 at 12.)
3 It is undisputed that the Amended Plan presently calls upon Reclamation to continue to meet a
4 salinity standard of 0.7 dS/m6 during September through March—a standard that is more stringent than
5 the revised, more relaxed (i.e., higher/saltier) standard of 1.0 dS/m. (AP at p. 34; FAC, ¶ 85.) It is also
6 undisputed that the State Board found the latter, more relaxed standard protective of agricultural
7 beneficial uses in the Delta. (AP at p. 12; FAC, ¶ 85.) It is plausibly alleged that the 0.7 dS/m salinity
8 standard applicable to Reclamation requires Reclamation to release water to ensure compliance with the
9 objective, thereby reducing water available for delivery under contracts the federal government
10 presently holds with irrigation and water districts. (FAC, ¶¶ 9–10.) This, in turn, impairs Reclamation’s
11 ability to satisfy the Congressionally authorized purposes of the New Melones Project, including the
12 provision of water for irrigation, municipal and industrial purposes, power generation, and recreation.
13 (Id., ¶¶ 7, 10.) Though implementation of the Amended Plan is not complete, Reclamation argues it was
14 immediately harmed upon adoption of the Amended Plan. This is because, without the specific
15 requirement that Reclamation continue to meet the 0.7 dS/m standard, Reclamation could have
16 petitioned the Board immediately to amend its water rights permits to operate to the 1.0 dS/m standard.
17 (Doc. 40 at 6, 8, 9, 10, 12.) In the past, when water quality standards have been relaxed, Reclamation
18 has petitioned the Board to amend its water right permits, and those petitions were subsequently granted.
19 (Declaration of Richard J. Woodley, Doc. 40-1, ¶ 7.)7 The Board does not appear to refute this assertion.
20 On this point, the Court agrees with the United States. The State Board’s arguments—that no
21 harm is done because Reclamation’s obligations have not “changed”—ignores the undisputed showing
22 by the United States that continued imposition of the more stringent standard upon Reclamation prevents
23 Reclamation from petitioning to conform its permit(s) to the less stringent standard. Nothing in the
24 present record suggests anything (other than the imposition of the more stringent standard upon
25

26 6 The complaint references the relevant water quality standards using the dS/m unit, while other documents in the record
occasionally use a different unit of measurement, millimhos/centimeter (“mmhos/cm”). (AP at p. 12.) These units appear to
27 be equivalent/interchangeable.
7 As is the case with much of the material offered in support of the briefing on ripeness, this paragraph of the Woodley
28 declaration is supported by judicially noticeable information contained in public records, such as the filing of petitions and
the granting of those petitions. See supra note 1.
2 standard. If past practice is a guide, the record also suggests that such a petition would likely be granted.
3 Given the lack of any showing to the contrary, the Court concludes the Amended Plan causes
4 Reclamation direct and immediate hardship.
5 D. Further Factual Development
6 The State Board argues that the Court’s decision-making would benefit from further factual
7 development because additional facts would help the Court determine whether the Amended Plan indeed
8 violates the IGI doctrine. (Doc. 31 at 16.) In the relevant factors, the Court must consider the “broader
9 regulatory context” because a state provision that appears to treat the United States differently on the
10 most specific level of analysis may not be discriminatory in the broader context. North Dakota, 495 U.S.
11 at 438.
12 The State Board argues that the “broader regulatory context” in this case includes
13 implementation of the water quality objectives and other measures that have been included in the Bay-
14 Delta Plan Amendments. (Doc. 31 at 6.) Furthermore, the State Board argues that the “significant
15 differences” between Reclamation and other water right holders in the San Joaquin River Basin
16 necessitate further factual development. (Id.) According to the Board, “[a]t this point, without further
17 factual development occurring during the implementation phase, the Court cannot evaluate whether the
18 Federal Government is being treated better or worse than any other party nor whether there are
19 significant differences between the Federal Government and others justifying inconsistent burdens.”
20 (Id.) This argument continues as follows:

21 The facts regarding the burdens imposed on Reclamation and any basis for
inconsistent treatment will not be fully developed until the Board has
22
received evidence about the characteristics and impacts of the various
23 water users in the watershed and assigned responsibilities for meeting the
objectives. It is premature to adjudicate the IGI claim before these facts
24 are developed for the record.
25 (Doc. 31 at 18–19.)
26 The State Board’s initial briefs provided some examples of possible ways further regulatory
27 action might inform the relevant inquiry. In the past, the State Board has included in the water rights
28 permits held by junior water right holders (i.e., those who hold rights lower in priority than
2 meet a water quality objective. (Doc. 31 at 16.) Standard Permit Term 91, which has been included in
3 certain water rights permits since 1978, prohibits diversion of water when stored water is being released
4 by Reclamation and DWR to meet Delta water quality objectives. (Doc. 32-3 at 8); El Dorado Irrigation
5 Dist. v. State Water Res. Control Bd., 142 Cal. App. 4th 937 (2006). Likewise, Standard Permit Term
6 93, which has been included in certain permits in the San Joaquin River system since 1983, provides that
7 diversions are prohibited when Reclamation is releasing water from New Melones to maintain water
8 quality at Vernalis. (Doc. 32-3 at 59–60.) According to the Board, Terms 91 and 93 reflect the State
9 Board’s determination that other junior water right holders must “share in the responsibility of meeting
10 Delta water quality standards by curtailing diversions.” (Id. at 10.)8
11 The United States addresses this argument obliquely, suggesting that further factual development
12 is unnecessary because “[t]he Amended plan on its face establishes disparate treatment of Reclamation,
13

14 8 Related to this point, the State Board also attempts to invoke the second Ohio Forestry factor, which permits the Court to
consider whether judicial intervention would interfere with the State Board’s administrative Process (Doc. 31 at 15 (citing
15 Ohio Forestry, 523 U.S. at 735 “([P]remature review ‘denies the agency an opportunity to correct its own mistakes and to
apply its expertise’[ ].”).) The State Board argues that it should be allowed to refine its policy vis-à-vis Reclamation during
16 the implementation phase by, among other things, “consider[ing] further refinements to the Bay-Delta Plan itself.” (Id. (“The
Board should be given the opportunity to allocate responsibilities and possibly revise the Plan itself prior to Court
17 intervention.”).) This argument is not convincing for several reasons. First, the “interference with administrative process”
factor was articulated in Ohio Forestry in the context of a challenge to a program-wide Forest Plan and related regulatory
18 regime that provided a specific pathway for revision of the Forest Plan in the face of a site-specific project that did not
conform to that plan. See Ohio Forestry, 523 U.S. at 735 (citing 53 Fed. Reg. 23807, 26836 (1988) (setting forth specific
19 procedure for amending Forest Plan in face of a conflicting site-specific plan)). This factor is most often found dispositive in
similar situations, where waiting for site-specific implementation will afford meaningful opportunities to amend a broader
20 regulatory regime, see Citizens for Better Forestry v. U.S. Dep’t of Agric., No. C 05-1144 PJH, 2006 WL 1072043, *5 (N.D.
Cal. Apr. 21, 2006) (applying Ohio Forestry’s interference factor to find a claim unripe where relevant regulation could be
21 amended or refined prior to any site-specific action); Or. Nat. Desert Ass’n v. Shuford, No. CIV. 06-242-AA, 2007 WL
1695162, *15 (D. Or. June 8, 2007), aff’d sub nom. Or. Nat. Desert Ass’n v. McDaniel, 405 F. App’x 197 (9th Cir. 2010)
22 (finding unripe a challenge to grazing management plan because agency could adjust the specific terms and conditions at the
site-specific level), or in other situations where an agency’s action remains truly uncertain, see S. Cal. Inst. of L. v. Biggers,
23 No. SACV 13-193 JVS (RNBsx), 2013 WL 11317728, at *7 (C.D. Cal. June 12, 2013) (finding that deprivation of asserted
property interest remained “only conjectural”). In contrast, the factor does not come into play when an agency has reached a
final policy decision. See Ctr. for Biological Diversity v. U.S. Fish & Wildlife Serv., 450 F.3d 930, 940 (9th Cir. 2006)
24
(judicial review of biological opinion would not impermissibly interfere with further administrative action because policy
was fixed upon issuance of biological opinion). This case is not a situation in which further site-specific action may change
25
the Amended Plan’s policy toward Reclamation; rather, as discussed in the body of this order, further administrative action
may modify how the Amended Plan impacts other water users and therefore how the IGI claim will be evaluated. The
26 Board’s policy toward Reclamation is “at an administrative resting place” and therefore judicial review will not interfere with
further administrative action vis-à-vis Reclamation. See Citizens for Better Forestry v. U.S. Dep’t of Agric., 341 F.3d 961,
27 977 (9th Cir. 2003). As the United States points out, “[i]f a government agency’s contention that it might amend a decision in
the future means that a challenge to that decision is not ripe, then governmental decision-making would rarely be subject to
28 challenge.” (Doc. 40 at 16.) The Court agrees with the United States on this. To find otherwise would turn this Ohio Forestry
factor into a black hole that would absorb almost any administrative action and render it unripe.
2 According to the United States, delaying review until after the Board implements the Amended Plan
3 because the Board “might impose different types of obligations on other water users (such as curtailing
4 diversions) to ‘assist’ in meeting the salinity objectives,” does nothing to overcome the fact that the
5 Board has not “m[ade] any representation that it might impose the prior, more stringent standard on
6 anybody other than Reclamation at the relevant compliance point.” (Id. at 18.)
7 Though the United States’ arguments seem logical at first glance, they largely miss the more
8 essential point by presuming that the United States is similarly situated to other water users. The Court
9 cannot tell from the complaint or any other document in the record which water users the United States
10 considers to be comparators.9 Assuming comparators can be identified, the relevant authorities appear to
11 require that the Court determine: (1) whether those water users are in fact similarly situated; (2) whether
12 they are being treated differently in some material way vis-à-vis Reclamation; and whether “significant
13 differences between the two classes justify the [disparate] burden.” United States v. Kernen Constr., 349
14 F. Supp. 3d 988, 993 (E.D. Cal. 2018) (citing North Dakota, 495 U.S. at 438). It is unclear how the
15 Court can will perform this analysis without knowing the magnitude of the disparate impact (i.e., how
16 the impacts to the United States compare to the impacts to other water users), the nature of the other
17 water users, and the reasons why the State Board imposes different obligations upon other water users
18 vis-à-vis Reclamation. As a practical matter, the Court cannot properly undertake its duties until the
19 Board completes implementation as to at least some purportedly similar water user(s).10
20

21 9It appears to be well established that Reclamation is a highly unique water user in many ways, including being one of the
principle causes of salinity exceedances at Vernalis. (See FAC, ¶ 90 (acknowledging and not challenging the Board’s
22 assertion that the Board’s Decision 1641 found “that Reclamation was the principle cause of salinity exceedances at
Vernalis”).) The complaint in this case alleges that other factors and water users contribute to salinity problems downstream
23 of Vernalis and that “the Amended Plan ignores all of these sources of salinity problems (other than the CVP and [State
Water Project], and instead [] requires Reclamation to mitigate salinity impacts caused by other users.” (FAC, ¶ 91.) That
others contribute to salinity problems does not—at least not obviously—address the need to identify similarly situated water
24
users.

25 10 The Court is unpersuaded by amicus curiae’s argument that the United States is advancing a “purely legal claim” and
therefore that further factual development is unnecessary. (Doc. 47 at 10 (citing Hotel Emples. & Rest. Emples. Int’l Union v.
26 Nev. Gaming Comm’n, 984 F.2d 1507, 1513 (9th Cir. 1993) (holding that facial preemption challenge to a reporting and
disclosure requirement a gaming regulatory system was ripe for review because it was “predominantly a legal question,
27 resolution of which would not be aided greatly by development of a more complete factual record”).) That the United States
attempts to frame its IGI claim as a purely legal one does not make it so. As discussed, the very nature of the IGI claim
28 asserted in this case demands factual comparisons to how other water users are treated. Hypothetically, a plaintiff could bring
an IGI claim that is purely legal under a “direct regulation” theory. See North Dakota, 495 U.S. at 435 (“A state regulation is
2 how the Board is implementing the Amended Plan as to some water users other than Reclamation. The
3 parties largely agree on the procedural status of those examples but not on how those implementation
4 efforts bear on the question of ripeness. The Court has examined each in detail.
5 1. Development of Comprehensive Operations Plan
6 The United States’ supplemental briefs emphasize the Amended Plan’s requirement that
7 Reclamation and the California Department of Water Resources together develop a “Comprehensive
8 Operations Plan” that, among other things, will address measures to meet the salinity objectives of the
9 Amended Plan. (AP at p. 36.) The United States concedes that the COP is still under development. (Doc.
10 66 at 2.) However, the United States points to a July 9, 2019, letter sent by the State Board to
11 Reclamation requesting that it submit a draft COP by August 25, 2019. (Doc. 61-3.) That letter expressly
12 stated that “[t]he amendments, including revised salinity objectives, were approved by the Office of
13 Administrative Law on February 25, 2019 and are now in effect under state law.” Id. This, according to
14 the United States, demonstrates that “nothing can or will change with respect to Reclamation’s salinity
15 obligations under the Amended Plan.” Id. This reiterates the basic problem with the United States’
16 argument: it has not identified a comparator. Even assuming the facially disparate obligation imposed
17 upon Reclamation under the Amended Plan remains in place, this establishes only one element of the
18 IGi claim. The Court still must be able to compare the requirements imposed upon Reclamation to those
19 imposed upon others and the justification(s) for any disparate treatment.
20 2. Water Quality Certifications for FERC Relicensing on the Merced and Tuolumne
21 Rivers
22 Merced Irrigation District (“Merced”), which operates hydroelectric facilities on the Merced
23 River, and Turlock Irrigation District and Merced Irrigation District (“TID/MID”), which jointly operate
24 hydroelectric projects on the Tuolumne River, presently are pursuing renewal of licenses for those
25 projects with the Federal Energy Regulatory Commission(“FERC”). (See Docs. 60-3, 60-4.) As part of
26

27 invalid only if it regulates the United States directly or discriminates against the Federal Government or those with whom it
deals.”). However, as noted above, the United States does not appear to advance a “direct regulation” IGI claim here, even
28 though direct regulation is undisputedly occurring, focusing its allegations instead on the theory that the Amended Plan
unlawfully discriminates against the United States. See supra note 3.
2 comply with state water quality laws. 33 U.S.C. 1341(a)(1), (d). Under California law, the State Board is
3 authorized to provide such certifications, when appropriate. Cal. Water Code § 13160(b)(1); Cal. Code
4 Regs, tit. 23, § 3838(a).
5 In early 2021, the State Board issued the certifications for the TID/MID projects. (Docs. 60-3,
6 60-4.) Both certifications provide that the licensee “shall not divert water when, in order to meet the
7 southern Delta salinity objective established in the [Amended Plan], [Reclamation] is releasing stored
8 water from New Melones Reservoir to avoid exceedance of 0.7 [] (dS/m) electrical conductivitiy (EC) at
9 Vernalis (April – August) and 1.0 dS/m EC at Vernalis (September– March).” (Docs. 60-3 at 46, 60-4 at
10 62.) The licensees are required to consult with Board staff monthly during times when Reclamation may
11 release stored water to achieve the Vernalis salinity requirement to determine whether the condition
12 applies. ((Doc. 60-3 at 46–47, 60-4 at 62.) The condition does not apply when curtailing diversions
13 would not be effective in lowering salinity concentration at Vernalis. (Doc. 60-3 at 47, 60-4 at 62.)
14 In early 2019, the D.C. Circuit decided Hoopa Valley Tribe v. FERC, 913 F.3d 1099 (D.C. Cir.
15 2019), which held that the State Board had waived its authority to issue a water quality certification in
16 relation to the FERC relicensing application at issue in that case. Considering Hoopa Valley and to avoid
17 the State Board’s imposition of conditions upon their projects, Merced and TID/MID petitioned FERC
18 for a determination that the State of California had waived its certification authority as to their re-
19 licensing applications. See Turlock Irrigation Dist. v. FERC, 36 F.4th 1179, 1182 (D.C. Cir. 2022), cert.
20 denied, 143 S. Ct. 1746, 215 L. Ed. 2d 648 (2023); Cal. State Water Res. Control Bd. (“SWRCB”) v.
21 FERC, 43 F.4th 920, 923 (9th Cir. 2022), cert. denied sub nom. Nevada Irrigation Dist. v. SWRCB., 143
22 S. Ct. 2459, 216 L. Ed. 2d 431 (2023). At the administrative level, FERC found that the State Board had
23 not waived its authority as to TID/MID, Turlock, 36 F.4th at 1182–83, but had waived its authority as to
24 Merced, SWRCB, 43 F.4th at 923. On appeal, the Ninth Circuit found that there had been no waiver as to
25 any of the FERC re-licensing applications. Turlock, 36 F.4th 1179; SWRCB, 43 F.4th 920.
26 The culmination of that litigation resolves only that the conditions imposed by the State Board
27 on the Merced and TID/MID licenses as part of the certification process are not barred because of
28 waiver. However, other questions remain. For one, FERC has yet to issue licenses to Merced or
2 pursuing separate lawsuits in state court challenging the water quality certifications on other grounds.
3 See Merced Irrigation Dist. vs. SWRCB et al., Madera County Superior Ct., Case No. MCV087985;
4 Turlock Irrigation Dist. et al., v. SWRCB. et al., Tuolumne County Superior Ct., Case No. CV63819;
5 City and County of San Francisco by and through its Public Utilities Commission v. SWRCB. et al.,
6 Tuolumne County Superior Ct., Case No. CV63838. Those state law cases remain pending before those
7 trial courts. In sum, it remains unclear when the conditions imposed upon Merced and/or TID/MID by
8 the State Board will be implemented, let alone when the impacts of those conditions will become clear
9 enough to shed light on this Court’s analysis of the IGI claim presented here.
10 3. State Board’s Initiation of Rulemaking to Allocate Responsibility for Implementing
11 Lower Jan Joaquin River Flow and Southern Delta Salinity Components of the
12 Amended Plan
13 In a joint status report filed August 9, 2023, the State Board reports on a related development
14 that it believes bears on the prudential ripeness issue. (Doc. 66 at 7.) On August 8, 2022, the State Board
15 initiated a rulemaking process for a proposed regulation to allocate responsibility to water rights holders
16 for implementing the Lower San Joaquin River flow and southern Delta salinity components of the
17 Amended Plan. See SWRCB, Revised Notice of Preparation of CEQA Scoping Meeting, available at:
18 https://www.waterboards.ca.gov/public_notices/notices/revised_notice_ceqa_baydelta_nop.pdf (last
19 visited August 29, 2023). According to the State Board, once that rulemaking process is complete, “the
20 full scope of responsibility for water right holders’ contributions to meeting unimpaired flows and
21 salinity requirements—and any correlative benefits from flows to achieving lower salinity
22 downstream—will be known and the relative position of the United States will be well developed.”
23 (Doc. 66 at 7.) The State Board maintains that only then “will the Court be able to weigh the burdens
24 imposed on Reclamation against the burdens imposed on others and the basis for imposing
25 responsibility.” (Id.) The United States did not address these points.
26 Though it is unclear when this regulatory process will be complete, the Court finds the State
27 Board’s arguments on this matter compelling. It appears that the subjects covered by this rulemaking are
28 likely to bear materially on the issues the Court must evaluate to resolve the United States’ IGI claim.
2 Considering the above examples, the Court is convinced that further factual development will aid
3 the Court’s decision making in this case. To evaluate the IGI claim, the Court must be able to compare
4 the impacts of the Amended Plan on Reclamation to the impacts upon some comparator entity. At this
5 time, it is unclear how the Court could do so. In addition, the State Board has pointed to ongoing
6 rulemaking procedures that are designed to get at the heart of the key issues. The Court finds the
7 “further factual development” factor weighs strongly against a finding of prudential ripeness.
8 The Court fully understands the United States’ frustration with the situation. As discussed above,
9 the United States has plausibly alleged it is being harmed by the requirement that it continue to abide by
10 a salinity standard that is more stringent than the standard applied to all other water users under the
11 Amended Plan. The hardship factor “serves as a counterbalance to any interest the judiciary has in
12 delaying consideration of a case.” Oklevueha Native Am. Church of Hawaii, Inc. v. Holder, 676 F.3d
13 829, 838 (9th Cir. 2012); Health Care Auth. v. Azar, No. 3:19-CV-06137-BHS-TLF, 2020 WL 7049324,
14 at *7 (W.D. Wash. July 27, 2020), report and recommendation adopted, No. 3:19-CV-06137-BHS,
15 2020 WL 6336456 (W.D. Wash. Oct. 29, 2020) (declining to evaluate hardship where claim was
16 otherwise fit for judicial review); see also Alaska Airlines Inc. v. Schurke, No. C11-0616JLR, 2012 WL
17 503862, at *13 (W.D. Wash. Feb. 14, 2012) (finding the plaintiff will not “suffer a direct and immediate
18 hardship that is significant enough to justify the court’s exercise of jurisdiction over this matter at this
19 time”).
20 The Court is also sympathetic to the United States’ contention that “implementation” of the
21 Amended Plan by the Board has no set timeframe. (Doc. 64 at 5.) The Board, in fact, concedes that
22 implementation is “in the beginning stage.” (Doc. 60 at 4.) The prudential ripeness jurisprudence does
23 not speak directly to the amount of time a Court should permit for the development of additional facts.
24 But what is clear is that it allows the Court to avoid engaging in the merits until the facts will permit it to
25 evaluate properly the issue before it. That time is not now, at least not based upon the present allegations
26 in this matter.11 The motion to dismiss the IGI claim on prudential ripeness grounds is GRANTED.
27

28 11 The United States has not requested leave to amend its IGI claim, nor can the Court envision how the claim could be
amended now to cure the ripeness issues identified herein.
1 Remaining Claims
2 This leaves up for consideration the status of the remaining claims in this case, all of which arise
3 || under state law and are before this Court pursuant to 28 U.S.C. § 1345 (providing for district court
4 || jurisdiction where the United States is the plaintiff). This Court previously found it would be appropriate
5 || to stay those claims pursuant to the abstention doctrine set forth in Colorado River Water Conservation
6 | District v. United States, 424 U.S. 800 (1976), (Doc. 28 at 22—28), but the Ninth Circuit reversed as to
7 || that determination, finding that (1) the Colorado River abstention doctrine generally does not allow a
g to impose a partial stay; (2) the presence of claims in the federal suit that do not overlap those in
g state suit (1.e., the IGI claim) give rise to a presumption that Colorado River is inapplicable; (3) and
10 || nothing about the United States’ litigation strategy overcomes that presumption. (Doc. 49.) Dismissal of
11 || the IGI claim has, at least arguably, upset the circumstances in place when the Ninth Circuit ruled. In
12 || addition, in the interim the parallel state law cases have proceeded forward. Accordingly, within 30
13 || days of the date of this order, the Court directs the parties to submit supplemental briefs, no longer
14 | than 10 pages in length, addressing applicability of Colorado River given the present procedural posture
15 | of the case.
16
IT IS SO ORDERED.
17
ig| Dated: _ August 30, 2023 Cerin | Tower
TED STATES DISTRICT JUDGE